Computer Room In-Row Air Conditioner

Table of Contents

1. Cover / Document Information

– Document Title: Computer Room In-Row Air Conditioner Technical Design Solution

– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Date: August 2026

– Version: V1.0

– Project Type: Technical design solution for Computer Room In-Row Air Conditioner

2. Table of Contents Structure

1. Company Introduction

2. Project Overview

3. User Requirement Analysis

4. Overall Design Description

5. Detailed System Design and Product Technical Parameters

6. Project Quotation and Configuration List

7. Core Solution Advantages

8. Technical Q&A

9. Construction Schedule Plan

10. Construction Organization Plan

11. After-Sales Service System

12. Operation and Maintenance Training Plan

13. Typical Project Cases

14. SEO Optimization System and Website Backend Configuration

15. Contact Information

3. Company Introduction

3.1 Company Development Overview

Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.

After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.

3.2 Core Business System

The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:

– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;

– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;

– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;

– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.

3.3 Brand and Qualification Honors

The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.

3.4 Core Competitive Advantages

1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;

2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;

3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;

4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.

4. Project Background and Objectives

4.1 Project Background

With the advancement of digital transformation, equipment density in data center rooms across all industries continues to rise; server, switch and storage heat loads have increased greatly. Traditional room precision AC and underfloor supply systems suffer from uneven supply, cold/hot air mixing, low cooling efficiency, high PUE and frequent local hot spots — unable to meet the precise cooling needs of high-density cabinets and micro-module cold aisle rooms.

The in-row air conditioner, as precision cooling equipment close to the heat source, deploys directly between cabinet rows, adapts to cold/hot aisle containment architecture, precisely absorbs IT equipment heat, eliminates cold/hot airflow mixing, greatly improves cooling efficiency and reduces room energy consumption — the core cooling equipment for modern high-density data centers, micro-module rooms, shielded rooms and container rooms. This project custom-designs an in-row air conditioning system overall solution for standardized data center construction, matching overall room standards and ensuring constant temperature, humidity, cleanliness and safe operation.

4.2 Project Objectives

Precise temperature and humidity control: room environment 18-24℃ and 40-60% RH maintained constantly; local hot spots completely eliminated for stable long-term IT operation.

High efficiency and energy saving: near-source cooling with cold/hot aisle isolation reduces supply energy and optimizes room PUE — green energy-saving room standards.

Intelligent stable operation: smart monitoring, 7×24 continuous operation, fault self-diagnosis, audible/visual alarms and remote monitoring; N+1 redundant backup mode supported.

Customized adaptation: perfect matching with micro-module cold aisles, integrated cabinets, shielded rooms and container rooms; size, capacity and function customization per site.

Full-process compliance: strict adherence to national data center codes, standardized construction, complete equipment qualifications — one-pass acceptance.

4.3 Project Scope

Equipment supply of room in-row precision AC; system design; equipment installation and commissioning; cold/hot aisle airflow organization optimization; environment-monitoring linkage commissioning; on-site construction; acceptance and delivery; personnel training; lifetime after-sales O&M; plus matching cabinet, cold aisle containment, environment monitoring and UPS systems for integrated room cooling construction.

4.4 Project Significance

The solution solves traditional room cooling problems — uneven cooling, high energy consumption, high fault rates and complex O&M — through near-source precise cooling and optimized airflow organization, improving overall data center stability and safety, lowering later O&M and energy costs, and helping customers build efficient, green, intelligent and safe modern standard data centers.

5. User Requirement Analysis

5.1 Room Environment Requirements

Per GB 50174-2017 Class A room standards, the room requires 7×24 operation with high-density IT deployment and large cabinet heat output, placing extremely high demands on temperature, humidity, cleanliness, airflow, stability, energy saving and intelligence. Traditional overhead supply has long delivery distance, high wind resistance and severe cold/hot mixing — unable to solve high-density cabinet local overheating; in-row precise cooling is needed. Temperature: constant 18-24℃ with fluctuation ≤±1℃, no hot spots above 28℃; humidity: 40-60% RH avoiding static and condensation faults; cleanliness: Class A room standard with no dust accumulation for smooth heat dissipation.

5.2 Equipment Performance Requirements

High stability: year-round continuous operation with well-known-brand components, interference immunity, high/low temperature tolerance and low fault rate for unattended operation.

Precise cooling: row-level near-source supply with front-supply/rear-return matching cabinet heat sources; on-demand capacity adjustment without wasted energy.

Intelligent control: local touchscreen operation, remote network monitoring, automatic temperature/humidity regulation; linkage with environment monitoring, fire and UPS systems.

Energy saving and low noise: high-efficiency coils, silent fans and variable-frequency speed control lowering noise and energy; optimized PUE for green data centers.

Strong adaptability: sizes matching standard cabinet row spacing; compatible with cold aisle containment, micro-module rooms, shielded rooms and container rooms; personalized function customization.

5.3 Construction and After-Sales Requirements

Standardized construction: per industry codes with controllable schedule and workmanship; no damage to existing decoration, power/weak-current or fire systems.

Fast delivery: source-Manufacturer supply with project-confirmed configuration; short production cycles, fast supply; experienced teams completing installation and commissioning efficiently.

Complete after-sales: 24-hour online response, on-site maintenance and emergency repair; professional training enabling independent O&M.

5.4 Customization Requirements

Custom cooling capacity, size and functions per cabinet count, equipment power, room area and aisle structure; options for humidification, dehumidification, variable frequency, redundant backup and IoT remote monitoring; three free design solutions per project.

