– Document Title: Computer Room Non-Piped Gas Fire Suppression System Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for Computer Room Non-Piped Gas Fire Suppression System
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Project Background
With accelerating informatization and digitalization, the data room — as the core carrier of information systems — holds large numbers of high-value electronic devices (servers, switches, storage). Its safety and stability directly determine business continuity. Fire is an extremely high-risk hazard in room scenarios: overloaded electrical circuits, overheated equipment and short circuits can all cause fire, while traditional water or dry-powder suppression causes irreversible damage to electronic equipment and cannot meet room suppression needs.
Gas fire suppression systems use clean agents — high suppression efficiency, no residue after discharge, no damage to electronic equipment, good insulation — making them the mainstream fire solution for rooms. The non-piped gas fire suppression system (cabinet-type gas suppression device) requires no complex piping network, offers high integration, flexible installation and short construction periods — especially suitable for small/medium rooms, single protected zones and retrofit projects — and is widely applied in data rooms, shielded rooms, micro-module cold aisles and outdoor integrated cabinets.
This solution designs a non-piped heptafluoropropane gas fire suppression system for rooms, building an integrated “detection-alarm-linkage-suppression” automatic fire system that protects precision electronic equipment and data assets while meeting national fire codes and room O&M requirements.
4.2 Project Objectives
Precise early warning: smoke + heat dual detection achieves precise identification and graded warning in the early smoldering stage, reserving ample time for evacuation and emergency handling.
Efficient clean suppression: heptafluoropropane clean agent with total-flooding rapid suppression — no residue, no corrosion, no damage to electronic equipment — rooms recover quickly after discharge.
Multi-level safety: automatic, manual and mechanical emergency start modes combine automation with human intervention, avoiding false and missed discharge.
System linkage: integration with ventilation, access control, power distribution and environment-monitoring systems — automatic cut-off of non-fire power and damper closing during discharge.
Compliance: strict adherence to GB 50370 and GB 50116 — one-pass fire acceptance.
Convenient O&M: simple structure without complex piping — easy patrol and maintenance, lower later O&M cost and technical threshold.
4.3 Applicable Scope
IDC data centers, enterprise computer rooms, network rooms and server rooms; shielded rooms, classified rooms, confidential archives and data rooms; micro-module cold aisles, integrated cabinet clusters and container rooms; outdoor integrated cabinets, base station rooms and edge computing nodes; UPS distribution rooms, battery rooms, precision AC rooms and weak-current rooms; distribution rooms, transformer rooms and diesel generator rooms.
5. User Requirement Analysis
5.1 Functional Requirements
Detection and alarm: photoelectric smoke and heat detectors monitor smoke and temperature; alarm triggers audible/visual alarms and displays the alarm position.
Automatic suppression: when two different-type detectors alarm simultaneously and fire is confirmed, a 30-second delay countdown starts, then the device discharges heptafluoropropane for total-flooding suppression.
Manual control: emergency start/stop buttons at the protected-zone entrance — press start on confirmed fire; press stop during the delay for false alarms.
Linkage control: close fresh-air/return-air dampers and fire dampers, cut non-fire power and release access control to prevent agent loss and fire spread.
Status monitoring and records: the controller displays running status, equipment faults and alarm events, storing history for query and export.
Mechanical emergency start: on electrical control failure, the mechanical start mechanism on the device opens the container valve directly — the final safety guarantee.
5.2 Performance Requirements
Suppression effectiveness: agent discharge ≤10 s; design concentration meets electrical fire protection; immersion ≥5 min for complete extinction without reignition.
Detection accuracy: sensitivity per national standards, low false-alarm rate, strong EMC immunity for the room’s complex electromagnetic environment.
System reliability: core equipment MTBF ≥100,000 h with fault self-diagnosis (line short/open, equipment faults).
Environmental adaptability: -10℃ to 55℃ working range, moisture/dust resistance and interference immunity.
Discharge uniformity: centrifugal atomizing nozzles ensure uniform diffusion with no dead corners — concentration compliant throughout the space.
5.3 Compliance Requirements
Design, construction and acceptance strictly follow GB 50370-2005, GB 50263-2007 and GB 50116-2013; all fire products carry 3C certification from the national fire-product evaluation center; the completed system passes third-party fire testing and fire authority acceptance with qualified documentation.
5.4 O&M Requirements
Simple Chinese-menu interface — room managers master daily operation after brief training; clear patrol items with visualized status (pressure gauges, indicators); complete after-sales maintenance with periodic patrol and fast fault response; convenient agent refill and equipment replacement with economical lifecycle cost.
6. Design Principles and Applicable Standards
6.1 Applicable Standards
GB 50370-2005 (gas suppression design), GB 50116-2013 (automatic fire alarm design), GB 50263-2007 (gas suppression construction and acceptance), GB 50016-2014 (2018 ed.) (building fire protection design), GB 50174-2017 (electronic information system room design), GB 16670-2006 (cabinet-type gas suppression devices), GA 400-2002 (heptafluoropropane clean gas suppression system requirements), site survey data and customer requirements.
6.2 Design Principles
Safety and reliability: mature heptafluoropropane technology and market-verified products; dual-detector AND logic and three-level start modes reduce false discharge and guarantee suppression; evacuation warnings and pressure relief protect personnel and building structure.
Advanced and applicable: new-generation equipment with forward-looking technology and scenario practicality; optimized configuration without redundant functions; reserved expansion for future room growth.
Economy: optimized architecture and selection controlling initial cost — no piping or cylinder-room cost; simple O&M and low consumable cost — optimal lifecycle cost.
Green: heptafluoropropane has ODP 0 (no ozone depletion); fully vaporizes after discharge with no residue or secondary pollution.
Scalable and compatible: controller with ample loops and linkage points for future zones and detectors; standard communication interfaces integrating with existing fire alarm, environment-monitoring and building automation systems.
6.3 System Architecture
Four subsystems cooperate for full automation from detection to suppression: the suppression execution subsystem — cabinet-type heptafluoropropane device (agent cylinder, container valve, start solenoid, pressure signal generator, atomizing nozzle, cabinet) placed directly in the protected zone; the fire detection subsystem — photoelectric smoke detectors, heat detectors and audible/visual alarms; the control management subsystem — gas suppression controller receiving alarms, logic judgment, start output, linkage management, status display and event records; and the site auxiliary subsystem — discharge indicator, emergency start/stop buttons, pressure relief vent and linkage modules.
