Table of Contents
Toggle1. Cover / Document Information
– Document Title: Computer Room Modular UPS Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for Computer Room Modular UPS
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Project Background
With the rapid growth of the digital economy, the data center — as the core carrier of digital infrastructure — depends directly on power supply reliability for business continuity and data security. Traditional tower UPS systems suffer from single-point-failure risk, difficult expansion, complex O&M and low efficiency at light load, no longer fitting the needs of new-generation data centers for flexible deployment, on-demand expansion and high efficiency.
Modular UPS, as the new-generation uninterruptible power technology, adopts modular redundant architecture with hot-swap design, delivering N+X redundancy, online capacity expansion, module-level fast maintenance and high efficiency across the whole load range. It has become the first-choice power solution for medium and large data centers, enterprise core rooms and government rooms.
This technical design solution is compiled to provide a highly reliable, high-performance, flexible uninterruptible power system for various computer rooms, meeting business growth capacity needs and reducing O&M difficulty and energy cost.
4.2 Project Objectives
Supply reliability: N+X redundant modular architecture eliminates single-point-failure risk and achieves 99.999% supply availability, keeping IT loads running through mains interruption and grid fluctuation without data loss or business interruption.
O&M convenience: full modular hot-swap design — power modules, bypass module and monitoring module are all replaceable online without system shutdown, greatly shortening fault repair time and lowering O&M difficulty and cost.
Expansion flexibility: on-demand step-by-step expansion by adding power modules as business grows, without replacing the host equipment, protecting initial investment and precisely matching capacity to business development.
Energy saving: three-level inverter technology gives whole-unit efficiency above 96%; intelligent sleep and ECO modes further reduce loss, helping lower room PUE per green data center requirements.
Intelligent management: a complete monitoring system supports remote monitoring, fault alarms, data statistics and logging, realizing visualized and intelligent power management.
4.3 Applicable Scope
This solution applies to uninterruptible power construction and retrofit of all types of data center rooms, including: government data centers, smart-city operation rooms and classified rooms; enterprise headquarters core rooms, branch rooms and industrial control rooms; hospital information center rooms and medical equipment power systems; campus data centers, laboratory rooms and multimedia rooms; communication base station rooms and edge computing nodes; financial and securities rooms and disaster-recovery centers; internet enterprise rooms and cloud computing nodes. The solution is flexibly adjustable per actual load capacity, site conditions, redundancy requirements and backup time.
4.4 Compilation Basis
– *Code for Design of Data Centers* — GB 50174-2017
– *Uninterruptible Power Systems (UPS) — Part 1-1: General and Safety Requirements for UPS Used in Operator-Accessible Areas* — GB 7260.1-2008
– *Uninterruptible Power Systems (UPS) — Part 3: Method of Specifying the Performance and Test Requirements* — GB/T 7260.3-2003
– *Code for Construction and Acceptance of Data Center Infrastructure* — GB 50462-2015
– *Code for Design of Low-Voltage Electrical Installations* — GB 50054-2011
– *Code for Design of Protection of Structures against Lightning* — GB 50057-2010
– *Valve-Regulated Sealed Lead-Acid Batteries for Telecommunications* — YD/T 799-2010
– *Code for Construction and Acceptance of Electronic Information System Computer Rooms* — GB 50462-2008
– Guangzhou Lain enterprise product standards and construction codes, industry common design guidelines and customer application requirements
5. User Requirement Analysis
5.1 Basic Power Supply Requirements
Servers, switches, storage, security and monitoring equipment are first-level loads with extremely high supply continuity requirements — any interruption can cause data loss, business stoppage and equipment damage. The UPS must provide stable uninterruptible supply: clean power when mains is normal, and seamless switch to battery on mains interruption or anomaly, sustaining loads until the backup generator starts or business systems shut down orderly.
Mains grids commonly suffer voltage fluctuation, frequency drift, harmonic interference and surge impact, which chronically damage precision electronics. The UPS must regulate input/output power quality, filtering grid interference and delivering pure, stable sine-wave power.
5.2 Reliability Requirements
The power system is the lifeline of the room; reliability is the primary consideration. Traditional centralized single-large-host UPS has single-point-failure risk — a host failure paralyzes the whole supply system. The user needs a redundant-architecture UPS: with N+X redundancy, when any power module fails, the remaining modules automatically carry the full load without shutdown. A complete bypass backup mechanism seamlessly switches to bypass under overload, severe fault or maintenance, maximizing overall reliability.
5.3 O&M Management Requirements
Traditional tower UPS is complex; fault repair often requires on-site engineer disassembly, taking hours or days during which the system has no redundancy — high supply risk. Monitoring is weak, faults are discovered late, and O&M is passive. The user needs: module-level hot-swap maintenance (fault modules removed and replaced online without shutdown or professional disassembly, ordinary O&M staff can do it); complete intelligent monitoring (real-time parameters, battery status, alarms, remote management, automatic alarming for active O&M); and fault self-diagnosis and positioning to locate the faulty module and cause quickly.
5.4 Expansion and Upgrade Requirements
Business scales continuously; room IT load grows. Traditional UPS must plan final capacity at initial construction — oversized investment, long-term light-load operation, low utilization and high energy cost; if undersized, later expansion needs a whole new UPS with complex, costly construction and difficult redundancy coordination. The user needs a modular UPS with flexible expansion: initial investment per current load, later adding only power modules without replacing the host cabinet or other parts; expansion completes online without affecting the running system, growing capacity with business and maximizing investment protection.
5.5 Energy-Saving Requirements
PUE is the core indicator of room green efficiency; the power system’s own loss is a major part of room energy consumption. Traditional UPS efficiency is low, especially at light load, causing large electricity loss, higher cost and more heat burdening the cooling system. The user needs a high-efficiency UPS maintaining high efficiency across the full load range — especially the common 30-60% load-rate band — reducing self-loss, electricity cost and cooling demand, lowering room PUE per the dual-carbon policy and green data center requirements.
5.6 Safety Protection Requirements
Room power systems involve high-voltage equipment requiring complete safety mechanisms: comprehensive electrical protections (input overvoltage/undervoltage/overcurrent, output short circuit/overload/overtemperature, battery undervoltage/reverse connection) that trigger automatically in abnormal conditions to prevent fault expansion; complete lightning/grounding design resisting surge impact on UPS and IT loads; and electrical-safety-compliant structures with anti-electric-shock and anti-misoperation protection for operator safety.
6. Design Principles and Applicable Standards
6.1 Applicable Standards
The main standards applied include GB 50174-2017, GB 7260.1-2008, GB/T 7260.3-2003, GB 50462-2015, GB 50054-2011, GB 50057-2010, YD/T 799-2010, GB 50462-2008, plus the manufacturer’s enterprise product standards, industry common design guidelines and customer application requirements.
6.2 Design Principles
Reliability first: modular redundant architecture, dual input design and bypass backup eliminate single points of failure at the architecture level.
Technical advancement: mature three-level inverter technology, digital control and intelligent monitoring keep the solution at the industry frontier with a long product life.
Economy: reasonable capacity and redundancy configuration avoids over-provisioning waste; lifecycle cost is optimized through high efficiency and low expansion/O&M cost.
Flexible expansion: modular, standardized design supports smooth online capacity expansion and standardized interfaces for later upgrades.
Easy O&M: hot-swap modular design simplifies maintenance; intelligent monitoring makes status visible, alarms automatic and management digital, lowering the professional bar for O&M staff.
Green and energy-saving: high-efficiency products and optimized operating modes reduce self-consumption and cooling demand, meeting green data center standards.
6.3 System Architecture
The rack-mounted modular UPS system uses a standard 19-inch cabinet structure, composed of the UPS host cabinet, power modules, bypass module, intelligent monitoring module, battery groups, input/output distribution units and lightning protection modules — all core parts modular and hot-swappable. The architecture is “centralized bypass + distributed power modules”:
Power modules: parallel redundant design — multiple modules run in parallel sharing the load; any module failure automatically isolates itself while the rest share the load, achieving N+X redundancy. Each module integrates all power conversion circuits (rectifier, inverter, charger, protection) and works independently or in parallel expansion.
