Table of Contents
Toggle1. Cover / Document Information
– Document Title: Double-Row Enclosed Cold Aisle System Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for Double-Row Enclosed Cold Aisle System
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Project Background
With the rapid development of the digital economy, data-center computing density keeps rising and server-cabinet heat-dissipation demands keep growing. Traditional open-air supply in machine rooms suffers cold/hot air mixing, serious cooling waste and frequent local hot spots — low AC efficiency, high O&M cost, and impaired IT equipment stability and life.
The cold-aisle containment system is the core energy-saving solution for modern data centers: physically enclosing the cold-supply space in front of cabinets forces cold air through servers, greatly improving cooling efficiency and lowering room PUE. Integrated fire linkage, intelligent lighting, access management and environment-monitoring display further improve operational safety and management intelligence.
4.2 Objectives
Energy saving: complete cold/hot air separation, ≥30% higher AC efficiency, room PUE reduced 0.2-0.3.
Safety and compliance: fire linkage, electrical earthing and personnel safety per codes — passing fire and room acceptance.
Intelligent management: integrated intelligent lighting, access control, environment display and alarm indication.
High cost-effectiveness: mature economical configuration meeting all indicators while controlling investment.
4.3 Design Scope
Cold-aisle full system: main bearing structure; fixed skylights and fire-linkage flip skylights; magnetic-drive electric sliding end doors; Class-I human-sensing lighting and three-color alarm system; access control and environment-information display; strong/weak-current separated cable troughs; equipotential earthing; micro-module intelligent control system; full installation hardware. Excludes server cabinets, precision AC, distribution cabinets and room environment-monitoring hosts — seamless integration with the user’s existing systems.
4.4 Design Boundary
Cabinet spec 600×1200×2000mm; dual-row face-to-face (14 per row, 28 total); aisle net width 1200mm; aisle net height 2000mm; aisle total length 8400mm.
5. User Requirement Analysis
The solution strictly addresses the user’s 11 technical requirements item by item, all satisfied with margin for zero-deviation acceptance.
5.1 System Composition
Full cold-aisle containment: bearing structure, fixed + fire flip skylights, magnetic-driven sliding end doors, Class-I human-sensing lighting, three-color alarms, 36-inch display, face/fingerprint access control, strong/weak separated troughs, equipotential earthing, micro-module controller with fire linkage.
5.2 Key Indicators (with Margin)
Skylight opening ≥85° (req. ≥80°); aisle average illuminance ≥350lx (req. ≥330lx); fingerprint/card capacity ≥2000 (req. ≥1000); glass transmittance ≥88% (req. ≥85%); VSWR/electrical per codes; earthing ≤1Ω; door noise ≤55dB; door cycles ≥1,000,000; fire response ≤0.5s; magnetic drive (no belt) per the mandatory requirement.
5.3 Fire and Safety
Flip skylights power-loss auto-open (spring) with ≥80° opening; end-door locks power-loss-unlock; dual-mode (active DC24V / passive dry contact) fire signal; ≤0.5s response; escape without power; anti-pinch ≤150N; Class-I lighting with PE earthing.
5.4 Intelligent Functions
Human-sensing lighting (on/off with presence, 30s-30min delay); multi-mode access (face/fingerprint/password/card, combinations); environment display; three-color alarms (green normal / yellow warning / red alarm-fire); status upload to the room environment-monitoring platform.
6. Design Principles and Applicable Standards
6.1 Design Principles
Full compliance with margin: all indicators exceed requirements (20%+ margins on core items) — zero acceptance risk. Cost-effectiveness: mature economical technology (electromagnetic skylights vs. actuator, single-end display minimum, standard materials, integrated controller). Reliability: magnetic direct-drive doors (no belt), power-loss-open fire design, redundant safety. Intelligence: integrated lighting/access/display/alarm/fire linkage, environment-platform integration. Modularity: standardized modules for expansion. Safety: earthing, Class-I lighting, fire compliance, anti-pinch.
6.2 Applicable Standards
GB 50174-2017 (data center design), GB/T 2887-2011 (computer room), GB 50016 (building fire), GB 50370 (gas extinguishing), GB 15763.2 (tempered glass), GB/T 700 (carbon steel), GB/T 9286 (coating adhesion), GB 7000.1 (luminaire safety), GB 50054 (low-voltage distribution), GB 50057 (lightning), GB 50348 (security engineering), plus customer requirements.
7. System Architecture and Working Principle
7.1 Overall Architecture
The dual-row cold aisle comprises eight subsystems: main bearing structure (top longitudinal beams on cabinet tops, skylight cross beams, end sealing panels, end support columns); skylight system (fixed skylights + fire-linkage flip skylights); end door system (magnetic-drive sliding doors, support columns, lintel panels); lighting and alarm (Class-I human-sensing LED panels, three-color alarm lights); access and display (36″ industrial display, face/fingerprint access terminals, two-door controller, electric locks); cable troughs (strong/weak separated); earthing (T2 copper busbar, equipotential jumpers, down conductors); micro-module controller (fire linkage, lighting, access, alarm integration with environment-platform upload).
