Table of Contents
Toggle1. Cover / Document Information
– Document Title: Computer Room Fire Alarm Control and Sensor Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for Computer Room Fire Alarm Control and Sensor
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Project Background
With the rapid advancement of the digital economy and informatization, the computer room — as the core infrastructure carrying data storage, computing and transmission — directly determines business continuity and data asset safety. Rooms hold large numbers of high-value servers, switches, storage, UPS and precision distribution equipment; cables are dense, heat output is high, and electrical fire risk is prominent. Rooms are mostly enclosed spaces with combustible decoration and equipment materials; once fire starts, it spreads fast and is hard to fight — causing hardware destruction, core data loss and business interruption with incalculable economic and social impact.
Traditional fire detection solutions generally suffer from late warning, high false-alarm rates, weak linkage and poor adaptation — failing to meet modern rooms’ requirements for early warning, precise identification and intelligent handling. Building an advanced, stable, room-adapted fire alarm control and sensor system is the core measure for preventing room fire risk.
This project designs a complete room fire alarm control and sensor system: multi-type, high-precision fire detection sensors networked with an intelligent fire alarm control host — achieving full-coverage fire monitoring, smoldering-stage early warning, graded alarms and multi-system linkage handling, comprehensively improving room fire prevention capability.
4.2 Project Objectives
Full-coverage detection: detectors selected and positioned per the fire characteristics of each functional area — main hall, distribution room, battery room, corridors and stairwells with no blind spots.
Early precise warning: high-sensitivity detection and intelligent recognition algorithms capture smoke, temperature and flame signals in the smoldering stage, issuing early warnings for timely investigation and handling.
Intelligent graded alarms: pre-alarm and fire-alarm two-level mechanism with different handling flows per level — timely warning and accurate alarms, low false-alarm disturbance.
Linkage handling: linkage with gas suppression, smoke exhaust, access control, emergency lighting and HVAC — automatic preset logic on confirmed fire for automated handling.
Centralized management: full-system monitoring and status display on the controller, history storage/query, integration with the room environment-monitoring platform.
Compliance and stability: strict compliance with national fire codes and data center standards — passing fire acceptance; industrial-grade high-reliability products supporting 7×24 operation in the complex room electromagnetic environment.
4.3 Project Scope
Front-end detection sensors (photoelectric smoke, rate-of-rise/fixed-temperature heat, infrared flame, aspirating smoke, linear heat-sensing cable); fire alarm control system (linkage-type fire alarm controller, graphical display device, fire display panel); manual alarm and warning systems (manual call points, hydrant buttons, audible/visual alarms, fire emergency broadcast); fire communication (phone host, extensions, jacks); linkage modules (input, output, input/output, short-circuit isolators); auxiliary materials (fire-rated cables, galvanized conduits, metal trays, boxes, grounding); installation, commissioning, testing, acceptance, training and after-sales services.
5. User Requirement Analysis
5.1 Functional Requirements
Fire detection: real-time monitoring of smoke concentration, ambient temperature and open-flame characteristics; accurate identification of real fire signals while distinguishing dust, moisture, insects and electromagnetic interference — fewer false alarms, no missed alarms.
Graded alarms: pre-alarm and fire-alarm levels — pre-alarm prompts only on the controller for on-site verification; fire alarm activates on-site audible/visual, broadcast and linkage programs with configurable response logic.
Alarm positioning: precise display of the alarming device number, zone and position with an electronic map for rapid location.
Manual alarm: manual call points at accessible positions as a supplement to automatic detection.
Linkage control: preset logic linking audible/visual alarms, fire broadcast, non-fire power cut-off, exhaust fans, damper closing, gas suppression triggering, access release and emergency lighting.
Status monitoring: real-time monitoring of all front-end devices, communication lines and power; automatic identification of device faults, communication interruption, power anomalies and line short/open with fault alarms and position display.
Record query: automatic storage of fire, fault, linkage and operation events with multi-condition query, printing and export for tracing and analysis.
Remote monitoring: standard communication interfaces integrating with the room environment-monitoring platform.
5.2 Performance Requirements
Response speed: photoelectric smoke ≤3 s, rate-of-rise/fixed-temperature heat ≤5 s, flame detector ≤1 s, aspirating detector hours ahead for ultra-early smoke.
Detection accuracy: smoke sensitivity per national class II with multi-level adjustment; temperature accuracy ±0.5℃; flame recognition rate ≥99%.
Reliability: MTBF ≥100,000 h; strong EMC immunity for the room environment.
Communication: two-bus distance ≥1500 m, error rate ≤10⁻⁹, ring wiring with single-point fault tolerance.
Power endurance: standby power ≥8 h monitoring, ≥30 min alarm/linkage.
Environment: sensors at -10℃ to 55℃, ≤95% RH without condensation.
5.3 Compliance Requirements
Design per GB 50116, GB 50174 and GB 50016; all fire products with 3C certification and complete certificates/test reports; wiring, grounding and lightning design per electrical and lightning codes; acceptance by the local fire authority.
5.4 O&M Requirements
Clear architecture, standard labels, tidy wiring for easy patrol and fault finding; plug-in front-end devices with convenient addressing and fast replacement; self-diagnosis identifying fault type and position; complete manuals and training for independent daily management.
6. Design Principles and Applicable Standards
6.1 Applicable Standards
GB 50116-2013 (fire alarm design), GB 50166-2019 (fire alarm construction and acceptance), GB 50174-2017 (data center design), GB 50016-2014 (2018 ed.) (building fire protection), GB 51309-2018 (fire emergency lighting and evacuation indication), GB 50370-2005 (gas suppression design), GB 50343-2012 (electronic information system lightning protection), GB 50054-2011 (low-voltage distribution), GB 50311-2016 (structured cabling), plus owner drawings, requirements and enterprise standards.
6.2 Design Principles
Safety and reliability first: fire warning and protection are the core mission — mature technology, certified high-quality products, redundant key links, stable and effective when it matters.
Advanced and applicable: intelligent detection algorithms and control technology adapted to modern room needs, without pursuing novelty at the expense of stability.
Scenario-precise adaptation: differentiated detector types and densities per zone fire-risk characteristics — precise adaptation, key-area reinforcement, no blind spots or waste.
Linkage and expansion: open interfaces and protocols for third-party fire equipment and room systems; modular architecture for point expansion per room growth.
Economy: optimized architecture and selection balancing construction and long-term O&M cost — high cost-performance.
O&M convenience: simple installation and maintenance, precise fault positioning, friendly operation interfaces.
