Table of Contents
Toggle1. Cover / Document Information
– Document Title: Computer Room Rack-Mounted UPS System Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for Computer Room Rack-Mounted UPS System
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Project Background
With digital transformation advancing across industries, business operations depend heavily on information systems. The continuous, stable operation of core IT equipment — servers, switches, storage and security devices — directly affects business continuity and data security. Power anomalies such as mains failure, voltage fluctuation, harmonic interference and surge impact can cause equipment downtime and data loss at best, and business stoppage, production accidents and major economic loss at worst.
As the core protection equipment of the computer room power system, the uninterruptible power supply (UPS) seamlessly switches to battery power during mains anomalies, delivering continuous, stable and clean power to the load. The rack-mounted UPS, with its standard 19-inch rack-mount structure, perfectly matches the modern cabinet-based, modular deployment trend of computer rooms. Compared with traditional tower UPS, it greatly saves room space, simplifies wiring and enables centralized management, making it the mainstream choice for small and medium rooms, edge nodes and network cabinets.
4.2 Application Value
This solution builds a complete uninterruptible power protection system around the KITOZER high-frequency online rack-mounted UPS, matched with VRLA batteries, intelligent power distribution units and remote monitoring modules:
Zero interruption: the double-conversion online architecture switches between mains and battery with zero millisecond gap, completely eliminating power-loss impact on loads.
Clean power: mains-side voltage fluctuation, harmonics, surges and interference are isolated, providing pure, stable sine-wave power for IT equipment.
Space efficiency: the standard 19-inch rack structure installs directly in the server cabinet without occupying floor space, adapting to high-density deployment.
Intelligent O&M: remote status monitoring, fault alarm and parameter configuration reduce O&M difficulty and improve management efficiency.
Flexible expansion: full power coverage, customizable backup time, and parallel redundancy on medium/large models meet business expansion at different stages.
4.3 Project Objectives
Through scientific selection and standardized design, this solution achieves:
– A highly reliable uninterruptible power system — seamless switch to battery on mains failure, keeping core loads running and reserving sufficient time for orderly shutdown or generator startup.
– Standard rack-mounted deployment adapting to existing server cabinets, unified equipment layout, optimized space utilization and standardized wiring.
– Full-status visualized monitoring with multi-channel timely alarms, improving O&M efficiency and reducing fault risk.
– Economy with expansion headroom — meeting current load needs while reserving 3-5 years of growth margin.
– Compliance with national and industry standards, standardized and safe construction, and complete after-sales and training support for long-term stable operation.
4.4 Applicable Scope
This rack-mounted UPS technical solution applies to power protection for:
– Small and medium enterprise data rooms, office rooms and network rooms
– Branch rooms and weak-current rooms in government, education, medical and finance sectors
– Edge computing nodes, 5G base station rooms and IoT site rooms
– Single server racks and small multi-rack rooms for centralized power supply
– Computer room UPS upgrades and replacement of aging equipment
5. User Requirement Analysis
5.1 Power Reliability Requirements
Core room loads — servers, switches, routers, storage and security hosts — demand extremely high supply continuity with no interruption. The UPS must feature an online double-conversion architecture with zero switching time on mains failure, plus multiple protections (overvoltage, undervoltage, short circuit, overload, overtemperature) that isolate mains-side power quality problems and keep loads stable long term.
For high-importance rooms, bypass backup and parallel redundancy are required so a single device failure cannot interrupt supply, further improving system reliability and availability.
5.2 Space Deployment Requirements
Modern rooms use standardized cabinet deployment with limited floor space; tower UPS units occupy floor area and create messy cabling. The UPS must adopt a standard 19-inch rack structure installed directly inside server cabinets, unified with switches and servers, achieving intensive space utilization, separated power/weak-current wiring and improved tidiness and maintainability. Device depth must suit conventional cabinets, with front maintenance and no rear service space.
5.3 Intelligent O&M Requirements
With limited O&M staff and no 24-hour on-site duty, the UPS needs complete intelligent monitoring and alarming: local status display plus network access to the room environment-monitoring system for remote viewing of input/output voltage, load rate, battery capacity and temperature; multi-channel alarms (audible/visual, SMS, email) for mains anomaly, battery low voltage, overload and overtemperature; plus event logging, automatic battery testing and remote on/off.
5.4 Expansion and Upgrade Requirements
As business grows, room loads increase. The UPS must reserve reasonable power margin; medium/large models support parallel operation of multiple units for capacity expansion and redundancy without whole-system replacement, protecting prior investment. Battery backup time is configurable by adding battery groups to match different endurance needs.
5.5 Environmental Adaptability Requirements
Room equipment runs continuously; the UPS must suit normal room temperature/humidity with good heat dissipation and low noise. For small rooms and weak-current rooms without precision cooling, a wide working temperature range, dust resistance and anti-interference capability are required for stable operation in complex environments.
5.6 Construction and Service Requirements
A professional team must complete on-site installation, wiring and commissioning per electrical safety codes with firm connections and clear labeling. Complete after-sales support is required: sufficient warranty, fast on-site fault response, periodic patrol and maintenance, and operation training so O&M staff master daily operation and basic fault handling.
6. Design Principles and Applicable Standards
6.1 Applicable Standards
– *Code for Design of Data Centers* — GB 50174-2017
– *Uninterruptible Power Systems (UPS) — Part 1: General* — GB 7260.1-2008
– *Uninterruptible Power Supply (UPS) for Telecommunications* — YD/T 1095-2008
– *Code for Design of Low-Voltage Electrical Installations* — GB 50054-2011
– *Code for Design of Protection of Structures against Lightning* — GB 50057-2010
– *Code for Construction and Acceptance of Electronic Information System Computer Rooms* — GB 50462-2016
– *Information Technology Equipment — Safety — Part 1: General Requirements* — GB 4943.1-2011
– KITOZER rack-mounted UPS enterprise technical standards
6.2 Design Principles
(1) Reliability first. Mature double-conversion online architecture, industrial-grade core components and multiple electrical protections; redundancy design for critical scenarios to eliminate single points of failure; strict electrical-code construction — full-process high availability from product to installation.
(2) Standardization. UPS hosts, distribution units and battery racks all use 19-inch standard rack dimensions compatible with mainstream server cabinets; mounting, openings and wiring follow industry standards for easy deployment, strong adaptability and later upgrade/replacement.
(3) Efficiency and energy saving. High-efficiency models with mains-mode conversion efficiency ≥96% and ECO mode ≥98%, reducing self-consumption and heat, lowering room cooling load and electricity cost in line with green data center concepts.
(4) Intelligent O&M. Rich standard communication interfaces and monitoring functions, remote management and automatic alarms; modular design and front maintenance make routine care and fault replacement simple and fast.
(5) Economy and scalability. Configuration is optimized to control construction cost while meeting current load and redundancy margin; expansion capacity for later power growth and backup-time extension balances short-term investment and long-term development.
6.3 System Architecture
The rack-mounted UPS system consists of four core units:
Input distribution unit: mains input switch, surge/lightning protector and input breaker — safe mains access, overload/short-circuit protection and lightning surge protection.
UPS host unit: the core unit using double-conversion online architecture — AC/DC conversion and regulated, frequency-stable output; charges batteries while powering the load from mains, and automatically switches to battery on mains failure.
Battery unit: the energy storage unit of multiple VRLA batteries in series, float-charging in standby during normal mains and discharging DC power to the UPS host on mains failure.
Output distribution and monitoring unit: distributes UPS output to load circuits; monitors UPS status, battery status and distribution parameters in real time with remote management and timely alarm.
The supply path is: mains input → input distribution → UPS host → output distribution → IT load. On mains failure: battery → UPS inverter → output distribution → IT load, with zero-interruption switching invisible to the load.
6.4 Working Principle and Operating Modes
Double-conversion online principle. In normal operation, mains is first converted by the rectifier to DC — one path charges the battery, the other feeds the inverter, which converts DC back to a clean sine-wave AC output to the load. Because the load is always powered by the inverter, mains voltage fluctuation, frequency drift, harmonic interference and surges are completely isolated — output stability and purity far exceed standby and line-interactive UPS, making it the optimal architecture for precision IT equipment.
