Disaster Relief Container Installation and Commissioning Manual

Table of Contents

SEO Optimization Tag System

Core Page Optimization Tags

Title Tag: Disaster Relief Container Installation and Commissioning Manual_ Emergency Support Container Manufacturer – Guangzhou Lain Intelligent System Development Co., Ltd.

Meta Keywords: Disaster relief container, emergency support container, disaster relief container installation and commissioning, disaster relief container manufacturer, custom emergency disaster relief container, KITOZER disaster relief container, mobile disaster relief shelter, disaster prevention and mitigation container

Meta Description: Guangzhou Lain Intelligent System Development Co., Ltd. specializes in R&D and production of disaster relief containers and full-series emergency support containers. This manual provides detailed explanations of disaster relief container installation procedures, system commissioning methods, routine maintenance specifications, and troubleshooting solutions, covering the complete installation and commissioning workflow for all categories of disaster relief containers including housing, command, material storage, and medical types. Factory service hotline: +86 13538869979, Technical support: +86 13538869979, Official website: https://gdlain.com.

H1 Tag: Disaster Relief Container Installation and Commissioning Manual

H2 Tags: Emergency Support Disaster Relief Container Product Overview, Pre-Installation Preparation for Disaster Relief Containers, Main Structure Installation Process for Disaster Relief Containers, Installation Specifications for Internal Functional Systems, System Commissioning and Acceptance Standards, Routine Operation and Maintenance and Troubleshooting, Safety Operating Procedures and Emergency Plans, Transportation and Storage Management Specifications, After-Sales Service and Technical Support

Internal Link Optimization Anchor Text

Core Anchor Text: Disaster relief container, emergency support container

Long-tail Anchor Text: Disaster relief container installation and commissioning methods, disaster relief container manufacturer, custom disaster relief container specifications and parameters, mobile disaster relief container installation steps

Associated Anchor Text: Emergency material storage container, disaster prevention and mitigation equipment, emergency shelter module, modular emergency building

Chapter 1: Emergency Support Disaster Relief Container Product Overview

1.1 Product Definition and Core Positioning

A disaster relief container, also known as an emergency support container, is a mobile emergency building unit modified based on standard container modular structures, integrating architectural structures, electromechanical systems, living support, and emergency command functions. As core equipment in the disaster prevention and mitigation system, disaster relief containers can be rapidly deployed for use in sudden disaster scenarios such as earthquakes, floods, typhoons, and epidemics, addressing core needs including temporary shelter, emergency command, material storage, medical rescue, and communication support. They are indispensable standardized equipment in modern emergency rescue systems.

As a professional disaster relief container manufacturer, Guangzhou Lain Intelligent System Development Co., Ltd. has been deeply engaged in the modular emergency building field for many years. The KITOZER series disaster relief containers developed by the company feature core advantages including rapid installation, strong protective performance, high functional integration, and wide environmental adaptability. Functional configurations can be customized according to different disaster relief scenarios, meeting emergency support requirements in complex environments including plateaus, cold regions, tropics, and mountainous areas.

1.2 Classification of Disaster Relief Container Products

By functional purpose, disaster relief containers are mainly divided into the following five major categories. Different categories have differentiated installation and commissioning process requirements. This manual covers common installation specifications for all categories and specialized commissioning essentials for each category:

Housing-type Disaster Relief Containers: Primarily used for temporary shelter of affected populations. Internally integrated with basic living facilities including beds, lighting, ventilation, power supply, and water supply/drainage, meeting temporary residential needs. Standard specifications include 20-foot and 40-foot standard containers, with each container accommodating 8-20 people for temporary residence.

Command-type Disaster Relief Containers: Used as emergency rescue command centers. Internally integrated with command dispatch systems, video conferencing systems, communication base stations, large-screen display systems, and UPS power supply systems, featuring independent command office space. They serve as the command hub for on-site rescue operations.

Material Storage-type Disaster Relief Containers: Used for storage of emergency supplies, disaster relief equipment, food, and medicine. Featuring constant temperature and humidity control, fire and theft prevention, and sealed moisture-proofing, ensuring the storage safety of relief materials under harsh environments. Some models are equipped with intelligent warehouse management systems.

Medical Rescue-type Disaster Relief Containers: Used as temporary medical points, first-aid stations, and nucleic acid testing points. Internally divided into diagnosis and treatment areas, buffer areas, and disinfection areas, equipped with medical-grade power supply, sterile ventilation, and medical wastewater treatment systems, compliant with medical and health standards.

Comprehensive Support-type Disaster Relief Containers: Integrating living support functions including kitchen, bathroom, shower, and laundry facilities. Can be used in conjunction with housing-type containers to build a complete temporary resettlement community living support system.

1.3 Core Technical Parameters of Products

Core parameters of standard series disaster relief containers produced by KITOZER are as follows. Parameters of non-standard custom products shall be subject to the contract technical agreement:

Parameter Category 20-foot Standard Disaster Relief Container 40-foot Standard Disaster Relief Container Non-standard Custom Container
External dimensions (L×W×H) 6058mm×2438mm×2896mm 12192mm×2438mm×2896mm Customizable length 3-18m
Internal dimensions (L×W×H) 5890mm×2350mm×2680mm 12000mm×2350mm×2680mm Corresponding custom dimensions
Main frame material Q235B high-strength carbon structural steel Q235B high-strength carbon structural steel Optional Q355B high-strength steel
Wall panel material 50mm thick rock wool sandwich panel, double-sided 0.5mm color steel plate 50mm thick rock wool sandwich panel, double-sided 0.5mm color steel plate Optional 75mm/100mm thick insulation panels
Roof material 1.2mm thick galvanized steel plate + polyurethane waterproof coating 1.2mm thick galvanized steel plate + polyurethane waterproof coating Optional stainless steel roof
Fire resistance rating Wall panels ≥1.5h, roof ≥1.0h Wall panels ≥1.5h, roof ≥1.0h Customizable Class A fire protection standard
Wind resistance rating Grade 12 (117km/h) Grade 12 (117km/h) Customizable Grade 14 wind resistance
Seismic rating Seismic fortification intensity 8 degrees Seismic fortification intensity 8 degrees Seismic fortification intensity 8 degrees
Waterproof rating IP65 IP65 IP67 optional
Operating temperature range -40°C to +60°C -40°C to +60°C Customizable extreme temperature zone versions
Design service life 15+ years 15+ years 20+ years optional
Empty container weight Approx. 2.8 tons Approx. 4.5 tons Calculated per configuration
Rated static load Roof ≥150kg/m², floor ≥500kg/m² Roof ≥150kg/m², floor ≥500kg/m² Customizable heavy-duty type

1.4 Core Product Advantages

Rapid Deployment and Efficient Installation: Disaster relief containers are factory-prefabricated. On-site work only requires lifting into position, simple splicing, and utility connections before use. A single container can be installed and commissioned within 4 hours. Complete support capability can be established within 24 hours for multi-container combinations, fully meeting the “rapid response” core requirement of emergency disaster relief.

Sturdy Structure and Strong Protection: The main structure adopts a steel frame with high overall rigidity, providing multiple protection capabilities including wind resistance, seismic resistance, rain protection, fire resistance, and theft prevention. It can be used stably under extreme disaster environments, ensuring the safety of internal personnel and materials.

Integrated Functions and Customization on Demand: As a professional disaster relief container manufacturer, KITOZER can customize internal functional configurations according to different disaster relief scenarios, from basic housing to professional command and medical scenarios, achieving “one container, one solution” customized services. Multiple cooperation models are supported including OEM processing, confidential customization, and spot goods supply.

Convenient Transportation and High Reusability: Compliant with international standard container transportation dimensions, transportable by road, rail, and sea. After disasters, containers can be disassembled, recycled, and redeployed. Overall usage cost is far lower than temporary prefabricated houses.

Environmental Adaptability and Wide Coverage: Adaptable to complex environments including plateaus, high-cold regions, high-temperature zones, high-humidity areas, deserts, and islands. Optional specialized configurations include plateau oxygen generation, cold-region heating, tropical air conditioning, and island anti-corrosion, achieving all-region emergency support coverage.

1.5 Applicable Scenario Scope

As a general-purpose emergency support equipment, disaster relief containers are widely applicable to the following scenarios:

Natural Disaster Emergency Response: Temporary resettlement of affected populations, command and dispatch, and material storage following earthquakes, floods, typhoons, mudslides, snow disasters, and other disasters.

Public Health Emergency Response: Epidemic prevention and control quarantine points, nucleic acid sampling stations, temporary medical stations, and epidemic prevention material reserve warehouses.

Production Safety Emergency Response: Emergency rescue command, temporary personnel refuge, and emergency material storage in mining, chemical, electric power, and other industries.

Military Logistics Support: Temporary command posts for field training exercises, temporary soldier accommodation, material storage and transportation, and field medical support.

Large-scale Event Support: Temporary command, security duty, and logistics support stations for major events such as competitions, exhibitions, and gatherings.

Engineering Infrastructure Support: Temporary office, accommodation, and warehousing supporting facilities for construction projects in remote areas.

1.6 Applicable Standards and Specifications

The design, production, installation, and commissioning of this product strictly comply with the following national and industry standards:

  • GB/T 1413-2018 “Series 1 Freight Containers – Classification, Dimensions and Ratings”
  • GB 50016-2014 (2018 edition) “Code for Fire Protection Design of Buildings”
  • GB 50011-2010 (2016 edition) “Code for Seismic Design of Buildings”
  • GB 50345-2012 “Technical Code for Roof Engineering”
  • GB 50303-2015 “Code for Acceptance of Construction Quality of Building Electrical Engineering”
  • GB 50243-2016 “Code for Acceptance of Construction Quality of Ventilation and Air Conditioning Engineering”
  • GB 50242-2002 “Code for Acceptance of Construction Quality of Water Supply, Drainage and Heating Engineering”
  • GB 50720-2011 “Technical Code for Fire Safety of Building Construction Site”
  • JGJ/T 421-2018 “Technical Standard for Multi-story Residential Buildings with Cold-formed Thin-walled Steel”
  • MZ/T 179-2021 “Natural Disaster Emergency Shelter – Operation Management Specification”

Chapter 2: Pre-Installation Preparation for Disaster Relief Containers

2.1 Installation Site Survey and Assessment

Site survey is a prerequisite step ensuring the installation quality and operational safety of disaster relief containers. It must be conducted on-site by engineering technical personnel with professional qualifications. Construction may only proceed after a formal “Site Survey Report” has been completed.

2.1.1 Terrain and Geological Survey

Terrain Flatness Inspection: Use a level to measure site elevation. Overall site flatness deviation shall not exceed 50mm/10m, and slope shall not exceed 3°. If significant elevation differences exist, site leveling treatment must be performed first. Excavation and backfill areas require layered compaction with a compaction coefficient of no less than 0.93.