6.3 System Architecture
The layered distributed architecture has four layers: perception layer — fire detection sensors (smoke, heat, flame, aspirating), manual call points, hydrant buttons and feedback devices collecting fire characteristics and manual alarms; transmission layer — fire-specific two-bus communication (two wires carry both signal and power — simple, anti-interference), short-circuit isolators for segment isolation, flame-retardant cables for uninterrupted communication in fire; control layer — the linkage-type fire alarm controller as the brain (receiving, analyzing, judging, alarming, linking), with fire phone host, broadcast host, graphical display and fire display panels; application layer — local control room terminals, electronic map monitoring, and remote modules integrating with the environment-monitoring platform for centralized intelligent O&M.
6.4 Overall Scheme
A centralized alarm system with one linkage-type controller in the fire control/monitoring room; zones wired by fire two-bus to controller loops.
Zone-based detection: main/server room — photoelectric smoke + rate-of-rise/fixed-temperature heat (smoke-heat compound, dual verification), optional aspirating detection for high-density core rooms; distribution/UPS/battery rooms — strengthened temperature detection with denser heat detectors, linear heat-sensing cable along cable trays and busways; diesel generator room/oil storage — infrared flame detectors for open flame plus heat detection; corridors, stairwells and duty rooms — smoke detectors, manual call points, audible/visual alarms and fire display panels at key positions.
Linkage logic: “dual-detector trigger” — two independent detectors in one zone, or one detector plus one manual call point, confirm fire and start linkage, avoiding single-device false linkage. Main logic: confirm fire → start zone audible/visual alarms and fire broadcast with evacuation voice; gas suppression zone → delay countdown (0-30 s adjustable) then start output triggering discharge, closing fire dampers/doors and cutting non-fire power; start exhaust fans and close HVAC to prevent smoke/fire spread; release access-control magnetic locks and start emergency lighting/evacuation indication; all actions with status feedback displayed on the controller.
Power and grounding: main AC220V from the room fire distribution circuit; VRLA standby battery with seamless switch ≤0.1 s; dedicated fire working ground (≤1 Ω) and protective ground (≤4 Ω) into the room joint ground network; all metal enclosures and cable shields grounded.
7. System Architecture and Working Principle
7.1 Fire Alarm Controller (Linkage Type, KITOZER-FACP)
Wall-mounted linkage-type controller per GB 4717-2005 and GB 16806-2006, 3C certified; 420×580×150 mm, ~22 kg, cold-rolled steel powder coated, IP30; 7-inch color TFT 800×480 full-Chinese graphical interface with film keys + touchscreen and three-level passwords. Capacity: 2 standard loops (expandable to 8), 121 addresses per loop, 968 total, 64 linkage zones, 8 direct manual control points, 10,000-event history (fire/fault/linkage/operation/mask classified), permanent black-box storage of the latest 1,000 critical events. Electrical: AC 187-242V 50Hz, DC24V standby (12V batteries in series), monitoring ≤60 W, alarm ≤150 W, full linkage ≤300 W; loop output DC 18-24V, ≤2 A per loop; main/standby switch ≤0.1 s. Communication: two-bus polarity-free, 1500 m per loop, error ≤10⁻⁹; RS232/RS485/Ethernet/USB; up to 32 controllers networked; third-party integration with environment-monitoring and building automation. Features: fuzzy-control and trend-analysis algorithms distinguishing real fires from interference (false-alarm reduction); programmable AND/OR/NOT/delay logic with up to 10 triggers per logic; point/loop/zone masking with full records; self-diagnosis of devices and lines (short/open/fault/communication); two-level alarms with adjustable sensitivity; RTC (month error ≤±5 s, power-fail retained); thermal printer ≥50 mm/s. Environment: 0-40℃, ≤95% RH, EMC per GB/T 17626, 86-106 kPa.
7.2 Photoelectric Smoke Detector (KITOZER-SD-OP1)
Scattered-light photoelectric detector per GB 4715-2005, 3C; two-bus polarity-free, plug-in ceiling base; φ102×53 mm, ~85 g, ABS V0, IP30; red LED (blink 6 s monitoring, steady alarm). Electrical: DC 16-28V (rated 24V), monitoring ≤350 μA, alarm ≤3 mA, electronic addressing 1-127, wiring distance 1500 m. Performance: class II sensitivity (I/II/III adjustable), threshold 0.10-0.25 dB/m, response ≤3 s in standard smoke box, 360° detection, protection area 60 m² (ceiling ≤6 m) / 80 m² (6-12 m), radius ≤5.8 m, max mounting height 12 m; built-in smart algorithm resisting dust, moisture, insects, static and EMI. Features: patented anti-insect/dust optical labyrinth; self-diagnosis of optical pollution with fault warning at threshold; remote reset; anti-misinstallation base; interchangeable with heat detector on the same base. Environment: -10℃ to 55℃, ≤95% RH, airflow ≤5 m/s, salt-spray and vibration compliant.
7.3 Rate-of-Rise/Fixed-Temperature Heat Detector (KITOZER-TD-DT1)
Compound heat detector per GB 4716-2005, 3C; two-bus polarity-free; high-precision NTC element; φ102×50 mm, ~80 g, ABS V0, IP33. Electrical: DC 16-28V, monitoring ≤300 μA, alarm ≤3 mA, addressing 1-127. Performance: class A; fixed threshold 60℃ default (54℃/70℃ custom); rate-of-rise ≥5℃/min triggers differential alarm; temperature accuracy ±0.5℃; fixed response ≤30 s, differential ≤5 s; 360°; protection area 30 m² (ceiling ≤8 m), radius ≤3.6 m, height ≤8 m; either condition alarms independently. Features: combined differential + fixed modes covering fast and slow temperature rises; ambient temperature compensation avoiding seasonal false alarms; self-diagnosis; remote reset; base shared with smoke detector; better dust/moisture resistance — suited to auxiliary areas.
7.4 Manual Alarm Call Point (KITOZER-MCP-1)
With phone jack, per GB 19880-2005, 3C; two-bus polarity-free; wall 86-box; 90×125×48 mm, ~120 g, ABS red panel, IP43; press-and-lock operation, key reset. Electrical: DC 16-28V, monitoring ≤150 μA, action ≤1 mA, addressing 1-127, NO contact DC30V/1A; phone jack compatible with bus and multi-wire fire phones. Mechanical: operating force 30-100 N, life ≥1000 operations, transparent cover against accidental touch. Features: supplementary manual alarm with steady red indication; phone handle for direct control-room communication; line short/open monitoring; white fire mark on red panel.