Mains normal mode: the rectifier converts AC to DC, the inverter outputs stable AC to the load, and the charger float-charges the battery — the main operating mode.
Battery mode: on mains failure or out-of-range mains, the rectifier stops and the battery feeds the inverter, which continues stable output — zero-millisecond switching, duration determined by battery capacity and load.
Static bypass mode: on overload, overtemperature or inverter fault, the system switches to static bypass, powering the load directly from mains without interruption while raising an alarm; it returns to inverter mode automatically when normal.
Maintenance bypass mode: medium/large models include a manual maintenance bypass switch — during maintenance, close the switch, power the load from mains and safely shut down the UPS host without interrupting the load.
ECO mode: for good mains quality, the load is powered via bypass with the inverter in standby, reaching efficiency above 98%; on mains anomaly it switches quickly back to inverter — balancing energy saving and reliability.
6.5 Rack Deployment and Structure Design
Standard rack mounting. All rack-mounted UPS hosts comply with 19-inch standard mounting with side mounting ears fixed to rack posts by screws; heights cover 2U, 3U, 4U, 6U and 12U per power rating, installable at any free U position and unified with servers, switches and patch panels. Front-intake/rear-exhaust ventilation matches rack cold/hot aisle layout.
Rack-mounted battery deployment. Batteries are installed on standard 19-inch battery racks of 2U/4U/6U heights, in the same cabinet or a dedicated battery cabinet. Racks use cold-rolled steel with strong load capacity, adjustable shelves, battery retainers and insulation protection.
Wiring and identification. Power and weak-current wires are separated; input/output power cables are flame-retardant and routed in side cable channels; signal cables are shielded and separated from power cables; every cable is labeled at both ends with circuit name, routing and specification for later O&M.
6.6 Supply Path and Redundancy Design
Three supply path designs match different reliability levels:
Single-path architecture: one UPS host + one battery group — for non-core loads and small office rooms, economical and simple.
N+1 parallel redundancy: multiple identical UPS hosts in parallel sharing the load — if one fails, the rest carry the full load without interruption — for core rooms and critical business systems.
Dual-bus architecture: two independent UPS systems supply two separate inputs of dual-power servers and storage, eliminating single points of failure for the highest reliability level — for high-grade data centers.
6.7 Grounding and Lightning Protection
Grounding. UPS host enclosures, battery racks and distribution cabinets are reliably connected to the room grounding system with ground resistance ≤4 Ω; a dedicated protective earth is provided with neutral and earth strictly separated to avoid high neutral-earth voltage interfering with IT equipment.
Lightning/surge protection. The input distribution side is fitted with a Class C surge protector absorbing lightning and switching surges; the UPS host integrates internal surge protection circuits, forming a multi-level protection system.
7. System Architecture and Working Principle
7.1 UPS Host Series
The KITOZER high-frequency online rack-mounted UPS series covers 1 kVA to 40 kVA:
KITOZER-R1k (1 kVA/0.9 kW, 2U): input 220V AC (110-300V full load, 80-110V derated), PF ≥0.99, THDi ≤3%, output 220V ±1% sine wave, PF 0.9, THDv ≤2% (linear), overload 105-130% 10 min / 130-150% 1 min / >150% instant bypass, crest factor 3:1, 24V DC bus with 2 built-in 12V batteries, ~5 min full-load backup (12 min half-load), three-stage charging (float 27.2V, boost 28.8V, max 3A), modes: mains/battery/bypass/ECO, 0 ms mains-battery switch, efficiency ≥96% (ECO ≥98%), RS232/USB/dry-contact standard, optional SNMP/WiFi/4G, LED+LCD display, rack/tower dual use, 440×400×88 mm, ~12 kg, noise ≤40 dB, 0-40℃.
KITOZER-R3k (3 kVA/2.7 kW, 3U): 96V DC bus, 8 external 12V batteries, ~10 min backup, max charge 6A, 440×500×132 mm, ~18 kg, noise ≤45 dB, no parallel support.
KITOZER-R6k (6 kVA/5.4 kW, 4U): 192V DC bus, 16 × 12V batteries, max charge 10A, efficiency ≥96.5% (ECO ≥98.5%), supports up to 3 units parallel (N+1), 440×580×176 mm, ~30 kg, noise ≤50 dB.
KITOZER-R10k (10 kVA/9 kW, 6U): 192V DC bus, 16 × 12V, max charge 12A, output 220V ±0.5%, supports up to 4 units parallel (N+1/N+X, load sharing ≤5%), 2000-event log, 440×650×264 mm, ~45 kg, noise ≤52 dB.
KITOZER-R20k (20 kVA/18 kW, 6U): single-phase 220V or three-phase 380V input, 384V DC bus, 32 × 12V batteries, max charge 20A, efficiency ≥97% (ECO ≥98.5%), up to 6 units parallel with sharing ≤3% and circulating current <1%, standard maintenance bypass, 5000-event log, front maintenance, 482×700×264 mm, ~75 kg, noise ≤55 dB, surge protection common-mode 6 kV/differential 3 kV, CE/UL certified.
KITOZER-R40k (40 kVA/36 kW, 12U): three-phase 380V input with active PFC, 384V DC bus, 32 × 12V, max charge 30A, IGBT rectifier + IGBT inverter, dual-DSP control, efficiency ≥97.5% (ECO ≥99%), up to 6 units parallel (mixed-capacity supported), 7-inch color touchscreen, 10,000-event log, 482×800×528 mm, ~150 kg, noise ≤60 dB, CE/UL certified.
7.2 Battery Series
Valve-regulated sealed lead-acid (VRLA) batteries in 12V 7AH to 12V 200AH:
KITOZER-B127 (7AH): internal resistance ~22 mΩ, float 13.6-13.8V, boost 14.4-14.7V, max discharge 105 A/5 s, self-discharge ≤3%/month, cycle life ≥300 (100% DOD), float life ≥5 years, AGM gel electrolyte, ABS V0 housing, 151×65×94 mm, 2.1 kg.
KITOZER-B1224 (24AH): ~9 mΩ, max discharge 240 A/5 s, self-discharge ≤2%/month, cycle ≥400, float life ≥6 years, 166×175×125 mm, 8.5 kg, copper tin-plated terminals.
KITOZER-B1265 (65AH): ~3.8 mΩ, max discharge 650 A/5 s, cycle ≥500, float design life ≥8 years, lead-calcium-tin grids, 350×166×174 mm, ~20 kg, TLC (China Telecom) certified.
KITOZER-B12100 (100AH): ~2.5 mΩ, max discharge 1000 A/5 s, self-discharge ≤1.5%/month, cycle ≥600 (100% DOD) / ≥1200 (50% DOD), float design life ≥10 years, working range -20℃ to +60℃ discharge, AGM absorbed electrolyte, anti-explosion valve, 330×173×215 mm, ~30 kg, per GB/T 19638.2, YD/T 799, IEC 60896-21.
KITOZER-B12150 (150AH): ~1.8 mΩ, max discharge 1500 A/5 s, cycle ≥600, float life ≥10 years, 483×170×240 mm, ~45 kg.
KITOZER-B12200 (200AH): ~1.4 mΩ, max discharge 2000 A/5 s, self-discharge ≤1%/month, cycle ≥600, float design life ≥12 years, thickened lead-calcium-tin plates, 522×240×218 mm, ~62 kg.
All batteries are maintenance-free, sealed and leak-proof, low self-discharge, with wide temperature adaptability.
7.3 Distribution and Monitoring Components
Basic rack PDU (KITOZER-P8): 220V AC, 16A, IEC C20 input, 8× IEC C13 outlets, 1U, aluminum housing, built-in 16A breaker, 482×44×110 mm.