6. Design Principles and Applicable Standards

6.1 Applicable Standards

GB 50174-2017 (Class A data center design), GB 50462-2016 (electronic information system room construction and acceptance), GB 50019-2015 (HVAC design), GB 50016-2014 (building fire protection design), GB 50314-2015 (intelligent building design), enterprise production standards and patents, and site survey data.

6.2 Design Principles

Safety: all equipment, workmanship and wiring per national safety standards — leakage, condensation, fire and interference protection; suitable for shielded room safety requirements.

High efficiency and energy saving: row-level near-source cooling with optimized airflow eliminating cold/hot mixing; variable frequency and intelligent on-demand start/stop minimizing energy and optimizing PUE.

Intelligent stability: smart monitoring, fault self-diagnosis and redundant backup for 7×24 unattended operation — stable, extremely low fault rate.

Adaptation and customization: parameters and installation customized per room architecture, cabinet layout and heat load — matching micro-module cold aisles, integrated cabinets and outdoor container rooms.

Economy: source-Manufacturer Supply, long life, low O&M cost, one-stop service.

Scalability: reserved expansion interfaces — adding AC units and monitoring functions for later equipment expansion and computing upgrades.

6.3 Overall Design Approach

The solution uses in-row row-level precise cooling + cold/hot aisle containment: cabinets in standard “face-to-face, back-to-back” layout with cold aisle supply and hot aisle return; in-row AC units deployed between cabinet rows absorbing IT heat at close range — completely solving uneven supply, high energy and local hot spots. The architecture has four modules: in-row precision AC cooling; room airflow organization optimization; intelligent environment monitoring and linkage; power supply assurance — cooperating for precise temperature/humidity control, intelligent monitoring and stable operation, compatible with the company’s micro-module cold aisle, integrated cabinet and shielded room systems.

6.4 Airflow Organization Design

Cabinets arranged face-to-face/back-to-back with cold aisles at fronts and hot aisles at backs; cold aisle containment physically isolates cold/hot airflow. In-row AC units installed between two cabinet rows with front-supply/rear-return: cold air delivered into the cold aisle, drawn through cabinets cooling IT equipment, exhausted hot into the hot aisle and rapidly recovered and cooled by the in-row units — a closed-loop airflow. This eliminates cold/hot mixing, reduces wind resistance and supply loss, improves cooling efficiency over 30% versus traditional systems, precisely matches high-density cabinet heat loads (6 kW+ per cabinet), eliminates local hot spots, maintains constant temperature/humidity and greatly optimizes PUE.

6.5 System Linkage Design

The in-row AC system links seamlessly with UPS, environment monitoring, fire alarm and access control: on mains anomaly the UPS switches seamlessly, keeping AC running; on temperature/humidity deviation the AC automatically adjusts cooling, humidification and dehumidification power; on fire alarm the AC shuts down automatically eliminating hazards; all operating data uploads to the monitoring platform in real time for remote viewing, debugging and alarms.

7. System Architecture and Working Principle

7.1 In-Row Precision AC — 30 kW Basic (KITOZER-LT30)

For small/medium data centers, ordinary micro-module rooms, government/enterprise rooms and shielded rooms. Rated cooling 30 kW with 10%-100% variable-frequency stepless regulation; supply air 18-22℃, return air 32-38℃; matches 3-5 kW per cabinet heat load. Temperature accuracy ±0.5℃, humidity ±3% RH — constant temperature/humidity eliminating static, condensation and overheating faults. Imported silent centrifugal fans, stepless variable frequency, airflow 8500 m³/h, external static pressure 180 Pa, 0-1450 r/min, noise ≤52 dB. High-purity copper coils with hydrophilic aluminum fins, full-section heat exchange, efficiency ≥92%, corrosion-resistant, long life; G4 filter keeping room air clean. Well-known-brand scroll compressor — high energy efficiency, low vibration/fault, COP ≥3.8, smooth start for continuous operation, N+1 redundant backup supported. Electrical: 380V±10% 50Hz three-phase five-wire, rated power 9.2 kW, max 11.5 kW, class F insulation, IP54 — waterproof, dustproof, leakage-proof, EMI-immune for shielded rooms. Dimensions 600(W)×1200(D)×2000(H) mm — standard row spacing. 7-inch touchscreen; RS485/Modbus for DCIM integration; automatic temperature/humidity regulation, fault self-diagnosis, audible/visual alarms, data records, power-fail memory, auto restart; remote IoT monitoring by phone/computer. Protections: high/low pressure, overload, phase loss, overtemperature, water leakage, fan fault. Environment: -10℃ to 45℃, 20-95% RH without condensation, all-weather operation.