6.4 Working Principle
Automatic mode: single detector alarm → pre-alarm with audible/visual warning and position display; two different-type detectors (smoke + heat) simultaneously → confirmed fire, secondary alarm, linkage (close HVAC/dampers/access control, cut non-fire power); 0-30 s adjustable delay (default 30 s) with continuous warning and door closing; after the delay, DC24V start current opens the container valve, agent atomizes through nozzles for total-flooding suppression; pressure rise triggers the pressure signal generator feeding back discharge status; the discharge indicator lights outside the zone; after immersion, ventilation clears the gas before entry.
Manual mode: detection only alarms; personnel confirm and press the emergency start button or controller manual start; delay then discharge as automatic; false alarm — press stop during the delay.
Mechanical emergency mode: on power/line failure, trained personnel pull the safety pin and press the mechanical start handle/impact button on the container valve to discharge directly — no delay; confirm the zone is empty and evacuate immediately after operation.
6.5 Suppression Design Parameters
Design concentration 8% (minimum for electrical fires); discharge ≤10 s; immersion ≥5 min (electrical); charge density ≤1150 kg/m³; storage pressure 2.5 MPa (20℃, low-pressure system); working temperature -10℃ to 55℃; relief vent opening pressure 800-1200 Pa.
6.6 Protected-Zone Design Requirements
Enclosure and doors/windows fire-resistance limit ≥0.5 h (ceiling ≥0.25 h); allowable internal pressure ≥1200 Pa; relatively sealed space with all openings closable (leakage compensation considered); relief vent at ≥2/3 of the net height, preferably on the exterior wall, area calculated per volume and discharge rate; doors open in the evacuation direction and self-close, openable from inside; emergency start/stop buttons, discharge indicator and audible/visual alarm at the entrance; fire dampers on ventilation that close automatically, with mechanical exhaust for post-fire gas clearance; devices arranged along walls with nozzles inward, ≥0.5 m operation space, protection radius ≤5 m per device, uniform multi-device placement.
7. System Architecture and Working Principle
7.1 Cabinet-Type Heptafluoropropane Device Series
Prefabricated total-flooding devices — no external piping, factory-assembled, charged and pressure-tested; on-site fixing and wiring only. Common parameters: HFC-227ea; nominal working pressure 2.5 MPa (20℃), max 4.2 MPa (50℃); design concentration 7-10%; discharge ≤10 s; working temperature -10℃ to 55℃; max charge density 1150 kg/m³; electrical start DC24V ≥1.5A + mechanical emergency; feedback NO contact DC24V/1A, AC220V/0.5A; cabinet IP30, cold-rolled steel ≥1.2 mm, powder coated, computer grey (RAL custom); per GB 16670-2006, GB 50370-2005, GA 400-2002; 3C certified; cylinder design life 20 years, valve 10 years.
QMP40/2.5: 40 L, max charge 46 kg, DN25 container valve, single-outlet centrifugal nozzle, protection ≤50 m³, 1500×500×450 mm, ~65 kg empty / ~110 kg charged.
QMP70/2.5: 70 L, 80.5 kg, DN32, dual-outlet, ≤90 m³, 1700×550×500 mm, ~95/~175 kg.
QMP90/2.5: 90 L, 103.5 kg, DN40, triple-outlet multi-angle, ≤120 m³, 1800×600×550 mm, ~120/~223 kg.
QMP120/2.5: 120 L, 138 kg, DN50, four-outlet 360° uniform, ≤160 m³, 1900×650×600 mm, ~150/~288 kg.
QMP150/2.5: 150 L, 172.5 kg, DN50, multi-outlet high-flow, ≤200 m³, 2000×700×650 mm, ~185/~357 kg.
All: 37Mn seamless steel cylinders with internal anti-corrosion treatment, floor-mounted with expansion bolts.
Container valve: H59 brass forged, nickel-plated; NBR + PTFE seals (zero leakage); DN25/32/40/50; nominal 4.2 MPa, hydrostatic test 6.3 MPa; safety relief at 5.0±0.25 MPa; DC24V solenoid start (insulation ≥100 MΩ, life ≥1000 operations); mechanical press/impact start ≤150 N; integrates filling, relief, start, pressure display and signal feedback.
Pressure signal generator: 0-4.2 MPa range, action 0.2-0.5 MPa, NO contact DC24V/1A AC220V/0.5A, IP65, G1/2″ thread, brass nickel-plated.
Atomizing nozzle: brass/aluminum with hard anodizing; 4-12 orifices by model; atomizing angle 90°-120°; flow coefficient calibrated ±5%; internal-thread connection; anti-clogging flow path with fine uniform atomization.
Cylinder: per GB 5099; 40-150 L; nominal 2.5 MPa, hydrostatic 3.75 MPa; 37Mn steel; internal anti-rust coating; PZ27.8/W21.8 threads; inspection every 3 years; design life 20 years.
7.2 Gas Suppression Controller (KITOZER-QMK)
Control center: main AC 187-242V 50Hz, standby DC24V/7Ah (≥8 h monitoring, ≥30 min alarm); 1-2 loops, 128 address points per loop; single/dual zone with cascade expansion; per-zone start output DC24V/2A; 2 per-zone linkage outputs (NO, AC220V/5A); per-zone discharge feedback input; 128×64 LCD Chinese menus; film keys with three-level password; ≥1000-event history (power-fail retained); RS485 networking; wall-mounted 400×300×120 mm; 0℃ to 55℃, ≤95% RH; IP30; per GB 4717-2005, GB 16806-2006; 3C certified. Features: AND logic (two different-type detectors to start suppression); 0-30 s adjustable delay; manual/auto switch with status indicators; external emergency start/stop; fault self-diagnosis (detectors, line short/open, power, start lines) with audible/visual fault alarms and position display; programmable linkage logic; battery switching with auto-recharge; integration with fire alarm hosts.
7.3 Detection and Alarm Devices
Photoelectric smoke detector (KITOZER-JTY-GD): light-scattering; bus-powered DC15-28V; monitoring ≤300 μA, alarm ≤2 mA; sensitivity class II per GB 4715; protection area 60 m² (ceiling ≤6 m); -10℃ to 55℃, ≤95% RH; red LED (blink 3 s monitoring, steady alarm); electronic addressing 1-128; screw base; ABS V0; IP30; 3C; φ102×43 mm.
Rate-of-rise/fixed-temperature detector (KITOZER-JTW-ZD): A2R compound — fixed 57℃, rate-of-rise ≥3℃/min; bus-powered; monitoring ≤300 μA; protection area 30 m² (≤6 m); -10℃ to 60℃; per GB 4716-2005; 3C; φ102×42 mm; base shared with smoke detector.