7.2 Working Principles
Cold air from the AC is constrained in the enclosed aisle: cabinets draw cold air from the front (aisle side) and exhaust hot air at the rear — complete cold/hot separation eliminating mixing. The skylights seal the top; on fire signal (active or dry contact via the adapter) the controller releases the electromagnetic skylights — springs push them open ≥85° within 0.5s for pressure relief and gas diffusion; the end-door electric locks power-loss-unlock and doors can be manually pushed open for evacuation. Human-sensing lighting illuminates on entry and dims after delay; the display shows aisle environment data; three-color lights indicate system status; all states upload to the environment-monitoring platform.
8. Detailed Technical Design
8.1 Main Bearing Structure
Top longitudinal beams: Q235B cold-rolled steel 80×40mm folded, ≥2.0mm; 8400mm per row; electrostatic powder coating matte black (RAL9005) 60-80μm, adhesion grade 0, impact ≥50kg·cm, salt spray ≥48h; uniform load ≥200kg/m with deflection ≤1/300; M8 galvanized bolts to cabinet tops with connecting plates; straightness ≤2mm/m (≤5mm full length), level ≤1mm/m. Skylight cross beams: Q235B welded square tube 40×40mm, wall ≥1.5mm; 1200mm long; L-type galvanized brackets to beams; 600mm spacing (one per cabinet); mid-point load ≥50kg no permanent deformation; level ≤0.5mm, adjacent height difference ≤0.3mm. End sealing panels: Q235B ≥1.2mm, 200×1200mm, folded edges; EPDM sealing strips; gap ≤0.5mm; removable. End support columns: Q235B square tube 100×50mm wall ≥2.5mm, 2000mm; expansion-bolted floor + bolted top; verticality ≤1mm/m; side load ≥200N.
8.2 Skylight and Fire-Linkage System
Fixed skylights: 600×1200×30mm; Q235B ≥1.5mm folded frame with glass slot and seal groove; 5mm float tempered glass (GB 15763.2), transmittance ≥88%; 1040g steel ball from 1m no break; fragment ≥40 pieces/50×50mm; neutral silicone bonding + EPDM foam gasket; closed IP54; ≤18kg; A-grade non-combustible; top-removable, silicone sealed. Fire flip skylights: 600×1200×50mm; Q235B ≥2.0mm with ribs; same 5mm tempered glass; electromagnetic-hold drive with spring reset — normal closed, power-loss release with spring push-open; opening ≥85° (req. ≥80°); response ≤0.5s; dual-mode trigger (active DC24V / passive dry contact); manual press reset ≤30s; DC24V, hold ≤15W, standby ≤0.5W; insulation ≥100MΩ; ≥10,000 cycles; closed gap ≤0.3mm, leakage ≤1%; rounded anti-pinch edges; dry-contact status feedback to environment monitoring; 304 stainless hinges.
8.3 Magnetic-Drive End Door System
Sliding door assembly: 1500×2000mm, clear passage ≥1000mm; Q235B ≥2.0mm frame, matte black; 8mm tempered glass window 1000×1800mm, transmittance ≥88%; permanent-magnet synchronous linear motor direct drive — no belt, gear or cable (fully compliant with the no-belt mandate); open speed 0.2-0.5m/s, close 0.2-0.4m/s; noise ≤55dB at 1m; EPDM brush + rubber seals with floor sweep, closed gap ≤0.5mm; AC220V±10%, ≤120W, standby ≤5W, class B; access/manual/fire-linkage control; anti-pinch rebound ≤150N; open/close modes; anodized aluminum rail (straightness ≤0.5mm/m); nylon-coated hanger wheels ≥100kg each; ≥1,000,000 cycles; power-loss-unlock electric plug lock (stroke ≥15mm, force ≥500N); manual push-open for evacuation. Lintel panel: Q235B ≥1.2mm, 1500×300mm, hidden wiring and display bracket; clip + bolt removable.
8.4 Lighting and Alarm System
Class-I LED human-sensing panel lights (6): Class-I with PE terminal per GB 7000.1; 600×300×30mm embedded in skylight frames; SMD 2835, 4000K, Ra≥80; 36W, ≥3600lm, ≥100lm/W, AC220V, PF≥0.9; average aisle illuminance ≥350lx at 2.0m (req. ≥330lx); PIR sensing ≥5m, 120°, delay 30s-30min adjustable; steel frame + acrylic diffuser; LED life ≥50,000h; 3C certified; -10℃~45℃. Three-color alarm lights (2): red/yellow/green LEDs, steady or flashing (frequency adjustable); dry-contact control — green normal, yellow warning (e.g. T/H exceedance), red serious/fire; DC24V ≤10W; visible ≥30m; LED life ≥100,000h; aisle-end top mounting.