Bypass module: centralized bypass provides a unified bypass channel including static bypass and maintenance bypass for seamless switching under overload, fault or maintenance.
Monitoring module: the control/management core — collects all module parameters, performs system logic control, current-sharing control, fault diagnosis, alarm management and external communication.
Distribution unit: integrates input distribution, output distribution and battery switches for power distribution, switching and protection.
Battery system: VRLA battery groups provide DC energy on mains interruption for sustained inverter output.
The whole system uses standardized cabinet integration with full front maintenance — wall-mountable, saving space and simplifying deployment and management.
6.4 Capacity Configuration Calculation
Load capacity: total load power (kW) = sum of IT rated power × simultaneity factor (0.7-0.9) × power factor (0.9 typically). UPS rated capacity (kVA) ≥ load power (kW) / output power factor (0.9, up to 1.0 on high-end models).
Redundancy: N+X configuration — N base modules carrying the load, X redundant modules (usually 1 or 2). N+1 suits general enterprise/branch rooms at good value; N+2 suits high-grade data centers and core business rooms. Example: 60 kW load, PF 0.9 → ~66.7 kVA → base modules N = 66.7/20 ≈ 3.33 → 4; total 4+1 = 5 × 20 kVA = 100 kVA, carrying 90 kW with one module redundancy.
Battery backup time: battery capacity (Ah) = (UPS rated kW × 1000) / (DC bus voltage × inverter efficiency × battery discharge efficiency), then refined by discharge curve. Standards: 0.5-1 h with backup generator; 1-2 h for general rooms without generator; 4-8 h+ for core business and no-mains-guarantee scenarios. Default 1 hour in this solution.
6.5 System Topology
The modular UPS uses a double-conversion online topology: input rectifier, DC bus, inverter, static bypass, maintenance bypass and battery group.
Normal inverter mode: mains enters the rectifier via the input breaker → DC, float-charging the battery and feeding the inverter, which outputs pure sine-wave AC through the output breaker. The load is fully powered by the inverter; all mains interference is isolated — optimal output quality.
Battery mode: on mains interruption or out-of-range mains, the rectifier stops and the battery feeds the inverter directly through the DC bus — zero switching time, invisible to the load. On mains recovery, the system automatically returns to inverter mode and recharges the battery.
Static bypass mode: on system fault, output overload beyond inverter capacity or overtemperature, the static bypass switch triggers and mains powers the load directly — supply uninterrupted; the system returns to inverter mode seamlessly after the fault or overload clears.
Maintenance bypass mode: for whole-unit maintenance, close the maintenance bypass switch (mains powers the load directly), then open all UPS input/output breakers and power down the UPS host safely. After maintenance, start the UPS to bypass synchronism, open the maintenance bypass, and the system returns to normal — load supply uninterrupted throughout.
6.6 Operating Modes
Double-conversion online mode: the standard mode with the best power quality and isolation, for poor grid environments and quality-sensitive loads.
ECO economy mode: when mains parameters are normal, the load is powered via bypass with the inverter in hot standby — efficiency above 99%; on mains anomaly the system switches to inverter mode within milliseconds. For stable grids and energy-saving scenarios.
Intelligent sleep mode: the system automatically adjusts the number of running power modules by real-time load rate, keeping running modules in the high-efficiency band; sleeping modules remain hot-standby and wake instantly on load surge or module failure — significantly improving light-load efficiency.
Battery test mode: periodic automatic battery discharge tests per a set schedule, recording data and generating a battery health report to detect aging batteries early.
6.7 Battery System Design
The solution uses VRLA batteries — maintenance-free, sealed, no electrolyte leakage, flexible installation, high reliability. The DC bus is typically ±192V or 384V; for 384V, each group is 32 × 12V in series; multiple groups parallel for higher capacity. Configuration principles: same brand/model/capacity/batch in one group for consistency; two or more groups in parallel for important scenarios (one group failure still leaves backup); DC breakers/fuses for overcurrent/short protection with optional battery patrol units monitoring per-cell voltage, internal resistance and temperature; optimal environment 20-25℃ with temperature control to extend life. Built-in battery management provides auto float/boost switching, temperature-compensated charging, capacity prediction, remaining-capacity display, low-voltage alarm and low-voltage shutdown protection.
6.8 Distribution and Lightning/Grounding Design
Distribution: input distribution cabinet (main switch, branch switches, surge protector, energy meter; optional ATS for dual mains); output distribution cabinet (main switch, multiple branch circuits with independent protection; optional smart distribution module for per-circuit monitoring); battery DC breakers per group for control and short protection.
Lightning: three-level protection — Class B at the mains input cabinet (nominal discharge ≥60 kA) for direct/large induced lightning; Class C at the UPS input (≥40 kA) for residual surges; Class D sockets/protectors at critical loads. Grounding per national codes: UPS enclosures, cabinets, battery racks and distribution equipment reliably protective-grounded with ground resistance ≤4 Ω; DC working ground, AC working ground, protective ground and lightning ground share one grounding body with equipotential connection.
7. System Architecture and Working Principle
7.1 Modular UPS Cabinet
The host cabinet is a standard 19-inch rack (600 W × 1000 D × 2000 H mm, customizable) with up to 10 power module slots (1-10 flexible), floor-standing with side-by-side cabinet installation, full front maintenance, cold-rolled steel ≥1.5 mm, electrostatic powder coating, IP20, empty ~150 kg / full ~350 kg, max system capacity 200 kVA (10 × 20 kVA), copper busbars ≥630 A, ±192V DC bus, integrated bypass busbar, smart air cooling (front-inlet rear-exhaust, load/temperature-based fan speed), noise ≤55 dB(A) full load, rear top/bottom cable entry options, battery terminals for two groups, RS232/RS485/dry-contact/Ethernet interfaces, 0-40℃ operation.
7.2 Power Modules
20 kVA module (3U): 20 kVA/18 kW, three-phase 380/400/415V input, input range 208-478V AC, frequency 40-70 Hz, PF ≥0.99, THDi ≤3%, active PFC, output 380/400/415V ±1%, THDv ≤2% (linear) / ≤5% (non-linear), 100% unbalanced load with voltage unbalance ≤2%, overload 110% continuous / 125% 10 min / 150% 1 min / >150% instant bypass, double-conversion efficiency ≥96% (ECO ≥99%, half-load ≥95.5%, sleep mode +3-5%), full protections (input/output/DC/temperature/fuses), DSP control, parallel bus communication with sharing ≤±3%, LED status, front hot-swap with load (replacement ≤5 min), ~25 kg, MTBF ≥200,000 h, MTTR ≤5 min, CCC/CE.
30 kVA module (4U): 30 kVA/27 kW, 384V DC bus, input 208-478V AC three-phase, PF ≥0.99, THDi ≤3%, output ±1%, overload 110% continuous / 125% 10 min / 150% 1 min, efficiency ≥96.2% (ECO ≥99%), ~35 kg, same protections/communications/certifications as 20 kVA.
7.3 Bypass Module
100 kVA rated matching system max capacity, 380V three-phase four-wire; SCR static bypass with ≤2 ms seamless switching (system fault, overload, overtemperature, manual command), overload 10× rated for 1 cycle; manual maintenance isolation switch with mechanical interlock; sync range voltage ±10%, frequency ±2 Hz, phase ±15°, locking ≤100 ms, phase accuracy ≤5°; overcurrent/overtemperature protection and self-test; 3U hot-swap, ~20 kg, LED status, bus communication, switch life ≥100,000 operations, MTBF ≥300,000 h.