Audible/visual alarm (KITOZER-SG): bus-powered DC24V; monitoring ≤100 μA, alarm ≤150 mA; sound ≥85 dB at 3 m; red flash 1-2 Hz; fire-tone variation; addressing 1-128; wall 86-box; ABS; IP43; per GB 26851-2011; 3C; φ90×50 mm.
Discharge indicator (KITOZER-FQD): DC24V, ≤100 mA; red “GAS DISCHARGED — DO NOT ENTER” luminous text ≥500 cd/m²; static on; steel housing powder coated; mounted above the zone entrance; IP30; 300×150×40 mm.
Emergency start/stop button (KITOZER-QA): DC24V; 1 NO start + 1 NC stop contacts (DC24V/1A); press-to-actuate, key reset; key lock against misoperation; status indicators; wall 86-box at 1.5 m; IP54; ABS; 86×86×40 mm.
7.4 Mechanical Pressure Relief Vent (KITOZER-XYK)
0.1 m² / 0.2 m² effective area; opening 800-1200 Pa adjustable, closing ≤600 Pa; closed leakage ≤5%; cold-rolled steel frame with electrostatic powder coating, aluminum vanes with seal strips; wall embedded; -10℃ to 60℃; 0.1 m² type 450×300 mm, 0.2 m² type 600×400 mm; per GB 50370-2005.
7.5 Heptafluoropropane Agent
CF₃CHFCF₃, MW 170.03; boiling -16.4℃, freezing -131℃; liquid density 1.40 g/cm³ (20℃), vapor 7.2 kg/m³; vapor pressure 3.91 bar (20℃); colorless odorless gas, pressurized liquid storage. Suppression mechanism: chemical inhibition (fluorine radicals interrupt chain reactions) plus physical cooling and oxygen dilution; concentrations: Class A surface 5.8%, Class B liquid 6.7%, electrical 7-8%; extinguishes within 10 s in total flooding; insulation breakdown ≥15 kV (safe for energized equipment); fully vaporizes with no residue or corrosion. Safety: low toxicity, NOAEL 9% (design concentration below this — safe for short exposure); non-corrosive; ODP 0; GWP 3220, atmospheric life 33 years; per Montreal Protocol alternatives; purity ≥99.9%, moisture ≤10 ppm, acidity ≤1 ppm.
7.6 Piping and Auxiliary Materials
Hot-dip galvanized steel pipe SC20/SC25 (per GB/T 3091-2015, Q235B, zinc ≥80 μm, threaded connections); flame-retardant cables ZR-RVS 2×1.5 (signal bus), ZR-BV 2.5 (power/start), ZR-BV 1.5 (linkage) per GB/T 19666-2019 class B; organic fire-stop putty (fire-resistance ≥3 h, oil/water resistant 30 days, reusable, -20℃ to 60℃).
8. Detailed Technical Design
8.1 Selection and Configuration Design
Agent quantity per the constant-volume method with the protected zone net volume (L×W×H minus large non-combustible equipment) at 8% design concentration plus leakage compensation; match the device model (≈50 m³/40 L, 90/70 L, 120/90 L, 160/120 L, 200/150 L); multi-device zones (≤10 devices per zone, simultaneous start with response difference ≤2 s) for large or long narrow zones; pressure level 2.5 MPa low-pressure for non-piped applications.
8.2 Protected-Zone Design
Enclosure fire-resistance ≥0.5 h; relief vent at ≥2/3 net height with calculated area; doors outward self-closing, openable from inside; entrance fittings (emergency buttons, discharge indicator, audible/visual); fire dampers on ventilation; mechanical exhaust for post-fire clearance.
8.3 Detection and Control Design
Smoke + heat detectors in AND logic (both required for start); addressing 1-128; controller with 0-30 s delay, manual/auto switch, emergency start/stop; linkage programming for dampers, power cut and access control; RS485 integration with fire alarm hosts and environment-monitoring platforms.
8.4 Installation and Wiring Design
Devices near the zone entrance with nozzles inward, ≥0.5 m operation space, away from heat/flame sources, level with expansion bolts; multiple devices evenly distributed; wiring in galvanized steel pipes with horizontal/vertical layout, code-compliant supports, fire-stop putty at wall/floor penetrations, joints in boxes with insulation, voltage-level separation, start lines separately piped; shielded devices for shielded rooms with waveguide penetrations and shielded relief vents.
8.5 Commissioning Design
Pre-power checks; power-on and parameter setting; single-device tests; smoke/heat alarm tests; AND logic verification; delay and start output tests; emergency start/stop tests; linkage tests (dampers, power cut, access control); simulated discharge with feedback verification; discharge indicator test; DCIM integration; documentation and training.
9. Recommended Configuration and Preliminary Budget
9.1 Configuration Summary (Single Protected Zone Standard)
| No. | Equipment | Specification | Qty | Unit |
|---|---|---|---|---|
| 1 | Cabinet-type heptafluoropropane device | KITOZER-QMP40/2.5 (size per zone volume) | 1 | pc |
| 2 | Heptafluoropropane agent | HFC-227ea ≥99.9% | Calculated | kg |
| 3 | Gas suppression controller (single zone) | KITOZER-QMK-1, wall-mounted, linkage type | 1 | pc |
| 4 | Photoelectric smoke detector | KITOZER-JTY-GD, addressable, 3C | 4 | pcs |
| 5 | Rate-of-rise/fixed-temperature detector | KITOZER-JTW-ZD, A2R, 3C | 4 | pcs |
| 6 | Detector bases | Universal screw type | 8 | pcs |
| 7 | Audible/visual alarm | KITOZER-SG, addressable, wall | 2 | pcs |
| 8 | Discharge indicator | KITOZER-FQD, entrance mounting | 1 | pc |
| 9 | Emergency start/stop button | KITOZER-QA, key lock | 1 | pc |
| 10 | Mechanical pressure relief vent | KITOZER-XYK-0.1 (0.1 m²) | 1 | pc |
| 11 | Input/output modules | KITOZER-MK, linkage | 2 | pcs |
| 12 | Standby battery | DC24V/7Ah (≥8 h endurance) | 1 | set |
| 13 | Installation auxiliaries | Galvanized pipes, cables, boxes, fire-stop putty, labels | Per site | lot |
| 14 | Engineering services | Installation, commissioning, simulated discharge test, transport, inspection support, tax | 1 | item |
9.2 Quotation Notes
The above is a single-zone standard configuration template; the actual configuration and quotation are calculated precisely per zone count, volume and site conditions, with itemized quotation available. All prices are indicative and quoted in RMB (CNY) only — no foreign-currency conversion is provided. The final quotation is subject to a formal quotation document; agent refill, cylinder inspection and annual testing services are available after delivery.
