KITOZER
KITOZER

Double-Layer Shielding Cabinet System (Outer Stainless Steel and Inner Permalloy)

Table of Contents

1. Cover / Document Information

– Document Title: Double-Layer Shielding Cabinet System (Outer Stainless Steel and Inner Permalloy) Technical Design Solution

– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Date: August 2026

– Version: V1.0

– Project Type: Technical design solution for Double-Layer Shielding Cabinet System (Outer Stainless Steel and Inner Permalloy)

2. Table of Contents Structure

1. Company Introduction

2. Project Overview

3. User Requirement Analysis

4. Overall Design Description

5. Detailed System Design and Product Technical Parameters

6. Project Quotation and Configuration List

7. Core Solution Advantages

8. Technical Q&A

9. Construction Schedule Plan

10. Construction Organization Plan

11. After-Sales Service System

12. Operation and Maintenance Training Plan

13. Typical Project Cases

14. SEO Optimization System and Website Backend Configuration

15. Contact Information

3. Company Introduction

3.1 Company Development Overview

Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.

After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.

3.2 Core Business System

The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:

– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;

– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;

– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;

– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.

3.3 Brand and Qualification Honors

The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.

3.4 Core Competitive Advantages

1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;

2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;

3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;

4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.

4. Project Background and Objectives

4.1 Project Background

Precision instruments, measurement systems, medical devices and industrial control equipment increasingly face composite electromagnetic pulse interference — dominated by 1kHz low-frequency pulsed magnetic fields (from power equipment, frequency converters and gradient coils) and 1MHz high-frequency pulsed electromagnetic fields (from switching supplies and radio systems). Ordinary single-layer cabinets cannot suppress both bands simultaneously: conductive materials excel at high-frequency shielding but fail at low-frequency magnetic fields, while high-permeability materials excel at low-frequency magnetic shielding but are weak, costly and ineffective at high frequency. This demands a dual-layer composite shielding cabinet.

4.2 Project Objectives

Provide a full-band shielding cabinet that simultaneously suppresses 1kHz low-frequency magnetic pulse and 1MHz high-frequency electromagnetic pulse interference; guarantee cabinet shielding effectiveness of >=40dB at 1kHz and >=60dB at 1MHz (per GB/T 12190); maintain IP55 protection with adequate ventilation and heat dissipation; support flexible customization for diverse scenarios; and deliver reliable long-term operation with complete service.

4.3 Compilation Basis

GB/T 12190 (shielding effectiveness measurement), GB/T 3047.2 / IEC 60297 (19-inch cabinet standards), GB 4208 / IEC 60529 (IP protection), GB 50054 (low-voltage distribution), GB 50169 (earthing), GB/T 17215 and EMC standards (GB/T 17626 series), plus customer site requirements.

4.4 Scope

Applies to precision measurement, metrology, medical imaging support, EMC testing, industrial automation and other scenarios with composite low/high-frequency pulse interference.

5. User Requirement Analysis

5.1 Electromagnetic Environment Requirements

Site interference is a composite of 1kHz low-frequency pulsed magnetic fields and 1MHz high-frequency pulsed electromagnetic fields; the cabinet must provide simultaneous suppression of both; core-frequency shielding effectiveness must have design margin; radiated (space) and conducted (cable) paths must both be addressed.

5.2 Functional Requirements

Full-band shielding for equipment inside; ventilation and heat dissipation without degrading shielding; power filtering and distribution; signal interface shielding (network, serial, fiber, custom); reliable graded earthing; internal 19-inch mounting and tidy cabling.

5.3 Structure and Installation Requirements

Rigid all-welded structure; IP55 dust/splash protection; anti-corrosion surface; adjustable feet and leveling; sufficient load capacity for internal equipment; suitable for machine room and industrial workshop installation.

5.4 Performance Requirements

1kHz magnetic shielding >=40dB; 1MHz plane-wave shielding >=60dB; door seams, vents and penetrations shielded; ground resistance <=4 ohm; filters with insertion loss matching target bands; long service life (structure >=15 years, seals >=5 years).

5.5 O&M and Expansion Requirements

Simple daily maintenance; replaceable consumables (filter pads, seals, fans); standardized 19-inch mounting; support for later interface additions and shielding-level upgrades without degrading performance.

6. Design Principles and Applicable Standards

6.1 Design Principles

Composite dual-layer shielding: outer 304 stainless steel for high-frequency electrical shielding and structural load; inner 1J85 permalloy cavity for low-frequency magnetic shielding — each material does what it does best. Insulated isolation: epoxy supports isolate the two layers electrically and magnetically, enabling shielding-effect superposition (reflection-absorption-re-reflection between layers) instead of coupling cancellation. Full-chain closure: cabinet, doors, vents, power, signal and earthing all designed as a closed shielding loop to eliminate weak points. Segmented protection: space radiation suppressed by the shielded shell; conducted interference filtered at every cable entry; induced charges rapidly drained by graded earthing. Cost-effective: precise material/structure selection matches the interference scenario — no over-specification.

6.2 Applicable Standards

GB/T 12190 (shielding effectiveness), IEC 60297 / GB/T 3047.2 (19-inch racks), GB 4208 / IEC 60529 (IP ratings), GB 50054 (distribution), GB 50169 (earthing), GB/T 17626 (EMC immunity), UL 1283 / GB/T 15287 (filters), plus customer requirements.

7. System Architecture and Working Principle

7.1 Composite Dual-Layer Shielding Principle

The outer stainless shell uses skin effect and eddy-current reflection to attenuate high-frequency electromagnetic fields; the inner 1J85 permalloy cavity uses the magnetic-shunting effect of high-permeability material to greatly weaken low-frequency magnetic penetration; the 50mm air gap between layers adds reflection loss and thermal buffering. Insulated supports (>=10kV withstand, >=1000M ohm insulation) keep the two layers electrically and magnetically isolated so the two shielding effects add.