7.4 Intelligent Monitoring Module
32-bit ARM processor, ≥256 MB RAM, ≥128 MB Flash (≥1 year history), 7-inch color LCD touchscreen (800×480, Chinese/English), displays system single-line diagram, input/output parameters, battery parameters, module status, alarms and records; collects input/output voltage/current/frequency/power, battery voltage/current/capacity/temperature, per-module parameters (accuracy ±0.5% V/I, ±1% power); controls start/stop, bypass switching, battery test, module start/stop, current sharing ≤±3%, smart charging, sleep scheduling; 60+ alarm types in three levels (general/important/emergency) with local audible/visual, popup, remote communication and dry-contact alarms, 1000-event alarm log; standard RS232/RS485/dry-contact×4/USB, optional SNMP/Modbus TCP/expansion; protocols Modbus-RTU/TCP, SNMP V1/V2c, HTTP, TFTP; web/SNMP/DCIM remote management; battery SOC/SOH, patrol unit support, manual/auto discharge test with reports, two-level low-voltage alarm and auto-shutdown; hot-swap panel mounting, ~1.5 kg, -10℃ to 60℃, DC 24V UPS-powered with data retention.
7.5 Batteries, Cabinets and Connection Cables
Battery (12V 100Ah AGM): rated 100 Ah (10 h rate, 25℃), ~30 kg, float 13.5-13.8V (25℃, temp compensation -3 mV/℃·cell), boost 14.1-14.4V, self-discharge ≤2%/month (≥88% remaining after 6 months), discharge cutoff 10.5V/cell, 10C 5-min high-current capability, lead-calcium-tin alloy plates, AGM absorbed electrolyte, one-way anti-explosion valve (open 10-35 kPa, close 3-15 kPa), ABS UL94-V0 housing, fully sealed (horizontal/vertical mounting), design life 10 years float (25℃), cycle ≥500 (100% DOD), -15℃ to 45℃ discharge / 0-40℃ charge, TLC/UL/CE, per YD/T 799-2010 and GB/T 19638.2.
Battery cabinet (A32): holds 32 × 12V 100Ah, 800×600×1200 mm, cold-rolled steel ≥1.2 mm, three-layer rack with insulation, static load ≥1000 kg, ventilated doors, insulated terminal blocks, ground terminal, RAL7035, complete fixing accessories.
Battery connection cables: ZR-BVR flame-retardant multi-strand copper, 25-70 mm² per capacity, 1000V insulation, tin-plated copper cold-pressed terminals with heat-shrink insulation and polarity marks, complete series/parallel/output sets.
7.6 Distribution Cabinets and Lightning Protectors
Input/output distribution cabinets: 800×600×2000 mm, cold-rolled steel ≥1.5 mm, IP30, floor-standing, top/bottom cable entry; input main breaker 4P 160A molded-case (breaking ≥35 kA), output main 4P 160A, 10 output branch circuits (16/32/63A selectable), brands Chint/Delixi/Schneider/ABB; multi-function power meter (three-phase V/A/W/Hz/kWh/PF/harmonics, 0.5 class, LCD); built-in Class C surge protector 40 kA 3+1; front operation, copper busbars, secondary terminal blocks, ground busbar; -10℃ to 45℃; per GB 7251.1 and GB 50054, 3C certified.
Surge protectors: Class B (Un 385V, Uc 420V, In 60 kA/line, Imax 100 kA, Up ≤2.5 kV) and Class C (In 40 kA, Imax 80 kA, Up ≤1.8 kV), 3+1 mode (L-PE, N-PE), pluggable modules with window status (green normal / red fault) and optional remote alarm contacts, response ≤25 ns, 35 mm DIN rail, -40℃ to 85℃, per GB 18802.1 and IEC 61643-11, CQC/CE.
7.7 Cables and Auxiliary Materials
Power cables YJV 0.6/1 kV flame-retardant copper per GB/T 12706; control cables RVVP shielded 300/500V; galvanized cable trays; DT tin-plated copper terminals; 304 stainless expansion bolts; flame-retardant nylon ties (V2); 10 kV insulating tape; 2:1 heat-shrink tubing.
8. Detailed Technical Design
8.1 Capacity and Module Configuration
For a 100 kVA standard system: 5 × 20 kVA modules (4+1 redundancy), 1 bypass module, 1 monitoring module; DC bus ±192V; 64 × 12V 100Ah batteries in 2 groups of 32 (1-hour backup); input/output distribution cabinets; three-level lightning protection. N+2 for high-grade rooms; dual-bus 2N architecture for Tier 3+; 30 kVA modules for 150-300 kVA systems; host cabinets can parallel up to 4 units for 800 kVA+.
8.2 Electrical Design
Cables sized per current (100 kVA ≈ 144 A → 3×70+1×35 mm² recommended), flame-retardant; ATS for dual-mains scenarios; per-circuit output distribution with independent protection; DC breakers per battery group; grounding with ≥16 mm² main ground and equipotential bonding; three-level lightning protection as designed.
8.3 Battery and Backup Design
Backup time per scenario (0.5-1 h generator / 1-2 h general / 4-8 h core); battery groups of identical cells; DC breaker per group; optional battery patrol unit; temperature control 20-25℃; charging parameters per manufacturer with temperature compensation.
8.4 Monitoring and Integration Design
Monitoring module as the management core with local touchscreen; integration to DCIM via Modbus-TCP/SNMP; SNMP card for network management platforms; alarm push via dry contacts, email, SMS; remote web access; periodic automatic battery tests with health reports.
8.5 Commissioning Design
Commissioning covers: pre-power checks (continuity, insulation, phase sequence); single-module power-on; parallel current-sharing verification; inverter/battery/bypass/maintenance-bypass switching tests; battery discharge test; alarm and protection tests; loaded trial run (72 h); DCIM integration joint test; documentation and training.
9. Recommended Configuration and Preliminary Budget
9.1 Configuration Summary
The following table lists the standard 100 kVA modular UPS system configuration (N+1 redundancy, 20 kVA modules, 1-hour backup), adjustable per actual capacity, backup time and requirements:
| No. | System | Product | Specification | Qty | Unit |
|---|---|---|---|---|---|
| 1 | UPS host | Modular UPS cabinet | 19-inch, 10 module slots, integrated busbars, cooling, distribution interfaces | 1 | pc |
| 2 | UPS host | Power module | 20 kVA/18 kW, three-level inverter, hot-swap | 5 | pcs |
| 3 | UPS host | Centralized bypass module | 100 kVA, static + maintenance bypass, hot-swap | 1 | pc |
| 4 | UPS host | Intelligent monitoring module | 7-inch color touchscreen, full parameter monitoring, multi-protocol | 1 | pc |
| 5 | UPS host | SNMP network card | WEB access, SNMP, DCIM integration | 1 | pc (optional) |
| 6 | Battery | VRLA battery | 12V 100Ah long-life, maintenance-free | 64 | cells |
| 7 | Battery | Standard battery cabinet | A32 type, holds 32 × 12V 100Ah | 2 | pcs |
| 8 | Battery | Battery connection cables | Flame-retardant copper with terminals | 2 | sets |
| 9 | Battery | DC breaker | 2P DC, matched to battery current | 2 | pcs |
| 10 | Battery | Battery patrol unit | Per-cell voltage/temperature/resistance | 1 | set (optional) |
| 11 | Distribution | Input distribution cabinet | 800×600×2000, main switch, surge, meter | 1 | pc |
| 12 | Distribution | Output distribution cabinet | 800×600×2000, main + branch circuits | 1 | pc |
| 13 | Distribution | ATS | 160A 4P intelligent | 1 | pc (optional) |
| 14 | Distribution | Smart distribution module | Full electrical parameter monitoring | 1 | set (optional) |
| 15 | Lightning | Class B surge protector | 380V 3+1, In 60 kA | 1 | set |
| 16 | Lightning | Class C surge protector | 380V 3+1, In 40 kA | 1 | set |
| 17 | Lightning | Equipotential ground bus | 30×3 mm copper | 5 | pcs |
| 18 | Lightning | Grounding cable | BVR-16 mm² yellow-green | 50 | m |
| 19 | Service | Power cables, trays, auxiliaries | Per site measurement | 1 | lot |
| 20 | Service | Transport, installation, commissioning, training | Full on-site service | 1 | item |
9.2 Quotation Notes
The configuration covers the UPS host system (cabinet, power modules, bypass, monitoring), battery and supporting system, distribution system, lightning/grounding system, auxiliary materials and engineering services (transport, installation, commissioning, training), plus tax. All prices are indicative and quoted in RMB (CNY) only — no foreign-currency conversion is provided. The final quotation is calculated per the actual project configuration, quantity, construction difficulty and transport distance, and is subject to a formal quotation. Free on-site survey and solution optimization are available; warranty can be upgraded to 5 years or on-site resident service.
