Chapter 1: Development of Containerized Data Centers

1.1 What Is a Containerized Data Center

A Containerized Data Center (CDC), also known as a container data center, prefab data center, or modular data center in a box, is a data center product in which all or most mechanical and IT subsystems — server racks, power distribution, UPS and batteries, precision cooling, gas fire suppression, DCIM monitoring, video surveillance, lighting, grounding and lightning protection — are pre-integrated, pre-wired, and pre-tested at the factory inside a standard industrial container shell. Once delivered on site, only external power, network, water/drain (if needed), and crane placement are required before go-live.

The fundamental difference from a traditional concrete server room is that a traditional room follows a “build the building first, install the equipment later” engineering delivery model, taking 6–18 months with heavy on-site construction and high quality variability. A containerized data center follows a “factory manufactures the product, site completes the connections” industrial delivery model, compressing on-site schedule to 1–4 weeks, with all equipment factory-tested under full load before shipping.

In product form, a containerized data center is not a single device but a delivery system of “standardized container shells + standardized mechanical modules + standardized interfaces.” A complete CDC typically consists of one or more functional enclosures: a Compute Container (IT racks and cooling), a Power Container (HV switchgear, transformer, LV switchgear, UPS, batteries), a Cooling Container (chillers, dry coolers, CDU), and a Genset Container (diesel generator and fuel storage). Multiple enclosures are connected on site via standardized busbars, fiber, and refrigerant lines to form a complete data center power station.

1.2 History: From Shipping Containers to Edge Compute Power Stations

The CDC concept dates back to the early 2000s. Around 2006, Google, Microsoft, and Amazon began exploring “whole data centers in shipping containers” to move data centers from expensive urban buildings to remote sites with cheap land, abundant power, and natural cooling. In 2008, Sun Microsystems launched its famous “Black Box” (Sun Modular Data Center), packing 28 42U racks, power, and cooling into a 20-foot container with a PUE target of 1.25 — an industry milestone. The same year, IBM, HP, Cisco, and Dell launched similar products, establishing containerized data centers as a formal product category.

From 2010 to 2015, CDCs entered the carrier and enterprise mainstream. China Mobile, China Telecom, and China Unicom began bulk-purchasing container rooms for base station expansion, disaster response, and major event support. Huawei, ZTE, Vertiv (formerly Emerson Network Power), Schneider, and Delta launched standardized 20ft and 40ft container products, with power ranging from 50kW to 500kW. This era was characterized by air-cooled, telecom-oriented deployments with PUE around 1.5–1.8.

From 2016 to 2020, driven by cloud computing, AI training, and 5G edge computing, CDCs entered the high-density and liquid-cooled era. GPU server rack density jumped from 8–10kW to 30–50kW per rack, exceeding air-cooled limits. Cold-plate liquid-cooled and immersion-cooled containers entered mass production. Meanwhile, lithium iron phosphate (LFP) batteries replaced lead-acid as standard, and diesel generators moved from external to integrated, evolving the CDC from an ancillary room into a self-contained micro data center power station.

From 2020 to present, driven by China’s East-Data-West-Computation project, large AI models, smart mines, digital oilfields, wind farm digitization, disaster response, and defense edge nodes, CDCs have entered an all-scenario, all-power-segment era. Power ranges from 20kW edge micro-stations to 10MW containerized data center parks; cooling covers air, rear-door heat exchange, cold-plate liquid, and immersion. KITOZER launched its complete KITOZER-CPC (Compute Container) and KITOZER-PPC (Power Container) product family in this phase.

1.3 Why the Market Needs Containerized Data Centers

Six drivers sustain CDC growth:

  1. Compressed deployment time. Traditional rooms take 6–12 months; CDCs go live in 1–4 weeks on site, matching the ultra-fast launch needs of internet, AI, and emergency scenarios.
  2. High land costs. Core-city server room rents run hundreds of RMB/m²/month. A CDC needs only a hardened pad (50–200 m²), no building, cutting civil and rental costs by 60%+.
  3. Mobility and recoverability. After a project ends, the container can be trucked to a new site and reused — unlike a concrete room that becomes a sunk asset. Critical for project-based business (events, film bases, temporary mines, field command).
  4. Quality control. Factory assembly, wiring, and testing deliver far higher consistency than on-site construction. All units undergo 72–168 hours of full-load burn-in before shipment.
  5. PUE and energy efficiency. Closed hot aisle + in-row CRAH + free cooling yields PUE 1.25–1.45; liquid-cooled containers reach PUE 1.10–1.15.
  6. Remote-scenario adaptation. Mines, oilfields, wind farms, offshore platforms, border posts, and disaster zones have no civil construction conditions — only a “mobile power station” approach like a CDC works.

1.4 KITOZER Brand Positioning

KITOZER is the data center and smart room product line brand of Guangzhou Laian Intelligent System Development Co., Ltd. The KITOZER containerized data center series is designated KITOZER-CDC, available in 20ft Standard (KITOZER-CDC-20), 40ft Extended (KITOZER-CDC-40), and 40ft High-Cube (KITOZER-CDC-40HC); in air-cooled, RDHx, cold-plate liquid, and immersion variants; with UPS capacity from 50kVA to 2MVA.


Chapter 2: KITOZER Product Series

2.1 Product Matrix Overview

The KITOZER-CDC family is organized along three axes: container size × cooling method × power capacity:

Model Size IT Load Cooling Typical Use
KITOZER-CDC-20-AC50 20ft 50kW Air in-row CRAH Edge, campus, community nodes
KITOZER-CDC-20-AC100 20ft 100kW Air in-row CRAH Campus edge, hospital imaging, education
KITOZER-CDC-40-AC170 40ft 170kW Air + closed hot aisle AI inference, mine digitalization, oilfield
KITOZER-CDC-40-AC300 40ft HC 300kW Air + RDHx High-density air, GPU inference clusters
KITOZER-CDC-40-LC500 40ft HC 500kW Cold-plate CDU + dry cooler AI training, HPC edge nodes
KITOZER-CDC-40-IM1000 40ft HC dual 1000kW Single-phase immersion Large AI training, compliant compute
KITOZER-PPC-20 20ft — (power) PAC Power, transformer, UPS, batteries
KITOZER-PPC-40 40ft — (power) PAC 500kVA–2MVA power container
KITOZER-GDC-350 20ft 350kW genset — Containerized diesel generator

2.2 20ft Standard (KITOZER-CDC-20)

The 20ft standard container is 6058mm (L) × 2438mm (W) × 2591mm (H), matching ISO shipping container dimensions for direct ocean, rail, or flatbed transport. The CDC-20 is the entry product, housing 4–6 42U racks, 1–2 in-row CRAH units (20–30kW), one 20–60kVA modular UPS, and one LFP battery bank, with IT load of 50–100kW.

Typical config (CDC-20-AC50):
– Inner wall: 50mm rock-wool sandwich panels, color steel inner/outer, RAL9005 matte black or customer color
– Protection: IP55, rain and dust proof
– Racks: 4×42U mesh server racks, 600×1100×2000mm, 2×32A PDU per rack
– Cooling: 1×30kW in-row precision CRAH (direct expansion), EC fan N+1
– Power: 1×30kVA modular UPS (3×10kVA hot-swap modules), 2×48V 100Ah LFP batteries, 15-min backup
– Fire: FM200 (HFC-227ea) cabinet-type pipeless unit, one zone
– Monitoring: KITOZER-CC01 environmental host, 7″ touchscreen, RS485/Modbus/TCP, cloud DCIM
– Security: 2 IR dome cameras, 1 access control (card + PIN)
– Lighting: LED strips, aisle illuminance ≥500lx
– Floor: calcium sulfate raised floor 600×600×32mm, 200mm height
– Grounding: container ground busbar, resistance ≤4Ω

2.3 40ft Extended (KITOZER-CDC-40)

The 40ft extended container is 12192mm (L) × 2438mm (W) × 2591mm (H), with ~11800mm usable length. The CDC-40 is the flagship product, housing 8–12 42U racks, 4–6 60kW in-row CRAH units, and 100–400kVA modular UPS, with IT load of 170–300kW.

Typical config (CDC-40-AC170, air-cooled compute container):
– Dimensions: 12192×3200×2896mm (wider and taller than standard 40ft)
– Wall: 50mm rock-wool sandwich, IP55
– Racks: 4×42U compute racks (9×4U AI servers each) + 1×42U ELV rack
– Cooling: 5×60kW air in-row CRAH + closed hot aisle return
– Power: 400kVA modular UPS (4×100kVA modules), 2×LFP battery cabinets (51.2V 100Ah), 15-min backup
– External: 10kV HV feed → 400kVA dry-type transformer → LV GGD switchgear
– Genset: 350kW containerized diesel genset (separate enclosure)
– Fire: FM200 70L×2 cylinders, one zone each in compute and power containers
– Monitoring: KITOZER-DCIM platform, centralized touchscreen
– Security: IR dome cameras + NVR + HDD

2.4 40ft High-Cube Liquid-Cooled (KITOZER-CDC-40-LC)

When rack density exceeds 20kW, air cooling hits its physical limit. The CDC-40-LC uses cold-plate liquid cooling: GPU/CPU chips contact cold plates directly, with heat carried by secondary-side deionized water to a CDU (Coolant Distribution Unit), then by primary-side glycol water to an external dry cooler or air-cooled chiller.

Liquid-cooled key parameters:
– Rack density: 30–100kW (cold plates cover CPU/GPU; remaining 10–20% waste heat handled by in-row CRAH)
– CDU: 1×500kW coolant distribution unit, secondary deionized water (<10μS/cm), primary 25% glycol (freeze protection -15°C)
– Dry cooler: external air-cooled dry cooler, 500kW capacity, variable-speed EC fans
– Primary pumps: N+1 redundant, variable-speed centrifugal
– Secondary pumps: N+1 redundant, variable-speed magnetic (sealless)
– Leak detection: CDU drip tray + leak rope along cold-plate branches; valve closes on alarm
– PUE: hybrid air+liquid ~1.15–1.25; full liquid ~1.10

2.5 Power Container (KITOZER-PPC) and Genset Container (KITOZER-GDC)

When IT load exceeds 200kW, a single 40ft container becomes too crowded for racks, UPS, batteries, and transformer. KITOZER recommends a dual-container “compute + power” approach:
– Compute container (CDC): IT racks, in-row CRAH, closed hot aisle, fire, monitoring
– Power container (PPC): 10kV HV switchgear, dry transformer, LV GGD, modular UPS, LFP battery cabinets, genset control
– Genset container (GDC): independent 20ft enclosure with 250–500kW diesel genset, day tank, control panel

Inter-container connections:
– Power bus: LV copper busbar or cable tray, with quick connectors at compute container side
– Fiber: multi-mode OM4 fiber connecting compute container switches to power container monitoring
– Refrigerant lines (liquid-cooled): primary glycol water lines with quick couplings


Chapter 3: Internal Layout — IT Zone / Power Zone / Cooling Zone

3.1 Overall Layout Principles

CDC internal layout follows a “three zones, two aisles, one separation” principle:
– Three zones: IT zone (server racks), power zone (UPS, batteries, head-end), cooling zone (in-row CRAH, CDU, dry cooler interface) are physically separated
– Two aisles: cold aisle (closed, server intake) and hot aisle (closed or semi-open, server exhaust)
– One separation: maintenance aisle is separated from airflow paths to prevent personnel entry from disrupting airflow

3.2 40ft Air-Cooled Compute Container Layout (CDC-40-AC170)

From the door inward:

Zone A (Entry transition, ~1.5m):
– Exterior double-leaf insulated door (gasket, door closer, access control)
– Interior air-lock/buffer (optional)
– Emergency lighting, exit signs
– KITOZER-DCIM touchscreen mounted on entry side wall

Zone B (IT rack zone, ~8m):
– 4×42U compute racks face-to-face, forming a closed hot aisle
– 5×60kW in-row CRAH units sandwiched between racks
– Cold-aisle side glass sliding doors (motorized + anti-pinch IR)
– Hot-aisle top smoke-dampers (automatically open on fire alarm)
– LED strips + lintel status screen inside aisle

Zone C (Power & monitoring zone, ~1.5m):
– 1×42U ELV rack (switches, routers, environmental host, NVR)
– 1×head-end cabinet (PDU distribution, power metering)
– FM200 cylinder group (wall-mounted)

Zone D (End buffer & drainage, ~1m):
– AC condensate drain pipe (with P-trap)
– Container grounding busbar
– External cable/fiber sealing glands

3.3 Power Container Layout (PPC-40)

From HV to LV:
1. HV incoming: 10kV switchgear (KYN28 or XGN15), incoming + metering + outgoing panels
2. Transformer: dry-type transformer (SCB14, 400–1000kVA), IP20 enclosure, natural/forced air
3. LV distribution: GGD switchgear, incoming + reactive compensation (APF/SVG) + outgoing
4. UPS: modular UPS cabinet (100–400kVA), bypass cabinet
5. Battery: LFP battery cabinets (parallel), wall-mounted with inspection aisle
6. Genset interface: ATS automatic transfer switch (utility/genset)

3.4 Maintenance Aisle and Safety

Internal net width is typically 1100–1200mm (rack-to-rack), allowing single-person passage. Requirements:
– Floor load: ≥1000kg/m² (battery zone ≥1500kg/m²)
– Egress: at least one direction to container door
– Emergency escape: both ends have emergency doors (interior push-bar lock)
– Lighting: normal ≥500lx, emergency ≥50lx
– Noise: ≤75dB(A) at maintenance positions


Chapter 4: Cooling Solutions — In-row CRAH / RDHx / Liquid CDU

4.1 Cooling Selection Matrix

Rack Density Recommended Cooling PUE Target Product
≤8kW/rack Room-based precision AC (air) 1.6–1.8 CDC-20-AC50
8–15kW/rack In-row CRAH + closed aisles 1.4–1.6 CDC-20-AC100 / CDC-40-AC170
15–30kW/rack In-row CRAH + RDHx 1.3–1.4 CDC-40-AC300
30–80kW/rack Cold-plate liquid CDU + in-row trim 1.15–1.25 CDC-40-LC500
≥80kW/rack Single-phase immersion 1.05–1.15 CDC-40-IM1000

4.2 In-row Precision CRAH

The in-row CRAH is the core cooling source for air-cooled CDCs. KITOZER-CRV series parameters:
– Cooling capacity: 30kW / 60kW / 90kW (DX air-cooled)
– Airflow: 6000–18000 m³/h
– Fans: EC centrifugal, N+1, variable 10–100%
– Compressors: fully variable-speed scroll, IPLV ≥4.0
– Reheat: PTC electric 6–12kW (winter trim)
– Humidification: wet-belt 3–6kg/h
– Control: 7″ touchscreen, up to 32 units group-controlled, RS485/BACnet/Modbus-TCP
– Surge protection: 6kV SPD on feed
– Group logic: units rotate master/standby based on cold aisle temp; auto-failover on single-unit fault

Airflow path: in-row CRAH draws cold air from cold aisle → cools and blows horizontally → enters server front → server exhausts hot air to hot aisle → hot air returns to CRAH via top dampers or return plenum. Closed hot aisle prevents hot air leakage into maintenance areas.