7.2 In-Row Precision AC — 50 kW High-Density (KITOZER-LT50)

For large data centers, high-density micro-module rooms, cloud computing rooms, IDC rooms and container rooms. Rated cooling 50 kW with 5%-100% variable frequency; supply 19-21℃, return 35-40℃; matches 6-10 kW per cabinet ultra-high heat load — solving high-density local hot spots. Temperature accuracy ±0.3℃, humidity ±2% RH — meeting Class A data center standards. Dual silent variable-frequency centrifugal fans with linked speed control, airflow 14500 m³/h, external static pressure 220 Pa, 0-1600 r/min, noise ≤55 dB — high airflow, high static pressure, strong penetration. Thickened copper coils with hydrophilic filmed aluminum fins and multi-bend structure, efficiency ≥95%, anti-frost, anti-corrosion, high-temperature tolerant; G5 filter for deep dust/particle filtration. Dual scroll variable-frequency compressors with intelligent on-demand start/stop, COP ≥4.2 — over 35% energy saving versus traditional AC; 7×24 continuous operation with strong redundant stability. Electrical: 380V±10% 50Hz three-phase five-wire, rated 15.8 kW, max 18.2 kW, class H insulation, IP55 — stronger dust/water/EMI resistance for high-grade shielded and container rooms. Dimensions 800(W)×1200(D)×2000(H) mm — wider body, larger heat exchange. 10-inch touchscreen, full Chinese interface; Modbus + SNMP dual protocols for DCIM and cloud platforms; intelligent on-demand cooling, temperature/humidity linked regulation, precise fault positioning, cloud data storage, remote start/stop and parameter modification; multi-unit cluster linkage for large rooms. Special features: room 3D temperature-field modeling automatically identifies local hot spots, prioritizing intensified cooling for high-temperature zones and allocating cooling power on demand — PUE controllable at 1.2-1.3. Protections: high/low pressure, overload/phase loss, anti-freeze, water leakage alarm, fan self-diagnosis, communication anomaly, fire linkage shutdown.

7.3 Intelligent Monitoring Module (KITOZER-JK200)

Industrial-grade main chip; DC12V/AC220V dual supply; -20℃ to 60℃; 7×24 operation. Monitors temperature, humidity, airflow, power, current, pressure, running status and fault codes in full dimension at 1 sample/second. Alarms: temperature/humidity deviation, equipment fault, power loss, water leakage and communication anomaly with audible/visual plus SMS and cloud push. Communication: RS485, WiFi and Ethernet with mainstream DCIM platforms; remote parameter setting, start/stop and mode switching. Storage: 1 year local, permanent cloud backup, export and reports for traceability.

7.4 Cold Aisle Containment Components

High-strength aluminum alloy frames with anodizing — corrosion-resistant, non-deforming, load-bearing, life ≥15 years. Containment panels: tempered glass + flame-retardant PC (B1), light-transmitting, impact-resistant — isolating cold/hot airflow and eliminating mixing loss. Adapts to 600/800/1000 mm cabinets, aisle height 2000 mm, customizable length and height. Fire linkage skylights auto-open for smoke exhaust on fire; maintenance access doors; full seal strips with sealing rate ≥98%.

7.5 Environment Monitoring Sensors

Temperature -20℃ to 60℃, accuracy ±0.2℃; humidity 0-100% RH, accuracy ±2% RH — fast and precise. Photoelectric smoke detection with adjustable sensitivity for early fire warning per room fire codes. Locating water-leakage detection precisely identifying pipe and floor leak points with timely alarms. RS485 bus communication with the AC system for linked automatic regulation.

7.6 Associated Products

Micro-module cold aisle cabinets (cold-rolled steel, electrostatic powder coating, IP54, standard sizes matching in-row AC, cold/hot aisle containment, modular assembly); shielded rooms (national Class B shielding, constant temperature/humidity with in-row AC in an interference-free environment); UPS (online type, zero-switch power for uninterrupted AC operation preventing room temperature surges).

8. Detailed Technical Design

8.1 Selection Design

Per-cabinet heat load and cabinet count: 3-5 kW per cabinet → 30 kW models; 6-10 kW high density → 50 kW models; free on-site survey by the factory matches models precisely per layout and heat data with a dedicated selection solution; N+1 redundancy for critical rooms.

8.2 Airflow and Layout Design

Face-to-face/back-to-back cabinet layout with cold aisle containment; in-row units between rows with front-supply/rear-return; closed-loop airflow eliminating mixing; hot-spot identification allocating cooling power on demand.

8.3 Control and Monitoring Design

7-inch/10-inch touchscreens; RS485/Modbus (LT30) and Modbus + SNMP (LT50) for DCIM integration; JK200 IoT modules with full-dimension monitoring, multi-channel alarms, remote management and cloud storage; temperature/humidity sensors and water-leakage/smoke sensors linked for automatic regulation.

8.4 Power and Protection Design

380V three-phase five-wire supply with dedicated breaker and wiring components; UPS-backed power for continuous operation; multi-level protections (high/low pressure, overload, phase loss, anti-freeze, leakage, fan fault, communication, fire linkage); fire alarm triggers automatic shutdown.

8.5 Commissioning Design

Step-by-step single-unit commissioning then integrated linkage; verification of cooling, temperature/humidity control, alarms, remote monitoring and fire linkage; airflow optimization eliminating local hot spots; 72-hour trial run with parameter monitoring and rectification.

9. Recommended Configuration and Preliminary Budget

9.1 Configuration Summary

No. Equipment Specification Qty Unit
1 In-row precision AC (basic) KITOZER-LT30, 30 kW, variable frequency, constant T/H 4 pcs
2 In-row precision AC (high-density) KITOZER-LT50, 50 kW, cold aisle dedicated 2 pcs
3 Intelligent monitoring module KITOZER-JK200 IoT version 6 sets
4 Cold aisle containment components Custom standard type 1 set
5 Environment monitoring sensors Temperature/humidity + smoke + water leakage 20 pcs
6 AC power wiring components Flame-retardant, with cables, breakers, protection 6 sets
7 AC mounting brackets Row-specific custom, anti-vibration 6 sets
8 System commissioning and service Full commissioning, acceptance, training 1 item

9.2 Quotation Notes

The quotation is the source-factory tax-included price including equipment, materials, production, transport, installation and commissioning, on-site construction and basic training, with free maintenance during warranty; no middleman markup. Equipment quantities and parameters are adjustable per needs with minor price adjustment. Warranty: 3 years whole unit, 5 years core parts (compressor, mainboard, coils), lifetime free technical consultation and cost-price repair; nationwide on-site construction and training, 24-hour after-sales response. All prices are indicative and quoted in RMB (CNY) only — no foreign-currency conversion is provided; the final quotation is subject to a formal quotation document.

