Preface

This manual has been compiled in accordance with *GB/T 50719-2011 Technical Code for Electromagnetic Shielding Room Engineering*, *GB/T 12190-2006 Measuring Methods for Shielding Effectiveness of Electromagnetic Shielding Enclosures*, *GB/T 37429-2019 General Specification for Electromagnetic Shielding Ventilation Devices*, and the BMB series standards issued by the National Administration for the Protection of State Secrets. It serves as the sole official technical guidance document for the installation, wiring, commissioning, acceptance, maintenance, and troubleshooting of the LA-BD series electromagnetic shielding waveguide windows produced by Guangzhou Lain Intelligent System Development Co., Ltd.

As a core ventilation and shielding component within the electromagnetic shielding auxiliary materials and accessories system, the electromagnetic shielding waveguide window is a critical device that balances electromagnetic shielding integrity with indoor ventilation and heat dissipation requirements. This manual comprehensively covers the full lifecycle technical requirements of the product, aiming to provide engineering contractors, system integrators, end users, and maintenance personnel with standardized and regulated operational references, ensuring that after installation the product achieves the required shielding effectiveness, maintains stable ventilation performance, and meets design service life requirements.

This manual contains fifteen core chapters: Product Introduction, Product Composition, Product List, Product Principle, Product Technical Parameters, Product Functions and Features, Product Application Scenarios, Product Installation, Product Wiring, Product Commissioning, Product Precautions, Product Repair and Maintenance, Product Common Problems and Solutions, Product QA, and Product Acceptance. The full text contains detailed technical specifications, clear operational procedures, and well-defined acceptance criteria, and may be used directly as an engineering construction guidance document and operation and maintenance management manual.

All installation, commissioning, and repair operations must be performed by professionally trained electromagnetic shielding engineering technicians. Please read this manual in full before operation and strictly follow the relevant process requirements and safety regulations. The manufacturer assumes no responsibility for product performance degradation, shielding failure, or safety accidents caused by improper operation.

Chapter 1 Product Introduction

1.1 Product Definition

The electromagnetic shielding waveguide window, also known as a cutoff waveguide ventilation window or cellular shielding ventilation window, is a passive electromagnetic shielding device designed based on the electromagnetic wave cutoff transmission principle. It belongs to the ventilation-type shielding product category within the electromagnetic shielding auxiliary materials and accessories classification. It consists of a large number of parallel-arranged metal waveguide cells forming a honeycomb structure, which allows free air circulation to satisfy indoor ventilation and heat dissipation requirements while producing strong attenuation of electromagnetic waves below the waveguide cutoff frequency, thereby blocking electromagnetic signals from leaking out or penetrating in through ventilation openings. It is an essential supporting component for enclosed shielding spaces such as shielded computer rooms, confidential rooms, EMC anechoic chambers, and military shielding compartments.

The LA-BD series electromagnetic shielding waveguide windows manufactured by Guangzhou Lain Intelligent System Development Co., Ltd. utilize high-precision honeycomb core forming technology and all-metal integrated welded construction, covering broadband electromagnetic shielding requirements from 10kHz to 40GHz, with maximum shielding effectiveness exceeding 110dB and ventilation efficiency ≥75%. Product performance complies with national Class A, B, C, and D four-level shielding standards, and the products are widely used in classified information systems, national defense and military applications, medical MRI facilities, data centers, scientific research and testing, and many other fields.

1.2 Industry Development Background

With the rapid development of electronic information technology, the electromagnetic environment has become increasingly complex. On one hand, classified information systems, precision electronic equipment, and high-sensitivity detection instruments have ever-increasing requirements for electromagnetic protection, necessitating enclosed shielding spaces to isolate external electromagnetic interference and prevent internal sensitive signal leakage. On the other hand, equipment operating within shielding spaces continuously generates heat that must be dissipated through ventilation systems; otherwise, equipment temperature rise may lead to performance degradation or even failure and damage.

Traditional louvers and metal mesh vents cannot meet high-frequency electromagnetic shielding requirements, providing less than 30dB shielding effectiveness above 1GHz, which is completely inadequate for classified and high-precision protection scenarios. Against this backdrop, electromagnetic shielding waveguide windows based on the waveguide cutoff principle emerged as the optimal solution to resolve the contradiction between “shielding integrity” and “ventilation and heat dissipation requirements.”

