Table of Contents
Toggle1. Cover / Document Information
– Document Title: Computer Room Room-Level Precision Air Conditioner Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for Computer Room Room-Level Precision Air Conditioner
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Industry Background and Policy Environment
Data centers, computer rooms and telecommunication rooms are the core carriers of enterprise information systems. The servers, switches and storage devices deployed inside continuously generate large amounts of heat while demanding strict stability of ambient temperature, humidity and air cleanliness. Ordinary comfort air conditioners cannot meet the requirements of year-round uninterrupted operation, high-precision temperature/humidity control and high reliability of a computer room — environmental fluctuation easily accelerates component aging, causes static faults and even system downtime, resulting in significant economic loss.
National standards such as *Code for Design of Data Centers* (GB 50174) and *Unit Air Conditioners for Computer and Data Processing Rooms* (GB/T 19413) clearly define the environmental control requirements of data centers and the performance requirements of computer-room air conditioners. With the rapid development of digital economy and the continuous growth of computing power, both new data center construction and existing room renovation have steadily growing demand for professional room-level precision air conditioning with constant temperature and humidity, high efficiency and intelligent control.
4.2 Project Overview
This solution targets the environmental assurance needs of a standard computer room, adopting the KITOZER (Pioneer) FJ series room-level precision air conditioner to create a constant-temperature, constant-humidity, clean and stable room operating environment. The scheme is planned comprehensively from the dimensions of heat-load calculation, airflow-organization optimization, redundant reliability design, intelligent monitoring integration and full-cycle service, ensuring the system not only meets current usage needs but also reserves future expansion margin, while balancing energy saving and O&M convenience.
The KITOZER-FJ series covers a cooling capacity range of 30 kW to 100 kW, supporting both downflow (underfloor) and upflow supply, with a complete set of six subsystems — refrigeration cycle, air circulation, humidification, heating, filtration and intelligent control — providing a high cost-performance professional computer-room air conditioning solution.
4.3 Core Project Objectives
Environmental objective: maintain a stable year-round environment with temperature 18℃-28℃ continuously adjustable and control accuracy better than ±1℃; relative humidity 40%-60% continuously adjustable with accuracy better than ±5% RH; avoid condensation, static electricity and moisture damage to electronic equipment.
Reliability objective: support 365×24 uninterrupted operation with system MTBF not lower than 100,000 hours; adopt N+1 redundant configuration so a standby unit automatically takes over on unit failure, preventing IT downtime caused by air conditioning faults.
Energy objective: achieve high-efficiency core components and intelligent load-adjustment technology with EER at or above the national first-level energy-efficiency grade, reducing the room’s overall PUE and long-term electricity cost; support optional natural-cooling (free cooling) to cut compressor runtime in low outdoor temperatures.
Cleanliness objective: effectively filter dust and particles from the room air through multi-stage filtration to prevent dust deposition on circuit boards, heat-dissipation degradation, short circuits and corrosion, extending IT equipment life.
Intelligence objective: provide complete local and remote monitoring — real-time operating parameters, device status and fault alarms; support integration with the room environmental (dynamic-environment) monitoring system and building automation system for centralized, unattended management; support group control, automatic load distribution, primary/standby auto-switchover and rotation operation.
4.4 Necessity of Construction
Core protection of IT equipment. Servers and storage devices are extremely sensitive to temperature and humidity. Over-temperature accelerates component aging and can trigger thermal shutdown; excessive dryness causes static discharge that damages chips; excessive humidity causes condensation and short circuits. A room-level precision air conditioner is the fundamental infrastructure that keeps electronic equipment within its rated environmental envelope, directly determining equipment life and business continuity.
Uninterrupted operation requirement. A computer room operates 24×7; an ordinary air conditioner designed for intermittent duty cannot survive continuous operation and cannot maintain humidity control, leading to frequent failures and environmental swings. Only an industrial-grade precision air conditioner designed for year-round duty with redundant architecture can guarantee the stability that business systems require.
Energy cost consideration. The air conditioning system accounts for about 30%-40% of a data center’s total energy consumption. High-efficiency components, intelligent load adjustment and optional natural-cooling technology directly lower PUE and cut long-term electricity cost, making the professional solution both safer and more economical over the equipment lifecycle.
5. User Requirement Analysis
5.1 Temperature and Humidity Control Requirements
The room must maintain a stable temperature and humidity environment year-round: temperature control range 18℃-28℃ continuously adjustable with accuracy better than ±1℃; relative humidity control range 40%-60% continuously adjustable with accuracy better than ±5% RH. Large temperature/humidity fluctuations must be avoided to eliminate condensation, static electricity and component dampness risks, meeting the environmental standards of electronic equipment operation.
5.2 Reliability Operation Requirements
The air conditioning system must support 365-day × 24-hour uninterrupted continuous operation with whole-unit mean time between failures (MTBF) not lower than 100,000 hours. The system should adopt N+1 redundant configuration so that when a single unit fails, the standby unit automatically takes over the cooling load, seamlessly maintaining the room environment and eliminating IT downtime caused by air conditioning failure.
5.3 Energy-Saving Requirements
The system should feature high-efficiency core components and intelligent load-adjustment technology, with energy-efficiency ratio reaching the national first-level energy-efficiency grade or above, reducing the room’s overall PUE and long-term electricity cost. Low-temperature natural-cooling and other energy-saving functions are desirable, fully utilizing the outdoor low-temperature environment to reduce compressor runtime.
5.4 Air Cleanliness Requirements
Room air must meet a certain cleanliness standard, effectively filtering dust and particles to prevent dust deposition on circuit boards causing poor heat dissipation, short circuits and corrosion, thereby extending IT equipment service life.
5.5 Intelligent Monitoring Requirements
The system must have complete local and remote monitoring capability: real-time viewing of operating parameters, device status and fault alarms; support for integration with the room dynamic-environment monitoring system and building automation system for centralized management and unattended operation; support multi-unit group control, automatic load distribution, primary/standby automatic switchover and rotation operation.
5.6 Installation and Maintenance Requirements
Equipment should adopt a front-maintenance design to reduce installation footprint; core components should be modular for easy removal and replacement; fault self-diagnosis should precisely locate faults to reduce O&M difficulty and downtime. Air supply mode, appearance dimensions and functional configuration should be customizable to site conditions.
6. Design Principles and Applicable Standards
6.1 Applicable Standards
The design strictly follows the following national codes and industry standards:
– *Code for Design of Data Centers* — GB 50174-2017
– *Unit Air Conditioners for Computer and Data Processing Rooms* — GB/T 19413-2010
– *Code for Construction and Acceptance of Data Center Infrastructure* — GB 50462-2015
– *Code for Design of Heating, Ventilation and Air Conditioning of Industrial Buildings* — GB 50019-2015
– *Code for Design of Low-Voltage Electrical Installations* — GB 50054-2011
– Guangzhou KITOZER enterprise computer-room construction standards
– The customer’s room base data and functional requirements
6.2 Core Design Principles
(1) Reliability first. Core components are international first-line brands; the whole unit undergoes rigorous reliability testing; redundant architecture design minimizes system failure risk and guarantees year-round uninterrupted room operation.
(2) High-precision control. Fuzzy PID control algorithm combined with high-precision temperature/humidity sensors achieves precise control with fluctuation far below industry standards, fully meeting electronic equipment environmental requirements.
(3) High efficiency and energy saving. Energy saving is realized at three levels — component selection, system optimization and intelligent control — improving energy utilization and reducing the room’s whole-lifecycle operating cost.
(4) Intelligent and easy management. Complete monitoring and communication interfaces support remote management, automatic alarms and group-control linkage, reducing O&M difficulty and improving management efficiency.
(5) Scalability. The system reserves 15%-20% cooling margin for future equipment expansion; functional modules support later upgrade and addition.
(6) Customization and adaptability. Customized design can be provided per room building structure, installation density, installation conditions and functional requirements, ensuring the solution matches the site precisely.
7. System Architecture and Working Principle
7.1 Heat-Load Calculation Method
The room cooling capacity must be determined by accurate heat-load calculation to avoid insufficient cooling (temperature overrun) or oversized cooling (investment and energy waste). The total heat load consists of five parts:
IT equipment heat load: the dominant heat source, more than 80% of the total; IT equipment converts almost all electrical energy into heat during operation, calculated at 95% of the total rated power of equipment.