7.2 Overall Design Approach

Eight subsystems cooperate as one system: dual-layer cabinet body; dual-layer shielding doors; shielded ventilation; power filtering and distribution; signal interface shielding; equipotential earthing; internal mounting and cabling; sealing and accessories — performance-matched and structurally interlocked.

7.3 Full-Band Interference Suppression Architecture

A trinity of “space radiation shielding + conducted path filtering + equipotential earthing”: space paths blocked by the double shielding shell (1kHz magnetic, 1MHz electromagnetic); conducted paths filtered by power/signal filters and feed-through terminals; induced charges on the shield rapidly drained by the graded earthing system to avoid secondary coupling.

7.4 System Composition

As listed in 7.2 — eight subsystems forming the complete shielded cabinet function.

8. Detailed Technical Design

8.1 Dual-Layer Cabinet Body

Outer 304 stainless shell (high-frequency + structure): integral six-face welded structure; thickened folded frame; continuous argon-arc welding, ground smooth, conductive passivation; 2.0mm panels (3.0mm base/frame); brushed outer surface (Ra<=1.6um), conductive-passivated inner surface (contact resistance <=0.05 ohm); all seams double-treated with continuous welding + conductive sealant; beryllium-copper gaskets on door faces — IP55 and high-frequency continuity; side panels reserve interface flanges, top reserves waveguide windows, bottom reserves earthing and cable entries. Inner 1J85 permalloy cavity (low-frequency magnetic): independent sealed welded cavity mounted on insulated supports with no metal contact to the outer shell; 1.5mm panels (optional 2.0mm on the front/top); laser welding (narrow, uniform, minimal magnetic impact) then full high-temperature hydrogen-atmosphere magnetic annealing; inner wall insulated coating, outer wall bare metal for magnetic continuity; openings aligned with outer interfaces via shielded transition structures. Insulation isolation: cylindrical epoxy supports, 200mm grid, withstand >=10kV, insulation >=1000M ohm, compressive >=200MPa; 50mm air gap between layers.

8.2 Dual-Layer Shielding Door System

Outer stainless door: 2.0mm 304 steel with reinforcing ribs (flatness <=0.5mm/m); gold-plated beryllium-copper finger gaskets around the perimeter (contact resistance <=0.01 ohm/piece, life >=10,000 cycles) against precision-machined door frame; 3 heavy conductive hinges per door (>=100kg each, conduction <=0.005 ohm); three-point locking with multi-point compression; anti-theft lock. Inner permalloy door: 1.5mm 1J85 with magnetic annealing; laminated permalloy magnetic sealing strips bridging gap reluctance; linked to the outer door via insulated connectors (opening lag <=0.1s); 120° max opening with damping limiter.

8.3 Shielded Ventilation and Heat Dissipation

Honeycomb waveguide windows: stainless honeycomb core, tin-plated, welded to mounting flanges with conductive gaskets; hexagonal cells, cutoff frequency >=3GHz; shielding >=60dB at 1MHz, >=20dB at 1kHz magnetic; ventilation rate >=80%; low airflow resistance; layout: 2 lower intakes + 2 top exhausts forming natural draft, fan-assisted forced flow; G4 filter pads on intakes (>=90% at 5um), drawer-type replaceable, 3-6 month cycle. Metal shielded axial fans: full-metal housing with 360° conductive bonding; AC220V, >=200 m3/h, <=55dB, dual ball bearings, >=50,000h life; built-in EMI filtering; three-wire with protective earth to shield; manual switch standard, optional temperature/humidity linked control.

8.4 Power Filtering and Distribution

Broadband power filter: multi-stage common-mode + differential-mode + surge suppression; AC220V/16A; insertion loss >=40dB at 1kHz, >=60dB at 1MHz, >=65dB at 10MHz; withstand AC1500V/1min; leakage <=0.5mA; flange through-wall mounting with shell bonded to the outer shield; input/output physically separated to avoid re-coupling; EMC certified with overload/overvoltage/overheat protection. Feed-through power terminal: ceramic feed-through capacitor type; AC250V/DC300V, 10A, 1000pF; >=50dB at 1MHz; for DC lines not requiring filtering. Internal distribution unit: 2P 16A RCD (30mA, <=0.1s) + 8-position 10A 5-hole sockets, mounted on an insulated panel isolated from the shield.

8.5 Signal Interface Shielding

RJ45 network filter: gigabit auto-negotiation; 8-wire differential filtering; EMI insertion loss >=35dB at 1kHz, >=55dB at 1MHz; signal attenuation <=1dB; surge (common 2kV/differential 1kV) and ESD (+-15kV air / +-8kV contact) protection; flange through-wall. RS485 serial filter: DB9, RS485/RS422 up to 1Mbps; >=40dB at 1kHz, >=60dB at 1MHz; CMRR >=60dB; metal shielded housing, flange mount. Fiber shielded feed-through: LC simplex, single/multi-mode; insertion loss <=0.3dB; metal shell conductively bonded, conductive sealant filled; >=60dB 1MHz-1GHz. Universal signal feed-through terminal block: 10-core low-pass filter type, DC24V/AC110V, 5A/core, 100nF/core, >=50dB at 1MHz, screw termination 0.5-2.5mm2.