Smart metering PDU (KITOZER-P16M): 220V AC, 32A, 16× IEC C13 outlets, 1U, real-time voltage/current/power/energy/PF display (V/I ±1%, power ±2%), RS485 Modbus for DCIM integration, overload and surge protection.
SNMP network card (KITOZER-NET1): standard UPS smart slot, 10/100M Ethernet RJ45, SNMP v1/v2c/v3, HTTP/HTTPS, Telnet, Modbus TCP, SMTP; monitors input/output voltage/frequency/current, load rate, battery voltage/capacity, temperature, status and alarms; email/SNMP Trap/SMS alarms; web/client/SNMP management; 500-event log; UPS-powered.
4G wireless alarm module (KITOZER-4G1): full-network 4G (China Mobile/Unicom/Telecom), RS232/USB interface, SMS/phone/WeChat official-account alarms for mains failure, low battery, overload, fault and recovery; cloud platform status viewing; DC 12V UPS-powered; -20℃ to +60℃.
7.4 Battery Racks and Parallel Modules
2U battery rack (KITOZER-BR2U): 19-inch, holds 4 × 12V 7/24AH, 1.5 mm cold-rolled steel, load ≥50 kg, 482×400×88 mm.
4U battery rack (KITOZER-BR4U): holds 16×7AH / 8×24AH / 4×65/100AH, 2.0 mm steel, load ≥150 kg, dual-layer with retainers and cable channels, 482×500×176 mm.
6U battery rack (KITOZER-BR6U): holds 16 × 12V 65/100AH, 2.0 mm reinforced steel frame, load ≥350 kg, three-layer with independent fixing and ventilation, 482×600×264 mm.
Parallel communication module (KITOZER-PAR1): for 10/20/40 kVA models, up to 6 units parallel, phase sync error <1°, load sharing deviation <3%, circulating current <1%, dedicated parallel cable with differential signaling, N+1/N+X redundancy, auto isolation on parallel fault, 3 m cable standard (5/10 m optional).
8. Detailed Technical Design
8.1 Selection Design
Power selection follows: totalize the protected load power in W (not VA); reserve margin at 1.2-1.5× actual load (load rate 60-80%); choose the nearest standard model — avoiding long-term full load, adapting to load growth and absorbing start-up surge. Backup time is configured per scenario: 30 min for general office/network rooms (orderly shutdown and generator start), 1-2 h for core business rooms, 4-8 h long-endurance for generator-free sites.
8.2 Electrical and Distribution Design
Input/output power cables are sized per current (e.g. YJV-3×6 mm² for 10 kVA, YJV-3×16 mm² for 20 kVA, YJV-3×25 mm² for parallel systems); input and output breakers and a Class C surge protector are provided at the distribution side; power and signal cables are separated by ≥30 mm; grounding uses yellow-green stranded copper of ≥6 mm² with ground resistance ≤4 Ω and neutral-earth voltage <2 V.
8.3 Battery System Design
Battery strings are configured per DC bus voltage: 24V (2 × 12V) for R1k, 96V (8 × 12V) for R3k, 192V (16 × 12V) for R6k/R10k, 384V (32 × 12V) for R20k/R40k. Batteries are installed in standard battery racks with firm connections, correct polarity, insulation between cells and racks, ventilation, and serial connection with torque-controlled bolts. Backup time follows the discharge curve; e.g. 100AH × 16 cells at 10 kVA gives ~30 min full load.
8.4 Monitoring and Management Design
The UPS connects to the room environment-monitoring platform via the SNMP card (Modbus TCP/SNMP) or RS485; the 4G module provides SMS/phone/WeChat alarms for unattended sites; the central monitoring platform manages multiple UPS units, distribution and environment on one screen with web/client access, alarm configuration, remote on/off and log export.
8.5 Parallel and Redundancy Design
For N+1 parallel systems, identical models are connected via parallel cables with the PAR1 module, load sharing is verified during commissioning, and single-unit fault isolation is tested; for dual-bus systems, two independent UPS sets feed dual-power loads with A/B bus separation. Commissioning includes parallel sharing tests and fault simulation.
9. Recommended Configuration and Preliminary Budget
9.1 Configuration Summary
Small room (1-10 kVA, load ≤8 kW, single cabinet / small office room / weak-current room):
| No. | Item | Model / Specification | Qty | Unit |
|---|---|---|---|---|
| 1 | Rack-mounted UPS host | KITOZER-R10k, 10 kVA/9 kW, online double conversion, 2U | 1 | pc |
| 2 | VRLA battery | 12V100AH, sealed long-life | 16 | cells |
| 3 | Standard battery rack | 19-inch 4U, holds 16 × 100AH | 1 | set |
| 4 | Rack output PDU | 16A input, 8× IEC C13, current display | 1 | pc |
| 5 | SNMP monitoring card | Web access and alarms | 1 | pc (optional) |
| 6 | Power cable | YJV-3×6 mm² | 30 | m |
| 7 | Auxiliary package | Breakers, terminals, channels, ties, labels | 1 | lot |
| 8 | Installation and commissioning | On-site work, wiring, testing, acceptance | 1 | item |
| 9 | Warranty service | 3-year whole-unit warranty, annual patrol | 1 | item |
Medium room (10-40 kVA, load 10-36 kW, multi-rack enterprise/government room):
| No. | Item | Model / Specification | Qty | Unit |
|---|---|---|---|---|
| 1 | Rack-mounted UPS host | KITOZER-R20k, 20 kVA/18 kW, 6U, parallel-ready, maintenance bypass | 1 | pc |
| 2 | VRLA battery | 12V100AH, long-life | 32 | cells |
| 3 | Standard battery cabinet | 600×450×2000 mm, 19-inch structure | 1 | pc |
| 4 | Input/output distribution cabinet | Rack 3U, main/sub breakers, surge protector | 1 | pc |
| 5 | Environment monitoring module | UPS + temperature/humidity, SMS alarm | 1 | set |
| 6 | Power cable | YJV-3×16 mm² | 50 | m |
| 7 | Auxiliary package | Copper terminals, channels, ground bar, labels | 1 | lot |
| 8 | Installation and commissioning | On-site work, wiring, system commissioning, trial run | 1 | item |
| 9 | Warranty service | 3-year warranty, quarterly patrol | 1 | item |
Large room (N+1 parallel, core room / high-availability):
| No. | Item | Model / Specification | Qty | Unit |
|---|---|---|---|---|
| 1 | Rack-mounted UPS host | KITOZER-R20k, parallel-capable | 3 | pcs |
| 2 | Parallel communication module | Sync cable and module, load sharing | 1 | set |
| 3 | VRLA battery | 12V100AH, 32 cells per host, independent groups | 96 | cells |
| 4 | Standard battery cabinet | 600×800×2000 mm double-row rack | 3 | pcs |
| 5 | Parallel output distribution cabinet | Output main switch, load branch breakers | 1 | pc |
| 6 | Central monitoring system | Unified platform, web + client | 1 | set |
| 7 | Power cable | YJV-3×25 mm² | 100 | m |
| 8 | Auxiliary and grounding materials | Full package, ground bus, surge protector | 1 | lot |
| 9 | Installation and commissioning | Parallel system setup, redundancy tests | 1 | item |
| 10 | Warranty service | 3-year warranty, monthly patrol, 7×24 response | 1 | item |
9.2 Quotation Notes
All auxiliary materials and cables are selected per industry standard specifications; construction fees include labor, tools and transport; warranty can be upgraded to 5 years or on-site resident service. All prices are indicative and quoted in RMB (CNY) only — no foreign-currency conversion is provided. The final quotation is confirmed after free on-site survey according to actual load, backup-time requirements and construction environment, and is subject to a formal contract. Free on-site survey and solution optimization are available before ordering.