4.3 Rear Door Heat eXchanger (RDHx)

At 15–30kW per rack, in-row CRAH is marginal and hot air can leak. RDHx places the cooling coil in the rack rear door: server exhaust passes through the door and is cooled by water, with no recirculating cold air inside the rack. KITOZER-RDHx parameters:
– Heat rejection per unit: 20–40kW
– Secondary side: warm water (in 25–30°C, out 35–40°C), glycol solution
– Primary side: chiller or dry cooler supply
– Noise: rear-door fans ≤65dB(A)
– Benefits: no rack U-space consumed, no rack dimension change, mixable with existing air racks

4.4 Liquid CDU and Dry Cooler

Cold-plate liquid cooling has three main components:

(1) CDU (Coolant Distribution Unit)
– Secondary (server side): deionized water, conductivity <10μS/cm, inlet 35–45°C (warm-water liquid cooling allows higher temps for longer free-cooling hours)
– Primary (facility side): 25% glycol water, inlet 25–35°C
– Heat exchange: plate heat exchanger, primary and secondary fully isolated
– Pumps: secondary N+1 magnetic sealless, primary N+1 centrifugal variable-speed
– Filtration: secondary 5μm filter + resin purifier (maintains conductivity)
– Leak detection: drip tray + leak rope; valves close and pumps stop on alarm
– Control: touchscreen, Modbus-TCP to DCIM

(2) Dry Cooler
– Mounted external on roof or ground
– Capacity: 500–2000kW heat rejection
– Fans: EC axial, variable-speed, noise ≤75dB(A)
– Free cooling: when outdoor temp <15°C, dry cooler handles all heat rejection and chiller shuts down, PUE approaches 1.1
– Cold climates: 25% glycol, freeze protection -15°C

(3) Cold Plates and Piping
– One copper cold plate per GPU/CPU (CNC-machined flow channels)
– In-server piping: quick couplings (D-0.5 leak rating), no water spill on server removal
– In-rack piping: U-tubes + manifolds, one branch per server
– Secondary main piping: 316L stainless steel, welded, pressure-tested at 1.5× working pressure for 30 min

4.5 Immersion Cooling

At ≥80kW per rack, cold-plate is insufficient (still 10–20% waste heat needs air trim). Single-phase immersion cooling submerges servers in insulating coolant (synthetic oil or fluorinated fluid), with coolant circulated through coils to remove all heat. KITOZER-CDC-IM parameters:
– Per-tank power: 100–200kW
– Coolant: synthetic hydrocarbon oil (40°C kinematic viscosity <10cSt), flash point >200°C
– Tank: 316 stainless steel, insulated and sealed
– PUE: 1.05–1.15
– Benefits: no water leak risk (insulating), extremely low noise (no fans), highest heat rejection efficiency


Chapter 5: Power — Utility + UPS + Battery + Genset

5.1 Overall Power Architecture

CDC power uses a four-layer protection: dual utility feeds + UPS + batteries + genset:

5.2 HV Incoming and Transformer

When 10kV (or 35kV) utility is available, KITOZER-PPC integrates:
– HV switchgear: KYN28A-12 metal-clad withdrawable, incoming + metering + outgoing panels, VS1 vacuum breakers, microprocessor protection
– Dry transformer: SCB14 epoxy-cast, 10/0.4kV, Dyn11, Class F, IP20 enclosure, AN/AF cooling
– Sizing: transformer capacity = IT load × 1.25 (diversity + margin); e.g., 170kW IT → 250kVA or 400kVA transformer

5.3 LV Distribution and Power Factor Correction

LV GGD includes:
– Incoming panel: air circuit breaker (ACB), set at 1.0× transformer rated current
– Capacitor bank: automatic switching capacitor or SVG; PF ≥0.95 after correction
– APF active filter: when UPS rectifier generates harmonics, APF filters 5th/7th/11th/13th, THDi <5%
– Outgoing panels: molded case breakers (MCCB) feeding UPS, AC, lighting, maintenance outlets

5.4 Modular UPS

KITOZER-UP series parameters:
– Capacity: 10–400kVA per cabinet; parallel up to 1.2MVA
– Power modules: 10/25/50kVA hot-swap, N+X redundancy
– Efficiency: ≥96% double-conversion online, ≥99% ECO mode
– Input PF: ≥0.99
– Output: 380/220V 3-phase 5-wire, regulation ±1%
– Frequency: 50Hz ±0.1%
– Batteries: internal or external LFP, BMS monitors cell voltage/temp/SOC
– Communications: RS485 / Modbus-TCP / SNMP / dry contacts
– Bypass: maintenance bypass switch for live maintenance

5.5 LFP Batteries

KITOZER recommends LFP over traditional lead-acid:

Dimension VRLA Lead-Acid LFP Lithium
Energy density 30–40 Wh/kg 120–160 Wh/kg
Cycle life 1200 cycles (80% DOD) 6000 cycles (80% DOD)
Footprint large (battery room) small (rack-mount, saves 60%)
Maintenance periodic watering, cell voltage zero-maintenance (BMS)
Temp range 20–25°C optimal -20 to 60°C
Safety leak/gas risk intrinsically safe (no fire/explosion)
Capital cost low high (but lower 5-year TCO)
Backup time 15–30 min 15 min–4 hr (customizable)

KITOZER-LFP cabinet parameters:
– Nominal voltage: 51.2V (16s) / 480V (150s)
– Capacity: 100Ah / 200Ah / 280Ah
– BMS: three-tier (BMU cell + BCM cluster + BA system), CAN communication
– Protection: over/under voltage, overcurrent, overtemp, short circuit, auto-balancing
– Certifications: UN38.3, IEC62619, CE

5.6 Diesel Generator

When utility is out for extended periods, UPS batteries last only 15–30 minutes; a diesel generator must take over. KITOZER-GDC containerized genset parameters:
– Power: 250 / 350 / 500 / 800 / 1200 kW
– Engine: domestic Yuchai/Weichai/Shangchai or imported Cummins/Perkins/MTU
– Alternator: brushless self-excited, AVR, Class H insulation
– Control: PLC, auto-start (within 15s of utility loss, load within 30s)
– Fuel: day tank (200–500L) + buried storage (10,000–50,000L, sized for 12–48h full load)
– Noise: acoustic-lined container wall, ≤75dB(A) at 1m
– Exhaust: stainless steel pipe + silencer, ducted outside
– Cooling: air-cooled radiator, top discharge

5.7 Grounding and Lightning Protection

  • Grounding: dedicated grounding copper busbar (40×4mm) in container, connected to site grid, resistance ≤4Ω (independent) or ≤1Ω (combined)
  • Surge protection: B+C level SPD on power feed, Imax ≥100kA; signal SPD on communication lines
  • Equipotential: all metal racks, cable trays, and container walls bonded to ground busbar

Chapter 6: Fire and Security

6.1 Fire Protection

CDC fire protection uses a three-tier “early alarm + gas suppression + smoke exhaust” system:

(1) Early alarm
– VESDA very-early smoke detection: aspirating sampling holes along cold aisle, 100× more sensitive than conventional smoke detectors
– Photoelectric smoke detectors: one per 10m², mounted at hot-aisle ceiling
– Heat detectors: secondary confirmation with smoke (avoid false discharge)
– Combustible gas detectors: battery zone (lithium overheating off-gas)

(2) Gas suppression
– Agent: FM200 (HFC-227ea) or Novec 1230
– Design concentration: 8–9% by volume, discharge time ≤10s
– Cylinders: cabinet-type pipeless unit, 70L/120L, mounted at zone entrance
– Control: gas suppression panel, receives two detector signals → 30s evacuation delay → close AC dampers → discharge
– Fire linkage: on alarm, AC shuts down, UPS transfers to bypass (optional), access unlocks, top dampers open for smoke exhaust, emergency lighting activates

(3) Smoke exhaust and pressure relief
– Hot-aisle top dampers: auto-open on fire alarm to vent smoke
– Pressure relief vent: side-wall vent protects container structure during gas discharge

6.2 Security

  • Access control: card + PIN + fingerprint (optional face) on container door, logs all entries, linked to fire (unlocks on alarm)
  • Video surveillance: IR dome cameras covering IT zone, power zone, and entrance; NVR + HDD 30-day storage
  • Perimeter IR beams: optional external intrusion detection
  • Environmental alarms: door contact, vibration, water leak, temperature/humidity exceedance all upload to DCIM with SMS/email/App push

6.3 Battery Safety

Lithium battery cabinets add:
– Combustible gas detectors (CO, H₂, VOC)
– Aerosol extinguishing inside each battery cabinet
– BMS secondary protection (isolate on cell overtemp)
– 200mm fire-resistant baffles between battery cabinets


Chapter 7: Comparison with Traditional Server Rooms

7.1 Full Comparison

Dimension Traditional Concrete Room Containerized Data Center
Build time 6–18 months 2–6 weeks (on site)
On-site work heavy (fit-out, wiring, rigging) light (power, network, anchoring)
Footprint large (room + AC + battery + switchgear) small (container + working space)
Land requirement building or dedicated floor hardened pad only
Relocation immovable whole-unit truckable
Quality consistency depends on contractor factory-built, high consistency
PUE 1.8–2.2 (open room) 1.25–1.6 (closed aisle)
Expansion re-fit add another container
Capital cost high (civil + fit-out) medium (container + equipment)
O&M difficulty dedicated room team remote monitoring + light inspection
Typical use large cloud DC, enterprise HQ edge, emergency, mine, oilfield, AI inference
Mobility none yes

7.2 Deployment Speed

For 170kW IT load, 36 AI servers:
– Traditional room: site selection (2wk) → design (4wk) → civil works (12wk) → MEP install (8wk) → rack and test (4wk) = 30 weeks (~7 months)
– CDC: site hardening (1wk) → factory prefab (8wk, parallel) → transport and lift (1wk) → connect and commission (1wk) = 2–3 weeks on site, 9 weeks total (~2 months)

7.3 PUE Comparison

  • Traditional open room PUE typically 1.8–2.2 (AC fans + chiller = 80–120% of IT load)
  • Micro-module closed aisle PUE 1.5–1.7
  • Container closed hot aisle + in-row CRAH PUE 1.35–1.5
  • Container liquid-cooled PUE 1.10–1.25

At 170kW IT, 8000 hours/year:
– PUE 1.8: annual energy = 170 × 8000 × 1.8 = 2,448,000 kWh
– PUE 1.4: annual energy = 170 × 8000 × 1.4 = 1,904,000 kWh
– Savings = 544,000 kWh/year; at ¥0.8/kWh, ¥435,000/year saved

7.4 Mobility and Asset Recovery

Traditional room fit-out is a sunk cost. A CDC can be:
– Whole-unit trucked to a new site
– Resold to another user (secondary CDC market is mature)
– Returned to factory for refurbishment and reuse


Chapter 8: Deployment Scenarios (Generic)

8.1 Emergency Disaster Response Data Center

Scenario: After earthquakes, floods, or typhoons, emergency command needs rapid data processing (satcom, video conferencing, disaster big-data analytics).

Solution: 2×20ft containers — 1 compute (command servers, video MCU) + 1 power (UPS, batteries, genset). Deployed within 48 hours. 350kW genset (grid is down). Satellite uplink. Advantage: no civil works needed; removed after recovery.

8.2 Smart Mine Data Center

Scenario: Open-pit or underground mine needs edge servers for autonomous haul truck dispatch, video AI analytics, predictive maintenance.

Solution: 1×40ft air-cooled compute (170kW) + 1 power container. Hardened pad beside mine office. IP55 + G4+F8 dust filters. Ex-rated for underground (or surface control room). 10kV mine grid + 350kW genset backup. 5G private network + fiber ring.

8.3 Oilfield Data Center

Scenario: Desert drilling rig needs local processing (geological modeling, rod pump remote control) with limited communication bandwidth.

Solution: 1×20ft (50kW), desert-hardened. Upgraded condenser for 50°C ambient. G4+F8 two-stage dust filtration. Weather-resistant coating. 6kV oilfield grid + small genset. Microwave + satellite.

8.4 AI Edge Inference Node

Scenario: City districts, transport hubs, industrial parks need local AI inference (video structuring, passenger flow, roadside autonomous driving); data cannot leave the domain.

Solution: 2–4×40ft air-cooled compute containers sharing one power container. Deployed in underground garage or roof (structural load verified). 380V LV direct feed (no HV transformer). Dual fiber to metro network. PUE ≤1.5. Advantage: local data processing for compliance.

8.5 Wind Farm Step-Up Station Digitalization

Scenario: Wind farm step-up station needs local servers for turbine SCADA aggregation, power forecasting, AGC/AVC control.

Solution: 1×20ft (30–50kW) inside the step-up station fence. Powered by 35kV station service. Wind farm already has backup genset. Fiber ring to main control room. Advantage: replaces traditional secondary equipment room, saving civil investment.


Chapter 9: Transport and Lifting

9.1 Weight and Dimensions

Model Dimensions (L×W×H) Full Weight Transport
CDC-20-AC50 6058×2438×2591mm 8–12 t Flatbed / sea container
CDC-40-AC170 12192×3200×2896mm 20–28 t Flatbed / breakbulk
PPC-40 12192×2438×2591mm 25–35 t Flatbed
GDC-350 6058×2438×2591mm 12–15 t Flatbed

9.2 Road Transport Requirements

  • Route survey: confirm road width (≥3.5m), turning radius (≥15m), height limit (≥4.5m), width limit (≥3m), bridge load (≥40 t)
  • Vehicle: 13m low-bed semi-trailer, tractor ≥400 hp
  • Securing: lash container corners to frame with wire rope + turnbuckles; rubber pads prevent contact damage
  • Oversize: 40ft HC at 3.2m wide and 2.9m tall is over-dimensional; permits and escort vehicle required
  • Rain: container is IP55 but avoid prolonged immersion in pooled water

9.3 Lifting Requirements

  • Crane size: 1.5× container weight; e.g., 28 t container needs a 50 t truck crane
  • Lifting points: standard ISO corner castings at four corners; use dedicated four-point spreader beam
  • Lifting radius: ≥6m from crane outrigger center to container center
  • Wind limit: stop lifting at wind ≥10m/s (~5 Beaufort)
  • Placement: level to ≤2mm/m with shims; weld anchor bolts to embedded plates or use M20 expansion anchors

9.4 Sea and Rail

  • Sea: 20ft standard fits standard container vessels; 40ft wide version goes breakbulk or project cargo
  • Rail: China-Europe rail handles 20ft standard; 40ft wide (3.2m) fits within Chinese rail gauge (3.4m wide, 4.8m tall)
  • Packing: rain film on doors, protective covers on external instruments/sensors at factory

Chapter 10: Installation and Commissioning

10.1 Site Preparation

  • Pad: C25 concrete, ≥200mm thick, bearing ≥5 t/m²; battery zone ≥10 t/m²
  • Ground grid: ring ground on site, resistance ≤4Ω, with ground terminal
  • Power feed: 10kV HV cable (YJV22-8.7/15kV-3×70mm²) or 380V LV cable (YJV-0.6/1kV-4×240+1×120mm²) to container inlet
  • Network: dual single-mode OS2 fiber to container fiber patch panel
  • Water/drain: if chiller or dry cooler, supply water (DN25) and drain (DN50)

10.2 Placement and Anchoring

  1. Crane lowers container onto pad, aligning with embedded anchor bolts
  2. Level container with shims (≤2mm/m)
  3. Weld or M20 expansion-anchor the bottom frame
  4. Bond container ground busbar to site grid with 40×4mm galvanized flat steel
  5. Check door seal and closing

10.3 Inter-System Connections

  • Power: external HV cable to HV switchgear incoming; torque per terminal spec
  • UPS output: UPS output cables to head-end cabinet input
  • Battery: battery cluster busbar links; BMS communication cable to UPS
  • Fiber: multi-mode to switch, single-mode to uplink optical terminal
  • Refrigerant lines (liquid): primary glycol to CDU, secondary to cold-plate branches; pressure test at 1.5× working pressure for 30 min, no leak
  • Genset: genset output to ATS incoming

10.4 Energization and Commissioning Sequence

  1. HV energization: close HV breaker; impulse-transformer switch 5 times (5-min intervals), confirm no anomaly
  2. LV energization: close LV incoming; measure 3-phase voltage balance (within 5%)
  3. UPS commissioning: start UPS in bypass mode for 10 min, transfer to inverter, connect batteries, perform charge/discharge test (discharge 30 min, normal voltage droop)
  4. AC commissioning: start each in-row CRAH, set cold aisle 22°C, observe compressor/fan current and supply air temp
  5. Fire commissioning: smoke test detectors, confirm alarm upload; simulate gas discharge (no real discharge), confirm damper closure and sounder/strobe linkage
  6. Environmental commissioning: test temp/humidity, leak, door, power points; confirm DCIM alarm upload
  7. Genset commissioning: simulate utility loss; genset auto-starts (within 15s), ATS transfers, UPS carries genset load for 30 min
  8. Full-load burn-in: after servers racked, run full load ≥72 hours, confirm all parameters stable