8.6 Equipotential Earthing System

Graded design of “inner single-point, outer multi-point, shielded earth separate from protective earth”: inner shield — single earthing point (M10 copper bolt, tinned washer, contact <=0.01 ohm) to the shielded earth bus, eliminating ground loops that would induce cancelling fields; outer shell — two diagonal M12 copper bolts to the protective earth bus for effective high-frequency discharge and personnel safety; equipotential copper bar — tinned T2 copper 30x3x1800mm with 18 M8 holes, all internal equipment housings, cable screens and filter grounds bonded to it; marking — stainless etched labels “shielded earth / protective earth / equipotential bar”; system ground resistance <=4 ohm; ground wires multi-strand yellow-green >=6mm2.

8.7 Internal Mounting and Cabling

19-inch mounting rails: 4 galvanized cold-rolled rails, 42U, IEC 60297 square holes, laser-engraved U numbers, single-point load >=100kg, verticality <=0.5mm/m. Fixed shelves: 3 standard 19-inch shelves, 482x800mm, tool-free snap adjustment at 1U steps, uniform load >=50kg, deflection <=1mm. Cable managers: 2 x 1U 24-port galvanized metal managers; power and signal cables routed on separate sides (strong/weak current separation) to reduce coupling.

8.8 Sealing System

Continuous welding with defect repair and conductive sealant on key seams; two independent door seals (beryllium-copper for high frequency, permalloy strips for low frequency); conductive rubber gaskets under all flange mounts with uniform bolt compression plus conductive sealant edge sealing; silver-copper conductive sealant with volume resistivity <=0.01 ohm-cm, shear >=2MPa, IP65 sealing, aging resistance >=5 years.

9. Recommended Configuration and Preliminary Budget

9.1 Configuration List (Single Standard 42U Unit)

No. Module Item Spec Qty
1 Cabinet body Outer 304 stainless cabinet 600x1000x2050mm, 2.0mm, argon welded, brushed, IP55, >=60dB @1MHz 1
2 Inner 1J85 permalloy cavity 1.5mm, laser welded, annealed, >=40dB @1kHz 1
3 Epoxy insulation supports D20mm, >=10kV, 200mm grid 1 set
4 Stainless load base channel steel, 100mm, M12 adjustable feet 1
5 Doors Outer stainless shield door 2.0mm, single left opening, BeCu gaskets 1
6 Inner permalloy shield door 1.5mm, linked, magnetic strips 1
7 Heavy conductive hinges 304 stainless, load+conduction 3
8 Three-point shield lock multi-point, anti-theft 1
9 Door damping limiter 120° max 1
10 Ventilation Honeycomb waveguide windows 200x200mm, cutoff >=3GHz, >=60dB @1MHz 4
11 Metal shielded axial fans AC220V, >=200 m3/h, shielded housing 2
12 G4 filter pads replaceable 4
13 Power Broadband power filter 220V/16A, >=40dB @1kHz / >=60dB @1MHz 1
14 Feed-through power terminal capacitor type, 250V/10A 1
15 Internal distribution unit 2P16A RCD + 8 sockets 1
16 Epoxy insulated panel >=10kV 1
17 Signal RJ45 network filters gigabit, 8-wire differential 4
18 RS485 serial filters DB9 industrial 2
19 Fiber shielded feed-through LC simplex metal shell 2
20 Universal signal feed-through block 10-core, >=50dB @1MHz 1
21 Earthing Equipotential copper bar tinned T2 30x3x1800mm 1
22 Outer protective earth bolts M12 copper 2
23 Inner shield earth bolt M10 copper 1
24 Stainless earth labels etched 3
25 Internal 19-inch mounting rails 42U galvanized 4
26 Fixed shelves 19″, load >=50kg 3
27 1U metal cable managers 24-port 2
28 Accessory kit screws, nuts, ties, etc. 1
29 Sealing Gold BeCu finger gaskets >=50dB @1MHz seam 6m
30 Permalloy magnetic strips >=30dB @1kHz seam 5m
31 Silver-copper conductive sealant <=0.01 ohm-cm 2
32 Docs Nameplate / third-party test report / manual / certificate covering 1kHz, 1MHz set

9.2 Budget Notes

Prices per confirmed configuration, tax-inclusive, quoted in RMB (CNY) only. Customization (size, U-count, thickness, interfaces, shielding level, internal layout, color/branding) quoted separately; third-party shielding effectiveness test report included; delivery standard config 15-20 days, customized 20-30 days, urgent lanes available; warranty 12 months, annual inspection, lifetime maintenance.