7.5 Audible/Visual Alarm (KITOZER-SA-1)
Integrated per GB 26851-2011, 3C; two-bus addressable; wall 90×140×65 mm, ~150 g, ABS red, IP43. Electrical: DC 20-28V, monitoring ≤100 μA, working ≤150 mA, addressing 1-127 individually controllable. Performance: sound ≥85 dB (A) at 3 m, fire-tone variation 2-4 Hz alternating, flash 1-2 Hz, brightness ≥50 cd, visible ≥30 m, omnidirectional. Features: dual sound + light warning suited to noisy rooms; zoned or global linkage; ultra-low standby power; standard 86-box mounting.
7.6 Input/Output Module (KITOZER-M-IOM)
Combined control + monitoring per GB 16806-2006, 3C; two-bus polarity-free; DIN-rail/wall or module box; 86×86×30 mm, ~70 g, ABS, IP30; green run / red action LEDs. Electrical: DC 16-28V, monitoring ≤200 μA, action ≤2 mA, addressing 1-127; output NO contact DC30V/2A, AC220V/1A; feedback NO/NC input; end-of-line resistance monitoring for output/feedback line short/open. Features: one control output + one status feedback; pulse or level output modes; line monitoring with automatic fault report; automatic linkage or manual control; local status indication.
7.7 Bus Short-Circuit Isolator (KITOZER-M-SI)
Series-connected, no addressing; 86×86×28 mm, ~50 g, ABS; green normal / red fault LEDs. Electrical: DC 16-28V, normal voltage drop ≤0.5V; isolates at ≥100 mA short current within ≤100 ms; up to 32 devices per isolator; automatic recovery after fault clearance. Features: isolates the faulted bus segment keeping other sections working; auto-reset; polarity-free; compact for boxes/panels; improves overall reliability by narrowing fault impact.
7.8 Aspirating Smoke Detector (Optional, KITOZER-ASD)
Ultra-early laser aspirating detector (laser scattering + cloud-chamber enhancement); 4 sampling pipes; wall/rack mounting; 7-inch color touchscreen. Performance: sensitivity 0.001%-20% obs/m in four levels; four alarm stages (alert/action/fire1/fire2); 2-4 hours earlier than point detectors; 100 m per pipe, protection area up to 2000 m², up to 25 sampling holes per pipe; real-time concentration and trend display; airflow monitoring per pipe with anomaly alarm; self-cleaning optical chamber; RS485/Ethernet TCP/IP; 4 programmable relays; ≥10,000 events; multi-unit networking. For core data rooms, high-density server rooms, key storage rooms and shielded rooms.
7.9 Supporting Systems
Fire phone host (multi-wire, full duplex) with extensions and jacks; fire emergency broadcast host (120 W constant-voltage, MP3 source, emergency switching) with speakers; fire display panels (Chinese LCD, zoned alarm display); graphical display device (electronic map, event query); galvanized conduits and metal trays; flame-retardant two-bus/power/phone cables; standby battery 12V/38Ah with fire-rated box.
8. Detailed Technical Design
8.1 Point and Zone Design
Detector spacing per GB 50116: smoke ≤15 m spacing / ≤7.5 m from walls in open areas; heat ≤10 m / ≤5 m; avoid AC supply outlets, beams and obstructions; denser placement in rack-dense areas eliminating blind spots. Zone-based detection per area fire characteristics (smoke+heat compound in main hall, temperature emphasis in distribution/battery rooms, flame in generator rooms, aspirating for high-density cores).
8.2 Loop and Isolation Design
Two-bus polarity-free loops with 121 addresses each; short-circuit isolators every 20-32 devices and at fire-compartment boundaries; ring-capable wiring tolerating single-point faults; fire-rated cables with separation of systems and voltage levels.
8.3 Linkage and Gas Suppression Integration
Dual-detector trigger logic (two independent detectors, or detector + manual call point); 0-30 s adjustable delay for gas suppression zones; linkage outputs for audible/visual, broadcast, exhaust, damper closing, non-fire power cut, access release and emergency lighting; I/O modules with feedback; programmable logic per site.
8.4 Power and Grounding Design
Main AC220V from the fire distribution circuit; VRLA standby (≥8 h monitoring, ≥30 min alarm; 10 h+ with standard configuration); seamless switch ≤0.1 s; working ground ≤1 Ω, protective ground ≤4 Ω into the joint network; all enclosures and shields grounded.
8.5 Integration Design
RS485/Ethernet standard interfaces with Modbus/standard fire protocols integrating into environment-monitoring platforms and building automation; 32-controller networking for multi-room sites; centralized monitoring with electronic maps.
8.6 Commissioning Design
Pre-power checks; power-on and addressing; single-device tests; loop communication tests; linkage logic programming and tests; full-flow simulated fire test (detection → alarm → linkage → broadcast); gas suppression joint test; DCIM integration; documentation and training.
9. Recommended Configuration and Preliminary Budget
9.1 Configuration Summary (Standard Medium Room Reference)
| No. | Equipment | Specification | Qty | Unit |
|---|---|---|---|---|
| 1 | Fire alarm controller (linkage) | KITOZER-FACP, 2 loops, 242 points, color LCD | 1 | pc |
| 2 | Graphical display device | KITOZER-CRT, electronic map, event query | 1 | set |
| 3 | Fire phone host | KITOZER-FTP, 8-circuit, full duplex | 1 | pc |
| 4 | Fire broadcast host | KITOZER-FAB, 120 W, MP3, emergency switch | 1 | pc |
| 5 | Standby battery | 12V/38Ah VRLA, ≥8 h endurance | 2 | cells |
| 6 | Battery box | Wall-mounted, 2-cell, fire-rated | 1 | pc |
| 7 | Fire display panel | KITOZER-FDP, Chinese LCD zoned display | 2 | pcs |
| 8 | Photoelectric smoke detector | KITOZER-SD-OP1, smart algorithm, 3C | 45 | pcs |
| 9 | Smoke detector bases | Universal plug-in | 45 | pcs |
| 10 | Heat detector | KITOZER-TD-DT1, class A differential+fixed | 20 | pcs |
| 11 | Heat detector bases | Shared with smoke bases | 20 | pcs |
| 12 | Manual alarm call point | KITOZER-MCP-1, with phone jack | 10 | pcs |
| 13 | Hydrant button | KITOZER-HB-1, pump start feedback | 4 | pcs |
| 14 | Audible/visual alarm | KITOZER-SA-1, ≥85 dB | 12 | pcs |
| 15 | Input module | KITOZER-M-IM, passive signal, line monitoring | 12 | pcs |
| 16 | Input/output module | KITOZER-M-IOM, control + feedback | 10 | pcs |
| 17 | Short-circuit isolator | KITOZER-M-SI, auto isolation/reset | 6 | pcs |
| 18 | Fire phone extension | KITOZER-FT-EXT, fixed full duplex | 4 | pcs |
| 19 | Fire two-bus cable | ZR-RVS-2×1.5 mm² | 1500 | m |
| 20 | Fire power cable | ZR-BV-2.5 mm² | 800 | m |
| 21 | Fire phone cable | ZR-RVVP-2×1.0 mm² | 400 | m |
| 22 | Galvanized conduit | Φ20 | 600 | m |
| 23 | Metal tray | 100×50 mm | 100 | m |
| 24 | Boxes and auxiliaries | Standard national | 1 | lot |
| 25 | Installation and commissioning | Equipment, cabling, system commissioning | 1 | item |
| 26 | Transport and insurance | Delivery and cargo insurance | 1 | item |
| 27 | Testing and acceptance | Fire detection and acceptance support | 1 | item |
| 28 | Training | Operation and maintenance training | 1 | item |
| 29 | Design | Solution design, drawing deepening | 1 | item |
9.2 Quotation Notes
The quotation is a standard-configuration reference; the final price is calculated per actual points, room area and requirements. All equipment carries 3C certificates, certificates of conformity and test reports. The system warranty is 12 months with free on-site repair and replacement of non-artificial faults during warranty. All prices are indicative and quoted in RMB (CNY) only — no foreign-currency conversion is provided; the final quotation is subject to a formal quotation document.