Geological Bearing Capacity Inspection: Test the site foundation bearing capacity using the penetration test method or soil bearing capacity testing instruments. Standard disaster relief containers require foundation bearing capacity of no less than 80kPa, and heavy-duty material storage containers require no less than 120kPa. If the site has soft soil foundations, backfill soil, or sandy soil geology, foundation reinforcement treatment is required. Methods may include replacement with sand and gravel, pouring concrete cushion layers, or laying steel plates to improve bearing capacity.

Underground Pipeline Investigation: Survey whether underground pipelines exist beneath the site, including water supply pipes, sewage pipes, power cables, communication fiber optic cables, and gas pipelines. Clarify pipeline alignment and burial depth. Construction of foundations and container installation directly above pipelines is strictly prohibited. When necessary, contact the pipeline ownership unit for on-site disclosure and pipeline relocation.

Hydrogeological Assessment: Understand the site groundwater table elevation. If the groundwater table is higher than the foundation base, dewatering or waterproofing measures must be taken. Assess historical water accumulation conditions at the site. For low-lying areas prone to water accumulation, drainage slopes and drainage ditches must be provided to ensure no risk of water immersion around containers.

2.1.2 Surrounding Environment Assessment

Surrounding Obstacle Investigation: Clear obstacles within a 5m radius around the installation site, ensuring there are no high-voltage lines, trees, or buildings blocking the lifting operation radius. Installing disaster relief containers directly below high-voltage lines is strictly prohibited. The safe distance between containers and high-voltage lines must comply with the “Technical Safety Code for Temporary Power Use on Construction Sites”: no less than 4m for voltages below 1kV, no less than 6m for 1-10kV, and no less than 8m for 35-110kV.

Wind Direction and Sunlight Assessment: Adjust container orientation according to the local prevailing wind direction, avoiding placement of doors and windows on the windward side where possible to reduce wind and rain intrusion risks. Housing-type containers should be positioned to ensure good sunlight conditions, improving living comfort.

Utility Connection Condition Survey: Confirm the location of municipal power access points near the site, power supply capacity, and voltage level. Confirm water supply connection point location, water pressure, and water quality. Confirm sewage discharge destination and drainage interface location, ensuring reasonable utility connection distances and unobstructed pipeline routing paths.

Fire Access Route Planning: Container installation layout must reserve fire access routes no less than 4m wide, ensuring fire trucks can reach directly. Fire separation distance between containers shall not be less than 3.5m. Fire equipment placement locations should be reserved around the perimeter.

2.1.3 Weather Condition Confirmation

Installation operations must be conducted under suitable weather conditions. Entry for installation is strictly prohibited under the following conditions:

  • Lifting operations strictly prohibited when wind speed exceeds 10.8m/s (Beaufort scale 6) or above
  • Outdoor installation operations strictly prohibited during rain, snow, or lightning weather
  • Sealant application and electrical wiring operations not recommended when ambient temperature is below -10°C or above 40°C
  • Lifting and high-altitude operations strictly prohibited during heavy fog with visibility below 50m

2.2 Preparation of Installation Tools and Equipment

Based on the installation scale and container type, prepare all required tools and equipment in advance. Conduct comprehensive inspection and testing before site entry to ensure tools are in good working condition. The tool list is divided into six major categories, with specific configurations as follows:

2.2.1 Hoisting and Lifting Equipment

Equipment Name Specification/Model Quantity Purpose Notes
Truck crane 25 tons 1 unit Standard container lifting and positioning Select based on container weight and lifting radius; must have annual inspection certificate
Forklift 3 tons 1 unit Internal equipment and material handling Use when site hardening conditions are good
Lifting slings 5 tons, 6m 4 pieces Container lifting load-bearing Flat synthetic fiber slings, no damage or broken strands
Shackles 8.5 tons 4 pieces Connection between slings and lifting points American-style forged shackles, regular flaw detection inspection
Manual chain hoists 3 tons, 3m 2 units Container fine positioning adjustment Chains free from deformation or jamming
Hydraulic jacks 10-ton hydraulic 4 units Container leveling adjustment Synchronous lifting; single-corner over-lifting strictly prohibited

2.2.2 Measuring and Testing Tools

Tool Name Specification/Model Quantity Purpose Accuracy Requirement
Level DS32 1 unit Site elevation, container levelness measurement ±1mm/km
Theodolite J2 1 unit Container verticality, axis positioning measurement 2″
Steel measuring tape 50m 2 pieces Dimension and distance measurement Metrologically calibrated
Straightedge 2m 2 pieces Wall and panel flatness inspection 1mm
Feeler gauge 0.02-1mm 2 sets Gap width inspection /
Multimeter Digital 2 units Electrical circuit continuity and voltage testing Accuracy 0.5 class
Megohmmeter 500V 1 unit Insulation resistance testing /
Ground resistance tester Digital 1 unit Ground resistance testing Accuracy ±5%
Anemometer Portable 1 unit On-site wind speed monitoring /
Thermo-hygrometer Digital 2 units On-site ambient temperature and humidity testing /

2.2.3 Power Tools

Tool Name Specification/Model Quantity Purpose
Rotary hammer drill 220V, 13mm 4 units Concrete drilling, expansion bolt installation
Electric drill 220V, 10mm 4 units Metal and panel drilling
Angle grinder 100mm 3 units Metal cutting and grinding
Electric wrench Torque adjustable 2 units Bolt tightening
Electric screwdriver Rechargeable 4 units Self-tapping screw installation
Cut-off machine Profile cutting machine 2 units Section steel and pipe cutting
Hot melt tool PPR-specific 2 sets Water supply pipe hot melt connection
Wire crimping pliers Hydraulic 2 sets Cable terminal crimping
Heat gun 2000W 2 units Heat shrink tubing heating, waterproof membrane baking

2.2.4 Hand Tools

Wrenches: Adjustable wrenches (8″, 12″, 15″) 4 each; socket wrench sets (8-32mm) 2 sets; hex key sets 2 sets

Screwdrivers: Phillips screwdrivers (PH1-PH3), flathead screwdrivers (3-8mm) 4 sets each

Percussion Tools: Steel hammers (1lb, 2lb, 8lb) 2 each; rubber mallets 2; copper hammers 1

Cutting Tools: Lineman’s pliers, needle-nose pliers, diagonal cutting pliers 4 each; tin snips 2; pipe wrenches 2

Others: Spirit levels (300mm, 600mm) 4 each; ink marking lines 2; plumb bobs 2; utility knives, files, taps and dies, and other supporting tools as needed

2.2.5 Safety Protection Equipment

Personal Protection: Safety helmets 12, safety harnesses 6, anti-slip safety shoes 12 pairs, protective gloves 20 pairs, safety goggles 6, dust masks 20, reflective vests 12

On-site Protection: Safety warning cones 20, warning tape 2 rolls, construction warning signs 4, fire extinguishers (4kg dry powder) 8, temporary distribution boxes (three-level distribution) 4 sets, residual current circuit breakers as needed

High-altitude Work: Mobile scaffolding 2 sets, access ladders (3m, 5m) 2 each, safety nets 2

2.2.6 Auxiliary Materials and Tools

Sealing Materials: Neutral silicone weather-resistant sealant, butyl waterproof tape, foam sealant, sealing strips

Fastening Materials: Expansion bolts, self-tapping screws, hex bolts, nuts, flat washers, spring washers

Electrical Materials: Insulation tape, heat shrink tubing, cable ties, wire lugs, terminal blocks

Others: Markers, chalk, sandpaper, cleaning cloths, lubricating oil, anti-rust paint, silver paint

2.3 Installation Personnel Configuration and Training

2.3.1 Personnel Organization Structure

The standard project installation team comprises 10-12 persons, with positions arranged as follows:

Project Manager (1 person): Fully responsible for on-site installation management, progress control, safety and quality supervision, and external coordination. Requires more than 3 years of modular building installation management experience and holds a Safety Officer Class B certificate.

Technical Supervisor (1 person): Responsible for technical disclosure, installation guidance, commissioning and testing, and acceptance documentation preparation. Requires a background in mechatronics or structural engineering, familiar with disaster relief container system principles.

Hoisting Operations Group (2 persons): Includes 1 crane operator and 1 signal director, both requiring special operations certificates with more than 5 years of lifting operation experience.

Structural Installation Group (4 persons): Responsible for container lifting and positioning, structural splicing, sealing and waterproofing, and door/window installation. Requires steel structure installation experience and high-altitude work certificates.

Electromechanical Installation Group (3 persons): Responsible for installation and commissioning of power supply, lighting, water supply and drainage, ventilation and air conditioning, and fire protection systems. Requires corresponding qualifications including low-voltage electrician certificates and refrigeration technician certificates.

Safety Officer (1 person): Dedicated to on-site safety management, safety inspections, hazard identification, and safety disclosure. Holds a Safety Officer Class C certificate.

2.3.2 Personnel Qualification Requirements

  • Special operations personnel must work with valid certificates on site, with certificates within their validity period and matching the person holding them
  • All personnel entering the site must undergo three-level safety education and training and may only commence work after passing assessment
  • Installation personnel must be familiar with the contents of this manual and master the installation process and quality standards for disaster relief containers
  • High-altitude workers must undergo physical examinations and have no contraindicated conditions such as hypertension, heart disease, or acrophobia

2.3.3 Pre-Construction Technical Disclosure

Before construction begins on site, the Technical Supervisor must organize a technical disclosure session for all personnel. The disclosure content includes:

  • Project overview, container quantity, functional types, and installation layout
  • Installation process flow and key quality control standards at critical nodes
  • Operating specifications and safety precautions for each position
  • On-site emergency plans and emergency response procedures
  • Quality acceptance standards and finished product protection requirements

Technical disclosure must be documented in writing, signed and confirmed by all participants, and retained for filing.

2.4 Material Delivery and Acceptance

2.4.1 Container Transport Arrival Inspection

After disaster relief containers are transported from the factory to the site, immediate visual and structural inspection must be conducted to confirm no damage occurred during transportation:

Visual Inspection: Check container wall panels, roof, and frame for deformation, dents, scratches, or rust. Check paint surfaces for peeling or blistering. Check sealant for cracking.

Structural Inspection: Check frame welds for cracks, corner castings for deformation, door locks and hinges for integrity, and door/window glass for breakage.

Internal Inspection: Open container doors to check whether pre-installed equipment, piping, and accessories are complete, with no loosening, falling, moisture damage, or damage.

Documentation Verification: Verify container serial number, product certificate of conformity, factory inspection report, and accessory list, ensuring consistency with contract agreements.

If damage or missing parts are found, immediately photograph and document, then contact the manufacturer for resolution. Damaged containers must not be used for installation.

2.4.2 Accessories and Auxiliary Material Acceptance

  • Count accessory quantities one by one according to the packing list, including bolts, sealant, door/window accessories, electrical accessories, and water supply/drainage accessories
  • Inspect quality of auxiliary materials. Sealant, electrical wires, and pipes must have product certificates of conformity and testing reports, confirming specifications and models meet design requirements
  • Check integrity of pre-installed equipment. Air conditioners, distribution boxes, lighting fixtures, and water pumps must have intact appearance and complete accessories

After acceptance passes, fill in the “Material Entry Acceptance Form.” Store materials properly with moisture-proofing, theft prevention, and damage prevention measures.