10. Technical Specifications

10.1 System Performance Summary

Item Specification
Models KITOZER-LT30 (30 kW) / KITOZER-LT50 (50 kW)
Cooling capacity 30 kW (10-100% VFD) / 50 kW (5-100% VFD)
Temperature control ±0.5℃ (LT30) / ±0.3℃ (LT50)
Humidity control ±3% RH (LT30) / ±2% RH (LT50)
Supply/return air 18-22℃ / 32-38℃ (LT30); 19-21℃ / 35-40℃ (LT50)
Per-cabinet heat load 3-5 kW (LT30); 6-10 kW (LT50)
Airflow 8500 m³/h @180 Pa (LT30); 14500 m³/h @220 Pa (LT50)
Noise ≤52 dB (LT30) / ≤55 dB (LT50)
Coil efficiency ≥92% (LT30) / ≥95% (LT50); G4/G5 filters
Compressor Scroll, COP ≥3.8 (LT30); dual scroll VFD, COP ≥4.2 (LT50)
Electrical 380V±10% 50Hz three-phase five-wire; 9.2/15.8 kW rated
Protection rating IP54 (LT30) / IP55 (LT50)
Dimensions 600×1200×2000 mm (LT30); 800×1200×2000 mm (LT50)
Control 7-in/10-in touchscreen; RS485/Modbus; Modbus+SNMP (LT50)
PUE Controllable at 1.2-1.3
Efficiency gain 30%+ (LT50: 35%+) vs. traditional AC
Warranty 3 years whole unit, 5 years core parts

10.2 Key Component Specifications

Component Key Parameters
LT30 AC 30 kW, ±0.5℃/±3%RH, 8500 m³/h, ≤52 dB, COP ≥3.8, IP54
LT50 AC 50 kW, ±0.3℃/±2%RH, 14500 m³/h, ≤55 dB, COP ≥4.2, IP55
JK200 monitor Full-dimension data, 1 s sampling, multi-alarm, RS485/WiFi/Ethernet, cloud storage
Cold aisle kit Aluminum frame + glass/PC B1 panels, sealing ≥98%, fire skylights
Sensors T ±0.2℃, RH ±2%, smoke adjustable, locating leak detection, RS485
Wiring kit Flame-retardant, breakers, protection, per unit
Mounting bracket Row-specific, anti-vibration, load-compliant

11. Key Advantages and Customer Value

11.1 Source-Factory Strength

Self-developed, produced and customized with 23 years of room infrastructure experience — own factory, R&D team and patents, no middleman markup, equipment cost-performance beyond peers; complete production, testing, construction and after-sales systems; all products third-party tested with high-tech qualifications; three free design solutions.

11.2 Precise Cooling and Energy Saving

Row-level near-source cooling matching cabinet heat sources, with cold/hot aisle containment completely eliminating airflow mixing — cooling efficiency over 30% higher than traditional overhead supply. Variable-frequency intelligent speed control, hot-spot identification and on-demand cooling automatically adapt to room heat load, greatly reducing wasted energy and optimizing PUE — long-term electricity savings per green data center standards.

11.3 Intelligent, Stable and Safe

Industrial-grade intelligent control with 7×24 continuous operation and multi-level protections eliminating fault, leakage, condensation and overheating hazards; seamless linkage with environment monitoring, fire and UPS systems for automated intelligent management — unattended stable operation with extremely low fault rate and reduced O&M pressure.

11.4 Highly Adaptive Customization

Full adaptation to micro-module rooms, IDC data centers, shielded rooms, container rooms and ordinary government/enterprise rooms; size, cooling capacity and functions customizable per cabinet layout, room area and heat load; integration with the company’s own cabinets, cold aisles and shielded rooms for one-piece infrastructure compatibility, aesthetics and practicality.

11.5 Construction and Service Advantage

Professional experienced teams with standardized workmanship — controllable schedules, compliant construction, no damage to existing facilities; 24-hour online customer service, fast fault response and dedicated project follow-up; one-stop service from design, production, construction, commissioning, training to later O&M with complete after-sales assurance.

12. Technical Q&A (50+ Items)

12.1 Basics and Selection

Q1: What is an in-row air conditioner, and what are its advantages over traditional room AC?

A: It is precision cooling equipment deployed between cabinet rows, designed for high-density data center rooms, cooling near the heat source. Compared with traditional overhead/underfloor supply, it completely solves cold/hot airflow mixing, uneven supply, local hot spots and high energy — higher efficiency, better energy saving and stronger adaptability; the first choice for modern micro-module and IDC rooms.

Q2: How is the cooling capacity selected?

A: Per per-cabinet heat load, cabinet count and room area: 3-5 kW per cabinet → 30 kW model; 6-10 kW high density → 50 kW model; the factory provides free on-site survey matching the model precisely per layout and heat data with a dedicated selection solution.

Q3: What are the temperature and humidity control accuracies? Can they meet Class A standards?

A: Temperature accuracy up to ±0.3℃ and humidity ±2% RH — fully meeting GB 50174-2017 Class A constant temperature/humidity requirements; maintains 18-24℃ and 40-60% RH stably for high-grade data centers.

Q4: Can the in-row AC achieve energy saving? What is the PUE effect?