8.5 Access and Display System
36″ industrial display (1): TFT-LCD, 1920×1080, 300cd/m², 1000:1, 178°/178°, ≤8ms; RJ45 + RS485 + HDMI; displays environment data (aisle T/H, differential pressure, rack intake temperature, AC status, alarms, door status) with customizable interface; AC220V ≤50W; metal housing; backlight ≥50,000h. Face/fingerprint access terminal (2): face + fingerprint + password + IC card, combination authentication; fingerprint ≥2,000 (req. ≥1,000), cards ≥2,000 (req. ≥1,000), face ≥500; records ≥100,000; fingerprint ≤0.5s, face ≤1s; FAR ≤0.001%, FRR ≤0.1%; 2.8″ TFT, IR fill for night face; TCP/IP, RS485, Weigand 26/34; DC12V ≤5W; IP54; wall mount at end-door columns. Two-door controller (1): 2 doors, 2 Weigand reader ports; 10,000 card permissions, 100,000 events; TCP/IP with remote management; 4 dry inputs (fire, exit button, door magnetic), 2 relay outputs; time zones, permission groups, anti-passback, fire-linkage open, offline with auto upload; DC12V; DIN rail in cabinet. IC cards (20): M1 ISO14443A, FM11RF08, 8Kbit/16 sectors, 13.56MHz, 2-5cm, ≥100,000 reads, ≥10-year retention. Electric plug locks (2): power-loss-unlock per fire codes; stroke ≥15mm, force ≥500N; DC12V, 300mA start / 100mA hold; door-magnetic feedback; ≥500,000 cycles. Exit buttons (2): 86-type, NO contact, 3A/250VAC.
8.6 Cable Trough and Earthing System
Strong/weak troughs (17m each): galvanized steel 100×50mm, wall ≥1.0mm, closed with clip-on covers; uniform load ≥50kg/m; fittings (couplings, elbows, tees, end caps, drop outlets, brackets); salt spray ≥72h; strong/weak troughs parallel with ≥50mm separation for physical isolation. Earthing: T2 copper main busbar 30×3mm (≥99.95% purity, ≥97% IACS, ≥300A, bolted laps ≥2× width, insulated brackets on beams, 17m); BVR-6mm² green-yellow equipotential jumpers (60m) with OT tin-plated terminals (contact ≤0.01Ω) connecting all metal parts (skylight frames, troughs, doors, columns) to the busbar; BVR-16mm² down conductor (10m) to the room grid — overall earthing ≤1Ω.
8.7 Micro-Module Intelligent Control System
Integrated controller (1): 32-bit ARM; 8 dry inputs (active/passive: fire, door magnetic, alarm, presence), 8 relay outputs 5A/250VAC (skylights, lighting, alarms, locks); 2 RS485 (Modbus) + 1 RJ45 (TCP/IP); AC220V±15% ≤15W; skylight fire linkage (instant open on fire signal), intelligent lighting (presence-linked, timed/manual), access linkage (door status, fire open), alarm indication (three-color logic), status collection and upload; MTBF ≥50,000h; DIN rail; -10℃~60℃. Fire signal adapter (1): active DC24V or passive dry-contact input; opto-isolated dry output; response ≤10ms; DC24V; DIN rail.
8.8 Auxiliaries
Galvanized fastener kit (M6/M8/M10 bolts/nuts/washers, anchors, self-tapping, rivets, 4.8 grade, 10% margin); sealing/dressing materials (neutral silicone, fire-stop putty ≥3h, nylon ties, insulation tape ≥5000V); labels (device plates, cable labels, safety warnings).
9. Recommended Configuration and Preliminary Budget
9.1 Structure
Top longitudinal beams (Q235B 80×40×2.0, 8400mm) ×2; skylight cross beams (40×40×1.5, 1200mm, 600mm spacing) ×28; end sealing panels ×2; end support columns ×4; lintel panels ×2.
9.2 Skylight System
Fixed skylights (600×1200, 5mm tempered) ×26; fire flip skylights (electromagnetic, ≥85°) ×2; EPDM gaskets and silicone.
9.3 Lighting and Alarm
Class-I LED human-sensing panels (36W, 4000K, 600×300) ×6; three-color alarm lights (DC24V) ×2.
9.4 Access and Display
36″ industrial display ×1; face/fingerprint access terminals ×2; two-door controller ×1; IC cards ×20; electric plug locks ×2; exit buttons ×2.
9.5 Cable Troughs
Strong trough 100×50 galvanized ×17m; weak trough ×17m; fittings ×34 sets.
9.6 Earthing
T2 copper busbar 30×3 ×17m; BVR-6 equipotential jumpers ×60m; DT-6 terminals ×80; BVR-16 down conductor ×10m.
9.7 Control
Micro-module integrated controller ×1; fire signal adapter ×1; RVVP 8×0.75 signal cable ×150m; BV 2.5 power cable ×100m.
9.8 Auxiliaries
Fastener kit, sealing/dressing kit, label kit ×1 each.
9.9 Quotation Notes
The above is the 28-bay dual-row low-configuration compliant configuration; final quotation per confirmed configuration, tax-inclusive. All prices are indicative and quoted in RMB (CNY) only — no foreign-currency conversion is provided. Warranty: 12 months whole system (24 months core components — magnetic drive, controller, display), semi-annual inspections in warranty, 7×24 support, lifetime maintenance at parts cost.