10. Technical Specifications
10.1 System Performance Summary
| Item | Specification |
|---|---|
| System capacity | 10-200 kVA per cabinet (1-10 × 20 kVA modules); up to 4 cabinets parallel (800 kVA+) |
| Redundancy | N+X (N+1 / N+2 / N+X), module-level |
| Architecture | Double-conversion online, three-level inverter, active PFC |
| Input | Three-phase 380/400/415V AC, 208-478V wide range, 40-70 Hz |
| Input PF / THDi | ≥0.99 / ≤3% |
| Output | Three-phase, 380/400/415V ±1%, pure sine wave |
| Output THDv | ≤2% linear; ≤5% non-linear |
| Overload | 110% continuous; 125% 10 min; 150% 1 min; >150% instant bypass |
| Efficiency | ≥96-97.5% double-conversion; ≥99% ECO; ≥95.5% half-load |
| Sleep mode gain | +3-5% at light load |
| Bypass switching | ≤2 ms, seamless |
| Hot swap | Power/bypass/monitoring modules, online, MTTR ≤5 min |
| Battery | VRLA 12V, DC bus ±192V / 384V, 1 h default backup (customizable) |
| Monitoring | 7-inch touchscreen, Modbus-RTU/TCP, SNMP, HTTP, dry contacts |
| Alarms | 60+ types, 3 levels, 1000-event log |
| MTBF / MTTR | ≥200,000 h / ≤5 min (module level) |
| Standards | GB 50174, GB 7260.1, GB/T 7260.3, YD/T 799, CCC, CE |
| Warranty | 2 years whole unit, 3 years power/monitoring modules, 3 years battery |
10.2 Key Component Specifications
| Component | Key Parameters |
|---|---|
| UPS cabinet | 19-inch, 600×1000×2000 mm, 10 slots, ±192V bus, ≤55 dB, IP20 |
| 20 kVA module | 20 kVA/18 kW, 3U, 208-478V input, ±192V DC, hot-swap, 25 kg |
| 30 kVA module | 30 kVA/27 kW, 4U, 384V DC, hot-swap, 35 kg |
| Bypass module | 100 kVA, SCR ≤2 ms, maintenance isolation, 3U, 20 kg, MTBF ≥300,000 h |
| Monitoring module | 7-in touchscreen, ±0.5% V/I, 60+ alarms, Modbus/SNMP, hot-swap |
| Battery 12V100Ah | AGM, float 13.5-13.8V, self-discharge ≤2%/month, 10-year design life, 30 kg |
| Battery cabinet A32 | 32 cells, 800×600×1200 mm, load ≥1000 kg, ventilated |
| Input cabinet | 4P 160A MCCB, meter 0.5 class, Class C SPD, IP30 |
| Surge protector B | In 60 kA, Imax 100 kA, Up ≤2.5 kV, 3+1, pluggable |
| Surge protector C | In 40 kA, Imax 80 kA, Up ≤1.8 kV, 3+1, pluggable |
11. Key Advantages and Customer Value
11.1 High-Reliability Architecture — Continuous Supply
The modular N+X redundant architecture fundamentally solves the single-point-failure risk of tower UPS. Multiple power modules run in parallel sharing the load; when any module fails, the system automatically isolates it and the remaining modules immediately carry the full load — supply uninterrupted. Redundancy is configurable up to N+2/N+3, meeting Tier 3 and Tier 4 data center requirements. Static bypass and maintenance bypass provide dual backup: static bypass switches seamlessly within 2 ms on severe fault or overload; maintenance bypass allows full host power-down for servicing without affecting the load. The double-conversion online topology completely isolates grid voltage fluctuation, harmonics and surges, delivering pure stable sine-wave power that greatly improves IT equipment stability and service life.
11.2 High-Efficiency Technology — Lower Operating Cost
Three-level inverter and active PFC technologies give whole-unit efficiency above 96%, industry-leading. Self-loss is reduced by over 30% versus traditional UPS — a 100 kVA system running 8760 h/year saves tens of thousands of kWh annually, cutting electricity cost and cooling burden and lowering room PUE. ECO mode reaches 99% efficiency on stable grids; intelligent sleep mode adjusts running module count by load rate, keeping modules in the high-efficiency band and adding 3-5% efficiency at light load — a combined energy-saving package aligned with green data center and dual-carbon policies.
11.3 Flexible Expansion — Protecting Prior Investment
The on-demand, step-by-step expansion model configures power modules per current load; when business grows, add modules to raise capacity without replacing the host cabinet or other parts, with expansion completed online without affecting the running system. This avoids the resource waste and capital occupation of one-time maximum-capacity configuration, aligning investment with business growth. The system expands smoothly from 10 kVA to 200 kVA per cabinet; the standard 19-inch structure can be deployed side-by-side with server and network cabinets for a tidy layout.
11.4 Convenient O&M — Lower Maintenance Barrier
Full modular hot-swap design makes maintenance extremely simple: power, bypass and monitoring modules are all front hot-swappable; a faulty module is pulled and replaced directly without professional disassembly — ordinary O&M staff can do it after brief training, with MTTR ≤5 minutes. The intelligent monitoring system provides full visualization: the 7-inch color touchscreen shows the single-line diagram, running parameters, module status and alarms; SNMP/WEB/RS485 remote management lets staff monitor from the office. Fault self-diagnosis precisely locates the faulty module and cause, greatly shortening troubleshooting time and enabling active O&M.
11.5 Total Lifecycle Cost Advantage
On-demand configuration avoids over-investment at the initial stage; high efficiency cuts electricity cost in operation; module-level maintenance lowers repair and labor cost; expansion by adding modules avoids whole-unit replacement, extending overall system life. Traditional UPS faults often require manufacturer engineers on site — long cycles, high cost, and no redundancy during repair. Modular UPS needs only one spare power module to handle any module fault — low spare cost, fast replacement, far lower long-term O&M cost. Product design life exceeds 10 years, reducing replacement frequency.
11.6 Complete Safety Protection — Compliance
Comprehensive electrical protection covers input, output, DC and temperature — input over/undervoltage, phase loss, over/underfrequency; output overload, short circuit, over/undervoltage; battery overcharge, overdischarge, reverse connection; overtemperature — dozens of protections acting quickly to prevent fault expansion and protect equipment and personnel. The three-level lightning/grounding system resists induced surges and switching overvoltages; all electrical equipment carries 3C/CE safety certifications per national standards; the design strictly follows GB 50174, GB 50054 and UPS equipment standards, meeting compliance requirements of all room grades.
12. Technical Q&A (50+ Items)
12.1 Selection
Q1: How is the required modular UPS capacity determined?
A: First sum the rated power of all IT equipment, multiply by the simultaneity factor (0.7-0.9), giving actual load power; divide by the UPS output power factor (usually 0.9) for the kVA base; reserve 20-30% expansion margin and consider redundancy (N+1 or N+2). Example: 60 kW load → 60/0.9 ≈ 66.7 kVA → N+1 with 5 × 20 kVA modules = 100 kVA, satisfying demand with redundancy.
Q2: N+1 or N+2 redundancy?
A: N+1 — one redundant module beyond the base count; single-module failure does not affect capacity; cost-effective for general enterprise, branch and office rooms. N+2 — two redundant modules, tolerating two simultaneous module failures; higher reliability for finance, government, medical, operator core rooms and Tier 3+ data centers. Choose by business importance and reliability requirements.
Q3: What backup time is appropriate?
A: Determined by whether a backup generator exists, business importance and outage frequency/duration: with a diesel generator — 0.5-1 h (generator start/switch time); without a generator — 2-4 h; core rooms with poor mains — 4-8 h or more. This solution defaults to 1 h, adjustable by battery capacity and group count.
Q4: Lead-acid or lithium batteries?
A: VRLA lead-acid is the mainstream for room UPS — mature, reliable, low cost, safe, suited to most rooms. Lithium has higher energy density, longer life and faster charge/discharge but higher cost and stricter safety requirements — for space/weight-constrained or high-cycle-life scenarios. This solution defaults to lead-acid, with lithium options on request.