10. Technical Specifications

10.1 System Specification Summary

System Key Specifications
Outer shell 304 stainless, 2.0mm (3.0mm frame/base); 600x1000x2050mm; tensile >=520MPa; yield >=205MPa; elongation >=40%; conductivity >=2.5% IACS; brushed Ra<=1.6um; IP55; salt spray >=48h; static load >=800kg; ~280kg
Inner cavity 1J85 permalloy 1.5mm (2.0mm option); 500x900x1850mm; initial permeability >=30mH/m (30000Gs/Oe); max >=150mH/m; Bs >=0.7T; Hc <=1.2A/m; Tc >=400 degC; laser weld <=1.5mm; hydrogen annealing 1100-1200 degC 3-4h; batch permeability deviation <=10%; ~120kg
Insulation supports epoxy fiberglass D20x50mm; withstand >=10kV AC/1min; insulation >=1000M ohm; compressive >=200MPa; flexural >=100MPa; -40~+120 degC; UL94 V-0; 200mm grid
Shielding effectiveness 1kHz magnetic >=40dB (inner); 10kHz >=50dB; 100kHz >=55dB; 1MHz plane wave >=60dB (outer) / >=45dB (inner); 10k-100MHz electric >=70dB; per GB/T 12190
Doors Outer 2.0mm 304 + BeCu gold finger gaskets (<=0.01 ohm, >=10,000 cycles); inner 1.5mm 1J85 + laminated magnetic strips (seam >=30dB @1kHz); 3 heavy conductive hinges (>=100kg, <=0.005 ohm); three-point lock; 120° with limiter; linkage lag <=0.1s
Ventilation 4 honeycomb waveguide windows 200x200mm (cutoff >=3GHz; >=60dB @1MHz, >=20dB @1kHz; ventilation >=80%; wind resistance <=10Pa); 2 metal shielded axial fans AC220V >=200 m3/h <=55dB >=50,000h; G4 pads (>=90% @5um, 3-6 month cycle)
Power Broadband filter 220V/16A (loss >=40dB @1kHz / >=60dB @1MHz / >=65dB @10MHz; withstand 1500V; leakage <=0.5mA; surge CM 6kV/DM 4kV); feed-through terminal 250V/10A >=50dB @1MHz; 2P16A RCD 30mA <=0.1s + 8 sockets
Signal RJ45 filters (gigabit, loss >=35dB @1kHz / >=55dB @1MHz, attenuation <=1dB, ESD +-15kV/+-8kV); RS485 filters (1Mbps, >=40dB @1kHz / >=60dB @1MHz, CMRR >=60dB); fiber feed-through LC (loss <=0.3dB, >=60dB 1MHz-1GHz); 10-core feed-through block (DC24V/AC110V, 5A, >=50dB @1MHz)
Earthing Inner single point (M10, <=0.01 ohm) to shielded earth; outer two points (M12 diagonal) to protective earth; equipotential tinned T2 bar 30x3x1800mm 18 holes; ground resistance <=4 ohm; wires >=6mm2
Internal 4 rails 42U IEC 60297 (single-point >=100kg); 3 shelves (>=50kg, <=1mm deflection); 2 cable managers 24-port; strong/weak current separated
Sealing BeCu gold gaskets (seam >=50dB @1MHz); permalloy strips (seam >=30dB @1kHz); conductive rubber gaskets; silver-copper sealant <=0.01 ohm-cm, >=2MPa, IP65, aging >=5 years

10.2 Standards Compliance

GB/T 12190 (shielding effectiveness measurement); IEC 60297 / GB/T 3047.2 (19-inch); GB 4208 / IEC 60529 (IP55); GB 50054 (distribution); GB 50169 (earthing); GB/T 17626 (EMC immunity); UL 1283 / GB/T 15287 (filters); materials per GB/T 3280 (304) and GB/T 15006/1J85 permalloy spec; welding by certified welders with penetration inspection on key seams; finished units tested per GB/T 12190 with third-party report.

11. Key Advantages and Customer Value

11.1 Composite Dual-Layer Architecture — Full-Band Suppression

The outer stainless shell (skin effect + eddy reflection) handles high-frequency fields; the inner 1J85 permalloy cavity (magnetic shunting) handles low-frequency fields — breaking the single-material “cannot cover both bands” bottleneck; insulated isolation prevents coupling cancellation, delivering additive shielding with generous margin at core frequencies.

11.2 Source-Factory Customization

20+ years of EMC shielding and machine-room manufacturing; flexible customization — size/U-count/plate thickness, interface types/quantities/positions, shielding-level upgrades (thicker permalloy, extra layers), internal structure, appearance/branding.

11.3 Full-Chain Interference Closure

Shielding follows the short-board rule — one leak degrades everything. All-welded shell + conductive sealant; dual-door gaskets; cutoff waveguide vents; every cable through filters/feed-throughs; graded equipotential earthing — every weak point closed.

11.4 Rigorous Process and Quality Control

Incoming material sampling; certified welders with 100% weld inspection and penetration testing on key seams; strict hydrogen magnetic annealing with batch magnetic testing; GB/T 12190 effectiveness testing before shipment with third-party report; structure life >=15 years, seals >=5 years.

11.5 Full-Cycle Service

24h online support; warranty with free repair/replacement; periodic inspection; lifetime technical consultation and spares; on-site installation/earthing guidance and shielding-effectiveness re-testing.

11.6 Cost-Effective

Precise material/structure matching avoids over-specification; standardized modular design lowers production and maintenance cost; source-Manufacturer Supply — high reliability at the best value.

12. Technical Q&A (50+ Items)

12.1 Principles

Q1: Why dual-layer instead of single-layer permalloy?

A: Different frequency bands need different mechanisms — high-frequency shielding relies on eddy-current reflection of good conductors (stainless/copper/aluminum — moderate cost, high strength); low-frequency magnetic shielding relies on magnetic shunting of high-permeability soft-magnetic materials (permalloy — effective but expensive, weak, poor high-frequency value). Single permalloy: costly, weak structure, no high-frequency gain; single stainless: poor low-frequency suppression. The dual layer combines strengths and adds effects via insulated isolation — optimal value.

Q2: Why is 1kHz low-frequency pulse hard to shield?

A: Low-frequency magnetic fields have extremely low wave impedance; the magnetic component dominates and conductor reflection loss is minimal — ordinary metal cabinets barely work. Penetration is strong via gaps/holes and ground loops. The solution is magnetic shunting: high-permeability material (permalloy, silicon steel) provides a low-reluctance path that guides the field inside the material, sharply cutting flux entering the cavity. 1J85 has among the highest initial permeability of commercial materials — excellent 1kHz attenuation after annealing.

Q3: Why must the two layers be insulated?