According to the industry white paper published by the China Electronic Standardization Institute in 2024, the domestic electromagnetic shielding ventilation waveguide window market has achieved a compound annual growth rate of 12.3%, with the market size surpassing RMB 2.86 billion in 2024 and projected to climb to RMB 5.64 billion by 2030. With the proliferation of 5G/6G communications, accelerated data center construction, military informatization upgrades, and increasingly stringent national information security standards, electromagnetic shielding waveguide windows are rapidly evolving from single-function ventilation shielding devices toward high-integration, wide-band, long-life, and environment-adaptive solutions.

1.3 Product Classification

The LA-BD series electromagnetic shielding waveguide windows can be classified according to different dimensions to meet diverse application requirements:

1.3.1 Classification by Core Material

Aluminum Electromagnetic Shielding Waveguide Windows (LA-BD-A Series): Both the core and outer frame are made of high-quality rust-resistant aluminum alloy, offering light weight, moderate cost, and excellent electrical conductivity. The surface is treated with conductive oxidation or tin plating. Suitable for conventional indoor shielded computer rooms, confidential rooms, and standard EMC testing chambers in dry, low-corrosion environments. This is currently the most widely used category in the market.

Copper Electromagnetic Shielding Waveguide Windows (LA-BD-C Series): The core is made of red copper or brass, and the outer frame is made of copper-clad steel plate or pure copper plate. These offer excellent electrical conductivity, superior low-frequency shielding performance, and good electromagnetic pulse (EMP) resistance. Suitable for military command compartments, electromagnetic pulse protection rooms, high-precision electromagnetic testing laboratories, and other demanding applications.

Stainless Steel Electromagnetic Shielding Waveguide Windows (LA-BD-S Series): Both the core and outer frame are made of 304/316L stainless steel, providing exceptional corrosion resistance and stable long-term operation in harsh environments including salt spray, high humidity, and chemical corrosion. Suitable for coastal shielded computer rooms, shipboard shielding compartments, chemical plant explosion-proof shielding rooms, and outdoor shielding cabinets.

1.3.2 Classification by Shielding Level

Class B Shielding Waveguide Windows: Shielding effectiveness ≥80dB across 150kHz~10GHz. Suitable for general commercial confidentiality and general industrial electromagnetic protection scenarios.

Class C Shielding Waveguide Windows: Shielding effectiveness ≥100dB across 14kHz~18GHz. Complies with the National Administration for the Protection of State Secrets Class C shielding standards. Suitable for classified information system computer rooms, confidential meeting rooms, and conventional military shielding rooms.

Class D Shielding Waveguide Windows: Shielding effectiveness ≥100dB across 10kHz~40GHz. Meets the highest classification of classified protection and military standards. Suitable for top-secret confidential rooms, high-end EMC anechoic chambers, radar signal shielding compartments, and other core protection scenarios.

1.3.3 Classification by Installation Type

Flange-Type Electromagnetic Shielding Waveguide Windows: Equipped with mounting flanges around the perimeter, secured by bolts to pre-cut openings in shielding walls or cabinet panels. Easy to install with reliable sealing; this is the most mainstream installation form.

Welded-Type Electromagnetic Shielding Waveguide Windows: Without border flanges, welded directly into integral assembly with the shielding steel plate. Provides better shielding continuity with no bolt-gap leakage risk. Suitable for welded shielding rooms and high-grade shielding compartments.

Embedded Electromagnetic Shielding Waveguide Windows: The entire unit is embedded into a pre-machined slot in the shielding wall, with the surface flush with the wall face. Offers superior aesthetics. Suitable for confidential meeting rooms and exhibition shielding spaces where interior finishing quality is a priority.

1.3.4 Classification by Functional Integration

Standard Ventilation Waveguide Windows: Provide only basic ventilation and shielding functions. These are the standard configured products.

Dust-Proof Filter Type Waveguide Windows: Integrate primary/medium-efficiency air filter media, achieving air purification in addition to ventilation and shielding. Suitable for laboratories and data centers with higher cleanliness requirements.

Anti-Condensation Waveguide Windows: Incorporate PTC heating elements and temperature sensors, automatically heating to prevent condensation in waveguide apertures under low-temperature conditions. Suitable for environments with high humidity, low temperature, and large temperature differentials.

Fan-Integrated Waveguide Windows: Integrate low-radiation axial fans for active forced ventilation. Suitable for shielding cabinets and small shielding rooms with high heat generation where natural ventilation cannot meet heat dissipation requirements.