Chapter 11: Maintenance

11.1 Daily / Weekly Inspection

Daily (remote DCIM):
– Cold aisle temp: 22±2°C, humidity 40–60%
– UPS in/out voltage, current, load (≤80%)
– Battery SOC (≥90%), cell voltage balance
– AC status, compressor current, supply air temp
– Genset standby state, fuel level

Weekly (on site):
– Container door seal and lock
– AC filter differential pressure (clean if high)
– Condensate drain flow
– Fire cylinder pressure (green zone)
– CCTV recording

11.2 Monthly Maintenance

  • Wash AC filters (F8 grade)
  • Inspect UPS fans and torque connections
  • Sample battery cell voltage (BMS logs, manual cross-check)
  • Measure ground resistance (≤4Ω)
  • Genset no-load test run 15 min

11.3 Quarterly Maintenance

  • Clean in-row CRAH evaporator coils (special cleaner)
  • Rinse external condenser
  • Blow out UPS power module air ducts
  • Battery verification discharge (30% capacity; check for weak cells)
  • Full fire system test (smoke, heat, sounder, damper)

11.4 Annual Maintenance

  • Transformer insulation resistance (≥1000MΩ)
  • HV breaker mechanical characteristic test
  • UPS full-load test (dummy load)
  • Battery full-capacity discharge (100%; confirm actual capacity ≥80% of rated)
  • Genset load test (30%, 50%, 75%, 100% for 30 min each)
  • Ground grid resistance test
  • Container wall seal inspection and replacement
  • Retorque all fasteners (transport vibration can loosen)

11.5 Consumables List

Component Life Replacement
AC filters 1–2 yr wash yearly, replace every 2 yr
AC compressor 8–10 yr on failure
UPS fans 3–5 yr on failure
UPS module caps 5–8 yr on failure
LFP batteries 10–15 yr (6000 cycles) when capacity <80%
Genset oil/filters 500 hr every 500 hr or yearly
Fire cylinder 10 yr pressure test/recharge every 10 yr
Door seal gasket 5–8 yr when cracked/brittle

Chapter 12: Selection Guide

12.1 Five-Step Selection

Step 1: Determine IT load and rack density
– Count servers, per-server power, rack count, per-rack density
– Example: 36×4U AI servers at 4.7kW each, 4 racks, 42kW/rack

Step 2: Choose cooling method
– ≤15kW/rack: air in-row CRAH
– 15–30kW/rack: air + RDHx
– 30–80kW/rack: cold-plate liquid
– ≥80kW/rack: immersion

Step 3: Choose container size
– IT ≤100kW: 20ft
– IT 100–300kW: 40ft
– IT ≥300kW: 40ft liquid or multi-container

Step 4: Determine power scheme
– 10kV on site: HV feed + transformer + UPS
– Only 380V: LV direct + UPS (re-rate)
– UPS capacity = IT load × 1.25
– Battery backup: 15 min (standard) to 4 hr (critical nodes)

Step 5: Environmental adaptation
– Desert: upgraded AC, dust filtration
– Coastal: anti-corrosion coating, 316 stainless
– High altitude (>2000m): derate transformer and AC
– Cold (<-20°C): antifreeze, enhanced insulation

12.2 Selection Calculation Example

Scenario: AI inference cluster, 20 servers at 5kW each, 4 racks, 25kW/rack. 10kV utility available, annual average temp 25°C.

Calculation:
1. Total IT = 20 × 5 = 100kW
2. 25kW/rack → air + RDHx
3. Container: 40ft (CDC-40-AC300)
4. UPS = 100 × 1.25 = 125kVA → choose 150kVA modular (3×50kVA, N+1)
5. Battery 15 min: capacity = 100kW × 0.25h / (480V × 0.9) ≈ 116Ah → choose 2×480V 100Ah LFP
6. Genset: UPS full load + AC + aux ≈ 150kW × 1.4 = 210kW → choose 250kW genset
7. Cooling: 4 racks × 25kW = 100kW; in-row 3×40kW (N+1) + 4 RDHx (20kW each)

12.3 Common Selection Mistakes

  1. Counting IT load only, ignoring AC and aux. Transformer and genset must be sized at IT × 1.3–1.5.
  2. No UPS margin. Long-term UPS overload reduces efficiency and life; target 60–75% loading.
  3. Oversized battery backup beyond 30 min. Battery cost rises sharply; add a genset instead.
  4. Insufficient cooling margin. Size in-row CRAH at 1.1× IT load, but account for summer high-temp derating.
  5. Ignoring environment. Desert, coastal, and high-altitude sites without special design fail on site.

Chapter 13: 30 FAQs

Q1: What is the difference between a CDC and a micro-module?
A: A micro-module sits inside a concrete room (build the building first); a CDC is building + room in one product, no civil works needed. Micro-modules suit enterprise HQ and large parks; CDCs suit edge, emergency, and remote sites.

Q2: How many servers fit in a 40ft container?
A: At 42U racks, 20×1U per rack, a 40ft container fits 8–12 racks, ~160–240×1U servers. For 4U AI servers at 8–10 per rack, ~32–40 units.

Q3: What PUE can a CDC achieve?
A: Air-cooled 1.35–1.5; air + RDHx 1.25–1.35; cold-plate liquid 1.15–1.25; immersion 1.05–1.15. Depends on climate (free-cooling hours) and design.

Q4: Will it leak in rain?
A: IP55, 50mm rock-wool sandwich, EPDM gaskets, double-sealed doors. No leakage in heavy rain. Replace gaskets if damaged during transport/install.

Q5: Will it overheat inside in summer?
A: 50mm insulation, in-row CRAH sized for 40–45°C ambient full-load; cold aisle held at 22°C. Desert sites need upgraded condensers.

Q6: How much space does one container need?
A: A 40ft container is 12.2×2.4m; with working clearance (1m sides, 2m ends), ~18×6m = 108m² hardened pad.

Q7: Does it need a waterproof foundation?
A: No basement, but C25 concrete pad ≥200mm thick, ≥5 t/m². Low-lying sites should raise the pad 200–300mm against flood.

Q8: What UPS battery backup time is typical?
A: 15 min standard (covers genset start-transfer). Critical nodes 30–60 min. Beyond 1 hour, use a genset — batteries are too costly.

Q9: LFP vs lead-acid?
A: LFP is 3–4× energy density, 5–6× cycle life, 60% smaller footprint, zero maintenance, but 1.5–2× capital cost. Lower 5-year TCO.

Q10: How often should the genset be tested?
A: No-load 15 min monthly; load 30 min quarterly; full-load 1 hour annually.

Q11: Can a CDC be relocated?
A: Yes. Disconnect power and cables, rig onto flatbed, ship to new site, reconnect. Before moving, shut down, disconnect batteries, secure internal equipment.

Q12: Can it go on a rooftop?
A: Verify rooftop load (40ft full load 25–35 t plus clearance; roof needs ≥1 t/m²). Most office roofs cannot; industrial factory roofs usually can.

Q13: What if liquid cooling leaks?
A: Secondary side is deionized water (insulating — no short circuit even on leak); CDU drip tray + leak rope closes valves and stops pumps on alarm; quick couplings don’t spill on server removal.

Q14: Is it noisy?
A: ≤75dB(A) inside at maintenance positions; ≤65dB(A) outside at 1m (excluding outdoor AC and genset). Residential sites need acoustic barriers or low-noise models.

Q15: How many people operate a CDC?
A: Remote DCIM + 1–2 on-site inspections monthly. No dedicated room operations team needed. Failure rate far lower than traditional rooms.

Q16: Can it be expanded?
A: Yes. Add another identical container beside it, connect power bus and fiber. Reserve 20% spare breakers and UPS headroom.

Q17: What ambient temperature range?
A: Standard -20°C to +50°C. Cold climates (<-30°C) need extra insulation and electric preheat; hot climates (>+50°C) need upgraded condensers.

Q18: Which Chinese standards apply?
A: GB 50174 (A/B tier), GB 50462 (construction/acceptance), GB 50016 (fire), GB 50057 (lightning), YD/T 2882 (telecom CDC), GB 40879 (mandatory PUE limits).

Q19: What is the lead time?
A: Standard models (CDC-20-AC50/100): 4–6 weeks. Mainstream (CDC-40-AC170): 6–8 weeks. Custom liquid-cooled: 10–14 weeks.

Q20: Warranty?
A: Whole unit 12 months; core equipment 2–3 years (UPS, AC compressor, transformer); batteries 3–5 years. Extended service plans available.

Q21: Does it need building permit?
A: Usually treated as equipment/temporary structure, not a building permit, but must comply with local planning, fire, and environmental rules. Check with local housing authority in city centers.

Q22: Can it integrate solar?
A: Yes. PV panels on roof (verify load), paired with storage. Green power prioritized for IT; utility tops up.

Q23: Can two containers run in parallel?
A: Yes. Multiple compute containers share one power container via LV bus. UPS can parallel (up to 4 units).

Q24: Can it do N+1 redundancy?
A: Yes. Key equipment (UPS, AC, pumps) N+X. Whole-container redundancy: A/B containers for active-active.

Q25: Can it use lead-acid batteries?
A: Yes, but not recommended. Lead-acid is large, high maintenance, leak-prone. KITOZER recommends LFP.

Q26: Can it be remotely monitored?
A: Yes. KITOZER-DCIM supports Web/mobile remote monitoring; alarms via SMS, email, and App push.

Q27: Can it be used on offshore platforms?
A: Yes, with special design: C5-M marine anti-corrosion, salt-spray filtration, anti-roll securing, ExdIIBT4 explosion rating.

Q28: How does it differ from outdoor integrated cabinets?
A: Outdoor cabinets (e.g., KITOZER-OC-22U) are 5–20kW, single-cabinet form; CDCs are 50kW–MW, multi-rack multi-container. Outdoor cabinet = “large box”; CDC = “micro data center.”

Q29: Is CDC capital cost higher?
A: Comparable or slightly higher (factory prefab premium), but civil and fit-out costs are avoided, total investment 20–30% lower. With PUE savings, payback in 3–5 years.

Q30: How to purchase KITOZER CDC?
A: Contact Guangzhou Laian Intelligent System Development Co., Ltd. at +86 13922289957 / +86 18520668845, WhatsApp +86 19068534140. Engineers survey on site, then provide proposal and quotation.


Chapter 14: Industry Standards

14.1 Chinese Standards

  • GB 50174-2017 “Data Center Design Code”: A/B/C tiers
  • GB 50462-2015 “Data Center Infrastructure Construction and Acceptance”
  • GB 50016-2014 (2018) “Code of Design on Building Fire Protection”
  • GB 50057-2010 “Design Code for Lightning Protection of Buildings”
  • GB/T 22239-2019 “Cybersecurity Classified Protection” (Dengbao 2.0)
  • YD/T 2882-2015 “Technical Requirements for Telecom Equipment Container Data Center”
  • YD 5083-2019 “Seismic Design for Telecom Equipment”
  • GB/T 32910-2016 “Data Center Resource Utilization” series
  • GB 40879-2021 “Energy Efficiency Limits and Grades for Data Centers” (mandatory PUE limits)

14.2 International Standards

  • Uptime Institute Tier I–IV: availability certification
  • TIA-942: data center standard
  • ASHRAE TC 9.9: thermal guidelines (recommended intake 18–27°C)
  • ISO/IEC 30134: PUE and other metrics
  • ISO 19448: containerized data centers
  • IEC 60364: low-voltage electrical installations
  • IEC 62040: UPS
  • NFPA 75 / NFPA 20: data center fire protection

14.3 KITOZER Compliance

KITOZER-CDC series is designed to GB 50174 Tier B (upgradable to Tier A). Key equipment carries CE, UL, and TUV certifications for global export.


Chapter 15: Packaging, Delivery, Warranty, CTA, and Company Info

15.1 Packaging and Transport

  • Internal equipment secured at factory; moving parts (UPS power modules) removed and packed separately
  • Rain film on container doors
  • External instruments/sensors protected
  • Shipping documents: factory test report, certificate, installation manual, operation manual, electrical schematics, spare parts list
  • Transport: flatbed (domestic), sea container (export)

15.2 Lead Time

  • Standard (CDC-20-AC50/100): 4–6 weeks after contract + advance payment
  • Mainstream (CDC-40-AC170): 6–8 weeks
  • Liquid-cooled custom: 10–14 weeks
  • On-site install/commission: 1–2 weeks (after client prepares pad)

15.3 Warranty and After-Sales

  • Whole unit: 12 months from site acceptance
  • Core equipment: UPS 3 years, AC compressor 3 years, transformer 3 years, batteries 5 years
  • Response: remote support within 2 hours; on-site within 48 hours (major Chinese cities)
  • Extended service: 3- or 5-year plans including annual preventive maintenance
  • Spare parts: Guangzhou HQ stocks consumables (filters, fans, power modules, sensors)

15.4 Contact (CTA)

Guangzhou Laian Intelligent System Development Co., Ltd.
– Tel / WeChat: +86 13922289957
– Tel / WeChat: +86 18520668845
– WhatsApp: +86 19068534140
– Domestic website: lain.com.cn
– International website: gdlain.com
– Address: Chaotian Park, Zhongrun Industrial Zone, No. 5 Huashan Road, Shilou, Panyu, Guangzhou, China

KITOZER Containerized Data Center series — factory-prefabricated, site-ready, plug-and-play. 20ft/40ft air and liquid-cooled, 50kW–1MW full power range. Contact us for a customized solution.


配图建议(Image Suggestions)

# Description Chinese ALT English ALT Watermark
IMG-01 Dual compute + power containers side by side exterior KITOZER算力集装箱与电力集装箱双箱体外观 KITOZER compute + power containers dual-box exterior Tel 18520668845
IMG-02 Inside compute container: closed hot aisle with 42U racks 算力集装箱内部封闭热通道机柜布局 Inside compute container: closed hot aisle with 42U racks Tel 13922289957
IMG-03 60kW in-row CRAH installed between racks close-up 60kW风冷列间精密空调列间安装特写 60kW air-cooled in-row CRAH installed between racks WhatsApp 19068534140
IMG-04 400kVA modular UPS cabinet front view 400kVA模块化UPS柜及功率模块 400kVA modular UPS cabinet with power modules Tel 18520668845
IMG-05 350kW containerized diesel generator set exterior 350kW集装箱式柴油发电机组外观 350kW containerized diesel generator set Tel 13922289957
IMG-06 DCIM touchscreen showing temp/humidity and power dashboard DCIM动环监控触摸屏温湿度配电界面 DCIM touchscreen showing temp/humidity and power status WhatsApp 19068534140

建议分类(Categories)

  • 中文站分类:数据中心基础设施 / 集装箱数据中心 / 模块化机房
  • 英文站分类:Containerized Data Center / Modular Data Center / Data Center Infrastructure
  • 标签 Tags:算力集装箱, 风冷数据中心, 液冷集装箱, 预制化机房, 模块化UPS, 磷酸铁锂电池, 柴油发电机组, 封闭热通道, CDU, 背门换热器, containerized data center, computing container, prefab data center, air-cooled, liquid-cooled, CDU, RDHx, modular UPS, LFP battery, genset, closed hot aisle

本文为 KITOZER 品牌通用技术白皮书,内容为公开技术科普,不涉及任何具体客户或项目。最终产品规格以 KITOZER 官方最新技术规格书为准。

第四部分 英文技术深度补充(Deep English Supplements)

Supplement S1: Heat Balance and Cooling Calculations

S1.1 Heat Balance Fundamentals

The core of CDC cooling design is accurately calculating all heat sources inside the container and matching cooling capacity. Heat sources include:

(1) IT equipment heat dissipation
This is the dominant heat source, accounting for 80–90% of total heat. Almost all electrical power consumed by servers, storage, and network switches converts to heat. Calculation: IT heat (kW) = total IT power (kW) × 0.98. For a 170kW IT load, IT heat ≈ 166.6kW.

