Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32
KITOZER
KITOZER

Computer Room Fire Detection Tube Gas Fire Suppression

Table of Contents

1. Cover / Document Information

– Document Title: Computer Room Fire Detection Tube Gas Fire Suppression Technical Design Solution

– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Date: August 2026

– Version: V1.0

– Project Type: Technical design solution for Computer Room Fire Detection Tube Gas Fire Suppression

2. Table of Contents Structure

1. Company Introduction

2. Project Overview

3. User Requirement Analysis

4. Overall Design Description

5. Detailed System Design and Product Technical Parameters

6. Project Quotation and Configuration List

7. Core Solution Advantages

8. Technical Q&A

9. Construction Schedule Plan

10. Construction Organization Plan

11. After-Sales Service System

12. Operation and Maintenance Training Plan

13. Typical Project Cases

14. SEO Optimization System and Website Backend Configuration

15. Contact Information

3. Company Introduction

3.1 Company Development Overview

Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.

After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.

3.2 Core Business System

The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:

– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;

– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;

– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;

– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.

3.3 Brand and Qualification Honors

The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.

3.4 Core Competitive Advantages

1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;

2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;

3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;

4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.

4. Project Background and Objectives

4.1 Industry Background and Policy Environment

With the rapid development of the digital economy and computing-power industry, the scale of data rooms, shielding rooms and edge-computing sites continues to grow. High-density servers, storage devices, power-distribution modules and cable clusters are highly concentrated inside rooms, with high equipment value and strong business-continuity requirements. Once an electrical fire occurs, it not only destroys hardware but also causes data loss, business interruption and production stoppage — major economic losses and safety incidents.

Traditional pipe-network gas fire suppression systems have limitations: long construction periods, large space occupation, high renovation cost, and an inability to provide cabinet-level precise protection — poorly adapted to the diversified, refined fire-protection needs of current rooms. The fire-detection-tube gas fire suppression system, as an innovative flexible fire-detection-and-extinguishing technology, integrates fire detection and suppression in one device: no complex pipe network or dedicated cylinder room is needed, installation is flexible, response is rapid and extinguishing is precise — making it the optimal solution for local protection of rooms and overall protection of small spaces.

National codes including *Code for Design of Gas Fire Extinguishing Systems* (GB 50370), *Code for Fire Protection Design of Buildings* (GB 50016) and *Code for Design of Data Centers* (GB 50174) define clear requirements for gas suppression systems; fire acceptance authorities require compliant, certified products in protected spaces. Against this background, the demand for fire-detection-tube systems with clean agents, cabinet-level precision and low renovation impact is growing steadily in data centers, shielding rooms, micro-module cold aisles, integrated cabinets, outdoor communication cabinets and UPS distribution rooms.

4.2 Project Overview

This solution addresses the fire characteristics and protection needs of room scenarios, based on heptafluoropropane (HFC-227ea) clean extinguishing agent and fire-detection-tube temperature-sensing activation technology, designing a safe, reliable and economical room fire-detection-tube gas fire suppression system. It realizes multi-level protection at cabinet level, aisle level and room level, effectively suppressing early fire and minimizing fire loss, providing a full-time protection barrier for room equipment and data.

The solution covers three standard scenario configurations: single-cabinet-level protection (direct type), micro-module cold-aisle protection (indirect type) and small-room overall protection (indirect type), each with a complete equipment list — extinguishing-agent cylinders, fire detection tubes, discharge piping, nozzles, alarm controllers, sound/light alarms, manual start/stop boxes and supporting materials — plus design, installation, commissioning, acceptance support and after-sales maintenance.

4.3 Core Project Objectives

All-time automatic monitoring: the system operates without human duty, monitoring the protected area 7×24 and responding rapidly to activate suppression at the fire’s earliest stage.

Precise and efficient extinguishing: the agent acts directly on the fire area with fast, efficient suppression of Class A surface fires, Class B liquid fires and Class C electrical fires, preventing fire spread.

Equipment-friendly, damage-free: clean gaseous agent — non-conductive, non-corrosive, no residue — no cleanup after discharge and no effect on electronic equipment operation, suited to precision room equipment.

Compliant and certified: design, construction and acceptance strictly follow national fire codes and data-center construction standards, passing fire acceptance.

4.4 Necessity of Construction

Early suppression of electrical fires. Room fires usually start inside cabinets — at power supplies, cable terminations or within equipment. Traditional point-type smoke/heat detectors sense the fire only after smoke spreads to the ceiling, by which time the cabinet fire has often grown and damaged multiple devices. The fire detection tube placed directly at ignition-prone points activates within 3-5 seconds at the fire source, extinguishing at the very beginning — fundamentally reducing loss.

Filling the protection gap of pipe-network systems. Pipe-network gas systems protect the whole space but cannot act inside a cabinet; a single cabinet fire triggers a full-space discharge, flooding the room and disturbing all equipment. Cabinet-level and aisle-level fire-detection-tube protection fills this gap precisely and economically.

Adapting to unmanned and outdoor scenarios. Edge rooms and outdoor cabinets are often unattended and may lose power; the fire-detection-tube system’s detection and activation are completely passive — no external power required — so protection remains effective even during a power failure, which is essential for unmanned facilities.

5. User Requirement Analysis

5.1 Basic Protection Requirements

All-time automatic monitoring: the system operates without personnel, monitoring the protected area 7×24 and responding rapidly at the fire’s earliest stage.

Precise and efficient extinguishing: the agent acts directly on the fire area with fast, high-efficiency suppression of Class A surface, Class B liquid and Class C electrical fires, preventing spread.

Equipment-friendly and damage-free: clean gaseous agent, non-conductive, non-corrosive and residue-free — no cleanup after discharge and no effect on electronic equipment operation.

Compliance: design, construction and acceptance strictly follow national fire codes and data-center construction standards, meeting fire acceptance requirements.

5.2 Functional and Performance Requirements

Multiple activation modes: support both temperature-sensing automatic activation and manual emergency activation, covering unattended and human-handling scenarios.

Alarm and linkage capability: seamless integration with the room fire alarm system, dynamic-environment monitoring system, access-control system and exhaust system — synchronously triggering sound/light alarm, signal upload and linkage actions (power-off, airflow stop) on fire.

Status real-time monitoring: real-time monitoring of agent pressure and system pipe status; automatic alarm on abnormal pressure or pipe faults.

Flexible adaptability: adapt to different cabinet sizes, room areas and layout scenarios; support later expansion and renovation without destroying the room’s existing structure and equipment.

5.3 O&M and Service Requirements

Provide complete operation training so room O&M personnel can independently perform daily inspection and basic operation; provide long-term after-sales maintenance and regular inspection; provide technical consultation and fire-acceptance guidance supporting services.

6. Design Principles and Applicable Standards

6.1 Applicable Standards

The design strictly follows the following national codes and industry standards:

– *Code for Design of Gas Fire Extinguishing Systems* — GB 50370-2005

– *Code for Fire Protection Design of Buildings* — GB 50016-2014 (2018 edition)

– *Code for Design of Data Centers* — GB 50174-2017

– *Code for Design of Automatic Fire Alarm Systems* — GB 50116-2013

– *Code for Construction and Acceptance of Gas Fire Extinguishing Systems* — GB 50263-2007

– *Technical Code for Heptafluoropropane (HFC-227ea) Clean Agent Fire Extinguishing Systems* — DBJ/T 15-102-2017

– The customer’s room layout drawings, equipment arrangement and protection requirements

6.2 Core Design Principles

(1) Safety and reliability first. Core components are national 3C-certified fire products; design parameters strictly follow the codes; full-process quality control eliminates the risks of false discharge, missed discharge and failure.

(2) High efficiency and environmental friendliness. Heptafluoropropane clean agent — high extinguishing efficiency, zero ozone depletion potential, friendly to the environment and equipment, suited to rooms with personnel presence.

(3) Economy and practicality. No pipe network or cylinder room is required — low initial investment; simple structure, low failure rate and low O&M cost, giving excellent whole-lifecycle cost-performance.

