Acceptance testing proves that a new data center meets design intent before IT equipment is moved in. Commissioning covers each subsystem individually and the integrated site under realistic load. KITOZER recommends running a staged test plan that includes no-load, partial-load, and full-load tests, plus failover scenarios for utility outage and UPS transfer.
Table of Contents
ToggleTest Items
Electrical tests verify insulation resistance, protection coordination, and UPS transfer time. Battery tests measure runtime under load and impedance per block. Cooling tests confirm temperature stability, airflow volume, and leakage response. Fire and monitoring tests verify alarm routing and notification. Finally, a 24-hour burn-in under simulated IT load confirms stability before handover.
KITOZER Support
KITOZER provides factory witness, site commissioning, and test reports. From $3,000 per commissioning package. Contact +86 13922289957 for acceptance testing support.
Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com