A: Electrical contact would make them behave as one thicker plate — no high-frequency stacking gain, wasting a layer; isolation creates multiple reflection losses at the air interfaces (“reflect-absorb-re-reflect”) — higher high-frequency effectiveness. Magnetic contact would form a magnetic short — the inner shunting is bypassed by the outer shell — lower low-frequency shielding. Epoxy insulated supports (>=10kV, >=1000M ohm) guarantee the isolation and the additive effect.

Q4: Why is magnetic annealing essential for permalloy?

A: High permeability depends on the internal domain structure; rolling, bending and welding create internal stress that pins domain walls — permeability can drop 80%+ and shielding is lost. Hydrogen-atmosphere annealing at 1100-1200 degC for hours with slow cooling removes stress, optimizes the crystal structure and restores high permeability. It is an indispensable process — all our inner cavities and doors are fully annealed after welding.

Q5: Which paths does 1MHz high-frequency interference take?

A: Two: space radiation (waves through shell gaps/holes) and conduction (power, signal and earth cables). Space path — all-welded stainless shell, BeCu gasket door sealing, cutoff waveguide vents, all openings shield-reinforced. Conduction path — broadband power filter at the inlet, matched signal filters on lines, feed-through terminals for custom signals, plus graded earthing draining induced charges. Radiation + conduction dual protection.

Q6: Does the waveguide window affect shielding?

A: Ordinary openings leak badly at high frequency (diffraction, worse with larger holes/higher frequency). Cutoff waveguides maintain high effectiveness while ventilating: below cutoff frequency waves decay rapidly and cannot pass; honeycomb windows are arrays of tiny hexagonal waveguides with cutoff far above the interference band — >=60dB at 1MHz with >=80% ventilation.

Q7: How do the two door seals differ?

A: The outer door uses gold-plated beryllium-copper finger gaskets — low-resistance conductive sealing for high-frequency seams. The inner door uses laminated permalloy magnetic strips — high-permeability bridging of gap reluctance for low-frequency magnetic seams. Independent and complementary for full-band performance.

Q8: Why are power and signal cables both filtered?

A: Space shielding alone cannot stop conducted interference — cables act as antennas carrying interference in. Power filters (broadband multi-stage) block mains-borne pulses; signal filters (network/serial/feed-through) block line-borne pulses while preserving signal quality — both bands covered on every entry.

12.2 Performance

Q9: What does >=40dB at 1kHz mean?

A: SE(dB) = 20lg(E0/E1): 40dB = field inside is 1% of outside — 100x attenuation. E.g. 100A/m outside -> <=1A/m inside — below the sensitivity threshold of most precision instruments. Design margin means actual units typically exceed ratings.

Q10: What does IP55 mean?

A: First digit 5 — dust cannot fully enter but quantities are harmless; second digit 5 — low-pressure water jets from any direction cause no harmful effects. Suitable beyond machine rooms: industrial workshops, semi-outdoor corridors, underground tunnels, outdoor cabinet rooms.

Q11: Is thicker permalloy always better?

A: Within a range thickness raises low-frequency effectiveness but not linearly; past saturation, gains are marginal while cost/weight rise sharply. Effectiveness depends more on permeability and process — a thin properly annealed plate beats a thick un-annealed one. 1.5mm with full annealing achieves >=40dB at 1kHz — the optimum balance; 2.0mm or double-layer options exist for stronger fields.

Q12: What shielding levels are available?

A: Standard: 1kHz >=40dB / 1MHz >=60dB (general industrial/scientific). Enhanced: >=50dB / >=70dB (strong interference, sensitive equipment). High: >=60dB / >=80dB (precision metrology, weak-field detection). Achieved via plate thickness, layer count, sealing and filter grade.

Q13: What are the 304 mechanical properties?

A: Tensile >=520MPa, yield >=205MPa, elongation >=40%, hardness <=187HB, conductivity >=2.5% IACS — structural rigidity plus effective high-frequency shielding.

Q14: What are the 1J85 magnetic properties after annealing?

A: Initial permeability >=30mH/m, max >=150mH/m, Bs >=0.7T, Hc <=1.2A/m, Curie >=400 degC, resistivity >=55 uOhm-cm; batch permeability deviation <=10%.

Q15: What is the whole-unit weight and floor loading?

A: Standard 42U ~400kg; with equipment 600-800kg; floor requirement >=500kg/m2 — reinforced anti-static floors or a load base recommended; concrete floors generally fine.

12.3 Installation and Earthing

Q16: What are the earthing requirements? Why single-point inner earth?

A: Outer shell: two-point earth to protective earth — low high-frequency earth impedance, fast charge drain, personnel safety. Inner cavity: strictly single-point earth to shielded earth — two or more points create a ground loop; low-frequency fields induce loop current that generates a cancelling field, degrading magnetic shielding (worse at low frequency and larger loops). Ground resistance <=4 ohm; wires >=6mm2 yellow-green; contact resistance minimized.

Q17: What should be noted when installing?

A: Level, firm ground with adequate capacity; adjust feet to level so the door seals evenly; keep >=700mm opening clearance on the hinge side (not flush against a wall); earth to the machine-room system only — never to water/heat pipes; avoid impacts (especially the permalloy cavity — stress lowers local permeability); all cables through filters/feed-throughs — never through door gaps or vents.

Q18: Can it be installed against a wall?

A: Not recommended — full door opening and side-interface access need clearance; leave adequate space around the cabinet.

Q19: Any rules for internal equipment installation?

A: Bond equipment housings to the equipotential copper bar; separate power/signal cables on opposite sides (>=20cm separation); place sensitive equipment near cavity center (best shielding, away from walls/seams); shield cable screens single-end earthed; never drill or tap the cavity yourself — contact the factory for professional shielded additions.

Q20: Can I add signal interfaces later myself?