(4) Flexible customization. Solutions are customized per actual room layout, equipment type and protection grade, supporting cabinet-level, aisle-level and room-level protection without destroying the room’s existing decoration and systems.

(5) Intelligent integration. Standard communication interfaces integrate into the room’s integrated monitoring system, improving intelligent management level.

7. System Architecture and Working Principle

7.1 System Classification and Composition

Fire-detection-tube gas fire suppression systems are classified by structure and discharge mode into direct-type and indirect-type systems, both composed of extinguishing-agent cylinder sets, fire detection tubes, activation valve sets, signal feedback devices, alarm control units and supporting materials.

Direct-type system: the fire detection tube serves both detection and agent discharge — on fire, the tube ruptures at the fire point and the agent sprays directly from the rupture. Features: simplest structure, most convenient installation, lowest cost and strongest targeting. Suitable for local protection of narrow enclosed spaces such as single server cabinets, shielding cabinets, UPS cabinets and distribution boxes.

Indirect-type system: the fire detection tube serves only as the temperature-sensing activation element; on detecting fire it triggers the cylinder valve to open, and the agent discharges uniformly through dedicated piping and nozzles to the whole protected space. Features: large coverage, uniform agent distribution and more complete space protection. Suitable for overall protection of micro-module cold aisles, small rooms, distribution rooms and cable basements.

7.2 Working Principle

The fire detection tube is made of a special heat-sensitive polymer material, internally charged with low-pressure inert gas (nitrogen) maintained at a stable pressure, and routed along ignition-prone points of the protected area.

When a fire occurs and the ambient temperature reaches the tube’s rated bursting temperature, the tube softens and ruptures at the hottest point (the fire location), the internal pressure releases instantly, triggering the cylinder valve of the agent storage cylinder to open automatically; the agent is rapidly discharged to the protected area through the rupture (direct type) or dedicated discharge nozzles (indirect type), extinguishing the fire quickly through combined chemical inhibition and physical cooling.

The system requires no external power for automatic detection and extinguishing; response is far faster than traditional point-type smoke/heat detectors, activating suppression within 3-5 seconds of fire onset and effectively curbing fire spread at its earliest stage.

7.3 Core Parameter Design and Calculation

Protected-area net volume calculation: cabinet-level protection — net volume = cabinet internal volume − equipment occupied volume (equipment occupation estimated at 30%); space-level protection — net volume = length × width × net height − fixed large-equipment occupied volume.

Heptafluoropropane design quantity formula: W = K × V × C / (100 − C), where W is the design quantity (kg), K the altitude correction coefficient (1.0 at altitude ≤1000 m), V the protected-area net volume (m³), and C the design concentration (%) — 8% for electronic-equipment rooms, 9% for oil-immersed power equipment.

Fire-detection-tube layout parameters: direct-type — single-set tube length ≤30 m, fixing spacing 0.6-0.8 m, bending radius ≥50 mm; indirect-type — detection tube length ≤40 m, covering all ignition-prone areas without detection blind zones.

7.4 Scenario Layout Schemes

Cabinet-level protection (direct type): for standard 42U server cabinets, shielding cabinets and independent equipment — the agent cylinder is installed on a dedicated bracket at the cabinet bottom side without occupying equipment U positions; the fire detection tube runs in a snake pattern along the cabinet interior top and side columns, covering the server power area and cable terminal area; the pressure signal connects to the cabinet monitoring module for single-cabinet status monitoring.

Micro-module cold-aisle protection (indirect type): for overall protection of a standard micro-module cold aisle — the agent cylinder set is placed in the dedicated equipment area at the aisle end; detection tubes are evenly laid along the aisle top forming a full-coverage detection network; discharge nozzles are installed at equal spacing along the aisle top ensuring the agent fills the cold-aisle space uniformly; the alarm controller is installed at the aisle entrance and linked with the micro-module dynamic-environment system.

Small-room overall protection (indirect type): for rooms ≤50 m² including shielding rooms — multiple indirect-type sets are combined; cylinder sets are wall-mounted inside the room against the wall without a dedicated cylinder room; detection tubes are laid in layers under the ceiling, above equipment and in cable basements for three-dimensional detection; atomizing nozzles are evenly distributed on the room ceiling meeting the full-space concentration requirement; a complete alarm/linkage system is integrated into the room’s overall safety system.

8. Detailed Technical Design

8.1 Direct-Type Fire-Detection-Tube Heptafluoropropane Suppression Unit Series

The direct series covers four models — KITOZER-HD-Z-2/4.2, HD-Z-4/4.2, HD-Z-6/4.2 and HD-Z-12/4.2 — with cylinder volumes 2 L, 4 L, 6 L and 12 L:

– Pressure parameters: nominal working pressure 4.2 MPa (20℃); maximum working pressure 5.3 MPa (50℃); maximum agent charge 1.4 / 2.8 / 4.2 / 8.4 kg; charging density ≤0.7 kg/L.

– Activation: temperature-sensing automatic start / manual emergency start; standard tube φ6 mm (φ8 mm for 12 L); maximum tube length 15 / 25 / 30 / 35 m; rated bursting temperature 110℃ (standard) / 150℃ (high-temperature type).

– Discharge performance: extinguishing response ≤3 s (2/4 L) and ≤5 s (6/12 L); discharge time ≤8 s (2/4 L) and ≤10 s (6/12 L); fire-extinguishing ratings 1A 21B Class-C electrical (2 L), 2A 34B (4 L), 2A 55B (6 L), 3A 89B (12 L).

– Structure: applicable environment 0℃-50℃; cylinder of quality carbon-steel seamless gas cylinder (304 stainless steel optional); forged brass nickel-plated cylinder valve; pressure gauge 1.6 grade, 0-6 MPa (0-10 MPa for 12 L); signal feedback contact DC 24 V/1 A (2 A for 12 L), passive normally open; wall-mount or in-cabinet embedded installation; cylinder outer diameter φ102/140/159/219 mm; total height 380/420/520/680 mm; empty weight 3.5/6.8/9.2/18.5 kg; design life 20 years; tube life ≥10 years; protection IP54 (indoor) / IP65 (outdoor); national fire-product 3C certification with test reports.

8.2 Indirect-Type Fire-Detection-Tube Heptafluoropropane Suppression Unit Series

The indirect series covers five models — KITOZER-HD-J-20/4.2, HD-J-40/4.2, HD-J-70/4.2, HD-J-90/4.2 and HD-J-120/4.2 — with cylinder volumes 20 L, 40 L, 70 L, 90 L and 120 L:

– Pressure parameters: nominal working pressure 4.2 MPa (20℃), maximum 5.3 MPa (50℃); maximum agent charge 14 / 28 / 49 / 63 / 84 kg; charging density ≤0.7 kg/L.

– Activation: fire-detection-tube temperature-sensing start / manual start / electromagnetic start; detection tube φ6 mm (20/40 L) or φ8 mm (70/90/120 L); max detection-tube length 25 / 30 / 40 / 40 / 45 m; discharge piping connection DN15 / DN20 / DN25 / DN25 / DN32; rated bursting temperature 110℃ or 150℃ selectable.

– Discharge performance: extinguishing response ≤5 s (20/40 L), ≤8 s (70/90 L), ≤10 s (120 L); total-flooding discharge time ≤10 s; applicable protected volume ≤15 / 30 / 50 / 70 / 90 m³.

– Structure: applicable environment 0℃-50℃; quality carbon-steel seamless cylinder; forged brass chromium-plated cylinder valve; pressure gauge 0-6 MPa (0-10 MPa for 120 L), 1.6 grade; safety relief valve acting at 5.8 ±0.3 MPa (6.5 ±0.3 MPa for 120 L); signal feedback DC 24 V/2 A passive; wall-mount/floor (20/40 L) or floor/rack (70-120 L); outer diameter φ219/273/325/350/406 mm; height 820/950/1150/1280/1400 mm; empty weight 28/52/85/110/145 kg; design life 20 years; national fire 3C certification with type-test reports.

