Page Positioning: Professional-grade standard specification manual for homestay container house installation, construction, and system commissioning, targeted at cultural tourism project developers, engineering construction teams, homestay operators, and prefabricated building industry professionals.
Keyword Density Control: Core primary keyword density between 2.2%-2.8%, long-tail keywords distributed naturally throughout the content, related keywords integrated contextually within relevant scenarios.
Title Tag
Complete Installation and Commissioning Manual for Homestay Container Houses_Complete Container Homestay Construction and Installation Process_Water, Electrical, Waterproofing, and Commissioning Standards – Guangzhou Lain Intelligent System Development Co., Ltd.
Meta Keywords
Homestay container installation and commissioning, container homestay installation process, homestay container construction plan, mobile homestay container installation tutorial, influencer homestay container water and electrical installation, homestay container foundation construction, homestay container waterproofing methods, Guangzhou Lain homestay container manufacturer.
Meta Description
Guangzhou Lain Intelligent System Development Co., Ltd. provides a professional homestay container installation and commissioning manual, covering the complete process guide for container homestay foundation construction, main structure installation, water, electrical, HVAC commissioning, waterproofing and insulation construction, acceptance standards, and maintenance procedures. Professional homestay container custom manufacturer, supporting integrated installation services for cultural tourism, scenic area, and rural container homestays. Technical support hotline: 13538869979.
H1 Tag
Complete Installation and Commissioning Manual for Homestay Container Houses | Full-Process Specification for Container Homestay Construction, Installation, and System Commissioning
H2 Tag System
- Product Overview and Technical Parameters of Homestay Container Houses
- Pre-Installation Preparation and Site Survey for Homestay Container Houses
- Main Structure Installation and Construction Standards for Homestay Container Houses
- Enclosure System Installation Techniques for Homestay Container Houses
- Door and Window System Installation and Commissioning for Homestay Container Houses
- Water and Electrical System Installation and Commissioning Standards for Homestay Container Houses
- HVAC Comfort System Installation and Commissioning for Homestay Container Houses
- Waterproofing and Insulation System Construction Guide for Homestay Container Houses
- Interior Decoration and Soft Furnishing Installation Process for Homestay Container Houses
- Ancillary Facility Installation and Construction Requirements for Homestay Container Houses
- Overall Integrated Commissioning and Completion Acceptance for Homestay Container Houses
- Daily Use and Maintenance Manual for Homestay Container Houses
- Installation Safety Standards and Emergency Response Plans for Homestay Container Houses
- Manufacturer Service System and Contact Information
Internal Link Optimization Anchor Text System
Core Anchors: Homestay container, container homestay, homestay container installation and commissioning
Long-tail Anchors: Homestay container manufacturer customization, mobile homestay container installation process, homestay container water and electrical installation tutorial, homestay container waterproofing construction techniques, influencer homestay container integrated decoration
Related Anchors: Occupiable container, modular homestay, prefabricated homestay, cultural tourism homestay container, rural homestay container, scenic area container homestay
Chapter 1: Product Overview and Technical Parameters of Homestay Container Houses
1.1 Product Definition of Homestay Container Houses
Homestay container houses fall within the category of prefabricated modular buildings. They are movable living spaces created by using standard container box bodies as base units, modified through structural reinforcement, thermal insulation, water and electrical integration, and interior decoration processes. They represent a mainstream product form in the cultural tourism homestay, rural revitalization, and camp resort sectors. Homestay container houses produced by Guangzhou Lain Intelligent System Development Co., Ltd. follow modular design principles, achieving factory prefabrication and rapid on-site assembly, significantly shortening the project implementation cycle for homestay projects while offering core advantages including mobility, reusability, environmental protection, and low carbon footprint.
As a high-end subcategory of occupiable containers, homestay container houses place greater emphasis on spatial experience, decoration quality, and scenario adaptability while meeting basic residential functions. They can be developed into various forms based on project positioning, including influencer check-in homestays, family vacation homestays, luxury safari camp homestays, and rural wellness homestays, serving as the core carrier of modular homestays. Compared to traditional brick-and-concrete homestays, container homestay construction periods can be shortened by over 70%, overall construction costs reduced by 30%-50%, and construction waste emissions amount to less than 10% of traditional buildings, fully aligned with the development trend of prefabricated homestays.
1.2 Product Classification of Homestay Container Houses
1.2.1 Classification by Container Box Size and Specification
Standard Single-Box Homestay Container Houses:
- 20-foot Standard Model: External dimensions 6058mm × 2438mm × 2896mm, internal usable area approximately 13㎡, suitable for single guest rooms, mini suites, and ancillary service rooms. This is the fundamental model for rural homestay containers.
- 40-foot Standard Model: External dimensions 12192mm × 2438mm × 2896mm, internal usable area approximately 28㎡, configurable with independent bedroom, bathroom, and leisure area. This is the mainstream specification for scenic area container homestays.
- 40-foot Height-Increased Model: External dimensions 12192mm × 2438mm × 3175mm, internal clear height increased to above 2.7m, providing a stronger sense of space. Suitable for high-end influencer homestay container projects.
Combined and Expanded Homestay Container Houses:
- Horizontal Joint Model: 2-4 container boxes connected horizontally to form a large open space, suitable for creating homestay public living rooms, dining areas, conference rooms, and other functional zones. Ideal for public supporting facilities in cultural tourism homestay containers.
- Multi-Level Stacked Model: 2-3 layers of container boxes stacked vertically, complemented with outdoor staircases and terraces to form multi-level homestay buildings, significantly improving land utilization. This is a common solution for camp resort homestays.
- Irregular Combination Model: Creates distinctive architectural forms through offset connections, cantilever designs, and angular arrangements to achieve influencer check-in appeal, commonly seen in urban suburban influencer homestay container projects.
1.2.2 Classification by Decoration Grade
- Economy Homestay Container Houses: Basic decoration configuration meeting fundamental residential needs, suitable for staff dormitories, temporary accommodation, and budget rural homestay projects.
- Comfort Homestay Container Houses: Standard refined decoration configuration with integrated private bathrooms, branded appliances, and storage systems. This is the primary selection for most cultural tourism homestay projects.
- Light Luxury Homestay Container Houses: High-end decoration materials paired with smart control systems, custom furniture, and panoramic floor-to-ceiling windows. Positioned for the mid-to-high-end resort market, corresponding to high-end homestay container customization needs.
1.2.3 Classification by Functional Scenario
- Accommodation Guest Room Type: Standard homestay guest room including bedroom, bathroom, and leisure area.
- Public Supporting Type: Homestay front desk, restaurant, café, reading lounge, and public bathroom facilities.
- Featured Experience Type: Star-gazing rooms, bubble tent supporting facilities, children’s themed rooms, and hot spring supporting rooms.
- Logistics Support Type: Staff dormitories, linen rooms, storage rooms, and equipment rooms.
1.3 Core Advantages of Homestay Container Houses
1.3.1 Efficient Construction and Short Implementation Period
Homestay container houses utilize factory prefabrication, with over 80% of processes completed in the factory. On-site work only requires foundation construction, container lifting, connection fixing, and terminal commissioning. The main structure of a single container can be installed in as little as 1 day, with the entire project from ordering to delivery taking only 30-45 days, significantly faster than the 6-12 month construction period of traditional brick-and-concrete buildings. This enables rapid project deployment and operation for cultural tourism projects, helping to capture market opportunities early.
1.3.2 Modular Design with Flexible Reusability
Modular homestays adopt standard unit-based design, allowing flexible adjustment of container quantities and combinations based on operational needs. When projects relocate or sites change, the entire structure can be disassembled and moved to new locations for reassembly, with asset reuse rates reaching over 90%, significantly reducing secondary investment costs. This characteristic makes mobile homestay containers particularly suitable for cultural tourism projects on temporary land or with limited lease periods, avoiding resource waste associated with demolition of traditional buildings.
1.3.3 Stable Performance, Safe and Reliable
The main structure of Guangzhou Lain homestay container houses is welded from Q235B carbon structural steel, with the overall frame achieving a seismic resistance rating of level 8, wind resistance rating of level 12, and roof uniform load capacity of 0.5KN/㎡, meeting the climatic and geological requirements of most regions. Walls and roof integrate multi-layer insulation, fire protection, and sound insulation structures, providing living comfort equivalent to traditional houses and fully complying with safety standards for occupiable containers.
1.3.4 Environmentally Friendly, Low Carbon, and Policy Aligned
The construction process of homestay container houses primarily involves dry operations, generating no significant construction waste or dust pollution on site. The main structural steel can be 100% recycled, aligning with green building development concepts. Additionally, container homestays fall within the category of temporary buildings, making land use approval procedures relatively straightforward in most regions. This is particularly suitable for policy-encouraged projects such as rural revitalization and cultural tourism development, effectively solving the pain point of difficult approval processes for homestay projects.
1.3.5 Outstanding Cost Performance and Fast Investment Returns
Compared to traditional homestay construction, container homestays have lower comprehensive construction costs, and shorter construction periods mean earlier operational launch and earlier revenue generation. Furthermore, standardized production brings stronger quality consistency, lower maintenance costs in later stages, and a significantly shorter overall investment payback period compared to traditional homestay projects, making them a popular choice for current cultural tourism investment.
1.4 Application Scenarios for Homestay Container Houses
1.4.1 Rural Cultural Tourism Homestays
Leveraging rural natural ecology and pastoral scenery, create distinctive rural homestay container clusters complemented with dining, leisure, agricultural experience, and other business formats to support rural revitalization and rural tourism development. Container exteriors can be adapted to rural aesthetics using wood grain, stone texture, and other facade materials for natural integration with the surrounding environment.
1.4.2 Scenic Area Resort Homestays
In natural scenic areas, forest parks, lakeside, and coastal regions, develop scenic area container homestays to avoid large-scale earthworks that damage the ecological environment. Container quantities can be flexibly adjusted based on visitor flow peaks and valleys—increasing during peak seasons and reducing during off-seasons to lower operational risks. Influencer homestay containers paired with distinctive landscapes easily become scenic area check-in points, driving visitor growth.
1.4.3 Campground Homestays
In RV campgrounds, camping bases, and outdoor adventure campsites, configure mobile homestay containers as premium accommodation units. Compared to tents, they offer superior comfort and safety, enabling year-round operation and enhancing the campground’s reception capacity and average guest spending. The modular design facilitates overall camp planning and phased construction.
1.4.4 Urban Suburban Influencer Homestays
Create influencer container homestay clusters on the outskirts of cities, paired with cafés, camping, team building, and other business formats, becoming weekend micro-vacation destinations for urban residents. The distinctive container shapes and industrial-style design carry inherent social media appeal, easily driving customer acquisition through short video platforms.
1.4.5 Other Derived Scenarios
Including distinctive town supporting accommodation, research and education base dormitories, post-disaster temporary housing, and construction site temporary office accommodation. Homestay container houses can be rapidly adapted to meet various needs, leveraging their core advantages of rapid deployment and mobile reusability.
1.5 Technical Parameter Standards for Homestay Container Houses
These parameters are established in accordance with Guangzhou Lain Intelligent System Development Co., Ltd. enterprise standard Q/LA-MS-2026 “General Technical Conditions for Homestay Container Houses.” All factory-produced products comply with the following technical specifications.
1.5.1 Standard Dimension Parameter Table
| Model | External Dimensions (L×W×H) | Internal Net Dimensions (L×W×H) | Internal Usable Area | Self-Weight | Design Service Life |
|---|---|---|---|---|---|
| LA-MS20-Standard | 6058mm×2438mm×2896mm | 5800mm×2200mm×2500mm | ≈12.76㎡ | Approx. 2.2t | 20+ years |
| LA-MS40-Standard | 12192mm×2438mm×2896mm | 11900mm×2200mm×2500mm | ≈26.18㎡ | Approx. 3.8t | 20+ years |
| LA-MS40-Height Increased | 12192mm×2438mm×3175mm | 11900mm×2200mm×2780mm | ≈26.18㎡ | Approx. 4.1t | 20+ years |
| LA-MS20-Light Luxury | 6058mm×2438mm×2896mm | 5800mm×2200mm×2500mm | ≈12.76㎡ | Approx. 2.5t | 25+ years |
| LA-MS40-Light Luxury | 12192mm×2438mm×3175mm | 11900mm×2200mm×2780mm | ≈26.18㎡ | Approx. 4.5t | 25+ years |
1.5.2 Structural Mechanical Parameters
- Main Structure Material: Q235B carbon structural steel
- Bottom Frame Main Beam Specification: 16# I-beam / 120×60×3mm rectangular tube
- Column Specification: 100×100×3mm square tube
- Top Frame Main Beam Specification: 100×50×3mm rectangular tube
- Roof Uniform Live Load: ≥0.5KN/㎡
- Floor Uniform Live Load: ≥2.0KN/㎡
- Wall Wind Load: ≥0.55KN/㎡
- Seismic Fortification Intensity: Level 8
- Wind Resistance Rating: Level 12
- Structural Weld Grade: Grade 2 welds
1.5.3 Thermal Insulation Parameters
- Wall Insulation Layer Thickness: 50mm/75mm/100mm optional
- Roof Insulation Layer Thickness: 75mm/100mm optional
- Insulation Material: High-density glass wool / rock wool / polyurethane sandwich panel
- Wall Thermal Conductivity: ≤0.042W/(m·K)
- Roof Thermal Conductivity: ≤0.040W/(m·K)
- Summer Indoor-Outdoor Temperature Difference: 8-12℃
- Winter Indoor-Outdoor Temperature Difference: 10-15℃
1.5.4 Fire Protection Performance Parameters
- Wall Fire Resistance Rating: Class A non-combustible (rock wool/glass wool core material)
- Roof Fire Resistance Rating: Class A non-combustible
- Floor Fire Resistance Rating: Class B1 flame-retardant
- Interior Panel Fire Resistance Rating: Class B1 flame-retardant
- Overall Building Fire Resistance Limit: ≥1.5 hours
1.5.5 Sound Insulation Performance Parameters
- Wall Airborne Sound Insulation: ≥35dB (75mm insulation layer)
- Roof Airborne Sound Insulation: ≥30dB
- Floor Impact Sound Insulation: ≤65dB (double-layer structure)
- Door and Window Sound Insulation: ≥25dB (insulated glass)
1.5.6 Waterproofing Performance Parameters
- Roof Waterproofing Grade: Level II
- Roof Waterproofing Layer Service Life: ≥10 years
- Wall Waterproofing Grade: Level I
- Kitchen and Bathroom Waterproofing Grade: Level I
- Weld Waterproofing Leakage Rate: 0
1.6 Detailed Structural Composition of Homestay Container Houses
Homestay container houses consist of six core systems: the bottom load-bearing system, main steel frame system, enclosure wall system, roof system, door and window system, and internal functional integration system. Each system is prefabricated in the factory, then assembled and commissioned on site.
1.6.1 Bottom Load-Bearing System
The bottom load-bearing system is the load transfer core of the entire homestay container house, consisting of bottom frame main beams, secondary beams, floor load-bearing joists, and anti-corrosion chassis. It bears the self-weight of the container, indoor live loads, and furniture and equipment weight, evenly transferring loads to the foundation.
- Bottom Frame Main Beams: Arranged along the length direction of the container, using I-beams or large-section rectangular tubes. These are the primary load-bearing members, welded to columns at both ends.
- Bottom Frame Secondary Beams: Arranged at equal intervals (400-600mm spacing) along the width direction, welded to main beams, supporting floor panels.
- Anti-Corrosion Chassis: Galvanized steel plate laid at the bottom or treated with epoxy zinc-rich anti-corrosion coating to isolate ground moisture and prevent corrosion of bottom steel.
- Bottom Reserved Interfaces: Pre-reserved water supply and drainage interfaces, weak current and power cable entry interfaces, and sewage discharge interfaces, precisely positioned according to design drawings.
1.6.2 Main Steel Frame System
The main steel frame is the load-bearing skeleton of the homestay container house, consisting of columns, top frame, wall studs, and reinforcement connectors, determining the structural strength and overall stability of the container.
- Columns: Arranged at the four corners and intermediate intervals of the container, welded from square tubes with full-penetration welds connecting to the top frame and bottom frame at upper and lower ends respectively. These are the primary vertical load transfer members.
- Top Frame: Formed by welding main beams and secondary beams into an integrated frame, connected to column tops, bearing roof loads while providing installation foundations for roof panels and ceilings.
- Wall Studs: Vertical and horizontal studs arranged in a cross pattern at 400mm spacing, providing fixing foundations for interior and exterior wall panels. Door and window openings are reinforced with additional studs.
