Fan Unit Selection Design Quick
CFM: calculate required airflow (rack kW x 100 CFM). Mount: top or rear of rack. Noise:
Outdoor integrated cabinets for telecom, power and industrial sites, with weatherproof and application-specific designs.
CFM: calculate required airflow (rack kW x 100 CFM). Mount: top or rear of rack. Noise:
Perimeter: fence/wall around building. Door: access control card + PIN. CCTV: all entrances recorded 24/7. Motion: PIR inside after hours.
Earth: rack bonded to building earth bar. Conductor: minimum 6mm2 green/yellow. Busbar: copper busbar inside rack. Resistance: under 1 ohm
Floor standing: standard, most common. Wall mount: small rack, limited floor space. Freestanding: open frame, no sides. Disconnect: casters for
Blank every unused U position. Prevents: hot air recirculating to front intake. Without blanks: servers overheat even at low load.
Voltage: 380/220V three-phase. Incoming: from transformer or main switchgear. Outgoing: feeds UPS, AC, lighting, sockets. Breakers: MCB/MCCB per circuit. Metering:
Earth: rack bonded to building earth bar. Conductor: minimum 6mm2 green/yellow. Busbar: copper busbar inside rack (all devices bond). Resistance:
Aisle: hot/cold, 1200mm minimum. Rack spacing: 600mm between rows minimum. Access: front 1200mm, rear 1000mm. Corridor: 1500mm for equipment cart.
Post: on wall next to rack. List: IT on-call, facilities, security, electrician. Include: names, phone, email. Update: when staff changes.
Fan units: 1 spare fan tray. PDU: 1 spare PDU. Filter: 2 spare air filters. Lock: 1 spare lock core.