Q5: What is the maximum expansion capacity?
A: A single cabinet typically supports up to 200 kVA (10 × 20 kVA modules); up to 4 cabinets in parallel give 800 kVA+, meeting medium/large data center needs. Expansion adds power modules only — no host replacement, online, without affecting the load.
Q6: How is the module count for a specific load calculated?
A: Load kW ÷ output PF → kVA; kVA ÷ module capacity → base module count, rounded up; add redundant modules (1 or 2); verify the load rate stays in the efficient band with the redundancy margin.
Q7: What if the room will grow significantly in 3-5 years?
A: Configure the cabinet with full slots but install the initial module count only, reserving empty slots for future modules; or choose N+2 from the start for critical growth. Both avoid over-investment while preserving expansion.
Q8: Can different-capacity modules be mixed?
A: Not recommended — same brand/model/capacity keeps parameters consistent and current sharing uniform; different capacities cause uneven sharing and instability. When expanding, add modules identical to the existing specification.
Q9: Single-phase or three-phase input?
A: Modular UPS of this class uses three-phase input (380/400/415V) with a wide 208-478V range; for small single-cabinet loads a three-phase feed with balanced distribution is standard; verify the site’s available supply during the survey.
Q10: What redundancy level meets Tier 3/Tier 4?
A: Tier 3 generally requires N+1 at both system and module level with maintenance paths; Tier 4 requires 2N dual-bus. Modular UPS achieves this via module N+X plus parallel cabinets and dual-bus topology, satisfying both.
12.2 Technical Principles
Q11: What is a double-conversion online UPS?
A: During normal mains, power undergoes AC-DC-AC double conversion: the rectifier converts AC to DC (charging the battery and feeding the inverter), and the inverter converts DC to pure sine-wave AC for the load. The load is electrically isolated from the grid — all interference, fluctuation, harmonics and surges are blocked — with zero switching time on mains failure. The highest-reliability UPS mode for precision electronics.
Q12: What does hot-swap mean?
A: Hot-swap allows removing a faulty module and inserting a new one while the UPS runs at load with supply uninterrupted — based on the parallel redundant architecture and standardized interfaces. It fundamentally changes the shutdown-for-repair model of traditional UPS, greatly improving supply continuity and O&M convenience and shortening MTTR.
Q13: What is ECO mode? Does it affect reliability?
A: ECO (economy) mode powers the load via bypass during normal mains with the inverter in hot standby — efficiency up to 99%. On mains anomaly (voltage/frequency out of range) the system switches to inverter within 2 ms — short enough for virtually all IT power supplies — without affecting reliability. Suitable for stable grids with high energy-saving demands; enable/disable as needed.
Q14: What is parallel current sharing?
A: Parallel modules should carry nearly equal load current; poor sharing overloads some modules, accelerating aging and damage. This solution uses digital sharing control with high-speed bus communication, adjusting outputs in real time to sharing accuracy ≤±3%, balancing module load and improving overall stability and life.
Q15: What are the advantages of three-level inverter technology?
A: Compared with traditional two-level inverters: output waveform closer to sine (lower harmonic distortion, higher power quality); lower switching loss (higher efficiency, less heat); lower EMI. This solution’s power modules use three-level inversion for high efficiency, low harmonics and high stability.
Q16: How does the intelligent sleep mode work?
A: The monitoring module continuously measures load rate and adjusts the number of running modules so running modules work in the high-efficiency band; sleeping modules stay hot-standby and wake within milliseconds on load surge or running-module failure. It significantly improves light-load efficiency without losing redundancy.
Q17: What is the difference between static bypass and maintenance bypass?
A: Static bypass is an SCR-based automatic path that switches within ≤2 ms on fault/overload/overtemperature, keeping the load powered. Maintenance bypass is a manual isolation switch for whole-unit servicing — close it to power the load directly from mains, then power down the UPS host safely. Both keep supply uninterrupted; static is automatic protection, maintenance is planned servicing.
Q18: How is output voltage stabilized at ±1%?
A: Digital DSP control with closed-loop voltage regulation on the inverter, plus the isolation of the double-conversion structure — input variations and load changes are compensated in real time, keeping steady-state output within ±1%.
Q19: What does the 3:1 crest factor capability mean?
A: Crest factor is peak-to-RMS current ratio; switch-mode loads draw high peak currents. 3:1 capability lets the UPS supply such loads without limiting or distorting output — important for server and storage power supplies.
Q20: How is the system efficiency calculated, and why does it matter?
A: Efficiency = output power / input power. Higher efficiency means less self-loss — lower electricity cost and less heat (smaller cooling load, lower PUE). A 96% vs 90% system at 100 kVA differs by about 60,000 kWh per year.
12.3 Installation and Deployment
Q21: What are the room environment requirements?
A: Temperature 20-25℃ recommended, max 40℃ (higher accelerates aging and shortens battery life; lower reduces discharge capability); relative humidity 30-70% without condensation; clean, dust-controlled environment; ≥60 cm front operation space for module access; level floor with load capacity for equipment weight.
Q22: How are input/output cables selected?
A: By rated current at 3-5 A/mm² with margin, considering voltage drop for long runs. A 100 kVA UPS draws about 144 A — use 3×70+1×35 mm² copper cable; flame-retardant type per national standards; final selection by a professional electrical engineer per actual current and distance.
Q23: Can modular UPS cabinets parallel for expansion?
A: Yes — beyond module-level expansion, host cabinets parallel (up to 4) for higher capacity and redundancy, up to 800 kVA+, suitable for large data centers. Digital parallel technology needs no external parallel cabinet — hosts connect by parallel cables, simple commissioning, high sharing accuracy.
Q24: What are the grounding requirements?
A: UPS equipment reliably grounded; ground trunk ≥16 mm² yellow-green copper to the equipotential ground bus; working, protective and lightning grounds share one grounding body with resistance ≤4 Ω (≤1 Ω recommended for rooms with communication or classified equipment); firm connections, periodic resistance measurement.
Q25: How is the UPS cabinet fixed and installed?
A: Position per drawing, level with verticality deviation ≤1.5‰; fix with ≥4 expansion bolts; side-by-side cabinets joined with coupling screws, gap uniform, height difference ≤2 mm; reliable grounding connection with clear labels.
Q26: How are batteries installed?
A: Inspect appearance and measure per-cell voltage; arrange per design order with correct polarity and cooling gaps; series connections torqued properly; measure total voltage after connection — no short or reverse; connect group positives/negatives through DC breakers with insulation; optional patrol wiring per cell with clear labels.
Q27: What are the cable laying rules?
A: Trays installed level and firm with code-compliant support spacing; cables inspected (model, insulation test) before laying; layered separation by voltage/purpose with labels; bending radius ≥10× cable diameter for power cables; ends reserved with margin; cables tied, labeled with number, start, end and specification.
Q28: What are the wiring requirements in the cabinets?
A: Verify phase sequence before termination; strip without damaging conductors; crimp copper terminals firmly with heat-shrink insulation; torque terminals properly; phase colors A yellow / B green / C red / N blue / PE yellow-green; clean the cabinet after wiring, no tools or metal debris left.
Q29: How is lightning protection installed?
A: Class B at the mains input cabinet, Class C at the UPS input — installed firmly, correct phase sequence, ground wire short and straight (≤0.5 m); equipotential ground bus in the room with all metal enclosures connected; contact surfaces tin-plated with firm bolted connections; ground resistance tested after installation.
Q30: Can installation run while the room is live?
A: Yes — the modular UPS installs in its own area with controlled work zones; power connections are made on de-energized circuits with verification and permits; commissioning of new systems does not disturb running loads; coordination with the owner’s operations keeps business unaffected.
12.4 O&M Management
Q31: What daily maintenance is required?
A: Daily patrol — running status, alarms, panel parameters (voltage, current, temperature), fan operation, abnormal noise/smell. Quarterly/semi-annual — clean surfaces and inlet filters, check terminals for loosening/heating, check battery appearance, calibrate capacity, test alarms. Annual — deep inspection and preventive maintenance by professional engineers.