- Connection Nodes: All welded nodes receive anti-rust and anti-corrosion treatment. High-strength bolted connections are treated with anti-loosening measures to ensure long-term structural stability.
1.6.3 Enclosure Wall System
The enclosure wall system is the exterior protective structure of the homestay container house, combining multiple functions of insulation, heat retention, sound insulation, fire protection, and decoration. It consists of exterior wall panels, insulation layer, interior wall panels, vapor barrier layer, and stud framework.
- Exterior Wall Panels: Made of metal embossed panels, aluminum-plastic panels, fiber cement panels, wood grain hanging panels, and other materials, providing weather resistance, waterproofing, and decorative functions, determining the exterior style of the container.
- Insulation Layer: Filled between wall studs, using Class A fire-rated insulation materials. This is the core layer for thermal insulation, heat retention, and sound reduction.
- Vapor Barrier Layer: Laid on the inner side of the insulation layer to prevent indoor moisture vapor from entering the insulation layer, maintaining insulation effectiveness and preventing condensation.
- Interior Wall Panels: Made of bamboo-wood fiber panels, gypsum boards, solid wood veneer panels, and other materials, providing decorative, fire-resistant, and environmentally friendly functions, determining the interior decoration style.
1.6.4 Roof System
The roof system handles waterproofing, drainage, insulation, and load-bearing functions, consisting of the roof load-bearing structure, insulation layer, waterproofing layer, roof panels, and drainage system.
- Roof Load-Bearing Structure: Composed of purlins and top frame, bearing roof loads and snow loads.
- Insulation Layer: Laid above the purlins, with thickness greater than the wall insulation layer to enhance top insulation performance.
- Waterproofing Layer: Using SBS modified bituminous waterproofing membrane or TPO polymer waterproofing membrane with full-adhesion installation to ensure zero roof leakage.
- Roof Panels: Using color steel tiles, metal roof panels, or asphalt shingles to enhance appearance quality and weather resistance.
- Drainage System: Equipped with gutters and downspouts using organized drainage to prevent rainwater from washing down walls.
1.6.5 Door and Window System
The door and window system serves as the lighting and ventilation components of the homestay container house, also affecting building appearance and indoor comfort. It includes entrance doors, exterior windows, interior doors, glass partitions, and supporting hardware.
- Entrance Doors: Using security doors, solid wood composite doors, or smart lock integrated doors, providing security, sound insulation, and thermal insulation functions.
- Exterior Windows: Using thermally broken aluminum alloy insulated glass windows. Select high-end models feature panoramic floor-to-ceiling windows and skylights to enhance lighting and landscape views.
- Interior Doors: Bathroom and bedroom doors using wooden doors or aluminum alloy doors, adapted to interior decoration styles.
- Hardware Accessories: Hinges, handles, locks, weatherstripping, and wind braces all use branded components to ensure smooth long-term operation.
1.6.6 Internal Functional Integration System
The internal functional integration system is the core carrier of residential functions in homestay container houses, comprising five modules: water and electrical systems, HVAC systems, kitchen and bathroom systems, storage systems, and smart control systems. All modules are prefabricated and integrated in the factory, requiring only interface connection on site.
- Water and Electrical Module: Integrated distribution box, wiring, switches and sockets, water supply and drainage piping, and sanitary ware. Ready for use after connecting water and electricity.
- HVAC Module: Pre-installed piping for air conditioning, fresh air ventilation, exhaust fans, and other equipment. Equipment installation on site enables immediate commissioning.
- Kitchen and Bathroom Module: Integrated bathrooms and kitchens prefabricated and assembled in the factory, fixed and connected to piping on site.
- Storage Module: Custom wardrobes, storage cabinets, TV cabinets, and other storage furniture pre-installed in the factory.
- Smart Module: Smart locks, smart lighting, smart curtains, temperature control systems, etc., enabling centralized control.
1.7 Core Material Specifications for Homestay Container Houses
1.7.1 Main Structural Steel
The main structure of Guangzhou Lain homestay container houses uses Q235B carbon structural steel from certified steel mills. Steel yield strength is 235MPa, tensile strength is 375-500MPa, with good plasticity and welding performance, suitable for building structural load requirements.
- Steel Surface Treatment: All structural steel components undergo shot blasting rust removal to Sa2.5 grade cleanliness, followed by three-layer anti-corrosion coating: epoxy zinc-rich primer + epoxy micaceous iron oxide intermediate coat + acrylic polyurethane top coat, with total film thickness ≥120μm, ensuring no corrosion of steel structures for 20 years.
- Welding Materials: E43 series electrodes matched with Q235B steel. Welds are full and free of porosity, slag inclusion, cracks, and other defects. Grade 2 welds undergo 100% visual inspection, with critical nodes tested by ultrasonic flaw detection.
- Bolted Connections: 8.8-grade high-strength bolts with galvanized surface treatment, complete with flat washers, spring washers, and nuts to ensure secure, anti-loosening connections.
1.7.2 Enclosure and Insulation Materials
Rock Wool Insulation:
- Material: Artificial inorganic fiber made from high-temperature melting of basalt
- Fire Resistance Rating: Class A non-combustible, melting point ≥1000℃
- Thermal Conductivity: 0.040-0.043W/(m·K)
- Density: 80-100kg/m³
- Characteristics: Excellent fire performance, good sound insulation, chemically stable, resistant to mold and insects. This is the mainstream insulation material for homestay container houses.
Glass Wool:
- Material: Insulation material made from melted glass fiberization
- Fire Resistance Rating: Class A non-combustible
- Thermal Conductivity: 0.038-0.042W/(m·K)
- Density: 48-64kg/m³
- Characteristics: Lightweight, good insulation effect, moderate price, moisture resistance superior to rock wool.
Polyurethane Sandwich Panel:
- Material: Upper and lower metal panels + polyurethane rigid foam core
- Fire Resistance Rating: Class B1 flame-retardant
- Thermal Conductivity: 0.022-0.026W/(m·K)
- Characteristics: Best insulation performance, integrated panel installation for convenience, suitable for severe cold regions.
1.7.3 Interior and Exterior Decorative Panels
Exterior Metal Embossed Panels:
- Structure: Surface layer of galvanized aluminum-zinc color steel plate with embossing + middle polyurethane insulation layer + inner aluminum foil protective layer
- Thickness: 16mm/20mm/25mm
- Fire Resistance Rating: Class B1
- Characteristics: Strong decorative appeal with over a hundred patterns including wood grain, stone texture, and brick texture. Self-insulating, easy to install, strong weather resistance, service life of over 15 years. This is the preferred material for homestay container exterior walls.
Fiber Cement Siding Panels:
- Material: Pressed from cement, plant fiber, quartz sand, etc.
- Thickness: 8mm/12mm
- Fire Resistance Rating: Class A non-combustible
- Characteristics: Substantial texture, can be finished with real stone paint or coatings, strong style adaptability, waterproof and moisture-proof, suitable for rural homestay container exteriors.
Interior Bamboo-Wood Fiber Integrated Wall Panels:
- Material: Bamboo-wood fiber + polymer material extruded
- Thickness: 9mm/10mm
- Fire Resistance Rating: Class B1
- Characteristics: Quick installation, rich color options, environmentally friendly with zero formaldehyde, moisture-proof, mold-resistant, and easy to clean. This is the mainstream material for interior wall finishing.
Interior Gypsum Boards:
- Material: Building gypsum + paper liner
- Thickness: 9.5mm/12mm
- Fire Resistance Rating: Class B1, fire-resistant gypsum boards can achieve Class A
- Characteristics: High flatness, can be finished with latex paint or wallpaper, strong style versatility, suitable for high-end homestay interior decoration.
1.7.4 Waterproofing and Sealing Materials
Roof Waterproofing Membrane:
- Type: SBS modified bituminous waterproofing membrane / TPO polymer waterproofing membrane
- Thickness: 3mm/4mm
- Characteristics: High tensile strength, large elongation, excellent resistance to high and low temperatures, long service life. This is the core material for roof waterproofing.
Construction Sealant:
- Type: Neutral silicone weather-resistant sealant / polyurethane sealant
- Characteristics: Strong adhesion, good weather resistance, excellent elasticity, accommodates thermal expansion and contraction of panels. Used for sealing and waterproofing wall panel joints, door and window perimeters, and other areas.
Waterproof Coating:
- Type: Polymer cement-based waterproof coating (JS) / polyurethane waterproof coating
- Thickness: 1.5mm/2.0mm
- Characteristics: Applied by brush or roller, seamless, suitable for waterproofing kitchen, bathroom, and other irregular-shaped areas.
1.7.5 Hardware Accessories
- Door and Window Hardware: Domestic first-tier brand thermally broken aluminum hardware, smooth operation, strong load-bearing capacity, service life of ≥30,000 opening cycles.
- Lock Hardware: Entrance doors equipped with smart fingerprint locks supporting four opening methods: fingerprint, password, card, and key, adapted to unattended homestay operation needs.
- Connection Hardware: Stainless steel expansion bolts, self-tapping screws, angle brackets, and connectors, all made of 304 stainless steel, rust-proof and corrosion-resistant.
- Weatherstripping: EPDM rubber sealing strips, aging-resistant with good elasticity, used for door and window gap sealing to enhance sound insulation and waterproofing performance.
Chapter 2: Pre-Installation Preparation and Site Survey for Homestay Container Houses
2.1 Site Survey and Site Assessment
The site survey before homestay container house installation is a prerequisite for ensuring smooth installation and structural safety. Professional technical personnel must complete a comprehensive survey on site, and a construction plan can only be formulated after the survey report is produced.
2.1.1 Site Topography and Dimension Survey
- Measure the actual usable dimensions of the site and verify that they meet the placement dimensions of the homestay container house, reserving space for lifting operations, pedestrian access, and utility connection. Single container lifting requires at least 8m×6m of working space. Multi-container combination projects need sufficient crane operating radius reserved based on the lifting plan.
- Survey the terrain slope of the site. The natural site slope should not exceed 5%. Areas beyond this range require site leveling or stepped foundation treatment. Slope projects require assessment of earthwork volume and support requirements to avoid landslide risks.
- Confirm the site elevation and surrounding drainage relationships. Ensure the homestay container site elevation is at least 300mm higher than the surrounding ground to prevent rainwater backflow. Low-lying sites require drainage diversion and elevation treatment first.
- Survey obstacles on site, including trees, utility poles, pipelines, structures, etc. Mark obstacle positions and heights and assess whether relocation or adjustment of container placement positions is required.
2.1.2 Geological Condition Testing
- Assess the foundation bearing capacity of the site. Homestay container foundation requires a characteristic foundation bearing capacity of ≥80kPa, which ordinary compacted plain soil can satisfy. Soft foundations, backfilled soil, and silty soil foundations require reinforcement treatment such as sand and gravel replacement, pile driving, or increased foundation area.
- Survey the groundwater level conditions. Sites with high groundwater levels require foundation waterproofing and container bottom moisture protection, with drainage blind ditches added when necessary. When the groundwater level is higher than the foundation base, dewatering measures are required.
- Confirm whether permafrost layers exist on site. In severe cold regions, the foundation base must be set below the permafrost layer to avoid frost heave damage to the structure.
- Survey underground pipeline distribution, including water supply and drainage pipes, power cables, communication fiber optic cables, gas pipelines, etc. It is strictly forbidden to set foundations above underground pipelines or conduct lifting operations directly above them. Relevant departments should be contacted to confirm pipeline positions and depths when necessary.
2.1.3 Surrounding Environment Assessment
- Climate Environment: Understand the project location’s year-round wind speeds, maximum wind pressure, snowfall, extreme high and low temperatures, and other climate parameters. Verify that the homestay container house’s wind resistance, snow load capacity, and insulation performance meet local climate requirements. Special anti-corrosion treatment is required for coastal high-salt-fog areas, and thicker insulation layers are needed in severe cold regions.
- Traffic Environment: Survey the access road width, height limits, weight limits, and turning radius to confirm that transport vehicles and lifting vehicles can enter smoothly. If road width is insufficient, there are culvert height limits, or bridge weight limits, advance plans for transshipment and road reinforcement must be developed.
- Surrounding Utilities: Confirm the location and distance of water and electrical access points, verify municipal water supply pressure, power supply capacity, and sewage discharge interface positions, and assess the cost and construction difficulty of utility connections. Sites without municipal utilities require planning for self-contained water sources, power supply systems, and sewage treatment solutions.
- Environmental Restrictions: Confirm whether the site is in noise-sensitive areas, ecological protection zones, cultural relic protection areas, or other special regions. Assess noise and dust control requirements during construction and formulate corresponding civilized construction plans.
2.1.4 On-Site Temporary Facility Planning
- Temporary Material Storage Area: Plan a level, dry area for storing container components, installation materials, tools, and equipment. Provide rain and moisture protection measures. The area should not be too far from the lifting operation zone.
- Temporary Office and Rest Area: Set up temporary rest and office areas for construction personnel, equipped with necessary drinking water, first aid, and fire-fighting facilities.
- Temporary Power Supply: Connect temporary construction power with three-level power distribution and two-level protection, meeting construction equipment power requirements. Sites without external power supply should be equipped with diesel generators.
- Temporary Water Supply: Connect temporary construction water supply to meet construction and living needs.
- Temporary Enclosure: Enclose and isolate the construction area with temporary fencing, set up warning signs, and prohibit unauthorized personnel from entering the construction area.
2.2 Foundation Construction Standards
The foundation is a critical component of homestay container house structural safety. Foundation selection must be determined comprehensively based on geological conditions, container specifications, and project budget. Common foundation forms include four types: reinforced concrete strip foundation, screw pile foundation, elevated steel structure foundation, and concrete slab foundation.
2.2.1 Foundation Selection Principles
- Reinforced Concrete Strip Foundation: Suitable for projects with average geological conditions, long-term fixed placement, and moderate budgets. Structurally stable with high bearing capacity. This is the most commonly used foundation form for rural homestay containers.
- Screw Pile Foundation: Suitable for projects with good geological conditions, temporary placement, requiring rapid construction, and reusable applications. Short construction period with minimal site disturbance, ideal for campground and scenic area projects.
- Elevated Steel Structure Foundation: Suitable for slopes, wetlands, and sites requiring ventilation and moisture protection. Height-adjustable to avoid ground moisture, ideal for humid southern regions and mountain projects.
- Concrete Slab Foundation: Suitable for multi-container combinations, large platforms, and projects with high floor loads. Provides excellent overall flatness, suitable for homestay public areas and multi-level stacked projects.
2.2.2 Reinforced Concrete Strip Foundation Construction Standards
Construction Preparation
- Material Preparation: P.O42.5 ordinary Portland cement, medium sand, 5-20mm crushed stone, HRB400 grade rebar, formwork, embedded parts
- Tool Preparation: Excavator, shovels, tape measure, level gauge, theodolite, vibrator rod, trowel
- Technical Preparation: Layout and positioning drawings, foundation construction drawings, technical disclosure records
Construction Process
1. Site Leveling and Layout Positioning
- Remove weeds, debris, and loose soil from site. Compact the base with a roller or tamper, achieving a compaction coefficient of ≥0.93.
- Set out foundation axis lines, boundary lines, and elevation control points according to construction drawings. Install gantry piles, mark foundation excavation depth and width, and verify axis deviation ≤5mm.
- Foundation positions correspond to the bottom frame main beam positions of the homestay container house. Strip foundation width shall not be less than 300mm, height not less than 300mm, and length extending 200mm beyond each end of the container.
2. Trench Excavation
- Excavate foundation trenches manually or with small excavators. Excavation depth is determined based on permafrost layer and foundation bearing capacity, and shall not be less than 300mm.
- Reserve 100mm of soil at the trench bottom for manual cleanup to avoid disturbing the original soil. Trench bottom flatness deviation ≤20mm.
- Slope the sides of the trench according to soil type, generally at 1:0.5 to 1:0.75, to prevent trench wall collapse.
- After excavation, inspect the trench bottom elevation, width, and axis position. Proceed to the next process only after acceptance.
3. Blinding Layer Placement
- Place a 100mm thick C15 plain concrete blinding layer at the trench bottom, vibrate to compact, and level the surface.
- The blinding layer width extends 100mm beyond each side of the foundation base. Flatness deviation ≤10mm.
- After placement, cure for more than 24 hours. Subsequent construction can proceed after strength reaches 1.2MPa.
4. Rebar Tying
- Tie foundation rebar according to drawing requirements. Main bars use Φ12-Φ16 deformed steel bars at 150-200mm spacing. Distribution bars use Φ8 plain round steel bars at 200-300mm spacing.
- Rebar protective layer thickness shall not be less than 40mm, controlled with concrete spacer blocks.
- After rebar tying, inspect bar specifications, quantity, spacing, and protective layer thickness. Proceed to formwork installation only after acceptance.