10. Technical Specifications
10.1 System Performance Summary
| Item | Specification |
|---|---|
| System type | Prefabricated cabinet-type non-piped gas suppression |
| Agent | Heptafluoropropane HFC-227ea, purity ≥99.9% |
| Storage pressure | 2.5 MPa (20℃); max 4.2 MPa (50℃) |
| Design concentration | 8% (electrical fires), range 7-10% |
| Discharge time | ≤10 s |
| Immersion time | ≥5 min (electrical) |
| Max charge density | 1150 kg/m³ |
| Device models | QMP40/70/90/120/150 (40-150 L) |
| Protection volume | ≤50 / 90 / 120 / 160 / 200 m³ per model |
| Start modes | Automatic / manual / mechanical emergency |
| Start signal | DC24V, ≥1.5 A |
| Delay | 0-30 s adjustable (default 30 s) |
| Detection logic | Smoke + heat AND (two different-type detectors) |
| Controller | QMK-1, 128×64 LCD, 128 points/loop, 1000+ events |
| Standby power | DC24V/7Ah, ≥8 h monitoring |
| Working temperature | -10℃ ~ +55℃ |
| Relief vent | 800-1200 Pa opening, 0.1/0.2 m² |
| Agent safety | NOAEL 9%, ODP 0, insulation ≥15 kV, no residue |
| Standards | GB 50370, GB 50116, GB 50263, GB 16670, GA 400 |
| Certification | 3C (all fire products), cylinder inspection every 3 years |
| Warranty | 12 months, quarterly patrol |
10.2 Key Component Specifications
| Component | Key Parameters |
|---|---|
| QMP40/2.5 | 40 L, 46 kg max charge, DN25 valve, ≤50 m³, 110 kg charged |
| QMP70/2.5 | 70 L, 80.5 kg, DN32, ≤90 m³, 175 kg |
| QMP90/2.5 | 90 L, 103.5 kg, DN40, ≤120 m³, 223 kg |
| QMP120/2.5 | 120 L, 138 kg, DN50, ≤160 m³, 288 kg |
| QMP150/2.5 | 150 L, 172.5 kg, DN50, ≤200 m³, 357 kg |
| Container valve | H59 brass nickel-plated, DN25-50, 4.2 MPa, relief 5.0±0.25 MPa |
| Pressure signal | 0-4.2 MPa, action 0.2-0.5 MPa, NO contact, IP65 |
| Nozzle | 4-12 orifices, 90°-120°, anti-clog, calibrated ±5% |
| Cylinder | 37Mn steel, 2.5 MPa, hydrostatic 3.75 MPa, life 20 years |
| Controller QMK-1 | 1-2 loops, 128 points, 2 linkage outputs AC220V/5A, RS485 |
| Smoke detector | Photoelectric, ≤300 μA, class II, 60 m², addressing 1-128 |
| Heat detector | A2R fixed 57℃ / rate ≥3℃/min, 30 m² |
| Audible/visual SG | ≥85 dB at 3 m, red flash 1-2 Hz, IP43 |
| Discharge indicator | ≥500 cd/m² red text, entrance mounting |
| Emergency button QA | 1 NO + 1 NC, key reset, IP54 |
| Relief vent XYK | 0.1/0.2 m², 800-1200 Pa, leakage ≤5% |
11. Key Advantages and Customer Value
11.1 Technical Architecture Advantage
Mature, reliable total-flooding suppression technology verified over decades — high efficiency, wide applicability, fully code-compliant, the standard room fire solution. The non-piped prefabricated architecture simplifies the system, reduces fault points and raises reliability. Dual-detection AND logic (smoke + heat both required) greatly reduces false alarms and false-discharge downtime losses — ideal for high-value rooms. Three-level start (automatic/manual/mechanical emergency) combines unattended automation with human intervention; mechanical emergency guarantees suppression in extreme cases. Complete linkage logic closes dampers, cuts non-fire power and releases access control, preventing agent loss and fire spread through ventilation.
11.2 Product Performance Advantage
All core equipment is KITOZER factory-produced with 3C certification, quality materials and precision processing — stable, low failure rate, long life for 7×24 room operation. Heptafluoropropane is clean and non-damaging: good insulation, fully vaporizes after discharge — no residue, corrosion or pollution — no secondary damage to servers, switches or storage; rooms resume operation quickly, minimizing fire loss. The integrated cabinet (cylinder, valve, nozzle, feedback) is compact, saves space, needs no cylinder room — placed in a room corner. Wide working temperature and strong EMC immunity suit the complex room electromagnetic environment.
11.3 Construction and Deployment Advantage
No complex piping, no pipe pressure testing, purging or airtightness tests — only signal/power wiring, device installation and commissioning: small workload, short period, low impact on room operation — ideal for retrofit projects. Cabinet devices flexibly arranged per zone shape and size — single or multiple units, from small weak-current rooms to medium data rooms, shielded rooms, container rooms, micro-module cold aisles and outdoor cabinets. Standardized construction per GB 50263 with certified crews and three-level quality inspection — one-pass fire acceptance.
11.4 Cost and O&M Advantage
Lower initial cost than piped systems (no pipes, fittings, installation labor or cylinder room) — especially economical for single or few zones. Simple daily patrol (pressure gauges, controller status, detector appearance) — room managers maintain independently after brief training, no long-term specialist presence, low O&M cost. Long equipment life; heptafluoropropane is chemically stable (5-10 years without replacement when tests pass); modular parts replaced individually — low repair cost.
11.5 Customization Service Advantage
One-on-one design with on-site survey — precise agent quantity and device configuration per area, height, layout and protection grade — compliant, effective and economical. Full one-stop service from design, supply, installation, commissioning, acceptance, training to maintenance — a single interface for the customer. Flexible customization: cabinet color/size/appearance per decoration; special devices for shielded, explosion-proof and outdoor scenarios; linkage logic tailored to existing environment-monitoring platforms. Original-Manufacturer Supply — no middlemen, better price, direct after-sales and professional technical support.
12. Technical Q&A (50+ Items)
12.1 Fundamentals
Q1: What is a non-piped gas fire suppression system?