A: No — unshielded drilling creates a leakage point that collapses overall effectiveness. Contact the factory: matched filter/feed-through configured, professional opening and sealing, performance unaffected.

Q21: Can shielding effectiveness be verified on site?

A: Yes — per GB/T 12190: transmit from outside with a source and antenna, measure inside with a receiving antenna and field-strength meter, compute the ratio. Magnetic probes for 1kHz, field probes for 1MHz. Third-party report at delivery; re-test after installation.

Q22: Does it protect against lightning surges?

A: It attenuates radiated lightning-induced fields, and the power/signal filters carry surge modules suppressing conducted surges. But it cannot replace a professional lightning system — in lightning-prone areas install class-1/2 protection at building/distribution level; the cabinet is the class-3 terminal protection.

12.4 Materials and Environment

Q23: Will the stainless shell rust?

A: 304 is corrosion-resistant in normal indoor and dry industrial environments. For high humidity, salt spray or corrosive gas — 316L option for coastal/chemical sites. IP55 adds moisture/splash resistance.

Q24: What is the operating temperature range?

A: Cabinet and components -40~+150 degC (waveguide) / -40~+125 degC (feed-throughs) / -25~+85 degC (filters); fan -10~+60 degC; sealant -50~+120 degC — full industrial range.

Q25: Can it be used in humid environments?

A: Yes — IP55 dust/splash protection, 304 corrosion resistance, insulated inner coating; 316L available for severe salt/corrosive environments.

Q26: What is the noise level?

A: Fans <=55dB(A) — quiet enough for labs and machine rooms; temperature-linked control runs fans only as needed.

Q27: What is the load capacity?

A: Whole unit static >=800kg (base >=1000kg, fork-lift holes); top >=100kg; rails single-point >=100kg; shelves >=50kg uniform / >=25kg concentrated; base impact >=10g.

12.5 Maintenance and O&M

Q28: What daily maintenance is needed? What are consumables?

A: Minimal — check and replace G4 filter pads every 3-6 months; inspect door gaskets (BeCu fingers, magnetic strips) yearly for deformation/elasticity loss, verify uniform compression; check earthing bolts semi-annually; check fans yearly; wipe surfaces with dry cloth or neutral cleaner (never strong acids/bases). Seals >=5 years, fans >=5 years, structure >=15 years.

Q29: How is the filter pad replaced?

A: Drawer-type slot mounting — pull out, replace, push in; no tools; 3-6 month cycle or when visibly clogged.

Q30: What if door compression becomes uneven?

A: Check hinge tightness and frame flatness; adjust the three-point lock compression; replace worn gaskets; contact factory for recalibration if needed.

Q31: What if shielding effectiveness drops?

A: Check door gasket continuity and compression; check flange gaskets and sealant at all penetrations; check earth connections (resistance still <=4 ohm?); check for unauthorized drilling/cabling — rectify and re-test.

Q32: What is the warranty and service?

A: 12-month free warranty from acceptance (non-human faults); 7×24 hotline with 30-minute phone response; on-site within 24h (province) / 48h (nationwide); lifetime maintenance at cost; original spares stocked; annual maintenance agreements with performance re-testing.

12.6 Customization and Delivery

Q33: What customization is supported?

A: Size and U-count; plate thickness; interface types/quantities/positions; shielding level (thicker permalloy, extra layers); internal structure (shelves, rails, trays); color, marking and branding.

Q34: What is the delivery cycle?

A: Standard config: 1-3 days if stocked, 15-20 days production; customized: 20-30 days per complexity; urgent lanes available; flexible production line with ample material stock.

Q35: Can multiple units be produced in parallel?

A: Yes — multi-unit orders run parallel production; total cycle does not multiply by quantity; 3-10 days added only for custom content.

Q36: What documentation is delivered?

A: Third-party shielding effectiveness test report (1kHz/1MHz core points), installation/operation manual, routine O&M manual, fault-handling guide, certificate of conformity, nameplate, training courseware.

Q37: Is training provided?

A: On-site training at delivery: theory (shielding principles, structure, performance, usage, maintenance) + practice (door operation, filter pad replacement, earthing checks, seal checks, common fault finding, equipment installation); Q&A and assessment; paper + electronic manuals; remote training for new staff.

Q38: How is acceptance performed?

A: Appearance/dimension check; door function; ground resistance test; insulation test; shielding effectiveness re-test at 1kHz/1MHz; functional checks of distribution, fans and signal interfaces; documentation handover; acceptance report signed.

Q39: Why choose the KITOZER/Lain solution?

A: Source factory with 20+ years of EMC shielding expertise; complete R&D/production/testing; certified welders and strict annealing; third-party effectiveness testing; full customization; 7×24 service and lifetime maintenance.

Q40: What is the product life?

A: Structure >=15 years; seals >=5 years; fans >=5 years (50,000h bearing life); filters and feed-throughs long-life with surge aging factors — designed for decade-scale service.

Q41: Can internal layout be adjusted?

A: Yes — rails and shelves adjust at 1U steps, tool-free; custom trays, guides and brackets per equipment; rails carry >=100kg per point.

Q42: Is the cabinet stackable or relocatable?

A: It is a standalone floor cabinet — relocate with care (lift from base, avoid tilting; inner cavity stress-sensitive); a load base with fork-lift holes eases moving.

Q43: How is the 50mm air gap maintained?

A: Epoxy supports at a 200mm grid, compressive >=200MPa, flexural >=100MPa, firmly fixed to both shells; gap is consistent, adding reflection loss and thermal buffering.

Q44: What about strong/weak current separation?

A: Power and signal cables route on opposite sides of the cabinet (>=20cm), managed by 1U metal managers, ties fixed — minimizing coupling into sensitive lines.