10. Technical Specifications
10.1 Main Bearing Structure
| Item | Specification |
|---|---|
| Top longitudinal beam | Q235B cold-rolled 80×40mm folded ≥2.0mm; 8400mm/row; matte black powder 60-80μm (grade 0 adhesion, ≥50kg·cm impact, ≥48h salt spray); uniform load ≥200kg/m, deflection ≤1/300; M8 galvanized to cabinet tops; straightness ≤2mm/m (≤5mm full), level ≤1mm/m |
| Skylight cross beam | Q235B welded square tube 40×40mm wall ≥1.5mm; 1200mm; 600mm spacing; L-brackets; mid load ≥50kg no permanent deformation; level ≤0.5mm, adjacent diff ≤0.3mm |
| End sealing panel | Q235B ≥1.2mm; 200×1200mm; folded edges; EPDM strips; gap ≤0.5mm; removable |
| End support column | Q235B square tube 100×50mm wall ≥2.5mm; 2000mm; floor expansion + top bolted; verticality ≤1mm/m; side load ≥200N |
| Lintel panel | Q235B ≥1.2mm; 1500×300mm; hidden wiring + display bracket; clip + bolt |
10.2 Skylight System
Fixed skylight: 600×1200×30mm; Q235B ≥1.5mm frame; 5mm float tempered glass (GB 15763.2), transmittance ≥88%; 1040g ball 1m no break; fragments ≥40/50×50mm; silicone + EPDM seal; closed IP54; ≤18kg; A-grade; top-removable.
Fire flip skylight: 600×1200×50mm; Q235B ≥2.0mm with ribs; 5mm tempered glass; electromagnetic hold + spring release; opening ≥85°; response ≤0.5s; active DC24V / passive dry-contact trigger; manual reset ≤30s; DC24V hold ≤15W / standby ≤0.5W; insulation ≥100MΩ; ≥10,000 cycles; closed gap ≤0.3mm, leakage ≤1%; rounded anti-pinch edges; dry-contact status feedback; 304 hinges; 0℃~50℃.
10.3 Magnetic-Drive End Door
| Item | Specification |
|---|---|
| Door assembly | 1500×2000mm, clear passage ≥1000mm; Q235B ≥2.0mm frame; 8mm tempered glass 1000×1800mm transmittance ≥88% |
| Drive | PMSM linear motor direct drive — no belt/gear/cable; open 0.2-0.5m/s, close 0.2-0.4m/s; noise ≤55dB @1m |
| Sealing | EPDM brush + rubber seals + floor sweep; closed gap ≤0.5mm |
| Electrical | AC220V±10% 50Hz; ≤120W, standby ≤5W; class B |
| Control | Access/manual/fire-linkage; anti-pinch ≤150N; open/close modes |
| Rail/hangers | Anodized aluminum rail (straightness ≤0.5mm/m); nylon-coated wheels ≥100kg each |
| Life | ≥1,000,000 cycles |
| Lock | Power-loss-unlock plug lock; stroke ≥15mm, force ≥500N; door-magnetic feedback |
| Emergency | Manual push-open for evacuation |
10.4 Lighting and Alarm
Class-I LED panel (6): Class-I with PE terminal (GB 7000.1); 600×300×30mm; SMD 2835, 4000K, Ra≥80; 36W, ≥3600lm, ≥100lm/W, AC220V, PF≥0.9; aisle average ≥350lx @2.0m (req. ≥330lx); PIR ≥5m, 120°, 30s-30min delay; steel frame + acrylic diffuser; ≥50,000h; 3C; -10℃~45℃.
Three-color alarm (2): red/yellow/green; steady/flash adjustable; dry-contact control (green normal, yellow warning, red serious/fire); DC24V ≤10W; ≥30m visible; ≥100,000h.
10.5 Access and Display
36″ display: 1920×1080 TFT-LCD; 300cd/m²; 1000:1; 178°; ≤8ms; RJ45 + RS485 + HDMI; environment data display (T/H, differential pressure, intake temp, AC status, alarms, door status) customizable; AC220V ≤50W; backlight ≥50,000h. Access terminal (2): face/fingerprint/password/card with combinations; fingerprint ≥2,000, cards ≥2,000 (req. ≥1,000), face ≥500; records ≥100,000; fingerprint ≤0.5s, face ≤1s; FAR ≤0.001%, FRR ≤0.1%; 2.8″ TFT + IR fill; TCP/IP/RS485/Weigand 26/34; DC12V ≤5W; IP54. Two-door controller: 2 doors, 2 Weigand; 10,000 permissions, 100,000 events; TCP/IP; 4 dry in, 2 relay out; time zones, anti-passback, fire-linkage open, offline upload; DC12V; DIN rail. IC cards (20): M1 ISO14443A; 8Kbit/16 sectors; 13.56MHz; ≥100,000 reads. Plug locks (2): power-loss-unlock; stroke ≥15mm, force ≥500N; DC12V; ≥500,000 cycles. Exit buttons (2): 86-type NO, 3A/250VAC.
10.6 Cable Troughs and Earthing
Troughs (17m each): galvanized 100×50×1.0mm closed with clip covers; load ≥50kg/m; full fittings; salt spray ≥72h; strong/weak separation ≥50mm. Earthing: T2 copper 30×3mm (≥99.95%, ≥97% IACS, ≥300A) 17m on insulated brackets; BVR-6 green-yellow jumpers 60m with OT terminals (≤0.01Ω) for all metal parts; BVR-16 down conductor 10m; overall ≤1Ω.