A: Also called a prefabricated gas suppression system or cabinet-type gas suppression device: the agent cylinder, start valve and nozzles are all integrated in one cabinet with no external piping, placed directly in the protected zone. On fire, the agent discharges from the cabinet nozzles to reach the suppression concentration in the zone — total-flooding suppression.
Q2: What is the difference between non-piped and piped systems?
A: Structure — piped systems have a separate cylinder room with piping to each zone; non-piped devices sit directly in the zone. Scenarios — piped suits multi-zone, large projects; non-piped suits single-zone, small/medium areas, retrofits and hard-to-pipe sites. Cost — non-piped is cheaper for single zones; piped amortizes better for many zones. Construction — non-piped is simple and short; piped is complex and long.
Q3: What is the suppression principle of heptafluoropropane?
A: Chemical inhibition primarily, physical cooling secondarily: heated decomposition produces fluorine radicals that combine with active hydrogen/hydroxyl radicals in the combustion reaction, interrupting the chain reaction; liquid vaporization absorbs heat, lowering temperature; the gas also dilutes oxygen — aiding extinction.
Q4: Is heptafluoropropane harmful to people? Can it discharge with people present?
A: At the design concentration (typically 8%), it is safe — NOAEL is 9%, above the design concentration; short exposure causes no harm. However, codes require evacuation during the delay: discharge produces noise and cold airflow, and occupancy affects suppression. The 30 s evacuation delay ensures safe withdrawal.
Q5: What fires can the non-piped system extinguish?
A: Class A surface fires (paper, wood, fabric, archives); Class B liquid and meltable-solid fires (gasoline, diesel, lubricants, paraffin); Class C gas fires (with gas supply cut); Class E electrical fires (energized equipment, cables, electronics, computer rooms — the main room type). Not for active metals, metal hydrides or oxidizer-containing chemicals.
Q6: Why must rooms use gas suppression instead of water sprinklers?
A: Rooms hold high-value precision electronics; water causes short circuits, corrosion and data loss — secondary losses far exceeding the fire itself. Gas agents are insulating, residue-free and non-damaging — the standard room solution; GB 50174 requires Class A and B rooms to be equipped with clean gas suppression.
Q7: What is total-flooding suppression?
A: The agent is discharged to fill the entire enclosed protected zone to the design concentration, extinguishing fire anywhere in the space regardless of the fire’s location — essential for rooms where the fire point cannot be predicted.
Q8: What is the AND (dual-detector) logic?
A: Suppression starts only when two different-type detectors (smoke + heat) alarm simultaneously; a single detector alarm only pre-alarms — greatly reducing false discharge from dust, insects or equipment heat.
Q9: What is immersion time and why does it matter?
A: The period the agent must remain at the design concentration after discharge to cool and prevent reignition — ≥5 min for electrical fires; the enclosed zone maintains the concentration during immersion.
Q10: Why is the insulation of the agent important?
A: Breakdown voltage ≥15 kV means the agent can be safely discharged over energized equipment without short-circuiting — critical for E-class electrical fires in live rooms.
12.2 Selection
Q11: How is the device size determined for a room?
A: Calculate the required agent quantity from the zone net volume (L×W×H minus large non-combustible equipment) at the 8% design concentration with leakage compensation, then match the device: ≈50 m³/40 L, 90/70 L, 120/90 L, 160/120 L, 200/150 L; confirm by a professional engineer per the standard formula.
Q12: Can multiple devices protect one zone?
A: Yes — for large volumes or long narrow shapes, multiple cabinets combine; per GB 50370, a zone may have up to 10 prefabricated devices, all starting simultaneously with response difference ≤2 s for uniform concentration.
Q13: What is the difference between 2.5 MPa and 4.2 MPa storage?
A: 2.5 MPa is the low-pressure system — higher charge ratio (more agent per volume), short delivery distance, suited to close-range discharge; cabinet devices mostly use it at lower cost. 4.2 MPa high-pressure delivers over long distances — mainly for piped systems. Non-piped room scenarios are fully served by 2.5 MPa.
Q14: Is the relief vent mandatory?
A: Yes — discharge rapidly raises pressure in the sealed zone; without relief, pressure could exceed the enclosure limit and damage walls, doors or glass. The vent opens at the set pressure, releases excess gas and protects the structure while maintaining the suppression concentration.
Q15: Must both smoke and heat detectors be installed?
A: Yes — codes require the AND logic of two detector types for gas suppression zones; single-type installation risks false alarms (dust/insects on smoke, equipment heat on heat) and false discharge. Two-type confirmation is the necessary design.
Q16: Heptafluoropropane vs. IG541 — which for rooms?
A: Mechanism — HFC-227ea chemical inhibition (low concentration, small quantity); IG541 physical suffocation (high concentration, large quantity). Storage — 2.5/4.2 MPa vs. 15/20 MPa. Environment — HFC ODP 0 with some GWP; IG541 inert blend, better. Cost — HFC systems cheaper; IG541 needs more cylinders. Rooms: small/medium single zones prefer HFC non-piped; large multi-zone data centers may choose IG541 piped.
Q17: What is the protection radius of one device?
A: About 5 m per device — devices arranged along walls with nozzles inward; multiple devices evenly distributed for long narrow zones to ensure uniform concentration.
Q18: How is the agent quantity calculated?
A: Per GB 50370: W = K × (V/S) × C/(100-C), where V is the net volume, C the design concentration (8%), S the specific volume at the zone temperature, K the altitude/leakage correction — followed by discharge-rate verification for nozzle sizing.
Q19: What pressure is shown on the gauge, and what does the color zone mean?
A: Green = normal working pressure; yellow = high (usually high ambient temperature — check heat/sunlight); red = low (leakage — contact professionals to check and recharge promptly).
Q20: Can the system protect multiple zones?
A: The controller supports single/dual zone with cascade expansion; each zone has independent detectors, devices and start outputs — multi-zone projects use per-zone devices under zoned control.
12.3 Installation
Q21: Where should the cabinet device be installed?
A: Near the zone entrance for emergency operation and maintenance; nozzles inward, away from large equipment blocking airflow; ≥0.5 m operation space around; away from heat sources and flammables, no direct sunlight; level, fixed with expansion bolts; multiple devices evenly distributed.
Q22: What are the door/window requirements? Do they need full sealing?
A: Full sealing is not required: enclosure/doors/windows fire-resistance ≥0.5 h; gaps not oversized and closable during discharge; allowable internal pressure ≥1200 Pa; doors open in the evacuation direction, self-close, and evacuation doors openable from inside. Normal gap leakage is compensated in the design quantity.