10. Technical Specifications
10.1 System Performance Summary
| Item | Specification |
|---|---|
| Power range | 1 kVA / 0.9 kW to 40 kVA / 36 kW |
| Architecture | Double-conversion online, high-frequency digital control |
| Output | Pure sine wave, 220V ±1% (380V three-phase for R40k), PF 0.9 |
| Switching time | Mains-battery 0 ms; inverter-bypass <1 ms |
| Efficiency | ≥96-97.5% mains mode; ≥98-99% ECO mode |
| Input PF / THDi | ≥0.99 / ≤3% (full load) |
| Output THDv | ≤2% linear; ≤5% non-linear |
| Overload | 105-130% 10-60 min; 130-150% 1-10 min; >150% instant bypass |
| Parallel | Up to 6 units (R6k: 3; R10k: 4), N+1/N+X, sharing ≤3% |
| Battery bus | 24V (R1k) / 96V (R3k) / 192V (R6k, R10k) / 384V (R20k, R40k) |
| Backup time | Configurable, e.g. 10 kVA + 16×100AH ≈ 30 min full load |
| Monitoring | RS232/USB/dry-contact standard; SNMP/RS485/4G optional |
| Alarms | Audible/visual, email, SMS, WeChat, SNMP Trap |
| Mounting | 19-inch standard rack (2U-12U) / tower dual use (small models) |
| Noise | ≤40-60 dB by model |
| MTBF | ≥200,000 h |
| Warranty | 3 years whole unit + 3 years battery |
| Standards | GB 7260.1, YD/T 1095, GB 4943.1, CE, UL |
10.2 Key Component Specifications
| Component | Key Parameters |
|---|---|
| R1k UPS | 1 kVA/0.9 kW, 2U, 24V bus, 2×12V built-in, ~5 min backup, 12 kg |
| R3k UPS | 3 kVA/2.7 kW, 3U, 96V bus, 8×12V external, ~10 min, 18 kg |
| R6k UPS | 6 kVA/5.4 kW, 4U, 192V bus, 16×12V, 3-unit parallel, 30 kg |
| R10k UPS | 10 kVA/9 kW, 6U, 192V bus, 4-unit parallel, 45 kg, 2000-event log |
| R20k UPS | 20 kVA/18 kW, 6U, 384V bus, 6-unit parallel, maintenance bypass, 75 kg |
| R40k UPS | 40 kVA/36 kW, 12U, three-phase, 7-in touchscreen, 6-unit parallel, 150 kg |
| Battery B12100 | 12V 100AH, 2.5 mΩ, float life ≥10 years, 30 kg |
| Battery B12200 | 12V 200AH, 1.4 mΩ, float life ≥12 years, 62 kg |
| PDU P16M | 32A, 16× C13, metering ±1%, RS485 Modbus, 1U |
| SNMP card NET1 | SNMP v1/v2c/v3, HTTP, Modbus TCP, 500-event log |
| 4G module 4G1 | SMS/phone/WeChat alarms, cloud platform, -20~60℃ |
| Battery rack BR6U | 6U, load ≥350 kg, holds 16×65/100AH |
| Parallel module PAR1 | 6 units max, sync <1°, sharing <3%, ring current <1% |
11. Key Advantages and Customer Value
11.1 Extreme Supply Reliability
The double-conversion online architecture completely isolates mains voltage fluctuation, frequency drift, harmonic interference and surges, continuously outputting pure, stable sine-wave power — the optimal supply environment for servers, switches and storage. Mains failure switches to battery in zero milliseconds, invisible to the load, eliminating downtime, data loss and business interruption risks. Industrial-grade core components with strict aging tests give MTBF over 200,000 hours. Multiple protections (input over/undervoltage, output short/overload, battery overcharge/discharge, overtemperature, lightning surge) protect equipment and loads; medium/large models include static bypass and manual maintenance bypass for seamless non-stop maintenance.
11.2 Rack-Mounted Space Value
Unlike tower UPS occupying floor space with messy wiring, all core equipment uses the 19-inch standard rack structure, installed directly in standard server cabinets and unified with servers and switches. No floor area is occupied, greatly improving space utilization — ideal for small/medium rooms, weak-current rooms and edge nodes. Rack deployment also standardizes wiring with separated power/weak-current routing and clear labels for easier O&M. Front-maintenance design allows wiring, operation and maintenance from the front without rear space, enabling wall-mounted cabinets.
11.3 High Efficiency and Green Low-Carbon
The high-frequency digital design achieves mains-mode efficiency up to 97.5% and ECO-mode efficiency up to 99%, greatly reducing self-loss and electricity cost; lower loss also means less heat, reducing room cooling load and overall energy consumption per green data center concepts. Smart fan speed control adjusts to load and temperature — low speed at low load for less noise and energy. High input PF (≥0.99) and low THDi (≤3%) reduce grid harmonic pollution and distribution losses.
11.4 Full-Dimension Intelligent O&M
Local LCD displays all running parameters; standard RS232/USB plus optional SNMP card and 4G module integrate with the room environment-monitoring platform for remote centralized management via web, client or phone — real-time status, battery capacity, load rate and alarms without on-site duty. Multi-channel alarms (audible/visual, email, SMS, WeChat, SNMP) notify O&M staff immediately on mains anomaly, low battery and overload. The intelligent battery management system provides capacity estimation, health assessment, automatic charge/discharge tests, failure warning and temperature-compensated charging, extending battery life; automatic logs and fault records support analysis and tracing.
11.5 Flexible and Scalable Configuration
The 1-40 kVA full power range allows precise selection per actual load with reasonable margin; backup time is customizable from minutes to hours; medium/large models support parallel expansion and redundancy — adding UPS hosts raises capacity and reliability without replacing existing equipment, protecting prior investment. Input/output distribution, monitoring functions, battery configuration and mounting can be customized per site with multiple free design options.
11.6 Full-Process Professional Service
As a source manufacturer and room solution provider, the company offers design, supply, installation, commissioning and after-sales service: free on-site survey and optimal solution design; an experienced construction team installing per national codes; complete operation training at delivery; 7×24 technical hotline with 2-hour on-site response in urban areas and 4 hours within the province; periodic patrol and preventive maintenance; ample spare-part stock; dedicated follow-up throughout — keeping the system stable long term.
11.7 Brand and Quality Endorsement
KITOZER (Pioneer) is the core room-equipment brand of Guangzhou Lain with more than 20 years of industry experience; products are long-term market-verified and recognized by government, enterprise, medical, education and finance customers. All products pass national authority testing per industry standards and safety certifications; the enterprise holds multiple patents and high-tech qualifications with a complete quality management system — every unit undergoes strict aging and performance tests before delivery.
12. Technical Q&A (50+ Items)
12.1 Basic Concepts
Q1: What is a rack-mounted UPS, and how does it differ from a tower UPS?
A: A rack-mounted UPS conforms to 19-inch standard rack dimensions — flat, installed in a standard cabinet like a server or switch. Core function is identical to tower UPS; differences: mounting (rack vs. floor), space utilization (cabinet deployment saves floor space and neatens wiring), power range (rack types are mainly 1-40 kVA for cabinet deployment; tower covers wider ranges with large models), and maintenance (rack types are mostly front-maintenance, saving rear space).
Q2: What does double-conversion online UPS mean, and what are its advantages?
A: Mains first passes the rectifier converting to DC — one path charges the battery, the other feeds the inverter, which converts DC back to clean AC for the load. Because the load is always powered by the inverter, it is “online”; power undergoes AC-DC and DC-AC conversion, hence “double-conversion”. Advantages: best supply quality (completely isolates mains interference, purest sine wave); zero-interruption switching (0 ms, invisible to load); highest stability (mature architecture, complete protections) for important loads.
Q3: What is the relationship between VA and W?
A: VA (volt-ampere) is apparent power; W (watt) is active power. Active power (W) = apparent power (VA) × power factor. This series has output PF 0.9 — a 10 kVA UPS carries 9 kW of active load. Selection should use load active power (W), not VA, to avoid undersizing.
Q4: What is backup time, and how is it calculated?
A: Backup time is how long the UPS sustains the load on battery after mains failure. Estimation: backup time (h) = (total battery capacity × battery voltage) / load power / inverter efficiency. Discharge is non-linear — larger current reduces capacity — so precise calculation uses the battery discharge curve. E.g. 10 kVA UPS with 16 × 100AH gives ~30 min full load.