Building envelope heat load: heat transferred through walls, roof, windows and floor, calculated per building structure parameters, orientation and outdoor extreme temperature.
Lighting heat load: heat from room lighting, calculated at total lighting power.
Personnel heat load: heat dissipated by O&M personnel in the room, calculated at the maximum simultaneous occupancy.
Fresh-air heat load: heat and moisture load brought by outdoor fresh air introduced to maintain room positive pressure.
Total cooling formula: Total cooling capacity = (IT equipment heat load + envelope heat load + lighting heat load + personnel heat load + fresh-air heat load) × safety factor (1.1-1.2).
Quick estimation reference: for ordinary rack-server rooms with 3-5 kW per cabinet, estimate 0.8-1.2 kW cooling per square meter; high-density rooms must be calculated accurately from actual equipment power. The company provides free on-site survey with an accurate heat-load calculation report by professional engineers.
7.2 Airflow Organization Design
Reasonable airflow organization is the key to improving cooling efficiency and avoiding local hot spots. Two mainstream airflow forms are offered, selectable per room conditions:
Downflow supply / upflow return (recommended): cold air is discharged from the unit bottom into the plenum under the raised floor, delivered uniformly into the cold aisle through perforated floor tiles in front of the cabinets; cold air absorbs equipment heat and becomes warm air, exhausted from the cabinet rear to the upper room space, then returns through the unit top return grille. This form has high cooling utilization, clear cold/hot air stratification and can combine with cold/hot aisle containment for higher efficiency — the standard airflow form for data rooms with raised floors.
Upflow supply / downflow return: cold air is discharged from the unit top and delivered uniformly through supply ducts and diffusers in the upper room space; cold air sinks, absorbs heat and returns through lower room return grilles. This form needs no raised floor, is simple to install and suits rooms without raised floors, high-ceiling rooms or renovation projects.
7.3 System Composition Architecture
The room-level precision air conditioner consists of six core subsystems working together to realize the integrated functions of constant temperature, constant humidity, cleanliness and ventilation:
– Refrigeration cycle system: compressor, evaporator, condenser and throttling device transfer heat to accomplish cooling and dehumidification;
– Air circulation system: centrifugal fans drive air circulation, delivering cold air into the room and returning warm air to the unit, ensuring uniform airflow;
– Humidification system: electrode or infrared humidifiers produce clean steam to raise humidity and prevent static electricity;
– Heating system: PTC ceramic heating raises air temperature for low-temperature environments or temperature compensation after dehumidification;
– Filtration system: multi-stage air filters remove dust and particles to guarantee room air cleanliness;
– Intelligent control system: the “brain” of the unit — collects environmental data and automatically adjusts each subsystem for precise temperature/humidity control, providing monitoring, alarm and communication functions.
7.4 Redundant Reliability Design
This solution adopts N+1 redundant configuration: N units satisfy the full-load cooling requirement and one additional standby unit is provided. During normal operation, multiple units work in rotation sharing the load; when any unit fails, the standby unit automatically starts and takes over to fill the cooling gap, keeping room temperature within the normal range at all times.
Besides improving reliability, the redundant design enables rotation operation — avoiding any single unit running at high load long term, balancing equipment wear and extending overall system life. For Class-A (A-level) rooms with the highest importance, the configuration can be upgraded to 2N redundancy for even higher fault tolerance.
8. Detailed Technical Design
8.1 Refrigeration Cycle System
Scroll compressor: fully hermetic flexible scroll type from international first-line brands (Copeland/Daikin); smooth operation, low vibration and noise, high volumetric efficiency, liquid-slugging tolerance and high reliability; F-class insulation; IP54 protection; built-in over-temperature and overcurrent protection with automatic shutdown on high discharge temperature; R410A environmentally friendly refrigerant (ODP 0) with high working pressure and excellent heat-exchange efficiency; operating conditions evaporation 5℃-10℃, condensation 40℃-60℃ with wide-range adaptability.
Evaporator: copper-tube aluminum-fin direct-expansion type; internally grooved oxygen-free copper tube φ9.52 mm, wall ≥0.35 mm, grooves enlarge the heat-exchange area; hydrophilic aluminum foil wavy fins, 2.0 mm pitch — condensate drains quickly without frosting or water accumulation, low air resistance; heat-exchange area ≥36 m² (30 kW), ≥60 m² (50 kW), ≥96 m² (80 kW); design pressure 4.0 MPa with 100% helium mass-spectrometer leak testing; V-type/double-row compact structure for uniform heat exchange.
Throttling device: electronic expansion valve from international first-line brands; 10%-100% continuous stepless regulation with opening accuracy ±5% and response time ≤2 s; precisely regulates refrigerant flow per system load to keep evaporation temperature stable, with significant part-load energy saving — far superior to capillary tubes and thermostatic expansion valves.
Refrigeration accessories: molecular-sieve + screen filter drier (removable) absorbing moisture and impurities; sight glass with humidity indicator for refrigerant state and moisture observation; high/low pressure switches acting at 3.0 MPa (high side) and 0.2 MPa (low side) with automatic shutdown protection; receiver storing excess refrigerant to stabilize pressure under load fluctuation; solenoid valve controlling refrigerant on/off with the compressor to prevent refrigerant migration after shutdown.
8.2 Air Circulation System
Centrifugal fan: backward-curved double-inlet centrifugal type with EC brushless DC motor from international first-line brands; 0-100% stepless speed regulation with automatic airflow adjustment per return-air temperature; fan efficiency ≥85%, far higher than traditional AC fans; static pressure 100-300 Pa continuously adjustable for different raised-floor heights and duct resistance; F-class insulation; IP54; design life ≥50,000 hours. The EC motor saves more than 30% energy versus ordinary AC fans with soft start and no inrush current.
Air duct and volute: quality galvanized steel sheet ≥1.2 mm, corrosion-resistant and durable; fluid-dynamics-optimized volute profile for smooth airflow, low resistance and low eddy noise; sealed joints with gasket strips reducing air leakage; rubber anti-vibration pads under fans reducing vibration transmission and noise.
8.3 Humidification System
Standard electrode humidifier: humidification capacity 3 kg/h (30 kW), 5 kg/h (50 kW), 8 kg/h (80 kW), 12 kg/h (100 kW); generates steam by passing current through electrode rods in water — clean steam without white powder; proportional regulation per humidity deviation for high control accuracy; ordinary tap water only, no pure-water equipment needed; food-grade high-temperature engineering-plastic humidifier tank, removable, cleanable or replaceable after scaling; protection functions of water-shortage power-off, overcurrent, overheat and high-water-level; 220 V/50 Hz; simple structure, low cost, fast humidification.
Optional infrared humidifier: same capacity as the corresponding electrode type; infrared quartz lamp radiates the water surface to produce steam without electrode-water contact; insensitive to water quality — scale does not reduce heating efficiency; no electrode wear, longer maintenance intervals and lower maintenance cost; lamp life ≥8,000 hours; stepless proportional regulation; suited to remote rooms with poor water quality or limited O&M manpower.
8.4 Heating System
PTC ceramic electric heater: heating power 3 kW (30 kW), 6 kW (50 kW), 10 kW (80 kW), 15 kW (100 kW); three-stage step or stepless regulation; heat conversion efficiency ≥98%; PTC ceramics are self-limiting — surface temperature never exceeds 200℃, no open flame, no overheat risk, safe and reliable; long life without power decay; double-pole over-temperature protector plus thermal fuse for dual overheat protection; 380 V/50 Hz; installed on the discharge side so heated air is delivered uniformly without local overheating.
8.5 Air Filtration System
Two-stage filtration is standard, upgradeable to three-stage high-efficiency filtration to guarantee room air cleanliness.
G4 primary filter: filtration efficiency ≥90% for ≥5 μm particles (EN779); synthetic-fiber non-woven media with high dust-holding capacity; reusable aluminum frame, media replaceable separately; initial resistance ≤50 Pa, final resistance ≤150 Pa; replacement cycle 3-6 months per ambient cleanliness; protects downstream medium filters and heat exchangers.
F8 medium filter: filtration efficiency ≥95% for ≥1 μm particles (EN779); micro-glass-fiber media in pleated structure enlarging the filtration area; galvanized steel/ABS frame; initial resistance ≤80 Pa, final ≤200 Pa; replacement cycle 6-12 months; filters fine dust to guarantee room cleanliness and protect IT circuit boards.