Q23: How long does construction take?
A: Single-zone small projects: 3-5 days on site (piping, installation, wiring, commissioning); multi-zone or decoration-linked projects longer; 50%+ shorter than piped systems — low impact on room operation.
Q24: Can construction proceed with the room running?
A: Yes — with protection: work-area isolation limiting dust; certified electricians for live areas per room rules; dust-free piping methods; devices may be installed empty with agent charged before acceptance; commissioning coordinated away from business peaks.
Q25: What are the piping requirements?
A: Detection/control lines in galvanized steel pipes, not bare; horizontal/vertical layout with code-compliant supports; fire-stop putty at wall/floor penetrations; joints in boxes by welding or crimping with insulation; different voltage levels and systems not in one pipe; start lines separately piped away from signal lines.
Q26: What pre-power checks are required?
A: Verify wiring (no wrong/missing/short connections), line continuity and insulation, address settings, all devices fixed; confirm no tools/debris; then power on and test per commissioning procedure.
Q27: What does commissioning include?
A: Power-on and parameter setting; per-device tests; smoke/heat alarm tests; AND logic verification; delay and start output; emergency start/stop; linkage tests (dampers, power cut, access control); simulated discharge with feedback and discharge indicator; DCIM integration; documentation.
Q28: What are the safety measures during construction?
A: Certified electricians; de-energized work with tagging; insulated tools and PPE; helmets; no smoking, extinguishers, hot-work permits; dust control; product protection (dust covers, capped pipes, warning signs, manual mode before handover).
Q29: How is a retrofit of an old room handled?
A: Survey the existing ceiling/wall/floor conditions, choose device positions avoiding conflicts, schedule off-peak work windows, use dust-free methods, and stage construction to keep the room operational.
Q30: What acceptance items apply?
A: Device quantities/models/positions per design; piping compliance; wiring and addressing; alarm and linkage functions; delay and start logic; simulated discharge and feedback; discharge indicator; relief vent; documentation (3C certificates, test reports, as-built drawings) — passed with the fire authority.
12.4 O&M
Q31: What daily maintenance is required?
A: Daily/weekly patrol — controller status and alarms, gauge in the green zone, detector/audible-visual appearance, emergency button seals, doors/windows and relief vent; quarterly — detector filter cleaning, standby battery test, connection checks; annual — professional full inspection (simulated alarms, linkage tests, agent weighing, valve sealing, cylinder appearance) with a report.
Q32: How often is the agent replaced?
A: Heptafluoropropane is chemically stable with no fixed expiry when sealed. Annual weighing: if weight loss ≤5% of charge, continue use; >5%, replenish or recharge. In normal environments, 5-10 years without replacement when tests pass.
Q33: How often are cylinders inspected?
A: Cylinders are pressure vessels — per the gas cylinder safety regulation, seamless steel cylinders are inspected every 3 years (hydrostatic, airtightness, appearance) by qualified bodies; design life 20 years, then scrap and replace.
Q34: What if a false alarm occurs? Will it discharge?
A: Stay calm — single-detector alarm is pre-alarm only, no discharge. On dual-detector alarm, the 30 s delay allows pressing the emergency stop button or controller stop to abort — no false discharge. Keep the zone clean (dust/moisture) to reduce false alarms.
Q35: What does the gauge reading in the yellow/red zone mean?
A: Yellow — pressure high, usually ambient temperature (check sunlight/heat); red — pressure low, likely leakage — contact professionals to inspect and recharge promptly.
Q36: What should be checked during the quarterly patrol?
A: System status and fault records; gauge readings; detector/audible-visual/discharge indicator appearance; emergency button seals; relief vent condition; line and terminal tightness; standby battery; zone door/window closure.
Q37: How is the standby battery maintained?
A: Quarterly discharge test via the controller; replace aging batteries (DC24V/7Ah); the controller auto-switches to battery on main power loss (≥8 h monitoring) and recharges on recovery.
Q38: How is the discharge feedback verified?
A: During the simulated discharge test, the pressure signal generator’s contact closes and the controller records the discharge event; the discharge indicator lights — verified per commissioning and annual tests.
Q39: What records should be kept?
A: Daily patrol logs, quarterly maintenance records, annual test reports, weighing records and cylinder inspection certificates — for compliance and trend analysis.
Q40: Is operator training provided?
A: Yes — 1-day training (theory + hands-on): system principles, controller operation, alarm handling, patrol practice, emergency procedures, with assessment and manuals; free retraining for personnel changes.
12.5 Compliance
Q41: Does the system require fire acceptance?
A: Yes — gas suppression is a building fire installation; after completion it must pass fire acceptance or filing with a qualified testing report before use; the fire authority accepts after review.
Q42: What national standards apply?
A: GB 50370-2005, GB 50263-2007, GB 50116-2013, GB 50174-2017, GB 50016-2014 (2018 ed.), GB 16670-2006.
Q43: Must fire products have 3C certification?
A: Yes — heptafluoropropane devices, gas suppression controllers, detectors and audible/visual alarms are in the mandatory certification catalog; uncertified products are non-compliant and cannot pass fire acceptance.
Q44: How many prefabricated devices per zone at most?
A: Per GB 50370, no more than 10 per zone, all starting simultaneously with response difference ≤2 s — uniform agent distribution.
Q45: What are the evacuation door requirements?
A: Open in the evacuation direction and self-close; openable from inside without locking; fire-resistance ≥0.5 h; entrance fitted with audible/visual alarm, discharge indicator and emergency start/stop buttons.
Q46: What documentation supports acceptance?
A: 3C certificates, type test reports, agent test reports, installation records, commissioning and test records, simulated discharge records, as-built drawings — delivered for filing.
Q47: Is the controller required to network with the fire alarm host?
A: Recommended — RS485 integration enables centralized monitoring and unified management; the controller operates standalone if no host exists.
Q48: What about compliance for shielded rooms?
A: Shielded devices with equipotential connection to the shielding shell, waveguide penetrations for external devices, shielded relief vents and shielded piping treatment — passing both confidentiality assessment and fire acceptance.
Q49: What are the responsibilities after delivery?
A: The owner maintains daily patrol and records; the supplier provides quarterly patrol during warranty, annual professional inspection, weighing and cylinder inspection coordination, and refill services.
Q50: When should the manufacturer be called?
A: For gauge readings outside green, weight loss >5%, any alarm that cannot be identified, discharge events (refill and reset), cylinder inspection scheduling, or any work on energized or pressurized systems — engage qualified professionals.
12.6 Service
Q51: What is the warranty?