Q45: Are filters certified?

A: Power filter per GB/T 15287 and UL 1283; network/serial filters with EMC compliance; surge and ESD ratings verified; full test data in the delivery package.

Q46: Can it house 24/7 continuous-running equipment?

A: Yes — dual fans with optional redundant backup, >=200 m3/h each, waveguide intakes/exhausts, G4 filtration — sustained heat dissipation for long-run devices.

Q47: What is the power consumption of the cabinet itself?

A: Only fans (<=40W each) and distribution losses — negligible; temperature-linked control further saves energy.

Q48: Is it suitable for medical imaging environments?

A: Yes — enhanced low-frequency shielding (2.0mm permalloy option) suppresses gradient-coil pulsed fields; fiber and differential filters keep data clean; proven in MRI support applications.

Q49: Can it be used for EMC laboratory reference equipment?

A: Yes — enhanced-level versions (>=70dB @1MHz, dual permalloy layers) isolate reference equipment from wideband test interference, preserving measurement accuracy.

Q50: What are the key buying criteria for such cabinets?

A: Verified shielding effectiveness (third-party GB/T 12190 report), full-chain design (doors/vents/cables/earthing), material authenticity (304 composition, 1J85 magnetic data), process quality (welding, annealing), customization ability, service and lifecycle cost.

13. Construction Schedule

13.1 Standard Schedule (Single Unit)

Stage No. Work Duration Responsible Prerequisite Deliverable
Preparation 1 Requirement confirmation and scheme finalization 1d PM + engineer Contract Final scheme, config list
2 Production order and material preparation 2d Production lead Scheme Work order, BOM
Manufacturing 3 Outer shell fabrication and welding 5d Sheet-metal + welding crews Materials Outer shell semi-finished
4 Inner permalloy cavity fabrication and welding 4d Precision welding crew Materials Inner cavity semi-finished
5 High-temperature magnetic annealing 2d Heat-treatment crew Cavity welded Annealed cavity
6 Inner/outer assembly, insulation supports 2d Assembly crew Both semi-finished Body assembled
7 Doors and seals installation and adjustment 2d Assembly crew Body assembled Smooth doors, tight seals
8 Electrical parts and filters wiring 2d Electricians Body assembled Distribution/filter wiring done
9 Internal mounting and accessories 1d Assembly crew Body assembled Internal installed
10 Factory effectiveness test and full inspection 1d QC Fully assembled Factory + third-party reports
11 Packing and shipping preparation 1d Logistics Passed QC Packed cabinet
Transport 12 Logistics to site 2-5d Logistics Shipped Receipt
Site 13 Unloading, positioning, leveling 1d Site crew Arrival, site ready Leveled cabinet
14 Earthing installation and connection 1d Site electrician Positioned Earth connected, <=4 ohm
15 Cable connection and function debugging 1d Site engineer Earthed Power/signal/fans OK
16 On-site effectiveness re-test 0.5d Test engineer Wired Site test report
Acceptance 17 Overall acceptance and documentation 0.5d PM Test passed Acceptance report, docs
18 Operation and maintenance training 0.5d Engineer Accepted Training record

Total: ~22-25 days (excluding transport). Multi-unit orders run in parallel; custom content adds 3-10 days; site work depends on customer-provided conditions; urgent production lanes available.

14. Construction Organization and Quality/Safety Measures

14.1 Organization

PM (1): overall progress/quality/cost/safety; customer liaison; acceptance. Technical lead (1): design, disclosure, technical problem solving, effectiveness testing, documentation. Production lead (1): production plan across sheet-metal/welding/assembly/heat treatment; quality and schedule. Site crew lead (1): site team management, installation/earthing/wiring/debugging, site quality and safety. QC engineer (1): incoming material, in-process, finished-product inspection; site acceptance testing; reports. Workers (2-3): certified, installation, wiring, earthing, civilized construction.

14.2 Pre-Construction Preparation

Technical: disclosure of drawings, requirements, shielding key points and acceptance criteria; detailed construction plan and work instructions; calibrated instruments (earth-resistance tester, level, torque wrench, electrical tools). Materials: full config verification (model/spec/qty); transport packing and lifting tools; site consumables (earthing materials, sealants, fasteners). Site: survey transport routes, elevator/door dimensions; confirm floor capacity, flatness, earthing terminal and resistance; confirm power; clear the installation area.

14.3 Core Construction Processes

Unloading and positioning: forklift or crane; light lift, no rolling/dropping; protect surfaces; level <=1mm/m and verticality <=1.5mm/m via feet, then lock; check door operation and seal alignment after transport. Earthing: connect outer protective earth (two diagonal points) and inner shielded earth (strictly single point); >=6mm2 multi-strand yellow-green wires; clean contact faces, apply conductive paste, torque fasteners, contact <=0.01 ohm; test resistance <=4 ohm (coordinate grid improvement if not). Power and signal wiring: every cable through filters/feed-throughs/waveguides — never through door gaps, vents or ordinary holes; filter input external, output internal, separated routing; flanges bonded to shield; correct interface wiring; neat ties with strong/weak separation and labels. Sealing check: gaskets continuous, uniform, no lifting/falling; flanges, welds and hole edges sealed; door compression uniform after locking. Debugging and testing: power distribution, fans and indicators; signal continuity and stable data; on-site effectiveness test with records.

14.4 Quality Control

Three-inspection system (self, mutual, special) per process; key processes (earthing, sealing, filter installation) with technical-lead on-site supervision; all tests recorded and signed, fully traceable; non-conforming work halted, corrected with preventive measures before proceeding.