Optional H13 HEPA filter: efficiency ≥99.97% for ≥0.3 μm particles; for clean rooms, medical equipment rooms and laboratories; initial resistance ≤200 Pa; replacement cycle 12-24 months.
8.6 Intelligent Control System
Controller hardware: 32-bit ARM industrial-grade processor with fast computation, strong anti-interference and stable operation; 7-inch color LCD touchscreen (800 × 480) with intuitive Chinese graphic interface; built-in large storage keeping more than 1 year of operating data and fault records with export support; high-precision digital temperature/humidity sensors with accuracy ±0.3℃/±2% RH and high sampling frequency.
Control functions: operating modes — cooling, heating, humidifying, dehumidifying, auto, ventilation, sleep; adaptive fuzzy PID algorithm with small temperature/humidity fluctuation and precise control, avoiding frequent start/stop; group control up to 32 networked units with automatic load distribution, primary/standby switchover, rotation and automatic standby start on fault; weekday/holiday timed on/off and mode switching; multi-level password protection against misoperation.
Alarm functions: more than 30 alarm types — temperature too high/low, humidity out of range, high/low pressure, fan fault, compressor fault, humidifier fault, heater fault, filter clogging, power anomaly; local sound/light alarm, screen prompt, remote communication alarm and dry-contact alarm output; all alarms automatically recorded with time, type and value for query and tracing.
Communication interfaces: standard RS485 with Modbus-RTU; optional Ethernet with SNMP and TCP/IP for dynamic-environment monitoring and BA system integration; optional dry-contact alarm output to third-party alarm platforms; optional 4G wireless module for mobile APP remote monitoring.
Intelligent energy-saving functions: load-adaptive regulation — automatic adjustment of compressor output and fan speed per room heat load for high part-load efficiency; optional natural-cooling mode — when outdoor temperature is below the set value, outdoor fresh air cools the room directly with the compressor stopped, saving up to 40%+ energy; intelligent dehumidification — cooling + heating combined dehumidification in low-temperature/low-humidity conditions avoiding large temperature fluctuation; rotation operation among multiple units balancing wear and extending life.
8.7 Unit Structure and Protection Parameters
Frame: high-strength steel profile frame, stable and load-bearing without long-term deformation.
Panels: quality galvanized steel ≥1.2 mm with electrostatic powder coating — corrosion-resistant, wear-resistant and attractive, standard ivory white, colors customizable.
Insulation: 20 mm high-density flame-retardant insulation cotton on the inner walls with low thermal conductivity, preventing shell condensation and reducing cold loss.
Maintenance: front double-door design — all core components maintainable from the front, no maintenance space needed at sides/back, saving room area.
Base: thickened steel base for forklift handling and floor fixing, adapted to raised-floor installation.
Protection: indoor unit IP20, outdoor condenser IP54; electrical safety per GB 7251.1 with reliable grounding, qualified insulation, main power switch and branch protection.
8.8 Outdoor Condenser
Air-cooled fin type; V-type double-row (30/50 kW) or V-type triple-row (80/100 kW) structure; EC stepless-speed axial fans — 2 units (30/50 kW) or 4 units (80/100 kW); total airflow 12,000/18,000/30,000/36,000 m³/h; noise ≤52/55/58/60 dB(A) at 1 m; applicable ambient temperature -15℃ to +45℃, optional low-temperature kit extending to -30℃; galvanized steel + electrostatic powder coating shell, IP54; high-efficiency internally grooved copper tubes and hydrophilic wavy aluminum fins, corrosion-resistant and easy to clean; fan speed automatically regulated per condensing pressure — high speed for heat rejection, low speed for energy saving; optional low-temperature components (pressure-regulating valve, crankcase heater) for cold-climate operation.
9. Recommended Configuration and Preliminary Budget
9.1 Configuration Summary
The following table shows a typical configuration for a 100 m² server room: 2 × 50 kW room-level constant-temperature/humidity precision air conditioners in 1+1 (N+1) redundancy with downflow supply:
| No. | Item | Model / Specification | Qty | Unit |
|---|---|---|---|---|
| 1 | Room-level constant temp/humidity precision AC indoor unit | KTZ-FJ-50KW-X; 50 kW cooling; downflow; 7-inch touchscreen; RS485 standard | 2 | sets |
| 2 | Air-cooled outdoor condenser | KTZ-LN-50KW; V-type; EC fans; IP54 | 2 | sets |
| 3 | Medium filter kit | KTZ-GL-F8; F8 class, with G4 primary | 2 | sets |
| 4 | Intelligent monitoring networking module | KTZ-JK-ETH; Ethernet, SNMP, dynamic-environment integration | 2 | sets |
| 5 | Electrode humidifier kit | KTZ-JS-5; 5 kg/h, with inlet solenoid valve | 2 | sets |
| 6 | PTC electric heating kit | KTZ-JR-8; 8 kW, multi-stage regulation | 2 | sets |
| 7 | Refrigerant copper pipe and insulation | Copper tube + B1 rubber-plastic insulation, fittings | 2 | sets |
| 8 | Condensate pipe and drain fittings | UPVC, with traps and hangers | 2 | sets |
| 9 | Power and control cables | Three-phase five-wire power cable + shielded control cable, conduit laid | 2 | sets |
| 10 | Perforated floor tiles | 600×600, 40% opening, steel, with supports | 20 | pcs |
| 11 | Equipment transport and unloading | Local transport with manual unloading | 1 | item |
| 12 | Installation and commissioning service | Equipment installation, pipe connection, vacuuming and charging, energized commissioning, parameter calibration | 1 | item |
9.2 Quotation Notes
The preliminary budget covers the indoor units, outdoor condensers, optional kits, copper piping, cables, floor tiles, transport and installation/commissioning, inclusive of tax. All prices are indicative and quoted in RMB (CNY) only — no foreign-currency conversion is provided. The final quotation is confirmed by the sales engineer after the on-site survey based on the actual room area, heat load, selected model (30/50/80/100 kW), airflow form, quantity and delivery location, and is subject to a formal contract. Optional infrared humidifier, HEPA filter, low-temperature kit and natural-cooling module are priced separately. Free on-site survey, free heat-load calculation report and free design proposals are provided; projects outside the local city are quoted with additional travel and transport costs as applicable.