A: 12-month overall warranty from acceptance — quality/installation faults repaired and parts replaced free with on-site service; replaced parts carry a renewed 12-month warranty; exclusions: artificial damage, force majeure, improper operation (paid repair available).
Q52: What is the response commitment?
A: 7×24 hotline; 1-hour call-back with guidance; urban on-site within 4 hours, suburban 8; general faults repaired within 24 hours; major faults trigger an emergency mechanism with senior engineers and standby equipment; closed-loop handling with a fault report and follow-up.
Q53: What does the patrol service include?
A: Quarterly free on-site patrol during warranty (status, wiring, pressure, function tests); annual comprehensive maintenance (detector cleaning, controller dusting, terminal tightening, cylinder pressure/weight, full function tests) with a formal report.
Q54: What services continue after warranty?
A: Lifetime paid maintenance with annual agreements at preferential rates; long-term supply of detectors, solenoids, gauges and agent at transparent prices; professional refill and testing; system upgrades (zones, capacity, controller functions, DCIM integration).
Q55: How is the agent refilled after discharge?
A: Qualified professionals recover/refill per the rated charge with density verification, then pressure and airtightness tests and re-sealing; the system is re-commissioned and records updated.
Q56: What value-added services exist?
A: Free technical consultation; remote support by phone/video; code-update interpretation; dedicated service specialist per project; training materials and free new-employee training.
Q57: How is the total lifecycle cost controlled?
A: Lower initial cost (no piping/cylinder room); simple daily O&M by room staff; long-life agent (5-10 years); modular part replacement; transparent refill and spare prices — economical over the lifecycle.
Q58: What are the green credentials?
A: ODP 0 (no ozone depletion), compliant with Montreal Protocol alternatives, fully vaporizes with no residue — no secondary pollution to the room or environment.
Q59: How is service quality supervised?
A: Closed-loop fault handling with reports and follow-up; quarterly patrol reports delivered; dedicated specialist per project; complaint channel with satisfaction tracking.
Q60: Why choose the KITOZER/Lain solution?
A: 20+ years of room engineering experience, source-factory 3C-certified products, precise design per standard formulas, standardized construction with one-pass acceptance, full one-stop service and complete after-sales network — a reliable non-piped gas suppression solution for rooms.
13. Construction Schedule
13.1 Overall Period
For a single standard protected zone, the total period is about 7 calendar days across five stages: preparation, piping, equipment installation, commissioning and acceptance. Multi-zone projects work in parallel with proportionally extended periods.
13.2 Stage Schedule
| Stage | Work | Days | Responsible | Coordination |
|---|---|---|---|---|
| 1. Preparation | Site survey (device points, pipe routes); drawing review and safety disclosure; material/equipment incoming inspection; tools and temporary facilities; product protection | 1 | PM | Owner provides entry conditions, power, storage |
| 2. Piping | Line marking; bracket fixing; galvanized pipe installation; wall/floor openings with fire-stop putty; cable pulling, continuity and insulation tests; boxes and detector bases | 2 | Foreman | Owner coordinates work windows and interfaces |
| 3. Equipment installation | Controller wall mounting; detectors, audible/visual alarms, discharge indicator; emergency buttons, relief vent; device positioning and fixing | 2 | Crew | — |
| 4. Commissioning | Wiring check; power-on and parameter setting; alarm and linkage tests; delay and start tests; simulated discharge with feedback; discharge indicator test; DCIM integration | 1 | Engineer | Owner O&M staff observe |
| 5. Acceptance | Self-inspection and rectification; documentation; owner/fire acceptance support; training and handover | 1 | PM, engineer | Owner organizes acceptance |
13.3 Schedule Assurance
Plan control: detailed daily plan with progress meetings and lag adjustment. Personnel: sufficient certified staff with overtime/expansion as needed. Materials: advance stocking ensuring on-time arrival. Coordination: communication with the owner, supervision and other contractors resolving cross-operation issues. Technical: early resolution of technical difficulties and optimized processes avoiding delays.
13.4 Product Protection
Equipment stored properly (moisture/rain/impact protection, original packaging for precision devices); installed controllers and detectors covered with dust covers; pipe ends capped after installation; warning signs on devices — no unauthorized touching of valves or start buttons; wall/floor openings repaired neatly after cutting; system set to manual mode after commissioning with dedicated caretaker before handover.
14. Construction Organization and Quality/Safety Measures
14.1 Organization Structure
Project manager (1): overall management, progress, quality, safety, coordination. Technical lead (1): disclosure, technical guidance, commissioning, acceptance. Electrical crew (2-4 certified): piping, wiring, installation. Safety officer (1): site safety, inspection, disclosure. QC inspector (1): material inspection, process checks, concealed-work acceptance.
14.2 Pre-Construction Preparation
Technical: study drawings and manuals; technical and safety disclosure; process and acceptance standards; key-process control points. Materials: verify certificates, test reports, appearance, sizes and quantities; unqualified products rejected; proper storage. Tooling: multimeter, insulation tester, drill, crimping tools, level, torque tools, fire equipment, PPE. Site: clear the area, confirm power and storage, protect finished work, demarcate the zone with signs.
14.3 Core Construction Processes
Piping: mark positions; fix brackets; lay galvanized pipes horizontal/vertical with code-compliant supports; open wall/floor penetrations and pack with fire-stop putty; pull cables, test continuity and insulation; install boxes and bases.
Equipment installation: mount the controller on the wall (level, firm); install detectors, audible/visual alarms and discharge indicator at designed positions; install emergency buttons at 1.5 m and relief vents embedded in walls; position and fix the cabinet device (level, expansion bolts, ≥0.5 m operation space, nozzles inward).
Wiring: signal bus ZR-RVS 2×1.5, power/start ZR-BV 2.5, linkage ZR-BV 1.5; address devices per plan (no duplicates); joints in boxes by welding/crimping with insulation; start lines separately piped; labels on all circuits.
Commissioning: full wiring check; power-on and parameter setting; smoke/heat alarm tests; AND logic verification; delay (0-30 s) and start output tests; emergency start/stop tests; linkage tests (dampers, power cut, access control); simulated discharge with pressure feedback and discharge indicator; DCIM integration; documentation.
14.4 Quality Control
Three-inspection system: self, mutual and special inspection per process; next process after passing. Material control: all products with certificates and 3C; sampling re-checks of key parameters. Key-process supervision: piping concealment, device fixing and commissioning supervised on site; concealed works accepted and signed before covering. Quality records: complete, accurate, synchronized with progress — delivered as as-built documentation.