14.5 Safety and Civilized Construction

Safety disclosure before work; temporary power per code with RCDs; certified electricians; harnesses for high work; coordinated heavy lifting; no smoking, fire permits for hot work, extinguishers on site; tidy materials, clean as you go; uniforms and badges; respect customer site rules.

14.6 Finished-Product Protection

Timber-frame + cushion packaging; elevated dry storage, covered against dust/rain; protect surfaces from tool scratches, weld spatter and paint contamination; doors opened/closed gently; watch personnel before acceptance.

15. After-Sales Service

15.1 Warranty Commitment

12-month free warranty from final acceptance; free repair/parts for quality faults under normal use; quarterly follow-up calls and one free annual on-site inspection; human-caused/external/environment faults charged at cost only.

15.2 Response Mechanism

7×24 hotline; 30-minute phone response with remote troubleshooting; on-site within 24h (province) / 48h (nationwide, remote negotiable); major faults escalate with senior engineers prioritizing restoration.

15.3 Lifetime Maintenance

After warranty: lifetime maintenance at reasonable cost; original spares stocked with warranty on replacements; free lifetime technical consultation; annual maintenance agreements with inspection, care and effectiveness re-testing.

15.4 Upgrade and Expansion

Interface additions, shielding-level upgrades and internal capacity expansion supported with factory-designed customized solutions; original-factory implementation preserving performance and reliability.

15.5 Service Supervision

Service archives tracking every case; satisfaction follow-up after each service; supervision hotline for complaints and suggestions.

16. Training Plan

16.1 Training Objectives and Audience

Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.

Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.

16.2 Tiered Training Content System

Level 1: Basic operation training (1 day)

– Basic principles: system concepts, structure composition, performance indicators;

– Daily operation standards: correct operation of equipment, control and safety systems;

– Daily inspection contents: daily/weekly/monthly check items;

– Safety precautions: usage prohibitions and emergency handling procedures.

Level 2: Maintenance training (1 day)

– Detailed structure of each subsystem and working principles;

– Daily maintenance methods: cleaning, fastening checks, routine care;

– Common fault identification and simple handling;

– Emergency handling procedures for power failure, fire and equipment faults.

Level 3: Advanced management training (as needed)

– Performance influencing factors and how to avoid degradation;

– Upgrade and expansion knowledge and specification requirements;

– Relevant national standards interpretation.

16.3 Training Methods and Schedule

– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;

– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.

16.4 Training Assessment and Documentation Delivery

– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;

– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.

17. Anonymous Typical Project Scenarios

All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.

17.1 Research Institute Precision Instrument Shielding Project

Background. A provincial metrology institute’s precision electromagnetic test laboratory faced 1kHz pulsed magnetic interference from nearby power and frequency-converter equipment plus 1MHz conducted interference — causing drift and poor repeatability in high-sensitivity magnetometers and weak-signal analyzers.

Solution. Dual-layer stainless + permalloy shielded cabinet with broadband power filter, multi-channel signal feed-throughs and honeycomb waveguide ventilation; graded single-point earthing; custom internal platform and cable troughs per instrument dimensions.

Results. Third-party tests: 45dB at 1kHz, 68dB at 1MHz — meeting design requirements; data drift down 90%+; repeatability and accuracy greatly improved; metrology certification passed; stable long-run operation.

17.2 Medical Equipment Manufacturer MRI Support Shielding Project

Background. An MRI manufacturer’s data acquisition and control system was highly interference-sensitive — gradient-coil switching generated strong low-frequency pulsed fields and RF high-frequency interference causing bit errors and image artifacts.

Solution. Customized dual-layer cabinet with inner permalloy thickened to 2.0mm; multiple fiber feed-throughs and differential signal filters; redundant dual-fan cooling for 24/7 operation.

Results. Stable operation, artifacts clearly reduced, error rate near zero; passed medical EMC testing; adopted across multiple MRI product lines.

17.3 Automotive Electronics EMC Laboratory Shielding Project

Background. An automotive parts EMC lab testing vehicle controllers needed reference equipment shielded from wideband interference (1kHz to hundreds of MHz) to preserve test accuracy.

Solution. Enhanced-level dual-layer cabinet — outer stainless 2.5mm, dual permalloy inner layers; full filter suite covering CAN/LIN, analog and Ethernet signals; adjustable rails and shelves for different equipment.

Results. Laboratory-grade shielding performance; accurate reference measurements; flexible internal layout raised equipment utilization and test efficiency — highly recognized.

17.4 Industrial Automation Measurement and Control Anti-Interference Project

Background. An automotive parts production line with many servo motors, frequency converters and relays generated complex electromagnetic pulses — causing data anomalies and control misoperation in high-precision dimension inspection and PLC systems.

Solution. IP55 dual-layer cabinet with 304 shell for the dusty, oily workshop; industrial power and serial filters optimized for field interference; reinforced structure and dust-protected cooling for continuous operation.

Results. Fault/stop rate down 90%+, data anomalies and misoperation essentially eliminated; production stability and yield significantly improved; low maintenance — praised by production and maintenance departments.

18. SEO Optimization Section

All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.

18.1 Keyword System

– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;

– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;

– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;

– Brand keywords: KITOZER, Guangzhou Lain.

18.2 SEO Tag System

– Title tag: the article title — Guangzhou Lain KITOZER;

– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;

– H1 tag: the article title;

– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.

18.3 Internal Link Anchor Text

– Core anchor text: technical design solution, system construction;

– Long-tail anchor text: configuration list, technical parameters, construction plan;

– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.

19. Official Contact Information

– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Official Website: https://gdlain.com

– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)

– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China

For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.

Shopping Cart