10. Technical Specifications
10.1 System Performance Summary
| Item | KTZ-FJ-30KW | KTZ-FJ-50KW | KTZ-FJ-80KW | KTZ-FJ-100KW |
|---|---|---|---|---|
| Nominal cooling capacity (24℃/50%RH) | 30 kW | 50 kW | 80 kW | 100 kW |
| Sensible cooling capacity | 28.5 kW | 47.5 kW | 76 kW | 95 kW |
| Sensible heat ratio | ≥0.95 | ≥0.95 | ≥0.95 | ≥0.95 |
| Airflow | 7,200 m³/h | 12,000 m³/h | 19,200 m³/h | 24,000 m³/h |
| External static pressure | 150 Pa (adj.) | 150 Pa (adj.) | 200 Pa (adj.) | 200 Pa (adj.) |
| Temp control range / accuracy | 18-28℃ / ±0.5-1℃ | 18-28℃ / ±0.5-1℃ | 18-28℃ / ±0.5-1℃ | 18-28℃ / ±0.5-1℃ |
| Humidity control range / accuracy | 40-60% RH / ±3-5% | 40-60% RH / ±3-5% | 40-60% RH / ±3-5% | 40-60% RH / ±3-5% |
| EER | ≥3.3 | ≥3.2 | ≥3.2 | ≥3.1 |
| Power supply | 380V/3N/50Hz | 380V/3N/50Hz | 380V/3N/50Hz | 380V/3N/50Hz |
| Rated input power | 9.1 kW | 15.6 kW | 25 kW | 32.3 kW |
| Noise (1 m) | ≤58 dB(A) | ≤60 dB(A) | ≤62 dB(A) | ≤65 dB(A) |
| Supply / return form | Down/up selectable | Down/up selectable | Down/up selectable | Down/up selectable |
| MTBF | ≥100,000 h | ≥100,000 h | ≥100,000 h | ≥100,000 h |
| Design life | ≥15 years | ≥15 years | ≥15 years | ≥15 years |
| Dimensions (W×D×H) | 850×950×1900 mm | 1000×1100×2000 mm | 1200×1300×2100 mm | 1400×1500×2200 mm |
| Net weight | 280 kg | 380 kg | 520 kg | 680 kg |
10.2 Key Component Specifications
| Component | Key Parameters |
|---|---|
| Scroll compressor | Hermetic flexible scroll, international first-line brand; R410A; F-class; IP54; evaporation 5-10℃, condensation 40-60℃ |
| Evaporator | Inner-grooved copper tube φ9.52 mm + hydrophilic wavy fins 2.0 mm; area ≥36/60/96 m²; design pressure 4.0 MPa |
| Electronic expansion valve | International first-line; 10%-100% stepless; accuracy ±5%; response ≤2 s |
| Centrifugal fan | Backward-curved double-inlet; EC motor; efficiency ≥85%; 100-300 Pa; ≥50,000 h; >30% energy saving vs AC fan |
| Electrode humidifier | 3/5/8/12 kg/h; proportional; tap water; tank replaceable; 220V/50Hz |
| PTC heater | 3/6/10/15 kW; ≥98% efficiency; self-limiting ≤200℃; double overheat protection; 380V/50Hz |
| G4 primary filter | ≥90% for ≥5 μm; initial ≤50 Pa, final ≤150 Pa; cycle 3-6 months |
| F8 medium filter | ≥95% for ≥1 μm; initial ≤80 Pa, final ≤200 Pa; cycle 6-12 months |
| H13 HEPA (optional) | ≥99.97% for ≥0.3 μm; initial ≤200 Pa; cycle 12-24 months |
| Controller | 32-bit ARM; 7-inch touchscreen; fuzzy PID; group control up to 32 units; 30+ alarms |
| Interfaces | RS485 Modbus-RTU standard; Ethernet SNMP / dry contacts / 4G optional |
| Indoor unit protection | IP20; frame + galvanized panels ≥1.2 mm; 20 mm insulation; front maintenance; GB 7251.1 |
| Outdoor condenser | Air-cooled V-type; EC axial fans; IP54; -15℃ to +45℃ (low-temp kit to -30℃) |
11. Key Advantages and Customer Value
11.1 Product Performance Advantage
Ultra-high sensible heat ratio: sensible heat ratio ≥0.95 — nearly all cooling capacity is used for temperature reduction with little dehumidification, avoiding over-drying that causes static electricity, while greatly improving cooling efficiency and eliminating wasted energy.
High-precision control: fuzzy PID algorithm with high-precision sensors delivers temperature accuracy ±0.5℃ and humidity accuracy ±3% RH with small fluctuation, fully protecting electronic component stability and extending equipment life.
High-reliability design: all core components are international first-line brands; the whole unit passes high/low temperature, damp-heat, vibration and long-run reliability tests with MTBF ≥100,000 hours; N+1 redundant architecture eliminates single-point failure risk for year-round uninterrupted room operation.
All-scenario adaptability: standard models operate with outdoor ambient -15℃ to +45℃; the optional low-temperature kit extends operation to -30℃; both downflow and upflow supply forms adapt to various room building conditions.
11.2 Energy Saving Advantage
High-efficiency component combination: EC brushless DC fans, electronic expansion valves, high-efficiency scroll compressors and hydrophilic-aluminum-foil heat exchangers combine for whole-unit EER far above the national first-level energy-efficiency grade.
Intelligent load regulation: the system monitors room heat load in real time and automatically adjusts the number of running compressors, fan speed and throttling-valve opening; part-load efficiency improves further, saving 20%-30% energy versus fixed-speed units.
Natural-cooling technology: with the optional natural-cooling module, when outdoor temperature is low in spring/autumn/winter the room is cooled directly by outdoor air with the compressor stopped — saving up to 40%+ energy and substantially cutting annual electricity cost.
Group-control scheduling: multi-unit group control automatically distributes load, avoiding multiple units running inefficiently at low load simultaneously and optimizing overall operating efficiency.
11.3 Design and Service Advantage
Source-factory customization: as a source manufacturer with its own factory, the company provides one-to-one design per room area, heat density, installation conditions and functional requirements, free of charge, with three differentiated proposals — highly matched to the actual scenario and avoiding the fit problems of standardized solutions.
Professional team support: design, construction and after-sales teams with more than 20 years of computer-room air conditioning and room-construction experience, familiar with industry codes and requirements; dedicated personnel follow the whole process from survey, design, production, installation to maintenance.
Full-lifecycle service: free maintenance during warranty, annual maintenance agreements after warranty, parts replacement, upgrade renovation and relocation services keep the equipment reliably running long term.
11.4 O&M Convenience Advantage
Front full-maintenance design: all core components can be inspected and replaced from the front, allowing wall-mounted installation and saving valuable room space.
Fault self-diagnosis: the control system automatically detects faults, precisely locates the fault point and displays the fault code with handling suggestions, greatly shortening troubleshooting time.
Remote centralized monitoring: supports integration with the dynamic-environment system for remote parameter viewing, setting modification and alarm reception without on-site duty, reducing O&M labor cost.
Modular structure: each functional module is independently designed for convenient replacement, minimizing fault downtime.
12. Technical Q&A (50+ Items)
12.1 Basics and Product Selection
Q1: What is a room-level precision air conditioner, and how does it differ from an ordinary comfort air conditioner?
A: A room-level precision air conditioner is a dedicated industrial air conditioner for data rooms, communication rooms and laboratories, designed to keep the equipment environment stable. The differences are fundamental: sensible heat ratio — precision units ≥0.9 (cooling for temperature), comfort units about 0.6-0.7 (much cooling wasted on dehumidification, over-drying the room and causing static faults); runtime — precision units are designed for 365×24 duty with 15+ year design life, comfort units for about 8 h/day and fail quickly in continuous duty; control accuracy — precision units ±0.5-1℃ and ±3-5% RH with humidity control, comfort units about ±2℃ without humidity control; functions — precision units integrate cooling, heating, humidifying, dehumidifying and multi-stage filtration; airflow — precision units have high airflow and static pressure for uniform underfloor supply, comfort units have short throw and create local hot spots.
Q2: How do I choose between room-level and row-level (in-row) precision air conditioners?
A: The difference is deployment and cooling density. Room-level units condition the whole room with large per-unit capacity, flexible deployment, lower cost and simple maintenance — suited to small/medium rooms, branch rooms and retrofits with ≤5 kW per cabinet. Row-level units sit between cabinet rows close to the heat source, with higher efficiency, lower PUE and support for higher heat density — suited to medium/large data centers with 5-20 kW per cabinet, requiring cold/hot aisle containment and higher initial investment. In short, ordinary office and small enterprise rooms choose room-level for best cost-performance; high-density IDC chooses row-level for efficiency.
Q3: Does a constant-temperature/humidity unit run cooling and humidifying simultaneously, wasting energy?
A: No. The intelligent PID control dynamically regulates cooling, heating, humidifying and dehumidifying output per the real-time deviation from set points, always staying near the balance point — it never runs full cooling and full humidification at once. Only in extreme conditions does small cold/heat cancellation occur, which is the normal price of precision control; overall consumption is far below the repeated start/stop losses of comfort units.
Q4: Which models are available and how do I pick the right cooling capacity?
A: The KITOZER-FJ series covers 30/50/80/100 kW nominal cooling. Selection is based on the calculated total heat load with a 1.1-1.2 safety factor and 15%-20% margin: about 0.8-1.2 kW per m² for ordinary rack-server rooms, or precise calculation from equipment power for high-density rooms. For a 100 m² standard room with 20 cabinets, two 50 kW units in N+1 are typical. The company provides a free heat-load calculation report.
Q5: What is the sensible heat ratio, and why does ≥0.95 matter?
A: The sensible heat ratio is sensible cooling divided by total cooling. In a computer room the load is almost entirely sensible (heat from IT equipment), with little latent load. A high ratio means nearly all cooling lowers temperature instead of condensing moisture, so the room does not become over-dry (preventing static damage), cooling efficiency is high and energy is not wasted on unnecessary dehumidification. Precision units are designed for ≥0.9-0.95; comfort units at 0.6-0.7 would over-dehumidify a room.