2.5 On-Site Temporary Facility Arrangement

Temporary Power Supply: Install a three-level distribution system: main distribution box → sub-distribution box → switch box. Implement “one machine, one switch, one RCD, one box” configuration. Ensure reliable grounding, matched RCD parameters, and overhead wiring or conduit-installed cables. Dragging cables on the ground or loose wiring is strictly prohibited.

Temporary Water Supply: Connect to temporary water supply points, install dedicated valves, implement freeze protection and leak prevention measures, and centrally discharge construction wastewater.

Material Storage Area: Plan a dedicated material storage area, classifying and storing accessories, tools, and auxiliary materials with proper labeling. Elevate materials for moisture protection. Store fragile and easily damaged items separately.

Safety Warning Zone: Set up warning tape and signs in the lifting operation area. Unauthorized personnel are strictly prohibited from entering. Arrange dedicated personnel for monitoring.

Temporary Office and Rest Area: Set up temporary rest points equipped with first aid kits and drinking water to ensure basic needs of workers are met.

Chapter 3: Main Structure Installation Process for Disaster Relief Containers

3.1 Foundation Construction Procedures

The foundation is a critical step ensuring structural stability and moisture/waterproofing of disaster relief containers. Based on site conditions and container types, three foundation forms may be selected: concrete strip foundation, concrete slab foundation, or steel ground beam foundation. Concrete strip foundation is recommended as the preferred option, offering optimal cost-effectiveness and stability.

3.1.1 Concrete Strip Foundation Construction

Survey and Layout: Based on the installation plan drawing, use a theodolite and steel measuring tape to lay out foundation axis and boundary lines. Drive positioning stakes, mark elevation control points, and only commence excavation after verification is error-free.

Trench Excavation: Excavate foundation trenches manually or with small machinery. Trench width is 300mm. Trench depth is determined by frost line depth and geological conditions. In northern cold regions, excavation must extend 200mm below the frost line. In southern regions, depth shall not be less than 300mm. Control trench bottom flatness during excavation. Over-excavation is strictly prohibited. If over-excavation occurs, backfill with sand and gravel and compact thoroughly.

Base Treatment: Compact the native soil at the trench bottom with a compaction coefficient of no less than 0.9. Lay a 100mm thick crushed stone cushion layer, vibrate to compact, and level the surface.

Rebar Placement: Place φ12mm deformed steel main reinforcing bars at 200mm spacing, φ6mm stirrups at 300mm spacing. Concrete cover thickness shall not be less than 40mm. Secure binding with no loosening or deformation.

Formwork Installation: Use timber or steel formwork. Install firmly with tight joints. Apply release agent to formwork. The formwork top elevation is the foundation top elevation, with a deviation of no more than ±5mm.

Concrete Pouring: Use C25 ready-mixed concrete. Pour in layers, vibrate thoroughly with a vibrator, and trowel the surface smooth. Retain concrete test cubes during pouring and test strength after 28 days of standard curing.

Curing and Formwork Removal: Cover and water-cure within 12 hours after pouring. Curing duration shall not be less than 7 days. Formwork may be removed only after strength reaches 70% or above. After formwork removal, inspect the foundation appearance for defects such as honeycombing, pitting, cracks, or exposed rebar.

Foundation Acceptance: After completion, inspect dimensions, elevation, flatness, and strength. Foundation top elevation deviation shall not exceed ±3mm, and axis deviation shall not exceed 5mm. Container installation may proceed only after acceptance passes.

3.1.2 Concrete Slab Foundation Construction

For multi-container combinations or integrated layout disaster resettlement sites, a monolithic concrete slab foundation may be used:

1. Level and compact the site, lay a 150mm thick sand and gravel cushion layer, and roll to compact.

2. Place φ10mm@200mm bi-directional reinforcing mesh, and set expansion joints at intervals not exceeding 6m.

3. Pour 150mm thick C20 concrete, finish the surface smooth, and provide a drainage slope of not less than 2‰.

4. After curing meets requirements, conduct acceptance. Ground flatness deviation shall not exceed 5mm/2m.

3.1.3 Steel Ground Beam Foundation Construction

For scenarios requiring rapid temporary deployment with good site conditions, a steel ground beam foundation may be used to achieve concrete-free rapid installation:

1. Level and compact the site, lay a 200mm thick crushed stone cushion layer for leveling.

2. Fabricate ground beam frame using 10# channel steel welding, with dimensions matching the container bottom rail.

3. Secure ground beams to the ground using expansion bolts, or fix with counterweight blocks.

4. Adjust ground beam levelness with a deviation of no more than 2mm/1000mm. Weld joints securely and apply anti-rust paint.

3.2 Container Lifting and Positioning Procedures

3.2.1 Lifting Plan Confirmation

  • Select a crane of appropriate tonnage based on container weight, lifting height, and working radius. Verify crane stability, ensuring the lifting safety factor is no less than 1.5.
  • Confirm lifting point positions: standard disaster relief containers use four top corner castings as lifting points for four-point lifting. Single-point or two-point lifting is strictly prohibited.
  • Sling rigging: thread lifting slings through the corner casting lifting holes, adjust sling lengths to be consistent, ensuring the container remains level after lifting.
  • Test lifting inspection: pause when the container is lifted 200-300mm off the ground. Check lifting point loading, container balance, and sling condition. Only proceed with continued lifting after confirming no abnormalities.

3.2.2 Lifting and Positioning Procedure

1. Slowly rotate the crane boom to move the container to directly above the foundation. Decelerate when 300mm above the foundation top surface, with installation personnel guiding positioning from all sides.

2. Align with foundation positioning lines and slowly lower the container. Use inching operation when approaching the foundation to avoid impact.

3. After the container is seated, use a level to check the four-corner elevation of the container. If levelness deviation exceeds 2mm/1000mm, use hydraulic jacks for adjustment and insert steel shim plates for leveling, ensuring the overall container is level.

4. After leveling, weld the bottom rail to foundation embedded parts or secure with expansion bolts. Each side shall have no fewer than 2 fixing points, ensuring no risk of container displacement.

5. When installing multiple containers side by side, control uniform container spacing and consistent joint width with a deviation of no more than 3mm. Container sides must be flush, with misalignment no greater than 2mm.

3.2.3 Lifting Safety Precautions

  • Lifting operations shall be directed by dedicated personnel with clear and standardized signals. The crane operator must strictly obey the signal director.
  • Standing within the lifting radius is strictly prohibited. Installation personnel may only approach for operation after the container is stable.
  • Lifting is strictly prohibited when wind speed exceeds Beaufort scale 6. Lifting is strictly prohibited during rain, snow, or lightning weather.
  • Lifting and lowering operations shall be smooth, with no sudden stops or sharp turns, avoiding large container swing.
  • Overload lifting, angled pulling/lifting, and having people beneath lifted loads are strictly prohibited.

3.3 Multi-Container Splicing Installation Procedures

When a single container cannot meet requirements, multiple containers may be spliced horizontally, longitudinally, or stacked in two layers to create larger usable space.

3.3.1 Horizontal Splicing (Side-by-Side Splicing)

1. Lift two containers into position and adjust spacing so adjacent side walls fit together, with joint width controlled at 5-8mm.

2. At internal joint locations, use M10 galvanized bolts to connect the corresponding columns, bottom rails, and top rails of adjacent containers. Bolt spacing shall not exceed 500mm, tightened evenly to ensure secure connection.

3. Fill exterior joints with polyethylene foam rod to a depth of 2/3 of the joint width, then apply neutral silicone weather-resistant sealant. Sealant joints should be uniform in width, smooth and flat on the surface, with no bubbles or broken seams.

4. Install galvanized waterproof cover plates over top joints, with cover plate width not less than 200mm. Fix both sides with self-tapping screws at spacing not greater than 300mm. Apply sealant around the perimeter of cover plates for waterproofing.

5. Install waterproof sealing strips at bottom joints and apply sealant to prevent rainwater and moisture from penetrating from the bottom.

6. After splicing is complete, inspect joint sealing integrity. The water spray test may be used for testing, with no leakage deemed acceptable.

3.3.2 Longitudinal Splicing (End-to-End Splicing)

1. Remove container end wall panels, clean end frame surfaces, and grind to remove rust.

2. Align the ends of two containers, adjusting coaxiality with a deviation no greater than 3mm.

3. Use connection plates to weld or bolt-connect the end columns, top rails, and bottom rails correspondingly. Welds must be full and free of slag inclusion and porosity. After welding, grind and apply anti-rust paint.

4. Apply waterproof sealing treatment to inner and outer joints, same as horizontal splicing procedure.

5. Install floor panels of matching material, apply sealant at joints, and install decorative cover panels on walls and ceilings to ensure a unified interior appearance.

3.3.3 Two-Layer Stacking Installation

1. Upper-layer container lifting is permitted only after lower-layer container installation is complete and acceptance has passed.

2. Install positioning pins at the four top corner castings of the lower-layer container. The upper-layer container has corresponding holes in its corner castings to ensure accurate stacking positioning.

3. Lift the upper-layer container into position, lower slowly, align with positioning pins and seat. Check alignment between upper and lower containers with misalignment no greater than 5mm.

4. Secure between upper and lower container corner castings using dedicated twist locks, one per corner casting, locked firmly to prevent horizontal displacement.

5. After stacking is complete, install access stairs between layers. Stairs shall be steel construction with secure handrails and anti-slip treads, reliably connected to the container.

6. Total height of two-layer stacking shall not exceed 6m. Wind resistance verification must meet the local maximum wind speed requirements. Add wind rope bracing when necessary.

7. Stair openings may be pre-reserved in the floor of the upper-level container, with dedicated stairs installed to create a vertical communication space. Guardrails shall be installed around openings.

3.4 Waterproof Sealing System Construction

Waterproof sealing is a core quality control point in disaster relief container installation, directly affecting container service life and internal use safety. Construction must strictly follow procedural requirements.

3.4.1 Roof Waterproofing Construction

  • Containers have received basic waterproofing treatment before leaving the factory. On-site installation focuses on treating splicing joints, openings, and fastener locations.
  • Roof splicing joints: First clean joint surfaces of dust and oil, apply butyl waterproof tape with width not less than 100mm, press firmly to expel air bubbles, then install waterproof pressure strips fixed with self-tapping screws. Apply sealant over screw heads.
  • Roof openings (e.g., air conditioning holes, ventilation holes, conduit holes): Grind and clean around openings, install waterproof sleeves, apply sealant around the circumference, add rubber sealing rings on flanges, and tighten bolts.
  • Roof fasteners: All self-tapping screws and bolt heads shall be covered with sealant to prevent water penetration.
  • Roof drainage: Inspect roof drainage slope to ensure rainwater flows smoothly to drainage outlets. Install filter screens at drainage outlets to prevent debris blockage. Apply reinforced waterproofing treatment around drainage outlets.
  • After completion, conduct a roof water spray test: continuously spray water for 30 minutes. No leakage on the interior ceiling is deemed acceptable.