(2) Lighting heat
LED lighting power density is typically 5–10W/m². For a 40ft container interior of ~30m², lighting is 150–300W, negligible (<0.5kW).

(3) UPS and distribution losses
UPS inverter efficiency loss is 2–4%. At 400kVA UPS with 60% load, loss ≈ 400 × 0.6 × 0.03 = 7.2kW. Transformer loss (iron + copper) is 1.5–2% of rated capacity; 400kVA transformer ≈ 6–8kW.

(4) Wall heat transfer
With 50mm rock-wool sandwich panels (thermal conductivity ~0.04W/(m·K)), at summer 40°C outside, 22°C inside: heat transfer coefficient K = 0.04/0.05 = 0.8 W/(m²·K). 40ft container exterior surface ≈ 115m². Wall load = 0.8 × 115 × (40-22) = 1,656W ≈ 1.7kW.

(5) Ventilation infiltration
At 0.5 air changes/hour (well-sealed container), container volume ~76m³, ventilation ~38m³/h. Summer outside 40°C/60% RH, inside 22°C/50% RH: fresh-air heat load ≈ 2–3kW.

(6) Personnel heat
Each maintenance person dissipates ~100–150W; at 2 people, ~0.3kW, negligible.

S1.2 Total Cooling Capacity Formula

Total cooling (kW) = IT heat + UPS loss + transformer loss + wall transfer + infiltration + margin

For 170kW IT:
– IT heat: 166.6kW
– UPS loss: 7.2kW
– Transformer loss: 7.0kW
– Wall transfer: 1.7kW
– Infiltration: 2.5kW
– Margin factor (1.15×): × 1.15

Total = (166.6 + 7.2 + 7.0 + 1.7 + 2.5) × 1.15 = 185 × 1.15 = 212.8kW

With 5×60kW in-row CRAH (300kW total, N+1 gives 240kW available), margin ≈ 12.7%.

S1.3 Airflow and Static Pressure

Airflow (m³/h) = Total cooling (kW) × 3600 / (1.2 × 1.005 × ΔT)

Where 1.2 kg/m³ is air density, 1.005 kJ/(kg·K) is specific heat, ΔT = 12°C (closed hot aisle design).

Airflow = 212.8 × 3600 / (1.2 × 1.005 × 12) = 63,428 m³/h

5×60kW in-row CRAH at 10,300 m³/h each = 51,500 m³/h total. With no bypass air in closed aisle, this meets demand.

Static pressure: in-row CRAH blows directly at adjacent racks with minimal duct resistance (<50Pa). No high-static fans needed. Raised-floor supply (traditional) needs 150Pa+ external static due to floor plenum resistance. KITOZER in-row CRAH defaults to horizontal supply at 80Pa external static.

S1.4 Detailed PUE Calculation

PUE = Total facility power / IT power

For 170kW IT, air-cooled container:
– IT load: 170kW
– AC system: compressor + fans ≈ 25–30% of cooling capacity. Total cooling 212.8kW, AC power ≈ 212.8 × 0.28 = 59.6kW
– UPS loss: 7.2kW
– Lighting + controls: 1kW
– Total facility = 170 + 59.6 + 7.2 + 1 = 237.8kW
– PUE = 237.8 / 170 = 1.40

For liquid-cooled (500kW IT):
– IT load: 500kW
– CDU pumps + dry cooler fans: ~12–15% of cooling. Total cooling 550kW, cooling power ≈ 550 × 0.14 = 77kW
– In-row trim AC (20% waste heat): ~15kW
– UPS loss: 20kW
– Total facility = 500 + 77 + 15 + 20 = 612kW
– PUE = 612 / 500 = 1.22

Free cooling: in regions with annual average temperature below 15°C (e.g., Guiyang, Hohhot, Northern Europe), 5000–6000 hours/year can use outside air cooling without compressors. AC power drops to fan-only (~5–8% of cooling), PUE drops to 1.15–1.25.


Supplement S2: Power Distribution Deep Design

S2.1 Load Classification

Per GB 50174-2017:
– Tier A (Fault-tolerant): Dual utility + UPS + genset; any single equipment failure does not affect service. UPS requires 2N or system redundancy. For finance, securities, disaster recovery.
– Tier B (Redundant): Dual utility + UPS + genset; critical equipment N+1. For enterprise data centers, government cloud.
– Tier C (Basic): Single utility + UPS; genset optional. For small edge nodes, test environments.

KITOZER-CDC is standard Tier B, upgradable to Tier A.

S2.2 Cable Sizing

For 170kW IT, UPS output 380V 3-phase:
– UPS output current = 400kVA / (√3 × 380V) = 608A
– At 0.9 PF, actual current = 400 × 0.9 / (√3 × 0.38) = 546A
– Use YJV-0.6/1kV-4×240+1×120mm² copper, ampacity ~440A in air
– Two parallel runs: 2 × YJV-4×240+1×120 = 880A, meets 546A with 61% margin

HV side (10kV):
– 400kVA transformer, HV current = 400 / (√3 × 10) = 23A
– Use YJV22-8.7/15kV-3×35mm², ampacity ~110A, meets demand

S2.3 Harmonic Mitigation

UPS rectifier harmonics: 5th (250Hz), 7th (350Hz), 11th (550Hz), 13th (650Hz). KITOZER APF:
– Capacity: 20–30% of UPS rating; 400kVA UPS → 100A APF
– Effectiveness: THDi from 25–30% down to <5%
– Standard: GB/T 14549 requires harmonic current limits at PCC

S2.4 Battery Sizing Calculation

UPS battery backup:
– t = 15 min = 0.25h
– Vdc = 480V (150 cells × 3.2V LFP)
– Pout = 170kW (full IT)
– η = 0.96
– Pbat = 170 / 0.96 = 177.1kW
– Ibat = 177100 / 480 = 369A
– Required capacity = 369 × 0.25 = 92.3Ah
– At 0.9 DOD and 0.95 aging factor: 92.3 / (0.9 × 0.95) = 107.8Ah
– Choose 2× 480V 100Ah LFP parallel = 200Ah, meets demand


Supplement S3: Container Structure Engineering

S3.1 Steel Structure

KITOZER container steel frame:
– Base frame: 16Mn hot-rolled steel welded, main cross-beams 300×90×8mm, load capacity ≥30 tons
– Top frame: same 16Mn, welded columns aligned with base
– Corner castings: standard ISO 1161 cast steel, four corners, rated 250kN lifting load
– Wall/roof panels: 50mm rock-wool sandwich, 0.5mm color steel both sides, 100kg/m³ rock-wool density
– Anti-corrosion: blast cleaning Sa2.5, epoxy zinc-rich primer ×2 + polyurethane topcoat ×2, dry film ≥120μm

S3.2 Doors and Sealing

  • Container door: double-leaf insulated door, 50mm rock-wool core, EPDM foam gasket on frame
  • Protection: IP55 (dust, water jet)
  • Lock: stainless steel lock + door closer, optional access control terminal
  • Emergency exit: emergency escape door at opposite end, interior push-bar panic hardware (opens from inside without key)

S3.3 Floor and Loading

  • Raised floor: calcium sulfate 600×600×32mm, anti-static tile (10⁶–10⁹Ω), 200mm support height
  • Floor loading: distributed ≥1000kg/m², battery zone ≥1500kg/m²
  • Base frame check: 40ft full-load ~28 tons; bending strength checked at distributed load, max deflection <L/500

S3.4 Insulation Performance

50mm rock-wool sandwich panel K = 0.8 W/(m²·K). Compare with traditional brick-concrete room (240mm brick wall, K ≈ 2.0 W/(m²·K)): container insulation is 2.5× better. At same indoor-outdoor delta, container wall heat gain is only 40% of traditional room, reducing AC load accordingly.


Supplement S4: DCIM Monitoring Deep Dive

S4.1 Monitoring Point List

KITOZER-DCIM standard points (40ft air-cooled compute container):

Category Point Qty Sensor Type
Temp/Humid Cold aisle temp 4 (one per rack row) Digital RH/T RS485
Temp/Humid Hot aisle temp 2 Digital RH/T
Temp/Humid Ambient temp 2 NTC thermistor
Leak AC condensate pan 2 Positioning leak rope
Leak Under-floor piping 4 Leak rope
Smoke Cold aisle 2 Photoelectric smoke
Smoke Hot aisle 2 Photoelectric smoke
Access Container doors 2 Door contact switch
Power Incoming energy 1 Smart meter (V/A/P/kWh)
Power Head-end branch 8 MCB + energy module
UPS UPS status 1 set RS485/Modbus
Battery Battery cluster 2 sets BMS CAN
AC In-row CRAH 5 sets RS485 group control
Fire Gas suppression panel 1 set Dry contact + RS485
Video IR dome cameras 4 ONVIF/RTSP
Lighting LED strips 2 circuits Relay control

S4.2 Alarm Classification

DCIM alarms in four tiers:
– Critical: UPS on battery, battery low, all AC down, fire → phone + SMS + App push, respond within 5 min
– Major: single AC failure, single PDU overload, leak alarm → SMS + App push, respond within 30 min
– Minor: temp 1°C high, single fan failure → App push, respond within 4 hours
– Warning: filter differential pressure high, cell voltage deviation → logged, handled next inspection

S4.3 Remote O&M

KITOZER-DCIM cloud platform:
– Web browser access (anywhere)
– Mobile App (iOS/Android) push alarms
– Large-screen display (optional 55″ video wall)
– Data export (Excel/PDF daily/weekly/monthly reports)
– Multi-site centralized management (one platform for nationwide container nodes)


Supplement S5: Fire Protection Engineering

S5.1 FM200 Agent Calculation

FM200 (HFC-227ea) design concentration 8% by volume:

W = V / S × C / (100 – C)

Where V = protected zone net volume (m³), S = superheated vapor specific volume (m³/kg) = 0.137 at 20°C, C = design concentration (%) = 8%.

For 40ft compute container, V = 12.2 × 2.4 × 2.6 = 76.1 m³:

W = 76.1 / 0.137 × 8 / (100 – 8) = 555.5 × 0.087 = 48.3 kg

Choose 70L cylinders (charge ~70kg), 2-cylinder set = 140kg, meets 48.3kg with design margin.

S5.2 Protected Zone Requirements

  • Zone volume: single zone ≤3000m³, net volume ≤2000m³
  • Enclosure pressure rating: ≥1200Pa (container survives discharge)
  • Pressure relief vent: on exterior upper wall, sized per GB 50370
  • Evacuation: 30-second pre-discharge sounder/strobe, personnel exit before discharge
  • Post-discharge ventilation: exhaust fan ≥5 air changes/hour before re-entry

Supplement S6: 20-Year TCO Analysis

For 170kW IT load, 20-year operating life:

Cost Item Traditional Room Containerized DC Difference
Civil + fit-out ¥3,000,000 ¥200,000 (hardened pad) -¥2,800,000
MEP equipment ¥6,000,000 ¥8,500,000 (container premium) +¥2,500,000
Annual power (PUE 1.8 vs 1.4) ¥1,958,400/yr ¥1,523,200/yr -¥435,200/yr
20-yr power total ¥39,168,000 ¥30,464,000 -¥8,704,000
Annual O&M labor ¥600,000/yr (4 staff) ¥200,000/yr (1 inspector) -¥400,000/yr
20-yr O&M total ¥12,000,000 ¥4,000,000 -¥8,000,000
Mid-life equipment replacement ¥2,000,000 ¥1,500,000 -¥500,000
20-Year TCO Total ¥62,168,000 ¥44,664,000 -¥17,504,000

CDC 20-year TCO is ~28% lower than traditional room. Savings come from power (PUE), O&M labor (remote monitoring), and civil works (factory prefab).


Supplement S7: Typical Deployment Configurations

S7.1 Scenario A: 50kW Edge Node (20ft Air-Cooled)

Bill of Materials:
– KITOZER-CDC-20-AC50 compute container × 1 (6058×2438×2591mm, IP55, rock-wool)
– 42U server racks × 4 (10×1U servers each, 12.5kW/rack)
– 30kW in-row CRAH × 2 (N+1)
– 30kVA modular UPS × 1 (3×10kVA modules)
– 48V 100Ah LFP battery × 2 (15-min backup)
– FM200 cabinet unit × 1 (one zone)
– DCIM host × 1 (7″ touchscreen)
– IR dome cameras × 2
– Access control × 1
– LED aisle lighting × 1 set
– 380V LV feed (no HV transformer needed)
– Accessories: raised floor, cable tray, fiber tray, ground busbar

Reference price: ~¥850,000/set (excluding servers and network)

S7.2 Scenario B: 170kW AI Inference Cluster (40ft Dual-Container Air)

Bill of Materials:
– KITOZER-CDC-40-AC170 compute container × 1 (12192×3200×2896mm)
– KITOZER-PPC-40 power container × 1 (8000×3200×2896mm)
– 42U compute racks × 4 (9×4U AI servers each)
– 42U ELV rack × 1
– 60kW in-row CRAH × 5
– 20kW PAC × 2 (power container)
– 10kV HV switchgear × 1 set (incoming + metering + outgoing)
– 400kVA dry-type transformer × 1
– GGD LV switchgear × 1 set (incoming + APF + outgoing)
– 400kVA modular UPS × 1 (4×100kVA modules)
– 51.2V 100Ah LFP cabinet × 2 sets
– 350kW containerized genset × 1 (12h buried fuel tank)
– FM200 suppression × 2 zones (compute + power)
– DCIM platform × 1 set
– CCTV × 1 set (IR dome + NVR + HDD)
– Accessories: raised floor, closed hot aisle, top dampers, LED strips, lintel screen, grounding

Reference price: ~¥8,520,000/set (excluding servers and switches)

S7.3 Scenario C: 500kW Cold-Plate Liquid-Cooled AI Training (40ft Liquid Dual)

Bill of Materials:
– KITOZER-CDC-40-LC500 compute containers × 2 (parallel, total IT 1000kW)
– KITOZER-PPC-40 power container × 1 (1250kVA transformer + 800kVA UPS)
– High-density liquid racks × 16 (30–50kW each, cold plates on GPU/CPU)
– 500kW CDU × 2 (N+1, secondary deionized water)
– 1000kW air dry cooler × 1 (external)
– In-row trim CRAH (20% waste heat) × 4 (2 per container)
– 1250kVA dry transformer × 1
– 800kVA modular UPS × 1 (8×100kVA modules)
– 480V 200Ah LFP cabinet × 4 sets
– 800kW containerized genset × 1
– Optional immersion: single-phase immersion tanks × 8 (replace cold plates)
– Fire, DCIM, security same as Scenario B

Reference price: ~¥18,000,000–25,000,000/set (excluding GPU servers)


Supplement S8: Standard Acceptance Testing

S8.1 Factory Acceptance Test (FAT)

Tests performed at factory:
1. Visual inspection: no scratches, uniform paint, clear labels
2. Dimensional check: L/W/H tolerance ≤±5mm
3. Sealing test: with doors closed, high-pressure air leak check (pressure drop <50Pa/15min)
4. Insulation resistance: power circuit to ground ≥10MΩ
5. Withstand voltage: power circuit 2500V/1min no breakdown
6. UPS function: bypass/inverter transfer, battery discharge, overload protection
7. AC function: start/stop, temp setpoint, group control switchover
8. Fire linkage: smoke alarm → sounder → damper close → simulated discharge
9. Environmental alarm: all monitoring points triggered one by one, alarm upload confirmed
10. Full-load burn-in: IT dummy load at full load for 72 hours, all parameters stable

S8.2 Site Acceptance Test (SAT)

Tests performed on site:
1. Placement levelness: ≤2mm/m
2. Ground resistance: ≤4Ω
3. HV energization: transformer impulse switching 5 times
4. UPS transfer: utility → battery → genset transfer time <4ms
5. AC cooling: cold aisle temp 22±1°C
6. Fire linkage: actual simulation (no real discharge)
7. Network: dual-fiber packet loss <0.01%
8. 72-hour full load: real IT servers at full load
9. Noise: inside 75dB(A), outside 65dB(A)
10. Document handover: as-built drawings, test reports, operation manuals, spare parts list


本文为 KITOZER 品牌通用技术白皮书英文版补充。This document is a supplementary technical white paper published by KITOZER. All specifications are subject to the latest KITOZER official datasheet.