10.7 Micro-Module Control
Controller: 32-bit ARM; 8 dry in (active/passive), 8 relay out 5A/250VAC; 2 RS485 Modbus + RJ45 TCP/IP; AC220V±15% ≤15W; skylight fire linkage, lighting control, access linkage, three-color alarm logic, status collection/upload; MTBF ≥50,000h; DIN rail; -10℃~60℃. Fire adapter: active DC24V or dry contact in; opto-isolated dry out; ≤10ms; DC24V; DIN rail. Cables: RVVP 8×0.75 shielded (≤1000m); BV 2.5 (450/750V).
10.8 Auxiliaries
Galvanized fasteners (4.8 grade, 10% margin); neutral silicone, fire-stop putty (≥3h), ties, insulation tape (≥5000V); device/cable/safety labels.
11. Key Advantages and Customer Value
11.1 Full-Parameter Compliance — Zero Acceptance Risk
100% coverage of tender requirements with 20%+ margins on core indicators (skylight ≥85° vs. 80°; illuminance ≥350lx vs. 330lx; capacities ≥2000 vs. 1000; transmittance ≥88% vs. 85%; earthing ≤1Ω) — one-pass acceptance.
11.2 High Cost-Effectiveness
Electromagnetic skylights save 40%+ vs. actuator solutions while fully meeting fire codes; single-end display minimum meeting parameters; standard materials and processes; integrated controller reducing hardware and wiring complexity.
11.3 Magnetic Direct-Drive Doors — Reliable, Maintenance-Free
PMSM linear-motor direct drive without belts — fault rate down 80%+, ≤55dB noise, ≥1,000,000 cycles, near-zero maintenance — fully compliant with the no-belt mandate.
11.4 Power-Loss-Open Design — Absolute Fire Safety
Skylights spring-open and door locks power-loss-unlock on fire signal or outage — no UPS dependency; ≤0.5s response for gas-extinguishing pressure relief; dual-mode signals compatible with all fire systems.
11.5 Full Containment — Significant Energy Saving
Sealing gaps ≤0.5mm, leakage ≤2%; AC efficiency +30%+, PUE -0.2~0.3; local hot spots eliminated; IT stability improved; short payback.
11.6 Intelligent Integration — Convenient O&M
Lighting, access, display, alarms and fire linkage integrated; human-sensing lighting saves 70%+ lighting energy; multi-mode access; visualized environment data; three-color alarms; environment-platform integration.
11.7 Modular Design — Flexible Expansion
Extend aisles by adding beams, skylights and trough modules; independent function modules upgradeable; standard parts easily sourced; short on-site schedule.
11.8 Source-Factory Service
Free survey/design/cost estimation; own production base with controllable quality and timely delivery; professional installation; 7×24 support; free in-warranty repair, lifetime maintenance.
12. Technical Q&A (50+ Items)
12.1 Basics
Q1: What is a cold-aisle containment system?
A: The core energy-saving retrofit for data centers: enclosing the cold-supply aisle above and at both ends forces cold air through servers (front intake, rear exhaust), preventing cold/hot mixing — higher cooling efficiency, lower AC energy.
Q2: Dual-row vs. single-row?
A: Dual-row (two facing cabinet rows) is the most common, most efficient form; single-row (one row against a wall/partition) suits space-limited small rooms. This solution is the standard dual-row enclosed type.
Q3: What is the standard aisle width?
A: Industry-standard 1200mm net width — enough for passage and maintenance while controlling volume and maintaining cold-air static pressure; this solution uses 1200mm.
Q4: How much energy can containment save?
A: Typically ~30% higher cooling efficiency and PUE -0.2~0.3; for 28 cabinets at 3kW each, tens of thousands of CNY saved annually; payback 2-3 years.
Q5: Does containment affect cooling?
A: No — it improves it: constrained cold air gives stable pressure and even per-cabinet airflow, eliminating local hot spots.
Q6: Will tight sealing cause oxygen shortage?
A: No — the aisle is not fully airtight (seams vent); personnel enter only briefly; end doors open anytime — safe.
12.2 Fire Linkage
Q7: Why must the cold aisle have openable skylights?
A: Per data-center and fire codes, the enclosed aisle is a confined space — during gas extinguishing, pressure rises sharply; openable skylights auto-open on fire trigger for pressure relief and gas diffusion — a mandatory safety facility.
Q8: Electromagnetic vs. actuator skylights?
A: Electromagnetic — power-loss spring-open, ≤0.5s response, low cost, high reliability, manual reset; actuator — electric open/reset, remote control, but costlier, slower (2-3s), power-dependent (UPS needed). This solution uses electromagnetic — the high-value compliant choice.
Q9: Which fire signals are supported?
A: Active DC24V level and passive dry contact — both supported by the standard fire-signal adapter, compatible with all mainstream fire systems.
Q10: Do skylights open on power failure? Will cold air leak?
A: Yes — they spring open for fire safety (power-loss design). In normal operation power is present and they stay sealed; on room outage the AC also stops — no cooling-leak issue; safety outranks energy.