Q5: What is ECO mode? Should it be enabled?
A: ECO (economy) mode powers the load directly via bypass when mains is normal, with the inverter in standby, achieving efficiency above 98%. On mains anomaly it switches quickly back to inverter. Enable it when mains quality is good and stable; keep normal online mode when mains fluctuates frequently to avoid repeated switching.
Q6: What is the difference between online, line-interactive and standby UPS?
A: Online (double-conversion) always powers the load through the inverter — best quality, zero switching, highest cost. Line-interactive adjusts voltage via an autotransformer with battery backup — moderate quality and cost. Standby switches to inverter only on mains failure — lowest cost, noticeable switching gap, for non-critical loads. This solution uses online architecture for precision IT equipment.
Q7: Why is a pure sine wave output important for IT loads?
A: Server power supplies, storage and network equipment rely on power-factor-corrected switch-mode supplies that can malfunction or overheat on stepped or modified waveforms. Pure sine wave guarantees stable voltage, low distortion and correct frequency for reliable long-term operation of precision equipment.
Q8: What does the power factor 0.9 mean for selection?
A: Output PF 0.9 means a 10 kVA UPS delivers 9 kW active power. Modern server loads have PF close to 1; selecting by W with 1.2-1.5× margin keeps the load rate at 60-80% for long life and growth headroom.
Q9: What is the crest factor 3:1?
A: Crest factor is the ratio of peak current to RMS current. Server switch-mode supplies draw high peak currents; 3:1 crest factor capacity lets the UPS handle such loads without output limiting or distortion.
Q10: What are THDi and THDv?
A: THDi is input current total harmonic distortion (≤3% here, thanks to active PFC) — low grid pollution and smaller upstream equipment. THDv is output voltage distortion (≤2% linear, ≤5% non-linear) — cleaner power for loads.
12.2 Selection and Configuration
Q11: How do I select UPS power for a room? What margin is needed?
A: Steps: totalize protected load power in W (not VA); reserve margin at 1.2-1.5× actual load (load rate 60-80%); choose the nearest standard model. Margin avoids long-term full load (extends life), adapts to load growth, and absorbs start-up surge.
Q12: Can a rack-mounted UPS be installed in a normal server cabinet?
A: Yes, in any standard 19-inch cabinet. Check: cabinet depth (small models 400-500 mm fit most; large models 600-800 mm need matching depth); U positions with cooling space; load capacity (host + batteries are heavy — install near the bottom if needed); ventilation (front/back airflow, avoid sealed spaces).
Q13: How large should the battery be? What backup time is appropriate?
A: By required backup time: general office/network rooms ~30 min (orderly shutdown, generator start); core business rooms 1-2 h (emergency margin); generator-free sites 4-8 h per local outage history. Avoid over-long backup — high cost and low utilization of long-float batteries.
Q14: When is parallel redundancy needed? What is N+1?
A: When the load is critical and a single UPS failure must not cause outage. N+1 means N units carry the full load plus 1 redundant unit. E.g. 2+1 parallel: 3 units share the load at low rate; if any fails, the remaining 2 carry everything without interruption — for data centers, hospitals and government sites.
Q15: How long do lead-acid batteries last? When should they be replaced?
A: Design float life is 5-10 years under normal conditions (25℃, maintained); actual capacity begins declining at 3-5 years. Replace when: discharge capacity below 80% of rated; swelling, leakage or terminal corrosion; noticeably higher internal resistance or abnormal charging voltage; over 5 years with frequent low-voltage alarms. High temperature, deep discharge and neglected float charging shorten life.
Q16: How is backup time extended later?
A: Add battery groups or replace with larger capacity batteries, matching the UPS charge current; for parallel-capable models, add identical UPS hosts for capacity expansion. Reserve margin at selection to simplify later growth.
Q17: What is the difference between 1 kVA and 40 kVA models in application?
A: 1-3 kVA suit single cabinets, small network rooms and weak-current rooms; 6-10 kVA suit small multi-rack rooms; 20 kVA suits medium enterprise/government rooms (single-phase or three-phase input); 40 kVA three-phase suits larger rooms, hospitals and core systems, with the widest parallel capability.
Q18: Can batteries of different capacities be mixed?
A: No — mix only identical model, capacity, age and charge state in one string; mixed strings create imbalance, reduce capacity and shorten life. Replace failed cells with the same model.
Q19: How is the DC bus voltage determined?
A: By the UPS design — 24V (R1k), 96V (R3k), 192V (R6k/R10k), 384V (R20k/R40k), built from series 12V batteries. Use the configured cell count; wrong count damages the charger or reduces backup.
Q20: What if the room has poor mains quality?
A: The wide input range (110-300V) tolerates fluctuation; the online architecture cleans output regardless of input; avoid ECO mode on unstable mains; the Class C surge protector and internal surge circuits protect against transients; consider AVR upstream if voltage sags are extreme.
12.3 Installation and Construction
Q21: What are the installation code requirements?
A: Cabinet firmly installed, level, load capacity satisfied; power cables matched and firmly terminated with standard crimping; power/weak-current separation with clear labels; reliable grounding ≤4 Ω with protective earth connected; proper input/output breakers with overload/short protection; post-installation power-on, battery discharge and bypass switch tests; construction per GB 50462.
Q22: What should be noted when installing batteries?
A: Inspect for damage/leakage and measure voltage before installation; series connections in correct polarity — never reverse, disconnect breakers before wiring; torque connection bolts properly for good contact (avoid heating at high current); insulate between cells and racks; measure total voltage and polarity after completion; ensure battery room/cabinet ventilation; recycle waste batteries properly.
Q23: How should the UPS be grounded?
A: UPS enclosure, battery racks and distribution cabinets connect reliably to the room protective ground bar; use yellow-green stranded copper ≥6 mm²; ground resistance ≤4 Ω (≤1 Ω for joint grounding); neutral and earth strictly separated with neutral-earth voltage <2 V; no series connection of ground wires — single-point or ring connection; surge protector at input distribution for lightning grounding.
Q24: What is the construction process for a standard project?
A: Survey and solution confirmation → production/stocking and factory test → transport and incoming inspection → rack and equipment installation, battery assembly, distribution wiring, grounding, monitoring installation, cable dressing and labeling → pre-power checks → power-on, parameter setting, function tests, battery discharge test, bypass switch test, alarm test, monitoring joint test → loaded trial run → cleaning, documentation and acceptance.
Q25: How are rack-mounted equipment and batteries fixed in the cabinet?
A: Mounting ears fix the UPS to rack posts with screws, level and firm; battery racks bolt to the posts with shelves level; heavy batteries sit on reinforced shelves with retainers; cables run along cable management; equipment with front maintenance needs no rear space.
Q26: What are the wiring rules for power and signal cables?
A: Power cables flame-retardant (YJV type), sized per current; signal cables shielded; separated by ≥30 mm to avoid interference; routed in channels, neatly tied; every cable labeled at both ends with circuit, direction and specification; terminals crimped firmly with correct phase sequence.
Q27: What pre-power checks are required?
A: Verify all wiring — no wrong, missing or short connections; measure input voltage and battery voltage; confirm all breakers open; remove tools and debris from equipment; check grounding connection; then close input breaker and start the UPS self-test.
Q28: How is a loaded trial run performed?
A: Connect loads circuit by circuit, observing UPS status as load increases; run at load for 30+ minutes checking temperature, noise and voltage stability; record parameters and confirm all indicators meet requirements.
Q29: What acceptance tests are included?
A: Output voltage/frequency accuracy; zero-switch battery mode test (mains interruption); static bypass and maintenance bypass switch tests; alarm tests (mains failure, low battery, overload); battery discharge test; monitoring platform communication; grounding resistance; documentation review — all per GB 50462.
Q30: Can installation proceed while the room is running?