14.5 Safety and Civilized Construction
Safety: certified staff; de-energized work with tagging (“whoever cuts power restores it”); insulated tools and PPE; no smoking, extinguishers, hot-work permits with watchers; helmets and harnesses for high work; daily power cut-off and site check. Civilized: materials stacked neatly, channels clear; daily cleaning — work finished, site clean; noise control; owner site rules observed; protection of finished work.
14.6 Contingency Plans
Electric shock: cut power immediately, separate the victim (never bare hands), ventilated area, check breathing/heartbeat, CPR if needed, call 120, preserve the scene, investigate and rectify. Equipment damage: stop work, protect the scene, report, contact the factory for assessment and repair, coordinate standby or expedited repair. Schedule delay: adjust the plan, add staff, optimize processes, communicate with the customer, analyze causes and prevent recurrence.
15. After-Sales Service
15.1 Warranty Commitment
12-month overall warranty from qualified acceptance; quality/construction faults repaired and parts replaced free with on-site service. Scope covers all supplied equipment/materials and construction; exclusions: artificial damage, force majeure, improper operation (paid repair available). Warranty continuation: repaired/replaced parts carry a renewed 12-month warranty from replacement.
15.2 Fault Response Mechanism
7×24 hotline year-round; 1-hour call-back with guidance; urban on-site within 4 hours, suburban 8; general faults repaired within 24 hours; major faults trigger the emergency mechanism (senior engineers with standby equipment) minimizing downtime; closed-loop handling with a fault report (cause, prevention) and follow-up.
15.3 Periodic Patrol and Maintenance
Quarterly patrol (free during warranty): full system check — equipment status, wiring, pressure, function tests — identifying and handling hidden risks early. Annual maintenance: detector cleaning, controller dusting, terminal tightening, cylinder pressure and weight, full function tests — with an annual report. Patrol reports delivered after every visit documenting status, findings, results and recommendations.
15.4 Lifetime Maintenance and Spare Parts
Lifetime paid maintenance after warranty with annual agreements at preferential rates; long-term supply of detectors, solenoids, gauges and agent (original, transparent, timely); professional refill and testing by qualified organizations; system upgrade services (zones, capacity, controller functions, DCIM integration) extending system life.
15.5 Technical Support and Consultation
Free technical consultation year-round; remote support by phone/video; code-update interpretation and compliance advice; a dedicated service specialist per project for single-interface service.
16. Training Plan
16.1 Training Objectives
Enable the owner’s O&M managers to fully master the system’s working principles, operation, daily maintenance and emergency procedures — independent patrol, basic operation and simple fault handling for safe, normal operation.
16.2 Audience and Levels
Operation level (duty/patrol staff): basic operation, daily patrol, alarm handling — operate correctly, identify anomalies, report correctly. Management level (room supervisors/O&M leads): principles, management rules, emergency command, maintenance management — overall management and coordination. Technical level (weak-current/fire technicians): commissioning, fault finding, simple repair — common fault handling and coordination with professional maintenance.
16.3 Training Content
Theory: fire basics and room fire risk; gas suppression function, principle and scope; national fire codes; system composition, device functions and workflow; three start modes and scenarios; agent characteristics and safety; daily O&M rules and patrol requirements; fire and false-alarm emergency flows.
Hands-on: controller panel operation (status viewing, silence/reset, manual/auto switching, history query, standby battery test); device identification and inspection (detectors, audible/visual, discharge indicator, emergency buttons, device, gauge); emergency button operation (start/stop/key reset); simulated alarm drills (single and dual detector) with handling flow; patrol practice step by step; common fault identification and simple handling (communication, detector, low pressure).
16.4 Methods and Assessment
“Theory lecture + on-site demonstration + hands-on practice + Q&A” — practical and interactive, learning by doing. Standard duration 1 day (half theory, half practice), adjustable per customer needs. Assessment: written + practical — pass before independent operation; free retraining and re-examination for failures.
16.5 Documentation
Delivered at training completion: system operation manual, daily maintenance manual, emergency flow chart, electronic courseware, and original manuals, certificates and test reports; one free new-employee training for personnel changes.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.
17.1 Enterprise Data Center Room Gas Fire Project
Project overview. A new data center with three independent protected zones — main hall, UPS distribution room and battery room — totaling about 180 m² at 3.2 m clear height, a core business node requiring safe, non-damaging suppression without affecting equipment operation.
Implementation. Cabinet-type heptafluoropropane non-piped systems, each zone independently controlled: main hall with 2 × 120 L devices, 8 smoke + 8 heat detectors, 2 audible/visual alarms, 1 discharge indicator, 1 emergency button and 1 relief vent; UPS room with 1 × 90 L device; battery room with 1 × 70 L device; three start modes with linkage closing precision AC and fresh-air systems.
Results. Seven-day construction with one-pass fire acceptance; stable operation with accurate warning; multiple fire inspections passed — effectively safeguarding the data center, highly recognized by the customer.
17.2 Shielded Room Gas Fire Project
Project overview. A classified unit’s new electromagnetic shielded room of about 40 m², welded shielding shell, with strict requirements for shielding performance, non-corrosiveness and no damage to the shielding structure.
Implementation. Customized design for the shielded room: 1 × 70 L device with shielded cabinet equipotentially connected to the shielding shell; detectors and audible/visual devices connected through waveguide penetrations preserving shielding integrity; electromagnetic shielded relief vent combining relief and shielding; dual-detector AND logic avoiding false discharge; all piping shielded with professional shielded sealing at shell penetrations.
Results. Shielding effectiveness unaffected after installation; all indicators compliant with national confidentiality standards and fire codes; one-pass fire acceptance and confidentiality assessment; three years of fault-free operation with passing routine tests.
17.3 Internet Company Micro-Module Cold Aisle Fire Project
Project overview. A room upgrade with 4 micro-module cold aisles, each an independent enclosed space, requiring fire protection adapted to the micro-module structure — easy installation, no structural modification, and environment-monitoring integration.
Implementation. One prefabricated non-piped system per micro-module: 2 × 40 L devices at both ends of the cold aisle; compact gas controller embedded in the module’s distribution cabinet saving space; smoke/heat compound detectors inside the aisle; RS485 interface to the customer’s environment-monitoring platform for centralized monitoring and alarm upload.
Results. Installation without modifying the micro-module structure; all installation and commissioning completed in 3 days; smooth platform integration with real-time alarm upload; stable operation meeting the customer’s intelligent O&M needs.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.