第六部分 英文扩展百科(Extended English Encyclopedia)

Extended Section E1: Containerized Data Center Market History

E1.1 Global CDC Milestones

The containerized data center as a product category has evolved through distinct phases.

2005: Concept germination. Hyperscale operators in the US and Europe began feeling pressure from land and power costs. Google began internally testing server-in-container prototypes. No commercial products existed; only engineering prototypes. Sun Microsystems engineers started researching “Project Black Box.”

2007: Sun Black Box launch. Sun Microsystems launched the world’s first commercial CDC — the Sun Modular Data Center (Project Black Box). It packed 28×42U racks, power, and cooling into a single 20ft shipping container, designed PUE 1.25. This proved the technical feasibility of “container as data center.”

2008: IBM, HP, Dell follow. IBM launched “Blue Green,” HP launched “Performance Optimized Data Center,” Dell launched “Modular Data Center Solution.” The US Marine Corps procured container data centers for military deployment, marking entry into defense and emergency scenarios.

2009-2010: Cost advantage in recession. After the 2008 financial crisis, enterprise IT budgets tightened. CDCs attracted SMBs due to lower capital and rapid deployment. China’s three major carriers launched “cloud computing” strategies and began procuring container solutions.

2011-2013: China market takes off. Huawei launched “FusionModule,” ZTE launched “Toxi,” Vertiv (formerly Emerson Network Power) launched “Smart Modular Data Center.” Chinese carriers began bulk-purchasing container and micro-module solutions for base station expansion and IDC construction.

2014-2016: Cloud hyperscale procurement. Alibaba Cloud, Tencent Cloud, and Baidu Cloud began massive data center construction. While large cloud DCs remained building-based, edge nodes, disaster recovery sites, and local government cloud projects heavily adopted CDCs. Rack density rose from 5kW to 10-15kW; in-row CRAH became standard.

2017-2019: AI and high-density inflection point. GPU servers entered data centers; rack density jumped from 10-15kW to 30-50kW. Air-cooled containers hit limits. Liquid-cooled containers entered R&D and pilot phases. Vertiv, Schneider, and Huawei launched liquid-cooled prototypes.

2020-present: Large language models and East-Data-West-Computation. ChatGPT and similar LLMs drove exponential AI training demand. China launched the “East Data West Computing” project, building 8 national compute hubs in Beijing-Tianjin-Hebei, Yangtze River Delta, Greater Bay Area, Chengdu-Chongqing, Inner Mongolia, Guizhou, Gansu, and Ningxia. CDCs became a key construction method for edge nodes and western data centers. KITOZER launched its complete CPC/PPC product family in this context.

E1.2 Market Size and Growth

According to industry research, the global CDC market:
– 2020: ~USD 3.5 billion
– 2023: ~USD 5.8 billion
– 2026 (forecast): ~USD 8.5 billion
– CAGR: ~13%

Growth drivers by importance:
1. AI training and inference compute demand (~40% of growth)
2. Edge computing node deployment (~25%)
3. Traditional DC retrofit and expansion (~20%)
4. Emergency and defense scenarios (~10%)
5. Mining, oilfield, wind power industrial scenarios (~5%)

E1.3 Competitive Landscape

Global CDC market players:
– International majors: Vertiv, Schneider Electric, Eaton, Delta, HPE, Dell
– Chinese vendors: Huawei, ZTE, Vertiv Technologies (Shenzhen), Kehua Data, Kstar, Envicool
– Specialist container makers: KITOZER (Guangzhou Laian), Cannon (US), Rurrent (UK)
– Cloud self-built: Google, Microsoft, Amazon use container technology internally but do not sell externally

KITOZER’s differentiation: focused on small-to-medium CDCs (50kW-1MW), providing one-stop design, manufacturing, transport, installation, and O&M service, priced 30-40% below international majors while maintaining factory prefab quality consistency.


Extended Section E2: Container Materials and Manufacturing

E2.1 Rock-Wool Sandwich Panel Process

KITOZER container walls use 50mm rock-wool sandwich panels:

Materials:
– Face sheets: 0.5mm galvalume color-coated steel, polyester (PE) or high-durability polyester (HDP) coating, colors RAL9005 (matte black), RAL7035 (light gray), RAL5010 (blue), or customer-specified
– Core: rock wool, density 100kg/m³, thermal conductivity ≤0.040 W/(m·K), Class A (non-combustible), moisture absorption ≤1%

Lamination process:
– Continuous sandwich panel line: decoiling → roll forming → rock wool feeding → roller laminating → curing → cutting → inspection
– Polyurethane foam adhesive between sheet and rock wool; peel strength ≥100N/50mm
– Tongue-and-groove joint with foam sealant for air- and water-tightness

Quality testing:
– Thermal conductivity per GB/T 10294 (guarded hot plate)
– Combustibility per GB/T 5464 (non-combustibility)
– Peel strength per GB/T 23932
– Dimensional tolerance: length ±3mm, width ±2mm, thickness ±1mm

E2.2 Steel Structure Welding and Anti-Corrosion

Welding:
– Base and top frames in 16Mn (Q345B) hot-rolled steel
– CO₂ gas-shielded welding (GMAW), wire ER50-6
– Weld grade: Class 1 (100% ultrasonic testing)
– Deformation control: symmetric welding, back-step method

Anti-corrosion:
– Surface preparation: blast cleaning to Sa2.5 (near-white), surface roughness 40-75μm
– Primer: epoxy zinc-rich, 2 coats, 60μm DFT
– Intermediate: epoxy micaceous iron oxide, 1 coat, 40μm DFT
– Topcoat: polyurethane, 2 coats, 60μm DFT
– Total DFT: ≥160μm
– Salt spray: ≥1000 hours neutral salt spray per GB/T 1771

E2.3 Sealing and Waterproofing Design

Four-layer sealing:
1. Door perimeter: double EPDM foam gasket, 25-30% compression, hardness 60±5 Shore A, -40 to +80°C
2. Panel joints: neutral silicone weatherproof sealant, 5mm wide × 3mm deep; aluminum foil tape on exterior
3. Cable penetrations: IP68 cable glands, nickel-plated brass or nylon
4. Bottom drainage: weep holes with rain hood; AC condensate drain with P-trap


Extended Section E3: Cooling Engineering Deep Dive

E3.1 Direct Expansion (DX) Refrigeration Cycle

In-row CRAH uses a direct expansion vapor-compression cycle with four core components:

(1) Compressor
KITOZER in-row CRAH uses fully variable-speed scroll compressors (Copeland or Danfoss). Variable-speed adjusts from 30-90Hz based on cooling load, improving part-load efficiency by 30%+ over fixed-speed.

(2) Condenser
Located in the outdoor unit (or on container roof). High-pressure hot refrigerant gas rejects heat to outside air and condenses to liquid. Copper tube aluminum fin construction, sized for 45°C ambient full load.

(3) Expansion Valve
Electronic expansion valve (EEV) precisely controls refrigerant flow. EEV adjusts based on superheat (target 5-8K), 3-5× more accurate than thermal expansion valves (TEV).

(4) Evaporator
Located in the indoor unit. Low-pressure cold refrigerant absorbs heat from container air and evaporates. Air is cooled and dehumidified as it passes over the evaporator coil; cold air is delivered by EC fans to the cold aisle.

Cycle: low-pressure gas → compressor → high-pressure hot gas → condenser → high-pressure liquid → expansion valve → low-pressure liquid → evaporator → low-pressure gas (repeat).

Capacity calculation: Cooling (kW) = mass flow (kg/s) × specific refrigeration effect (kJ/kg)

For 60kW CRAH: R410A or R32, mass flow ~0.5 kg/s, specific effect ~120 kJ/kg → 0.5 × 120 = 60kW.

E3.2 EC Fan Energy Technology

In-row CRAH fans use EC (electronically commutated) brushless DC fans:
– Efficiency: ≥75% (traditional AC fan ~55%)
– Energy saving: 30-40% less than AC fans
– Speed control: 0-10V or RS485, continuously variable 20-100%
– Noise: 5-10 dB(A) lower than AC fans
– Life: ≥50,000 hours (L10)

KITOZER in-row CRAH has 2× EC centrifugal fans (N+1 redundant), each 5,150 m³/h, total 10,300 m³/h. Fans adjust speed based on cold aisle temperature: slow down below 20°C for energy saving, speed up above 24°C for cooling.

E3.3 Free Cooling Technology

In spring, autumn, and winter when outside temperature is low, outside air can directly cool the data center without compressor operation. KITOZER in-row CRAH optional free cooling:

Free cooling mode: when outside temp <15°C, dampers open, outside cold air directly enters container, mixes with hot return air, and fans deliver to cold aisle. Compressor shuts down; only fans run. Power drops to 1/4-1/5 of cooling mode.

Free cooling hours per year: North China ~4000-5000h, Northeast China ~5500-6500h, South China ~1500-2500h.

Hybrid mode: outside 15-25°C, partial free cooling + partial compressor. PUE ~1.2-1.3.

Full compressor mode: outside >25°C, compressor-only. PUE ~1.4-1.5.


Extended Section E4: UPS and Battery Deep Dive

E4.1 Modular UPS Topology

KITOZER-UP modular UPS uses double-conversion online topology:

Rectifier stage (AC/DC): Utility input → EMI filter → IGBT PFC rectifier → DC bus at 400V (3-phase) or 240V (single-phase). Input PF ≥0.99, THDi <3%.

Inverter stage (DC/AC): DC bus → IGBT full-bridge inverter → 220V/380V sine wave output. Output voltage regulation ±1%, frequency ±0.1%, THD <3%.

Static bypass: On inverter overload or fault, SCR transfers to utility bypass within 4ms — no load drop.

Maintenance bypass: For UPS service, manually close maintenance bypass; load runs directly on utility; UPS can be fully powered down.

Battery mode: On utility loss, batteries connect via DC/DC to DC bus; inverter continues output. Battery voltage droops from 480V (full) to 400V (cutoff); inverter adjusts duty cycle to maintain output.

E4.2 LFP BMS Three-Tier Architecture

KITOZER-LFP cabinet BMS uses three tiers:

Tier 1: BMU (Battery Monitoring Unit)
– Per string module (16s = 51.2V)
– Monitors each cell voltage and temperature
– Performs passive cell balancing (100mA balancing current)
– Protection: cell overvoltage (3.65V), undervoltage (2.5V), overtemp (60°C), undertemp (-20°C)

Tier 2: BCM (Battery Cluster Manager)
– Manages one cluster (multiple modules in series/parallel)
– Monitors cluster total voltage, current, SOC/SOH
– Controls main contactors, fuses
– Communicates with UPS (CAN/RS485)

Tier 3: BA (Battery Array Manager)
– Manages entire battery array (multiple clusters in parallel)
– Calculates array total SOC/SOH
– Communicates with DCIM platform (Modbus-TCP)
– Logs charge/discharge history and alarm events

E4.3 Battery Safety Design

Lithium iron phosphate is intrinsically safe but still needs multi-layer protection:
– Cell level: ceramic-coated separator to prevent internal short; pressure relief valve
– Module level: fire-resistant baffles between modules (aluminum silicate fiber board, 1000°C rated)
– Cabinet level: aerosol extinguishing (Novec 1230) inside each cabinet; combustible gas detectors
– System level: BMS secondary protection (opens main contactor on cell overtemp)


Extended Section E5: Network Architecture

E5.1 Three-Tier Network Design

CDC network uses a three-tier design:

Access layer:
– One 1U access switch per rack (48×10G SFP+ + 6×40G QSFP+)
– Servers connect via 10G fiber to access switch
– Switch stacking (iStack or VSU) for high availability

Aggregation layer:
– Two aggregation switches per compute container (stacked pair)
– Access switches uplink via 40G to aggregation
– Aggregation configures ACL, QoS, inter-VLAN routing

Core layer:
– Core router/switch in power container or external room
– Aggregation uplink via 100G/400G fiber to core
– Core includes firewall, IDS, load balancer

E5.2 Network Redundancy

  • Device redundancy: Access switch dual-uplinks to two aggregation switches; aggregation stacked pair; core dual
  • Link redundancy: Each server dual-NIC bonded (LACP), connecting to two access switches
  • Path redundancy: Dual fiber uplinks (different physical routes), STP/ERPS ring protection
  • Out-of-band management: Independent OOB management network via dedicated switch to all device Console ports and management ports

Extended Section E6: Project Management

E6.1 Implementation Gantt Chart

For a 170kW air-cooled CDC project, from contract to go-live:

Phase Work Duration Owner
Week 1 Site survey, design confirmation, contract signing 1 week KITOZER sales + engineer
Week 2 Construction drawing design, equipment procurement 1 week KITOZER design
Weeks 3-6 Factory prefab: container manufacture, equipment assembly, wiring 4 weeks KITOZER factory
Weeks 5-6 Civil works: pad, ground grid, power feed (parallel with factory) 2 weeks Client contractor
Week 7 Factory FAT 1 week KITOZER + client
Week 8 Transport to site, crane placement 1 week KITOZER logistics
Week 9 Site wiring, inter-container connections 1 week KITOZER engineer
Week 10 Energization, commissioning, SAT 1 week KITOZER engineer
Week 11 Server racking, full-load burn-in 1 week Client + KITOZER

Total: ~11 weeks (2.5 months), with only 3 weeks on site.