8.3 Fire Detection Tube Detailed Parameters

The fire detection tube series covers standard and high-temperature types in φ6 mm and φ8 mm:

– Material: special modified polyamide high-molecular composite (standard) or high-temperature-resistant special composite (high-temperature type).

– Dimensions: outer diameter 6.0 ±0.2 mm / 8.0 ±0.2 mm; inner diameter 3.0 ±0.1 mm / 4.0 ±0.1 mm; wall 1.5 mm / 2.0 mm.

– Pressure: normal charged pressure 1.0 ±0.2 MPa (standard) / 1.2 ±0.2 MPa (high-temperature), nitrogen; normal-temperature bursting pressure ≥3.5 MPa / ≥4.0 MPa.

– Temperature: rated bursting temperature 110℃ ±10℃ (standard) / 150℃ ±10℃ (high-temperature); long-term working temperature range -20℃ to 85℃ / -20℃ to 120℃; short-term tolerance 100℃/100 h (standard) / 140℃/100 h (high-temperature) without cracking.

– Mechanical: minimum bending radius 50 mm / 60 mm; tensile strength ≥22 MPa / ≥25 MPa; elongation ≥200% / ≥180%; 1000 h heat aging with bursting-temperature change ≤10%; resistant to oil, acid/alkali and salt spray without obvious corrosion.

– Electrical/fire: dielectric breakdown voltage ≥15 kV/mm; flame-retardant grade UL94 V-0; UV resistance indoor ≥10 years, outdoor ≥5 years.

– Installation: standard coil 100 m; dedicated quick-fit connectors for tool-free installation; suitable for normal-temperature rooms, cabinets and distribution rooms (standard), and high-temperature equipment areas, outdoor cabinets and battery compartments (high-temperature type).

8.4 Agent Cylinder and Cylinder Valve

Agent cylinder: per GB 5099 (seamless steel gas cylinders); 40CrMnMo quality alloy steel, seamless drawn; internal anti-rust passivation not reacting with the agent; external red epoxy electrostatic coating with strong adhesion; hydrostatic test pressure 10.5 MPa without permanent deformation; air-tightness test pressure 4.2 MPa without leakage; hydrostatic test every 3 years; design life 20 years; standard fire cylinder threads (PZ27.8, PZ39); accessories — cap, anti-vibration ring and fixing clamps.

Dedicated cylinder valve (KITOZER-FV-01): HPb59-1 forged brass body, nickel-plated; NBR seals resistant to agent corrosion; inlet PZ27.8, outlet G1/2 (direct) / G1 (indirect); differential-pressure automatic activation with response ≤0.5 s; manual press-type emergency activation with operating force ≤150 N; built-in safety membrane for overpressure relief; M14 × 1.5 pressure-gauge port; built-in micro switch for passive signal feedback; working pressure 0-6 MPa; temperature -20℃ to 60℃; zero leakage (helium mass-spectrometer tested); life ≥10 years, ≥1000 actuations.

8.5 Alarm Control and Linkage Equipment

Fire alarm controller (KITOZER-FC-100): single/double loop; up to 128/256 points; AC 220 V ±15%, 50 Hz with DC 24 V/7 Ah standby battery; standby power ≤10 W; 3.5-inch LCD + LED status lamps; membrane keys with password authority; alarms — fire, fault, abnormal pressure and linkage-action; 4 programmable relay outputs DC 24 V/5 A; RS485 and RJ45 Ethernet with Modbus protocol for dynamic-environment integration; 10,000-event history retained on power loss; wall-mounted 320 × 220 × 80 mm; working 0℃-50℃, humidity ≤95% without condensation; IP30; national fire 3C certification.

Sound/light alarm (KITOZER-SG-01): DC 24 V; current ≤150 mA; sound pressure 85-115 dB at 3 m front; red strobe 1-2 Hz; fire tone selectable; ABS flame-retardant housing; wall-mounted base installation; -10℃ to 55℃; IP43; explosion-proof version (Exd II CT6) optional.

Manual emergency start/stop box (KITOZER-SD-01): manual start and manual stop buttons; mushroom-head self-locking buttons with protective covers; contacts DC 24 V/3 A; start/stop status indicator lamps; ABS flame-retardant housing; surface or flush mounting; IP54; -10℃ to 55℃.

8.6 Supporting Materials

Quick-fit connectors: 304 stainless steel / nickel-plated brass; for φ6 mm and φ8 mm tubes; pressure ≥6 MPa; conical sealing rings, no thread tape needed; types — straight, elbow, tee, end cap.

Tube fixing clamps: 304 stainless steel / galvanized steel; for φ6-φ50 mm; expansion-bolt or self-tapping fixing; galvanized/powder-coated finish.

Signal cables: RVVP 2 × 1.0 mm² shielded; 300/500 V; braided copper shield ≥85% coverage; ZR-B flame-retardant grade.

Galvanized steel pipe: per GB/T 3091; Q235B; hot-dip galvanized; common sizes DN15, DN20, DN25, DN32.

9. Recommended Configuration and Preliminary Budget

9.1 Configuration Summary

Single-cabinet-level protection (direct type, one 42U cabinet):

No. Item Model / Specification Qty Unit
1 Direct-type fire-detection-tube heptafluoropropane unit KITOZER-HD-Z-6/4.2; 6 L; 4.2 MPa; with cylinder, valve, gauge 1 set
2 Heptafluoropropane agent Clean type, purity ≥99.9% 4.2 kg
3 Standard fire detection tube φ6 mm, 110℃ bursting temperature 8 m
4 Pressure signal feedback device DC 24 V, normally open 1 pc
5 Mounting bracket 304 stainless steel, cabinet dedicated 1 set
6 Connectors and auxiliaries Quick-fit connectors, fixing clamps 1 lot
7 Installation and commissioning Install, pressure test, commissioning 1 item
8 Transport and tax Transport, VAT invoice 1 item

Micro-module cold-aisle protection (indirect type, 10-cabinet single row):

No. Item Model / Specification Qty Unit
1 Indirect-type fire-detection-tube heptafluoropropane unit KITOZER-HD-J-90/4.2; 90 L; 4.2 MPa; with cylinder and activation valve 2 sets
2 Heptafluoropropane agent Clean type, purity ≥99.9% 126 kg
3 Standard fire detection tube φ8 mm, 110℃ bursting 30 m
4 Discharge main piping Galvanized steel pipe, DN25 12 m
5 Atomizing nozzles Dedicated gas suppression nozzles 6 pcs
6 Fire alarm controller Linkage type, single loop 1 set
7 Sound/light alarm DC 24 V, explosion-proof optional 2 pcs
8 Manual start/stop box With protective cover, wall-mounted 2 pcs
9 Pressure signal feedback DC 24 V, passive contact 2 pcs
10 Brackets and pipe auxiliaries Fixing brackets, fittings 1 lot
11 Installation and commissioning Install, pressure test, commissioning, acceptance support 1 item
12 Transport and tax Transport, VAT invoice 1 item

Small-room overall protection (indirect type, 40 m² room):

No. Item Model / Specification Qty Unit
1 Indirect-type fire-detection-tube unit KITOZER-HD-J-120/4.2; 120 L; 4.2 MPa 2 sets
2 Heptafluoropropane agent Clean type, purity ≥99.9% 168 kg
3 High-temperature fire detection tube φ8 mm, 150℃ bursting 50 m
4 Discharge pipe network Galvanized seamless steel, DN32/DN25 with fittings 1 lot
5 Atomizing nozzles Swirl type, flow coefficient 2.0 10 pcs
6 Fire alarm controller Linkage type, double loop, communication interface 1 set
7 Sound/light alarm DC 24 V, high sound level 3 pcs
8 Manual start/stop buttons With protective cover, explosion-proof optional 2 pcs
9 Discharge indicator lamps Wall-mounted, 24 V 2 pcs
10 Pressure switches and signal modules Passive contact, signal feedback 2 sets
11 Brackets and auxiliaries Fixing frames, clamps, seals 1 lot
12 Installation and commissioning Install, pressure test, commissioning, fire-acceptance guidance 1 item
13 Transport and tax Transport, VAT invoice 1 item

9.2 Quotation Notes

The preliminary budget covers all equipment and materials (agent units, agent charge, fire detection tubes, discharge piping and nozzles, alarm/linkage devices, auxiliary materials), installation and commissioning labor, transport and tax. All prices are indicative and quoted in RMB (CNY) only — no foreign-currency conversion is provided. The final configuration and quotation are calculated per the actual site dimensions, protection grade and customization needs, with items adjustable as required, and are subject to a formal contract. Free on-site survey, free design proposals and free fire-acceptance guidance are provided; the agent charge and cylinder configuration follow the design concentration and protected-volume calculation in Section 7.3.