5. Formwork Installation
- Use wooden or steel formwork with secure support to ensure no movement or deformation during concrete placement.
- Apply release agent to the inner surface of formwork. Apply sponge strips at joints to prevent grout leakage.
- Recheck inner dimensions, elevation, and verticality of formwork, with deviations within specification requirements.
6. Embedded Part Installation
- Embed anchor bolts or embedded steel plates according to the bolt hole positions of the container bottom frame. Embedded part positioning deviation ≤3mm.
- Anchor bolt embedment depth shall not be less than 300mm, with hooked ends welded to foundation rebar for fixation.
- Embedded steel plates shall not be less than 10mm thick, with anchoring bars welded on the back to ensure firm bonding with concrete.
- Embedded part top surface elevation deviation ≤±2mm, surface level. Protect embedded parts during concrete placement to prevent displacement.
7. Concrete Placement
- Use C25-C30 ready-mixed concrete. Spray water to moisten the blinding layer and formwork before placement.
- Place in layers with vibrating at each layer, each layer not exceeding 300mm thickness. Use an immersion vibrator for proper compaction without missed or over-vibration.
- During placement, continuously check whether formwork and embedded parts have shifted. Address any issues promptly.
- After placement, finish and level the foundation top surface with a trowel, ensuring top surface flatness deviation ≤3mm.
8. Curing and Formwork Removal
- Cover and water-cure within 12 hours after placement. Curing time shall not be less than 7 days, keeping the concrete surface moist during curing.
- Side formwork can be removed after concrete strength reaches 70%. Container lifting can proceed only after strength reaches 100%.
- After formwork removal, inspect the foundation appearance for honeycombing, surface voids, exposed rebar, cracks, and other defects. Geometric dimensions shall meet design requirements.
Foundation Acceptance Standards
| Inspection Item | Acceptance Standard |
|---|---|
| Axis position deviation | ≤10mm |
| Top surface elevation deviation | ±5mm |
| Foundation top surface flatness | ≤3mm/2m |
| Embedded part center offset | ≤3mm |
| Foundation cross-section dimension deviation | ±10mm |
2.2.3 Screw Pile Foundation Construction Standards
The screw pile foundation is a prefabricated foundation type where galvanized steel screw piles are rotated into the ground as supports. It offers advantages of fast construction, recyclability, and minimal site disturbance, making it the preferred foundation type for mobile homestay container houses.
Construction Preparation
- Material Preparation: Hot-dip galvanized screw piles (diameter 76-114mm, length 1.5-3m), adjustment flanges, horizontal connecting beams
- Tool Preparation: Screw pile installation machine, level gauge, tape measure, wrenches
- Technical Preparation: Foundation point layout drawings, elevation control data
Construction Process
1. Point Layout
- Determine screw pile points according to the bottom frame main beam positions of the container house. Each container is configured with 6-8 screw pile support points, evenly distributed below the bottom frame main beams.
- Layout and position marking, deviation ≤10mm. Set elevation control points.
2. Screw Pile Installation
- Install the screw pile on the installation machine, align with the point, and rotate vertically into the ground.
- Calibrate verticality continuously during installation, with verticality deviation ≤1°.
- Installation depth is determined based on geological conditions, ensuring the screw pile bearing capacity meets requirements. Single screw pile bearing capacity shall not be less than 2t.
- Stop after reaching the predetermined elevation, reserving 50-100mm adjustment allowance.
3. Elevation Leveling
- Use a level gauge to measure the top elevation of each screw pile point. Adjust the height of each support point through adjustment flanges.
- Top surface elevation deviation of all support points ≤2mm, ensuring the bottom frame is level after placement.
- After adjustment, tighten locking nuts to prevent loosening.
4. Connecting Beam Fixation
- Install horizontal connecting beams on top of the screw piles to connect all screw piles into an integrated unit, enhancing foundation stability.
- Connecting beams use galvanized square tubes, bolted to the screw pile flanges.
- Inspect overall stability for no movement or displacement.
Foundation Acceptance Standards
| Inspection Item | Acceptance Standard |
|---|---|
| Point position deviation | ≤15mm |
| Top surface elevation deviation | ±3mm |
| Screw pile verticality | ≤1° |
| Overall levelness | ≤3mm per container length |
2.2.4 Elevated Steel Structure Foundation Construction Standards
Suitable for slopes, damp sites, and scenarios requiring the container to be raised to a specific height. The foundation consists of steel structural supports made up of columns, beams, and diagonal braces, elevating the container to the designated height.
Construction Process
1. Place concrete independent foundations at designed points, embedding steel plates or anchor bolts.
2. Install steel structural columns, welded or bolted to embedded parts, calibrating verticality.
3. Install top beams, adjusting top surface elevation and levelness.
4. Add diagonal bracing for reinforcement to enhance overall stability.
5. All steel structures receive anti-corrosion galvanizing or painting treatment.
6. Recheck top surface elevation, levelness, and bearing capacity. Container lifting may proceed only after acceptance.
Technical Requirements
- Elevated height is generally 0.3-2.0m, with custom heights available for special requirements.
- Column spacing shall not exceed 2m, ensuring beam deflection meets requirements.
- Overall structure anti-overturning coefficient ≥1.5.
- Steel structure corrosion protection grade not lower than C3.
2.2.5 Common Foundation Construction Issues and Solutions
- Insufficient Foundation Bearing Capacity: Use the replacement method by excavating the weak soil layer and replacing with graded sand and gravel compacted in layers; or enlarge the foundation base area to reduce base pressure; or increase the number of foundation piles.
- Uneven Foundation Settlement: Strengthen base compaction, increase foundation rigidity, and use adjustable supports between the container and foundation for later fine-tuning of elevation.
- Excessively High Groundwater Level: Lay a gravel filter layer at the foundation base, set drainage blind ditches around the perimeter, apply waterproofing treatment to the foundation, and add an additional moisture barrier at the container bottom.
- Embedded Part Displacement: Assign dedicated personnel to monitor embedded parts during concrete placement, correcting displacement promptly. Minor displacement can be corrected by reaming holes. Excessive displacement requires re-grouting treatment.
2.3 Installation Tools and Equipment List
Homestay container house installation requires complete sets of lifting, measuring, fastening, welding, and safety protection tools and equipment. All equipment must be inspected for proper operation before entering the site. Measuring instruments must be within their verification validity period.
2.3.1 Lifting Equipment
| Equipment Name | Specification/Model | Purpose | Quantity |
|---|---|---|---|
| Truck crane | 8t/25t | Container lifting, heavy component lifting | 1 unit |
| Manual chain hoist | 2t/5t | Component fine adjustment, alignment pulling | 2-4 units |
| Hydraulic jack | 5t/10t | Container elevation adjustment, leveling | 4 units |
| Lifting sling | 5t/10t | Container lifting and tying | 4 pieces |
| Shackle | 5t/10t | Rigging connection | 6 pieces |
2.3.2 Measuring and Testing Tools
| Tool Name | Accuracy Requirement | Purpose | Quantity |
|---|---|---|---|
| Electronic theodolite | 2″ | Axis layout, verticality measurement | 1 unit |
| Automatic level | ±1mm/km | Elevation measurement, levelness testing | 1 unit |
| Laser level | ±2mm/10m | Level layout, elevation positioning | 2 units |
| Steel tape measure | 5m/50m | Dimension measurement | Multiple |
| Feeler gauge | 0.02-1mm | Gap inspection | 2 pieces |
| Torque wrench | 100-500N·m | Bolt tightening torque inspection | 2 pieces |
| Insulation resistance tester | 500V | Circuit insulation testing | 1 unit |
| Ground resistance tester | 0-100Ω | Ground resistance testing | 1 unit |
| Pressure test pump | 0-1.6MPa | Water pipe pressure testing | 1 unit |
2.3.3 Fastening and Installation Tools
Electric wrench, impact drill, electric drill, hand drill, screwdriver set, hex key set, adjustable wrench, socket wrench set, combination wrench, open-end wrench, locking pliers, slip-joint pliers, needle-nose pliers, wire stripper, crimping tool, utility knife, tape measure, ink line, plumb bob, rubber mallet, sledgehammer, pry bar, ladder, scaffolding.
2.3.4 Welding and Cutting Equipment
DC welding machine, TIG welding machine, gas cutting equipment, angle grinder, cut-off saw, electric hammer, beveling machine, wire brush, slag hammer.
2.3.5 Safety Protection Equipment
Safety helmet, safety harness, safety rope, non-slip shoes, protective gloves, safety goggles, dust mask, gas mask, fire extinguisher, temporary distribution box, residual current circuit breaker, warning tape, warning sign boards, first aid kit.
2.3.6 Auxiliary Equipment and Materials
Generator, air compressor, sealant gun, caulking gun, brushes, rollers, wiping cloths, anti-rust paint, silver paint, sealant, expansion bolts, self-tapping screws, washers, welding electrodes, cutting discs, sandpaper.
2.4 Installation Personnel Configuration and Job Responsibilities
The installation of homestay container homes requires the formation of a professional construction team with clearly defined job responsibilities for each position to ensure construction safety, quality, and schedule. The standard personnel configuration for a single project is as follows:
2.4.1 Project Organizational Structure
| Position | Quantity |
|---|---|
| Project Manager | 1 |
| Technical Director | 1 |
| Safety Officer | 1 |
| Quality Inspector | 1 |
| Lifting Crew | 2–3 persons |
| Structural Installation Crew | 3–4 persons |
| Plumbing & Electrical Crew | 2–3 persons |
| Finishing & Interior Crew | 2–3 persons |
2.4.2 Job Responsibilities
Project Manager
- Fully responsible for project construction management, coordinating personnel, materials, and equipment dispatch
- Liaise with the client and manufacturer, coordinate relationships among all parties on site
- Control construction progress, quality, and safety to ensure project delivery on schedule
- Organize construction briefings and safety briefings, implement all construction plans
- Responsible for problem-solving decisions and emergency handling during construction
Technical Director
- Responsible for construction drawing review and technical briefing, resolving on-site technical issues
- Prepare construction plans and work instructions, guide crews to construct in accordance with specifications
- Responsible for technical control of surveying and setting out, elevation control, and precision calibration
- Participate in acceptance of each work process, compile construction technical documentation
- Liaise with manufacturer technical support, implement product installation technical requirements
Safety Officer
- Responsible for on-site safety management and implementation of safety management systems
- Conduct safety education and safety briefings, supervise execution of safety protection measures
- Patrol for on-site safety hazards, promptly stop violations of safety regulations
- Manage high-risk operations including temporary electrical, lifting operations, and elevated work
- Responsible for fire protection and emergency management, participate in handling safety incidents
Quality Inspector
- Responsible for quality inspection and acceptance of each work process, controlling construction quality
- Inspect quality and specifications of incoming materials and accessories
- Complete quality inspection records and retain acceptance documentation
- Issue rectification requirements for non-conforming items and track rectification implementation
- Participate in final acceptance, cooperate with client’s acceptance inspection
Lifting Crew
- Responsible for lifting and positioning of container modules and heavy structural components
- Operate lifting equipment, rig slings, execute lifting commands
- Cooperate with structural crew to complete module alignment and temporary fixation
- Responsible for daily inspection and maintenance of lifting equipment
Structural Installation Crew
- Responsible for foundation re-check, module positioning, structural connection and fixation
- Complete structural installation of walls, roof, stairs, platforms, etc.
- Execute welding, bolt tightening, anti-corrosion touch-up painting and other processes
- Cooperate with surveyors to complete verticality and levelness calibration
Plumbing & Electrical Crew
- Responsible for water supply and drainage pipeline connection and pressure testing
- Responsible for power and low-voltage wiring connection and commissioning
- Responsible for installation and commissioning of sanitary fixtures, lighting fixtures, switches and sockets
- Cooperate in completing plumbing and electrical system acceptance and fault troubleshooting
Finishing & Interior Crew
- Responsible for interior/exterior wall panel joint treatment, caulking and sealing
- Responsible for interior finishing work, furniture installation and fixation
- Responsible for waterproofing construction and water retention testing
- Responsible for site cleaning, finished product protection and completion work
2.5 Material Delivery and Acceptance Specifications
2.5.1 Material Delivery Procedure
1. After materials, accessories, and container modules arrive on site, the quality inspector and warehouse keeper jointly conduct acceptance, verifying the delivery note against the purchase list.
2. Inspect product appearance, specifications, model, and quantity; verify quality certification documents including product certificates, test reports, and warranty certificates.
3. Conduct sampling inspection of critical materials; non-conforming products are strictly prohibited from entering the site and shall be returned.
4. Accepted materials shall be sorted and stacked by category, labelled, and warehousing procedures completed.
2.5.2 Main Container Module Acceptance
- Verify that module model, dimensions, and quantity match the contract.
- Inspect module appearance: steel structure free from deformation, dents, and rust; welds full and free from defects.
- Inspect wall panels, doors and windows for damage, scratches, or deformation; sealing strips intact and not detached.
- Inspect pre-installed internal plumbing/electrical lines, sanitary fixtures, and furniture for damage or looseness.
- Verify that accompanying accessories, bolts, sealing materials, and manuals are complete.
- Damage caused during transportation shall be the responsibility of the carrier, handled by on-site repair or return to factory.
2.5.3 Installation Material Acceptance
- Steel and connecting components: Verify specifications and material grade; check galvanized coating or paint finish intact, free from rust and deformation; bolt accessories match in specification; quality certificates available.
- Waterproofing and sealing materials: Check brand, model, and shelf life; sealant free from curing and cracking; waterproof membrane free from damage and deterioration; test reports available.
- Plumbing and electrical materials: Cables, pipes, switches, sockets, sanitary fixtures, etc. — verify brand and specification; 3C certification and certificates of conformity required; appearance intact without damage.
- Interior decoration materials: Wall panels, boards, hardware, etc. — verify pattern and specification; free from damage, deformation, and color difference; environmental indicators meet requirements.
2.5.4 Material Storage and Protection Requirements
- Container modules shall be placed on level, solid ground with timber sleepers underneath to prevent bottom contact with ground moisture and rusting.
- Panels and insulation materials shall be stacked flat with rainproof and moisture-proof covering to avoid water damage and deformation.
- Hardware accessories and electrical components shall be stored in a dry, ventilated warehouse, sorted and labelled.
- Flammable and explosive materials stored separately, away from ignition sources, with fire-fighting equipment provided.
- Easily scratched or fragile doors, windows, glass, and sanitary fixtures shall be protected to avoid impact damage.
- Stacking height of materials shall comply with safety requirements to prevent collapse, with handling aisles reserved.
2.6 Construction Safety Technical Briefing
Before construction commences, a safety technical briefing must be conducted for all construction personnel. The briefing content includes construction procedures, technical requirements, safety regulations, and emergency measures. All personnel must sign for confirmation before being permitted to work.
2.6.1 Elevated Work Safety Requirements
- Elevated work personnel must hold valid certificates, wear safety harnesses, safety helmets, and non-slip shoes; safety harness lanyards shall be attached high and anchored low.
- Scaffolding, ladders, and work platforms used for elevated work must be secure and reliable, usable only after passing inspection.
- Tools used at height shall be kept in tool bags at all times; throwing tools or materials up or down is strictly prohibited.
- Work at height outdoors shall cease in adverse weather conditions including winds of Force 6 or above, rain, snow, and heavy fog.
- A warning zone shall be established below elevated work areas; personnel passage is prohibited; a dedicated lookout shall be stationed.
2.6.2 Lifting Operation Safety Requirements
- Lifting operations shall be directed by a certified rigger with unified, clear, and accurate signals.
- Inspect slings and rigging equipment for integrity before lifting; overload lifting is strictly prohibited.
- Personnel are strictly prohibited from standing within the lifting radius; warning zones shall be established with a dedicated lookout.
- A trial lift shall be performed before hoisting: lift the load 100–200mm off the ground, check lifting stability, and only continue after confirming no abnormalities.
- Lifting shall be smooth, avoiding sudden stops and rotations; the sling may only be released after the component is positioned and secured.
- Outriggers of truck cranes shall be fully extended with timber sleepers placed underneath; the crane body shall be level to ensure lifting stability.
2.6.3 Electrical Work Safety Requirements
- On-site temporary power shall implement three-level power distribution with two-level protection; distribution boxes shall be locked and managed by certified electricians.
- All electrical equipment shall have grounding and neutral protection, equipped with residual current devices; leakage trip current ≤ 30mA.
- Cables shall be overhead or protected by conduit; dragging on the ground or running over by vehicles is strictly prohibited; damaged cables shall be replaced promptly.
- Live work shall only be performed by certified electricians; no live work by a single person — a standby supervisor is required.