A: Yes — equipment mounts in free U positions and wiring follows existing channels; power work is done with proper shutdown of the relevant circuit and verification; live work uses insulated tools with two-person cooperation; no impact on unrelated running systems.
12.4 Operation and Maintenance
Q31: What daily maintenance does a rack-mounted UPS need?
A: Daily patrol: panel display normal, no alarms, load rate and battery voltage normal, no abnormal noise or smell, ambient temperature/humidity normal. Quarterly: clean filters and surfaces, check terminals for heating, calibrate parameters, record data. Annual: battery capacity test, internal resistance check, fan/capacitor inspection, whole-unit performance test, alarm function test.
Q32: How can battery life be extended?
A: Control temperature (best 20-25℃; high temperature shortens life sharply); avoid deep discharge and recharge promptly after discharge; periodic discharge tests every six months activate the battery; enable temperature-compensated charging; keep clean and dry with good terminal contact; keep overcharge/overdischarge protection enabled.
Q33: How should a UPS be stored long-term?
A: Store fully charged with all loads and input disconnected; in a dry, ventilated, cool place at 0-25℃; recharge every 3 months to prevent over-discharge damage; do not store longer than 6 months without a recharge/discharge cycle.
Q34: How often should batteries be discharge-tested?
A: Every six months for float-charged batteries, discharging to ~50% capacity and recharging promptly; annual capacity test for aging assessment; more frequent testing for critical sites with old batteries.
Q35: What is temperature-compensated charging?
A: Charging voltage adjusts with battery temperature (e.g. -2 to -3 mV/℃ per cell) — higher voltage at low temperature, lower at high temperature — preventing overcharge at high temperature and undercharge at low temperature, extending battery life.
Q36: What do the LCD indicators and alarms mean?
A: The display shows input/output voltage, frequency, current, load rate, battery voltage/capacity, temperature and fault codes; indicators distinguish mains, battery, bypass and fault modes; alarms identify mains anomaly, low battery, overload, overtemperature, short circuit, battery fault and device fault.
Q37: How is the environment-monitoring integration configured?
A: Insert the SNMP card, connect network, configure IP and protocols (SNMP/Modbus TCP), add the UPS to the monitoring platform, map parameters and alarms, and test data upload and alarm push.
Q38: Can remote on/off be performed?
A: Yes — via the monitoring software/web (remote start/stop and parameter setting) or the 4G module for unattended sites; remember auto-restart after mains recovery and restart delay settings to avoid grid impact.
Q39: What records should O&M staff keep?
A: Daily operation logs (mode, load rate, battery status, alarms), quarterly maintenance records, battery test records, event log exports from the UPS, and annual inspection reports — enabling trend analysis and early fault detection.
Q40: Is it necessary to turn off the UPS during cleaning?
A: No — clean surfaces and filters with the UPS running, using dry cloths and avoiding conductive liquids; for internal cleaning or component work, use maintenance bypass so the load stays powered.
12.5 Fault Handling
Q41: The battery does not supply power after a mains failure — why?
A: Common causes: battery aging/failure (capacity too low, low voltage on discharge); battery switch open or connections loose/disconnected; inverter fault; battery reverse-connection protection triggered; load short circuit or overload tripping output protection. Handle: check battery switch and wiring first, then measure battery voltage; rule out battery issues, then contact technical support.
Q42: Frequent low-battery alarms — why?
A: Frequent mains interruptions discharging the battery without full recharge; battery aging with capacity decline; charger circuit fault (insufficient charge voltage); oversized load drawing large discharge current with high voltage drop; low battery temperature reducing capacity.
Q43: Why does the UPS switch to bypass? Is it normal?
A: Normal cases: overload beyond capacity, startup/shutdown process, manual maintenance bypass operation. Fault cases: inverter fault, overtemperature, output anomaly, DC voltage anomaly. Overload bypass recovers automatically when overload clears — normal protection; fault bypass accompanies an alarm and requires prompt investigation. Long-term bypass operation loses uninterruptible capability — restore inverter mode as soon as possible.
Q44: The UPS has no output — what to check?
A: Check input power and breaker status; check the UPS display for fault codes; check output breaker and load short circuits; check battery mode start capability (cold start); verify wiring and terminals; if codes persist, contact technical support with the fault code.
Q45: The UPS does not charge the battery — why?
A: Possible: charger circuit fault; battery fully charged (normal — float state); temperature outside charging range; battery connection loose or reverse; charger current limited by load/backup configuration. Measure battery voltage and charge current to judge.
Q46: Abnormal noise from the UPS — what does it mean?
A: Fan noise at high load/temperature is normal (smart speed); persistent loud noise may indicate fan bearing wear or foreign objects — inspect and clean or replace; buzzing from transformers/inductors may indicate distortion or overload — check input quality and load rate; any burning smell requires immediate shutdown and service.
Q47: Output voltage unstable — causes?
A: Input voltage/frequency out of range; overload or non-linear loads beyond capability; inverter aging or fault; bypass mode with unstable mains. Check load rate, input quality and mode; restore inverter mode for stable output.
Q48: How is a fault alarm reset?
A: After the cause clears — mains recovery, load reduction, temperature normalization — press the reset/silence button; some faults need power-cycle after troubleshooting; persistent codes require technical support with the code.
Q49: What should be done in a fire emergency?
A: Immediately cut input power and the battery breaker if safely possible; use CO2 or dry-powder extinguishers (never water on live equipment); evacuate per plan; after the fire is controlled, have the system inspected by professionals before re-energizing.
Q50: What if the parallel system has uneven load sharing?
A: Check the parallel cables and module connections; verify all units are the same model/firmware; check phase sync and ring current; re-run the parallel commissioning procedure; contact technical support if deviation exceeds 3-5%.
12.6 Function Expansion
Q51: Can the rack-mounted UPS integrate with the room environment-monitoring system?
A: Yes — via the optional SNMP card or RS485 interface supporting Modbus/SNMP, integrating with mainstream DCIM platforms for unified UPS status, parameter and alarm monitoring; development protocols can be provided for custom platforms.
Q52: Can remote monitoring and alarms be done by phone?
A: Yes — the optional 4G module supports SMS, phone-call and WeChat official-account alarms, and phone web/mini-program viewing of real-time UPS status anytime, anywhere.
Q53: Can the existing UPS be expanded?
A: Two cases: extend backup time — add battery groups or larger batteries, matching charge current; increase capacity — for parallel-capable models, add identical UPS hosts; non-parallel models require full replacement. Reserve margin at selection to avoid later complications.
Q54: Can different-capacity models be paralleled?
A: The 40 kVA model supports mixed-capacity parallel operation with load sharing within 3%; for other models, parallel requires identical models and firmware; confirm with technical support before configuring mixed systems.
Q55: What monitoring data is available remotely?
A: Input/output voltage, frequency and current, load rate, battery voltage and capacity, temperature, operating mode, alarm status and event logs — via web, client, SNMP platform or cloud, with history export and reports.
Q56: What is the battery patrol module?
A: An optional module measuring each cell’s voltage in real time, detecting weak cells early, uploading per-cell data to the monitoring platform — recommended for large battery banks (e.g. dual-bus hospital systems) to prevent cell failure risks.
Q57: Can the UPS work with a generator?
A: Yes — the wide input range and frequency tolerance accept generator output; enable the restart delay setting so the UPS waits for stable generator power before restarting, avoiding grid impact; for frequent outages, coordinate generator start with the UPS backup time.
Q58: What communication protocols are supported?
A: SNMP v1/v2c/v3, HTTP/HTTPS, Telnet, Modbus TCP (SNMP card), Modbus-RTU (RS485), SMTP (email), plus dry contacts — covering mainstream monitoring platforms and building automation.
Q59: What is the recommended maintenance plan for critical rooms?
A: Monthly remote inspection plus quarterly on-site patrol, semi-annual battery discharge test, annual comprehensive inspection with capacity and component tests, 7×24 response with standby units for dual-bus or parallel configurations, and annual fire-inspection support.
Q60: What documentation and training are delivered?