Q32: How is battery life extended?
A: Temperature is the biggest factor — best 20-25℃; every +10℃ halves life. Avoid overcharge/overdischarge (keep UPS smart charging enabled, don’t alter parameters); discharge-test every six months to activate batteries and find aging cells; keep clean and dry, prevent terminal corrosion; replace damaged individual cells promptly to protect the whole group.
Q33: Can the UPS monitoring integrate with the room environment-monitoring system?
A: Yes — the monitoring module supports Modbus-RTU/TCP, SNMP and other protocols for direct integration with mainstream DCIM platforms, unifying UPS data and alarms; the SNMP card also connects to network management platforms with WEB remote access.
Q34: How are modules replaced without downtime?
A: Pull the faulty module along its rails after confirming redundancy is sufficient (N+X), insert the spare module, and it synchronizes and shares automatically — no tools beyond a screwdriver, no shutdown; observe ESD precautions and avoid forced operation.
Q35: What should be checked during the quarterly patrol?
A: Running parameters and alarm logs; module health status and temperatures; battery per-cell voltage/internal resistance spot checks; terminal tightening and thermal scan; dust cleaning; surge protector status windows; ground resistance; functional tests of bypass and alarm paths.
Q36: How is the battery discharge test performed?
A: Via the monitoring module’s manual or scheduled automatic test — the system discharges to a set threshold (e.g. 50% SOC), records voltage/current/capacity curves, generates a health report, then recharges automatically. Frequency: every six months for float-charged groups.
Q37: What parameters should be monitored remotely?
A: Input/output voltage, current, frequency and power; battery voltage, current, SOC and temperature; per-module status and load; alarms and event logs; environment temperature/humidity — via WEB, SNMP platform or DCIM.
Q38: How are alarm levels distinguished?
A: Three levels — general (e.g. input voltage high, temperature high), important (e.g. battery low), emergency (e.g. output fault, module fault). General alarms often clear when external conditions recover; emergency alarms require prompt action — confirm load supply (bypass may be active) and replace faulty modules.
Q39: What records should be kept?
A: Daily operation logs, quarterly maintenance records, battery test reports, alarm logs (exported from the system), annual inspection reports — enabling trend analysis and early fault detection.
Q40: Is operator training provided?
A: Yes — 1-day training at acceptance (theory + hands-on): operation, module hot-swap drill, patrol practice, fault simulation; assessment by written and practical tests with certification; 30-day follow-up Q&A window and free refresher within warranty.
12.5 Fault Handling
Q41: What should be done when an alarm occurs?
A: Check the alarm content and level. General alarms (input voltage high, temperature high) — check mains and environment; they clear when external conditions recover. Emergency alarms (output fault, module fault) — first confirm load supply; if the system switched to bypass, investigate promptly; replace faulty modules online; contact technical support if unresolved — never disassemble arbitrarily.
Q42: Why is battery backup time shorter than expected?
A: Common causes: actual load larger than designed (higher discharge current); battery aging (capacity decline); low ambient temperature (reduced discharge capability); long float without discharge (capacity fade). Verify load power, test battery capacity by discharge, and replace aging cells.
Q43: Why does the UPS switch to bypass frequently?
A: Causes: overload or surge loads exceeding inverter capability; large mains voltage/frequency fluctuation beyond input range; inverter module fault or overtemperature; overly strict bypass parameter settings. Check load, mains quality (add regulator if fluctuating), replace faulty modules, and review parameters.
Q44: The power module fault light is on — what now?
A: Confirm the system still carries the load (single module failure does not affect supply with redundancy); view fault details; try reset/restart if recoverable; if not, hot-swap the module for a spare and return the faulty one for repair. Wear an anti-static wrist strap and pull along the rails smoothly.
Q45: What if the bypass does not switch when needed?
A: Check bypass module status and synchronization (voltage/frequency/phase within range); check for bypass module fault alarms; verify the manual maintenance bypass is not engaged; confirm parameter settings allow bypass on this fault type; replace the bypass module if faulty.
Q46: The system reports battery low voltage — causes?
A: Battery aging with capacity decline; long discharge without full recharge; charger fault (insufficient charge voltage); loose battery connections; oversized load; low temperature. Test battery voltage and charge current to isolate the cause.
Q47: How is an uncharged battery handled?
A: Check charger function and parameters, connection integrity and temperature range; verify the battery is not fully charged already (normal float); run a controlled discharge/recharge cycle; if capacity remains low after cycling, replace the aging cells.
Q48: What should be done in a power outage during commissioning?
A: Shut down running tools and equipment, reset switches to off; use emergency lighting and evacuate orderly; confirm outage cause and restoration time with the owner/property; after restoration, re-energize device by device with verification.
Q49: How are electrical emergencies handled?
A: Electric shock — cut power or separate the victim with insulating material, never bare hands; check consciousness/breathing, perform CPR if needed, call 120; preserve the scene and investigate. Fire — cut power, use dry-powder extinguishers (never water), call 119 if large, evacuate; after extinguishing, inspect and rectify before resuming.
Q50: What if the parallel system has uneven sharing?
A: Check parallel cables and connections; verify identical module firmware/models; check phase sync and ring current; rerun parallel commissioning; contact technical support if deviation exceeds 3-5%.
12.6 Comparison and Selection
Q51: Modular vs. traditional tower UPS?
A: Four core advantages: reliability — module N+X eliminates single points of failure, while a single tower host failure fails the whole system; O&M — hot-swap online replacement with short repair time vs. shutdown/disassembly with long cycles; expansion — on-demand module addition, step-by-step investment vs. one-time full capacity with costly expansion; efficiency — sleep mode at light load saves energy. Modular UPS suits rooms with continuous business growth and high reliability/O&M requirements.
Q52: Online vs. standby UPS — which for rooms?
A: Standby UPS powers the load directly from mains and starts the inverter only on failure — tens of milliseconds switching gap, low cost, poor quality — for homes and ordinary office PCs. Online UPS always powers through the inverter — zero switching, best quality, highest reliability — the room standard. This modular UPS is double-conversion online, the highest-grade online structure.
Q53: Industrial-frequency (line-frequency) vs. high-frequency UPS?
A: Line-frequency UPS carries an output transformer — bulky, lower efficiency, higher harmonics, but strong impact tolerance — for industrial and utility environments. High-frequency UPS is compact, light, efficient, high input PF and low harmonics — the mainstream for data centers. This modular UPS is high-frequency online — advanced, energy-saving, suited to precision electronic loads.
Q54: How does modular UPS compare with rack-mounted fixed-capacity UPS?
A: Both install in standard racks, but modular UPS adds hot-swap module redundancy, online expansion and sleep-mode efficiency — while fixed-capacity rack UPS is simpler and cheaper for small, stable loads. Modular suits growing, high-availability rooms; fixed-capacity suits small rooms and edge nodes.
Q55: What is the ROI of modular UPS?
A: Higher initial cost than an equivalent tower UPS is offset by: efficiency gains (electricity savings), module-level repair (no engineer-heavy repair costs), on-demand expansion (no over-provisioning), and longer effective life — typically recovering the premium within 2-3 years for systems above 60 kVA.
Q56: Which scenarios need dual-bus (2N)?
A: Tier 4 data centers, hospitals, financial core systems and other loads with two independent power inputs needing no single point of failure end-to-end. Two independent modular UPS systems feed A/B buses; one system can be fully serviced while the other carries the load.
Q57: Can the solution be customized for specific sites?
A: Yes — capacity, module size (20/30 kVA), backup time, battery type (lead-acid/lithium), cabinet count, distribution circuits, monitoring integration and lightning class are all configurable per site; three free design options are provided before ordering.
Q58: What are the green credentials?
A: High efficiency (96%+) reduces electricity and cooling demand; ECO/sleep modes cut light-load loss; low THDi reduces grid pollution; the design supports green data center certification and dual-carbon goals; PUE improvement is measurable and documented.
Q59: What documentation supports acceptance?
A: 3C/CE certificates, type test reports, factory test reports, wiring and single-line diagrams, commissioning records, battery test reports, training records and maintenance manuals — satisfying data center construction and fire acceptance filing.