10. Technical Specifications

10.1 System Performance Summary

Item Specification
System type Fire-detection-tube gas fire suppression (direct / indirect)
Agent Heptafluoropropane HFC-227ea, purity ≥99.9%, ODP 0
Nominal working pressure 4.2 MPa (20℃); max 5.3 MPa (50℃)
Charging density ≤0.7 kg/L
Fire tube bursting temperature 110℃ ±10℃ (standard) / 150℃ ±10℃ (high-temperature)
Detection/activation Passive — no external power; response ≤0.5 s valve activation
Fire response time ≤3-5 s (direct), ≤5-10 s (indirect)
Discharge time ≤8-10 s; total flooding ≤10 s
Design concentration 8% (electronic equipment), 9% (oil-immersed equipment)
Design formula W = K × V × C / (100 − C)
Fire ratings 1A 21B C to 3A 89B C (direct series)
Direct series HD-Z-2/4/6/12: 2-12 L, charge 1.4-8.4 kg, tube ≤15-35 m
Indirect series HD-J-20/40/70/90/120: 20-120 L, charge 14-84 kg, volume ≤15-90 m³
Protected scenarios Cabinet, cold aisle, small room (≤50 m²), UPS/distribution room, outdoor cabinet
Cylinder life 20 years design life; hydrostatic test every 3 years
Fire tube life ≥10 years (indoor); UL94 V-0; dielectric ≥15 kV/mm
Controller FC-100; 128/256 points; AC220V + DC24V backup; RS485/Ethernet Modbus; 3C
Certifications National fire 3C certification, type-test reports
Warranty 24 months, quarterly free inspection during warranty

10.2 Key Component Specifications

Component Key Parameters
Direct unit cylinder 2/4/6/12 L; seamless carbon steel (304 SS optional); φ102-219 mm; IP54 indoor / IP65 outdoor
Direct unit valve Forged brass nickel-plated; differential auto start ≤0.5 s; manual ≤150 N; safety membrane
Indirect unit cylinder 20/40/70/90/120 L; φ219-406 mm; relief valve 5.8/6.5 ±0.3 MPa
Standard fire tube φ6/8 mm; burst ≥3.5 MPa; bend radius 50/60 mm; tensile ≥22 MPa; -20℃ to 85℃
High-temp fire tube φ6/8 mm; burst ≥4.0 MPa; 150℃ ±10℃; -20℃ to 120℃; for hot equipment/outdoor
Cylinder valve FV-01 HPb59-1 brass; NBR seals; PZ27.8 inlet; zero leakage (helium tested); ≥1000 actuations
Alarm controller FC-100 1/2 loops; 128/256 points; 4 relay outputs DC24V/5A; 10,000 events; IP30; 3C
Sound/light alarm 85-115 dB at 3 m; red strobe 1-2 Hz; IP43; Exd II CT6 optional
Manual start/stop box Mushroom self-locking buttons with cover; DC24V/3A; IP54
Quick-fit connectors 304 SS/nickel-plated brass; ≥6 MPa; conical seals; straight/elbow/tee/end-cap
Signal cable RVVP 2×1.0 mm² shielded; ≥85% braid; ZR-B flame retardant
Discharge pipe Galvanized steel pipe GB/T 3091; DN15-DN32; Q235B

11. Key Advantages and Customer Value

11.1 Technical Performance Advantage — Extremely Early Response and Precise Protection

Ultra-early response, fast extinguishing: the fire detection tube is placed directly at ignition-prone points with temperature sensitivity far higher than traditional detectors, activating suppression within 3-5 seconds at the fire’s earliest stage — extinguishing the fire at its beginning and drastically reducing equipment loss and business-interruption time.

Precise, targeted protection: cabinet-level and equipment-level precise protection is achieved without discharging the whole room’s gas system for a local fire — avoiding over-engineering, greatly reducing suppression cost and secondary impact.

Clean suppression, zero equipment damage: heptafluoropropane clean agent is non-conductive, non-corrosive and residue-free — no cleanup after discharge and no secondary damage to servers, switches and storage devices.

Passive activation, high reliability: detection and activation require no external power — triggered purely by temperature change and pressure difference, immune to power failure, especially suited to unattended edge rooms and outdoor cabinets.

11.2 Cost and O&M Advantage — Low Investment, Simple Maintenance

Low initial investment: no complex pipe network, no dedicated cylinder room and no large numbers of smoke/heat detectors — simple structure with material and construction cost far below traditional pipe-network gas systems, especially for small-scale protection.

Flexible, convenient installation: the fire detection tube bends freely, adapting to complex spaces and equipment layouts; short construction period with minimal impact on room operation — ideal for fire-retrofit of existing rooms.

Simple, low-cost maintenance: few components and low failure rate; daily O&M is only periodic pressure-gauge and tube-appearance checks; long consumable replacement cycles make whole-lifecycle O&M cost far lower than traditional fire systems.

Easy expansion and renovation: when equipment is added or layouts change, suppression units and tube lengths are flexibly adjusted without large-scale modification of the existing system — adapting to dynamic room upgrades.

11.3 Product and Service Advantage — Source Factory, Full Guarantee

Source factory, guaranteed quality: KITOZER-brand full series produced in the company’s own factory; all core components pass national 3C certification with full-process quality control — stable and reliable, eliminating the risk of inferior products.

Customized solution design: professional engineers customize a dedicated solution per actual site conditions and needs, free of charge, with three differentiated proposals balancing protection effect and economy.

Professional construction and acceptance: certified professional team construction strictly per fire codes with full-process quality control; fire-acceptance guidance and technical support ensure smooth project acceptance.

Full-time after-sales: 7×24 technical service hotline; on-site within 4 hours in urban areas and 8 hours within the province; free inspection and repair during the warranty and preferential maintenance after — with lifetime technical support.

12. Technical Q&A (50+ Items)

12.1 Basics and Working Principle

Q1: What is a fire-detection-tube gas fire suppression system?

A: It is an innovative gas suppression device integrating fire detection and suppression in one. A special heat-sensitive fire detection tube senses the fire and automatically triggers discharge of clean extinguishing agent — no external power and no complex detectors needed; simple structure, flexible installation and rapid response, widely used in cabinets, rooms and distribution rooms.

Q2: How does the fire detection tube work?

A: The tube is a special heat-sensitive high-molecular material internally charged with low-pressure nitrogen at stable pressure. When a fire raises the temperature to the rated bursting temperature, the tube softens and ruptures at the fire point; the internal pressure drops instantly, triggering the agent cylinder valve to open automatically and the agent to discharge rapidly to extinguish the fire.

Q3: What is the difference between direct-type and indirect-type systems?

A: In a direct-type system the tube performs both detection and discharge — the agent sprays from the tube rupture itself, suited to local protection of narrow spaces such as cabinets and distribution boxes. In an indirect-type system the tube is used only for detection and activation — the agent discharges uniformly through dedicated piping and nozzles, suited to overall protection of spaces such as small rooms and cold aisles.

Q4: Does the fire-detection-tube system need electricity?

A: The core detection and suppression functions are completely passive — no external power is needed for automatic operation. If alarm signal output and linkage with other devices are required, the alarm controller is powered; this does not affect the suppression function itself.