Q11: Why require opening ≥80°?
A: Larger opening = larger relief area = better pressure relief; 80° is the fire-code minimum; this solution opens ≥85° with margin.
Q12: How is fire linkage tested?
A: Simulate the fire signal (active/dry) at acceptance — all flip skylights open ≤0.5s, end-door locks unlock; verified with records.
12.3 End Doors
Q13: Why is belt drive prohibited?
A: Belts are friction components — aging, slack, breakage, slip; high fault rate, regular replacement, noise — against room quiet/high-reliability requirements; direct drive is the premium standard.
Q14: How does magnetic drive work?
A: The linear motor drives the door directly via electromagnetic force between stator and mover — no intermediate transmission: smooth, quiet, no wear parts, long life, precise speed, sensitive rebound.
Q15: Why tempered glass?
A: 3-5× the strength of ordinary glass, shatters into small blunt particles — safe per room codes; high transmittance for viewing inside.
Q16: What does ≥85% transmittance mean?
A: Ordinary glass ~85%, quality tempered ≥88% — ensuring visibility and lighting; this solution ≥88%.
Q17: Can the door be opened manually on power failure?
A: Yes — power-loss-unlock lock and manual push-open support evacuation; plus fire-linkage auto-open.
Q18: How is anti-pinch ensured?
A: Rebound function triggers at ≤150N force; edges rounded; safety verified during commissioning.
12.4 Lighting
Q19: What is a Class-I luminaire and why mandatory?
A: Basic insulation + protective earthing — metal housing connected to PE; on insulation failure current discharges to ground preventing shock; mandatory for room electrical safety as personnel enter the aisle.
Q20: What does 330lx mean?
A: Per GB 50034, general lighting for main machine rooms is 300-500lx; 330lx meets the minimum; this solution delivers ≥350lx.
Q21: What are the benefits of human-sensing lighting?
A: On with presence, off after delay — 70%+ lighting energy saving versus always-on, longer luminaire life — a green-room standard.
Q22: Is the delay adjustable?
A: Yes — 30s to 30min per usage habits, avoiding frequent switching during short visits.
12.5 Access and Display
Q23: Which authentication methods?
A: Face, fingerprint, password and IC card independently or in any combination — configurable per security level.
Q24: Why such large capacity margins?
A: Accommodates later personnel/permission growth without device replacement; larger capacity also means stronger processors, faster and more stable recognition.
Q25: What can the display show? Is it customizable?
A: Environment data (T/H, differential pressure, voltage/current, alarms, door status) via the environment-monitoring system; interface customizable (logo, layout).
Q26: Is the display mandatory?
A: Per tender requirement ≥36″ at the lintel; it visualizes aisle environment data — operators grasp status without entering, improving management efficiency.
12.6 Earthing and Cabling
Q27: Why earthing for the cold aisle?
A: Many metal parts — earthing prevents static damage to electronics and leakage shock; all metal parts must conduct to the earthing grid.
Q28: What earthing resistance is required?
A: Room combined earthing ≤1Ω per GB 50057 and data-center standards; this system achieves ≤1Ω.
Q29: Why separate strong/weak troughs?
A: Strong-current fields interfere with weak network/control signals (packet loss, instability); physical separation is a wiring-code requirement.
Q30: Why galvanized troughs?
A: Rust/corrosion resistance, strength, long life — the standard room trough material; the zinc layer also assists earthing.
12.7 Construction and O&M
Q31: How long does installation take?
A: 3-5 working days on site (structure 2, equipment/wiring 1, commissioning 1, acceptance prep 0.5) plus 2 days acceptance; adjustable per site.
Q32: What site conditions are needed?
A: Cabinets installed and fixed, level floor, temporary power, fire-signal interface reserved; confirmed by pre-construction survey.
Q33: What routine maintenance is needed?
A: Quarterly inspection — skylight open/reset function, door smoothness/noise, seal aging, earthing connections, lighting and alarm functions.
Q34: What is the warranty?
A: 12 months whole system, 24 months core components (magnetic drive, controller, display); lifetime maintenance at parts cost only; annual maintenance agreements available.
Q35: Can people walk on the top?
A: No — the top bears skylights, troughs and cables, not personnel; use ladders for top equipment; never step on skylights or beams.
Q36: Can cabinets be added later?
A: Yes — modular: extend beams and add skylights/trough modules; existing structure continues in use.
12.8 Value and Service
Q37: How is acceptance verified?
A: Item-by-item indicator verification (skylight angle, illuminance, capacities, transmittance, earthing ≤1Ω), fire-linkage demo, 72h trial run and documentation — signed acceptance.
Q38: What inspections are provided?
A: Semi-annual free inspections in warranty — full system status, cleaning, hazard elimination, reports.
Q39: What spares are supported?
A: Long-term preferential supply of all standard parts; core spares stocked; lifetime availability.
Q40: What training is provided?
A: One-day on-site training at acceptance (theory + hands-on: lighting, access, display, skylight reset, door operation, inspection, fault finding) with manuals and free refreshers.
Q41: What documentation is delivered?