- Safety voltage shall be used in damp environments; power tools shall be equipped with insulated handles.
2.6.4 Welding Work Safety Requirements
- Welders must hold valid certificates and wear protective face shields, gloves, and work clothing.
- Flammable and explosive materials shall be removed from the vicinity of welding operations; fire extinguishers shall be provided with a dedicated fire watch.
- Welding machines shall be properly grounded; welding cable insulation intact; operation of defective equipment is prohibited.
- Ventilation shall be provided for welding in enclosed spaces to prevent poisoning and asphyxiation.
- After welding is completed, verify that no fire hazards remain before leaving the area.
2.6.5 On-Site Civilized Construction Requirements
- Construction areas shall be fenced off with clear signage; unauthorized personnel are prohibited from entering.
- Materials stacked neatly; site cleaned daily; “work complete, site clean” policy implemented.
- Construction noise controlled within designated hours to avoid disturbing residents.
- Construction waste concentrated and removed regularly; indiscriminate disposal is strictly prohibited.
- Fire-fighting facilities provided on site; access routes kept clear; smoking and open-flame heating strictly prohibited.
3.1 Construction Layout and Positioning Re-Verification
Before container module lifting, final layout and positioning must be completed on the foundation surface to ensure precise module placement, providing the reference for subsequent assembly and pipeline connection.
3.1.1 Benchmark Point Establishment
- Using the building red line or site benchmark point provided by the client as the basis, establish the overall positioning benchmark points and elevation benchmark points for the homestay project.
- Benchmark points shall be set at stable, secure locations protected from damage, clearly marked, and serve as the measurement reference throughout construction.
- No fewer than 2 benchmark points shall be established to facilitate cross-verification; periodically check benchmark points for displacement.
3.1.2 Axis Layout
- Based on construction drawings, mark the outline, centerline, and bolt hole positioning line of each module on the foundation top surface.
- Snap clear ink lines using a chalk line; label module numbers and orientation to avoid misalignment during lifting.
- For multi-module combination projects, mark the joint gap position lines and alignment reference lines to ensure modules align correctly.
- Mark the water and electrical interface connection position lines; verify correspondence between module reserved interfaces and foundation pipeline interfaces.
3.1.3 Elevation Re-Verification
- Use a level to measure the elevation of each foundation support surface point-by-point, verifying compliance with design requirements.
- Elevation deviation at each module support point shall not exceed ±3mm; out-of-range areas shall be leveled with steel shim plates.
- Shim plates shall be galvanized steel, thickness determined by deviation; no more than 3 shims per location, stacked neatly and in close contact with the foundation surface.
- After leveling, re-verify elevation; mark and confirm before proceeding.
3.1.4 Positioning Re-Verification and Acceptance
- Verify positioning axes of all modules: deviation ≤ 5mm.
- Verify spacing between adjacent modules and joint gap widths meet design requirements.
- Verify overall layout meets planning requirements for distances from site boundaries and surrounding facilities.
- Joint acceptance by the technical director and quality inspector with signed confirmation before lifting operations may commence.
3.2 Bottom Frame Lifting and Leveling
3.2.1 Lifting Preparation
- Re-check foundation elevation, positioning lines, and embedded parts locations to confirm compliance.
- Inspect slings and lifting belts for integrity; rated load capacity shall meet module weight requirements with a safety factor ≥ 6.
- Clean debris from foundation top surface; place rubber vibration-damping pads at embedded part locations to reduce vibration and rigid contact.
- Assign lifting director and auxiliary personnel; clarify division of labor and standardize lifting signals.
3.2.2 Module Lifting and Positioning
- Rig lifting belts at specified positions on the bottom frame main beams, with symmetrical rigging points to ensure the module remains level after lifting.
- Perform a trial lift of 100–200mm before hoisting; confirm the module is stable, sling load is evenly distributed, with no risk of tilting or slippage.
- Slowly hoist to 300–500mm above the foundation; adjust module orientation and angle to align with foundation positioning lines.
- Slowly lower the module; crew members assist with alignment during lowering so that bottom frame bolt holes align with anchor bolts and module edges align with positioning ink lines.
- Stop lowering before the module contacts the foundation; make fine position adjustments, then slowly set down after confirming precise positioning.
3.2.3 Levelness Adjustment
- After the module is set down, use a level to measure elevation at the four corners to check overall levelness.
- Levelness deviation in the module length direction ≤ 3mm; in the width direction ≤ 2mm.
- When levelness is out of tolerance, use jacks to raise the corresponding position and adjust by adding or removing bottom shims, calibrating point by point.
- During adjustment, simultaneously check module verticality to ensure no tilting.
- After levelness adjustment is complete, initially tighten anchor bolt nuts with uniform pre-tension.
3.2.4 Bottom Frame Fixation to Foundation
- After levelness re-verification passes, tighten all anchor bolts using a torque wrench to the specified torque; tightening sequence shall be diagonal and staggered to avoid stress concentration.
- M16 anchor bolt tightening torque: 120–150 N·m; M20 bolt tightening torque: 220–260 N·m.
- After tightening, exposed thread length shall be 2–3 threads; bolts and nuts shall be matched with flat washers and spring washers installed.
- Re-verify module levelness and positioning after fixation to confirm no displacement.
- Apply anti-rust paint to exposed portions of anchor bolts; apply grease to nut areas for corrosion protection; where necessary, pour concrete protective caps.
3.2.5 Bottom Frame Anti-Corrosion Treatment
- Inspect bottom frame for paint damage during transport and lifting; damaged areas shall be ground and derusted, then touch up with anti-rust primer and topcoat.
- Seal gaps between bottom frame and foundation contact surfaces with sealant to prevent rainwater and moisture from entering and corroding bottom steel.
- Check bottom ventilation openings are unobstructed to ensure ventilation and moisture prevention under the bottom frame.
3.3 Column Installation and Verticality Calibration
For site-assembled homestay container homes, columns are installed on site; for integrally prefabricated modules, columns are already welded at the factory and only verticality verification is required. The following specifications apply to site-assembled column installation.
3.3.1 Column Lifting and Alignment
- Transport columns to installation position by number; inspect column specifications, length, and weld quality; clean debris and rust from connecting end faces.
- Erect columns using lifting belts or manual methods; align bottom with bottom frame column connection plates; insert positioning bolts for temporary fixation.
- Adjust column orientation so connection plate holes align; insert all connecting bolts with nuts installed but not tightened.
3.3.2 Temporary Fixation
- Install temporary diagonal braces on both sides of the column; one end connected to the column and the other to the bottom frame or ground anchor points.
- Adjust brace length to initially adjust column verticality so the column is approximately vertical.
- Each column shall have at least two temporary supports to ensure stability and prevent toppling.
3.3.3 Verticality Measurement and Calibration
- Use a theodolite to measure column verticality from two perpendicular directions; column verticality deviation ≤ H/1000, with total deviation ≤ 5mm (H = column height).
- Calibrate column verticality one by one by adjusting temporary diagonal braces and bottom shims.
- During calibration, simultaneously check column top elevation to ensure all column top elevations are consistent, deviation ≤ ±3mm.
- Adjacent column spacing deviation ≤ ±3mm; diagonal deviation ≤ 5mm.
3.3.4 Bolt Tightening and Joint Anti-Corrosion Treatment
- After verticality acceptance passes, tighten column-to-bottom-frame connecting bolts to the specified torque, diagonal and staggered sequence.
- High-strength bolts shall be tightened in three steps: initial tightening, second tightening, and final tightening; initial tightening torque is 50% of final torque; second tightening torque equals initial torque; final tightening reaches the specified torque value.
- Mark bolts after tightening to prevent missed bolts.
- Apply anti-rust and topcoat paint to connection plate gaps, bolt heads, and nuts; touch-up coverage shall extend at least 50mm beyond the damaged edge.
- For columns connected by welding, weld height shall comply with design requirements; clean slag thoroughly and apply anti-corrosion treatment.
3.4 Top Frame Installation and Fixation
3.4.1 Section-by-Section Lifting of Top Frame
- Top frame sections are prefabricated at the factory and assembled on site by lifting each section. Before lifting, verify section numbers and installation positions.
- Lift the first top frame section to the column tops, align with column connection plates, and insert positioning bolts for temporary fixation.
- Subsequently lift remaining sections in sequence; align adjacent sections and insert assembly bolts.
3.4.2 Overall Levelness Calibration
- After all top frame sections are in place, use a level to measure elevations at various points of the top frame to check overall levelness.
- Top frame main beam levelness deviation ≤ 3mm; overall top surface elevation deviation ≤ ±5mm.
- Calibrate levelness by adjusting shims at column tops to ensure the top frame is flat without warping.
- Check top frame diagonal lengths; diagonal difference ≤ 5mm to ensure the frame is square.
3.4.3 Joint Connection and Fixation
- After levelness acceptance passes, tighten top-frame-to-column connecting bolts in a symmetrical sequence.
- Tighten assembly bolts between top frame sections; assembly gaps shall be tightly fitted, gap ≤ 1mm.
- Critical joints reinforced by welding; welds continuous and full, weld leg height complies with design requirements.
- After all bolts are tightened, check each one individually and mark completion.
3.4.4 Welding and Anti-Corrosion Treatment
- After welding, remove slag and inspect weld quality: free from porosity, slag inclusion, cracks, and undercut defects.
- Grind and derust welds and surrounding areas; apply two coats of epoxy zinc-rich primer and two coats of topcoat with proper overlap with existing coating.
- Bolt heads, nuts, and connection plates shall all receive anti-corrosion treatment to ensure no exposed steel.
3.5 Wall Framing (Keel) Installation
3.5.1 Framing Layout Lines
- Snap vertical keel positioning lines on the bottom and top frames at 400mm spacing; mark reinforced keel positions at door and window openings.
- Snap horizontal keel elevation lines; horizontal keel spacing 600–800mm; reinforced horizontal keels at top and bottom of door/window openings.
3.5.2 Vertical Keel Installation
- Install vertical keels per positioning lines; secure top and bottom ends to bottom/top frames with self-tapping screws or rivets.
- Keels installed vertically; verticality deviation ≤ 2mm/m.
- Reinforced keels installed on both sides of door/window openings, one size larger than standard keels, or double keels installed side by side for reinforcement.
- Lintel keels installed above openings to carry loads above openings; lintel ends extend no less than 200mm beyond each side of the opening.
3.5.3 Horizontal Keel Installation
- Install horizontal keels per elevation lines; connect and secure to vertical keels with connectors at all intersections.
- Horizontal keels installed level; levelness deviation ≤ 3mm/2m.
- When wall height exceeds 3m, increase the number of horizontal keel runs to ensure overall wall rigidity.
- At locations where plumbing and electrical lines pass through walls, keels shall be cut with reinforcement to avoid compromising the load-bearing section of the keel.
3.5.4 Keel Acceptance Criteria
- Verify keel specifications, spacing, and connection methods comply with design requirements.
- Verify wall flatness and verticality within allowable tolerances.
- Verify door/window opening reinforcement is in place; dimensions accurate; diagonal deviation ≤ 3mm.
- Verify keel connections are secure with no looseness or deformation.
3.6 Roof Panel Load-Bearing Structure Installation
3.6.1 Roof Purlin Installation
- Snap purlin positioning lines on top frame main beams; purlin spacing determined by roof panel type, typically 600–800mm.
- Lift purlins into position and secure to top frame with bolts or self-tapping screws.
- Purlins installed parallel with uniform spacing; top surfaces flush; height difference ≤ 2mm.
- Purlin splices located above main beams; splices secure; overhang length complies with design requirements.
3.6.2 Roof Slope Adjustment
- Homestay container roofs typically have a 2%–5% drainage slope, created by height differences in purlins.
- Adjust purlin heights to ensure accurate roof slope with drainage direction toward the gutter side.
- Ridge and eave elevations accurate; no reverse slope or ponding hazards.
3.6.3 Joint Reinforcement
- Install angle brackets to reinforce purlin-to-main-beam connection joints for connection strength.
- Reinforce roof openings and equipment base locations with additional purlins.
- Purlin spacing densified at gutter installation locations to bear gutter and rainwater loads.
3.7 Multi-Story Homestay Container Stacking Construction
Multi-story stacking is a common design form for trendy homestay container homes, utilizing 2–3 levels of stacked modules to increase usable area and create terraces and three-dimensional spaces. Stacking construction requires strict precision control to ensure structural safety.
3.7.1 Lower Module Leveling Re-Verification
- Before lifting the upper module, comprehensively re-verify the lower module’s levelness, verticality, and structural strength to confirm it meets stacked load requirements.
- Clean debris from the lower module top surface; lay rubber vibration-damping pads at stacking support positions with pad thickness of 10–20mm.
- Snap positioning lines for the upper module on the lower module top surface; mark support column positions to ensure upper and lower columns align for vertical load transfer.
- Verify stacking joint connectors on the lower module are intact and reserved bolt holes are accurately positioned.
3.7.2 Upper Module Lifting and Positioning
- Use a truck crane with adequate lifting height and capacity; lifting radius and rated capacity comply with the lifting plan.
- Hoist the upper module smoothly; when exceeding 500mm above the lower module top surface, adjust horizontal position to align with positioning lines.
- Slowly lower the module; crew members assist with alignment at four corners during lowering to ensure upper and lower modules align precisely with columns matching.
- Reduce lowering speed as the module approaches the lower module top surface to avoid impact; set down smoothly.
3.7.3 Upper and Lower Module Connection and Fixation
- After the module is set down, re-verify upper module levelness and verticality; proceed with connection and fixation only after deviations meet requirements.
- Use dedicated stacking connectors to firmly connect the corner columns of upper and lower modules; install 4–8 sets of high-strength bolts at each corner column.
- Tighten bolts to specified torque in diagonal staggered sequence to ensure tight connection with no gaps.
- Install waterproof rubber strips at the joint gap between upper and lower modules; after stacking, squeeze tightly to prevent rainwater infiltration.
- Install connection angle steel on side faces to enhance overall lateral resistance and improve overall structural stability.
3.7.4 Stacking Joint Waterproofing
- Apply weather-resistant sealant to the exterior of upper/lower module joint gaps; sealant continuous and full, width not less than 20mm.
- Install waterproof cover plates on the exterior of stacked column joints to block rainwater intrusion paths.
- Provide drip edge treatment at the junction of the upper module bottom and lower module top to direct rainwater outward.
- After stacking is complete, conduct a water spray test to check joints for leakage.
3.7.5 Overall Verticality Re-Verification
- After stacking is complete, use a theodolite to measure the overall building verticality; overall verticality deviation ≤ H/1000, with total deviation ≤ 10mm.
- Verify levelness of each module level meets specification requirements.
- Verify all connection joints are tightened with none missed.
- Check anti-corrosion touch-up at stacking joints to ensure no exposed steel.
3.8 Exterior Stair and Platform Installation
Multi-story homestay container homes require exterior stairs and landing platforms as vertical circulation facilities; installation must meet structural safety and comfort requirements.
3.8.1 Stair Foundation Fixation
- Install independent concrete foundations at stair base with embedded steel plates; foundation bearing capacity meets stair load requirements.
- Weld stair column bases to embedded steel plates; welds secure with weld leg height complying with design requirements.
- Correct stair column verticality; deviation ≤ 1/1000.
3.8.2 Stair Flight Installation
- Stair flights are integrally prefabricated; lift into position with top end connecting to floor platform and bottom end connecting to base foundation.
- Adjust stair slope and elevation; treads level with uniform step height; step height difference ≤ 3mm.
- Connection joints secured by welding or high-strength bolts to ensure structural safety.
- Stair stringers reliably connected to module structure to form an integral load-bearing system.
3.8.3 Platform Railing Installation
- Landing platform decking laid level and securely connected to structure; platform flatness ≤ 3mm/2m.
- Railing posts installed vertically with uniform spacing not exceeding 1200mm; post height not less than 1100mm.
- Handrails installed straight at height 1050–1100mm; joints smooth and flush.
- Install 100mm high toe boards at railing base to prevent falling objects.
- All railing connections secure; capable of withstanding horizontal force of not less than 1KN/m.
3.8.4 Tread Anti-Slip Treatment
- Tread surfaces treated with anti-slip measures: apply anti-slip strips or create anti-slip patterns; strips protrude 2–3mm above tread surface.
- Exterior stair treads given drainage slope to avoid water accumulation.
- Stair nosing corners rounded to prevent impact injuries.
3.8.5 Load Testing
- After stair installation, conduct load testing: apply 1.2 times the design live load for 24 continuous hours; verify no structural deformation, no loose connections, and no residual deformation after unloading; only after acceptance passes may the stairs be put into use.