Q5: Is heptafluoropropane harmful to people? Can it be used in rooms with personnel?

A: At the design concentration (8%), heptafluoropropane has no obvious harm to humans and can be used in occupied rooms; however, personnel should evacuate promptly during discharge and avoid prolonged exposure to high concentrations. It does not deplete the ozone layer and is environmentally excellent.

Q6: What classes of fire can it extinguish?

A: Class A surface fires (wood, paper, fabric), Class B liquid fires (flammable liquids) and Class C electrical fires (energized equipment). Fire ratings range from 1A 21B C up to 3A 89B C across the direct series — covering the fire types typical of rooms and electrical installations.

Q7: How fast does the system respond compared with traditional detectors?

A: Traditional point-type smoke detectors sense smoke only after it spreads to the ceiling, typically tens of seconds after ignition; the fire detection tube placed at the source responds to local temperature within seconds — activating suppression in 3-5 seconds (direct type). This early response is the system’s core advantage.

Q8: What happens after the tube ruptures?

A: The tube cannot be reused after rupture; after a discharge the tube must be replaced and the agent recharged, and the cause of the fire investigated. The cylinder valve and pressure gauge can be re-used after professional inspection; the company provides fast replacement and recharging service.

12.2 Selection and Design

Q9: What size fire-detection-tube unit does a standard server cabinet need?

A: For a regular 42U server cabinet with about 30% equipment occupancy, a 6 L direct-type unit charged with 4.2 kg of heptafluoropropane typically meets the protection requirement; high-density cabinets can use a larger model.

Q10: What room areas are suitable for fire-detection-tube systems?

A: The system is particularly suited to small rooms, shielding rooms and distribution rooms within 50 m²; larger rooms can combine multiple sets, or use the system as a supplement to a traditional pipe-network system for enhanced protection of key equipment.

Q11: Should the bursting temperature be 110℃ or 150℃?

A: For ordinary normal-temperature rooms and indoor cabinets (ambient up to about 40℃), choose the 110℃ standard type. For environments near heat-generating equipment, high-temperature workshops, outdoor cabinets or battery compartments, choose the 150℃ high-temperature type to avoid false activation.

Q12: How is the agent quantity calculated?

A: W = K × V × C / (100 − C): W = design quantity (kg), K = altitude correction (1.0 below 1000 m), V = protected net volume (m³), C = design concentration (8% for electronic equipment, 9% for oil-immersed equipment). Net volume deducts equipment occupancy (about 30% for cabinets) or fixed large equipment. The company provides complete design calculation documents.

Q13: Can one set protect multiple cabinets?

A: A direct-type set generally protects one protected space — not recommended across multiple cabinets. An indirect-type set can protect multiple cabinets within one enclosed space (e.g. all cabinets in a micro-module cold aisle) through piping and nozzles.

Q14: How is the fire detection tube laid out?

A: The tube is routed along ignition-prone points: within a cabinet along the top and side columns covering the power and cable-terminal areas; in a space along the ceiling above equipment and in cable basements. Direct type: fixing spacing 0.6-0.8 m, bending radius ≥50 mm; the tube must cover all risk points without blind zones.

Q15: What protection grade should be chosen for outdoor cabinets?

A: Use the high-temperature tube (150℃) plus an IP65-protection cylinder unit for outdoor high/low temperature, rain and dust environments; widely applied in communication base stations, outdoor cabinets and charging stations.

Q16: Can a shielding room use this system without affecting shielding performance?

A: Yes. The fire detection tube is non-metallic, and wall penetrations can be treated with dedicated shielding seals, so the room’s electromagnetic shielding effectiveness is not compromised — the ideal fire solution for shielding rooms.

12.3 Installation and Construction

Q17: What are the installation requirements for the fire detection tube?

A: The tube is placed 30-50 cm above heat sources; fixing spacing ≤0.8 m on horizontal runs and ≤1.0 m on vertical runs; bending radius not less than 10× the tube diameter (≥50 mm for φ6 mm); avoid sharp edges that could cut the tube and stay away from strongly corrosive environments.

Q18: Can a fire-detection-tube system be added to an already running room?

A: Yes. Construction is simple without large-scale renovation — installation can be performed without shutting down the room, with minimal impact on operation; this is an ideal fire-upgrade solution for existing rooms.

Q19: Can the fire detection tube be extended if too short?

A: Yes — connect with dedicated quick-fit connectors with reliable sealing that do not affect system performance; however, the total tube length of one set must not exceed the product’s rated maximum (15-45 m by model) to avoid affecting activation sensitivity.

Q20: How is the agent cylinder fixed? Is a cylinder room required?

A: Small-capacity cylinders mount directly on cabinet sides or walls; large-capacity cylinders stand on the floor, firmly fixed — no dedicated cylinder room is needed, saving room space; this is one of the system’s major advantages.

Q21: What is the construction process?

A: Survey and marking → bracket and pipe installation (drilling, expansion bolts, pipe fixing, wall-through sealing with fire-stop) → tube laying (fixing, bends, connections) → equipment installation (cylinders, valves, gauges, controllers, alarms, buttons, nozzles, discharge lamps) → wiring (shielded cable, strong/weak separation, grounding ≤4Ω) → air-tightness test (1.05× working pressure, 24-hour hold, pressure drop ≤1%) → system commissioning (alarm, simulated activation, linkage tests).

Q22: How long does installation take for a small project?

A: A standard small project takes about 13 days total (survey/preparation 2 days, brackets and piping 2 days, tube laying 2 days, equipment installation 3 days, commissioning 2 days, acceptance 2 days); urgent schedules can be accelerated per the customer’s needs.

Q23: Does installation require power-off of the cabinets?

A: No. Tube laying and cylinder installation are mechanical work around the cabinets without touching live equipment; only the alarm controller needs a 220 V supply connection, arranged in a short window. The system is installed and commissioned without interrupting room operation.

Q24: Is it necessary to install the alarm controller for every set?

A: For a single small set, the built-in pressure gauge plus optional signal feedback suffices; for cold-aisle and room-level protection, an alarm controller (FC-100) provides status display, fault alarms and linkage outputs, and is recommended for integration with the dynamic-environment system.

12.4 Maintenance and Refill

Q25: Does the system require annual inspection?

A: Yes. Per fire codes, gas suppression systems require at least one comprehensive inspection per year — pressure check, tube appearance check, alarm function test and simulated activation test — ensuring the system remains in full working order.

Q26: How long does the fire detection tube last, and when is it replaced?

A: Under normal indoor conditions the tube life is ≥10 years; harsh high-temperature/humidity or corrosive environments shorten it. Replace promptly when patrols find cracking, aging or abnormal pressure.

Q27: How often does the agent need recharging?

A: With no leakage or discharge, heptafluoropropane stores long term; check concentration and pressure every 3-5 years and top up if pressure is low. After a discharge, recharge the agent and replace the tube.

Q28: What should the daily patrol check?

A: Monthly patrol: pressure-gauge pointer in the green normal range; tube free of damage, aging or loosening; controller with no fault alarm; equipment appearance without damage or corrosion. Quarterly on-site service during the warranty covers full system checks.

Q29: What should be done after an accidental discharge?

A: With proper design, certified products and standard installation, accidental discharge is extremely unlikely. If it happens: ventilate first, enter only after confirming safety; contact the service provider to replace the tube, recharge the agent and investigate the cause to eliminate it.

Q30: What are the common causes of false activation, and how are they prevented?

A: False activation usually comes from choosing a too-low bursting temperature for a hot environment, tubes too close to heat sources, mechanical damage causing leaks, or direct flame/smoke proximity. Prevention: select 150℃ high-temperature tubes for hot environments, keep 30-50 cm from heat sources, protect tubes from damage, and keep pressure within the normal range.

Q31: Can the system still activate after a long period without power?

A: Yes — the detection and activation mechanism is fully pneumatic and passive; the agent cylinder and charged tube hold their own energy, so the system remains effective regardless of power supply condition, which is critical for unattended facilities.

Q32: How is the cylinder’s pressure checked?