A: Yes — variable frequency, hot-spot intelligent identification and on-demand cooling with cold/hot aisle containment eliminate wasted cooling energy — over 30% energy saving versus traditional AC, optimizing room PUE to 1.2-1.3 and greatly reducing long-term energy cost.

Q5: What is the difference between 30 kW and 50 kW models?

A: Capacity (30 vs. 50 kW), per-cabinet heat matching (3-5 vs. 6-10 kW), control accuracy (±0.5℃/±3%RH vs. ±0.3℃/±2%RH), airflow (8500 vs. 14500 m³/h), noise (≤52 vs. ≤55 dB), COP (≥3.8 vs. ≥4.2), protection (IP54 vs. IP55), size (600 vs. 800 mm wide) and protocols (RS485/Modbus vs. Modbus+SNMP) — choose per density and room grade.

Q6: How is the number of units calculated for a room?

A: Total cooling requirement = sum of cabinet heat loads (or room sensible heat) with a redundancy margin; units selected and distributed per row — e.g. 8 × 30 kW for a micro-module project; N+1 redundancy for critical rooms; the factory provides the calculation basis.

Q7: Can the AC operate in N+1 redundant mode?

A: Yes — units cluster-linked with intelligent on-demand scheduling; if one fails, the rest automatically compensate, keeping the room cooled — supported by the LT50 cluster control.

Q8: What is the PUE target with this solution?

A: 1.2-1.3 with near-source cooling, cold/hot aisle isolation, variable frequency and hot-spot allocation — verified in delivered projects (e.g. 1.28 in a government micro-module project).

Q9: Is the AC suitable for shielded rooms?

A: Yes — IP54/IP55 enclosures, EMI immunity and customized shielded-compatible versions maintain constant temperature/humidity without electromagnetic interference, meeting shielded room requirements.

Q10: Can the AC be used outdoors in container rooms?

A: Yes — customized outdoor-adapted versions withstand container enclosed environments, high temperatures and interference with energy-saving stability.

12.2 Performance and Technology

Q11: How does variable frequency save energy?

A: The compressor and fans modulate continuously with the heat load (10-100% / 5-100%) — no on-off cycling losses; at light load power drops proportionally while temperature/humidity stay precise — energy saving over 30-35%.

Q12: How does hot-spot identification work?

A: The 3D temperature-field modeling technology maps the room temperature distribution, automatically identifies local hot spots and prioritizes intensified cooling for high-temperature zones, allocating cooling power on demand — no wasted energy on already-cool areas.

Q13: What is the closed-loop airflow?

A: Cold air from the in-row unit enters the cold aisle, is drawn through cabinets cooling IT equipment, exhausted hot into the hot aisle and returned to the unit for rapid cooling — a closed loop with no cold/hot mixing, over 30% efficiency gain.

Q14: What are the coil and filter specifications?

A: High-purity copper tubes with hydrophilic aluminum fins — efficiency ≥92% (LT30) / ≥95% (LT50), anti-frost, anti-corrosion, long life; G4 filter (LT30) and G5 filter (LT50) for room cleanliness.

Q15: What is the compressor configuration?

A: LT30 — single well-known-brand scroll compressor, COP ≥3.8; LT50 — dual scroll variable-frequency compressors with intelligent on-demand start/stop, COP ≥4.2 — low vibration, high reliability for continuous operation.

Q16: What are the protections?

A: High/low pressure, overload, phase loss, overtemperature/anti-freeze, water leakage, fan fault, communication anomaly and fire linkage shutdown — comprehensive equipment and room safety.

Q17: What is the noise level?

A: ≤52 dB (LT30) and ≤55 dB (LT50) at rated operation with silent centrifugal fans and variable speed — meeting office-adjacent room noise requirements.

Q18: How is humidity controlled?

A: Built-in humidification/dehumidification with ±3% RH (LT30) / ±2% RH (LT50) accuracy; automatic regulation per sensor feedback preventing static and condensation faults.

Q19: What communication protocols are supported?

A: RS485/Modbus (LT30); Modbus + SNMP (LT50) — seamless integration with mainstream environment-monitoring platforms, building automation and cloud monitoring systems.

Q20: What is the operating environment?

A: Indoor -10℃ to 45℃, 20-95% RH without condensation — all-weather continuous operation for various indoor room scenarios.

12.3 Installation and Adaptation

Q21: Is the AC compatible with micro-module cold aisles and shielded rooms?

A: Fully — self-developed matching products: airflow organization, dimensions and system linkage fully compatible with the company’s micro-module cold aisle, integrated cabinet, shielded room and container room systems for one-piece infrastructure construction.

Q22: Can an existing room be retrofitted with in-row AC?

A: Yes — standardized dust-free construction with step-by-step installation and commissioning minimizing impact on existing equipment; after retrofit the room’s cooling shortcomings are completely resolved.

Q23: What are the installation dimensions?

A: LT30 600(W)×1200(D)×2000(H) mm and LT50 800(W)×1200(D)×2000(H) mm — matching standard cabinet row spacing; brackets custom per row with anti-vibration; level installation with deviation ≤2 mm.

Q24: What are the electrical requirements?

A: 380V±10% 50Hz three-phase five-wire; dedicated breaker and wiring components per unit; UPS-backed supply for continuous operation; class F (LT30) / H (LT50) insulation.

Q25: How long does construction take?

A: 15 working days for a standard project: survey 2, delivery 1, wiring/base 3, installation 3, commissioning 3, trial run 1, acceptance/training 2.

Q26: How is the cold aisle containment installed?

A: Frames leveled and plumbed; panels sealed with full seal strips (sealing ≥98%); fire skylights and access doors operating smoothly; airflow isolation verified.