3.9 Balcony and Terrace Structure Installation
Balconies and terraces extend the living space of homestay containers, enhancing living experience and viewing functions; installation must focus on cantilever structural safety and waterproofing.
3.9.1 Balcony Cantilever Beam Installation
- Cantilever beams securely connected to the module main structure; anchorage end length shall not be less than 1.5 times the cantilever length.
- Cantilever beam installation elevation accurate; 1% drainage slope provided, sloping outward.
- Cantilever beam spacing not exceeding 1200mm to ensure balcony slab deflection meets requirements.
- Install transverse tie beams at cantilever beam ends to enhance overall stability.
3.9.2 Terrace Deck Installation
- Terrace decking uses fiber-cement board, anti-corrosion wood board, or patterned steel plate, securely connected to furring.
- Decking laid level with uniform gaps; drainage slope provided; no reverse slope or ponding.
- Panel joints sealed to prevent rainwater penetration.
3.9.3 Railing Installation
- Terrace railing height not less than 1100mm; use tempered glass railings, metal railings, or other forms.
- Railing posts firmly fixed to main structure; spacing not exceeding 1200mm.
- Glass railings use tempered laminated glass with thickness not less than 12mm; sealant applied between glass and metal frame.
- Railing overall horizontal load capacity not less than 1.5KN/m to ensure safety.
3.9.4 Waterproofing Base Treatment
- Terrace decking given waterproofing base treatment; internal/external corners transitioned with rounded arcs.
- Waterproofing turned up at terrace-to-wall junctions; upturn height not less than 250mm.
- Floor drain located at the lowest point for smooth drainage.
4.1 Exterior Wall Panel Installation
Exterior wall panels are the core components of the homestay container facade, combining decorative, waterproofing, insulation, and weather-resistant functions; installation quality directly affects building appearance and service life. Using the most commonly used metal carved panel as an example, the installation process is described below.
4.1.1 Construction Preparation
- Verify wall keel installation has passed acceptance; surface level with no protrusions.
- Sort exterior panels by specification and pattern; inspect panels for damage, color difference, and deformation.
- Prepare dedicated accessories: starter strips, trim pieces, internal/external corner profiles, connectors, sealant, self-tapping screws.
- Snap installation reference lines, door/window opening edge lines, and panel division lines on the wall.
4.1.2 Starter Strip Installation
- Install starter strip at wall base; starter strip installed level with levelness deviation ≤ 2mm/m.
- Secure starter strip to keel with self-tapping screws at 300–400mm spacing.
- Starter strip bottom flush with wall base; ends joined by overlapping with tight splice joints.
4.1.3 Panel Installation Sequence
- Exterior panel installation follows bottom-to-top sequence, corners before flat areas.
- Install internal/external corner profiles first; corner profiles installed vertically with verticality deviation ≤ 2mm/m.
- Starting from one corner of the wall, install large panels upward row by row; panels joined horizontally with vertically staggered joints.
4.1.4 Panel Fixation Method
1. Insert the bottom edge of the first panel into the starter strip; adjust verticality and levelness; after confirming accurate position, secure at the top interlocking slot of the panel using dedicated self-tapping screws into the keel.
2. Drive fixing screws vertically with appropriate tightness; avoid bending the panel; each panel shall have no fewer than 4 fixing points with spacing not exceeding 600mm.
3. Align the interlocking slot of the second panel with the interlocking male edge of the first panel; push in smoothly for tight fit with uniform joint gap; gap width ≤ 0.5mm.
4. Continue installing upward; check levelness and verticality after each row; adjust cumulative deviation promptly to avoid accumulated errors.
4.1.5 Door/Window Opening Treatment
- Install trim pieces around door/window openings; trim pieces cut accurately with 45° mitered corners.
- Panels around openings cut to size with smooth cut edges; overlap tightly with trim pieces.
- Provide drip edges and drainage slopes at top and bottom of openings to ensure rainwater does not leak indoors.
- Apply weather-resistant sealant at window frame-to-wall panel junctions; sealant continuous and full, width 10–15mm.
4.1.6 Closure and Edge Trimming
- Install top closure trim at wall top, tightly jointed with roof panel to prevent rainwater ingress.
- All wall corners, door/window perimeters, and pipe penetration locations closed with dedicated trims.
- Install decorative grommets at pipe penetrations; seal gaps with sealant.
- Apply sealant along bottom edge of starter strip to seal gap with bottom frame.
4.1.7 Joint Sealing Treatment
- Horizontal and vertical panel joints use interlocking connections which are inherently water-resistant; additional sealant applied at critical locations.
- All leak-prone locations including internal/external corners, door/window perimeters, wall top and bottom receive neutral silicone weather-resistant sealant.
- Clean dust and debris from gaps before sealing; apply masking tape to ensure straight, neat sealant lines.
- Sealant surface smooth and even, free from bubbles, breaks, and omissions.
4.1.8 Exterior Wall Panel Installation Quality Standards
| Item | Tolerance |
|---|---|
| Panel surface flatness | ≤ 3mm/2m |
| Facade verticality | ≤ 3mm/2m |
| Joint height difference | ≤ 0.5mm |
| Joint width deviation | ±0.5mm |
| Internal/external corner squareness | ≤ 2mm |
| Fixings secure, no looseness or omissions | — |
4.2 Interior Wall Panel Installation
Interior wall panels are decorative surface layers of interior spaces, featuring environmental protection, fire resistance, moisture resistance, and aesthetics; commonly used methods are bamboo-wood fiber integrated wall panels and gypsum board.
4.2.1 Bamboo-Wood Fiber Integrated Wall Panel Installation
Construction Preparation
- Wall keel installation accepted; plumbing and electrical lines embedded and tested.
- Panels sorted by pattern and specification; inspect for damage, color difference, and deformation.
- Prepare accessories: internal/external corner trims, closure trims, waist lines, clips, self-tapping screws, structural adhesive.
- Snap installation reference lines and switch/socket elevation lines.
Installation Process
- Base inspection: Clean debris from wall keel surfaces; inspect flatness and verticality; rectify out-of-tolerance areas in advance.
- Initial installation: Starting from the wall corner, apply structural adhesive dots on the back of the first panel; insert side edge into internal/external corner trim; adjust verticality and secure with clips to the keel at 300mm intervals.
- Panel assembly: Align the male groove of the second panel with the female groove of the first panel; gently tap to achieve tight assembly with gap ≤ 0.3mm; secure clips; continue installing panel by panel.
- Opening cutting: Precisely measure switch/socket and door/window opening positions; cut openings with cutting machine; cut edges smooth and matching trim strips.
- Closure treatment: Use matching profiles to close top, bottom, and door/window openings; profiles joined at 45° mitered corners with tight joints.
- Internal/external corner treatment: Use dedicated internal/external corner trims; profiles straight and joints smooth.
Quality Standards
| Item | Tolerance |
|---|---|
| Wall surface flatness | ≤ 2mm/2m |
| Facade verticality | ≤ 2mm/2m |
| Joint height difference | ≤ 0.3mm |
| Internal/external corner squareness | ≤ 2mm |
| Panel surface free from scratches, damage, color difference | — |
| Fixings secure, no looseness or hollow areas | — |
4.2.2 Gypsum Board Interior Wall Installation
Construction Preparation
- Wall keel accepted; insulation cotton filled; plumbing and electrical lines embedded.
- Gypsum boards received and inspected: no damage or moisture, specifications comply.
- Prepare self-tapping screws, joint compound, paper tape, putty, sandpaper, and other materials.
Installation Process
- Board cutting: Cut gypsum boards to size; cut edges straight without edge chipping.
- Board fixing: Gypsum boards installed vertically; long edge joints located on vertical keels; secure with self-tapping screws at 200–250mm spacing; screw heads sunk 0.5–1mm below board surface without breaking the paper face.
- Joint treatment: Leave 5–8mm gaps between boards; clean before filling with joint compound; apply fiberglass tape; apply another layer of joint compound; sand smooth.
- Internal/external corner treatment: Apply corner guard paper tape at internal/external corners; apply joint compound; ensure corners are straight and square.
- Overall plastering: Apply 2–3 coats of putty over the entire wall; sand smooth and level in preparation for subsequent latex paint or wallpaper application.
Quality Standards
| Item | Tolerance |
|---|---|
| Wall surface flatness | ≤ 2mm/2m |
| Facade verticality | ≤ 3mm/2m |
| Internal/external corner squareness | ≤ 2mm |
| Screws arranged neatly, no missed or protruding screws | — |
| Board joints free from cracks and hollow areas | — |
4.3 Ceiling Installation
Ceilings serve to conceal pipes, provide insulation and soundproofing, and enhance decoration; homestay containers commonly use integrated ceilings and gypsum board ceilings.
4.3.1 Integrated Ceiling Installation
Construction Preparation
- Top keel installation complete; plumbing/electrical lines, air conditioning and fresh air ducts, and exhaust ducts embedded and tested.
- Integrated ceiling panels, keels, and corner moldings received and inspected; specifications and patterns comply with design.
- Snap ceiling elevation lines, keel layout lines, and luminaire/electrical positioning lines.
Installation Process
- Hanger rod installation: Install hanger rods at 800–1000mm spacing; securely connect to top structure; rods vertical with adjustable length.
- Main keel installation: Connect main keels to hanger rods; adjust elevation and levelness; main keel spacing 800–1000mm.
- Triangular keel installation: Connect triangular keels perpendicular to main keels at 300mm spacing (matching panel module); adjust level; secure with clips.
- Corner molding installation: Install corner moldings along wall elevation lines; level and straight; internal/external corners joined at 45° miters.
- Panel installation: Starting from one corner, install aluminum panels one by one; panels tightly assembled with uniform gaps; surfaces level.
- Electrical installation: Embedded installation of luminaires, bathroom heaters, exhaust fans, etc.; secure fixation and compliant wiring.
Quality Standards
| Item | Tolerance |
|---|---|
| Ceiling flatness | ≤ 2mm/2m |
| Joint height difference | ≤ 0.3mm |
| Joint straightness | ≤ 1mm/2m |
| Corner molding levelness | ≤ 2mm/5m |
| Panel surface free from scratches and deformation; electrical fixtures securely installed | — |
4.3.2 Gypsum Board Ceiling Installation
Construction Process
- Install hanger rods, main keels, and furring channels; keel spacing complies with specifications; levelness adjusted.
- Cover with gypsum boards; secure with self-tapping screws at 150–200mm spacing with screw heads countersunk.
- Joint treatment and internal/external corner treatment as per interior gypsum board wall technique.
- Apply putty in coats; sand smooth; apply latex paint or wallpaper.
- Luminaire, air vent, and sprinkler openings cut at accurate positions with neat edges and finished trim.
4.4 Floor Installation
Homestay container floors require moisture resistance, wear resistance, slip resistance, and aesthetics; common flooring methods include laminate flooring, SPC stone-plastic flooring, solid wood flooring, and ceramic tiles.
4.4.1 Floor Base Treatment
- Load-bearing floor base is fiber-cement board or oriented strand board (OSB); inspect base flatness, deviation ≤ 2mm/2m.
- Clean debris and dust from base surface; grind down raised areas and fill depressed areas.
- Lay moisture barrier film with 100mm overlaps; turn up 50mm at walls to block ground moisture.
- Moisture barrier laid flat without damage; repair damaged areas promptly.
4.4.2 SPC Stone-Plastic Flooring Installation (Mainstream Method)
- Starting from one end of the room, leave 8–10mm expansion gap on the wall side of the first plank, held in place with spacers.
- Align the end tongue-and-groove of the second plank with the first; tap gently to lock together; joint tight with no gaps.
- Install row by row; end joints of adjacent rows staggered by more than 300mm to avoid aligned joints.
- Cut flooring around walls, columns, and door openings; leave expansion gaps; install baseboards to cover.
- After installation, check floor flatness: no lifting, hollow areas, or uneven joints.
4.4.3 Tile Installation (Kitchen and Bathroom Areas)
- Apply waterproofing to base; after water retention test passes, apply cement mortar leveling layer.
- Snap tile layout control lines; determine layout plan; place cut tiles in inconspicuous edge/corner locations.
- Use semi-dry mortar for setting; soak tiles in water; apply neat cement slurry to tile backs.
- Tap tiles with rubber mallet for compaction and leveling; leave 2–3mm joints; use cross spacers to control joint width.
- Grout joints 24 hours after setting; grout full and dense with smooth surface.
- Foot traffic prohibited during curing period; finished product protection in place.
4.4.4 Floor Installation Quality Standards
| Item | Tolerance |
|---|---|
| Surface flatness | ≤ 2mm/2m |
| Joint straightness | ≤ 2mm/5m |
| Joint height difference | ≤ 0.5mm |
| Tile gap width deviation | ≤ 0.5mm |
| No hollow areas, cracks, or scratches | — |
5.1 Entrance Door Installation and Commissioning
5.1.1 Installation Preparation
- Inspect door opening dimensions, verticality, and squareness; rectify out-of-tolerance areas in advance.
- Entrance door received and inspected: door leaf, frame, and hardware accessories complete; free from deformation, scratches, and damage.
- Prepare tools: hammer drill, level, tape measure, wooden wedges, wrench, foam sealant, sealant.
5.1.2 Door Frame Installation
- Place the door frame into the opening; adjust position so the frame outer edge is flush with the finished wall surface.
- Temporarily secure with wooden wedges around the frame; adjust frame verticality and levelness; verticality deviation ≤ 2mm; frame diagonal difference ≤ 3mm.
- Drill at frame fixing holes; drive expansion bolts; tighten bolts symmetrically; check frame verticality continuously during tightening to prevent frame deformation.
- Fill the gap between door frame and wall with foam sealant; foam filled fully; trim excess flush after curing.
5.1.3 Door Leaf Installation and Commissioning
- Hang the door leaf on frame hinges; adjust hinge positions so the gap between door leaf and frame is uniform at 2–3mm on all sides.
- Door leaf closes flush and flat without warping, rebound, or self-opening/closing.
- Adjust door lock and handle positions; smooth operation; latch and strike plate align accurately without sticking.
- Smart lock installation and wiring; test fingerprint, password, card, and key unlocking functions.
- Adjust bottom door seal strip; when the door is closed, the seal strip compresses evenly for good sealing.
5.1.4 Sealing and Closure
- Apply neutral sealant to both interior and exterior gaps between door frame and wall; sealant line straight and smooth, width 5–8mm.
- Install interior door casing line; casing fits tightly against wall with neat 45° mitered corners.
- Install door stop, peephole, and other accessories at accurate positions with secure fixation.
5.1.5 Installation Quality Standards
| Item | Tolerance |
|---|---|
| Door frame front/side verticality | ≤ 2mm |
| Door leaf to frame overlap uniform, deviation | ≤ 1mm |
| Door leaf to floor gap | 5–8mm (no bottom rail) |
| Door lock operates smoothly, no sticking | — |
| Sealant continuous and full, no breaks or bubbles | — |
| Appearance free from scratches and impact damage | — |
5.2 Exterior Window Installation and Commissioning
Homestay container exterior windows commonly use thermally broken aluminum alloy windows with insulating glass; some high-end projects feature panoramic floor-to-ceiling windows and skylights. Installation must focus on waterproofing, sealing, and smooth opening operation.
5.2.1 Installation Preparation
- Inspect window opening dimensions, elevation, and squareness within allowable tolerances.
- Window received and inspected: profiles, glass, and hardware accessories complete; free from deformation, damage, and scratches.
- Prepare expansion bolts, foam sealant, sealant, shims, wooden wedges, and auxiliary materials.
5.2.2 Window Frame Installation
- Place the window frame into the opening; adjust position so the frame is centered with front-back position per design.
- Temporarily secure with wooden wedges; adjust frame verticality, levelness, and squareness; verticality deviation ≤ 2mm; levelness deviation ≤ 1.5mm; diagonal difference ≤ 2mm.
- Secure both sides of the window frame to wall keel with expansion bolts; fixing point spacing ≤ 500mm; corner fixing points ≤ 180mm from corners.
- Check frame flatness continuously during fixing to prevent frame deformation from stress.
5.2.3 Gap Filling and Waterproofing
- Fill the gap between window frame and opening with foam sealant in layers; fill fully; re-fill any incomplete areas.
- On the exterior side, reserve a 5–8mm deep sealant groove; apply neutral silicone weather-resistant sealant; sealant continuous and smooth, firmly adhered to both frame and wall.
- On the interior side, apply construction sealant or cover with putty/door-window casing.
- Provide drainage slope at the bottom edge of the window frame to ensure rainwater drains outward without leaking indoors.
5.2.4 Window Sash Installation and Commissioning
- Install window sash hinges or friction stays; mount sash onto the frame.