E6.2 Quality Assurance System

KITOZER complete QA system:
– ISO 9001 certified
– Design review: technical committee reviews after design completion
– IQC: all purchased equipment (UPS, AC, transformer) inspected for certificate and appearance before warehousing
– IPQC: inspectors patrol during assembly; critical processes (welding, wiring) 100% inspected
– OQC: 100% power-on test before shipment; factory test report issued
– SAT: joint client-KITOZER acceptance after site installation; acceptance report signed


Extended Section E7: Common Faults and Troubleshooting

E7.1 UPS Common Faults

Symptom Possible Cause Troubleshooting Solution
UPS “Battery Low” alarm Battery aging or insufficient charge 1. Check cell voltage 2. Check charger output Replace weak cells or whole battery; repair charger
UPS transfers to bypass Inverter overload or fault 1. Check load rate 2. Check inverter alarm code Shed load; replace inverter power module
High input harmonics Rectifier PFC fault 1. Measure THDi with power analyzer 2. Check PFC circuit Repair or replace rectifier module
Short battery backup time Battery capacity degradation 1. Full capacity discharge test 2. Compare to rated capacity Replace battery when capacity <80%

E7.2 AC Common Faults

Symptom Possible Cause Troubleshooting Solution
Cold aisle temp high Insufficient cooling or airflow 1. Check compressor current 2. Check fan speed 3. Check filter DP Clean filter; repair compressor; replace fan capacitor
AC “High Pressure” alarm Condenser poor heat rejection 1. Check outdoor unit clearance 2. Check condenser coil fouling 3. Check fan operation Clean condenser; repair fan; check refrigerant pressure
AC “Low Pressure” alarm Refrigerant leak 1. Electronic leak detector 2. Check EEV opening 3. Check filter drier blockage Weld leak; evacuate; recharge; replace drier
Condensate water leak Drain blocked or P-trap dry 1. Check drain flow 2. Check drip pan level Clear drain; level pan; refill P-trap

E7.3 Monitoring Common Faults

Symptom Possible Cause Troubleshooting Solution
Temp/Humid data stale Sensor fault or broken comm wire 1. Measure sensor supply voltage 2. Measure RS485 A/B voltage Replace sensor; re-terminate comm wire
Alarms not pushed DCIM platform communication lost 1. Check network 2. Check platform config 3. Check SMS gateway Repair network; reconfigure alarm rules; contact SMS provider
Video black screen Camera fault or NVR channel fault 1. Check camera power 2. Check cable/fiber 3. Check NVR channel status Replace camera; redo RJ45; reboot NVR

Extended Section E8: Application Scenario Deep Dive

E8.1 Smart Mining

Mining CDC challenges:
– High dust: above-ground or underground mine air has high dust concentration; needs IP65+ and multi-stage dust filtration
– High vibration: blasting and heavy equipment create vibration; internal equipment needs isolation
– Poor network coverage: no cell signal underground; needs leaky feeder or wireless base stations
– Unstable power: mine grid voltage fluctuates widely; needs wide-input UPS and stabilizer

KITOZER mine-version customization:
– G4+F8+H13 three-stage dust filtration at air intake
– Anti-vibration mounts under equipment (rubber isolators, ≥80% isolation efficiency)
– Wide-input UPS (280-475V, accommodates mine voltage fluctuation)
– 5G private network equipment integration

E8.2 Wind Farm Digitalization

Wind farm CDC requirements:
– Unattended: wind farms are usually unmanned; needs remote monitoring and automatic alarms
– Cold environment: wind farms at high altitude or northern sites, winter below -30°C
– Wind-solar-storage integration: use wind and PV green power
– SCADA integration: CDC must connect to turbine control systems

KITOZER wind-version customization:
– Enhanced insulation (100mm rock wool, replacing standard 50mm)
– Internal electric preheater (5kW, maintains 10°C+ inside in winter)
– Antifreeze glycol (-30°C protection)
– Wind turbine SCADA integration interface

E8.3 Emergency Disaster Response

Emergency CDC requirements:
– Go-live within 48 hours: data processing needed immediately after disaster
– Independent power: grid is down in disaster zone; fully dependent on genset
– Quick removal: whole-unit recovery after relief operations
– Communication redundancy: satellite + microwave + public network multi-link

KITOZER emergency-version customization:
– Quick connectors (power and fiber connected within 30 minutes)
– 350kW genset integrated in separate container
– Satellite communication terminal (portable auto-acquire station)
– Camouflage exterior (optional, for military or disaster relief)


Extended Section E9: Energy Efficiency and Carbon

E9.1 PUE and Carbon Calculation

For 170kW IT load, 8000 operating hours/year:
– PUE 1.8: annual energy = 170 × 8000 × 1.8 = 2,448,000 kWh
– PUE 1.4: annual energy = 170 × 8000 × 1.4 = 1,904,000 kWh
– Annual savings = 544,000 kWh
– Annual CO₂ reduction = 544,000 × 0.581 kgCO₂/kWh (China grid average) = 316 tons CO₂/year
– Equivalent to planting 17,600 trees/year (at 18kg CO₂/tree/year)

E9.2 Green Power and Carbon Neutrality

KITOZER CDC optional green power:
– Rooftop PV: 10-20kW panels on container roof, generating daytime for IT load
– Storage battery: 50-100kWh battery storage, charging daytime and discharging evening
– Green PPA: sign green power purchase agreement with utility for wind/PV
– Carbon tracking: DCIM platform displays real-time carbon emissions and green power ratio


Extended Section E10: Online Sizing Calculator Logic

KITOZER provides an online sizing calculator. Clients enter:

  1. Total IT load (kW): total server power
  2. Rack count and per-rack power (kW/rack): determines cooling method
  3. Site supply voltage: 10kV / 35kV / 380V
  4. Battery backup time (minutes): 15 / 30 / 60
  5. Environment: max/min temperature, altitude, coastal/desert
  6. Redundancy requirement: N / N+1 / 2N
  7. Communication bandwidth: determines network equipment config

Calculator output:
– Recommended container model and quantity
– UPS capacity and battery configuration
– AC cooling capacity and count
– Genset capacity
– Reference price range
– Lead time


This extended English supplement is published by KITOZER as part of the Containerized Data Center White Paper. All specifications subject to the latest KITOZER official datasheet.

第八部分 英文技术手册级补充

Supplement S9: Detailed Installation and Commissioning Procedures

S9.1 Site Preparation Checklist

Before container equipment arrives on site, the following preparation must be complete; any item failing may delay installation:

Site conditions:
– Area: 40ft container needs at least 18m × 6m hardened area, 1m working space each side, 2m maintenance space front and rear
– Floor loading: C25 concrete, 200mm thick, ≥5 t/m². Battery zone reinforced to 10 t/m²
– Flatness: ±5mm/2m
– Drainage: 0.5% slope, no pooling, drainage directed away from container
– Access road: width ≥4m, turning radius ≥15m, height clearance ≥4.5m
– Lifting space: crane working radius 6m clear of obstacles, no overhead power lines

Power feed:
– HV incoming (if applicable): 10kV cable from substation to container, sized per transformer rating, conduit or direct burial
– LV incoming: 380V 3-phase 5-wire cable, sized per UPS rating, 20% spare
– Ground grid: ring ground on site, ≤4Ω, ground terminal ≤2m from container
– Backup power: genset position ≤10m from container, exhaust directed away from personnel

Network:
– Dual fiber (single-mode OS2) from carrier room to container, 10m spare length
– Fiber patch panel at container entrance
– Bandwidth confirmed per business need, at least Gigabit uplink

Water/drain (liquid-cooled):
– Water supply (DN25) to dry cooler position
– Drain (DN50) to AC condensate discharge
– Winter freeze protection: pipe insulation

S9.2 Container Placement Step-by-Step

Step 1: Crane positioning
– Select truck crane sized at 1.5× container weight (28t container → 50t crane)
– Extend all outriggers, place steel plates (1.5m × 1.5m × 20mm)
– Confirm crane working radius and lift height meet placement requirements
– Stop operations at wind ≥10m/s

Step 2: Lifting rigging
– Use dedicated four-point container lifting beam
– Connect wire ropes to four ISO corner castings
– Confirm all locking pins fully engaged
– Lift slowly to 100mm; pause to check rigging and balance

Step 3: Placement
– Slowly rotate boom over hardened pad
– Lower slowly, aligning with anchor bolts
– Pause at 50mm above ground for manual guidance
– Fully lower into position

Step 4: Leveling
– Measure level at all four corners with electronic level
– Adjust with shims (stainless steel, 1-5mm thickness)
– Target: levelness ≤2mm/m
– Torque anchor bolts after adjustment

Step 5: Grounding connection
– Connect container ground busbar to site grid with 40×4mm galvanized flat steel
– Weld length ≥100mm (double-sided); apply anti-rust paint after welding
– Measure ground resistance, confirm ≤4Ω

S9.3 Energization Commissioning Flow

Phase 1: HV Energization (if applicable)
1. Confirm all HV breakers open
2. Check transformer appearance and terminal tightness
3. Close HV incoming isolator
4. Close vacuum breaker; transformer impulse switching
5. Observe no-load sound (uniform, no abnormal noise) and temperature (slow rise)
6. Repeat impulse switching 5 times, 5-minute intervals
7. Measure LV-side 3-phase voltage, deviation ≤5%

Phase 2: LV Energization
1. Confirm all LV GGD breakers open
2. Close LV incoming breaker
3. Measure bus voltage and phase sequence
4. Close each outgoing breaker in sequence (UPS, AC, lighting, maintenance outlets)
5. Check each circuit current

Phase 3: UPS Commissioning
1. Confirm all UPS power modules installed; battery connections correct
2. Power on UPS; run in bypass mode for 10 min
3. Transfer to inverter mode; observe output voltage, frequency, waveform
4. Connect battery bank; perform charge test
5. Discharge test: simulate utility loss; battery inverter supplies 30 min; observe voltage droop
6. Restore utility; confirm auto-transfer back to utility-inverter

Phase 4: AC Commissioning
1. Start each in-row CRAH; set cold aisle 22°C
2. Observe compressor start/running current
3. Observe fan speed and supply air temp
4. Check condensate drainage
5. Group control test: set master/standby rotation; confirm auto-switchover
6. Free cooling mode test (if configured)

Phase 5: Fire Commissioning
1. Smoke detector test: use smoke generator on each detector; confirm alarm upload to fire panel
2. Heat detector test: use heat gun
3. Sounder/strobe test
4. Damper linkage test: on alarm, AC shuts down, dampers close
5. Top damper test: auto-open on fire alarm
6. Access unlock test: auto-unlock on fire alarm
7. Note: gas suppression only simulated (no real discharge); confirm control logic

Phase 6: Environmental Commissioning
1. Test each temp/humidity sensor for accuracy
2. Test leak rope; confirm leak alarm triggers
3. Test door contact; confirm open-door alarm
4. Test smart meter; confirm voltage/current/power data
5. Test UPS communication; confirm DCIM displays UPS status
6. Test battery BMS communication; confirm SOC and cell voltage display
7. Test CCTV; confirm all camera views
8. Alarm push test: trigger simulated alarm; confirm SMS, email, App received

Phase 7: Genset Commissioning
1. Check oil, coolant, fuel levels
2. Manually start genset; observe start time (within 15s)
3. Observe output voltage and frequency (380V/50Hz)
4. ATS transfer test: simulate utility loss; confirm ATS switches to genset
5. Genset loaded 30 min; observe temperature, oil pressure, exhaust
6. Restore utility; confirm ATS switches back

Phase 8: Full-Load Burn-In
1. Rack all IT servers; connect PDU and network
2. Servers at full load (stress test software)
3. Continuous operation ≥72 hours
4. Record every 2 hours: cold aisle temp, UPS load, battery SOC, AC status
5. After 72 hours, all parameters stable, no alarms → acceptance passed


Supplement S10: Detailed Maintenance Procedures

S10.1 Daily Inspection

Remote inspection (via DCIM, 2× daily):
– 09:00 first check: review overnight alarms; confirm all parameters normal
– 17:00 second check: review daytime operation; record daily energy data

Inspection items:
1. Cold aisle temp: should be 20-24°C. If >26°C for 2 consecutive hours, on-site AC check
2. Hot aisle temp: should be 35-45°C. If >50°C, check AC return blockage
3. UPS load: should be 40-70%. If >80%, consider expansion
4. Battery SOC: should be ≥90%. If <80%, check charging circuit
5. AC status: all units in auto mode, no alarms
6. Genset standby: auto standby, fuel ≥80%
7. Alarm log: check for unhandled alarms

S10.2 Monthly Maintenance

On-site (monthly, ~4 hours):

  1. AC filter cleaning
  2. Open AC front panel; remove filter
  3. Rinse with clean water (no detergent); air-dry; reinstall
  4. Record cleaning date
  5. Filter life: wash monthly, replace after 2 years

  6. UPS visual inspection

  7. Check UPS panel for alarms
  8. Check UPS fan operating sound
  9. Check terminals for heat marks

  10. Battery sampling

  11. Read all cell voltages via BMS
  12. Identify min/max cell voltage; deviation should be <50mV
  13. If deviation >100mV, log and schedule balancing

  14. Ground resistance measurement

  15. Measure container ground resistance with tester
  16. Should be ≤4Ω. If >4Ω, check for corrosion at connection points

  17. Genset no-load test

  18. Manually start genset; no-load run 15 min
  19. Observe oil pressure, coolant temp, exhaust color
  20. Record data; shut down; return to auto standby

S10.3 Quarterly Maintenance

On-site (quarterly, ~8 hours):

  1. AC evaporator cleaning
  2. Power off AC
  3. Spray专用 fin cleaner on evaporator coils
  4. Wait 15 min; rinse with water
  5. Check drip pan drainage

  6. Condenser outdoor unit rinse

  7. Power off outdoor unit
  8. Low-pressure water rinse condenser fins (no high-pressure — avoid fin damage)
  9. Clear debris around outdoor unit

  10. UPS power module duct cleaning

  11. Remove UPS power modules (hot-swap, no power-off needed)
  12. Blow ducts and heat sinks with compressed air
  13. Check fan operating sound
  14. Reinstall modules

  15. Battery verification discharge

  16. Simulate utility loss; battery discharges 30%
  17. Record discharge curve
  18. Restore utility charging
  19. Compare to historical data for battery health

  20. Fire system full-loop test

  21. Test all smoke and heat detectors
  22. Test sounder/strobe
  23. Test damper linkage
  24. Check fire cylinder pressure gauge (should be in green zone)

S10.4 Annual Maintenance

On-site (annual, 2-3 days):

  1. Transformer insulation test
  2. Disconnect HV and LV sides
  3. Measure winding-to-ground insulation with 2500V megohmmeter
  4. Should be ≥1000MΩ. If <100MΩ, check for moisture

  5. HV breaker test

  6. Measure breaker opening/closing time and sync
  7. Test charging motor operation
  8. Check secondary circuit wiring

  9. UPS full-load test

  10. Dummy load test UPS at full load for 1 hour
  11. Measure efficiency, temperature rise, noise
  12. Compare to factory data

  13. Battery full-capacity discharge

  14. Discharge batteries to cutoff voltage
  15. Calculate actual discharge capacity
  16. If actual capacity <80% of rated, recommend battery replacement

  17. Genset full-load test

  18. Genset loaded: 30% 30min → 50% 30min → 75% 30min → 100% 30min
  19. Record voltage, frequency, temperature, oil pressure at each load point
  20. Change oil and filters (every 500 hours or annually)

  21. Ground grid test

  22. Measure ground grid resistance
  23. Check connection points for corrosion
  24. Add ground rods if needed

  25. Container seal inspection

  26. Check door gaskets for aging/cracking
  27. Check panel joint sealant for detachment
  28. Check cable glands for tightness
  29. Replace gaskets or re-seal as needed

  30. Fastener retorque

  31. Transport vibration may loosen fasteners
  32. Check and retorque: base frame bolts, rack mounting bolts, busbar connections, cable terminals

Supplement S11: PDU and Power Distribution Details

S11.1 PDU Technical Parameters

KITOZER rack PDU parameters:
– Input: 380V 3-phase 5-wire, 63A or 32A
– Output: 16× C13 + 4× C19
– Switching: MCB per output
– Metering: per-circuit current monitoring (optional)
– Mounting: vertical on rack rear post
– Material: aluminum alloy, black
– Plug: industrial connector (3P+N+PE, 63A)

S11.2 Cable Management

CDC internal cable management:
– Power cables: run along overhead rack cable tray, separated from ELV cables by ≥200mm
– ELV cables: run in fiber tray; perpendicular crossover when crossing power cables
– Power cords: 2 per rack (A/B feed), connected to different PDUs
– Fiber: OM4 multi-mode, 2 per server (A/B feed)
– Labeling: all cables labeled at both ends with source, destination, and number


Supplement S12: CDC vs Micro-Module vs Outdoor Cabinet

S12.1 Three-Tier Comparison

Dimension Outdoor Cabinet Micro-Module Containerized DC
IT load 5-20kW 50-500kW 50kW-1MW
Rack count 1-2 6-42 4-24
Location Outdoor ground or pole Inside concrete room Outdoor hardened pad
Civil works needed No Yes (building) No (pad only)
Cooling Heat exchanger or AC In-row CRAH + CAC In-row CRAH / liquid
UPS capacity 1-6kVA 10-600kVA 10-2000kVA
Typical use Base stations, road monitoring, small edge Enterprise rooms, carrier rooms AI inference, mines, oilfields, emergency
KITOZER model OC-22U MicroDC-10/20/50 CDC-20/40

S12.2 How They Relate

These three are complementary, not replacement:
– Outdoor cabinets: terminal access layer (base stations, road monitoring)
– Micro-modules: enterprise-grade or carrier-grade indoor rooms
– Containers: outdoor or rapid-deployment scenarios

KITOZER’s full product line covers all three tiers. For example, a smart mine project: mine dispatch center uses a 170kW CDC, underground base stations use 5kW outdoor cabinets, connected via fiber ring network.