Q6: What refrigerants are used, and are they environmentally friendly?
A: The standard refrigerant is R410A, an HFC blend with zero ozone depletion potential (ODP 0), high working pressure and excellent heat-exchange efficiency, meeting environmental requirements. The sealed system requires no regular refrigerant charging; only leak repair and recharge after a detected leak.
Q7: Can the unit also heat in winter?
A: Yes. PTC ceramic electric heating is integrated (3-15 kW by model) with three-stage or stepless regulation, providing heating for low outdoor temperature operation and temperature compensation after dehumidification — the unit maintains constant temperature year-round.
Q8: What is the design life of the unit?
A: The design service life is ≥15 years with core compressor life beyond 100,000 hours under normal use and regular maintenance. Design margins, first-line components and proper maintenance (filters, cleaning, refrigerant checks) are what make long life achievable.
12.2 Sizing and Heat-Load Calculation
Q9: How is the cooling capacity of a room precision air conditioner calculated?
A: Accurate calculation considers IT equipment power, building structure, orientation, floor level, outdoor temperature, fresh-air volume and personnel count — best performed by professional engineers with an on-site survey. Quick estimation: by equipment power — total cooling ≈ IT equipment total power × 1.1-1.2; by area — 0.8-1.2 kW per m² for ordinary server rooms, precise calculation for high-density rooms. Estimation is for preliminary selection only; the final design must be accurately calculated.
Q10: Why is N+1 redundancy needed? Isn’t 1+1 a waste?
A: N+1 redundancy is a necessary safety investment, not waste. A computer room is critical infrastructure — air conditioning failure can raise room temperature rapidly and cause server shutdown within minutes, with huge economic loss. N+1 provides fault backup (standby auto-takeover), maintenance without downtime (units can be serviced in rotation) and longer life (rotation avoids one unit running at high load long term, extending overall life by 30%+). For core rooms the redundancy cost is far below downtime losses.
Q11: How much cooling margin should be reserved?
A: 15%-20% margin above the calculated load is recommended: it absorbs load growth from adding equipment, handles extreme outdoor temperatures, and accounts for filter/coil degradation before maintenance. This solution designs with 15%-20% margin as standard and supports future capacity upgrades.
Q12: Why does the IT load count as 95% of equipment rated power?
A: IT equipment converts almost all input electrical energy into heat during operation; the 95% coefficient covers real-world loading (most equipment runs below rated power) while still conservatively capturing the dominant heat source. Combined with the overall safety factor, this avoids both undersizing and gross oversizing.
Q13: What factors can make the calculated cooling insufficient in practice?
A: Common causes: underestimating future equipment additions; ignoring envelope loads on sun-exposed walls/roofs; excessive fresh-air volume; high ceiling and poor airflow organization causing hot spots even with adequate total capacity; and dirty filters/coils degrading performance. The design reserves margin and verifies airflow organization to prevent these.
Q14: Can one large unit replace two smaller units in N+1?
A: Not for redundancy purposes. A single unit is a single point of failure — if it fails, the room has no cooling at all. Two smaller units in N+1 keep the room cooled at reduced capacity during a failure and allow rotation operation. For rooms where the required capacity exceeds one unit’s range, multiple units are mandatory.
Q15: What is the air change rate for a precision air-conditioned room?
A: Typical design airflow corresponds to about 20-40 air changes per hour for rack-server rooms, ensuring temperature uniformity within ±1℃ across the room. The FJ series provides 7,200-24,000 m³/h airflow with 150-200 Pa external static pressure to deliver through raised-floor plenums.
12.3 Installation and Environment
Q16: What are the installation requirements for the room and the space to reserve?
A: Main requirements: indoor unit — at least 1 m front maintenance space, sides/back can be wall-mounted (front-maintenance model); outdoor condenser — in a ventilated, unobstructed location with 30 cm+ surrounding maintenance space; power — three-phase five-wire 380 V supply matching the unit rating with a dedicated breaker and grounding; water — tap-water supply for the humidifier and condensate drainage conditions; floor loading — indoor unit 280-680 kg, outdoor unit 85-260 kg, floor must carry the weight or a load-spreading frame is added; raised floor ≥30 cm for downflow, room clear height ≥2.8 m for upflow.
Q17: Can the indoor unit be installed outdoors?
A: No — the indoor unit is not weatherproof. The matching outdoor condenser is designed for outdoor installation with IP54 protection (rain, dust and sun resistant). For complete outdoor installation, the company’s outdoor-cabinet dedicated air conditioner models are available with whole-unit IP55 protection.
Q18: Is the unit noisy? Will it disturb adjacent offices?
A: Operating noise is about 58-65 dB(A) at 1 m — roughly normal conversation level. Computer rooms are usually enclosed; with the door closed, outdoor noise drops below 40 dB and does not disturb adjacent offices. For very strict noise requirements, sound-absorbing materials and anti-vibration bases can be added.
Q19: What power supply is required?
A: Three-phase five-wire 380 V/50 Hz (3N~380V), with a dedicated branch breaker and reliable grounding per the unit’s rated input power (9.1-32.3 kW by model). The power cable should be sized with margin and the ground connection must meet the electrical code; the unit has its own main switch and branch protection.
Q20: How is the condensate drained?
A: Condensate collects in the drain pan and flows through a UPVC drain pipe with a slope of ≥1% toward the drain point, fitted with a water trap to prevent odor backflow, and insulated to prevent condensation dripping. A drainage test is performed after installation to confirm unobstructed, leak-free drainage.
Q21: What is the requirement for the raised floor in downflow installation?
A: The plenum height under the raised floor should be ≥30 cm (deeper is better for even distribution), with perforated floor tiles placed in front of the cold aisle at the correct opening ratio (e.g. 40%) and the plenum kept clean and sealed so cold air is delivered where the equipment needs it.
Q22: Can the unit be installed in an existing running room without shutdown?
A: Yes. Installation is mostly mechanical and piping work around the equipment; refrigerant pipes, power and drain are run along existing routes; only brief power-off is needed for the final electrical connection, arranged in a maintenance window. The unit is then commissioned without affecting running IT loads.
12.4 Maintenance and Consumables
Q23: What routine maintenance is needed, and how often?
A: Maintenance is tiered: daily/weekly patrol — check the display status, temperature/humidity values and alarms, and confirm normal air in/out with no abnormal sound or smell; monthly — clean the G4 primary filter, check humidifier tank water level, clean the condensate pan and drain, check fan sound; quarterly — check high/low side pressures, detect refrigerant leaks, tighten electrical connections, calibrate sensors; annually — thoroughly clean evaporator and condenser fins, check compressor status, replace the F8 medium filter and humidifier tank (electrode type), run full performance checks and identify hidden dangers.
Q24: How often are filters replaced, and what happens if they are not?
A: Replacement cycles depend on ambient cleanliness: G4 primary 3-6 months, F8 medium 6-12 months, H13 HEPA 12-24 months; shorten the cycle in dusty environments. Blocked filters increase air resistance, reduce airflow and cooling, raise room temperature, increase fan load and energy consumption, and let dust penetrate into the room onto server boards — causing heat-dissipation degradation, short circuits and corrosion. Regular replacement protects both the unit and the IT equipment.
Q25: Does the unit need refrigerant recharging, and how often?
A: A properly installed refrigeration system is fully sealed with no normal consumption — no periodic recharging is needed. Recharging is required only after a leak is found and repaired. If cooling performance drops or low-side pressure is low, have a professional check for leaks rather than blindly recharging.
Q26: How should the humidifier tank be maintained?
A: The electrode humidifier uses tap water and forms scale over time. Check the water level monthly; clean or replace the removable food-grade tank when heavily scaled (typically every 6-12 months depending on water quality). The infrared humidifier needs less frequent service — no electrode wear, with lamp life ≥8,000 hours.
Q27: How do I clean the outdoor condenser fins?
A: Power off first, then gently rinse the fins with clean water (low pressure) from inside out, or use compressed air in the reverse direction of airflow; avoid bending the fins — use a fin comb if needed. Cleaning is especially important in spring/summer when cotton fibers and dust accumulate; clean quarterly or as ambient conditions require, and more often if high-pressure alarms recur.
Q28: What spare parts should the owner keep in stock?