A: Complete documentation: user manuals and warranty cards for the UPS and batteries, test reports, wiring and distribution diagrams, training PPT, common-fault handbook, patrol record templates and the after-sales contact card; training covers theory, hands-on operation, safety and monitoring, with written and practical assessment before independent operation.
13. Construction Schedule
13.1 Overall Period
From contract signing to final acceptance, the total period is graded by project scale: small projects (single unit ≤10 kVA) 7 working days; medium projects (single unit 10-40 kVA) 10 working days; large parallel projects 15 working days. The schedule is adjustable per customer requirements and site conditions; urgent projects can be expedited with compressed supply and construction periods.
13.2 Stage Schedule (Medium Project Example)
| Stage | Work | Days | Responsible | Deliverable |
|---|---|---|---|---|
| 1. Project start and survey | Confirm requirements, survey site, verify load/distribution/cabinet/wiring conditions, confirm final solution and configuration | 1 | PM + engineer | Survey report, solution confirmation |
| 2. Procurement and production | Stock/produce per configuration list, quality inspection, auxiliary preparation, factory test | 4 | Supply chain + QC | Outbound list, factory test report |
| 3. Transport and delivery | Deliver to site, unpack and inspect, verify quantity/model, entry procedures | 1 | Logistics + construction lead | Incoming acceptance record |
| 4. On-site installation | Cabinet/rack fixing, UPS host installation, battery assembly, distribution wiring, grounding, monitoring installation, cable dressing and labeling | 2 | Crew + electrician | Self-inspection record |
| 5. Commissioning and testing | Pre-power check, startup and parameter setting, function tests, battery discharge test, bypass switch test, alarm test, monitoring joint test | 1 | Engineer | Commissioning record, test report |
| 6. Acceptance and training | Customer acceptance, operation training, documentation handover, project closure | 1 | PM + engineer | Acceptance report, training record, full documentation |
13.3 Progress Control Mechanism
Dedicated PM: a dedicated project manager follows progress throughout, coordinates resources, updates progress daily and reports to the customer promptly.
Node early-warning: key nodes are pre-warned; delay risks are identified in advance with measures to protect the schedule.
Daily morning meeting: during construction, the morning meeting defines the day’s work and the evening summary reviews progress; issues are resolved the same day.
Weekly reporting: a weekly progress report is submitted to the customer with real-time sync at key nodes.
13.4 Schedule Assurance Measures
Stocking: common models are kept in safety stock for fast delivery, avoiding production delays.
Personnel: a self-owned professional construction team with sufficient staff can be dispatched per project needs.
Process: standardized construction processes connect seamlessly, reducing waiting time.
Contingency: emergency plans cover weather, logistics and site-condition changes with alternative arrangements, keeping the overall schedule unaffected.
14. Construction Organization and Quality/Safety Measures
14.1 Organization Structure
Project manager (1): overall coordination, progress control, customer communication, quality acceptance.
Technical lead (1): technical disclosure, construction guidance, system commissioning, problem solving.
Foreman (1): site organization, personnel arrangement, safety management, construction quality.
Electricians (2): distribution wiring, grounding, cable laying — certified with low-voltage electrician licenses.
Assistant worker (1): equipment moving, rack installation, auxiliary materials, site cleaning.
Safety officer (1, may be part-time): site safety supervision, disclosure, hazard inspection.
All personnel receive safety training and technical disclosure before entry.
14.2 Pre-Construction Preparation
Technical: study drawings and solution, confirm equipment positions, cable paths and distribution interfaces; technical disclosure covering standards, quality requirements and safety; verify model/specification/quantity against the solution; prepare drawings, wiring diagrams and test forms.
Materials: unpack and inspect equipment (appearance, accessories, model/count); prepare tools — drill, multimeter, crimping pliers, wrenches, screwdrivers, voltage tester, insulating gloves; auxiliary materials — cables, breakers, terminals, channels, ties, labels, ground bus, expansion bolts; safety items — helmets, insulating shoes, gloves, extinguishers, warning signs.
Site: confirm the work area, clean and reserve operation space; confirm temporary power; confirm cabinet positions, floor load and fixing conditions; protect finished work; complete entry procedures and observe the customer’s site rules.
14.3 Standard Construction Process
Step 1 — Positioning and rack installation: mark positions of UPS and battery racks per drawings; fix mounting ears with screws, level and firm; battery racks installed stably with level shelves and compliant load.
Step 2 — Battery assembly: inspect batteries (no damage/leakage, normal voltage); arrange in series with insulation; connect with torque-controlled bolts for good contact; measure total voltage, confirm polarity; label and dress battery cables.
Step 3 — Distribution wiring: open the upstream breaker, verify no voltage, hang “under construction — do not close” signs; run input/output/battery cables along channels with power/weak-current separation; crimp terminals, connect firmly with correct phase sequence; install input/output breakers and surge protectors; label all cables.
Step 4 — Grounding: connect UPS protective earth, enclosure grounds and battery rack grounds to the room ground bar; use compliant cable sizes with firm connections; measure ground resistance.
Step 5 — Monitoring installation: install the SNMP card and modules, connect communication lines, configure network parameters, test alarms and push.
Step 6 — Pre-power check: verify all wiring — no wrong/missing/short connections; measure input and battery voltage; confirm all breakers open; remove tools and debris.
Step 7 — Single-unit commissioning: close the input breaker, UPS self-test; verify output voltage/frequency/waveform; battery mode test (disconnect input — seamless switch); bypass mode test (manual switch, smooth); alarm tests (mains failure, low battery).
Step 8 — Loaded test and trial run: connect loads circuit by circuit, observe status; run 30+ minutes checking temperature, noise and voltage stability; record parameters.
Step 9 — Cleaning and finishing: remove waste, wipe equipment, organize the site; compile drawings, manuals and test reports; protect finished work and apply equipment labels.
14.4 Quality Control Standards
Equipment installation: levelness deviation ≤2 mm, firm without loosening. Wiring: firm crimping, no burrs, good insulation, correct phase sequence, clear labels. Cables: neat and straight, uniform ties, power/weak-current separation, no crossing. Grounding: resistance ≤4 Ω, reliable, no loose connections. Performance: output voltage deviation ≤±1%, 0 ms switching, no abnormal alarms. Documentation: complete, accurate, signed. All construction strictly follows GB 50462-2016 and GB 50054; each process passes self-inspection before the next.
14.5 Safety Management
Electrical safety: de-energized operation with voltage verification; compliant temporary wiring, no unauthorized connections; insulated tools and PPE.
Work at height: stable ladders for cabinet-top work, no cabinet climbing, helmets worn.
Heavy loads: batteries and hosts moved by multiple workers with handling tools, minding load limits.
Fire safety: no smoking on site, extinguishers provided, hot work requires approval and protection.
Disclosure and patrol: daily safety disclosure of the day’s risks and measures; the safety officer patrols throughout, correcting violations and eliminating hazards.
Incident handling: stop work immediately on any incident, activate the emergency plan and report promptly.
14.6 Civilized Construction and Site Management
Unified work clothes and badges, observing the customer’s site rules; warning signs at the work area with no unauthorized entry; tools and materials neatly placed with daily site cleaning; waste collected and removed after completion; customer facilities protected, damage compensated; noise minimized to avoid disturbing normal office work; “work finished, materials consumed, site clean” after completion.
14.7 Construction Risks and Contingency
Common risks: site conditions differing from the solution — verify thoroughly at survey and re-confirm before construction, adjust the plan with customer confirmation; equipment damaged in transit — strict incoming inspection, immediate exchange, standby units for emergencies; existing distribution hazards discovered — notify the customer, propose rectification, continue after rectification without forced energization; equipment fault during commissioning — on-site troubleshooting by engineers, standby replacement if unresolved.
Emergency flow: stop work, cut power, protect the scene; the PM assesses and activates the corresponding plan; inform the customer and agree the solution; dispatch resources quickly to minimize impact; record and analyze afterward to prevent recurrence.