3.4.2 Wall Waterproofing Construction

  • Wall panel splicing joints: Clean joints, fill with foam rod, apply weather-resistant sealant. Sealant joints shall be arc-shaped with smooth surfaces.
  • Door/window perimeter waterproofing: Fill gaps between door/window frames and walls with foam sealant. After trimming level, apply sealant on both inner and outer sides. Outer sealant joints shall be arc-shaped to facilitate drainage.
  • Wall conduit penetrations: After piping installation, seal voids with fire-stop putty, apply sealant on the outer side, and provide waterproof flashings on sleeves.
  • Container bottom waterproofing: Lay waterproof rubber strips between the bottom rail and foundation, apply sealant on the outer side, forming a bottom waterproof barrier to prevent ground moisture and rainwater penetration.

3.4.3 Sealant Application Specifications

  • Construction environment: Temperature 5-35°C, relative humidity no greater than 80%. Construction strictly prohibited during rain or strong wind.
  • Substrate preparation: Joint surfaces must be clean, dry, free of dust, oil, and loose rust. Wipe with acetone when necessary.
  • Backer material: When joint width exceeds 10mm, foam rod must be filled to a depth of 0.5-0.7 times the joint width.
  • Sealant application technique: Move the sealant gun at a uniform speed, apply continuously to avoid broken seams. After application, use a scraping tool to smooth and remove excess sealant, ensuring joints are full and dense.
  • Curing: Before sealant curing is complete, touching and water contact are strictly prohibited. Curing time is 24 hours at room temperature, with full curing requiring 7 days. Avoid joint deformation during the curing period.

3.5 Door and Window Installation and Commissioning

3.5.1 Security Door Installation

1. Check that door opening dimensions match door frame dimensions, with deviation no greater than 10mm.

2. Place the door frame into the door opening, adjust verticality and levelness, and temporarily secure with wooden wedges.

3. Secure the door frame to container columns by welding or expansion bolts, with no fewer than 3 fixing points per side, firmly secured.

4. Install the door leaf, adjust hinges to ensure smooth door operation with no sticking or abnormal noise. Gaps shall be uniform with good sealing performance.

5. Install door locks, handles, and door closers. Commission lock operation for smooth opening/closing and reliable deadbolt operation.

6. Fill gaps around the door frame with foam sealant and apply sealant on both inner and outer sides.

7. Commissioning standards: Door leaf operating force not greater than 100N. Sealing strip compression uniform. No obvious gaps visible in light transmission inspection.

3.5.2 Window Installation

1. Clean the window opening and check dimensional deviation.

2. Position the window frame, adjust horizontal, vertical, and diagonal deviations. Diagonal deviation shall not exceed 2mm.

3. Secure the window frame to the wall with self-tapping screws, with no fewer than 4 fixing points per side.

4. Install glass, apply glass sealant, install pressure strips, ensuring glass is secure with no looseness.

5. Commission window leaf operation: sliding windows shall slide smoothly, casement windows shall open and close freely, locks shall be reliable, and sealing strips shall fit tightly.

6. Apply sealant around window frames: architectural sealant on the inner side and weather-resistant sealant on the outer side.

3.6 Floor Construction

  • Containers come pre-installed with anti-slip flooring from the factory. On-site splicing areas require supplemental floor installation.
  • Clean the floor substrate, ensuring it is level and dry, and lay a moisture barrier film.
  • Cut floor panels to size, splice tightly with gaps no greater than 0.5mm, and secure with dedicated clips.
  • Install skirting boards at junctions with walls to cover gaps and fix with sealant.
  • Check floor flatness. No warping, hollow areas, or abnormal noise. Apply waterproof sealant at joints of waterproof flooring.

Chapter 4: Installation Specifications for Internal Functional Systems of Disaster Relief Containers

4.1 Power Supply and Distribution System Installation

The power supply and distribution system is the power core of all electrical equipment in disaster relief containers. Installation must strictly comply with electrical construction specifications to ensure safe and reliable power supply.

4.1.1 System Composition

The disaster relief container power supply and distribution system mainly consists of a utility power input unit, distribution box, UPS uninterruptible power supply (optional), diesel generator set (optional), lighting circuits, socket circuits, equipment-dedicated circuits, and a grounding protection unit. Command-type and medical-type containers come standard with UPS and generator interfaces. Housing-type containers come standard with utility power input and basic distribution.

4.1.2 Distribution Box Installation

  • The distribution box shall be wall-mounted at a height of 1.5m from the bottom edge to the floor. The installation location shall be dry, ventilated, convenient for operation, and away from water sources and flammable materials.
  • The box shall be securely fixed with a verticality deviation no greater than 1.5‰. The box door shall open and close freely with reliable grounding.
  • Internal components of the distribution box shall be neatly arranged, securely wired, clearly labeled, with correct phase sequence. Neutral and ground wires shall be laid separately.
  • Circuit configuration: Main switch → lighting circuit → general socket circuit → air conditioning socket circuit → equipment-dedicated circuit → spare circuit. Each circuit shall be equipped with an independent circuit breaker and residual current circuit breaker (RCD), with residual operating current of 30mA and operating time of 0.1s.
  • Affix a circuit identification chart on the distribution box door, indicating the circuit name and power rating corresponding to each switch.

4.1.3 Cable Routing

  • Indoor wiring shall use BV-type copper core insulated conductors, routed through PVC conduit or galvanized steel conduit. Exposed bare wiring is strictly prohibited.
  • Conduit shall be routed along wall corners and within suspended ceilings, horizontally and vertically aligned, securely fixed, with conduit clips spaced no greater than 1m.
  • Wire connections must be made inside junction boxes using crimp caps or soldered connections, with secure insulation wrapping. Connections inside conduit are strictly prohibited.
  • Conductors of different circuits and different voltage levels shall not be routed in the same conduit. The spacing between power and low-voltage wiring shall not be less than 300mm.
  • All circuits shall use color-coded conductors: phase L1 yellow, L2 green, L3 red, neutral blue, ground yellow-green striped.
  • Conduit passing through walls and floor slabs shall be fitted with protective sleeves, with voids sealed using fire-stop putty.

4.1.4 Socket and Switch Installation

  • Switches shall be installed at a height of 1.3m from the bottom edge to the floor, positioned 0.15-0.2m from the door frame edge. Switch heights in the same room shall be consistent with deviation no greater than 5mm.
  • General sockets shall be installed at a height of 0.3m from the bottom edge to the floor. Air conditioning sockets at 1.8m. Sockets in kitchens and bathrooms shall be equipped with splash-proof covers.
  • Socket wiring shall follow the “left neutral, right phase, upper ground” principle, with secure connections and no looseness.
  • Switches control the phase conductor. Single-pole and two-way switch wiring shall be correct, with responsive operation and reliable contact.
  • After installation, clean panels and keep them level, fitted tightly against the wall with no gaps.

4.1.5 Grounding System Installation

  • The container shall be provided with a main equipotential grounding terminal box. All electrical equipment metal enclosures, metal frames, conduit, and cable trays must be reliably connected to grounding terminals.
  • An artificial grounding electrode shall be installed outdoors, using 4 pieces of ∠50×5 galvanized angle steel, each 2.5m long, driven vertically into the ground at 5m spacing, welded and interconnected with 40×4 galvanized flat steel. Ground resistance shall not exceed 4Ω.
  • The grounding busbar shall be routed indoors and connected to the main grounding terminal. Weld points shall be treated with anti-corrosion coating.
  • Medical-type and command-type containers require equipotential bonding. Local equipotential terminal boxes shall be installed in bathrooms and treatment areas.
  • After installation, test with a ground resistance tester. A resistance value meeting requirements is deemed acceptable; otherwise, additional grounding electrodes must be added.

4.1.6 UPS and Generator Set Installation (Optional)

  • The UPS main unit shall be installed in a dry, ventilated position, elevated 100mm at the base, away from heat sources, with a maintenance space of no less than 0.5m reserved around it.
  • Battery banks shall be installed in dedicated battery cabinets with secure connections, correct polarity, good ventilation, and battery temperature monitoring and overcharge protection.
  • UPS input connected to utility power, output connected to critical loads. Commission switching time: after utility power interruption, switching time shall not exceed 10ms, ensuring uninterrupted operation of equipment.
  • Diesel generator sets shall be installed outdoors or in dedicated generator rooms, with stable foundations, vibration dampers properly installed, exhaust pipes routed outdoors, and silencers installed.
  • Generator sets and distribution boxes shall be provided with automatic transfer switches (ATS). After utility power interruption, the generator automatically starts. After utility power restoration, it automatically switches back and shuts down.

4.2 Lighting System Installation

4.2.1 Main Lighting Installation

  • Housing-type containers shall use LED ceiling lights with power of 18-36W and illuminance not less than 100lx. Command-type and medical-type containers shall use LED panel lights with illuminance not less than 300lx.
  • Light fixtures shall be centrally arranged with uniform spacing, securely fixed, securely wired, and reliably grounded.
  • Light fixtures shall be installed level and fitted tightly to the ceiling, with no tilting or looseness.
  • Multiple fixtures may be controlled in separate circuits to enable zoned control and save energy.

4.2.2 Emergency Lighting and Evacuation Signs

  • All disaster relief containers must be equipped with emergency lighting fixtures using self-contained battery types, providing continuous illumination for not less than 90 minutes after power failure.
  • Emergency lighting fixtures shall be installed above entrances/exits and passageways at a height of 2.2-2.5m from the floor.
  • Evacuation direction signs shall be installed on walls at 0.3m from the floor, with spacing no greater than 20m, and no greater than 1m at corners, with clear direction indication.
  • Safety exit signs shall be installed above exit doors, with the bottom edge 0.2m above the door top.
  • Emergency lighting circuits shall be routed separately and shall not be controlled by general lighting switches, remaining continuously illuminated or automatically activating upon power failure.

4.2.3 Other Lighting

  • Bedside wall lamps, work desk lamps, and corridor floor-level lights shall be installed according to functional configuration, with standard wiring and corresponding switches.
  • Outdoor door head lamps and step lamps shall be installed outdoors using waterproof luminaires with IP65 protection rating.

Chapter 4.3 Ventilation and Air Conditioning System Installation

4.3.1 Natural Ventilation System

Operable exterior windows shall be installed on both sides of the container body, combined with ventilation louvers to achieve natural ventilation. The ventilation area shall not be less than 1/20 of the floor area.

Ventilation louvers shall be installed at the upper and lower portions of the walls to create air convection. Insect screens shall be fitted to the louvers.

Operable windows shall be equipped with limiting devices to prevent excessive opening, and may be closed and sealed during inclement weather.

4.3.2 Mechanical Ventilation System

Exhaust fans shall be installed in areas such as restrooms and kitchens, with an exhaust air volume not less than 10 air changes per hour.