A: Read the pressure gauge (green zone = normal); the system also supports remote pressure monitoring via the signal feedback and controller. If pressure is low, check for leaks (soap-water test at joints, hold test), repair and recharge.

12.5 Comparison and Compliance

Q33: What are the advantages and disadvantages versus a traditional pipe-network heptafluoropropane system?

A: Advantages: lower cost, faster installation, no cylinder room, cabinet-level precision, faster response and simpler maintenance. Limitations: single-set protected volume is limited, large rooms need multiple sets combined, and whole-space uniformity is slightly less than a pipe-network system. They suit different scenarios and are complementary rather than mutually exclusive — they can be combined.

Q34: Is the fire-detection-tube system code-compliant? Can it pass fire acceptance?

A: Yes. It is a form of gas suppression system; design and construction follow *Code for Design of Gas Fire Extinguishing Systems* GB 50370; core products carry national 3C certification; with complete documentation it passes fire acceptance normally.

Q35: Can it be used in a Class-A data center?

A: Class-A data centers typically use pipe-network gas systems as the main protection; fire-detection-tube systems serve as a supplement for cabinet interiors, battery cabinets and distribution cabinets — enhancing the overall fire-safety level at key points.

Q36: Can it extinguish electrical fires? Is there a shock risk?

A: Yes. Heptafluoropropane is non-conductive and the fire detection tube itself is insulating material — energized-equipment fires are suppressed safely with no shock risk, making it ideal for electrical installations.

Q37: Can carbon dioxide be used with the fire-detection-tube system?

A: Yes — CO₂ fire-detection-tube units are available for unmanned places and high-temperature scenarios; however, CO₂ has a suffocation risk, so occupied rooms should prefer heptafluoropropane.

Q38: What certifications do the products hold?

A: National fire-product 3C certification and type-test reports for all units, tubes and controllers; cylinders per GB 5099 with hydrostatic and air-tightness test records; full test reports provided for project acceptance and filing.

Q39: What documentation is delivered for acceptance?

A: Complete documentation: scheme design and calculation documents, construction drawings, product qualifications and 3C certificates, test reports, commissioning records (air-tightness, alarms, simulated activation), as-built drawings and operation manuals — supporting smooth fire acceptance.

Q40: What is the warranty period and post-warranty charging?

A: 24 months free warranty from acceptance; during the warranty, free quarterly on-site inspection and free repair/replacement of non-artificial faults. After the warranty, annual maintenance agreements (basic 2 visits/year or comprehensive 4 visits/year) are available; parts are supplied at cost price.

12.6 Application Scenarios and Service

Q41: What scenarios are covered by this solution?

A: IDC data rooms, shielding rooms, micro-module cold aisles, integrated cabinets, outdoor communication cabinets, UPS/distribution rooms, cable basements, battery compartments and small server rooms — cabinet-level, aisle-level and room-level protection.

Q42: Does the system support remote monitoring?

A: Yes. The alarm controller’s communication interface integrates with the room dynamic-environment monitoring system, providing remote real-time monitoring of pressure, operating status and alarm information for unattended remote management.

Q43: What linkage functions are available?

A: Linkage with the fire alarm system, dynamic-environment system, access control and exhaust systems: on fire — sound/light alarm, signal upload, forced power-off of protected circuits, air-conditioning/exhaust stop and door interlock as configured, per the fire code requirements.

Q44: Can the system be expanded when the room grows?

A: Yes. New cabinets can be protected by adding direct-type sets; a larger cold aisle or new room zone adds indirect-type sets to the same alarm controller network; tube lengths adjust to new layouts — expansion does not require rebuilding the existing system.

Q45: Is the system suitable for small server rooms of 10-20 m²?

A: Very suitable — this is one of its core strengths. A 10-20 m² room needs only one or two indirect-type sets with wall-mounted cylinders, no cylinder room and no pipe network; cost and construction are far below a traditional gas system while providing complete total-flooding protection.

Q46: What about the battery compartment of a UPS room?

A: Battery compartments are high-risk areas (hydrogen + electrical fire risk) — protect with high-temperature tubes (150℃) given the elevated ambient temperature, and link with the room alarm system; the clean agent does not damage batteries or electronics.

Q47: Does the system require a dedicated 220 V supply?

A: Only the alarm controller and sound/light alarms need 220 V (with battery backup); the suppression function itself is fully passive. If no controller is used, a single set operates with zero electrical connection.

Q48: How long does the agent remain effective in the cylinder?

A: With the valve closed and no leakage, the agent is stable for years; pressure is verified at inspections (3-5 year cycle for full re-verification). The system’s passive design keeps it charged and ready at all times.

Q49: What training is provided to the room O&M team?

A: One day of training (4 h theory + 4 h practice) at acceptance: system principle and structure, normal-state identification and gauge reading, manual emergency activation, reset and recovery, daily inspection and records, simple fault handling and fire emergency drills; a free refresher session is provided within the warranty.

Q50: What is the response time for after-sales service?

A: 7×24 hotline with technical response within 1 hour and remote guidance; on-site within 4 hours in the urban area, 8 hours within the province and 24 hours nationwide; general faults repaired within 24 hours and major faults given a solution within 48 hours.

Q51: How is the annual maintenance performed after the warranty?

A: Basic maintenance — 2 on-site visits/year checking pressure, pipes and alarm functions with technical consultation and cost-price parts; comprehensive maintenance — 4 visits/year with full performance testing, free wearing-part replacement, free agent-pressure top-up, priority service (halved response time), free system upgrades and full fire-acceptance cooperation.

Q52: What value-added services does the manufacturer provide?

A: System upgrade and expansion for room growth; free fire-code consultation, hidden-danger inspection and acceptance-document preparation; a dedicated O&M archive per project recording inspections, repairs, renovations and recharges across the lifecycle; long-term original spare-parts supply at cost price; and a service supervision hotline with satisfaction follow-up after every visit.

13. Construction Schedule

13.1 Overall Period

The standard small-project schedule is about 13 days, divided into six stages: construction preparation → bracket and pipe installation → fire-detection-tube laying → equipment installation → system commissioning → acceptance and delivery. Large projects or projects requiring coordination with other disciplines are scheduled separately; urgent construction can be arranged per customer requirements.

13.2 Stage Schedule

Stage Work Days Responsible Customer cooperation
1. Preparation Site survey and verification of points and pipe routes; technical disclosure; equipment/material arrival and open-box inspection; tools and PPE 2 Project manager Provide drawings, construction power, entry permit
2. Brackets and pipes Line marking of bracket/pipe/equipment positions; drilling and bracket/clamp installation; discharge pipe laying and fixing; wall-through openings and fire-stopping 2 Crew leader Coordinate site, confirm opening positions
3. Tube laying Lay detection tubes per design; fix tubes and handle bends/connectors; connect tube to cylinder valve; initial air-tightness check 2 Installer Avoid live equipment areas, protect finished work
4. Equipment installation Position and fix agent cylinders, install valves and gauges; install alarm controller, sound/light alarms, manual buttons; install nozzles and discharge lamps; cable laying and wiring with labels 3 Crew leader + electrician Provide 220 V power points
5. System commissioning Air-tightness test, 24-hour pressure hold without leakage; alarm function test (fault, fire, linkage); simulated activation test; parameter optimization and commissioning records 2 Technical engineer Witness by customer technical staff
6. Acceptance and delivery Self-inspection and rectification; compile completion documents, product qualifications and commissioning reports; customer/fire-authority acceptance; operation training; handover of keys and documents 2 Project manager Organize acceptance, arrange O&M staff for training

13.3 Schedule Assurance Measures

Personnel assurance: a dedicated project team with certified fire-installation experience is assigned; key processes are staffed adequately; standby personnel support schedule compression.

Material assurance: all equipment and materials are original with certificates, 3C documents and test reports; open-box inspection verifies model, specification and quantity before installation; classified storage with moisture, fire and theft protection.

Plan control: daily pre-shift task assignment and post-shift progress review; the project manager monitors throughout and recovers slippage by adjusting shifts or adding personnel.