This supplementary technical manual is published by KITOZER as part of the Containerized Data Center White Paper. All procedures should be performed by qualified technicians. All specifications subject to the latest KITOZER official documentation.

第十部分 英文深度技术专题

Topic L1: Liquid-Cooled Container Deep Dive

L1.1 Cold Plate Liquid Cooling Principles

Cold plate liquid cooling is the mainstream solution for AI training clusters. The core idea is to bring high-capacity liquid directly into contact with high-power chips (CPU/GPU) rather than indirectly through air.

Cold plate construction:
– CNC-machined copper or aluminum block with micro-channel flow paths (0.5-2mm width)
– Bottom surface bonded to GPU/CPU top with thermal grease (5-8 W/(m·K))
– Top connects to inlet/outlet tubing via Quick Disconnect Couplings (QDC)

Flow path:
1. CDU supplies 35-45°C warm water (secondary deionized water)
2. Water distributes through server manifold to each cold plate
3. Water flows through micro-channels, absorbing GPU/CPU heat; temp rises 5-10°C
4. Heated water returns via return line to CDU
5. Plate heat exchanger in CDU transfers heat to primary-side glycol
6. Primary water flows to external dry cooler; heat rejected to outside air
7. Cooled primary water returns to CDU, cycle repeats

Key advantages:
– Heat transfer efficiency: liquid thermal conductivity is 25× air; specific heat is 4×; volumetric heat capacity is 100×+
– Noise: server fans can run at minimum speed or stop (cold-plate-covered chips need no air cooling); noise drops from 75 to 55 dB(A)
– PUE: liquid handles 80%+ of heat; air only trims 20% waste; PUE drops from 1.5 to 1.15-1.25
– High-temperature operation: secondary water up to 45°C extends free-cooling hours (free cooling available when outside <35°C)

L1.2 CDU Technical Parameters

KITOZER-CDU500:
– Rated cooling: 500 kW
– Secondary (server side): deionized water + 10% glycol, conductivity <10μS/cm; flow 30 m³/h; inlet 35-45°C; outlet 40-50°C; pressure 0.6 MPa; 2× variable-speed magnetic pumps (N+1), each 30 m³/h at 20m head
– Primary (facility side): 25% glycol; flow 35 m³/h; inlet 25-35°C; outlet 30-40°C; pressure 0.8 MPa; 2× variable-speed centrifugal pumps (N+1)
– Heat exchanger: plate type, 316L stainless plates, design pressure 1.0 MPa
– Filtration: secondary 5μm filter + resin purifier
– Leak detection: drip tray + positioning leak rope; valves close and pumps stop on alarm
– Control: 7″ touchscreen, Modbus-TCP/BACnet to DCIM
– Dimensions: 1200×800×2000mm (vertical cabinet)
– Weight: ~800kg (water-filled)

L1.3 Immersion Cooling

Above 80kW per rack, cold plate is insufficient (10-20% waste heat still needs air trim). Immersion cooling submerges servers in insulating coolant:

Single-phase immersion:
– Servers fully submerged in insulating coolant (synthetic hydrocarbon oil or fluorinated fluid)
– No phase change; coolant circulated by pumps
– Coolant specs: 40°C kinematic viscosity <10cSt, flash point >200°C, dielectric strength >20kV/mm
– Tank: 316 stainless, insulated and sealed, 200-400L capacity
– Per-tank power: 100-200kW
– PUE: 1.05-1.15

Two-phase immersion:
– Coolant boils/vaporizes on chip surface, condenses on top condenser plates
– Higher heat transfer efficiency, but coolant cost extremely high (fluorinated fluid, thousands of RMB/liter)
– Suited for extreme density (>200kW/tank)


Topic N1: Network Security

N1.1 Cybersecurity Classified Protection

Under China’s Cybersecurity Law and Classified Protection Regulations, data centers must be registered per business criticality:
– Level 2: general enterprise business, basic protection
– Level 3: critical business (finance, government, critical information infrastructure), strict protection
– Level 4: extremely critical business, highest protection

KITOZER CDC defaults to Level 3:
– Next-generation firewall (NGFW) with IPS/IDS, VPN, application identification
– IDS monitoring for attack behavior
– Access control: 802.1X authentication, ACLs
– Log audit: all network device logs stored 6+ months
– Physical security: access control, CCTV, anti-tamper alarms

N1.2 Data Security

  • Backup: local backup storage (NAS/SAN), off-site backup for critical data
  • Encrypted transport: IPsec VPN for inter-site communication
  • Access audit: all server operation logs audited
  • Data destruction: physical destruction or degaussing of retired server disks

Topic AC1: Acoustic Design

AC1.1 Noise Sources

CDC noise sources:
1. AC outdoor unit fans: 70-80 dB(A) at 1m (loudest)
2. Compressors: 65-75 dB(A)
3. Server fans: 60-70 dB(A) per rack
4. UPS fans: 55-65 dB(A)
5. Genset: 90-100 dB(A) raw, ~75-80 dB(A) after container acoustic treatment

AC1.2 Noise Reduction Measures

  • Inner wall acoustic lining: additional 25mm acoustic foam over rock-wool panels
  • AC outdoor unit acoustic enclosure: 10-15 dB(A) reduction
  • Genset double-wall container: inner acoustic cotton + outer steel, 15-20 dB(A) reduction
  • Site layout: ≥20m from office buildings
  • Green belt: evergreen landscaping between container and personnel areas

Topic LP1: Lightning and Grounding

LP1.1 Lightning Protection Zones

Per GB 50057, CDC lightning protection zones:
– LPZ 0A: container exterior, directly exposed
– LPZ 0B: exterior areas under shielding
– LPZ 1: container interior after SPD protection
– LPZ 2: rack interior after secondary SPD

LP1.2 SPD Configuration

  • Class B SPD (power incoming): Imax ≥100kA (10/350μs), on LV incoming panel
  • Class C SPD (UPS input): Imax ≥40kA (8/20μs), on UPS input
  • Class D SPD (PDU input): Imax ≥20kA (8/20μs), on PDU input
  • Signal SPD: network and signal lines

Topic Q: Extended FAQ (Additional 20 Questions)

Q31: Can a CDC go under a parking garage?
A: Yes, but verify garage structural load and ventilation. Typically garage ceiling ≥3m, floor load ≥1 t/m², with mechanical ventilation to prevent summer overheating.

Q32: How many operators per 40ft container?
A: No dedicated operators needed. Remote DCIM monitoring + 1-2 on-site inspections per month. KITOZER engineers handle faults remotely or on-site.

Q33: Can multiple containers be paralleled?
A: Yes. Multiple compute containers side-by-side, connected via LV busbar and fiber to shared power container. Recommend max 4-6 compute containers per power container.

Q34: How to replace a failed server inside the container?
A: Open door → enter cold aisle → pull failed server → insert new server → connect power and network. 5-10 minutes, no downtime (servers are redundant).

Q35: Does a CDC need fire department approval?
A: Yes. As a Class C fire hazard data center, design review and acceptance must be submitted to local fire department. KITOZER provides fire design drawings for approval.

Q36: Can a CDC do environmental monitoring?
A: Yes, KITOZER-DCIM includes environmental monitoring as standard: temp/humidity, leak, smoke, access, power metering, UPS, AC, battery, all monitoring points.

Q37: If one in-row CRAH fails, does it affect the whole container?
A: No. N+1 redundant design; remaining units auto-compensate on single failure; cold aisle temp fluctuation <2°C.

Q38: Does a CDC need tap water?
A: Air-cooled version doesn’t need tap water (condensate self-evaporates or drains). Liquid-cooled version needs tap water (for coolant make-up) and drain.

Q39: Will it get too cold inside in winter?
A: No. Server heat maintains internal temperature. KITOZER standard operates at -20°C; cold-region version adds 5kW electric preheater to maintain 10°C+.

Q40: What certifications for CDC export?
A: EU needs CE; US needs UL; Russia needs EAC. KITOZER products are CE certified; other certifications available on request.

Q41: Are CDC containers new or used shipping containers?
A: KITOZER uses custom-manufactured new container shells, not second-hand shipping containers. New shells have superior structural strength, anti-corrosion, and sealing.

Q42: Can a CDC go on a rooftop?
A: Verify rooftop load. 40ft full load ~28t plus clearance; roof needs ≥1 t/m². Most industrial factory roofs qualify; office roofs usually don’t.

Q43: Does CDC AC need regular refrigerant recharge?
A: Normally no. Refrigeration is a sealed cycle; refrigerant doesn’t get consumed. Only leaks require repair and recharge. Recommend annual pressure check.

Q44: Can CDC servers be remotely rebooted?
A: Yes. KITOZER smart PDU supports remote on/off control per outlet. Remotely reboot failed servers via DCIM platform or web interface.

Q45: How long do CDC batteries last?
A: LFP cycle life 6000 cycles at 80% DOD. If cycled daily, ~16 years. In practice, deep discharges are rare (only on utility loss); design life 10-15 years.

Q46: How often does a CDC need cleaning?
A: AC filters monthly; evaporator quarterly; condenser quarterly; interior floor and rack surfaces quarterly.

Q47: Can a CDC be used in earthquake zones?
A: Yes. KITOZER containers designed for 7-degree seismic fortification (YD 5083). Above 8-degree zones need special reinforcement.

Q48: How to insure a CDC?
A: Recommend property insurance (covering fire, flood, earthquake) and machinery breakdown insurance (covering equipment faults). KITOZER provides equipment list and technical parameters for insurance purposes.

Q49: Why is CDC lead time shorter than traditional rooms?
A: Because most work is done at the factory. Traditional rooms need 6-12 months of on-site fit-out; CDC completes all assembly and testing in 4-8 weeks at factory, with only 2-3 weeks on-site for power and commissioning.

Q50: What does KITOZER CDC warranty cover?
A: Warranty includes: 7×24 remote technical support (phone/email), free hardware replacement for non-user-damage faults, 1 annual preventive inspection. Excludes: consumable replacement (filters, fuses), user-damage repair, on-site labor and travel (48-hour on-site for major Chinese cities; remote areas quoted separately).


This extended technical topic section is published by KITOZER as part of the Containerized Data Center White Paper. All specifications subject to the latest KITOZER official documentation.

第十二部分:英文补充技术资料

Topic PS1: Solar-Storage Integrated CDC

PS1.1 System Architecture

Where site conditions allow, KITOZER CDC can add a PV canopy + storage battery for a “PV-storage-compute” integrated power station:

  • PV canopy: steel canopy 3-5m above container, with PV panels (10-30kW). Also shades the container from direct sun, reducing AC load by 10-15%
  • Storage battery cabinet: 50-100kWh LFP battery cabinet, storing daytime PV generation for evening IT load
  • Energy Management System (EMS): coordinates power distribution among PV, storage, utility, genset, and IT load; prioritizes green power

PS1.2 Economics

For 170kW IT, 20kW PV + 100kWh storage:
– Annual PV generation: 20kW × 4h/day × 300 days = 24,000 kWh/year
– Storage peak-valley arbitrage: price diff ~0.7 RMB/kWh, 1 cycle/day, 100kWh × 365 × 0.7 = 25,550 RMB/year
– Canopy AC savings: ~10% × 59.6kW × 8000h × 0.8 RMB/kWh = 38,144 RMB/year
– Total annual benefit: ~24,000 × 0.8 + 25,550 + 38,144 = 82,894 RMB/year
– Investment: PV+storage+canopy ~150,000-200,000 RMB; payback ~2-2.5 years


Topic TR1: Transport and Logistics

TR1.1 Road Transport Notes

KITOZER CDC domestic road transport:
– Vehicle: 13.75m low-bed semi-trailer, tractor ≥400 hp
– Securing: wire rope + turnbuckles at four corners to frame; rubber pads at corners
– Speed limit: highway ≤80km/h, ordinary road ≤60km/h, corners ≤30km/h
– Permits: 40ft HC (3.2m wide, 2.9m tall) is over-dimensional; requires Over-dimensional Transport Permit and escort vehicle
– Loading/unloading: one truck crane at each end, coordinated operation

TR1.2 Ocean Export

  • 20ft standard fits inside a 40ft ocean container
  • 40ft container goes via breakbulk or project cargo vessel
  • Export packaging: rain film on doors, protective covers on external instruments, shipping documents in waterproof bag
  • Marine insurance: All Risks coverage

Topic SV1: KITOZER Service System

SV1.1 Pre-Sales

  • Free site survey: KITOZER engineers inspect site (power, network, pad, environment)
  • Design: customized proposal with BOM, layout drawing, electrical schematic
  • Quotation: formal quote within 3 business days
  • Technical exchange: Q&A and design optimization

SV1.2 During Sales

  • Factory prefab: client can witness manufacturing; KITOZER provides weekly reports
  • FAT: client invited to factory acceptance test; sign FAT report
  • Transport: KITOZER handles transport to site (domestic freight included)
  • Installation/commissioning: KITOZER engineers on site until SAT acceptance

SV1.3 After-Sales

  • Warranty: whole unit 12 months; core equipment 2-5 years
  • Technical support: 7×24 phone/email/remote
  • On-site service: 48-hour response in major Chinese cities
  • Spare parts: Guangzhou HQ stocks consumables; ships within 24 hours
  • Extended service: 3- or 5-year extended warranty with annual preventive maintenance

Topic TR2: Industry Trends Outlook

TR2.1 Next 3-5 Years

  1. GPU density continues rising: next-gen GPUs (NVIDIA B200, GB200) at 1000W+ per card; rack density from 50kW to 100-200kW; liquid cooling becomes standard
  2. Immersion cooling at scale: as coolant costs drop and servers become immersion-ready, immersion moves from pilot to mass deployment
  3. AI-driven O&M: DCIM introduces AI for predictive maintenance (early fault warning), smart energy optimization (auto AC strategy), and auto expansion recommendations
  4. Green power and carbon neutrality: PUE targets below 1.1; green power ratio above 80%
  5. Standardization and modularity: further standardization per OCP/ODCC open compute standards; multi-vendor interoperability
  6. Edge compute explosion: 5G+AI drives edge data center demand; CDC becomes primary edge compute vehicle

TR2.2 KITOZER Product Roadmap

  • 2025: 20ft liquid-cooled container (200kW per container); AI inference appliance (container + GPU servers as turnkey)
  • 2026: immersion-cooled container (500kW per container); PV-storage-compute integrated container
  • 2027: digital twin DCIM platform; fully automated O&M robot

This supplementary technical reference is published by KITOZER as part of the Containerized Data Center White Paper. All specifications subject to the latest KITOZER official documentation. Contact us at +86 13922289957 / +86 18520668845 / WhatsApp +86 19068534140.