Q27: How is the fire linkage configured?

A: The AC system connects to the fire alarm system — on fire alarm the units shut down automatically (fire linkage protection); the cold aisle skylights open for smoke exhaust; power to non-fire loads cut per room logic.

Q28: What commissioning is performed?

A: Step-by-step single-unit commissioning then integrated linkage — cooling, temperature/humidity control, alarms, remote monitoring and fire linkage verified; airflow optimized eliminating local hot spots; 72-hour trial run with parameter monitoring.

Q29: Can installation proceed with the room running?

A: Yes — dust-free zoned construction with temporary containment; water/refrigerant/electrical work in controlled windows; existing equipment protected; retrofit case completed without business impact.

Q30: What acceptance items apply?

A: Equipment models/quantities/positions per design; installation firmness and levelness; wiring compliance; temperature/humidity accuracy; airflow organization (no hot spots); alarm and linkage functions; documentation (certificates, test reports, as-built drawings) — one-pass acceptance.

12.4 O&M and Service

Q31: Is daily O&M complex? Is dedicated staffing needed?

A: Extremely simple — intelligent automatic regulation, 7×24 autonomous operation, fault self-diagnosis and automatic alarms; no dedicated staffing; routine work is filter cleaning and data viewing; full O&M training enables fast onboarding even for beginners.

Q32: What is the warranty and response?

A: 3-year whole-unit warranty, 5 years on core parts (compressor, mainboard, coils), lifetime free technical consultation and cost-price repair; 24-hour online response, 24-hour on-site emergency repair locally and nearby, 48 hours in remote areas; dedicated follow-up.

Q33: What does the quarterly maintenance include?

A: Free quarterly on-site patrol during warranty (4/year): equipment cleaning, parameter calibration, line inspection, fault finding and performance optimization — preventing hidden faults and extending life; cost-price maintenance after warranty.

Q34: How are filters maintained?

A: G4/G5 filters cleaned per patrol or when dirty; replace when clogged or damaged; keep the room clean to extend filter life and maintain cooling efficiency.

Q35: What records should be kept?

A: Daily operation logs (temperature/humidity, alarms, power), quarterly maintenance records, JK200 local 1-year data and cloud backups with reports — for trend analysis and traceability.

Q36: How is remote monitoring used?

A: Via the JK200 module or DCIM platform — phone/computer real-time status, parameter setting, start/stop and mode switching, alarm push (SMS/cloud), data export and reports.

Q37: How is the water leakage sensor used?

A: Locating leak detection along pipes and floor identifies leak points precisely, alarms and links the AC system for protective action — preventing accumulated water hazards.

Q38: What training is provided?

A: 2+ days on-site (theory + hands-on + one-on-one + assessment): principles, operation, parameter setting, patrol, fault codes and simple repair, emergency flows; full manuals delivered; lifetime free refresher and remote guidance.

Q39: What emergency services exist?

A: Emergency repair plan with prioritized technician and parts dispatch; on-site standby during major holidays and critical room periods; rapid restoration keeping the room running.

Q40: How is service quality supervised?

A: 24-hour hotline, dedicated follow-up per project, patrol reports, closed-loop fault handling with analysis and prevention, satisfaction tracking.

12.5 Customization and Expansion

Q41: What customization is supported?

A: Full-dimension — size, cooling capacity, humidification/dehumidification, remote monitoring and redundant backup modes; three free design solutions per project.

Q42: Can the system expand later?

A: Yes — reserved expansion interfaces and protocols; adding AC units and monitoring functions for later equipment expansion and computing upgrades without overall retrofit — convenient and lower cost.

Q43: Can the AC integrate with existing DCIM platforms?

A: Yes — RS485/Modbus (LT30) and Modbus + SNMP (LT50) with standard protocols seamlessly integrate into mainstream environment-monitoring, building automation and cloud platforms.

Q44: Can multiple units be centrally managed?

A: Yes — LT50 cluster linkage control manages multiple units for large rooms; the JK200 module and DCIM platform provide unified monitoring across units and sites.

Q45: What associated products are available?

A: Micro-module cold aisle cabinets, integrated cabinets, shielded rooms, UPS systems and environment monitoring — one-piece infrastructure matching the in-row AC for unified layout and management.

Q46: How is the total cost controlled?

A: Source-Manufacturer Supply (no middleman), 30%+ energy saving, long equipment life, simple O&M and cost-price after-warranty maintenance — optimal lifecycle cost.

Q47: What are the green credentials?

A: High COP (≥3.8/≥4.2), variable frequency and on-demand cooling reduce energy; PUE 1.2-1.3 supports green data center certification and dual-carbon goals.

Q48: How is the equipment quality guaranteed?

A: Third-party testing, high-tech qualifications and product patents; strict factory inspection per enterprise standards; G4/G5 filtration maintaining room cleanliness.

Q49: What documentation supports acceptance?

A: Certificates, test reports, patents, wiring and layout drawings, commissioning records, trial-run reports and as-built documentation — satisfying Class A room acceptance filing.

Q50: Why choose the KITOZER/Lain solution?

A: 23 years of room infrastructure experience, source-factory R&D with patents, precise near-source cooling with 30%+ efficiency gain, full scenario adaptation, standardized construction with one-pass acceptance and complete after-sales — a reliable in-row cooling solution.

12.6 Project Cases and Results

Q51: What are the typical results in delivered projects?

A: A government micro-module project with 8 × 30 kW units achieved PUE 1.28 with year-round zero high-temperature/fault issues and Class A acceptance; an IDC cloud room with 12 × 50 kW units eliminated local hot spots with significant energy savings; shielded and container room projects verified reliability and adaptation.