Coordination assurance: advance communication with the customer confirms room layouts, power points, linkage interfaces and access arrangements; approval procedures are completed in advance to prevent process delays.

13.4 Progress Control and Early-Warning Mechanism

Node acceptance: each stage is accepted before the next begins — material arrival acceptance, concealed-work acceptance (pipes, wiring), commissioning acceptance — preventing rework and schedule loss.

Daily report: a daily construction report records completed work, personnel, issues and next-day plans for real-time customer visibility.

Slippage warning: progress falling more than 1 day behind plan triggers an alert with cause analysis and recovery measures (added manpower or extended working time).

Coordination meeting: weekly coordination meetings report progress and resolve cross-discipline and site issues.

14. Construction Organization and Quality/Safety Measures

14.1 Organization Structure

A dedicated project team is established with clear responsibilities: 1 project manager (overall progress, quality, safety, cost, customer interface, acceptance and delivery); 1 technical lead (disclosure, technical problem solving, process/standard control, commissioning and test reports); 1 crew leader (daily task arrangement, construction per drawings, quality and site safety); 1 full-time safety officer (site safety management, disclosure and education, daily patrol, hazard handling); 1 quality inspector (material incoming inspection, process acceptance, concealed-work acceptance, final acceptance support); 3-5 professional installers (certified with fire-facility construction experience, pipe laying, equipment installation and wiring per codes).

14.2 Position Responsibilities

Project manager: overall responsibility for the project; interfaces with the customer, coordinates resources, handles major issues; controls construction nodes and organizes acceptance and delivery; manages project documentation.

Technical lead: conducts technical disclosure, solves construction technical problems, guides field work and controls process/technical standards; performs system commissioning and performance testing to meet design requirements; compiles commissioning reports and technical documents.

Crew leader: implements the construction plan and arranges daily tasks; leads installers to build per drawings with quality control; ensures site safety and protective measures; keeps construction records and reports progress.

Safety officer: implements safety management, conducts safety disclosure and education; daily safety patrol identifying hazards and stopping violations; manages construction power, work-at-height and hot-work; prepares emergency plans and handles incidents.

Quality inspector: inspects incoming materials — unqualified materials prohibited; process acceptance — unqualified upstream work does not proceed downstream; concealed-work acceptance with records; supports final acceptance and tracks rectification.

Installers: certified, experienced in fire-facility works; complete pipe laying, equipment installation and wiring per codes; observe safety rules; protect finished work and practice civilized construction.

14.3 Pre-Construction Preparation

Technical preparation: the team studies drawings, the solution and related codes with detailed technical disclosure clarifying quality standards and construction key points; interface with the customer’s technical staff confirming room layout, equipment positions, power points, linkage interfaces and building structure; optimize construction details avoiding other pipelines and equipment; compile a special safety construction scheme and emergency plan.

Material preparation: stock per the configuration list — all equipment and materials original with certificates, test reports and 3C documents; incoming inspection verifies model, specification, quantity and appearance — unqualified products prohibited; classified storage with moisture, fire and theft protection; prepare tools — impact drill, cutter, wrenches, stripping pliers, multimeter, pressure tester, test pump.

Personnel preparation: all installers hold valid certificates and relevant qualifications; pre-entry safety and technical training with assessment before work; clear job responsibilities.

14.4 Core Construction Processes

Survey and marking: mark cylinder positions, pipe routes, nozzle points and alarm device positions on site with ink lines per drawings; verify dimensions against other disciplines’ pipelines and equipment — adjust the solution if conflicts; positioning confirmed by the customer before proceeding.

Bracket and pipe installation: drill and install expansion bolts, brackets and pipe clamps firmly with code-compliant levelness/verticality; lay galvanized discharge pipes horizontal/vertical with threaded joints sealed with thread tape; fixing spacing — horizontal ≤1.5 m, vertical ≤2.0 m, extra fixing at bends; wall-through sleeves sealed with fire-stop putty for fire-proof sealing.

Fire-detection-tube laying: check the tube for damage, kinks or cracks before laying; route per design along cabinet tops, above equipment and under ceilings; bending radius per specification — no sharp kinks; dedicated quick-fit connectors, firmly sealed; end caps seal the tube ends; neat, orderly fixing.

Equipment installation: cylinders fixed on brackets with verticality deviation ≤1‰, gauge facing an observable direction with adequate operating space; valves, gauges and pressure switches installed tightly without leakage; nozzles installed at design positions with correct discharge direction and firm fixing; controller wall-mounted 1.5 m above floor; sound/light alarms and manual buttons at entrance/exit prominent positions at code heights.

Wiring: alarm lines use flame-retardant shielded cable in conduit with strong/weak current separated; connections firm with clear wire-number labels per drawings; reliable grounding with controller grounding resistance ≤4Ω; linkage signals connected to the customer’s monitoring system with signal testing.

Air-tightness test: after installation, test the whole piping system — test pressure 1.05× working pressure, slowly raise to test pressure, close the gas source; hold 24 hours with pressure drop ≤1% and no leakage points; record and sign off with the customer.

System commissioning: alarm function test — fire alarm, fault alarm, sound/light indication and signal output; simulated activation test — remove the agent cylinder, connect a simulated gas source, verify cylinder-valve activation reliability; linkage function test — verify logic with access control, exhaust and power-cut devices; detailed commissioning records and report.

14.5 Quality Control System

Material quality control: all incoming materials must carry certificates and test reports; core fire products must have 3C certification; the quality inspector checks batch by batch — unqualified materials are removed and prohibited from use.

Process quality control: the “three-check system” — installer self-check, crew mutual check, quality-inspector special check; unqualified upstream work does not proceed downstream; concealed works must pass customer acceptance and sign-off before covering.

Finished-product protection: protect the room’s existing decoration, equipment and pipelines from knocks and contamination during construction; dust covers on installed equipment; protective film on floors during work; site cleaned daily keeping the room tidy.

Acceptance standard: construction and acceptance strictly follow *Code for Construction and Acceptance of Gas Fire Extinguishing Systems* (GB 50263) with all indicators meeting code and design requirements.

14.6 Safety and Civilized Construction Measures

Safety principle: adhere to “safety first, prevention first, comprehensive treatment”; implement the safety responsibility system; eliminate safety accidents and ensure the safety of personnel and room equipment.

Electrical safety: construction power drawn from the customer-designated temporary distribution box with RCD protection; wiring performed by certified electricians with no unauthorized connections; power tools well insulated and periodically tested with intact cables; construction power cut at the end of each day.

Hot-work safety: no smoking on site and no non-compliant hot work; hot work requires approval with fire extinguishers and a designated watcher; flammable materials cleared before hot work and no ignition sources confirmed after.

Work-at-height safety: safety belts for work at height with qualified platforms; tools in tool bags with no throwing; designated supervision with no personnel underneath.

Room equipment safety: confirm equipment energization before work and never touch running equipment; insulated protection and supervision for work near live areas; never operate room equipment without the customer’s consent.

Civilized construction: uniformed workers with name badges observing the customer’s site rules; materials stacked neatly with timely waste removal; noise minimized away from office/rest hours; polite communication and respect for the customer’s personnel.

14.7 Finished Product Protection

Handling protection: equipment handled gently with protective packaging until installation; cylinders transported upright with anti-tipping measures; tubes coiled and stored away from sharp objects.

During installation: avoid tool and material impacts on existing equipment; mask around drilling and wiring; protect floors and walls; keep work areas clean.

After installation: dust covers on controllers and equipment; warning signs near manual buttons; check protection status daily and restore as needed; final cleaning and appearance check before acceptance.

15. After-Sales Service

15.1 Warranty Commitment

Warranty period: 24 months free warranty from the date of qualified project acceptance.

Warranty scope: during the warranty, faults caused by product quality or installation-process problems are repaired free with free parts replacement and on-site service; damage caused by artificial factors or force majeure is charged at cost only.

Regular inspection: free on-site inspection quarterly during the warranty with full system status checks, hidden-danger identification and inspection reports.