Q60: What is the warranty and service commitment?
A: 2-year whole-unit warranty, 3 years on power/monitoring modules and batteries; lifetime technical support; 7×24 response — call-back within 30 min, remote diagnosis within 1 h, on-site within 4 h in-province / 12 h out-of-province / 24 h remote; general faults repaired in 4 h, major faults in 24 h with standby substitution; quarterly patrol and annual deep inspection during warranty; regional service stations with certified engineers and local spare-part stock.
13. Construction Schedule
13.1 Stage Division
The project is divided into five closely linked stages: construction preparation (site survey, detailed design, material list confirmation, construction plan, personnel and tools); equipment arrival and acceptance (production/shipping per contract, joint unpacking inspection); on-site installation (cabinet positioning, battery assembly, cable laying, wiring, lightning/grounding); system commissioning (pre-power checks, unit tests, joint commissioning, parameter setting, function and loaded tests); completion acceptance (trial run, joint acceptance, documentation, training).
13.2 Detailed Schedule (100 kVA Standard Project, ~15 Working Days)
| Stage | No. | Work | Days | Responsible | Remarks |
|---|---|---|---|---|---|
| Preparation | 1 | Site survey and requirement confirmation | 1 | PM | Site conditions, load, cable routes |
| Preparation | 2 | Detailed design and solution confirmation | 2 | Technical lead | Drawings, material list, plan |
| Preparation | 3 | Personnel and tools preparation | 1 | Foreman | Disclosure, tools, consumables |
| Delivery | 4 | Production and transport | Per contract | Business lead | Standard products ship in 7-10 days |
| Delivery | 5 | Incoming joint inspection | 1 | PM + owner | Verify equipment, accessories, docs |
| Installation | 6 | Cabinet and battery cabinet positioning | 1 | Crew | Leveling, fixing, grounding |
| Installation | 7 | Battery assembly and wiring | 2 | Crew | Placement, series/parallel, insulation |
| Installation | 8 | Tray installation and cable laying | 2 | Crew | Power, control, ground cables |
| Installation | 9 | Distribution cabinet installation and wiring | 2 | Electricians | Input/output cabinets, termination |
| Installation | 10 | Lightning/grounding construction | 1 | Crew | SPD installation, equipotential, tests |
| Commissioning | 11 | Pre-power comprehensive check | 0.5 | Engineer | Continuity, insulation, phase sequence |
| Commissioning | 12 | Unit power-on tests | 0.5 | Engineer | UPS, monitoring, distribution |
| Commissioning | 13 | Joint commissioning and parameter setting | 1 | Engineer | Parallel, charging, alarm thresholds |
| Commissioning | 14 | Function and loaded tests | 1 | Engineer | Inverter/bypass, discharge, alarms |
| Acceptance | 15 | 72-hour trial run and rectification | 3 | PM | Track status, resolve issues |
| Acceptance | 16 | Formal acceptance and documentation | 1 | PM + owner | Sign acceptance, hand over documents |
| Acceptance | 17 | Operation and maintenance training | 1 | Engineer | Theory + hands-on |
Note: the schedule is a standard reference; actual duration adjusts per project scale, site conditions and owner coordination.
13.3 Schedule Assurance Measures
Organization: a dedicated project team with a full-time PM coordinates design, production, construction and commissioning; a detailed schedule defines node responsibilities with daily progress tracking.
Materials: production and stocking are arranged in advance with stock for common models; auxiliary materials purchased ahead to avoid shortages.
Personnel: an experienced crew and commissioning engineers are fixed without arbitrary changes; technical and safety disclosure in advance improves efficiency.
Contingency: delay emergency plans cover weather, site changes and transport delays with buffer time, keeping the total period controllable.
Communication: daily progress reporting and advance notice of owner-coordination items avoid delays from untimely cooperation.
14. Construction Organization and Quality/Safety Measures
14.1 Organization Structure
Under a project-manager responsibility system: project manager — overall schedule, quality, safety, cost and communication with the owner; technical lead — detailed design, construction plan, disclosure, commissioning plan, technical problem solving; foreman — site organization, task assignment, plan execution, safety and quality on site; electricians — distribution installation, cable laying, termination, lightning/grounding (certified); commissioning engineer — power-on, parameters, function tests, joint commissioning; safety officer — safety measures, disclosure, daily inspection; QC inspector — process quality acceptance with records.
14.2 Pre-Construction Preparation
Technical: study drawings and solution, verify equipment parameters; site survey (room size, floor load, power entry, load distribution, cable routes) with deviation handling; compile construction plan, work instructions and safety disclosure documents; full technical and safety disclosure to the crew.
Materials: confirm equipment production and shipment per list, track logistics; purchase auxiliary materials (cables, trays, terminals, grounding materials, consumables) with compliant specifications; prepare tools and instruments (drill, cutter, crimping pliers, multimeter, insulation tester, ground resistance tester) with valid calibration; joint unpacking inspection with records.
Site: coordinate entry procedures, clarify site management rules, power/water and safety requirements; clear the work area for equipment movement and installation; plan material/tool storage with labels; arrange safe temporary construction power.
14.3 Core Construction Processes
Cabinet installation: position per drawing with leveling (verticality ≤1.5‰); fix with ≥4 expansion bolts per cabinet, no wobble; side-by-side cabinets coupled with uniform gaps (height difference ≤2 mm); reliable grounding to the equipotential bus with clear labels.
Battery installation: fix the cabinet, install racks with insulation; inspect batteries (no swelling/leakage/damage, normal per-cell voltage); arrange per design with correct polarity and cooling gaps; series connections torqued to spec with good contact; measure total voltage — no short or reverse; connect groups through DC breakers with insulation; install patrol wiring with labels.
Cable laying: install trays level and firm with code-compliant support spacing; inspect cables (model, insulation test); lay straight and layered by voltage/purpose; bending radius ≥10× cable diameter; reserve end margin; tie and label with number, start, end and specification.
Wiring termination: verify phase sequence; strip without damaging conductors; crimp tin-plated terminals with heat-shrink insulation; torque terminals; phase colors A yellow / B green / C red / N blue / PE yellow-green; clean cabinets after wiring.
Lightning/grounding: install SPDs firmly with correct sequence and short straight ground wires (≤0.5 m); equipotential bus connects all enclosures, cabinets, trays and battery racks; connections with tin-plated contact surfaces and firm bolting; test ground resistance after completion.
14.4 Quality Control
Standards: strict compliance with national construction codes, design drawings and manufacturer requirements — one-pass acceptance quality.
Three-level inspection: self-inspection, mutual inspection and special inspection; each process passes before the next.
Key processes: insulation tests, battery polarity checks, pre-power insulation checks and phase-sequence verification are key-controlled with records and QC signatures.
Materials: all incoming equipment and materials carry certificates and test reports; unqualified products are prohibited.
Records: complete construction, test and acceptance records delivered as as-built documentation.
Product protection: avoid scratching or impact on equipment surfaces; keep debris out of equipment; dust protection for installed equipment.
14.5 Safety and Civilized Construction
Safety objectives: zero personal injury, zero electrical fire, zero equipment damage.
Measures: certified operation (electricians/welders hold valid special-operation certificates); helmets, harnesses and PPE; electrical work strictly with power-off, voltage verification, tagging and locking — live work only with supervision and protection; temporary power by certified electricians with RCDs and protected cables, no unauthorized wiring; fire equipment on site, no smoking, hot-work permits with watchers; daily safety disclosure; daily safety patrol with immediate rectification.
Civilized construction: materials stacked neatly and labeled, channels clear; daily waste removal — work finished, site clean; noise control with work scheduled away from rest hours; protect room facilities; observe owner site rules with polite communication.
14.6 Construction Contingency Plans
Electric shock: cut power immediately or separate the victim with insulating material (never bare hands); check consciousness/breathing, CPR if needed, call 120; preserve the scene, investigate and rectify.
Fire: cut power, use dry-powder extinguishers (never water on electrical fires); call 119 for large fires, evacuate orderly; protect equipment and documents; after extinguishing, guard the scene, cooperate with investigation, and comprehensively inspect before resuming.