10. Technical Specifications
10.1 System Performance Summary
| Item | Specification |
|---|---|
| System type | Centralized fire alarm control (linkage type) |
| Controller | KITOZER-FACP, 2-8 loops, 968 max points, 7-in color LCD |
| Communication | Fire two-bus, polarity-free, 1500 m/loop, error ≤10⁻⁹ |
| Response | Smoke ≤3 s; heat ≤5 s; flame ≤1 s; aspirating 2-4 h earlier |
| Alarm levels | Pre-alarm / fire alarm; aspirating 4-stage |
| Detection logic | Dual-detector trigger (two independent, or detector + manual) |
| Linkage | Broadcast, exhaust, dampers, non-fire power cut, access release, gas suppression |
| Delay | 0-30 s adjustable (gas suppression zones) |
| History | 10,000 events + 1,000 black-box critical events |
| Standby power | ≥8 h monitoring, ≥30 min alarm (10 h+ standard config) |
| Main/standby switch | ≤0.1 s, seamless |
| Grounding | Working ≤1 Ω; protective ≤4 Ω |
| MTBF | ≥100,000 h |
| Environment | -10℃~+55℃ sensors; 0-40℃ controller; ≤95% RH |
| Standards | GB 50116, GB 50166, GB 50174, GB 50016 |
| Certification | 3C (all fire products) |
| Warranty | 12 months, semi-annual patrol |
10.2 Key Component Specifications
| Component | Key Parameters |
|---|---|
| FACP controller | 2 loops std / 8 max, 121 pts/loop, 64 zones, 10,000 events, thermal printer |
| Smoke detector SD-OP1 | Photoelectric, class II, 0.10-0.25 dB/m, ≤3 s, 60-80 m², addressing 1-127 |
| Heat detector TD-DT1 | Class A, fixed 60℃ + rate ≥5℃/min, ±0.5℃, 30 m² |
| Manual call point MCP-1 | Press-lock, key reset, phone jack, 30-100 N, NO contact |
| Audible/visual SA-1 | ≥85 dB at 3 m, flash 1-2 Hz, ≥50 cd, addressable |
| I/O module M-IOM | 1 output (DC30V/2A) + 1 feedback, line monitoring, pulse/level |
| Isolator M-SI | ≥100 mA isolate ≤100 ms, 32 devices, auto reset |
| Aspirating ASD | 0.001-20% obs/m, 4 stages, 4 pipes ×100 m, 2000 m², TCP/IP |
| Phone host FTP | 8-circuit multi-wire, full duplex |
| Broadcast FAB | 120 W, MP3, emergency switching |
| Fire display FDP | Chinese LCD, zoned alarm display |
| Standby battery | 12V/38Ah VRLA, fire-rated box |
11. Key Advantages and Customer Value
11.1 Scenario-Customized Design for Rooms
The solution uses “zoned selection, compound detection, graded alarms” for room characteristics — dense electronics, complex electromagnetic environment, hidden fire hazards and high false-alarm cost. Detector types and densities matched per zone (main hall, distribution, battery) eliminate blind spots without over-design — the optimal balance of safety and cost; deep integration with decoration, power and weak-current systems without damaging the room layout.
11.2 High-Quality Reliable Products
All core equipment is KITOZER brand with 3C certification, industrial-grade components, strict aging/environment/EMC tests and MTBF over 100,000 h; ring bus architecture with short-circuit isolators gives single-point-fault tolerance; dual-power seamless switching keeps the system working on power loss; adapted to constant-temperature rooms with strong EMI — 7×24 stable operation.
11.3 Intelligent Precise Detection — Early Warning, Low False Alarms
Front-end detectors with intelligent fire recognition algorithms analyze smoke-concentration trends and temperature-rise rates, distinguishing real fires from dust, moisture, insects and static — false-alarm rate reduced over 60% versus traditional detectors. The optional aspirating detector with active sampling + laser analysis warns hours earlier than point detectors at extremely low smoke concentrations — precious time for investigation and loss minimization.
11.4 Complete Linkage — Full-Process Protection
Powerful linkage with flexible logic programming and the dual-detector trigger mechanism avoiding false linkage; integration with gas suppression, exhaust, access control, emergency lighting, HVAC and environment monitoring — “detection-alarm-handling-evacuation” fully automated; every action with status feedback and event records — traceable and auditable, a complete fire-safety loop.
11.5 Easy O&M and Expansion — Lower Lifecycle Cost
Modular design, plug-in front-end devices with electronic addressing, fast replacement without special tools; reserved point margin — room expansion adds front-end devices to the existing system without host replacement, protecting investment; complete self-diagnosis identifies fault type and position precisely — greatly improving O&M efficiency and lowering long-term cost.
11.6 Full-Process Professional Service
As a source factory, one-stop service from design, supply, installation, commissioning and testing to after-sales — no multi-party coordination; a professional team with over a decade of room fire engineering experience familiar with room codes; strict quality control with one-pass fire acceptance; 7×24 support with fast fault response.