A fresh air system is optionally available, utilizing wall-mounted fresh air units or ducted fresh air units to introduce filtered fresh air, suitable for environments with sand, dust, haze, or pollution.

Ventilation ducts shall be fabricated from galvanized steel sheet or PVC ductwork, with tight connections, secure fixation, and evenly distributed air outlets.

Fans shall be installed with vibration isolation pads, and flexible connections shall be fitted at the inlet and outlet to reduce operating noise. The noise level shall not exceed 55 dB(A).

4.3.3 Air Conditioning System Installation

Disaster relief containers are standardly equipped with wall-mounted or cabinet-type air conditioners, selected according to container volume: 20-ft containers are equipped with 1.5 HP air conditioners, 40-ft containers with 3 HP units. Electric heating type units may be selected for cold regions, and high-temperature duty units for tropical regions.

The indoor unit shall be mounted on the wall at a height of 1.8–2.2 m, installed horizontally with a deviation not exceeding 5 mm, positioned away from heat sources, with unobstructed airflow.

The outdoor unit shall be installed on an outdoor platform or roof bracket, with a stable foundation, fitted with vibration isolation pads, and provided with adequate clearance around the unit for heat dissipation and proper ventilation, avoiding direct sunlight.

Copper refrigerant lines shall be routed straight and neat, insulation sleeves complete and undamaged, brazed joints sound and secure, and refrigerant charged after evacuation.

The condensate drain pipe slope shall not be less than 5‰, with smooth drainage, connected to the designated drain point, and free from dripping.

The air conditioning power supply shall be on a dedicated circuit, equipped with a dedicated outlet and circuit breaker.

After installation is complete, power-on testing shall be conducted to verify normal operation in both cooling and heating modes, responsive temperature adjustment, and the absence of abnormal noise or water leakage.

Chapter 4.4 Water Supply and Drainage System Installation

4.4.1 Water Supply System Installation

The water inlet connection shall be located on the side of the container body, using a DN20 male-threaded connection, fitted with a globe valve and strainer.

Indoor water supply pipes shall use PPR hot-melt pipes, with a nominal pressure of 1.6 MPa and diameters of DN15–DN20, installed horizontally and vertically level, and securely fixed.

Pipe connections shall be made using hot-melt welding at 260°C, with sound joints and no leakage.

Water usage points configuration: wash basins, showers, kitchen sinks, toilets, etc., with corresponding sanitary fixtures configured according to function.

Cold and hot water piping shall be installed; hot water may be supplied by electric or gas water heaters. Water heaters shall be securely installed and equipped with residual current protection and pressure relief valves.

After system installation is complete, a hydrostatic pressure test shall be conducted at a test pressure of 0.6 MPa, held for 1 hour, with a pressure drop not exceeding 0.05 MPa and no leakage considered acceptable.

4.4.2 Drainage System Installation

Drainage pipes shall use UPVC drain pipes with diameters of DN50–DN110, connected by solvent cement bonding with tight joints.

Drainage pipe slopes: DN50 at 25‰, DN75 at 20‰, DN110 at 12‰. Reverse slopes are strictly prohibited.

Sanitary fixture installation: toilets, wash basins, shower floor drains, kitchen sinks, etc., installed level and securely, with sealed joints and no leakage.

Floor drains shall be deep-seal type with a seal water depth not less than 50 mm to prevent odor backflow.

The outdoor drainage connection shall be located at the bottom of the container body, connected to the outdoor sewage network or sewage treatment equipment.

Medical-type containers shall be equipped with medical wastewater treatment devices; discharge is permitted only after disinfection meets the required standards.

After installation is complete, a water flow test shall be conducted; smooth drainage with no blockage or leakage is considered acceptable.

4.4.3 Water Purification and Hot Water System (Optional)

Relocation sites may be equipped with a central water purification system to filter and purify incoming water, ensuring drinking water safety.

Electric water heaters shall have a capacity of 50–100 L, storage type, with adjustable temperature, and equipped with dry-burn protection and residual current protection.

Instant hot water dispensers are optional, supplying direct-drinking hot water with filtration, heating, and heat preservation functions.

Chapter 4.5 Fire Protection System Installation

4.5.1 Fire Extinguisher Configuration

One 4 kg dry powder fire extinguisher shall be provided for every 20 m², with no fewer than 2 units per container, placed in a conspicuous location near the door for easy access.

Fire extinguishers shall be installed in extinguisher cabinets or on mounting brackets, with the top no higher than 1.5 m and the bottom no lower than 0.08 m from the floor.

Fire extinguishers shall be within their validity period, with normal pressure and clear labeling.

4.5.2 Fire Alarm System

Standalone smoke detectors shall be installed indoors, one per 20 m², flush-mounted on the ceiling and centrally positioned.

Manual alarm call points are optional, installed near the door at a height of 1.5 m from the floor.

The alarm controller shall be installed in the duty room, and audible-visual alarm devices installed outdoors, with an alarm volume not less than 85 dB.

System commissioning: simulated smoke testing shall be conducted; smoke detection shall alarm accurately, the audible-visual alarm shall activate, and interlocking functions shall operate normally.

4.5.3 Emergency Evacuation System

Evacuation routes shall be kept clear and unobstructed, with a width not less than 0.9 m.

Evacuation signage and emergency lighting shall be installed in accordance with regulations and tested periodically.

Evacuation route diagrams shall be posted inside the container, indicating evacuation directions, fire extinguisher locations, and emergency exits.

Chapter 4.6 Communications and Intelligent System Installation

4.6.1 Network Communications System

Category 5e or Category 6 network cables shall be installed in the container, with two network outlets reserved in each room, installed on the wall at a height of 0.3 m from the floor.

Wireless routers shall be installed to achieve full WiFi coverage, with a signal strength not less than -70 dBm.

Command-type containers shall be equipped with fiber optic access interfaces, supporting broadband, 4G/5G multi-link access.

Telephone interfaces shall be reserved, connected to a PBX or carrier lines.

4.6.2 Video Surveillance System

High-definition network cameras shall be installed outdoors to monitor entrances, exits, and surrounding areas, with a night vision distance not less than 30 m.

Cameras shall be installed in indoor public areas, with recorded video retained for not less than 30 days.

The DVR shall be installed in the duty room, with monitors displaying surveillance images and remote viewing capability.

4.6.3 Emergency Broadcast System

Broadcast speakers shall be installed indoors and outdoors, covering all areas, with clear and adjustable volume.

Amplifiers and microphones shall be located in the command room, enabling all-area broadcasting and zone broadcasting.

The system shall support connection to emergency broadcast signals, enabling automatic playback of warning messages during disaster alerts.

Chapter 4.7 Internal Living Facility Installation

4.7.1 Bed Installation

Relocation-type containers shall be equipped with double-layer steel bunk beds, dimensions 2000×900 mm, sturdy and stable, with complete guardrails.

Beds shall be assembled with tightened screws, flat bed boards, and no loosening or rattling.

Bed spacing shall be reasonable with reserved walkway space; the passage width shall not be less than 0.6 m.

4.7.2 Storage Facility Installation

Storage cabinets and shelving units shall be installed, securely fixed, and capable of meeting load-bearing requirements.

Material reserve-type containers shall be equipped with heavy-duty racks, with a load-bearing capacity of not less than 200 kg per layer, and aisle widths sufficient for material handling.

4.7.3 Kitchen Facility Installation

Work counters, kitchen sinks, induction cookers, microwave ovens, refrigerators, and other kitchen equipment shall be installed.

Countertops shall be made of fire-resistant and waterproof materials. Equipment shall be on dedicated power circuits with reliable grounding.

Range hoods shall be installed to discharge cooking fumes outdoors, with sealed ducts and no oil leakage.

Chapter 5. Disaster Relief Container System Commissioning and Acceptance Standards

5.1 Pre-Commissioning Preparation

All systems shall be installed, and the construction crew shall complete self-inspection with self-inspection records filled out.

The site shall be cleared of debris, and all systems checked for intact appearance with no missing installed components.

Commissioning tools shall be prepared: multimeter, insulation resistance tester (megger), clamp ammeter, thermohygrometer, anemometer, water pressure gauge, sound level meter, etc.

Commissioning personnel shall be certified for their positions, familiar with system principles and commissioning procedures, and shall develop a commissioning plan specifying commissioning steps and acceptance criteria.

Water and power supply shall be confirmed normal, with stable utility power, adequate water supply pressure, and unobstructed drainage.

Safety protection shall be ensured: insulation protective equipment shall be worn during live commissioning, warning signs shall be posted, and unauthorized personnel strictly prohibited from entering the commissioning area.

5.2 Structural System Commissioning and Inspection

5.2.1 Structural Stability Inspection

Levelness inspection: Use a level to check the top surface elevations at the four corners of the container; calculate the levelness deviation. The allowable deviation shall be ≤3 mm over the full length.

Verticality inspection: Use a theodolite to check the verticality of container columns. The allowable deviation shall be ≤1.5‰ of column height, with a total deviation ≤5 mm.

Connection strength check: Verify all bolt tightening torques meet design requirements; welds shall be full and free of defects; connection nodes shall show no loosening or deformation.

Load test (optional): Apply a uniformly distributed load of 150 kg/m² on the roof for 24 hours. The structure shall show no permanent deformation and welds shall show no cracking to pass.

5.2.2 Waterproofing Performance Inspection

Water spray test: Use a fire hose to spray the roof, wall joints, and door/window perimeters at a water pressure of 0.2 MPa for 30 minutes. Check the corresponding interior locations for no leakage or moisture traces.

Post-rain inspection: In the event of rainfall, inspect all interior walls, ceilings, and floors for leaks 2 hours after the rain stops, and check sealant joints for cracking.

Drainage test: Pour water into the roof drain outlets to verify smooth drainage with no standing water; interior floor drains shall drain smoothly with no blockage.

5.2.3 Door and Window Commissioning

Open and close doors and windows 20 times; verify smooth operation with no jamming, abnormal noise, or loosening.

Check door locks and window locks for smooth operation, reliable latching, and proper anti-theft function.

Check weatherstrip fit; after closing, inspect for visible gaps using transmitted light; wind and rain resistance shall meet requirements.

Door closer adjustment: Adjust closing speed so the door closes smoothly without slamming, with proper hold-open function.

5.3 Electrical System Commissioning

5.3.1 Insulation Resistance Testing

Disconnect all loads and turn off all switches. Use a 500V megger to measure insulation resistance between phase and neutral conductors, phase and ground conductors, and neutral and ground conductors for each circuit.

Lighting and outlet circuits shall have insulation resistance ≥0.5 MΩ; power circuits ≥1 MΩ to pass.

If insulation resistance fails, investigate for damaged wiring, moisture ingress, or wiring errors; rectify and retest.

5.3.2 Ground Resistance Testing

Use a ground resistance tester to measure the resistance of the main grounding terminal. Repeat the measurement 3 times and take the average.