A: Recommended spares: one set of G4 primary and F8 medium filters, one humidifier tank (electrode type), drive belts (if applicable), fuses and contactors, temperature/humidity sensor spare, and a set of refrigerant pressure gauges. The company provides a spare-parts list and long-term original parts supply.
Q29: How is the temperature/humidity sensor calibrated?
A: Sensors are calibrated at commissioning with a reference instrument; during quarterly maintenance the displayed values are compared against a calibrated hygrometer/thermometer and adjusted via the controller; replace the sensor if the deviation cannot be corrected. Accurate sensing is the basis of the unit’s precision control.
Q30: What should be checked during the annual maintenance?
A: Annual maintenance covers: full cleaning of evaporator and condenser coils; compressor operating current, pressure and sound check; refrigerant leak test; EC fan bearing and speed check; electrical connection tightening and insulation test; filter replacement; humidifier tank replacement and drain cleaning; sensor calibration; full-function test of cooling/heating/humidifying/dehumidifying modes and alarms; and a maintenance report with optimization suggestions.
12.5 Fault Handling
Q31: What are the common causes of a high-pressure alarm, and how is it handled?
A: High-pressure alarm is the most common fault. Causes and simple handling: dirty/blocked condenser — power off and rinse the outdoor fins with water to remove dust and cotton fibers; outdoor fan not running — check fan power, capacitor and motor, replace faulty parts; overcharging of refrigerant — release to standard pressure; excessive outdoor temperature or poor ventilation — improve ventilation, avoid direct sun, add a sunshade. The unit auto-protects on high pressure; if it does not recover after simple treatment, call a professional — do not disassemble the system yourself.
Q32: Why won’t the room humidity drop?
A: Common causes: insufficient cooling capacity for dehumidification — check undersized selection, blocked filters or low refrigerant; excessive fresh air bringing in outdoor moisture — adjust fresh-air volume; water leakage or seepage in the room or a nearby water source — locate and fix; humidifier fault keeping it running — check the inlet valve sealing; humidity sensor fault giving wrong readings — calibrate or replace.
Q33: What are the causes of unit water leakage, and is it dangerous?
A: Common causes: blocked condensate drain — clear the pipe; damaged insulation with condensation dripping — re-wrap insulation; humidifier tank leakage — check the water-level switch and inlet valve. Leakage is dangerous in a room — water can seep into cabinets and short-circuit equipment; investigate and fix immediately upon discovery, and consider a leak-detection system for important rooms.
Q34: What does a compressor fault alarm mean, and what should I do?
A: The compressor alarm covers overcurrent, over-temperature and start failure, often caused by poor heat rejection, refrigerant shortage, capacitor/contactor failure or an aging compressor. Record the fault code, check the obvious causes (condenser cleanliness, refrigerant pressures, electrical connections), and if not resolved, contact service; do not repeatedly force-start the compressor.
Q35: What if the unit trips the power breaker?
A: Check for: short circuit or ground fault in the power cable; a faulty compressor start (locked rotor drawing high current); heater short circuit; or an undersized/aged breaker. Isolate the load and measure insulation resistance; never simply increase the breaker rating — identify and fix the root cause, with professional help if needed.
Q36: Why does the unit keep starting and stopping frequently?
A: Frequent start/stop usually indicates: control dead-band too small or sensors inaccurate; cooling capacity oversized for the load (short cycles); abnormal ambient conditions; or communication faults causing mode oscillation. Check set points and sensor readings first; the fuzzy PID control normally avoids frequent cycling — if it persists, have the control parameters checked.
Q37: What should I do when a fault code appears on the screen?
A: Read the fault code and description on the touchscreen (the manual lists all codes with causes and handling), check the obvious items the code points to (filters, drain, outdoor unit, pressures), press reset after confirming the cause is cleared; if the alarm repeats, contact the 7×24 service line with the code and operating data for remote diagnosis.
Q38: How is a refrigerant leak detected?
A: Leak detection uses electronic leak detectors, soap-water checks at joints and pressure-hold testing; the evaporator is 100% helium mass-spectrometer tested at the factory. If leak is suspected (low pressure, poor cooling), test the joints and fittings first, repair, evacuate and recharge to the nameplate quantity.
Q39: What emergency measures apply when the unit fails in hot weather?
A: If cooling fails and room temperature rises: check and clean the condenser and filters (most common causes), restore ventilation, temporarily reduce heat load (e.g. non-critical loads), use the redundant unit at full capacity, and call service for priority dispatch; for critical rooms, keep a spare unit contractually available or arrange temporary portable cooling.
12.6 Energy Saving and Lifecycle
Q40: How can I use the precision air conditioner more efficiently?
A: Practical measures: set temperature at 24-25℃ — each 1℃ increase saves about 8% energy; contain cold/hot aisles to reduce mixing and improve efficiency by 15%+; clean filters and condenser regularly — blockage substantially increases consumption; enable group control and rotation to optimize load distribution; add natural cooling for winter; raise set temperature slightly at night when loads are low.
Q41: What is natural cooling (free cooling), and when does it apply?
A: The optional natural-cooling module brings in outdoor air (or uses a heat exchanger) when outdoor temperature is low enough, cooling the room directly with the compressor stopped. In climates with long cool seasons this can cut annual cooling energy by more than 40%. It suits rooms with acceptable outdoor air quality (with filtration) or indirect designs where outside air cannot enter.
Q42: How long is the service life, and how is it extended?
A: With normal use and regular maintenance, design life is 10-15 years with compressor life over 100,000 hours. To extend life: regular professional maintenance and timely consumable replacement; N+1 redundancy with rotation to avoid one unit at sustained high load; keep the room clean to reduce dust ingress; stable power supply avoiding frequent outage shocks; and repair small faults promptly rather than running with defects.
Q43: What is the ECO/EER relationship to the electricity bill?
A: EER = cooling output ÷ input power. A 3.2 EER unit delivers 3.2 kW cooling per kW input; improving from 2.8 to 3.2 cuts the air-conditioning electricity consumption by about 12% for the same cooling. The FJ series’ high-EER components and part-load regulation directly reduce the largest operating cost item of a computer room.
Q44: Does the group-control function really save energy?
A: Yes. Group control distributes load among units so each runs near its most efficient point, rotates units to balance wear, and stops or unloads unnecessary capacity at low load. Without group control, multiple units may all run at inefficient low load simultaneously. Up to 32 units can be networked for automatic scheduling.
Q45: What is the difference between the three maintenance tiers offered after warranty?
A: Basic maintenance — on-call repair, discounted parts, phone support; standard maintenance — basic plus two scheduled on-site services per year with consumable discounts; full-coverage maintenance — standard plus free repair of all non-artificial faults, free wearing-part replacement and priority service with four scheduled services per year. Choose per room criticality and O&M budget.
Q46: How do I monitor the unit remotely without on-site staff?
A: Connect the unit via the standard RS485 interface (or optional Ethernet SNMP/4G module) to the room dynamic-environment monitoring system or directly to the provided monitoring platform; view temperature, humidity, operating parameters and alarms remotely, receive alarm notifications, and perform remote parameter changes — enabling unattended management of branch and edge rooms.
Q47: What is the payback of upgrading from comfort AC to precision AC?
A: Beyond the qualitative benefits (no IT failures from environmental swings, humidity control, cleanliness), energy savings of 20-30% (more with natural cooling) directly offset the higher first cost within a few years; equipment-life extension and reduced fault downtime add further returns. For 24×7 rooms the payback is typically well within the unit’s life.
Q48: Does the warranty include regular maintenance?
A: Yes. The whole unit is warranted for 2 years (core components such as the compressor 3 years) from acceptance; during the warranty, two free scheduled on-site maintenance visits per year are included plus free repair of non-artificial faults and free parts replacement, with 7×24 technical support.
Q49: What after-sales response time is provided?
A: 7×24 hotline with response within 30 minutes and an initial solution; on-site within 4 hours in urban areas and 8 hours in suburban areas; general faults repaired within 24 hours; major faults get a backup-equipment emergency plan to minimize downtime.
Q50: Can the system be expanded or relocated later?
A: Yes. The design reserves 15%-20% cooling margin; additional units can join the group-control network for capacity growth; units can be relocated by professional crews (reclaim refrigerant, move, re-pipe, re-commission); upgrade kits (HEPA, infrared humidifier, low-temperature kit, natural cooling) can be added at any time.