- Adjust hardware so the sash closes tightly with uniform gaps on all sides; gap deviation ≤ 0.5mm.
- Casement windows operate smoothly with opening angle up to 90°; limiters function correctly; all locking points engage after closing.
- Sliding windows slide smoothly without sticking or abnormal noise; latch aligns accurately; good sealing.
- Check seal strips compress evenly; no dislodgement or tearing.
5.2.5 Glass and Accessory Installation
- For insulating glass installation, place elastic setting blocks around the glass perimeter to avoid rigid contact between glass and profiles.
- Glass beads secured firmly with tight joints and 45° mitered corners.
- Install screens, handles, friction stays, limiters, and other accessories; functions normal and fixings secure.
- Clean glass and profile surfaces; remove protective film and stains.
5.2.6 Skylight Special Installation Requirements
- Apply flashing treatment at the junction of skylight and roof; waterproof membrane turned up onto skylight sidewall no less than 250mm and secured with metal pressure strips.
- Skylight frame securely connected to roof structure to withstand wind and snow loads.
- Use weather-resistant waterproof sealant for skylight sealing with double-layer sealing to ensure zero leakage.
- Skylight opening mechanism commissioned for smooth operation and tight closure with rainproof sealing function.
5.3 Interior Door and Glass Partition Installation
5.3.1 Interior Wooden Door Installation
- Fix the door jamb to the wall at the opening; correct verticality and squareness.
- Install door leaf hinges; adjust gaps; smooth opening without rebound.
- Install door lock, handle, and door stop; functions normal.
- Install door casing line with neat mitered corners and tight fit against wall.
5.3.2 Glass Partition Installation
- Measure and mark position; install top and bottom tracks and side fixing frames; correct levelness and verticality.
- Install tempered glass; place elastic setting blocks at glass bottom; apply sealant at sides for fixation.
- Install floor springs and hardware on glass doors; commission for smooth opening and tight closing.
- Apply transparent sealant at glass joints; sealant line straight and neat.
- Install door handles, locks, and floor stops and other accessories.
5.4 Door/Window Hardware Adjustment and Maintenance
5.4.1 Hardware Adjustment Standards
All doors and windows shall open and close smoothly without sticking, abnormal noise, or looseness.
Locks shall operate flexibly, with smooth latch bolt extension/retraction and proper locking engagement.
Hinges, friction stays, floor springs and other rotating components shall move freely without excessive play.
Weatherstripping shall compress uniformly, providing proper sealing after door/window closure with no visible light gaps.
Limit stops and wind braces shall function reliably, with opening angles conforming to the design.
5.4.2 Hardware Maintenance Instructions
Periodically clean dust and stains from hardware surfaces, keep dry, and avoid acid/alkali corrosion.
Lubricate hinges, friction stays, lock cylinders and other moving parts every six months to maintain smooth operation.
Periodically check fasteners for looseness and tighten promptly.
Inspect weatherstripping regularly and replace promptly when aged or cracked.
Chapter 6: Installation and Commissioning Standards for Homestay Container Water and Electrical Systems
6.1 Water Supply and Drainage System Installation
6.1.1 Water Supply System Installation
Pipe Material Selection
PPR hot-water pipes shall be used for the homestay container water supply system, with a nominal pressure of 1.6 MPa. S5 series for cold water, S3.2 series for hot water, featuring sanitary non-toxicity, corrosion resistance, and long service life.
Installation Procedure
Pipe routing: Supply pipes shall be routed along walls, floors, and within suspended ceilings, level and plumb, securely fixed. Pipe clamp spacing: 1000 mm for vertical risers, 800 mm for horizontal runs.
Pipe connection: Hot-melt fusion connection shall be used, with fusion temperature of 260±10°C. Fusion time determined by pipe diameter, insertion depth conforming to specifications, connection firm and leak-free.
Joint requirements: Joints shall be free of cracks or cold welds, with uniform and full fusion beads. Pipes shall have no twisting or deformation.
Branch connections: Branch pipe connections to fixtures such as wash basins, toilets, showers, and water heaters shall be accurate, with reserved interface elevations conforming to design.
Valve installation: Main inlet valve and branch valves shall be installed in accessible locations, with flexible operation and correct orientation.
Insulation treatment: Hot water pipes shall be wrapped with rubber-plastic insulation foam, 10 mm thickness, to reduce heat loss. Exposed cold water pipes shall receive anti-condensation insulation.
Quality Standards
Pipes shall be level and plumb, with verticality deviation ≤ 3 mm/m.
Joints shall be leak-free, with acceptable appearance quality of fusion joints.
Valves shall operate flexibly with correct installation orientation.
Pipes shall be firmly fixed, without looseness or vibration.
6.1.2 Drainage System Installation
Pipe Material Selection
Drainage pipes shall be UPVC drainage pipe, solvent-cement joined, with smooth interior walls, low drainage resistance, and corrosion resistance.
Installation Procedure
Drainage slope: Horizontal drainage pipes shall be installed with standard slopes: DN50 pipe slope 3.5‰, DN75 pipe slope 2.5‰, DN110 pipe slope 2‰. Reverse slope is strictly prohibited.
Pipe connection: Pipes and fittings shall be joined withadhesive adhesive, joint surfaces clean and dry, adhesive applied evenly, inserted to full depth, and allowed to cure undisturbed.
Fitting configuration: Drainage branch pipes connecting to horizontal mains shall use 45° wye fittings, avoiding straight tees which cause poor drainage. The base of vertical risers shall use two 45° elbows for transition.
Trap installation: Wash basins, showers, toilets, and floor drains shall all be fitted with traps, with water seal depth not less than 50 mm, to prevent odor backflow.
Vent pipe installation: Drainage risers shall be extended as vent stacks, terminating not less than 300 mm above the roof surface, maintaining pressure balance in the drainage system.
Pipe fixing: Riser pipe clamps spacing ≤ 1500 mm, horizontal pipe hangers spacing ≤ 1000 mm, securely fixed.
Quality Standards
Pipe slopes conform to requirements, no reverse slopes.
Joints firmly bonded, no leakage.
Pipes level and plumb, securely fixed.
Unobstructed water flow, no blockage or standing water.
6.1.3 Outdoor Pipeline Connection
Indoor water supply pipes shall connect to the outdoor municipal water supply, with installation of water meter, main valve, and check valve. Connection method: flange or hot-melt butt fusion.
Indoor drainage pipes shall connect to the outdoor septic tank or municipal sewage network, with an inspection chamber at the connection point for ease of cleaning.
Outdoor pipelines shall receive anti-freeze and anti-corrosion treatment. Buried pipelines shall be laid below the frost line.
After connection completion, proper marking shall be provided to prevent damage during subsequent construction.
6.2 Water Supply System Pressure Testing
6.2.1 Test Preparation
After water supply pipe installation is complete, hydrostatic pressure testing shall be performed. Before testing, plug all outlets and install pressure gauge and test pump.
Fill pipes with water, purge all air from the pipes, and allow to stand for 24 hours for full saturation.
Check all joints and valves for visible leaks; address any leakage before testing.
6.2.2 Test Standards
Cold water pipe test pressure shall be 1.5 times the working pressure, and not less than 0.6 MPa. Hot water pipe test pressure shall be 2 times the working pressure, and not less than 1.0 MPa.
Pressure increase shall be gradual, in stages, checking pipes for abnormalities at each stage.
After reaching test pressure, maintain stable pressure for 1 hour. Pressure drop ≤ 0.05 MPa is acceptable.
After stable pressure passes, reduce to working pressure and maintain for 2 hours. Pressure drop ≤ 0.03 MPa with no joint leakage is acceptable.
6.2.3 Test Recording and Acceptance
The test process shall be documented, with a water pressure test record form noting test pressure, stabilization duration, and pressure drop values.
Acceptance shall be jointly conducted by the contractor, owner, and supervisor, with signatures confirming results.
After test acceptance, slowly release pressure, drain water from pipes, and protect pipe openings.
6.3 Drainage System Water Flow and Ball Test
6.3.1 Water Flow Test
Open all water supply faucets simultaneously, and check each drainage point for smooth drainage, blockage, or standing water.
Check pipe joints for leakage and floors for water backflow.
The water flow test shall last 30 minutes. Smooth drainage with no leakage qualifies as acceptable.
6.3.2 Ball Test
Ball tests shall be performed on drainage risers and main horizontal pipes, using a ball with diameter equal to 3/4 of the pipe inner diameter.
Insert the ball from the top of the riser; passage through the bottom outlet qualifies as acceptable.
If the ball becomes obstructed, locate the position, clear the obstruction, and retest until the ball passes freely.
6.4 Power System Installation
6.4.1 Distribution Box Installation
The distribution box shall be mounted at a height of 1.5 m from the bottom edge to floor level, installed vertically with verticality deviation ≤ 1.5 mm.
The distribution box shall be firmly fixed, reliably grounded, with neat internal wiring and clear circuit identification labels.
Main switch and branch circuit breakers shall be configured per design. Residual current circuit breaker (RCCB) rated trip current 30 mA, trip time ≤ 0.1 s.
Phase, neutral, and ground conductor color coding: Phase conductors L: red, yellow, green; Neutral N: blue; Ground PE: yellow-green bicolor.
6.4.2 Conduit Routing
Wires shall be routed through PVC flame-retardant conduit or galvanized steel conduit, laid along walls, suspended ceilings, and floors, level and plumb, securely fixed.
No splices or kinks inside conduit. Conductors of different circuits and different voltages shall not share the same conduit.
Conduit bends shall use elbows or large-radius bends, ensuring smooth wire pulling and insulation protection.
Conductor cross-sectional area: lighting circuits 2.5 mm², general receptacle circuits 2.5 mm², high-power circuits such as air conditioners and water heaters 4 mm², main incoming feeders determined by total load.
6.4.3 Switch and Receptacle Installation
Switches installed at height 1.3 m, 150-200 mm from door frame edge. Switches within the same space shall have consistent heights, deviation ≤ 2 mm.
General receptacles at height 0.3 m. Kitchen and bathroom receptacles at 1.4 m. Air conditioner receptacles at 2.2 m.
Receptacle wiring shall follow the principle: left neutral, right phase, top ground. Wiring firm, terminals properly tightened.
Splash-proof receptacles shall be used in bathrooms, balconies, and other humid areas.
Switches control the phase conductor. Receptacles shall be reliably grounded. Switches and receptacles in the same location shall be neatly arranged with consistent heights.
6.4.4 Lighting Fixture Installation
Lighting fixtures shall be securely mounted. Fixtures weighing over 3 kg shall be fixed to dedicated suspension rods, not to ceiling furring.
Fixture wiring shall be correct with good contact, and metal housings reliably grounded.
Fixtures in the same space shall be neatly arranged, with centerline deviation ≤ 5 mm.
Switches shall correspond to fixtures correctly, with control logic conforming to design.
6.4.5 Grounding and Lightning Protection
The overall steel structure of the homestay container shall have equipotential bonding, reliably connected to the main grounding conductor.
All electrical equipment metal housings, metal conduits, and distribution box enclosures shall be connected to the PE conductor.
Grounding resistance ≤ 4 Ω, meeting safety grounding requirements.
Lightning protection strip shall be installed on the roof, connected to the main steel structure and the grounding system. Lightning protection level conforms to local requirements.
6.5 Power System Insulation and Grounding Testing
6.5.1 Insulation Resistance Testing
Use a 500 V megohmmeter to measure insulation resistance between phase and neutral, phase and ground, and neutral and ground for each circuit.
Lighting and receptacle circuit insulation resistance ≥ 0.5 MΩ qualifies as acceptable.
Disconnect all electrical equipment during testing to prevent equipment damage.
Maintain test records. For circuits with substandard values, investigate the cause, rectify, and retest.
6.5.2 Grounding Resistance Testing
Use a ground resistance tester to measure system grounding resistance.
Protective grounding resistance ≤ 4 Ω, lightning protection grounding resistance ≤ 10 Ω, combined grounding resistance ≤ 1 Ω.
If test results fail, add ground electrodes to reduce resistance until passing.
6.5.3 Residual Current Device Testing
Press the RCD test button; the protective device shall trip immediately.
Simulate leakage conditions; test that trip current and trip time meet standards.
Test each circuit individually; all circuits shall pass.
6.6 Low-Current System Installation
6.6.1 Network Communication System
Each guest room shall have 1-2 network points, using Cat5e or Cat6 cabling, routed radially from the low-current distribution box.
The low-current distribution box houses the router, optical modem, switch, and other equipment, with reserved power supply.
RJ45 connectors or network faceplates shall be terminated at both ends of each cable. Continuity testing passed and transmission rates meet requirements.
Whole-home WiFi coverage with signal strength meeting usage needs and no dead zones.
6.6.2 Cable Television System
Television points installed on living room and bedroom walls, height 0.3-1.0 m.
Coaxial cable shall be used, with signal attenuation meeting requirements.
Connect to cable TV signal or IPTV signal; image clear, no noise.
6.6.3 Security Monitoring System
Surveillance cameras installed in homestay public areas and entrances/exits, with no blind spots.
Camera installation height 2.5-3 m, appropriate angle, clear images.
Video recorder stores footage for no less than 30 days.
Power and signal lines shall be routed separately to avoid interference.
6.6.4 Smart Control System
Wiring for smart locks, smart lighting, smart curtains, smart climate control, voice control and other systems shall be fully installed.
Gateways and control hosts installed in the low-current box or dedicated equipment location, with stable power supply.
Sub-system linkage commissioning completed; mobile APP and voice control functions operating normally.
System shall have user permission settings, convenient operation, and stable performance.
6.7 Energized Trial Operation
6.7.1 Pre-Energization Inspection
Check all wiring connections for correctness, without short circuit or misconnection hazards.
All electrical equipment in the OFF state; all switches in the OFF position.
Circuit identification labels clear in the distribution box; breaker rated currents match circuit requirements.
6.7.2 Circuit-by-Circuit Energization
First close the main breaker, then close each branch breaker sequentially, checking for abnormalities after each circuit is energized.
Test lighting, receptacles, and equipment power supply for each circuit.
Test receptacles with a receptacle tester; phase, neutral, and ground wiring correct, no missing phase or reverse connection.
6.7.3 Full-Load Trial Operation
All lighting, receptacles, and electrical equipment turned on for full-load operation.
Run for 24 hours; check distribution box, wiring, and equipment for overheating, abnormal noise, or odor.
Measure total current and voltage, conforming to design requirements, with no overload.
Inspect every 2 hours during trial operation and maintain operation records.
Chapter 7: Installation and Commissioning of HVAC Comfort Systems for Homestay Containers
7.1 Air Conditioning System Installation and Commissioning
Homestay containers commonly use three types of air conditioning: split-type, central, and ducted units, selected according to project positioning and container layout.
7.1.1 Split-Type Air Conditioner Installation
Indoor unit installation: The indoor unit shall be wall-mounted or suspended within the ceiling, installed level, with the drainage side 1-2° lower to facilitate condensate drainage. Installation shall be firm with reliable load bearing, leaving service access space from ceiling and walls.
Outdoor unit installation: The outdoor unit shall be placed on an outdoor platform or dedicated position, with a stable foundation, good ventilation, and clearance around for heat dissipation. Anti-vibration pads installed properly to reduce vibration and noise.
Refrigerant line connection: Copper pipes joined by brazing with nitrogen purge to prevent internal oxidation. After pipe purging and vacuum dehydration pass, charge refrigerant.
Condensate drain installation: Condensate drain pipe slope ≥ 1%, connected into the drainage system, with proper trap configuration for smooth drainage.
Electrical connection: Dedicated circuit supply, correct wiring, reliable grounding.
7.1.2 System Commissioning
Before energization, check that wiring and piping connections are correct, and refrigerant charge weight meets manufacturer requirements.
Start units for trial operation; check compressor and fan for normal operation, abnormal noise, or vibration.
Test cooling and heating modes. Supply air temperature meets standards: in cooling mode, supply air temperature ≥ 8°C below indoor temperature; in heating mode, ≥ 15°C above indoor temperature.
Check condensate drainage is smooth with no dripping or overflow.
Test thermostat functions: temperature adjustment, mode switching, and timer functions normal.
Run for 2 hours; system pressure stable with no refrigerant leakage.
7.2 Fresh Air System Installation and Commissioning
7.2.1 Fresh Air Unit Installation
The fresh air unit shall be suspended within the ceiling using vibration-isolating hangers to reduce vibration and noise.
Unit location shall allow for service access, with a service opening provided.
Unit installed level, with supply and exhaust connections in the correct orientation.
7.2.2 Duct Installation
Fresh air ducts shall be PVC duct or galvanized sheet metal duct, routed within the ceiling, minimizing bends.