Fall from height: stop work, move the injured to a safe flat area, check injuries, temporary fixation and bandaging (never move spinal injuries arbitrarily), call 120, protect the scene with photos; rectify fall-protection deficiencies and re-disclose before resuming.
Equipment tipping/mechanical injury: stop related operations, evacuate, first aid and hospital for the injured; temporary support and assessment of tipped equipment; review processes and rectify overloading/illegal operations.
Sudden power outage: shut down running tools and equipment, reset switches; use emergency lighting and evacuate; confirm cause and restoration with the owner/property; re-energize device by device after restoration.
Emergency organization: an emergency management group led by the PM with the safety officer as on-site first responder; pre-entry drills define responsibilities and procedures; daily safety duty with side-station supervision for key operations; first-aid kits, dry-powder extinguishers, emergency lighting and insulated tools kept on site and inspected regularly.
15. After-Sales Service
15.1 Warranty Commitment
All equipment carries a 2-year whole-unit free warranty; core power modules and monitoring modules 3 years; batteries 3 years — from qualified completion acceptance. During warranty, non-artificial, non-force-majeure faults and part damage are repaired/replaced free with no parts, labor or service fees. Replaced parts are original new genuine parts with warranty continuation. Lifetime technical support continues after warranty (consultation, fault finding, firmware upgrades). A dedicated service file records the full lifecycle (installation, commissioning, patrol, repair, replacement) for traceability.
15.2 Response Standards
A 7×24 dedicated hotline operates year-round: call-back with professional answer and initial handling within 30 minutes; remote diagnosis and parameter adjustment within 1 hour for remotely accessible devices; on-site arrival within 4 hours in-province, 12 hours out-of-province, 24 hours in remote areas; general faults repaired on site within 4 hours, major faults within 24 hours, with standby equipment substitution when on-site repair is impossible.
15.3 Routine O&M Service
Periodic patrol: free quarterly on-site patrol during warranty (4 per year) covering running parameters, module health, battery capacity, terminal tightening, dust cleaning, alarm log analysis and lightning/grounding checks, with a formal patrol report and optimization advice.
Preventive maintenance: annual deep preventive maintenance — core component performance tests, cooling duct cleaning, parameter calibration, firmware upgrades — identifying hidden risks in advance.
Battery special maintenance: semi-annual battery inspection (per-cell voltage, internal resistance, temperature, group charge/discharge test, health assessment) with early warning of aging batteries and replacement advice.
Technical consultation: free consultation on use, expansion, upgrade and retrofit with professional configuration advice for room changes and load adjustments.
15.4 Post-Warranty Value-Added Services
Full coverage: annual maintenance contracts providing warranty-period-level on-site repair, part replacement and patrol — all labor and parts covered.
On-demand service: per-visit service fees and cost-only parts, flexible per customer needs.
Expansion and upgrade: power module expansion, monitoring upgrades, battery augmentation and distribution circuit extension protecting prior investment.
Residual value and trade-in: valuation and trade-in for aging equipment, reducing replacement cost.
15.5 Service Network and Support Team
A headquarter customer service center coordinates national resources; technical service stations in six regions (South, East, North, Central, Southwest, Northwest China) maintain resident certified engineers and common spare-part stock for local fast response. All engineers are factory-trained and certified with years of room power system experience. A three-level support system — front-line engineers on site, second-line experts remote, third-line R&D for difficult problems — ensures professional and efficient resolution of all faults.
16. Training Plan
16.1 Training Objectives
Through systematic theory and hands-on training, enable the customer’s O&M staff to fully master the modular UPS working principles, operation standards, daily patrol, common fault finding and emergency handling, and to independently complete daily O&M, correctly identify alarm information, handle general faults and emergencies, and keep the system stable and reliable long term.
16.2 Audience and Forms
Audience: the customer’s room O&M managers, electrical duty staff and IT center technicians, 3-5 persons recommended.
Forms: “theory lecture + on-site hands-on + Q&A assessment” over 1 working day at the acceptance stage; custom advanced courses (advanced O&M, deep fault finding) on request.
Materials: free paper and electronic system operation manual, O&M guide, training PPT and common-fault handbook for later reference.
16.3 Theory Training Content
Fundamentals: modular UPS architecture and working principle; operating logic of double-conversion online, ECO and bypass modes; battery characteristics and charge/discharge principles; redundancy configuration and reliability design.
Operation standards: standard procedures for start, stop, bypass switching and battery discharge test; module functions and operation precautions; monitoring interface parameter interpretation.
Daily O&M: patrol content, frequency and standards; battery maintenance points; cleaning and environment requirements; log keeping standards.
Safety: high-voltage electrical safety codes; verification and tagging before operation; PPE use; prohibited operations.
Faults and emergencies: alarm identification and handling; emergency flows for mains interruption, module fault and bypass transfer; emergency shutdown procedures.
16.4 Hands-On Training Content
Operation practice: under engineer guidance, trainees operate start/stop, manual bypass transfer and battery tests, and navigate the touchscreen menus and parameter settings.
Module swap drill: safe demonstration of hot-swap replacement of power and monitoring modules with installation precautions and latch points.
Patrol practice: complete patrol flow — appearance check, indicator recognition, parameter recording, terminal thermal scan, battery voltage measurement.
Fault simulation: simulated common faults with trainees completing finding, positioning and initial handling, plus reporting and emergency steps.
16.5 Assessment and Certification
Training effectiveness is verified by written and practical tests. Qualified trainees receive an O&M operation certification; those who fail get free retraining and re-examination. A 30-day technical Q&A window follows training, with engineers available for guidance on real work issues, ensuring the training is applied on the job.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.
17.1 Government Data Center Modular UPS Project
Project background. A municipal government service data center’s new room carries the government cloud platform, government service systems and data-sharing platform — core business with extremely high supply reliability requirements, needing Tier 3 room standards plus flexible expansion for future government business growth.
Implementation. Two 200 kVA modular UPS systems in 2N redundant architecture; each system configured with 10 × 20 kVA power modules (N+1); VRLA battery groups providing 2 hours backup; smart distribution system integrated with the environment-monitoring platform for full remote parameter monitoring.
Results. One-pass acceptance with 99.999% supply availability; module-level redundancy completely eliminated single-point-failure risk; overall operating efficiency above 96%, effectively lowering room PUE. Three years of zero-fault operation supported multiple government system expansions — capacity upgrades completed purely by adding power modules without host replacement, greatly saving expansion cost.
17.2 Enterprise Headquarters Room UPS Upgrade Project
Project background. A large manufacturing enterprise’s headquarters room had tower UPS equipment over 8 years old — aging, rising fault rate, capacity insufficient for new server loads, difficult expansion and high O&M cost.
Implementation. An online cutover solution replaced the old system without business interruption: a 160 kVA modular UPS system with 8 × 20 kVA modules (N+1); part of the original battery groups retained with new battery cabinets and a smart patrol unit; input/output distribution cabinets upgraded with a complete three-level lightning/grounding system.
Results. Zero business interruption during cutover; greatly reduced O&M difficulty — module faults replaced online without shutdown; system efficiency improved 4% over the old equipment, saving over 30,000 CNY of electricity annually; reserved expansion slots support 5 years of business growth, protecting the customer’s investment.
17.3 Tertiary Hospital Information Center Power Project
Project background. A tertiary hospital’s information center carries HIS, LIS, PACS and electronic medical record systems; power interruption directly affects diagnosis and treatment services and threatens medical safety — extremely high requirements for supply continuity and stability.
Implementation. A dual-bus architecture with two 120 kVA modular UPS systems, each with 6 × 20 kVA modules (N+1); battery backup of 2 hours covering generator start/switch time; precision distribution with branch-level energy monitoring and alarms; monitoring integrated into the hospital’s smart logistics platform for unified management.
Results. Four years of stable operation with zero supply interruption incidents, successfully resisting multiple mains fluctuations and short outages and keeping medical services continuous. The modular design greatly reduced O&M pressure — the hospital team independently performs daily patrols and module replacement after training, cutting O&M cost by 60%.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.