12. Technical Q&A (50+ Items)
12.1 System Basics
Q1: What does a complete room fire alarm system consist of?
A: Four parts: front-end detection sensors (smoke, heat, flame detectors, manual call points) sensing fire signals; the alarm control host (the brain) receiving, judging and issuing alarms and linkage commands; warning and linkage devices (audible/visual alarms, fire broadcast, linkage modules, fire phones); and transmission cables, power and grounding supporting stable operation.
Q2: Why both smoke and heat detectors — not just smoke?
A: Rooms have dense electronics and cables; some electrical short-circuit fires start with little smoke but fast temperature rise — smoke-only response lags. AC airflow and dust also disturb smoke detectors. The smoke-heat compound verifies with dual detection — real fire is confirmed only when both alarm — greatly reducing false alarms and avoiding false suppression with unnecessary equipment loss; heat detection also performs better in high-heat areas like distribution and battery rooms.
Q3: What are the installation spacing requirements?
A: Per GB 50116: photoelectric smoke detectors in open spaces ≤15 m spacing and ≤7.5 m from walls; heat detectors ≤10 m and ≤5 m. Avoid AC supply outlets, beams and obstructions; install in stable airflow positions for effective detection; denser placement in rack-dense, obstructed areas eliminating blind spots.
Q4: What is the fire two-bus, and what are its advantages?
A: The mainstream fire communication method — two wires carry both power and signal for front-end devices, no separate power/signal lines. Advantages: simple wiring (less cable and cost); polarity-free connections (no wrong polarity, lower error rate); strong anti-interference for the complex room EM environment; easy expansion by paralleling new devices on the bus.
Q5: What standby power endurance is required?
A: Per national codes, the fire alarm system standby power must last ≥8 h in monitoring and ≥30 min in alarm/linkage. This solution’s standard VRLA battery provides 10 h+ monitoring, fully compliant; larger batteries configurable on request.
Q6: Differential/fixed vs. fixed-only heat detectors?
A: Fixed-only detectors alarm when ambient temperature reaches the threshold — effective for slow temperature rises but lagging on fast fires. Differential/fixed detectors combine both: fixed mode monitors absolute temperature, differential mode monitors temperature-rise rate (alarm at ≥5℃/min) — responding to both slow and fast electrical fires with broader coverage and timelier response.
Q7: How are false alarms handled?
A: First verify on site whether there is a real fire; if false, reset on the controller. Frequent false alarms — check causes: dust accumulation (clean), unsuitable position (near AC outlets/dust sources — relocate), device faults (replace). Reduce false alarms with smart-algorithm detectors, smoke-heat compound logic and periodic maintenance.
Q8: Why is grounding so important for room fire systems?
A: Rooms have dense electronics and complex EM environments; poor grounding causes electromagnetic interference — false alarms, unstable communication and even equipment damage. Good grounding improves immunity and stability, and is a basic electrical safety requirement against lightning, static and leakage. Per code: working ground ≤1 Ω, protective ground ≤4 Ω, into the joint ground network.
Q9: What is the “dual-detector trigger” linkage logic?
A: One detector alarm → pre-alarm only (on-site verification); two independent detectors, or one detector plus one manual call point, alarm simultaneously → fire confirmed and linkage starts — preventing single-device false alarms from triggering false linkage.
Q10: How are fire products certified?
A: Fire products are in the national mandatory certification catalog — 3C certification is required for production, sale and use; uncertified products cannot pass fire acceptance and pose safety hazards. All products in this solution carry 3C certificates.
12.2 Detection and Sensors
Q11: What detector types are used in which areas?
A: Main/server room — photoelectric smoke + rate-of-rise/fixed heat (compound, dual verification), optional aspirating for high-density cores; distribution/UPS/battery rooms — denser heat detectors plus linear heat-sensing cable along cable trays; generator/oil rooms — infrared flame + heat; corridors/stairwells/duty rooms — smoke detectors, manual call points, audible/visual alarms and display panels.
Q12: What is the aspirating smoke detector, and where is it used?
A: It actively draws air samples through pipes and analyzes them with laser/cloud-chamber enhancement — detecting ultra-early smoke hours before point detectors (2-4 h earlier), with four alarm stages. Ideal for high-density server rooms, core storage rooms, key network rooms and shielded rooms requiring the highest early-warning level.
Q13: What is the linear heat-sensing cable for?
A: It continuously monitors temperature along its length — installed along cable trays, busways and cable trenches in distribution/battery rooms to detect overheating anywhere along the route, complementing point heat detectors.
Q14: What is the protection area of point detectors?
A: Smoke: 60 m² (ceiling ≤6 m) / 80 m² (6-12 m), radius ≤5.8 m, max height 12 m; heat: 30 m² (ceiling ≤8 m), radius ≤3.6 m — final design positions per layout and obstructions.
Q15: How do smart algorithms reduce false alarms?
A: Fuzzy-control and trend-analysis algorithms evaluate smoke-concentration trends and temperature-rise rates over time, distinguishing true fire signatures from dust, moisture, insects and static transients — false alarms reduced over 60% versus traditional detectors.
Q16: What is the response time of each detector?
A: Photoelectric smoke ≤3 s in standard smoke; differential/fixed heat ≤5 s (rate) / ≤30 s (fixed); infrared flame ≤1 s; aspirating detects ultra-early smoke with 4-stage alarms.
Q17: How is detector sensitivity adjusted?
A: Smoke: class I/II/III (default II) selectable; heat: fixed threshold 60℃ default with 54℃/70℃ options and differential rate 5℃/min; aspirating: four sensitivity levels 0.001-20% obs/m — set per zone environment.
Q18: Can smoke and heat detectors share bases?
A: Yes — both use the same universal plug-in base, allowing direct interchange and later upgrades without rewiring.
Q19: How are devices addressed?
A: Electronic addressing 1-127 with a field programmer — set and recorded per position, no duplicates; addresses and positions logged in the controller for precise alarm positioning.
Q20: What is the environment adaptability?
A: Sensors -10℃ to 55℃, ≤95% RH without condensation, airflow ≤5 m/s (smoke) / ≤8 m/s (heat); salt-spray and vibration compliant; EMC per GB/T 17626 — suiting constant-temperature rooms and auxiliary areas.
12.3 Controller and System
Q21: Where should the controller be installed?
A: In the fire control room, room monitoring room or a 24-hour attended room; wall-mounted at 1.3-1.5 m bottom height; dry, ventilated, no strong EMI, away from water, heat and flammables; preferably in the monitoring room for unified management with the environment-monitoring system.