Supply air diffusers placed in bedrooms, living rooms, and other occupied areas. Return air grilles placed in common areas or bathrooms.
Duct connections shall be airtight, leakage within standards, and ducts securely fixed.
Supply and exhaust openings shall maintain adequate separation to prevent air short-circuiting.
7.2.3 System Commissioning
Start units for trial operation; check fans run smoothly without abnormal noise or vibration.
Test airflow at each supply diffuser; air velocity uniform, total fresh air volume meeting design requirements.
Test filtration system and heat exchange system functions normal.
Adjust fresh air fan speed; high/low speed switching smooth.
Check noise levels: indoor noise ≤ 40 dB, meeting sleep requirements.
7.3 Exhaust Ventilation System Installation
7.3.1 Bathroom Exhaust Fan Installation
Exhaust fan mounted within the bathroom ceiling, connected to exhaust duct routed to the outside.
Exhaust fan securely fixed with anti-vibration pads to reduce operating noise.
Exhaust duct sloped toward exterior to prevent condensate backflow; outlet fitted with weatherproof louver.
Switch installed at the bathroom entrance for convenient control.
7.3.2 Kitchen Exhaust Installation
Range hood or exhaust fan installed, exhaust duct routed to the outside with a backdraft damper at the outlet.
Exhaust duct connections airtight with no smoke leakage.
Trial operation to verify suction is normal with no backdraft.
7.4 Underfloor Heating System Installation and Commissioning (Optional)
7.4.1 Underfloor Heating Installation
Floor base leveled; install reflective film, insulation board, then heating pipes at 150-200 mm spacing.
Heating pipes securely fixed, undamaged, with bending radius meeting requirements.
Manifold installed in an accessible location, with each circuit clearly labeled.
7.4.2 Pressure Testing
After heating pipe installation, perform hydrostatic pressure test at 0.6-0.8 MPa.
Maintain pressure for 1 hour; pressure drop ≤ 0.05 MPa with no leakage qualifies as acceptable.
After test acceptance, proceed with floor backfill and leveling. Maintain pressure during the curing period.
7.4.3 System Commissioning
Connect heat source (gas wall-hung boiler, air-source heat pump, etc.), fill system with water and purge air.
Heat up slowly; initial start-up water temperature not exceeding 30°C. After 24 hours of operation, gradually raise to design temperature.
Check water circulation in each circuit is normal, floor surface temperature uniform, without hot/cold spots.
Test thermostat functions; independent temperature control in each room operating normally.
7.5 HVAC System Integrated Commissioning
After individual commissioning of air conditioning, fresh air, exhaust, and underfloor heating systems pass, perform integrated commissioning.
Test coordinated operation of systems under different modes, such as cooling + fresh air, heating + fresh air.
Test smart climate control system linkage functions; automatic temperature adjustment operating normally.
Continuous operation for 48 hours; systems run stably, parameters normal, no fault alarms.
Indoor temperature, humidity, fresh air volume, and noise levels meet design comfort requirements.
Chapter 8: Waterproofing and Insulation System Construction Guidelines for Homestay Containers
8.1 Roof Waterproofing System Construction
Roof waterproofing is the key priority in homestay container waterproofing, directly affecting building service life. Construction shall strictly follow specifications to ensure zero leakage.
8.1.1 Roof Substrate Preparation
Roof substrate shall be level, dry, and clean, free of protrusions, sharp objects, oil stains, and dust.
Internal and external corners, gutters, chimney bases, and pipe penetrations shall have arc transitions with arc radius of 50 mm.
Substrate moisture content ≤ 9%. Simple test: cover substrate with 1 m² membrane; after standing 3-4 hours, no water marks indicates acceptable for construction.
8.1.2 Additional Layer Construction
Additional waterproofing layers shall be applied first at leak-prone locations: internal/external corners, gutters, eaves, pipe penetrations, and expansion joints.
Additional layer shall be the same membrane material, width 500 mm (250 mm on each side), full-surface adhered.
Additional layer firmly bonded, free of air pockets or wrinkles.
8.1.3 SBS Membrane Installation
Membrane laying direction: when roof slope is less than 3%, membrane laid parallel to roof ridge; when slope is 3%-15%, may be laid parallel or perpendicular to ridge.
Torch-applied method: use flame torch to heat membrane underside and substrate. After membrane surface melts, roll forward, expelling air, adhering firmly.
Lap requirements: longitudinal lap width ≥ 100 mm, transverse lap width ≥ 150 mm. Upper and lower membrane layers staggered by 1/3-1/2 of sheet width. Sheets shall not be laid perpendicular to each other.
Lap joint treatment: lap joints torch-bonded, with molten bitumen extruded to form a uniform bitumen bead, tightly sealed.
Edge termination: membrane edges tucked into grooves, secured with metal batten strips and nails, sealed with sealant.
8.1.4 Gutter and Drainage System Construction
Membrane in gutters laid straight and smooth, lap joints staggered, with additional layer at gutter base.
Additional layer applied within 500 mm around roof drains, extending into the drain opening not less than 50 mm.
Roof drains securely installed, with watertight sealing at the intersection with roofing, and smooth drainage.
Downspouts installed vertically, securely fixed, with outlet 150-200 mm above ground level.
8.1.5 Water Ponding Test
After waterproofing layer construction, perform a water ponding test.
Plug roof drains and fill with water to a minimum depth of not less than 20 mm at the shallowest point. Maintain for no less than 24 hours.
Check roof for leakage or ponding, and check ceiling below for water penetration marks.
Only after the ponding test passes may the protective layer or finish layer be installed.
8.2 Wall Waterproofing Construction
8.2.1 Exterior Wall Waterproofing
Homestay container exterior wall panels themselves have waterproofing capability. Focus on sealing joints and special details.
Wall panel joints use a dual waterproofing system of tongue-and-groove fit plus sealant, with sealant applied continuously and fully.
Weather-resistant sealant applied at window/door perimeters, pipe through-wall penetrations, and internal/external corners, with multiple sealing passes.
Flashing treatment at wall base to direct rainwater outward, preventing water ingress at the bottom.
Water spray test: spray walls with high-pressure water for 15 minutes; no leakage observed from the interior side qualifies as acceptable.
8.2.2 Interior Kitchen/Bathroom Wall Waterproofing
Substrate preparation: wall surface level, clean, free of loose dust, internal/external corners finished with arc transitions.
Waterproof coating application: polymer cement-based waterproof coating, 2-3 coats, total thickness ≥ 1.5 mm.
Waterproofing height: shower area not less than 1800 mm, wash basin area not less than 1200 mm, other walls not less than 300 mm.
Application requirements: each coat applied perpendicular to the previous, subsequent coats applied after previous coat fully dries. Application uniform, no missed areas or blistering.
Water ponding test: kitchen and bathroom floor and wall waterproofing tested together with water ponding for 24 hours with no leakage.
8.3 Floor Waterproofing Construction
8.3.1 Kitchen/Bathroom Floor Waterproofing
Substrate leveled with slope of 1%-1.5% directed toward floor drain. No reverse slope or standing water.
Waterproof coating applied, extending from floor up the wall, lapping with wall waterproofing.
Additional layer applied at floor drains and pipe penetrations for enhanced protection.
Water ponding test for 24 hours; no leakage to the floor below or surrounding areas qualifies as acceptable.
After waterproofing passes, apply protective layer to prevent damage during subsequent construction.
8.3.2 Overall Floor Moisture Protection
The base chassis of homestay containers shall receive anti-corrosion and moisture-proof treatment, with installation of a moisture barrier layer.
Moisture barrier film laid on the floor substrate, with tight laps, turned up at walls, forming a complete moisture barrier.
In humid southern regions, ventilation openings shall be added at the base to maintain air circulation and prevent condensation and dampness.
8.4 Insulation System Construction
8.4.1 Wall Insulation Construction
Insulation wool filled within wall stud cavities, filled fully, without voids or sagging.
Insulation wool laid with tight seams, gaps ≤ 5 mm, with staggered joints.
Avoid compressing insulation during installation; maintain original thickness to ensure insulation effectiveness.
A vapor barrier membrane shall be installed on the interior side of the insulation layer, with 100 mm laps, sealed with tape, preventing interior moisture vapor from entering the insulation layer.
Insulation wool at window/door openings shall be cut neatly and packed tightly to prevent thermal bridging.
8.4.2 Roof Insulation Construction
Roof insulation boards placed above purlins, boards fitted tightly, gaps filled with insulation strip.
Insulation layer laid level with uniform thickness; damaged areas repaired promptly.
Waterproofing layer installed above the insulation layer to prevent water damage to insulation.
Thermal bridge locations on the roof shall receive enhanced insulation treatment to reduce heat loss.
8.4.3 Floor Insulation Construction
For elevated-bottom projects or projects with underfloor heating, insulation boards laid on the floor to reduce downward heat transfer.
Insulation boards laid level with tight joints, seams taped.
Protective layer above insulation to prevent compression deformation.
8.5 Waterproofing and Insulation Performance Testing
8.5.1 Waterproofing Performance Testing
Roof ponding test and kitchen/bathroom ponding tests shall pass.
Exterior wall water spray test shall pass.
All special details shall be free of leakage.
Comprehensive inspection after rain: no water penetration or leakage marks.
8.5.2 Insulation Performance Testing
Insulation layer thickness conforms to design requirements with deviation ≤ 5%.
Insulation material thermal conductivity conforms to product standards.
Winter indoor/outdoor temperature differential testing: design insulation performance achieved.
No visible thermal bridging or condensation phenomenon.
Chapter 9: Interior Decoration and Soft Furnishing Installation Process for Homestay Containers
9.1 Kitchen Area Installation
9.1.1 Cabinet Installation
Kitchen wall and floor tile work complete, water and electrical point locations accurate.
Install base cabinets, adjust leveling and height. Base cabinet flatness ≤ 2 mm, cabinet door gaps uniform.
Install wall cabinets at accurate heights, level and secure, 700-750 mm above the countertop surface.
Install countertops (quartz stone or stainless steel), seams sanded smooth, sealed with sealant against the wall.
Install handles, hinges, pull-out baskets and other hardware; operation smooth.
9.1.2 Kitchen Appliance Installation
Sink and faucet installation, drain connection, water test with no leakage.
Induction cooker, microwave oven, refrigerator and other appliances positioned, wired, energized, and tested for normal function.
Range hood installation, exhaust duct connected, test run verifying normal suction.
All appliances reliably grounded; receptacle positions reasonable and convenient to use.
9.2 Bathroom Area Installation
9.2.1 Modular Bathroom Installation
Homestay containers commonly use modular bathrooms, prefabricated at the factory and installed quickly on site.
Bathroom base chassis positioned, leveled, and docked to drainage connections.
Install wall panels with tight joints and waterproof sealant sealing.
Install ceiling, lighting, and exhaust fan.
Install sanitary fixtures and hardware, connecting to water supply and drainage.
Ponding test passed; water and power supply tests verify all functions.
9.2.2 Sanitary Fixture Installation
Toilet installation: discharge outlet aligned, wax ring seal, securely fixed, water test with no leakage, flushing smooth.
Wash basin installation: countertop installed level, faucet securely mounted, drain connection smooth, no leakage.
Shower installation: shower screen sealed, shower head and faucet securely mounted, normal water discharge, smooth hot/cold water adjustment.
Hardware accessories: towel bars, shelves, toilet paper holders, and mirrors installed securely with consistent heights and neat arrangement.
9.3 Storage System Installation
9.3.1 Wardrobe Installation
Wardrobe body assembled, plumb and level verified, securely fixed.
Install doors, adjust hinges for uniform gaps and smooth operation.
Install hanging rods, drawers, and shelves; hardware functions normal.
Wardrobe fitted tightly against walls and ceiling, with neat trim.
9.3.2 Other Storage
TV cabinet, nightstands, shelving units and other furniture installed and secured.
All furniture level and plumb, neatly arranged, securely fixed to prevent tipping.
Hardware accessories complete, functions normal, surfaces free of scratches or damage.
9.4 Soft Furnishing Arrangement and Installation
9.4.1 Curtain Installation
Curtain tracks or curtain rods installed, level and secure, with consistent heights.
Curtains hung with uniform folds, smooth opening/closing.
Smart curtains tested for motor, remote control, and APP control functions.
9.4.2 Lighting and Decoration
Main lights, wall sconces, bedside lamps, and accent lighting installed and commissioned; lighting effects conform to design.
Decorative artwork and hangings installed at accurate positions, level and secure.
Wall decoration and feature walls completed to required effect.
9.4.3 Furniture and Appliance Placement
Beds, sofas, tables, chairs and other furniture positioned per design.
TV, air conditioner, water heater and other appliances commissioned and functioning normally.
Bedding, throw pillows, rugs and other soft furnishings arranged; overall effect coordinated.
9.5 Indoor Air Quality Testing
After decoration completion, ventilate and air out for 7-15 days.
Commission a professional agency to test indoor formaldehyde, benzene, TVOC, and other harmful gas levels.
Air quality shall meet Class I civil building requirements per the “Standard for Indoor Environmental Pollution Control of Civil Building Engineering.”
If test results are unsatisfactory, implement remediation measures until compliant.
Chapter 10: Installation Construction Requirements for Ancillary Facilities of Homestay Containers
10.1 Outdoor Platform and Boardwalk Installation
10.1.1 Treated Wood Platform Installation
Platform joists securely connected to foundation or container structure, with proper preservative treatment.
Treated wood deck boards installed with 3-5 mm gaps, hidden fasteners, level surface.
Platform provided with 1% drainage slope for smooth water runoff.
Wood surfaces coated with wood oil or preservative paint to protect and extend service life.
10.1.2 Guardrail Installation
Guardrails installed around platform perimeter, height not less than 1100 mm, post spacing not greater than 1200 mm.
Guardrails firmly fixed, resisting horizontal load ≥ 1.5 kN/m.
Guardrail material and style coordinated with the overall homestay aesthetic.
10.2 Awning and Canopy Installation
Awning frame securely connected to the main structure, with wind resistance meeting requirements.
Canopy fabric or polycarbonate sheets installed level with smooth drainage and no standing water.
Retractable awnings commissioned for motor and remote control functions, with smooth extension/retraction.
Edges finished with neat trimming for a clean appearance.
10.3 Signage and House Number Installation
Homestay signboard, wayfinding signs, and house numbers installed at prominent locations with consistent style.
Installations secure, weather-resistant; illuminated signage wiring conforms to code.
Signage content clear, typography standardized, conforming to design.
10.4 Wastewater Treatment Equipment Installation (For Sites Without Municipal Sewage)
Compact integrated wastewater treatment equipment positioned on a stable foundation.
Inlet and outlet pipes connected; equipment operating parameters commissioned.
Treated water quality meets discharge standards; periodic cleaning and maintenance performed.
Equipment installed discreetly to avoid impacting the landscape.
10.5 Solar System Installation (Optional)
Solar photovoltaic panels or solar water heaters installed on the roof, with sturdy brackets and proper tilt angles.
Wiring and energy storage equipment connected; system commissioned normally.
Power generation or heating efficiency meets design standards.
Lightning protection and grounding reliable, conforming to safety codes.
Chapter 11: Overall Integrated Commissioning and Completion Acceptance for Homestay Containers
11.1 Sub-System Commissioning Re-Inspection
11.1.1 Structural System Re-Inspection
Check all structural connection nodes: bolts properly torqued, weld quality acceptable, anti-corrosion coating intact.
Re-verify overall verticality and levelness, conforming to code.
Check stairs, platforms, balconies, and other ancillary structures for secure installation.
Check structural appearance: no deformation, corrosion, or damage.
11.1.2 Enclosure System Re-Inspection
Check interior/exterior wall panel installation quality: level, secure, and aesthetically pleasing joints.
Check doors/windows for smooth operation, proper sealing, and complete hardware.
Check floor and ceiling installation quality, meeting acceptance standards.
Check all sealant application locations: full, no cracking.
11.1.3 Water and Electrical System Re-Inspection
Water supply system re-pressure-tested to confirm no leakage.
Drainage system water flow tested: smooth drainage, no blockage.
Power system full-load trial operation: wiring and equipment operating normally.
All low-current system function tests normal, signals stable.
11.1.4 Waterproofing and Insulation Re-Inspection
Roof and kitchen/bathroom re-ponding tested: no leakage.
Exterior wall water spray test: no water penetration.
Check all waterproofing details: seals intact.
Check insulation layer integrity: no damage or thermal bridging.
11.1.5 HVAC System Re-Inspection
Air conditioning, fresh air, and exhaust equipment operating normally with performance meeting standards.
Temperature control and linkage functions normal.
Operating noise meets requirements, no abnormal sounds.