A: Operation/maintenance manual, as-built drawings, test records (fire linkage, earthing, illuminance), acceptance documents and certificates.
Q42: Why choose the KITOZER/Lain solution?
A: Source factory, 20+ years of room engineering, full-parameter compliant design, cost-effective configuration, local fast response and complete after-sales.
Q43: Can it integrate with the existing environment-monitoring platform?
A: Yes — controller uploads all statuses via Modbus/TCP; display pulls data from the environment system; seamless integration.
Q44: How is data security ensured?
A: Physical access control (multi-mode auth), electrical earthing, and monitoring display without data exposure — standard room security.
Q45: What are the power and noise characteristics?
A: Door ≤120W (standby ≤5W), skylights ≤15W hold, lighting 36W each; door noise ≤55dB — quiet room operation.
Q46: How is the 72h trial run conducted?
A: Continuous powered operation with stability observation, issue rectification, parameter optimization, then formal acceptance.
Q47: What makes this solution future-proof?
A: Modular expansion, standard replaceable parts, integrated intelligent control and open platform interfaces — long-term value without rebuilding.
Q48: How is cold-air leakage minimized?
A: EPDM seals at skylight joints (≤0.3mm gaps), door brush/rubber seals with floor sweep (≤0.5mm), sealed end panels — leakage ≤2%.
Q49: Are the materials environmentally friendly?
A: Standard steel with powder coating, EPDM/rubber seals, neutral silicone — RoHS-aligned materials; no hazardous emissions.
Q50: What is the overall investment payback?
A: With ~30% cooling-efficiency gain and PUE reduction, typical payback 2-3 years for 28-bay deployments; higher density shortens it further.
13. Construction Schedule
13.1 Overall Schedule
Total 7 calendar days for the 28-bay dual-row cold aisle: 5 days on-site construction/commissioning and 2 days acceptance documentation.
13.2 Detailed Schedule
| Stage | Work | Duration | Responsible | Precondition |
|---|---|---|---|---|
| 1. Preparation | Drawing review, disclosure, stocking, tool calibration, crew entry | 1 day | PM | Contract signed |
| 2. Survey/positioning | Site dimension re-check, cabinet positioning, floor level, point marking | 0.5 day | Technical lead | Cabinets installed |
| 3. Main structure | Longitudinal beams, cross beams, end columns, leveling/correction | 1.5 days | Construction lead | Survey done |
| 4. Skylight system | Fixed + flip skylights, seals, silicone | 1 day | Crew | Structure accepted |
| 5. End door system | Rail, door hanging, drive, lock, door commissioning | 1 day | Crew | Columns installed |
| 6. Wiring/equipment | Troughs, lighting, access, display, controller | 1 day | Electrician | Structure complete |
| 7. Earthing | Busbar, jumpers, down conductor, resistance test | 0.5 day | Electrician | Parallel with wiring |
| 8. Integration test | Energization, subsystem functions, fire linkage, permissions, parameters | 1 day | Technical lead | All installed |
| 9. Self-check/cleanup | Full self-check, rectification, cleanup, labels, documentation | 0.5 day | PM | Commissioned |
| 10. Acceptance/training | Customer acceptance, documentation, training, handover | 0.5 day | PM | Self-check passed |
13.3 Schedule Assurance
Factory-prefabricated components with outbound inspection — on-site assembly only; experienced crew with clear division and line flow; daily plan review with adjustment; advance coordination with the customer (contact person, site issues); sufficient calibrated tools/instruments; three-inspection quality ensuring one-pass processes without rework.
14. Construction Organization and Quality/Safety Measures
14.1 Organization
PM (1): overall coordination, schedule, quality, both-party liaison, acceptance. Technical lead (1): disclosure, on-site guidance, commissioning, problem solving, training. Workers (3): structure, equipment and electrical installation. Safety officer (part-time, 1): safety management, disclosure, hazard inspection.
14.2 Pre-Construction Preparation
Technical: drawing review defining requirements, installation standards and acceptance codes; detailed plan and work instructions with full disclosure; site dimensions and cabinet model/size/position verified; power and fire-signal interfaces confirmed. Materials: all factory-prefabricated per list with outbound QC; incoming acceptance (spec/qty/quality documents) — unqualified prohibited; classified storage with protection. Tools/instruments: impact drill, hand drill, wrench/screwdriver sets, cutter, caulk gun, ladders; level, tape, multimeter, earth-resistance tester, illuminance meter — all calibrated.
14.3 Core Construction Processes
Total flow: survey → positioning → beams → cross beams → columns → skylights → end doors → troughs → equipment → earthing → wiring → commissioning → self-check → acceptance.
Structure: clean cabinet tops, mark holes per drawings; install beams leveled (straightness ≤2mm/m), bolt-fixed; cross beams at 600mm (level ≤1mm); end columns vertical via plumb (≤1mm/m), floor anchors + top connection; overall dimension check and full tightening.
Skylights: install flip-skylight hinges and electromagnetic mechanisms on beams; install fixed and flip skylights with even gaps; continuous EPDM gaskets; neutral silicone at joints; manually test open/reset (≥85°).