Q22: What is the capacity of the controller?
A: 2 loops standard (expandable to 8), 121 addresses per loop, 968 total points, 64 linkage zones, 8 direct manual control points; 32 controllers networkable — scalable per room growth.
Q23: What is the function of the fire display panel?
A: Also called a zone indicator — installed at room entrances and corridors, displaying zone alarm information without going to the fire control room. Recommended for large, multi-zone rooms far from the control room; optional for small rooms with the controller on site.
Q24: What is the short-circuit isolator for? Must it be installed?
A: Series-connected on the bus; on a short circuit in one segment, it isolates that segment so the rest keeps working — typically one per 20-32 devices; codes require isolators where the bus crosses fire compartments; recommended segment-by-segment — a highly cost-effective reliability design narrowing fault impact.
Q25: What is the fire phone system for?
A: Direct full-duplex communication between the control room and on-site personnel during fires — phone extensions at key positions and phone jacks on manual call points allow instant reporting and command.
Q26: What is the fire emergency broadcast?
A: A 120 W constant-voltage broadcast with MP3 source and emergency switching — on confirmed fire it switches to evacuation voice messages guiding personnel; zoned or global broadcast per logic.
Q27: What is the graphical display device?
A: An electronic map terminal in the control room showing device positions, alarm points, linkage states and event history — visualized system management and rapid fire location.
Q28: How is the system networked and integrated?
A: RS232/RS485/Ethernet with standard protocols — up to 32 controllers networked; integration with environment-monitoring platforms and building automation via Modbus/standard fire protocols; remote viewing and unified management.
Q29: How is the standby battery maintained?
A: Quarterly capacity test via the controller; replace aging batteries (12V/38Ah series); the controller auto-switches on main power loss (≤0.1 s) and recharges on recovery — monitoring ≥8 h, alarm ≥30 min.
Q30: What does the black-box record do?
A: Permanently stores the latest 1,000 critical fire and linkage events, power-fail retained — providing essential evidence for post-fire analysis and tracing.
12.4 Installation and Construction
Q31: What are the conduit and tray requirements?
A: Galvanized steel conduits with smooth deburred openings; threaded connections with bonding jumpers; support spacing ≤1.5 m horizontal / ≤2 m vertical with extra points at bends; trays level and firm with bonding and complete covers; bend radius ≥10× cable diameter; visible runs neat, concealed runs marked.
Q32: What are the cable requirements?
A: All flame-retardant fire-rated types per design (two-bus ZR-RVS 2×1.5, power ZR-BV 2.5, phone ZR-RVVP 2×1.0); continuity and insulation tested before installation; no joints inside conduits (joints in boxes); different systems and voltage levels separated; 10-20 cm end margin with permanent labels matching drawings; final continuity and insulation tests before connection.
Q33: How are detectors installed?
A: Bases firmly mounted flush with the ceiling; wiring correct before installing the detector body (avoid contamination damage); positions avoid AC outlets, beams, lights and obstructions per code spacing; manual call points and audible/visual alarms wall-mounted at code heights, level and clearly marked; modules in module boxes or junction boxes with clear labels.
Q34: How is the controller installed?
A: Wall-mounted firm with verticality deviation ≤3‰ at an operable height; tidy wiring with ≤2 wires per terminal and clear labels; batteries fixed with correct polarity and insulation; grounding reliable with resistance tested; dust protection after installation.
Q35: What is the standard construction period?
A: About 15 calendar days for a standard project: preparation 2, piping 4, installation 3, commissioning 3, acceptance 3 — adjustable per scale and site.
Q36: What does commissioning include?
A: Wiring check and labels; continuity and ground resistance tests; power-on and addressing registration; single-device tests (detectors, buttons, modules, alarms); loop communication tests; linkage logic programming and tests; full-flow simulated fire test (detection → alarm → linkage → broadcast); gas suppression joint test; records formed.
Q37: Can an existing running room be retrofitted?
A: Yes — two-bus systems wire flexibly along ceilings, trays and wall conduits without large decoration damage; zoned construction away from business peaks; professional room-retrofit service providers minimize risk; the retrofit case completed with zero business impact.
Q38: What safety measures apply during construction?
A: Room safety rules, badges, certified staff; helmets, harnesses for high work; compliant temporary power with qualified boxes — no unauthorized wiring, live work by certified electricians; hot-work permits with extinguishers and watchers; daily cleanup; noise control; fire equipment on site, no smoking.
Q39: What acceptance items apply?
A: Point quantities/positions per design; piping and cabling compliance; device functions (detection, manual alarm, audible/visual); linkage logic; standby endurance; ground resistance; documentation (3C certificates, test reports, as-built drawings) — passed with the fire authority.
Q40: What documentation is delivered?
A: 3C certificates, certificates of conformity, test reports, user manuals, wiring and point diagrams, commissioning and test records, as-built drawings, training records — complete for filing and O&M.
12.5 O&M and Service
Q41: What daily maintenance is required?
A: Daily — controller status, main/standby power, no fault/mask info, record status. Quarterly — sample detector alarm tests, manual button and audible/visual function checks, linkage logic tests. Annual — full cleaning, all-detector function tests, standby battery endurance, line aging checks, with a report. Professional maintenance recommended.
Q42: How is the system checked during the semi-annual patrol?
A: Controller status and fault records; detector cleanliness and function sampling; manual call point and audible/visual function; module and isolator status; line and terminal tightness; standby battery; display panels; gas suppression interface status — with a patrol report.
Q43: What if a detector becomes contaminated?
A: Clean the dust cover/labyrinth gently; if optical pollution exceeds threshold, the self-diagnosis warns — clean or replace; keep the environment clean to reduce contamination frequency.
Q44: How are common faults diagnosed?
A: The controller self-diagnosis identifies fault type and position (device fault, line short/open, communication anomaly, power fault); check the reported device/lines first, then address; most faults are resolved by cleaning, tightening or replacement.
Q45: What is the warranty?
A: 12 months from acceptance: free repair/replacement of non-artificial faults; 7×24 technical support; quarterly phone follow-up and semi-annual on-site patrol with reports; free software/firmware upgrades; one free refresher training.
Q46: What services continue after warranty?
A: Lifetime paid maintenance with annual agreements: preferential spare parts (cost only, with warranty), periodic patrol and inspection, 7×24 technical consultation, preferential system upgrade/expansion, and priority fault response.
Q47: What is the fault response commitment?