Standard containers shall have ground resistance ≤4 Ω; medical-type containers ≤1 Ω to pass.

If unsatisfactory, add ground electrodes or relocate the grounding point until compliance is achieved.

5.3.3 Power-On Test Run

First close the main breaker, then close each branch circuit breaker sequentially; check for tripping or short circuits.

Lighting circuit commissioning: Turn on all luminaires sequentially; verify normal illumination, correct switch control, no flickering or abnormal noise; measure operating voltage within ±5% of rated voltage.

Outlet circuit commissioning: Use an outlet tester on each outlet to confirm correct phase, neutral, and ground wiring, with no missing phase or reverse polarity; press the test button on residual current devices (RCDs) and verify reliable tripping within 0.1 s.

Equipment circuit commissioning: Start air conditioners, water heaters, refrigerators, and other equipment sequentially; verify normal operation; measure operating current, which shall not exceed the rated current; check for line overheating.

Phase sequence check: For three-phase power systems, verify correct phase sequence and correct motor rotation direction.

5.3.4 UPS and Generator Commissioning

UPS commissioning: Under normal utility power, test the charging function and battery voltage; simulate utility power failure to test switchover time; loads shall experience no power interruption, and battery backup time shall meet design requirements; when utility power is restored, the system shall automatically switch back and resume normal charging.

Generator commissioning: Manually start the generator; verify smooth starting, stable operation at idle and rated speed, stable voltage and frequency, no abnormal noise or oil leakage; test automatic transfer function — the generator shall automatically start and supply power within 15 s of utility power failure, and automatically shut down after a cool-down period upon utility restoration; load test — operate at 75% rated power for 2 hours with all parameters normal.

5.3.5 Emergency Lighting Commissioning

Simulate a power failure by opening the main breaker; verify emergency luminaires illuminate automatically within 5 s.

Discharge for 90 minutes; verify no significant brightness decay in emergency lighting, meeting code requirements.

Upon power restoration, emergency luminaires shall automatically switch to charging mode with normal indicator lights.

5.4 Ventilation and Air Conditioning System Commissioning

5.4.1 Ventilation System Commissioning

Start all exhaust fans and fresh air units; verify correct rotation direction, stable operation, and no abnormal vibration or noise.

Use an anemometer to measure air outlet velocity; calculate exhaust air volume and fresh air volume to verify they meet design requirements.

Check duct connections for air leakage; air outlets shall discharge evenly; no significant negative or positive pressure indoors.

Noise testing: Indoor operating noise ≤55 dB(A), outdoor ≤65 dB(A).

5.4.2 Air Conditioning System Commissioning

Cooling mode commissioning: Set temperature to 26°C, run for 30 minutes; measure the indoor unit supply air temperature, which shall be 8–12°C lower than room temperature to be normal; measure outdoor unit operating current and pressures, which shall be within rated ranges; check for no condensate dripping indoors and smooth condensate drain flow.

Heating mode commissioning: Set temperature to 28°C, run for 30 minutes; supply air temperature shall be at least 15°C higher than room temperature to be normal; check defrost function operates correctly with no abnormal shutdown.

Test remote control and panel control functions — mode switching, temperature adjustment, and fan speed adjustment shall operate normally.

Run continuously for 4 hours; the system shall operate stably with no fault alarms.

5.5 Water Supply and Drainage System Commissioning

5.5.1 Water Supply System Commissioning

Open the main water supply valve; check for no leakage in piping and smooth water delivery at all usage points.

Measure cold and hot water outlet pressures; 0.1–0.35 MPa is normal.

Test water heater heating function — normal temperature rise, accurate temperature control, and effective residual current protection.

Test purified water equipment water quality; TDS value meets standards; filter cartridges correctly installed.

Run continuously for 30 minutes; all connections free of leakage to pass.

5.5.2 Drainage System Commissioning

Discharge water into all sanitary fixtures and floor drains; verify drainage rate with no blockage or backflow.

Check that trap water seals are intact with no odor backflow.

Check outdoor drain outlets for smooth drainage with no leakage.

Medical wastewater treatment equipment commissioning: Start the unit and verify each process stage operates normally; effluent water quality meets discharge standards.

5.6 Fire Protection and Security System Commissioning

5.6.1 Fire Protection System Commissioning

Smoke detector test: Use simulated smoke to trigger the smoke detector; verify the fire alarm controller receives the signal accurately, the audible-visual alarm activates, and interlocking with emergency lighting and broadcast systems operates normally.

Manual alarm test: Press the manual alarm call point; alarm function operates normally; system returns to standby after reset.

Fire extinguisher inspection: Verify extinguisher pressure is normal, within validity period, and quantities and positions are correct.

Evacuation signage check: All evacuation signs illuminate normally, indicating correct directions, and illuminate in emergency mode upon power failure.

5.6.2 Security Monitoring Commissioning

Power on all cameras; verify clear images, correct angles, and functioning night vision.

Test the DVR for recording, playback, and backup functions; storage capacity meets requirements.

Test remote monitoring — images viewable normally from mobile phones and computers.

Access control system commissioning: Card and PIN code unlocking functions normal, access permissions effective, and records accurate.

5.7 Overall Integrated Commissioning and Trial Operation

5.7.1 Overall Integrated Commissioning

All systems shall be turned on simultaneously to simulate full-load operating conditions, running continuously for 2 hours.

Verify all systems work cooperatively with no mutual interference; total electrical load shall not exceed the designed capacity.

Check overall environmental parameters — temperature, humidity, noise, and air quality — meet standards.

Simulate fault scenarios to test system protection functions and emergency switching functions.

5.7.2 72-Hour Trial Operation

All systems shall be placed in normal operating condition for a continuous 72-hour trial run.

Personnel shall conduct inspections every 8 hours, recording operating parameters, equipment status, and any faults.

If no major faults occur during the trial period and all performance indicators meet standards, the trial operation is deemed qualified.

Minor faults that occur during the trial period shall be rectified and the trial period restarted.

5.8 Completion Acceptance

5.8.1 Acceptance Documentation Preparation

The following complete as-built documentation shall be submitted before acceptance:

  • Product certificates of conformity, factory inspection reports
  • Material and equipment certificates of conformity, test reports
  • Construction records, concealed works acceptance records
  • Commissioning records and test reports for all systems
  • Trial operation records
  • As-built drawings, operation and maintenance manuals
  • Bill of quantities, acceptance application forms

5.8.2 On-Site Acceptance

An acceptance team shall be formed by the construction unit, contractor, and supervision unit.

Check installation quality, appearance, and functional completeness on site against design drawings and acceptance standards.

Perform spot-check testing of key performance indicators — witness testing of ground resistance, insulation resistance, waterproofing, fire protection, and other core parameters.

The acceptance team shall issue an acceptance opinion. Any identified issues shall be rectified within the specified period, and re-acceptance conducted after rectification.

5.8.3 Acceptance Criteria

Criteria for determining a qualified disaster relief container installation and commissioning:

  • Structure stable; levelness and verticality meet standards; connections secure; no deformation or cracking
  • Waterproofing performance qualified; no leakage points
  • Electrical system safe and reliable; insulation and grounding meet standards; all equipment operates normally
  • Water supply and drainage systems unobstructed; no leakage or blockage
  • Ventilation and air conditioning systems operate normally; temperature, humidity, and noise meet standards
  • Fire protection and security systems fully functional, compliant with code requirements
  • Doors and windows operate smoothly with good sealing
  • Clean appearance; finished product protection intact; no damage or contamination
  • Documentation complete, authentic, and accurate
  • 72-hour trial operation completed without faults

5.8.4 Acceptance and Delivery

After acceptance is qualified, all parties shall sign the “Completion Acceptance Form” and complete the handover procedures. Operation training shall be provided to the user unit, covering daily usage methods, precautions, basic fault handling, and maintenance points. Keys, documentation, and spare parts shall be delivered.

Chapter 6. Disaster Relief Container Daily Operation, Maintenance, and Fault Troubleshooting

6.1 Daily Inspection and Maintenance System

A tiered maintenance system shall be established, comprising four levels: daily inspection, monthly maintenance, quarterly maintenance, and annual overhaul, to ensure long-term stable operation of disaster relief containers and extend service life.

6.1.1 Daily Inspection (Daily)

Performed by duty personnel of the user unit. Inspection contents:

  • Check the container exterior for deformation, damage, or paint peeling
  • Check doors and windows for normal operation and intact locks
  • Check interior lighting and outlets for normal operation, and for unusual odors or noises
  • Check air conditioning and ventilation equipment for normal operation and abnormal noise
  • Check water supply and drainage for leakage or blockage; verify drains are unobstructed
  • Check fire protection equipment for intactness and emergency lighting for normal operation
  • Check roof drain outlets for debris blockage and surrounding areas for standing water
  • Complete a daily inspection record; report and address any issues promptly

6.1.2 Monthly Maintenance (Once per Month)

Performed by dedicated operation and maintenance personnel. Maintenance contents:

  • Clean the container inside and out; clear debris from roof and drainage channels; maintain unobstructed drainage
  • Check all bolts for loosening, particularly connection nodes, door/window hinges, and equipment mounting bolts; tighten promptly
  • Lubricate door/window hinges, locks, and slide tracks to ensure smooth operation
  • Check weatherstrips for aging or cracking; replace promptly
  • Check electrical wiring for overheating or aging; check terminal connections for loosening; tighten wiring
  • Test residual current devices by pressing the test button to verify correct tripping
  • Clean air conditioning filters and fresh air unit filters to ensure unobstructed airflow
  • Check fire extinguisher pressure; conduct emergency lighting discharge test
  • Check water supply and drainage pipe joints for leakage; clean hair and debris from floor drains
  • Complete monthly maintenance records; establish equipment ledger

6.1.3 Quarterly Maintenance (Once per Quarter)

Performed by professional technical personnel. Maintenance contents:

  • Conduct a comprehensive check of structural welds for cracking or corrosion; perform rust removal and touch-up painting where corrosion is found
  • Conduct a comprehensive check of roof and wall waterproofing seals; reapply sealant where cracked
  • Test electrical system insulation resistance and ground resistance to ensure compliance with safety standards
  • Deep cleaning of air conditioning system — clean evaporator and condenser coils; check refrigerant pressure
  • Clear water supply and drainage pipes; check valve operating flexibility; replace aged sealing washers
  • Comprehensive testing of fire protection system — calibrate smoke detectors, alarms, and broadcast functions
  • UPS battery capacity testing and activation maintenance
  • Run generator set unloaded for 30 minutes; check oil, fuel, and coolant levels
  • Check corrosion protection coating integrity; touch up damaged areas
  • Prepare quarterly maintenance report; assess equipment condition

6.1.4 Annual Overhaul (Once per Year)

Performed by the manufacturer’s professional after-sales team. Overhaul contents:

  • Overall structural inspection of the container; assess structural safety; reinforce if necessary
  • Complete waterproofing renovation — replace all aged sealant; repair roof waterproof coating
  • Comprehensive electrical system overhaul — replace aged wiring; test component performance
  • Air conditioning system overhaul — replace aged components; recharge refrigerant
  • Comprehensive water supply and drainage system overhaul — replace aged pipes and sanitary fixtures
  • Fire protection system annual inspection — issue fire protection inspection report
  • UPS battery capacity testing — replace failed batteries
  • Generator set comprehensive maintenance — replace three filters and oil; performance testing
  • Interior and exterior wall cleaning and renovation — replace damaged panels
  • Issue annual overhaul report and equipment life assessment

6.2 Common Fault Troubleshooting and Handling

6.2.1 Structural and Waterproofing Faults

Fault Symptom Possible Causes Handling Methods
Roof leaking indoors Roof sealant cracked; drain outlet blocked; waterproofing failed at roof openings Clear debris from drain outlets; locate leak point, clean base, reapply sealant; redo waterproofing at openings
Water seepage at wall joints Wall panel sealant cracked; door/window perimeter seals failed Remove old sealant, clean base, reapply weather-resistant sealant; reapply sealant around doors and windows
Moisture seepage at bottom Bottom seal failed; site standing water; high groundwater level Reapply sealant to exterior bottom; clear surrounding drainage, unblock drains; apply damp-proofing treatment to foundation
Door/window sticking when opening Hinges rusted; door leaf deformed; debris in tracks Clean debris from tracks; lubricate hinges; adjust door leaf position, correct deformation
Door lock cannot be opened Lock cylinder rusted; key bent; lock body faulty Lubricate lock cylinder with pencil lead powder; replace key; disassemble and repair lock body, replace if necessary
Wall panel dented/deformed External impact Minor dents can be pushed out from inside; severe deformation requires replacement of wall panel module

6.2.2 Electrical System Faults

Fault Symptom Possible Causes Handling Methods
Main breaker trips Total load overload; line short circuit; RCD activated Turn off some equipment to reduce load; locate short circuit point; identify leaking equipment by closing breakers one by one
Lamp does not light Bulb burnt out; switch faulty; circuit open; breaker tripped Replace bulb; check and replace switch; locate circuit break point; check corresponding circuit breaker
No power at outlet Breaker tripped; outlet wiring loose; circuit open Reset breaker; tighten wiring after power-off; troubleshoot wiring fault
RCD trips frequently Line leakage; equipment leakage; RCD defective Unplug equipment one by one to find leaking device; test line insulation; replace RCD
Air conditioner does not start Power supply fault; remote control battery dead; compressor protection; main board fault Check power outlet and breaker; replace remote control batteries; wait 3 minutes and restart; contact after-sales for main board repair
UPS not working Batteries failed; input fuse blown; inverter fault Replace batteries; replace fuse; contact after-sales for repair
Emergency lighting not illuminating Battery discharged; bulb damaged; wiring fault Test after charging; replace bulb; troubleshoot wiring

6.2.3 Water Supply and Drainage System Faults

Fault Symptom Possible Causes Handling Methods
Low or no water output Water inlet valve closed; filter clogged; insufficient water pressure; pipe blocked Open main valve; replace water purification filter; check municipal water pressure; clear blocked pipes
Leakage Joint loose; pipe cracked; seal washer aged Close valve, tighten joint; replace damaged pipe; replace seal washer
Slow drainage / blockage Floor drain clogged; foreign object in trap; main pipe blocked Clean debris from floor drain; clear trap; use drain auger to clear main pipe
Water heater not heating Power fault; heating element damaged; thermostat faulty Check power outlet and RCD; replace heating element; replace thermostat
Odor backflow Trap dried out; water seal broken Add water to floor drains and wash basins to restore seal; check trap integrity

6.2.4 Ventilation and Air Conditioning Faults

Fault Symptom Possible Causes Handling Methods
Poor cooling performance Filter clogged; insufficient refrigerant; poor outdoor unit heat dissipation Clean filter; contact after-sales to recharge refrigerant; clear debris around outdoor unit to ensure ventilation
Air conditioner leaking water Condensate drain blocked; unit not level; insulation damaged Clear condensate drain; adjust indoor unit level; repair insulation
Air conditioner abnormal noise Fan bearing worn; screws loose; foreign object inside Tighten screws; remove foreign object; contact after-sales to replace bearing
Exhaust fan excessively noisy Mounting loose; blade deformed; bearing lacks lubrication Tighten mounting screws; straighten blade; apply lubricating oil
Low fresh air volume Filter clogged; duct leaking; fan fault Replace filter; repair duct leaks; service fan

6.3 Wear Parts List and Replacement Specifications

6.3.1 Common Wear Parts List

Category Wear Part Name Recommended Replacement Cycle Remarks
Sealing Neutral silicone sealant 3–5 years Adjust based on environmental aging conditions
Sealing Door/window weatherstrips 3 years Replace when elasticity declines or cracking occurs
Electrical Air conditioner filter 1–3 months Shorten cycle in dusty environments
Electrical Fresh air unit filter 3–6 months /
Electrical LED light source 3–5 years Replace immediately when damaged
Electrical UPS batteries 3–5 years Replace when capacity falls below 80%
Plumbing Faucet cartridge 2–3 years Replace when dripping or hard to operate
Plumbing Water purification filter 3–12 months Based on water quality and usage volume
Mechanical Door lock cylinder 5 years Replace immediately when faulty
Mechanical Hinges 5–8 years Replace when severely loose or noisy

6.3.2 Replacement Precautions

Original manufacturer parts shall be preferred for replacements to ensure matching specifications and quality. Use of non-conforming substitutes is strictly prohibited.

Electrical parts replacement must be performed with power disconnected, with a “Do Not Close” warning sign posted and a dedicated person supervising.

After replacing waterproofing seals, a water spray test shall be performed to confirm no leakage.

Replacement records shall be completed and the equipment ledger updated after replacements.

Replacement of core components shall be performed or supervised by professional technical personnel.

6.4 Long-Term Storage Maintenance

During idle storage of disaster relief containers, maintenance shall be performed to ensure rapid deployment at any time.

The storage site shall be level and dry, well-ventilated, away from corrosion sources, and the container raised at least 300 mm above ground to prevent bottom water damage.

All doors and windows shall be closed and sealed to prevent rain, dust, insects, and rodents from entering.

Water supply and drainage pipes shall be drained of residual water to prevent freezing damage or bacterial growth.

The main power supply shall be disconnected; batteries shall be removed and stored separately, with periodic charging.

Monthly inspections shall be conducted to check appearance, corrosion, and sealing conditions, and to provide ventilation and dehumidification.

Electrical equipment shall be powered on for a trial run once per quarter, with all equipment operated for 30 minutes to verify proper function.

After storage exceeding six months, a comprehensive inspection and commissioning shall be conducted before use; the container may be put into service only after passing inspection.

Chapter 7. Disaster Relief Container Safety Operating Procedures and Emergency Plans

7.1 Installation Work Safety Operating Procedures

7.1.1 General Safety Requirements

All personnel must hold valid certifications for their positions, wear appropriate personal protective equipment. Working under the influence of alcohol or while ill is strictly prohibited.

Clear safety warning signs shall be posted at the construction site. Unauthorized personnel are strictly prohibited from entering.

Safety briefings shall be conducted before each shift, emphasizing the day’s operational risks and preventive measures.

Special operations shall strictly follow dedicated safety plans. Violating commands and operations are strictly prohibited.

Adequate fire extinguishing equipment shall be available on site. Smoking is strictly prohibited. Open-flame operations in the same area as flammable materials are strictly prohibited.

During strong winds of force 6 or above, thunderstorms, heavy fog, or other severe weather, outdoor elevated work and lifting operations shall be suspended.

7.1.2 Elevated Work Safety

Safety harnesses must be worn for elevated work (2 m and above), hooked at a high point and used with a short lanyard, with secure anchorage points.

Scaffolds and ladders shall be erected firmly and used only after inspection and acceptance. Ladder bases shall be non-slip with someone holding the ladder.

Tools for elevated work shall be placed in tool bags. Throwing tools or materials is strictly prohibited.

A warning zone shall be established below the work area; personnel passing through or loitering is strictly prohibited.

Elevated workers shall wear comfortable clothing and non-slip shoes. Hard-soled shoes and slippers are strictly prohibited.

7.1.3 Lifting Operation Safety

Crane operators and signal persons must hold valid certifications, work in coordination, and use standardized signals.

Before lifting, rigging and slings shall be inspected for integrity, and lifting points confirmed secure. Overloading is strictly prohibited.

No persons shall be within the lifting radius. Passing under suspended loads is strictly prohibited.

Lifting shall be slow and smooth, with no sudden stops or rotations, to avoid excessive swinging of the load.

Lifting is strictly prohibited when wind force exceeds 6. Adequate lighting shall be provided for night lifting operations.

7.1.4 Electrical Work Safety

Temporary electrical installations shall strictly follow the three-level distribution and two-level protection system. Unauthorized wiring is strictly prohibited.

Electricians must hold valid certifications. Live work requires supervision and the wearing of insulation protective equipment.

All electrical equipment metal housings shall be reliably grounded. Safety voltage shall be used in humid environments.

Distribution boxes shall be locked and managed by designated personnel, with periodic verification of RCD effectiveness.

Wiring installation shall be standardized. Dragging on the ground, crushing, or immersion is strictly prohibited. Damaged wiring shall be replaced promptly.

7.2 Operational Safety Management

7.2.1 Electrical Safety

Unauthorized wiring and modification of electrical circuits are strictly prohibited.

Overloading is strictly prohibited. High-power equipment shall be used at staggered times to avoid exceeding total load capacity.

Touching switches and outlets with wet hands is strictly prohibited. Electrical appliances shall be powered off promptly after use.

Hanging clothes on wires is strictly prohibited. Blocking or covering equipment heat dissipation vents is strictly prohibited.

Wiring and outlets shall be inspected regularly. Aging, overheating, or unusual odors shall be reported and serviced immediately after de-energizing.

7.2.2 Fire Safety

Open flames inside the container are strictly prohibited. Storage of flammable or explosive materials is strictly prohibited.

Blocking fire escape routes is strictly prohibited. Blocking or moving fire-fighting equipment is strictly prohibited.

Smoking shall be limited to designated areas, and cigarette butts fully extinguished.

Electrical appliances shall be switched off promptly after use. Leaving chargers unattended for extended periods is strictly prohibited.

Fire protection equipment shall be inspected regularly. Expired or failed equipment shall be replaced promptly.

All personnel shall master fire extinguisher usage and be familiar with evacuation routes.

7.2.3 Structural Safety

Placing heavy objects on the roof is strictly prohibited. Drilling into walls or structural beams for hanging heavy objects is strictly prohibited.

Severe impact to the container body is strictly prohibited. Prying structural frames is strictly prohibited.

Overloading of double-stacked containers is strictly prohibited. Upper-tier loads shall not exceed design values.

Structural connections shall be inspected regularly. Loosened bolts or cracked welds shall be reported for repair promptly.