Q52: How long does a standard project take from order to acceptance?

A: About 15 working days for standard projects (survey through training), with source-factory fast production and delivery; urgent projects can be expedited per requirements.

Q53: What happens if a unit fails during operation?

A: The fault self-diagnosis alarms via audible/visual, SMS and cloud push; N+1 redundancy keeps cooling; the 24-hour emergency response dispatches technicians and parts for rapid restoration.

Q54: Is the solution suitable for high-density AI/GPU computing rooms?

A: Yes — the 50 kW high-density model matches 6-10 kW per cabinet (up to higher with multiple units) and the 3D hot-spot technology prioritizes high-temperature zones — suited to AI/GPU dense computing rooms.

Q55: How does the system handle seasonal changes?

A: Variable frequency and on-demand cooling adapt output to load; temperature/humidity sensors maintain constant conditions regardless of season; anti-freeze protection covers winter operation.

Q56: What safety features protect the room?

A: Fire linkage shutdown, leakage protection, high/low pressure, overload/phase loss, anti-freeze and communication protections plus IP54/IP55 enclosures — comprehensive room and equipment safety.

Q57: How is the airflow optimized during commissioning?

A: Cold aisle containment sealing verified (≥98%); unit positions and nozzle/fan settings adjusted per temperature-field data; hot spots eliminated; airflow balance documented in the commissioning report.

Q58: What are the spare parts and long-term support?

A: Standing stock of compressors, mainboards, fans and sensors; cost-price supply after warranty; lifetime technical consultation and remote debugging.

Q59: Can the AC be monitored together with fire and UPS systems?

A: Yes — the linkage design coordinates UPS (power), fire (shutdown) and environment monitoring (regulation) for unified intelligent management.

Q60: How is the solution delivered end to end?

A: Free survey and three design options → source-factory production → standardized construction → commissioning with 72-hour trial run → training and documentation → quotation-confirmed warranty with quarterly patrol and lifetime support — one-stop service.

13. Construction Schedule

13.1 Overall Period

The standard construction period is 15 working days with standardized, clearly divided, controllable work:

Stage Work Days Responsible Acceptance standard
1. Survey and confirmation Measure room dimensions, cabinet layout, electrical layout; verify solution parameters; confirm details; issue disclosure documents 1-2 Technical lead Accurate data, solution matches site, complete disclosure
2. Equipment delivery Equipment/accessories arrival; model, quantity and qualification verification; appearance and performance check; incoming registration 3 Foreman Equipment intact, qualifications complete, models match
3. Wiring and base work AC power, communication and sensor lines; mounting bracket fixing; waterproof, fire and insulation treatment 4-6 Crew Neat wiring, insulation compliant, electrical-code conforming
4. Equipment installation In-row AC, monitoring modules, environment sensors and cold aisle components installed and fixed; leveling and spacing 7-9 Foreman Firm installation, orderly layout, precise dimensions
5. Wiring and commissioning Equipment wiring, linkage configuration; temperature/humidity control, alarms, remote monitoring and fire linkage debugging; airflow optimization 10-12 Engineer Normal operation, complete functions, parameters compliant
6. Trial run 72-hour continuous trial run; parameter monitoring; fault finding and optimization 13 Engineer Stable, fault-free, parameters compliant
7. Acceptance and training Overall acceptance with report; operation and O&M training; documentation handover 14-15 PM Project compliant, documentation complete, training effective

13.2 Schedule Assurance

Source-factory fast production with standing stock of common models; dedicated project team with fixed staff; daily progress tracking with lag adjustment; advance coordination on room access and work windows; contingency plan with standby personnel and parts.

14. Construction Organization and Quality/Safety Measures

14.1 Organization Structure

A dedicated project team: project lead (1), technical lead (1), on-site foreman (1), senior crew (4), commissioning engineers (2) and after-sales specialist (1) — coordinating design, construction, commissioning, acceptance and after-sales throughout.

14.2 Pre-Construction Preparation

Technical: full technical disclosure — design solution, codes, equipment parameters and site environment; clear construction and acceptance standards; risk avoidance.

Materials: pre-counted equipment, accessories, tools and protective items with quality verification; early storage with moisture and dust protection.

Site: clean the work area; demarcate construction and equipment storage zones; protect existing equipment from dust/debris; coordinate entry reporting with the owner.

Safety: safety training; electrical, high-work and installation safety rules; fire equipment and insulated tools; zero accidents.

14.3 Core Construction Processes

Wiring: power/weak-current lines layered (weak above, power below), neatly tied, waterproof insulated interfaces, all cables in conduits, openings packed with fire pillows per room fire codes.

Equipment installation: level installation with deviation ≤2 mm; load-compliant brackets; uniform spacing matching cabinet row layout; unobstructed supply/return airflow.

Cold aisle installation: frames leveled and plumbed; panels sealed with full seal strips; fire skylights and access doors operating smoothly; airflow isolation compliant.

Commissioning: step-by-step single-unit then integrated linkage; verification of cooling, temperature/humidity control, alarms, remote monitoring and fire linkage; airflow optimization eliminating local hot spots; all parameters compliant.

14.4 Safety Measures

Strict room construction management rules — no illegal power use or operations; zoned de-energized work avoiding electric shock and equipment damage; fire equipment and insulating PPE, no open flame, timely waste removal; full PPE with high-work protection; daily end-of-day hazard inspection, power cut-off and site cleanup with records.