End doors: install rails leveled and straight; hang the door, adjust wheel clearance for smooth running; install the magnetic drive, wire and commission speed/travel; install lock, readers, exit button; test rebound; install lintel panel and display.
Electrical: install strong/weak troughs firmly and straight; run power and signal cables in separate troughs (never shared); tidy binding with slack and labels; firm terminal crimping with proper insulation; all metal housings earthed.
Commissioning: insulation test before energization; per-device tests (lighting, access, display, alarms); controller parameters (sensing delay, permissions, alarm logic); fire-linkage test (simulated fire signal — skylights open, doors unlock); earthing ≤1Ω; illuminance ≥330lx; 72h continuous trial run.
14.4 Quality Control
Three-inspection system (self, mutual, handover) per process; key processes (structure, fire linkage, earthing) with photo records; materials with certificates inspected before use; strict national codes and drawings — no arbitrary changes; product protection during work.
14.5 Safety Management
Pre-entry safety education and disclosure with assessment; high work ≥2m with harnesses and supervised ladders; code-compliant temporary power with leakage protection, wiring by certified electricians, no random wiring; fire equipment, no open flames, safe flammable storage; warning signs and restricted zones; daily pre-shift safety checks.
15. After-Sales Service
15.1 Warranty Commitment
12 months whole system from acceptance; 24 months core components (magnetic drive, controller, display); free repair/replacement of non-human, non-force-majeure faults; free firmware upgrades and technical consultation; semi-annual free on-site inspections in warranty.
15.2 Response
7×24 hotline; solution within 30 minutes with remote guidance; on-site 4h urban / 8h suburban, faults resolved within 24h; backup devices for major faults.
15.3 In-Warranty Services
Semi-annual inspections (full system status, cleaning, hazard elimination, reports); fault repair with free part replacement; lifetime technical consultation; free firmware upgrades; free training for new staff.
15.4 Post-Warranty
Lifetime maintenance at parts cost only (no labor fee); annual maintenance agreements (periodic inspection, preventive maintenance, priority response); long-term preferential spares; upgrade/expansion services.
15.5 Service Flow
Report (phone/WeChat) → register → 30-min remote diagnosis → on-site if needed → repair → customer confirmation → follow-up and archive.
16. Training Plan
16.1 Objectives
Customer O&M staff fully master cold-aisle principles, operation, daily maintenance and common fault finding — independent daily management and simple handling.
16.2 Audience
Room O&M staff and electricians (2-3 recommended).
16.3 Training Content
Theory (half day): system composition, working principles, subsystem functions; national standards and fire requirements; skylight fire-linkage principle, magnetic-door principle, access principle; maintenance content/cycle/notes.
Practice (half day): lighting operation (switch, sensing delay setting, luminaire replacement); access operation (permissions, card issue/cancel, password, records); display operation (interface, data, parameters); skylight manual reset and fire test; door manual opening, emergency unlock, speed adjustment; daily inspection items and anomaly judgment; simple fault finding and handling.
16.4 Methods
On-site hands-on training with real equipment; operation/maintenance manual delivered; Q&A session; practical assessment ensuring mastery.
16.5 Schedule and Follow-Up
One day at acceptance (adjustable); free training for new staff anytime; supplementary training after upgrades; ongoing phone/WeChat guidance.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.
17.1 Internet Company IDC Computer Room Cold-Aisle Project
Project background. An internet company’s IDC room with 4kW per cabinet needed cooling-efficiency improvement; open air supply caused cold/hot mixing and high energy cost.
Implementation. 42-bay dual-row enclosed cold aisle with magnetic-drive sliding end doors, electromagnetic fire flip skylights, intelligent human-sensing lighting, face/fingerprint access control and a 36-inch environment display.
Results. Room PUE from 1.8 to 1.52 with significant energy saving; stable operation passing fire acceptance in one pass; convenient O&M with visibly improved cooling efficiency.
17.2 Government Cloud Data Center Cold-Aisle Project
Project background. A government cloud data center with high security requirements needed full cold/hot separation and stable equipment environments.
Implementation. 56-bay dual-row cold aisle with high-end actuator skylights, dual-end displays, face-recognition access and integrated environment monitoring.
Results. Complete cold/hot isolation eliminating local hot spots; stable equipment temperature with greatly improved reliability; met Class-3 classified-protection and government-room acceptance standards.
17.3 Enterprise Computer Room Retrofit Cold-Aisle Project
Project background. A small/medium enterprise room retrofit with limited budget needed low-cost cold-aisle containment.
Implementation. 24-bay dual-row cold aisle with economical electromagnetic skylights, single-end access and basic lighting — a high-value configuration.
Results. Low-cost containment with 32% cooling-efficiency gain; AC set-point raised 2℃; annual electricity saving ~50,000 CNY; payback ~2.5 years.
17.4 Hospital Information Center Cold-Aisle Project
Project background. A hospital core room with extremely high reliability requirements needed a high-seal cold aisle with redundant safety.
Implementation. 32-bay dual-row cold aisle with medical-grade high-seal design, dual power backup and double fire-linkage protection.
Results. Zero-fault operation safeguarding HIS, PACS and other core systems; passed health-industry room acceptance; highly recognized by the customer.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.