15. After-Sales Service
15.1 Warranty Commitment
Whole-unit warranty: 3-year free warranty on rack-mounted UPS hosts — non-artificial faults repaired and parts replaced free during warranty.
Battery warranty: 3-year free warranty on VRLA batteries — capacity shortage, swelling or leakage replaced free during warranty.
Warranty start: from qualified project acceptance. Upgrade options: 5-year warranty, lifetime warranty and other value-added services. During warranty, all repair, parts and on-site labor costs for normal-use quality issues are borne by us.
15.2 Fault Response and Handling
A 7×24 technical hotline operates year-round. Response: call-back within 15 minutes of a report with remote guidance; over 80% of faults resolved by remote guidance and parameter adjustment; on-site arrival within 2 hours in urban areas, 4 hours within the province, 24 hours outside (except remote areas). Process: report via phone/WeChat/email → remote diagnosis → on-site service if unresolved → spare-part or whole-unit replacement for hardware faults → post-repair review with prevention advice and a fault report. Spare-part warehouses across multiple regions stock whole units, mainboards, fans and batteries for fast repair.
15.3 Periodic Patrol and Preventive Maintenance
Free patrol during warranty identifies hidden risks in advance: standard service — quarterly phone follow-up and annual on-site patrol; core customers — quarterly on-site patrol and monthly remote patrol. Patrol covers UPS running status (input/output parameters, load rate, fans, temperature, alarm records); battery inspection (per-cell voltage, internal resistance, capacity, appearance, terminals); distribution system (breakers, terminals, grounding, surge protectors); monitoring functions and data records; environment (temperature/humidity, ventilation); cleaning (surfaces and filters); performance tests (battery discharge, bypass switching, alarms). A patrol report with optimization advice is issued.
15.4 Spare Parts and Repair Service
All replaced parts are original genuine parts with warranty continuation; repair engineers are factory-trained and certified; general faults repaired on site within 2 hours; complex faults use standby units for temporary replacement to keep supply uninterrupted; out-of-warranty equipment receives lifetime repair at reasonable part and service fees, transparently priced.
15.5 System Upgrade and Expansion
Software upgrade: free firmware and monitoring software upgrades.
Capacity expansion: professional expansion plans for parallel or battery expansion, protecting prior investment.
Function upgrade: new monitoring, communication and intelligent management functions on request.
15.6 Post-Warranty Services
Value-added service packages: on-site resident engineers during important periods; standby UPS hosts for instant replacement; full-lifecycle battery custody (periodic testing, maintenance, replacement reminders); annual maintenance contracts providing warranty-period service treatment after warranty expiry.
15.7 Complaint and Satisfaction Management
A dedicated complaint channel with a dedicated handler responds within 24 hours; satisfaction follow-up after delivery collects feedback for continuous improvement; a dedicated account manager follows each project; a customer service file records all service activities with proactive status tracking.
16. Training Plan
16.1 Objectives and Principles
Objectives: enable the customer’s O&M staff to understand UPS principles, architecture and functions; master daily operation (startup, shutdown, status viewing, parameter setting); identify common alarms and faults with basic troubleshooting and emergency handling; master daily maintenance and battery care; and perform daily patrol and operation records independently.
Principles: theory combined with hands-on practice (practice first); training tailored to the actual project configuration; progressive depth for different skill levels; assessment after training; full training materials delivered for later reference.
16.2 Audience and Forms
Audience: the customer’s room O&M staff and IT managers, 2-3 persons recommended for backup coverage.
Forms: on-site training at acceptance (face-to-face with real equipment); online training via video conference for remote sites or refreshers; self-study via operation manual, courseware and video tutorials; one free refresher within warranty for personnel changes.
16.3 Theory Training Content
Fundamentals: UPS overview (function, classification, applications); double-conversion online working principle (rectifier, inverter, bypass, battery modes); system composition (host, battery, distribution, monitoring); key parameters (capacity, power factor, backup time, efficiency, harmonics); operating modes and switching conditions.
O&M theory: daily patrol items and judgment methods; battery principles and care (life factors, maintenance, replacement criteria); alarm meanings and causes; safety operation rules and prohibitions; emergency procedures for outage and faults.
16.4 Hands-On Training Content
Basic operations: standard startup and shutdown; emergency shutdown; panel key operation, menu browsing, parameter viewing, history query; status identification via indicators/display; manual bypass switching in and out; battery discharge test procedure.
Maintenance and fault handling: daily cleaning; battery appearance check and voltage measurement; terminal inspection and tightening; alarm reset after mains recovery; simple fault finding (no output, no charging, alarms); emergency drills simulating mains failure and device faults.
Monitoring system: software/web login and use; real-time parameter viewing and history query; alarm configuration and contact management; remote on/off and parameter setting; log export and reports.
16.5 Safety Operation Training
Electrical safety (high-voltage danger, de-energized operation, voltage verification); battery safety (short-circuit risk, polarity identification, safe replacement); operation prohibitions (no disassembly, no output shorting, no overload); fire emergency (equipment fire handling, extinguisher use); personal protection (insulating PPE).
16.6 Assessment and Documentation
Assessment: theoretical written test (concepts, O&M knowledge, safety norms) plus practical test (startup/shutdown, status viewing, alarm handling, emergency flow); trainees pass before independent operation; those who fail receive supplementary training until qualified.
Documentation delivered: UPS user manual and warranty card; battery manual and test reports; system wiring and distribution diagrams; training PPT; common-fault handbook; patrol record templates; after-sales contact card.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.
17.1 Manufacturing Enterprise Data Center UPS Project
Project background. A large manufacturing enterprise built a new factory data center carrying ERP, MES and production management systems requiring highly reliable power; the room uses standard cabinet deployment, and the enterprise wanted rack-mounted UPS with unified layout.
Implementation. Two 20 kVA rack-mounted UPS hosts in 1+1 redundant parallel operation; each UPS configured with 32 × 12V100AH batteries providing 1 hour full-load backup; rack-mounted output distribution cabinet and smart PDUs; integration into the room environment-monitoring platform for remote unified management; battery groups in standard battery cabinets aligned with the server cabinets.
Results. Stable operation with seamless switching on multiple mains interruptions, zero production interruption; tidy rack deployment saving room space with standardized wiring for easy maintenance; complete intelligent monitoring letting O&M staff grasp status remotely, greatly reducing workload. The customer highly recognized product quality and service response, continuing cooperation on new factory projects.
17.2 Government Service Center Room Upgrade Project
Project background. A government service center’s old room had aging UPS equipment with insufficient capacity and frequent alarms; the tower equipment occupied space and the layout was messy. The upgrade could not interrupt government service operation.
Implementation. Three 10 kVA rack-mounted UPS hosts in 2+1 parallel redundancy replaced the old equipment; new 12V65AH battery groups provided 45 minutes backup; all equipment installed in the existing server cabinets, freeing floor space; 4G alarm modules sent real-time SMS notifications on outage and faults; a loaded cutover scheme achieved zero downtime during construction.
Results. Smooth cutover with no business interruption; greatly improved supply reliability, completely resolving the frequent-alarm problem; released room space with a tidier, more standardized layout and higher O&M efficiency; trained O&M staff manage daily operation simply.
17.3 Tertiary Hospital Information Center Power Project
Project background. A tertiary hospital’s information center carries HIS, LIS and PACS core systems; power interruption directly affects medical services and patient safety, demanding extremely high reliability. The original UPS had insufficient backup time and severely aged batteries.
Implementation. A 40 kVA rack-mounted UPS in dual-bus architecture with two independent systems backing each other up; each system configured with 64 × 12V100AH batteries providing 2 hours backup; a battery patrol system monitoring every cell in real time; complete lightning/grounding protection with multi-level surge protection; 7×24 dedicated O&M service with quarterly patrol and on-site presence during important periods.
Results. Stable operation through multiple sudden outages, keeping medical services running; precise battery management warned of failing cells in advance, avoiding battery-related risks; professional healthcare-sector service experience fully understood hospital needs; highly praised by the hospital IT department and leadership.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.