14.5 Quality Control

National room construction codes and enterprise standards throughout; self/mutual/special acceptance per process before proceeding; strict incoming verification (qualifications, parameters, quality — unqualified equipment rejected); photo, record and commissioning-data documentation for full traceability; 72-hour trial run verifying stability before delivery.

15. After-Sales Service

15.1 Warranty

All KITOZER in-row AC and associated products: 3-year whole-unit warranty, 5 years on core parts (compressor, main control board, coils); non-artificial faults repaired free with free part replacement and on-site service during warranty — no hidden fees.

15.2 Rapid Response

24-hour all-day response with online customer service; 24-hour on-site emergency repair locally and nearby, 48 hours nationwide — fast fault resolution keeping the room running.

15.3 Periodic Maintenance

Free quarterly on-site patrol during warranty (4 per year): cleaning, parameter calibration, line inspection, fault finding and performance optimization — preventing hidden faults and extending life; cost-price maintenance for life after warranty.

15.4 Technical Support

Lifetime free technical consultation, solution optimization, system upgrades and remote debugging — answering O&M, retrofit and expansion questions for long-term stable operation.

15.5 Emergency Assurance

Emergency repair plan with prioritized technician and parts dispatch; on-site standby during major holidays and critical room periods — full protection of room safety and stability.

16. Training Plan

16.1 Objectives and Audience

Objectives: enable the user’s O&M staff to master the in-row AC system’s principles, operation, parameter setting, daily O&M, fault finding and simple repair — independent O&M for long-term stable operation.

Audience: room O&M managers, equipment operators and technical leads — beginners welcome.

16.2 Training Content

Theory: working principles, system architecture, core component functions, room cooling basics and industry standards.

Hands-on: start/stop, mode switching, temperature/humidity parameter setting, touchscreen operation, remote monitoring platform operation, data viewing and export.

Daily O&M: cleaning, filter replacement, line inspection, operation data recording, patrol flow and standards.

Fault finding: fault code interpretation, cause analysis, simple repair methods and alarm handling flows.

Emergency: handling of equipment anomaly, power loss, water leakage and high temperature to protect the room.

16.3 Methods and Duration

“Theory + on-site hands-on + one-on-one guidance + Q&A assessment”, at least 2 days on site, with practical assessment ensuring mastery; full training materials, operation manual and fault handbook delivered; lifetime free refresher and remote guidance after system upgrades or function updates.

16. Training Plan

16.1 Training Objectives and Audience

Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.

Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.

16.2 Tiered Training Content System

Level 1: Basic operation training (1 day)

– Basic principles: system concepts, structure composition, performance indicators;

– Daily operation standards: correct operation of equipment, control and safety systems;

– Daily inspection contents: daily/weekly/monthly check items;

– Safety precautions: usage prohibitions and emergency handling procedures.

Level 2: Maintenance training (1 day)

– Detailed structure of each subsystem and working principles;

– Daily maintenance methods: cleaning, fastening checks, routine care;

– Common fault identification and simple handling;

– Emergency handling procedures for power failure, fire and equipment faults.

Level 3: Advanced management training (as needed)

– Performance influencing factors and how to avoid degradation;

– Upgrade and expansion knowledge and specification requirements;

– Relevant national standards interpretation.

16.3 Training Methods and Schedule

– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;

– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.

16.4 Training Assessment and Documentation Delivery

– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;

– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.

17. Anonymous Typical Project Scenarios

All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.

17.1 Government Enterprise Micro-Module Data Center Project

Project overview. A government enterprise’s micro-module data center faced high-density cabinet heat loads that traditional supply could not handle, with local hot spots and high energy consumption.

Implementation. 8 × 30 kW in-row precision AC units with the micro-module cold aisle system; cold/hot aisle containment with closed-loop airflow; JK200 IoT monitoring linked to the environment-monitoring platform; N+1 redundant operation.

Results. Room PUE optimized to 1.28 with year-round zero high-temperature and fault issues; stable operation; Class A room acceptance passed; significant long-term energy savings.

17.2 IDC Cloud Computing Room High-Density Project

Project overview. An IDC cloud computing room deployed ultra-high-density server cabinets with severe local hot spots that conventional cooling could not resolve.

Implementation. 12 × 50 kW high-density in-row AC units adapted to ultra-high-density cabinets; cold/hot aisle containment with precise near-source cooling; 3D temperature-field hot-spot identification allocating cooling power on demand.

Results. Local hot spots completely eliminated; cooling energy reduced by over 35% versus traditional systems; greatly lowered room operating energy consumption — highly recognized by the customer.

17.3 Hospital Shielded Room Project

Project overview. A hospital’s shielded room required constant temperature/humidity and electromagnetic interference immunity for 7×24 medical data room operation.

Implementation. Customized shielded-room in-row AC system with IP55 enclosures and EMI immunity, matching the shielded environment; linked with the environment-monitoring and UPS systems for continuous operation.

Results. Stable constant temperature/humidity without electromagnetic interference, meeting the strict medical industry O&M standards; one-pass acceptance with long-term reliable operation.

18. SEO Optimization Section

All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.

18.1 Keyword System

– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;

– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;

– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;

– Brand keywords: KITOZER, Guangzhou Lain.

18.2 SEO Tag System

– Title tag: the article title — Guangzhou Lain KITOZER;

– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;

– H1 tag: the article title;

– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.

18.3 Internal Link Anchor Text

– Core anchor text: technical design solution, system construction;

– Long-tail anchor text: configuration list, technical parameters, construction plan;

– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.

19. Official Contact Information

– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Official Website: https://gdlain.com

– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)

– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China

For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.

Shopping Cart