A: General consultation — answer within 1 hour; ordinary faults — respond within 4 hours, urban on-site within 8; urgent faults (system down, large-area false/missed alarms) — respond within 2 hours, urban on-site within 4, system restored within 24 hours.
Q48: How are spare parts guaranteed?
A: A standing stock of common devices and parts for fast replacement; dedicated customer archives recording system and service history; certified after-sales engineers.
Q49: Can the system expand later?
A: Yes — reserved point margin: add front-end devices to existing loops as room grows, no host replacement; expandable to 8 loops and networked controllers for larger sites; upgrades protect prior investment.
Q50: What training is provided?
A: 1-day training at acceptance (theory + hands-on): controller operation (start/stop, silence, reset, query, masking), alarm/fault identification and handling, patrol and simple maintenance, emergency flows including manual gas suppression operation — with assessment and manuals; refresher available.
12.6 Selection and Comparison
Q51: How many smoke detectors does a room need?
A: Rough estimate: area ÷ protection area (60 m² per smoke at 3-6 m ceiling, 30 m² per heat); final design positions per layout, beams, columns, racks and obstructions per code spacing, plus zoning and linkage considerations — professional point design recommended.
Q52: Can the system integrate with the environment-monitoring platform?
A: Yes — controllers carry RS485/Ethernet with standard protocols, seamlessly integrating into room environment-monitoring platforms; unified status, alarm and fault viewing, and linkage with video and access control for centralized management.
Q53: How does the fire alarm system integrate with gas suppression?
A: Via linkage modules with dual-detector trigger logic: one detector → pre-alarm; two independent detectors or detector + manual button → fire confirmed, delay countdown (0-30 s), then start output triggering discharge, with damper closing and non-fire power cut — logic flexibly programmable.
Q54: What should be checked when selecting a room fire system provider?
A: Product certification (3C, test reports); professional room fire experience; construction capability (certified teams, standardized work); after-sales (response, periodic maintenance); overall capability — prefer providers offering integrated alarm + suppression solutions to avoid interface issues.
Q55: How is the total cost controlled?
A: Two-bus wiring cuts cable and labor; plug-in devices reduce maintenance; self-diagnosis shortens fault finding; expansion without host replacement; long-life industrial-grade products — optimal lifecycle cost.
Q56: What are the green credentials?
A: Low standby power consumption of all devices; flame-retardant recyclable materials; no hazardous substances per fire product standards; energy-efficient operation supporting green data center goals.
Q57: How is service quality supervised?
A: Dedicated hotline, customer archives, patrol reports, closed-loop fault handling with follow-up, and satisfaction tracking.
Q58: Can the system be used in shielded rooms?
A: Yes — shielded-compatible devices and routing with waveguide penetrations and shielded treatment maintain shielding integrity while providing full detection and alarm functions.
Q59: What documentation supports fire acceptance?
A: 3C certificates and test reports for all products, wiring and point diagrams, commissioning and test records, standby endurance records, ground resistance records — satisfying acceptance filing.
Q60: Why choose the KITOZER/Lain solution?
A: 20+ years of room engineering experience, source-factory 3C-certified products with smart algorithms, zoned precise design, complete linkage with gas suppression and DCIM, professional construction with one-pass acceptance, and full after-sales — a reliable room fire alarm and sensor solution.
13. Construction Schedule
13.1 Overall Period
The standard construction period is 15 calendar days, adjustable per project scale, site conditions and owner requirements:
| Stage | Work | Days | Responsible | Remarks |
|---|---|---|---|---|
| 1. Preparation | Site survey (points, routes); drawing deepening, technical and safety disclosure; equipment/material procurement and incoming inspection; tools and personnel; product protection and safety layout | 2 | PM | Owner confirms site conditions |
| 2. Piping | Line marking (conduit/tray routes); wall chases and embedded boxes; galvanized conduit installation; metal tray installation and bonding; cable pulling with labels; continuity and insulation tests | 4 | Foreman | Concealed-work acceptance before next stage |
| 3. Equipment installation | Detector bases; manual call points, audible/visual alarms; module boxes, isolators; fire display panels; controller host; batteries, phone host, broadcast host | 3 | Foreman | Re-verify models/quantities before installation |
| 4. Commissioning | Wiring check and labels; continuity and ground resistance tests; power-on and addressing; single-device tests; linkage logic programming and tests; full-flow simulated fire test | 3 | Engineer | Complete commissioning records |
| 5. Acceptance | Internal self-inspection and rectification; third-party fire testing; owner/fire authority acceptance; as-built documentation; system and documentation handover; operation and maintenance training | 3 | PM | Warranty starts after acceptance |
13.2 Schedule Assurance
Advance stocking: core equipment stocked in advance to avoid supply delays. Flow-line operation: piping and installation overlap with reasonable shifts. Daily review: daily end-of-day progress review with lag adjustment. Coordination: advance communication with the owner on work windows. Contingency: standby personnel and spare equipment for emergencies.
14. Construction Organization and Quality/Safety Measures
14.1 Organization Structure
Project manager (1): overall management — progress, quality, safety, cost, coordination. Technical lead (1): solution deepening, disclosure, commissioning, technical problem solving. Foreman (1): crew management, plan execution, workmanship and codes. Electricians/wiring technicians (3-4): piping, installation, wiring. Safety officer (1, part-time): site safety supervision and hazard inspection.
14.2 Pre-Construction Preparation
Technical: study drawings, codes and plan; technical and safety disclosure; drawing deepening with point/route verification against site (conflict avoidance); special measures for difficult points with risk plans.
Materials: advance stocking per equipment list; incoming verification of certificates, 3C and test reports — unqualified products rejected; pre-installation power-on tests; tools (drill, cutter, multimeter, megger, fire addressing programmer, strippers, ladders, cable pullers); PPE (helmets, insulating gloves, harnesses, extinguishers, warning signs).
Site: coordinate construction power, material storage and temporary office; product protection for existing equipment, floors, walls and decoration; demarcate the work area with signs; inspect site hazards.
14.3 Core Construction Processes
Conduit and tray: galvanized steel conduits with smooth deburred openings; threaded connections with bonding jumpers and code-compliant support spacing (≤1.5 m horizontal, ≤2 m vertical, extra at bends); trays level and firm with bonding and complete covers; bend radius ≥10× cable diameter; visible runs neat, concealed runs marked.
Cable laying: all flame-retardant fire-rated types per design; continuity and insulation tests before installation; protection during pulling (no damage to insulation); no joints inside conduits (joints in boxes); different systems/voltage levels separated; 10-20 cm end margin with permanent labels; final continuity and insulation tests.