11.2 Overall Integrated Commissioning
All systems started simultaneously, simulating full-occupancy conditions, run continuously for 72 hours.
Conduct inspections every 4 hours, recording all operating parameters including voltage, current, water pressure, temperature, and equipment operating status.
Check coordinated operation of all systems for mutual interference or fault cascading.
Test extreme conditions: system performance during summer peak heat, winter extreme cold, and heavy rain.
Problems found during commissioning shall be rectified promptly and re-commissioned until all items pass.
11.3 Visual Quality Acceptance
Overall appearance: architectural form and facade effect conform to design, colors coordinated, good visual quality.
Interior finish quality: walls, floors, and ceilings level and appealing, joints straight, color uniform, no visible defects.
Doors/windows/hardware: surfaces clean, no scratches, hardware complete and installed squarely.
Detail finishing: internal/external corners, transitions, and pipe/duct openings neatly finished and trimmed.
Cleanliness: interior and exterior clean, free of construction debris, dust, and stains. Finished products well protected.
11.4 Functional Completeness Acceptance
Living functions: all functional spaces — bedrooms, living rooms, kitchen/bathroom, storage — operate normally and meet residential needs.
Water and electrical functions: water supply, drainage, power, lighting, and all receptacles fully functional without faults.
Comfort functions: air conditioning, fresh air, underfloor heating and other equipment operate normally; indoor temperature, humidity, and air quality meet standards.
Smart functions: smart lock, smart control, network communication, and all other functions normal.
Safety functions: fire protection, security, lightning protection, grounding and other safety facilities complete and effective.
11.5 Completion Acceptance Documentation
Complete as-built documentation shall be submitted for acceptance, including:
- Product certificates of conformity, factory inspection reports
- Material quality certification documents and test reports
- Construction records, concealed works acceptance records
- System test and commissioning records
- As-built drawings, change orders
- Sub-division quality acceptance records
- Completion acceptance certificate
- Operation manual, warranty card
11.6 Completion Acceptance Procedure
Contractor self-inspection passes; submit completion acceptance application and as-built documentation.
Acceptance team composed of the owner, manufacturer, and supervisor conducts on-site acceptance.
Systems and locations inspected item by item, with actual measurements taken and acceptance records completed.
Rectification comments issued for identified issues, with deadlines for correction.
After rectification is complete, re-inspect. Upon all items passing, sign the completion acceptance certificate and formally hand over for use.
Chapter 12: Daily Use and Maintenance Manual for Homestay Containers
12.1 Daily Use Precautions
12.1.1 Structural Use Precautions
Use the homestay container within its design load capacity. Floor overloading with heavy items is strictly prohibited. Walking on or storing items on the roof is prohibited.
Unauthorized modification of the main structure is prohibited, including removal of walls, columns, or beams. For renovations, contact the manufacturer for professional evaluation.
Avoid violent impacts to the container to prevent steel structure deformation and wall panel damage.
For multi-story containers, overloading balconies or terraces with concentrated crowds is prohibited; loads shall not exceed design values.
12.1.2 Water and Electrical Use Precautions
Total power consumption of electrical equipment shall not exceed distribution box rated capacity. Unauthorized wiring connections are prohibited.
High-power appliances shall be used at staggered times to avoid overload tripping.
Do not touch switches or receptacles with wet hands. Pay attention to moisture protection for bathroom electrical appliances.
Close the main water valve and main power when vacant for extended periods to prevent leakage and electrical accidents.
In cold winter regions, drain water from pipes when vacant long-term to prevent pipe freezing and bursting.
12.1.3 Door and Window Use Precautions
Open and close doors and windows gently; avoid violent force.
Close windows promptly during strong wind conditions to prevent sash damage.
Do not hang heavy objects on doors or windows to prevent deformation.
Clean tracks and channels of debris regularly to maintain smooth operation.
12.1.4 Waterproofing Use Precautions
Clean leaves and debris from the roof regularly to maintain drainage and prevent drain blockage causing ponding.
Avoid large accumulations of water in kitchen/bathroom use; clean hair and debris from floor drains promptly.
Damage to the waterproofing layer is prohibited. Wall penetrations shall be properly sealed for waterproofing.
Contact maintenance promptly upon discovering leaks to prevent spread.
12.2 Periodic Maintenance Plan
12.2.1 Monthly Maintenance
Clean interior/exterior walls, doors/windows, and floors to maintain cleanliness.
Check doors/windows for smooth operation and hardware for looseness.
Check floor drains and drainage outlets for blockage; clean promptly.
Check lighting fixtures, switches, and receptacles for normal operation.
Check air conditioner and fresh air filters; clean dust accumulation.
12.2.2 Quarterly Maintenance
Check exterior steel structure anti-corrosion coating for damage; touch up paint promptly.
Check exterior wall panels and sealant for cracking or peeling; repair and reseal promptly.
Check roof drainage system; clean debris from gutters and downspouts.
Tighten exposed bolted connections to prevent loosening.
Check water and electrical pipelines for aging or leakage; address promptly.
Lubricate door/window hardware, hinges, and locks.
12.2.3 Annual Maintenance
Comprehensively inspect the steel structure; remove rust, touch up paint, and perform anti-corrosion maintenance.
Comprehensively inspect all waterproofing areas; repair aged sealant; re-do partial waterproofing where necessary.
Check insulation layer performance; repair damaged areas to ensure insulation effectiveness.
Perform deep maintenance on air conditioners, fresh air systems, water heaters and other equipment; replace consumables.
Test electrical system insulation and grounding performance to eliminate safety hazards.
Check smart system operating status; upgrade firmware and optimize functions.
12.3 Common Fault Diagnosis and Troubleshooting
12.3.1 Water Leakage Faults
| Fault Symptom | Possible Cause | Remedy |
|---|---|---|
| Roof leakage | Waterproofing layer damage, roof drain blockage, lap joint failure | Clear roof drains, repair damaged waterproofing, reapply sealant |
| Window edge leakage | Sealant cracking, gap at window frame | Remove old sealant, reapply weather-resistant sealant |
| Wall leakage | Wall panel joint sealant failure, unsealed conduit openings | Reapply sealant at joints, re-seal openings |
| Kitchen/bathroom leakage | Waterproofing layer damage, pipe joint leakage | Locate leak point, repair waterproofing, tighten or replace pipe fittings |
12.3.2 Electrical Faults
| Fault Symptom | Possible Cause | Remedy |
|---|---|---|
| Whole-building power failure | Main breaker tripped, external power outage | Check main breaker, clear fault, re-close; confirm external supply |
| Single circuit failure | Branch breaker tripped, wiring fault | Check circuit appliances, clear short/overload, re-close; repair wiring |
| Receptacle no power | Loose receptacle wiring, breaker tripped | Check breaker, tighten receptacle wiring |
| Light not working | Bulb burned out, switch faulty | Replace bulb, repair switch |
12.3.3 Door/Window Faults
| Fault Symptom | Possible Cause | Remedy |
|---|---|---|
| Sticking operation | Hinges dry, debris in track | Clean track debris, lubricate hinges |
| Poor sealing | Gasket aged, door leaf distorted | Replace weatherstrip, adjust door leaf |
| Lock malfunction | Lock cylinder dry, latch misaligned | Apply graphite powder to cylinder, adjust strike plate position |
12.3.4 Water Supply/Drainage Faults
| Fault Symptom | Possible Cause | Remedy |
|---|---|---|
| Low water flow | Insufficient water pressure, filter screen blocked | Check water pressure, clean faucet filter screen |
| Slow drainage | Pipe blockage, trap obstruction | Clear pipe, clean trap |
| Pipe leakage | Loose joint, pipe material failure | Tighten joint, replace damaged pipe |
12.4 Seasonal Maintenance Points
12.4.1 Rainy Season Maintenance
Before the rainy season, comprehensively inspect roof and wall waterproofing; clean drainage system to ensure unobstructed flow.
Check door/window sealing to prevent rainwater ingress.
Check foundation perimeter drainage to prevent prolonged foundation water immersion.
After rain, inspect interior for leaks; address issues promptly.
12.4.2 Winter Maintenance
Before winter, insulate water pipes to prevent freezing and bursting.
Check door/window sealing to improve insulation performance.
In severe cold regions, when vacant long-term, drain water from pipes.
After snowfall, clear roof snow promptly to avoid overload.
12.4.3 Summer Maintenance
Before summer, clean air conditioner and fresh air filters for optimal cooling and ventilation performance.
Check sunshade and heat insulation facilities to improve thermal performance.
Check electrical equipment heat dissipation to avoid high-temperature overload.
Implement mosquito control measures; ensure window screens are intact.
12.5 Techniques for Extending Service Life
Regular anti-corrosion maintenance, promptly repairing damaged steel structure paint, is the key to extending container lifespan.
Maintain the waterproofing system integrity to prevent rainwater infiltration that corrodes the steel structure and insulation layer.
Avoid overload use and structural modification; protect the main structure’s load-bearing performance.
Maintain interior ventilation and dryness to prevent mildew of finishes and metal corrosion from prolonged dampness.
Service equipment regularly and replace wear parts promptly to extend equipment life.
Clean and maintain properly; avoid damage to interior/exterior decorative surfaces from acids, alkalis, or sharp objects.
Follow manufacturer instructions; contact professionals promptly for repairs. Do not delay minor issues.
Chapter 13: Safety Regulations and Emergency Response Plans for Homestay Container Installation Construction
13.1 General Safety Regulations for Installation Construction
All construction personnel must receive safety education and training, be familiar with position-specific safety operating procedures, and special operation personnel must hold valid certifications.
Hard hats must be worn on site. Fall protection harnesses must be worn for work at height. Non-slip shoes required. Personal protective equipment must be used correctly.
Clear safety warning signs shall be posted at the construction site. Hazardous areas shall be cordoned off with warning tape; unauthorized personnel prohibited from entering.
Daily pre-shift safety briefings shall be held, emphasizing the day’s work risks and safety precautions.
Working under the influence of alcohol, fatigued work, illegal direction, and illegal operation are strictly prohibited.
Smoking is strictly prohibited on site. Hot work requires a hot work permit, fire extinguishing equipment must be available, and a designated fire watcher assigned.
Construction power use shall strictly comply with temporary power regulations. Unauthorized wiring connections prohibited; the electrician is responsible for power management.
Clean the site daily after work, cut power, extinguish all fire sources, and verify no hazards remain before leaving.
13.2 Work at Height Safety Regulations
Before working at height, inspect scaffolding, work platforms, and ladders for stability; use only after acceptance.
Safety harnesses must be attached to secure structural members, anchored high and used low. Anchoring low and using high is prohibited.
Tools must be placed in tool bags when working at height. Items passed up or down using ropes; throwing is prohibited.
Work at height shall stop in severe weather: winds of force 6 or above, heavy rain, dense fog.
Warning zone established below work-at-height areas, with dedicated personnel monitoring; pedestrian passage prohibited.
Personnel working at height shall have regular physical examinations. Persons with hypertension, heart disease, or other disqualifying conditions shall not work at height.
13.3 Lifting Operation Safety Regulations
Lifting operations shall be directed by a dedicated signal person, with uniform and standardized signals. Crane operators must hold valid certifications.
Before lifting, inspect rigging and slings for integrity. Rated load capacity must satisfy requirements; overloading strictly prohibited.
Personnel are prohibited within the lifting radius; a warning area shall be established.
A trial lift shall be performed before formal lifting. Lifting shall be smooth, avoiding sudden stops and slews.
Components must be securely fixed before releasing the hook. Releasing the hook before fixing is prohibited.
All outriggers of the truck crane shall be fully extended, with timber cribbing placed underneath, machine level, and outrigger ground conditions firm.
Lifting operations shall stop when wind force reaches force 6 or above.
13.4 Electrical and Fire Safety Regulations
Temporary power shall use three-level distribution with two-level protection. Distribution boxes locked. Residual current devices sensitive and effective.
All electrical equipment metal housings shall have grounding/neutral protection. Wire insulation intact, no exposed or damaged conductors.
Use safety voltage in damp environments. Power tools shall have intact insulation.
Sufficient fire-fighting equipment shall be available at the construction site, placed in visible and accessible locations, and periodically checked for validity.
Flammable and explosive materials stored separately, away from ignition sources and high-temperature areas.
Before welding or cutting operations, clear surrounding combustibles. After operations, verify no fire sources remain.
High-power appliances and open-flame heating are strictly prohibited in dormitory areas.
13.5 Emergency Response Plans
13.5.1 Fall-from-Height Accident Response
If a fall accident occurs, immediately stop work and call 120 emergency services.
Provide initial assessment of the injured person. Control bleeding with bandaging; properly splint fractures; avoid unnecessary movement of the casualty.
Protect the accident scene. Report to the project manager and relevant authorities.
Cooperate with medical personnel in treatment and assist with transport to hospital.
13.5.2 Electric Shock Accident Response
Immediately cut off the power supply, or use a dry insulating object to separate the victim from the electrical source. Never pull the victim with bare hands.
After the victim is separated from the power source, check breathing and pulse. If stopped, begin CPR immediately.
Call 120 emergency services. Continue rescue until medical personnel arrive.
Cut power to the accident area, investigate the cause of the shock, and prevent secondary accidents.
13.5.3 Fire Accident Response
Upon discovering a fire, immediately raise the alarm and call 119 fire emergency services.
For incipient fires, use nearby fire extinguishers to suppress. Cut power and relocate nearby flammable/explosive materials.
Organize orderly evacuation along safe exit routes. Elevator use is prohibited.
Cooperate with the fire department; provide information on site conditions and hazardous material locations.
13.5.4 Object Strike Accident Response
After injury, immediately stop work and assess the injury.
For minor injuries, disinfect and bandage. For serious injuries, call 120 and arrange transport after proper handling.
Clear scattered objects from the scene, investigate hazards, and prevent further falling objects.
Report the accident, analyze the cause, and implement corrective measures.
Chapter 14: Manufacturer Service System and Contact Information
14.1 Manufacturer Service System
Guangzhou Lain Intelligent System Development Co., Ltd. specializes in integrated homestay container customization, production, and installation services, establishing a comprehensive pre-sale, in-sale, and after-sale service system to provide clients with full-process support.
14.1.1 Pre-Sale Customization Services
Free design proposals: professional homestay container planning, design renderings, and layout plans provided based on the client’s site, budget, and positioning.
Customization on demand: full customization supported for dimensions, exterior, interior, configuration, and function, meeting individual project needs.
Site survey: professional technical personnel visit the site to evaluate foundation, utility connection, and lifting conditions, developing the optimal plan.
Quotation and budget: detailed product quotes and construction budgets provided, transparent with no hidden costs.
14.1.2 In-Sale Installation Services
Factory production: standardized factory prefabrication under strict quality control, ensuring product quality.
Logistics: professional logistics for safe transportation to the project site.
Professional installation: certified installation teams perform on-site installation strictly per code, ensuring installation quality.
Schedule management: dedicated project coordinator tracks progress, provides real-time updates, and ensures on-time delivery.
14.1.3 After-Sale Warranty Services
Warranty commitment: 5-year warranty on main structure, 2-year warranty on water and electrical systems, 1-year warranty on decoration and equipment, lifetime maintenance.
Rapid response: after-sales issues responded to within 2 hours; on-site service within 24 hours within the province, 48 hours outside the province.
Regular follow-up: periodic visits to review usage, provide maintenance recommendations, and proactively identify potential issues.
Parts supply: long-term supply of original factory parts, ensuring future maintenance and replacement needs.
14.2 Core Service Strengths
Source factory: own large-scale production base, no middlemen, better cost-effectiveness, stronger customization capability.
Technical strength: professional design and technical team with years of R&D and production experience in prefabricated buildings.
Quality assurance: standardized production processes, strict quality inspection system, products conforming to relevant national standards.
Fast delivery: factory prefabrication + on-site installation significantly shortens construction period, accelerating project implementation.
Full-service: one-stop service from design, production, installation to after-sales — worry-free and convenient.
14.3 Contact Information
Manufacturer: Guangzhou Lain Intelligent System Development Co., Ltd.
Service Hotline: 13538869979 (WeChat same)
Technical Support: 13538869979
Address: Zhongrun Industrial Park, No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou
Official Website: https://gdlain.com
Excellent hospitality project developers, homestay operators, and engineering partners are welcome to visit our factory for inspection and consultation. Guangzhou Lain will support the successful implementation of your project with quality homestay container products and professional installation and commissioning services.
This manual is compiled by Guangzhou Lain Intelligent System Development Co., Ltd. All rights reserved. Reproduction without permission is prohibited. Product technology is continuously upgraded; actual parameters and installation specifications are subject to the latest version. For details, please contact the technical support hotline.