15.2 Response Time Commitment

A 7×24 technical service hotline accepts reports and consultation at any time; technical response within 1 hour with remote guidance; on-site within 4 hours in the urban area, 8 hours within the province and 24 hours nationwide; general faults repaired within 24 hours and major faults given a solution within 48 hours, minimizing impact on room operation.

15.3 Maintenance Services (Post-Warranty)

After the warranty, paid annual maintenance is available in two tiers:

Package Services Frequency
Basic 2 on-site inspections/year (pressure, pipes, alarm functions); free technical consultation and remote troubleshooting; cost-price parts; fire-acceptance guidance 2/year
Comprehensive 4 on-site inspections/year with full performance testing; free wearing-part replacement (connectors, seals); free agent-pressure top-up; priority service with halved response time; free system upgrades and training; full fire-acceptance cooperation 4/year

15.4 Value-Added Services

System upgrade and expansion: room expansion and equipment addition — upgrade/renovation services optimize the solution to meet new protection needs economically.

Fire consultation: free fire-code consultation, hidden-danger inspection and acceptance-document preparation.

Archive management: a dedicated O&M archive per project recording inspections, repairs, renovations and recharges across the lifecycle for easy customer management.

Spare-parts supply: long-term original spare-parts stock supplied at cost price, ensuring repair and replacement needs.

15.5 Service Supervision

A service supervision hotline accepts customer complaints and suggestions to continuously improve service quality; a satisfaction follow-up is conducted after every service visit to ensure service quality meets requirements.

16. Training Plan

16.1 Training Objectives

Through systematic theory and hands-on training, enable room O&M and management personnel to: master the working principle and structure of the fire-detection-tube gas suppression system; skillfully perform daily operation and inspection; identify common faults and handle simple problems; master fire emergency handling procedures and safety precautions; and independently complete daily O&M management.

16.2 Training Audience

Room O&M management personnel, room safety officers and front-line shift operators; the number of participants is determined by the customer’s needs.

16.3 Training Content

Theory: room fire-safety basics and relevant fire-code requirements; system composition, working principle and performance characteristics; characteristics and safety precautions of heptafluoropropane; design concept and protected-range explanation; daily maintenance knowledge and inspection key points; common fault recognition and handling; safety operation norms and emergency handling procedures.

Hands-on: normal-state identification and pressure-gauge reading; manual emergency activation steps and precautions; system reset and recovery procedures; daily inspection operations and record filling; simple fault troubleshooting and handling; fire emergency handling simulation drill.

Safety training: system operation safety norms and prohibited operations; safe handling and ventilation requirements after agent discharge; safety protection requirements during maintenance work; emergency escape and self-rescue knowledge.

16.4 Training Methods and Schedule

On-site face-to-face training: at acceptance and delivery, professional technical engineers conduct on-site training — theory explanation + hands-on demonstration + trainee practice with interactive Q&A.

Online training: electronic training manuals and operation videos provided for review at any time; online live training available on demand.

Refresher service: one free refresher training within the warranty ensuring smooth operation after personnel rotation.

Schedule: standard training of 1 day (4 hours theory + 4 hours practice); flexibly adjusted to the customer’s arrangement.

16.5 Assessment and Documentation Delivery

Assessment: theory and hands-on assessment after training; qualified trainees receive a training certificate; those who fail receive free retraining until qualified.

Documentation delivered: full documentation after training — system operation and maintenance manual, emergency handling procedure card, daily inspection record form, training PPT (electronic) and operation demonstration video, plus the after-sales service contact card.

16. Training Plan

16.1 Training Objectives and Audience

Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.

Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.

16.2 Tiered Training Content System

Level 1: Basic operation training (1 day)

– Basic principles: system concepts, structure composition, performance indicators;

– Daily operation standards: correct operation of equipment, control and safety systems;

– Daily inspection contents: daily/weekly/monthly check items;

– Safety precautions: usage prohibitions and emergency handling procedures.

Level 2: Maintenance training (1 day)

– Detailed structure of each subsystem and working principles;

– Daily maintenance methods: cleaning, fastening checks, routine care;

– Common fault identification and simple handling;

– Emergency handling procedures for power failure, fire and equipment faults.

Level 3: Advanced management training (as needed)

– Performance influencing factors and how to avoid degradation;

– Upgrade and expansion knowledge and specification requirements;

– Relevant national standards interpretation.

16.3 Training Methods and Schedule

– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;

– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.

16.4 Training Assessment and Documentation Delivery

– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;

– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.

17. Anonymous Typical Project Scenarios

All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.

17.1 Government Data Center Cabinet-Level Fire Protection Project

Project overview. A government data center housed 120 standard server cabinets with an existing room-level gas suppression system. However, a fire starting inside a single cabinet could spread before room-level detection responded, so the customer required cabinet-level precise protection to contain any fire within the originating cabinet — a typical scenario for the direct-type fire-detection-tube solution.

Implementation. Each cabinet was equipped with one KITOZER-HD-Z-6/4.2 direct-type heptafluoropropane unit with the fire detection tube routed in a snake pattern inside the cabinet covering the power and cable-terminal areas; all unit signals were connected to the dynamic-environment monitoring system for unified status monitoring. Construction was performed without shutting down cabinets, with zero impact on business operations; the cabinet-level protection complemented the existing room-level system to form two-tier protection.

Results. The system has operated stably and passed fire acceptance smoothly; the two-tier protection significantly raised the room’s fire-safety level — any cabinet fire is now extinguished within seconds at the source; the customer adopted the same solution for subsequent expansion projects.

17.2 Enterprise Shielding Room Overall Fire Protection Project

Project overview. A newly built electromagnetic shielding room of 42 m² with 3 m net height housed servers, network equipment and test instruments. The fire system had to protect the precision equipment without compromising the room’s shielding performance — a scenario where the non-metallic fire detection tube and clean agent of this solution are particularly suited.

Implementation. Two KITOZER-HD-J-70/4.2 indirect-type heptafluoropropane units were configured with layered tube layout and 8 atomizing nozzles evenly distributed; a complete alarm/linkage system was integrated with the access control and exhaust systems; wall-through pipes were treated with dedicated shielding seals. No cylinder room was needed — cylinders were wall-mounted inside the room, saving space; the clean agent guaranteed no damage to precision instruments.

Results. Both extinguishing performance and shielding effectiveness passed acceptance — the system passed fire acceptance and shielding testing successfully and has operated in good condition; the room’s electromagnetic shielding indicators were fully maintained while complete total-flooding protection was achieved.

17.3 Communication Operator Outdoor Base-Station Fire Protection Project

Project overview. A communication operator had 30 outdoor base-station cabinets in remote suburban locations, unattended, with high summer temperatures and electrical fire risk. The solution had to adapt to outdoor environments and operate reliably without any external power or frequent site visits.

Implementation. Each base station was equipped with one KITOZER-HD-Z-4/4.2 outdoor-type direct unit with 150℃ high-temperature fire detection tubes and IP65 protection, plus a remote status-monitoring module. The passive detection/activation design required no power supply — protection remained effective even during outages; the high-temperature tubes avoided false activation in the hot outdoor environment; remote monitoring eliminated the need for frequent field patrols.

Results. After installation the systems have run stably, effectively reducing the base stations’ fire risk and greatly reducing O&M cost; the remote status monitoring gives the operator real-time visibility of every station’s fire-protection state without dispatching personnel to remote sites.

18. SEO Optimization Section

All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.

18.1 Keyword System

– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;

– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;

– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;

– Brand keywords: KITOZER, Guangzhou Lain.

18.2 SEO Tag System

– Title tag: the article title — Guangzhou Lain KITOZER;

– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;

– H1 tag: the article title;

– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.

18.3 Internal Link Anchor Text

– Core anchor text: technical design solution, system construction;

– Long-tail anchor text: configuration list, technical parameters, construction plan;

– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.

19. Official Contact Information

– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Official Website: https://gdlain.com

– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)

– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China

For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.

Shopping Cart