Before extreme weather such as typhoons, heavy rain, or blizzards, the container shall be reinforced and surrounding hazards cleared.

7.3 Emergency Response Plans for Contingencies

7.3.1 Fire Emergency Plan

Upon discovering a fire, immediately shout a warning and call for help. Use nearby fire extinguishers to suppress the incipient fire.

Immediately cut off the main power supply, close gas valves, and organize personnel to evacuate orderly along evacuation routes.

Call 119 to report the fire, stating the location, fire conditions, and personnel situation.

Designate personnel to guide fire trucks and cooperate with firefighting and rescue.

After evacuation, count personnel to ensure everyone is safe. Returning to the fire scene without authorization is strictly prohibited.

After the fire is extinguished, investigate for hidden hazards to prevent reignition, preserve the scene, and cooperate with the incident investigation.

7.3.2 Electric Shock Emergency Plan

Upon discovering someone being electrocuted, immediately cut off the power supply, or use dry insulating materials to separate the victim from the power source. Never attempt rescue with bare hands.

Move the victim to a ventilated area, loosen the collar, and check breathing and pulse.

If breathing and heartbeat have stopped, immediately perform CPR and call 120 for emergency medical services.

Preserve the scene, investigate the cause of the electric shock, and eliminate hazards.

Designate personnel to await emergency medical personnel and brief them on the situation.

7.3.3 Heavy Rain and Flooding Emergency Plan

Upon receiving heavy rain warnings, inspect roof drain outlets, clear debris, and ensure unobstructed drainage.

Check door and window sealing, close windward doors and windows, and place sandbags at door entrances.

Cut off power to low-lying areas and move water-sensitive materials to higher ground.

When floodwaters rise, organize personnel to evacuate to safe areas and shut off the main power and water supply valves.

After the rain stops, inspect the container structure and electrical equipment; resume use only after confirming safety.

Check the container for leakage or settlement; address any hazards promptly.

7.3.4 Typhoon Emergency Plan

Upon receiving typhoon warnings, secure outdoor equipment and remove items at height that could fall.

Close and latch all doors and windows. Apply tape to glass if necessary.

Check container anchoring; add wind-resistant tie-down cables if necessary.

Stock emergency supplies: drinking water, food, emergency lights, and first aid kits.

Personnel shall remain indoors during the typhoon. Going outdoors is strictly prohibited. Stay away from doors and windows.

After the typhoon, inspect for damage, identify hidden hazards, and restore use after repairs.

7.3.5 Earthquake Emergency Plan

During an earthquake, personnel indoors shall quickly take cover beside sturdy furniture or in corners, protect their heads, and stay away from doors, windows, and exterior walls.

After shaking stops, evacuate quickly and orderly to open outdoor areas. Using elevators is strictly prohibited.

Cut off power and gas supplies during evacuation to prevent secondary disasters.

Personnel outdoors shall stay away from buildings, utility poles, and billboards to avoid falling objects.

After the earthquake, inspect the container structure for damage and assess safety. Containers with severe damage shall not be occupied.

Organize self-rescue and mutual aid; cooperate with rescue operations.

Chapter 8. Disaster Relief Container Transportation and Storage Management Specifications

8.1 Product Transportation Specifications

8.1.1 Transportation Mode Selection

Disaster relief containers conform to standard container dimensions and may be transported by road, rail, or sea. The optimal mode shall be selected based on transport distance, timeliness, and cost:

  • Road transport: Suitable for short-distance transport within 1000 km, using flatbed trucks. Flexible, convenient, door-to-door delivery — the most commonly used mode.
  • Rail transport: Suitable for long-distance cross-province transport. Low cost, high safety, suitable for large-batch container dispatch.
  • Sea transport: Suitable for deployment in coastal areas and islands. Transported by container ship with large capacity and low cost.

8.1.2 Road Transport Requirements

Vehicle selection: Use 13 m flatbed semi-trailers. 20-ft containers can be carried 1–2 units per truck; 40-ft containers, 1 unit per truck. Vehicles shall be in good condition and have cargo transport qualifications.

Loading and securing: Containers shall be lifted onto the center of the flatbed, aligned with the frame beams, with the four corner castings secured to the frame using twist locks to prevent displacement.

Height and width check: Confirm that transport height and width comply with road clearance limits. Apply for oversize load permits as required.

Lashing and reinforcement: Use steel wire ropes or ratchet straps at the four corners of the container, securely anchored to the vehicle to prevent movement during transport.

Equipment protection: Container doors shall be locked. Internal movable equipment and accessories shall be secured to prevent collision damage during transport. Fragile items shall be provided with cushioning protection.

Transport speed: Highway speed shall not exceed 80 km/h; national road speed not exceed 60 km/h. Reduce speed on curves and rough sections.

En-route inspection: Stop and inspect after every 100 km of travel to confirm secure fixation and no container displacement.

8.1.3 Loading and Unloading Requirements

The loading/unloading site shall be level and firm, with adequate load-bearing capacity and no surrounding obstructions.

Lifting operations shall be performed by certified personnel with unified signals. Lifting shall be steady with no impact.

Timber dunnage shall be placed under the container during loading/unloading to avoid direct ground contact and moisture damage.

Rough handling is strictly prohibited. Dragging or rolling the container is strictly prohibited.

After loading/unloading, inspect the container exterior to confirm no collision damage.

8.2 On-Site Storage Management

8.2.1 Storage Site Requirements

The site shall be level, dry, well-ventilated, with unobstructed drainage and no standing water.

The site shall be away from pollution sources, corrosion sources, and flammable/explosive materials, and away from high-voltage lines.

The site bearing capacity shall meet requirements, with solid foundations to avoid uneven settlement.

Transport access and lifting work space shall be reserved for convenient storage and retrieval.

8.2.2 Container Storage Requirements

Containers shall be stored in a single layer. Stacking shall not exceed 2 layers, with corner castings aligned and secured by twist locks between layers.

Containers shall be raised not less than 300 mm, with timber dunnage or base beams underneath, to prevent corrosion from ground moisture.

All doors, windows, and ventilation openings shall be closed, container doors locked, and sealing maintained to prevent rain, dust, insects, and rodents from entering.

The interior shall be cleared of debris, water pipes drained, power disconnected, and moisture-sensitive equipment provided with moisture-proof packaging.

A maintenance access of not less than 0.5 m shall be reserved between containers for inspection and maintenance.

Container numbers shall be clearly marked. A storage ledger shall be established, recording storage time, condition, and accessories.

8.2.3 Maintenance During Storage

Monthly inspection: check for exterior corrosion and sealing condition; clear surrounding debris.

Quarterly: open the container for ventilation, check for interior moisture or mold, and air out and dehumidify.

Semi-annually: conduct a comprehensive inspection — remove rust, touch up paint, and replace aged seals.

Increase inspection frequency during rainy and winter seasons; implement rain and freeze protection measures.

Electrical equipment in long-term storage shall be powered on periodically for trial operation to prevent moisture damage.

8.3 Relocation and Dispatch Management

Before relocation of disaster relief containers, a relocation plan shall be developed, specifying transport routes, vehicles, personnel, and timelines.

Prior to relocation, conduct a comprehensive inspection, secure internal equipment, disconnect external water and power connections, and clear interior debris.

Close and lock doors and windows, and provide transport protection.

Upon arrival at the new site, reposition, reconnect, and commission according to the installation process. The container may be put into service only after acceptance inspection.

Provide finished product protection during relocation to avoid collision damage; repair any damage promptly.

Update the ledger after relocation, recording deployment location and usage status.

Chapter 9. After-Sales Service and Technical Support

9.1 Quality Warranty Commitment

Guangzhou Lain Intelligent System Development Co., Ltd., as a professional manufacturer of emergency support containers, provides comprehensive warranty services for all disaster relief containers produced and sold:

  • Main structure warranty: The container steel structural frame is warranted for 3 years. Quality issues such as weld cracking or structural deformation occurring within the warranty period shall be repaired or replaced free of charge.
  • Waterproofing system warranty: Roof and wall waterproofing seals are warranted for 2 years. Non-accidental leakage within the warranty period shall be repaired free of charge.
  • Mechanical and electrical equipment warranty: Electrical systems, air conditioning, water supply and drainage, and fire protection equipment are warranted for 1 year. Equipment failures within the warranty period shall be repaired or replaced free of charge (excluding wear parts).
  • Warranty period calculation: Commences from the date of project completion acceptance.
  • Beyond warranty: Lifetime maintenance service is provided at cost only; spare parts supplied at factory prices.

9.2 After-Sales Service Response Mechanism

  • Service hotline: A 7×24 hour service hotline is available at +86 13538869979 (same as WeChat) to receive customer repair requests and consultations at any time.
  • Response time: Within 15 minutes of receiving a repair request, a response shall be given with a preliminary solution. On-site service within 24 hours for provincial locations, within 48 hours for other provinces (extended for remote areas).
  • Emergency faults: For emergency faults in disaster response scenarios, activate the emergency support plan, prioritize the dispatch of technical personnel and spare parts, and restore service at the earliest possible time.
  • Technical support: Technical support hotline +86 13538869979, providing 7×24 hour technical consultation and remote guidance for troubleshooting and minor repairs.

9.3 Value-Added Services

  • Customization services: Support functional, appearance, and size customization of disaster relief containers. Design exclusive solutions based on customer requirements. Provide full-service models including custom manufacturing, contract processing, confidential customization, and stock supply.
  • Training services: Free operation and maintenance training for user units, covering usage methods, daily maintenance, and basic fault handling. Personnel may operate independently only after passing the training assessment.
  • Regular follow-up: Quarterly telephone follow-up during the warranty period, and one on-site visit per year to assess equipment operation, identify issues, and provide maintenance recommendations.
  • Upgrades and retrofits: Provide container function upgrades and system retrofits. Air conditioning, power supply, and intelligent systems may be upgraded based on usage requirements to extend equipment service life.
  • Rental services: Provide short-term disaster relief container rental services to meet temporary emergency needs, with installation, commissioning, and operation and maintenance services.

9.4 Manufacturer Contact Information

  • Manufacturer: Guangzhou Lain Intelligent System Development Co., Ltd.
  • Service hotline: +86 13538869979 (same as WeChat)
  • Technical support: +86 13538869979
  • Address: Zhongrun Industrial Park, No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou
  • Official website: https://gdlain.com
  • Brand: KITOZER

Guangzhou Lain Intelligent System Development Co., Ltd. is consistently dedicated to the R&D and production of disaster prevention and reduction emergency equipment, providing solid support for emergency rescue and disaster prevention and reduction efforts through high-quality disaster relief container products and professional technical services. We adhere to the philosophy of “Quality First, Service Supreme.” All products undergo strict quality control throughout the production, installation, and commissioning process, ensuring that every emergency support container operates reliably at critical moments. For disaster relief container pricing, specifications, and customized solutions, please contact us by phone, and we will provide a professional one-stop solution.