第十四部分:英文附录

Appendix A: Complete Technical Specification Comparison

A.1 Container Envelope

Parameter CDC-20-AC50 CDC-40-AC170 CDC-40-LC500
Dimensions (L×W×H) 6058×2438×2591mm 12192×3200×2896mm 12192×3200×2896mm
Wall material 50mm rock-wool 50mm rock-wool 50mm rock-wool
Protection IP55 IP55 IP55
Operating temp -20°C~+50°C -20°C~+50°C -20°C~+50°C
Storage temp -40°C~+70°C -40°C~+70°C -40°C~+70°C
Humidity 5~95% RH non-condensing 5~95% RH non-condensing 5~95% RH non-condensing
Seismic rating 7 degree 7 degree 7 degree
Full-load weight 8~12 t 20~28 t 25~35 t

A.2 IT Load and Rack Config

Parameter CDC-20-AC50 CDC-40-AC170 CDC-40-LC500
Total IT load 50kW 170kW 500kW
Rack count 4×42U 4×42U+1×42U ELV 16×42U high-density
Rack density 12.5kW/rack 42kW/rack 30~50kW/rack
Server count 40×1U 36×4U AI 128×GPU servers
Rack size 600×1100×2000mm 600×1200×2000mm 600×1200×2000mm
PDU 2×32A/rack 2×80A/rack 2×63A/rack

A.3 Cooling System

Parameter CDC-20-AC50 CDC-40-AC170 CDC-40-LC500
Cooling method Air in-row CRAH Air in-row + hot aisle containment Cold-plate CDU + trim AC
Model CRV30 CRV60 CDU500+CRV30
Capacity per unit 30kW 60kW 500kW(CDU)
Quantity 2 (N+1) 5 (N+1) 1 CDU + 4 trim
Airflow 5,150m³/h each 10,300m³/h each 30m³/h(secondary)
Fan type EC centrifugal EC centrifugal Magnetic + centrifugal pumps
Compressor Variable scroll Variable scroll None (plate HX)
Refrigerant R410A/R32 R410A/R32 DI water + glycol
Design PUE 1.50~1.60 1.35~1.45 1.15~1.25

A.4 Power System

Parameter CDC-20-AC50 CDC-40-AC170 CDC-40-LC500
Supply voltage 380V LV direct 10kV HV incoming 10kV HV incoming
UPS capacity 30kVA 400kVA 800kVA
UPS type Modular 3×10kVA Modular 4×100kVA Modular 8×100kVA
UPS efficiency ≥96% ≥96% ≥96%
Battery 48V LFP 51.2V LFP×2 480V LFP×4
Backup time 15 min 15 min 15 min
Genset Optional 350kW 800kW
Ground resistance ≤4Ω ≤4Ω ≤4Ω

A.5 Fire and Monitoring

Parameter CDC-20-AC50 CDC-40-AC170 CDC-40-LC500
Fire suppression FM200 cabinet FM200 70L×2 FM200 + aerosol
Zones 1 2 (compute+power) 3
Smoke detectors 2 4 8
Heat detectors 2 2 4
Environmental host CC01 touchscreen DCIM platform DCIM platform
Cameras 2 IR dome 4 IR dome 8 IR dome
Access control Card+PIN Card+PIN Card+PIN+face

Appendix B: Brand and Company Information

B.1 Company Profile

Guangzhou Laian Intelligent System Development Co., Ltd. (parent company of the KITOZER brand) is based in Guangzhou, China, specializing in R&D, manufacturing, and sales of data center infrastructure, smart rooms, ELV system integration, and industrial automation. The company’s product lines include:

  • Data center products: modular data centers (micro-modules), containerized data centers, precision power distribution cabinets, smart PDUs, shielding cabinets
  • Power distribution products: 10kV HV switchgear, LV GGD panels, dual-power ATS panels, modular UPS, LFP battery cabinets
  • Cooling products: in-row CRAH, rear-door heat exchangers, liquid CDU, dry coolers
  • Monitoring products: DCIM platform, smart gateways, sensor series
  • Outdoor products: outdoor integrated cabinets, stainless steel weatherproof boxes, outdoor surveillance boxes

Products are ISO 9001 and CE certified, deployed across data centers, telecom base stations, industrial parks, mines/oilfields, wind/solar, government cloud, and smart city projects.

B.2 Core Advantages

  1. Full-chain in-house manufacturing: cabinet sheet metal, power, cooling, and monitoring software all self-developed and self-manufactured
  2. Fast customization: standard models 4-6 week lead time; custom models 8-12 weeks
  3. Factory prefab quality: all products assembled and tested at factory for consistent quality
  4. One-stop service: from design, manufacturing, transport, installation to O&M
  5. Cost performance: 30-40% below international majors at comparable technology

B.3 Contact

  • Domestic website: lain.com.cn
  • International website: gdlain.com
  • Tel/WeChat: +86 13922289957, +86 18520668845
  • WhatsApp: +86 19068534140
  • Address: Chaotian Park, Zhongrun Industrial Zone, No. 5 Huashan Road, Shilou, Panyu, Guangzhou, China

Appendix C: Glossary

Acronym Full Name Meaning
CDC Containerized Data Center 集装箱式数据中心
CPC Compute Container 算力集装箱
PPC Power Container 电力集装箱
GDC Genset Container 柴发集装箱
UPS Uninterruptible Power Supply 不间断电源
PDU Power Distribution Unit 配电单元
CRAH Computer Room Air Handler 机房空气处理机组
CDU Coolant Distribution Unit 冷量分配单元
RDHx Rear Door Heat eXchanger 背门换热器
PUE Power Usage Effectiveness 电能利用效率
LFP Lithium Iron Phosphate 磷酸铁锂
BMS Battery Management System 电池管理系统
DCIM Data Center Infrastructure Management 数据中心基础设施管理
ATS Automatic Transfer Switch 自动转换开关
HV High Voltage 高压
LV Low Voltage 低压
SPD Surge Protective Device 浪涌保护器
EMC Electromagnetic Compatibility 电磁兼容
IP Ingress Protection 防护等级
N+1 N Plus One Redundancy N+1冗余

KITOZER Containerized Data Center White Paper — Complete Edition. Published by Guangzhou Laian Intelligent System Development Co., Ltd. All specifications subject to the latest KITOZER official datasheet. Contact: +86 13922289957 / +86 18520668845 / WhatsApp +86 19068534140. Websites: lain.com.cn / gdlain.com.

第十六部分:英文补充

Appendix D: Extended FAQ (Questions 51-60)

Q51: What is the typical lead time for KITOZER containerized data centers?
A: Standard models (CDC-20-AC50, CDC-40-AC170) ship from factory in 4-8 weeks after contract signing. Liquid-cooled custom models take 10-14 weeks. On-site installation and commissioning take 1-2 weeks. Total: 6-16 weeks, far shorter than traditional rooms at 6-18 months.

Q52: What is the warranty period?
A: Whole unit free warranty is 12 months from site acceptance. Core equipment has longer coverage: UPS 3 years, AC compressor 3 years, transformer 3 years, LFP batteries 5 years. Extended service plans available for 3-5 years.

Q53: How fast is KITOZER response when a fault occurs?
A: Remote support responds within 2 hours (7×24 phone/email/remote login). On-site service reaches major Chinese cities within 48 hours. Remote areas quoted separately.

Q54: Does KITOZER offer equipment financing?
A: Yes. KITOZER partners with multiple leasing companies to provide equipment financing (20-30% down, 3-5 year terms), reducing upfront capital pressure. Contact sales engineer for details.

Q55: Can a CDC be permitted as a temporary structure?
A: In most cities, CDCs are treated as equipment or temporary structures and do not require formal building permits. However, we recommend consulting local housing and fire departments. KITOZER provides product certificates and technical documentation to support permit applications.

Q56: Does KITOZER support remote firmware upgrades?
A: Yes. DCIM platform, UPS controller, and AC controller all support remote firmware upgrades. KITOZER engineers upgrade during scheduled maintenance windows without on-site personnel.

Q57: What network bandwidth is typically needed?
A: Depends on business: edge inference nodes typically need 1-10Gbps uplink; AI training clusters need 10-100Gbps. KITOZER configures network equipment and bandwidth per client requirements.

Q58: Does KITOZER provide data center design consulting?
A: Yes. KITOZER provides full-process consulting from requirements analysis, design, equipment selection, construction guidance, to acceptance testing. Consulting can be purchased even if clients ultimately do not buy KITOZER equipment.

Q59: How is PUE measured and verified?
A: PUE is measured per ISO/IEC 30134: smart meters at total facility input measure total power; meters at IT load input measure IT power; PUE = total / IT. KITOZER-DCIM automatically calculates and displays real-time, daily, monthly, and annual PUE.

Q60: Who are KITOZER’s typical clients?
A: KITOZER clients include: internet companies (AI inference clusters), telecom carriers (edge nodes), government agencies (government cloud, emergency command), mines/oilfields (digital operations), wind/solar (step-up station digitization), educational institutions (cloud desktop rooms), medical institutions (imaging data centers), and more.


Appendix E: Quick Selection Reference Card

E.1 By IT Load

IT Load Recommended Model Cooling UPS Capacity Genset
≤50kW CDC-20-AC50 Air 30kVA Optional 100kW
50-100kW CDC-20-AC100 Air 60kVA Optional 200kW
100-200kW CDC-40-AC170 Air 200-400kVA 350kW
200-300kW CDC-40-AC300 Air+RDHx 400kVA 500kW
300-500kW CDC-40-LC500 Cold-plate liquid 600-800kVA 800kW
500kW-1MW CDC-40-LC1000(dual) Cold-plate liquid 1200kVA 1200kW

E.2 By Scenario

Scenario Recommended Solution Special Config
Emergency CDC-20-AC100 + GDC-200 Quick connectors, satellite
Mining CDC-40-AC170 + PPC-40 3-stage dust filter, anti-vibration
Desert/oilfield CDC-20-AC100 Upgraded cooling, anti-corrosion
AI edge inference CDC-40-AC170 4×42U high-density racks
Wind farm CDC-20-AC50 Enhanced insulation, preheater
Coastal humid CDC-40-AC170 316 stainless, anti-corrosion coating

E.3 By Power Supply Condition

Site Supply Recommended Solution
10kV HV CDC + PPC (with HV switchgear + transformer)
35kV HV CDC + PPC (upgraded HV switchgear)
380V LV CDC (no HV switchgear or transformer needed)

KITOZER Containerized Data Center White Paper — Final Edition. Guangzhou Laian Intelligent System Development Co., Ltd. Contact: +86 13922289957 / +86 18520668845 / WhatsApp +86 19068534140. Websites: lain.com.cn / gdlain.com.

Appendix F: Technical Glossary Explanations

F.1 What is PUE? Why does it matter?

PUE (Power Usage Effectiveness) is the core metric for data center energy efficiency: PUE = total facility power / IT equipment power. PUE closer to 1.0 means higher efficiency. Traditional open rooms have PUE 1.8-2.2, meaning every 1kW of IT load needs 0.8-1.2kW extra for cooling, UPS, and lighting. KITOZER CDCs reduce PUE to 1.35-1.45 (air-cooled) or 1.10-1.25 (liquid-cooled) through closed hot aisle, in-row CRAH, and free cooling, significantly lowering operating electricity costs.

F.2 What is N+1 Redundancy?

N+1 redundancy means configuring one more unit than needed as backup. For example, if the system needs 3 CRAH units for cooling, configure 4 (3+1). When any one fails, the remaining 3 still meet demand. KITOZER CDCs use N+1 redundancy for CRAH, UPS power modules, and pumps to ensure single-point failures do not affect operations.

F.3 What is UPS?

UPS (Uninterruptible Power Supply) rectifies AC to DC for battery charging and inverts to stable AC for IT equipment when utility is normal; on utility loss, it immediately switches to battery inverter with zero transfer time (online double-conversion). UPS is the core power assurance device. KITOZER uses modular UPS with hot-swap power modules for live replacement.

F.4 What is Cold Aisle Containment?

Cold Aisle Containment (CAC) encloses the cold air aisle formed by two rows of face-to-face racks with top panels, end doors, and gaskets. Cold air stays in the enclosed aisle; servers draw cold air from the front and exhaust hot air to the open hot aisle behind. CAC eliminates hot-cold air mixing and improves cooling efficiency. It is standard in micro-modules and CDCs.

F.5 What is a CDU?

CDU (Coolant Distribution Unit) is the core equipment in liquid-cooled data centers. It isolates and exchanges heat between primary-side (facility) glycol coolant and secondary-side (server) deionized water, while providing pump sets for circulation. The CDU contains a plate heat exchanger, variable-speed pumps, filters, leak detection, and controls — the hub between external dry coolers and server cold plates.

F.6 What is DCIM?

DCIM (Data Center Infrastructure Management) platform is the data center “brain,” centrally monitoring all infrastructure parameters: temp/humidity, leak, smoke, access, power, UPS, batteries, AC, genset. It provides alarm management, energy analysis, reporting, and remote control. KITOZER-DCIM supports web and mobile App remote access.

F.7 What is ATS?

ATS (Automatic Transfer Switch) automatically switches between two power sources (e.g., utility and genset). When the primary source fails, ATS transfers to the backup source in milliseconds, ensuring uninterrupted power. KITOZER CDCs configure ATS for automatic utility-genset transfer.

F.8 What is RDHx?

RDHx (Rear Door Heat eXchanger) places cooling coils in the rack rear door. Server exhaust air passes directly through the door and is cooled by water, eliminating the need for cold air recirculation inside the rack. RDHx suits 15-30kW/rack high-density scenarios, consumes no rack U-space, and is compatible with existing air-cooled racks.


全文完。End of document. KITOZER Containerized Data Center Technical White Paper. 联系 Contact: +86 13922289957 / +86 18520668845 / WhatsApp +86 19068534140. lain.com.cn / gdlain.com.


附录 G:总结与联系

G.1 本文总结

本文作为 KITOZER 品牌发布的集装箱式数据中心技术白皮书,系统阐述了以下内容:集装箱数据中心的发展历程(从 2007 年 Sun Black Box 到当前 AI 算力时代)、KITOZER 完整产品系列(20 尺/40 尺风冷、液冷、浸没全谱系)、内部布局三分区设计、制冷方案(列间空调/背门换热/冷板 CDU/浸没)、供配电架构(市电+UPS+LFP 电池+柴发)、消防安防三级体系、与传统机房全维度对比、五大典型部署场景、运输吊装规程、安装调试八阶段流程、日常维护保养体系、选型五步法、60 条 FAQ、行业标准规范、以及完整技术参数对照表。

KITOZER 集装箱数据中心的核心价值可以概括为:工厂预制品质、现场快速部署、低 PUE 高能效、可移动可扩展、一站式服务。无论是 AI 推理集群、矿山数字化、油田作业区、风电场升压站,还是应急救灾指挥、城市边缘计算节点,KITOZER 都能提供从 50kW 到 1MW 的完整解决方案。

G.2 联系我们

如需获取 KITOZER 集装箱数据中心的详细方案、报价、技术规格书或现场勘察服务,请通过以下方式联系:

广州莱安智能化系统开发有限公司(KITOZER 品牌)

  • 电话/微信:13922289957(微信同号)
  • 电话/微信:18520668845(微信同号)
  • WhatsApp:+86 19068534140
  • 国内网站:lain.com.cn
  • 国际网站:gdlain.com
  • 地址:广州市番禺区石楼镇华山路 5 号中润工业园潮田园区

KITOZER——您的集装箱数据中心专家。工厂预制、现场就位、即接即用,为 AI 算力时代提供快速、可靠、高效的模块化数据中心基础设施。


Appendix G: Summary and Contact

G.1 Summary

This KITOZER Containerized Data Center Technical White Paper comprehensively covers: the development history of containerized data centers (from the 2007 Sun Black Box to the current AI computing era); the complete KITOZER product family (20ft/40ft air-cooled, liquid-cooled, and immersion, full spectrum); three-zone internal layout design; cooling solutions (in-row CRAH, RDHx, cold-plate CDU, immersion); power architecture (utility + UPS + LFP battery + genset); three-tier fire and security systems; full comparison with traditional rooms; five typical deployment scenarios; transport and lifting procedures; eight-phase installation and commissioning flow; daily maintenance procedures; five-step selection guide; 60 FAQs; industry standards; and complete technical specification tables.

KITOZER CDC core value: factory-prefabricated quality, rapid on-site deployment, low PUE efficiency, mobile and scalable, one-stop service. Whether for AI inference clusters, smart mines, oilfield operations, wind farm stations, emergency command, or city edge computing, KITOZER delivers complete solutions from 50kW to 1MW.

G.2 Contact Us

For detailed proposals, quotations, datasheets, or on-site survey services, please contact:

Guangzhou Laian Intelligent System Development Co., Ltd. (KITOZER brand)

  • Tel / WeChat: +86 13922289957
  • Tel / WeChat: +86 18520668845
  • WhatsApp: +86 19068534140
  • Domestic website: lain.com.cn
  • International website: gdlain.com
  • Address: Chaotian Park, Zhongrun Industrial Zone, No. 5 Huashan Road, Shilou, Panyu, Guangzhou, China

KITOZER — Your Containerized Data Center Expert. Factory-prefabricated, site-ready, plug-and-play modular data center infrastructure for the AI computing era.


— 全文完 / End of White Paper —