Building a new data center follows a controlled sequence to avoid rework and safety issues. KITOZER recommends a phased workflow covering design, civil works, MEP installation, equipment installation, commissioning, and handover. Each phase should have documented acceptance checkpoints before the next phase begins.
Table of Contents
ToggleConstruction Phases
Phase one covers feasibility, layout design, and permit application. Phase two covers civil works including raised floor, wall, ceiling, and door modifications. Phase three installs electrical, UPS, battery, cooling, and fire systems. Phase four brings in racks, PDUs, and containment. Phase five performs integrated testing under load. Phase six hands over as-built drawings and operation manuals to the client team.
KITOZER Support
KITOZER delivers turnkey small and medium data center construction with project management. From $80,000 per 50kW room. Contact +86 13922289957 for construction schedule and pricing.
Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com