Front-end installation: detector bases firm and flush, correct wiring before installing bodies; positions avoid AC outlets, beams, lights and obstructions per code; manual call points and audible/visual alarms at code heights, level, clearly marked; modules in boxes with labels; product protection after installation.
Controller installation: firm wall mounting (verticality ≤3‰) at operable height; tidy wiring, ≤2 wires per terminal, clear labels; batteries firm with correct polarity and insulation; reliable grounding with resistance tested; dust protection.
Commissioning: single-device tests first; loop communication stability tests (no missing devices, false alarms or faults); linkage tests per designed logic (accurate, timely, feedback normal); full-flow simulated fire test (detection → alarm → linkage → broadcast); detailed records forming the commissioning report.
14.4 Quality Assurance
Strict compliance with national construction/acceptance codes, drawings and disclosure; each process passes self-inspection before the next; concealed works accepted by the owner/supervision with records and photos; all materials with certificates — rejects returned; key processes guided on site by the technical lead; product protection throughout; complete construction, commissioning and acceptance records delivered at completion.
14.5 Safety and Civilized Construction
Room safety rules, badges and certified staff; no touching of unrelated equipment; helmets, harnesses for high work; compliant temporary power with qualified boxes — no unauthorized wiring, live work by certified electricians; hot-work permits with extinguishers and watchers; daily cleanup — work finished, site clean; noise control; fire equipment on site, no smoking.
14.6 Contingency Plans
Electric shock: cut power immediately, separate the victim (never bare hands), ventilated area, check breathing/heartbeat, CPR if needed, call 120, preserve the scene, investigate and rectify. Equipment damage: stop work, protect the scene, report, contact the factory for assessment/repair, coordinate standby or expedited repair. Schedule delay: adjust the plan, add staff and optimize processes; communicate with the customer; analyze causes and prevent recurrence.
15. After-Sales Service
15.1 Warranty Commitment
12-month overall warranty from acceptance: free repair/replacement of non-artificial, non-force-majeure faults; 7×24 technical support; quarterly phone follow-up and semi-annual on-site patrol (hazard finding, cleaning, report); free software/firmware upgrades; one free refresher training.
15.2 Post-Warranty Services
Lifetime paid maintenance with annual agreements: spare parts at cost (with warranty on replacements), periodic patrol and full inspection with reports, 7×24 technical consultation, preferential system upgrade/expansion, and priority fault response.
15.3 Fault Response
General consultation — answer within 1 hour; ordinary faults — respond within 4 hours, urban on-site within 8; urgent faults (system down, large-area false/missed alarms) — respond within 2 hours, urban on-site within 4, system restored within 24 hours.
15.4 Service Assurance
Dedicated 7×24 hotline; customer archives recording system and service history; standing stock of common devices and parts for fast replacement; certified experienced after-sales engineers.
16. Training Plan
16.1 Objectives and Audience
Objectives: enable the owner’s O&M and duty staff to understand the system architecture and principles and fire codes; master controller daily operation (start/stop, silence, reset, query, masking); correctly identify fire/fault signals with the corresponding handling flows; master daily patrol and simple maintenance; and respond correctly in emergencies.
Audience: room O&M managers, fire duty staff and relevant technical leads.
16.2 Training Content
Theory: architecture and working principles; front-end device functions; fire codes and room fire safety; daily management requirements.
Operation: controller start/stop, silence, reset; fire information viewing, position locating and handling flow; fault viewing, type identification and initial troubleshooting; manual linkage control; event query and printing; masking/unmasking; field devices (display panels, manual call points).
Maintenance: patrol content and methods; detector cleaning; battery care and testing; line check precautions; common fault finding and handling.
Emergency: real-fire handling flow; false-alarm handling; system fault emergency measures; manual gas suppression operation.
16.3 Methods and Schedule
Theory via PPT with drawings and physical devices; live demonstration; hands-on practice on the controller and devices with guidance and correction; Q&A. Training at acceptance, 1 day: 2 h theory + 3 h practice and assessment; manuals delivered; refresher available on request.
16.4 Assessment
Practical and question-based assessment confirming basic operation and emergency capability before independent operation; training records filed; continuous hotline support after training.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.
17.1 Technology Company IDC Data Center Fire Alarm Project
Project overview. A new 1,200 m² Tier 3 data center of a technology company — main hall, distribution room, battery room, network room and cylinder room — requiring code-compliant, high-reliability, low-false-alarm fire protection integrated with the environment-monitoring platform.
Implementation. A linkage-type fire alarm controller with 2 loops and 200+ points; smoke + heat compound detection in the main hall with aspirating detectors added in high-density rack areas for ultra-early warning; denser heat detectors in distribution/battery rooms with linear heat-sensing cable along cable trays; manual call points, audible/visual alarms, fire phone, emergency broadcast and zone display panels; integration with the heptafluoropropane gas suppression system via dual-detector trigger logic; connection to the environment-monitoring platform.
Results. Stable, precise detection with an extremely low false-alarm rate, passing fire acceptance; ultra-early warning provided a higher protection level; the intelligent linkage greatly improved handling efficiency — highly recognized by the customer.
17.2 Government Unit Room Fire Alarm Retrofit Project
Project overview. An aging government unit room — the old fire alarm system frequently false-alarmed and faulted, with discontinued spare parts — required a full upgrade without affecting daily office work or room business.
Implementation. A new intelligent linkage-type controller with reused usable lines and fully replaced front-end detectors and modules; optimized point layout eliminating original blind spots with denser key-area coverage; new fire phone and emergency broadcast systems; upgraded linkage logic with stable gas suppression integration; phased, zoned construction with major work at night and weekends.
Results. Stable operation after the retrofit, completely resolving the frequent false alarms and faults; more convenient operation and simpler O&M; orderly construction with zero business impact; passed fire authority acceptance.
17.3 Tertiary Hospital Information Center Fire System Project
Project overview. A tertiary hospital’s information center carrying hospital-wide HIS and LIS core systems demanded extremely high fire safety with strict prohibition of false alarms and false actions — high reliability, high stability, and integration with the hospital logistics monitoring platform.
Implementation. A high-reliability industrial-grade controller with dual-loop redundancy; all smart-algorithm detectors with smoke-heat compound dual verification greatly reducing false alarms; a four-level alarm logic — pre-alarm prompts only, and only two-stage confirmation starts suppression linkage, minimizing false actions; complete manual emergency control for human intervention; integration with the hospital logistics platform.
Results. Zero false alarms since commissioning — stable and reliable, protecting room fire safety while avoiding false actions that could interrupt medical services — highly praised by the customer.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.