Q51: What documentation is delivered with the project?
A: Complete documentation is delivered: equipment manuals and certificates, operation and maintenance manual, as-built drawings and concealed-work records, commissioning and test reports, group-control and monitoring configuration instructions, filter/humidifier consumable list, and the after-sales service contact card.
Q52: How is training provided to the owner’s O&M staff?
A: On-site training at acceptance (theory + hands-on practice covering operation, parameter setting, filter cleaning/replacement, humidifier maintenance, alarm handling and monitoring-system use, about 2-3 hours, adjustable until fully mastered), plus online video/phone support and a free refresher session when personnel change; full electronic and paper manuals are handed over.
Q53: What should be done during the fire-alarm drill or when the room is vacant long-term?
A: In drills, follow the fire linkage plan (units and power cut per protocol); never operate the unit contrary to fire safety rules. For long vacancy, run the unit in dehumidification/ventilation mode periodically or keep temperature above dew point to prevent mold and condensation; keep power stable and check monthly.
13. Construction Schedule
13.1 Overall Period
Taking a standard dual-unit 50 kW precision air conditioner project as an example, the total schedule is about 15 working days, divided into six stages: preliminary preparation, arrival acceptance, installation construction, system commissioning, acceptance and delivery, and after-sales follow-up. Standard models are available from stock; customized models add production lead time; large and multi-room projects are scheduled per actual scale; the schedule is extended in case of force majeure or customer-caused delay.
13.2 Stage Schedule
| Stage | Work | Days | Responsible | Customer cooperation |
|---|---|---|---|---|
| 1. Preliminary preparation | On-site survey, solution confirmation, contract signing, production and stocking | 7 | Sales engineer, design engineer | Confirm solution, provide site conditions, arrange entry procedures |
| 2. Arrival acceptance | Transport of equipment and auxiliaries, unpacking, inventory and acceptance | 1 | Project manager, customer representative | On-site inspection and sign-off |
| 3. Installation construction | Indoor unit positioning and fixing; outdoor unit installation; refrigerant pipe brazing; condensate pipe; cable routing and wiring | 3 | Crew foreman, refrigeration technician, electrician | Provide construction power, coordinate site access |
| 4. System commissioning | Pipe pressure-hold leak test, evacuation, refrigerant charging, energized trial, function tests, temperature/humidity calibration, alarm tests | 2 | Commissioning engineer | Cooperate on energizing, confirm test results |
| 5. Acceptance and delivery | Overall acceptance, handover of equipment documentation, operation training, signing acceptance form | 1 | Project manager, customer leader | Organize acceptance, confirm delivery |
| 6. After-sales follow-up | Regular visits, warranty service, technical support | Long term | After-sales engineer | Feedback equipment operation |
13.3 Schedule Assurance Measures
Material assurance: standard models are stocked in advance; customized models receive priority scheduling with production tracked throughout to guarantee on-time dispatch; equipment is verified for model, specification, quantity and appearance at arrival with certificates and test reports — unqualified materials are rejected.
Personnel assurance: an experienced fixed crew is assigned with advance technical and safety disclosure; standby personnel cover schedule compression or additional scope.
Tooling assurance: complete and well-maintained tooling — impact drill, tube cutter, flaring tool, bender, nitrogen cylinder, brazing set, vacuum pump, refrigerant gauges, multimeter, torque wrench, level — checked before mobilization with accurate calibration.
Plan control: daily pre-shift meetings set tasks and post-shift reviews track progress; the project manager monitors throughout and recovers slippage immediately by adjusting shifts or adding manpower.
13.4 Progress Control and Early-Warning Mechanism
Daily report: a daily construction report records completed work, personnel, issues and next-day plans for real-time visibility by the owner.
Node acceptance: each key stage is accepted before the next begins — arrival acceptance, concealed-work (piping, wiring) acceptance, commissioning acceptance — avoiding rework and schedule loss from late defects.
Slippage warning: if actual progress falls more than 1 day behind plan, an alert is raised and the project manager analyzes causes and adds personnel or working time to recover.
Coordination: advance communication with the owner defines power-off and access windows and synchronizes with other disciplines to compress the total duration.
14. Construction Organization and Quality/Safety Measures
14.1 Organization Structure
The project adopts a project-manager responsibility system: 1 project manager (overall progress, quality, safety, coordination with the customer); 1 technical lead (disclosure, process control, commissioning guidance, technical problem solving); 1 crew foreman (site management, personnel dispatch, work sequencing, quality self-check); 2 refrigeration technicians (refrigerant pipe fabrication, brazing, pressure hold, evacuation, charging); 1 electrician (power/control cable laying, wiring, grounding); 1 safety officer (part-time, site safety management and inspection).
14.2 Position Responsibilities
Project manager: coordinates all parties and resources, liaises with the customer, resolves site issues; controls progress, quality, safety and cost; organizes acceptance, documentation handover and warranty follow-up.
Technical lead: makes all construction personnel familiar with drawings and the solution through technical and safety disclosure; supervises key processes in person; guides commissioning and calibration; compiles complete technical and acceptance documentation.
Crew foreman: leads the crew to complete tasks per drawings, codes and schedule; enforces process standards and quality; manages personnel, tooling and materials on site; keeps work records and reports issues promptly.
Refrigeration technicians: certified and experienced; perform pipe cutting/brazing with nitrogen protection, pressure-hold leak testing, evacuation and refrigerant charging per procedure.
Electrician: lays power and control cables, performs electrical wiring and grounding per code with insulation and grounding tests before energizing.
Safety officer: conducts pre-entry safety education and daily safety checks; enforces PPE, hot-work, temporary-power and work-at-height rules; handles incidents per the emergency plan.
14.3 Pre-Construction Preparation
Technical preparation: organize all personnel to study drawings and the solution; conduct technical and safety disclosure covering construction codes, quality standards and safety requirements.
Material preparation: stock in advance; verify model, specification, quantity and appearance at arrival with certificates and test reports; inventory auxiliaries per list and reject unqualified materials; store classified with moisture, fire and theft protection.
Tooling preparation: prepare impact drill, tube cutter, flaring tool, pipe bender, nitrogen cylinder, brazing set, vacuum pump, refrigerant pressure gauges, multimeter, torque wrench and level; verify tool condition and instrument calibration.
Site preparation: clean the work area; confirm and line-mark equipment installation positions; check site power and fire facilities; complete entry procedures; protect finished work on site.
14.4 Core Construction Processes
Equipment positioning: position indoor and outdoor units per design; level with a spirit level to ≤2‰; fix the indoor unit on floor or base with anti-vibration pads; install the outdoor unit on a concrete base or steel frame, firmly fixed with anti-vibration pads and wind-bracing.
Refrigerant pipe work: cut copper pipe with a dedicated tube cutter for a flat, burr-free end (never saw); braze with silver solder under nitrogen purging to prevent internal oxidation and scale; run pipes horizontal/vertical, firmly fixed at code spacing to avoid vibration and friction; after all connections, pressurize with nitrogen to 2.5 MPa and hold 24 hours — pressure drop ≤0.02 MPa passes; after the leak test, evacuate to below -0.1 MPa and hold 2 hours without rise; charge the specified refrigerant per the nameplate quantity.
Condensate pipe work: connect UPVC pipes with adhesive, slope ≥1% toward the drain point to avoid standing water; install a water trap before the drain connection to prevent odor backflow; insulate the pipe to prevent condensation dripping; perform a water-flow test after completion confirming unobstructed, leak-free drainage.
Electrical work: lay cables in galvanized steel conduit or trunking, neatly arranged with clear labels; connections firm with standard crimping and correct phase sequence; reliable grounding with equipment grounding resistance ≤4Ω; each branch configured with a correctly rated breaker and protection; perform insulation and grounding tests after completion before energizing.
System commissioning: re-check lines, pipes and valves before energizing; test each function — cooling, heating, humidifying, dehumidifying and fan operation; calibrate temperature/humidity sensors; test all alarms by simulating faults; set operating, group-control and communication parameters and connect the monitoring system; run continuously for 24 hours and record operating data to confirm all indicators meet the design.
14.5 Quality Control
Three-check system: after each process — self-check by the worker, mutual check by the crew foreman, special check by the project manager; the next process starts only after the previous one passes.
Key process control: brazing, pressure-hold leak testing, evacuation, electrical wiring and commissioning are supervised in person by the technical lead to ensure process quality.
Material quality control: all incoming materials must carry certificates; key materials are sample-tested; unqualified materials are immediately removed.
Documentation: construction records, inspection records and commissioning records are kept throughout and compiled into complete as-built documentation delivered at completion.
Acceptance standard: acceptance strictly follows *Code for Construction and Acceptance of Data Center Infrastructure* (GB 50462) and enterprise standards.
14.6 Safety and Civilized Construction Management
Safety regulations: all site personnel wear helmets; work at height uses safety belts and labor-protection shoes; special-operation personnel hold valid certificates — no unlicensed operation; hot work requires a hot-work permit with fire extinguishers and a designated watcher, confirming no ignition source remains after work; temporary power complies with code with RCD protection, no unauthorized wiring, and live work supervised by a dedicated person; pre-shift safety disclosure daily and post-shift safety inspection daily.
Civilized construction: materials and equipment stacked neatly with clear labels, not blocking fire lanes; construction waste removed daily — work finished, site clean; noise-reduction measures avoid disturbing surrounding offices; finished decoration, equipment and pipelines protected; workers dressed uniformly and observe the customer’s site management rules.
Emergency handling: electric-shock and fire emergency procedures are defined and rehearsed; first-aid kits and fire extinguishers are on site; incidents are reported immediately to the project manager and the customer with cause analysis and rectification.
14.7 Finished Product Protection
Handling protection: lift and place equipment gently with protective packaging until installation; outdoor units protected from rain and impact during storage.
During installation: avoid tool and material impacts; mask around drilling and brazing to prevent contamination; protect floors with covering during pipe work.
After installation: keep protective film on panels until acceptance; cover units during cross-operation; keep the area around units clean and dry; check protection status daily and restore if damaged.
15. After-Sales Service
15.1 Warranty Commitment
Warranty period: whole-unit free warranty of 2 years from the date of qualified project acceptance; core components such as the compressor are warranted for 3 years.
Warranty scope: during the warranty, faults caused by non-artificial factors are repaired free with free parts replacement; two free scheduled on-site maintenance services are provided each year. The warranty period starts from the date the acceptance form is signed.
15.2 Fault Response and Handling Mechanism
A 7×24 technical support hotline answers questions at any time. On a fault report: response within 30 minutes with an initial solution; engineer on site within 4 hours in urban areas and 8 hours in suburban areas; general faults repaired within 24 hours; major faults receive a backup-equipment emergency plan to minimize downtime. A follow-up call confirms resolution after each service; every visit is recorded in the project service file.
15.3 Maintenance Service Plans (Post-Warranty)
After the warranty, annual maintenance contracts provide professional service in three tiers:
| Tier | Services | Frequency |
|---|---|---|
| Basic | On-call fault repair, discounted parts, phone support | On call |
| Standard | All basic services + 2 scheduled on-site maintenance visits/year, consumable discounts | 2 visits/year + fault response |
| Full coverage | All standard services + free repair of non-artificial faults, free wearing-part replacement, priority service | 4 visits/year + full fault cover |
15.4 Value-Added Services
Free upgrades: control-system software versions upgraded free for life.
Expansion and renovation: room expansion and equipment upgrades at preferential prices.
Technical consultation: free consultation on room air conditioning and room-environment technology.
Inspection service: regular proactive visits and inspections identify hidden dangers in advance and reduce fault probability.
15.5 Service Assurance and Supervision
All after-sales engineers are professionally trained and certified with rich experience; a customer service file tracks service quality throughout; dissatisfaction can be reported through the supervision channel with dedicated follow-up to ensure service quality.
16. Training Plan
16.1 Training Objectives
Enable the customer’s O&M management personnel to fully master the basic principles, operation methods, daily inspection and simple fault handling of the precision air conditioner, and to independently perform daily O&M management, ensuring normal equipment operation.
16.2 Training Audience
The customer’s room O&M personnel and management staff; the number of participants is unlimited.
16.3 Training Content
Theory: system composition and working principle of the precision air conditioner; performance parameters and function introduction; control-panel operation and parameter-setting methods; daily inspection content and norms; recognition of common alarms and simple handling; safety operation precautions; daily maintenance essentials and cycles.
Hands-on: on/off operation and mode switching; temperature/humidity parameter setting and alarm-threshold setting; G4 primary filter removal, cleaning and replacement; humidifier tank inspection, cleaning and replacement; condensate pan cleaning and drain clearing; common alarm reset and simple fault-troubleshooting demonstration; dynamic-environment monitoring system viewing.
16.4 Training Methods and Schedule
Methods: on-site training at equipment acceptance and delivery — the commissioning engineer gives theory explanation + hands-on demonstration with practice and live Q&A; online video training and phone guidance on demand; a free refresher session is provided when personnel change.
Schedule: about 2-3 hours on site, flexibly adjusted until participants fully master the content.
16.5 Assessment and Documentation Delivery
Assessment: simple theory and hands-on verification after training confirms mastery; those who fail receive retraining until qualified.
Documentation delivered: complete equipment instruction manuals, operation manual and maintenance manual in electronic and paper form at delivery for later reference; after-sales service contact card included.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.
17.1 Technology Company Data Center Room Project
Project overview. A technology company’s data center room of about 120 m² with 20 cabinets required stable year-round temperature and humidity for its server room, high reliability, and unattended remote monitoring. The room hosts production IT equipment with strict environmental requirements — a typical application of the 50 kW room-level precision air conditioner with N+1 redundancy in this solution.
Implementation. Two 50 kW room-level constant-temperature/humidity precision air conditioners were configured in N+1 redundancy with downflow supply, and connected to the dynamic-environment monitoring system for remote supervision. The units’ fuzzy-PID precision control, EC fans and electronic expansion valves provided stable, efficient operation; the redundant architecture ensured a standby unit automatically took over on any failure; remote monitoring enabled unattended management with automatic alarm notification.
Results. The system operates stably with temperature control accuracy of about ±0.8℃ and humidity accuracy of about ±4% RH, with zero faults through a full year of operation and PUE controlled within 1.5. The customer highly recognized the performance and later continued cooperation for phase-II capacity expansion — adding units to the same group-control network without replacing existing equipment.
17.2 Communication Operator Base-Station Equipment Room Project
Project overview. A communication operator’s base-station equipment room of about 60 m², fully loaded with communication equipment, required unattended operation, high reliability, adaptation to hot summers and cold winters, and remote monitoring. The room had no full-time O&M staff and demanded minimal maintenance intervention.
Implementation. Two 30 kW room-level precision air conditioners were configured in a wind-cooled, upflow-supply arrangement with low-temperature operation kits. The upflow form needed no raised-floor renovation in the existing room; the low-temperature kits maintained normal refrigeration in severe winter conditions; remote monitoring through the dynamic-environment system covered temperature, humidity, alarms and unit status; N+1 redundancy guaranteed continuous cooling even during a unit failure or maintenance.
Results. The equipment has operated stably all year, providing normal cooling in both -5℃ low temperatures and 40℃ high-temperature conditions; the remote monitoring functions are complete, greatly reducing O&M labor cost, and the room environment has remained within the communication equipment’s rated range throughout operation.
17.3 Hospital Equipment Room Project
Project overview. A hospital’s equipment room of about 80 m² housed medical imaging equipment and servers requiring minimal temperature/humidity fluctuation, high air cleanliness, low noise and 24-hour continuous operation. Strict environmental control directly affects the stable operation of medical equipment and the continuity of hospital services.
Implementation. Two 40 kW constant-temperature/humidity precision air conditioners were configured with G4 + F8 + H13 three-stage filtration. The H13 HEPA filtration met the cleanliness requirements of the medical equipment; high-precision temperature/humidity control kept fluctuation minimal; low-noise design avoided disturbance to the surrounding clinical environment; N+1 redundancy guaranteed uninterrupted operation during any single-unit maintenance.
Results. Temperature and humidity have remained stably within the required ranges, cleanliness meets medical equipment requirements, operating noise is low, and the equipment fault rate has been zero, safeguarding the normal delivery of hospital services. Regular scheduled maintenance and quarterly inspections by the service team have kept the system in optimal condition.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 13538869979 (Tel / WhatsApp)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.