1.4 Product Implementation Standards

The design, production, and testing of LA-BD series electromagnetic shielding waveguide windows strictly comply with the following national and industry standards:

  • GB/T 50719-2011 *Technical Code for Electromagnetic Shielding Room Engineering*
  • GB/T 12190-2006 *Measuring Methods for Shielding Effectiveness of Electromagnetic Shielding Enclosures*
  • GB/T 37429-2019 *General Specification for Electromagnetic Shielding Ventilation Devices*
  • BMB19-2006 *Technical Requirements for Hierarchical Protection of Information Systems Involving State Secrets*
  • GJB 5792-2006 *General Specification for Military Electromagnetic Shielding Rooms*
  • GB 8702-2014 *Controlling Limits for Electromagnetic Environment*
  • GB/T 2423 Series *Environmental Testing for Electric and Electronic Products*

1.5 Product Market Positioning and Advantages

As a professional domestic supplier of electromagnetic shielding equipment and integrated computer room solutions, Guangzhou Lain Intelligent System Development Co., Ltd. has established its LA-BD series electromagnetic shielding waveguide windows as mainstream selected products in the domestic shielding engineering sector, owing to high-precision craftsmanship, stable performance specifications, and a comprehensive after-sales service system. The core advantages of the products lie in strict compliance with the dual quality system of national standards and military standards. Every production batch undergoes factory shielding effectiveness testing to ensure actual performance is consistent with rated parameters. Additionally, full custom sizing is supported, enabling personalized design based on customer opening dimensions, shielding levels, and environmental conditions, perfectly matching the requirements of various shielding engineering projects.

Chapter 2 Product Composition

The LA-BD series electromagnetic shielding waveguide windows feature a modular integrated structure, primarily comprising five core components: the honeycomb waveguide core, the mounting outer frame flange, the conductive sealing gasket, fastening connectors, and the protective mesh cover. Certain functional products also include auxiliary functional modules (filter module, heating module, fan module). All components work in coordination to achieve electromagnetic shielding, ventilation and heat dissipation, structural support, and environmental protection functions.

2.1 Honeycomb Waveguide Core

The honeycomb waveguide core is the core functional component of the electromagnetic shielding waveguide window, determining the product’s fundamental performance indicators including shielding effectiveness, ventilation efficiency, and cutoff frequency.

2.1.1 Structural Configuration

The core is formed by a large number of thin-walled metal tubes with regular hexagonal cross-sections, tightly arranged and welded together to create a honeycomb-like porous structure. Each hexagonal channel constitutes an independent cutoff waveguide cell. All waveguide cell axes are parallel and perpendicular to the plane of the waveguide window. The regular hexagonal structure is the optimal geometric configuration balancing structural strength, material utilization, and ventilation area. Compared with rectangular or circular channels, the hexagonal structure offers higher ventilation efficiency per unit cross-sectional area, greater structural stability, and lower welding difficulty.

2.1.2 Material Selection

Depending on the product series, the core material falls into three categories: aluminum alloy, red copper, and stainless steel:

  • Aluminum Alloy Core: Made of 3003/5052 series rust-resistant aluminum foil, 0.2~0.5mm thickness. Good electrical conductivity, light weight, easy to process, and controllable cost. This is the preferred material for conventional scenarios.
  • Red Copper Core: Made of T2 red copper foil, 0.15~0.4mm thickness. Higher electrical conductivity than aluminum alloy, providing superior low-frequency magnetic field shielding, along with excellent thermal conductivity and electromagnetic pulse resistance.
  • Stainless Steel Core: Made of 304/316L stainless steel foil, 0.2~0.6mm thickness. High mechanical strength and exceptional corrosion resistance, capable of withstanding harsh environments including salt spray, acid, and alkali.

2.1.3 Forming Process

The core is formed using the vacuum brazing process, which is the critical process ensuring the electrical continuity and structural strength of the waveguide core:

1. Metal foil is stamped into hexagonal corrugated strips using dedicated molds;

2. The corrugated strips are stacked and aligned layer by layer, with special brazing filler metal applied;

3. The assembly is placed in a vacuum brazing furnace where the filler metal melts in a high-temperature, oxygen-free environment, achieving metallurgical bonding at all contact points;

4. After cooling, the assembly is cut and machined to the designed thickness, forming a complete honeycomb core.

Compared with traditional soldering or adhesive bonding processes, vacuum brazed cores achieve full metallic fusion at all nodes, resulting in excellent electrical conductivity continuity, zero contact resistance, and more stable shielding effectiveness. Additionally, the structural strength is high, with superior vibration resistance, impact resistance, and longer service life.

2.1.4 Surface Treatment

After core machining is completed, surface conductive treatment is required to further enhance electrical conductivity and corrosion resistance:

  • Aluminum Core: Chemical conductive oxidation or tin plating treatment, with oxidation film thickness ≥3μm and tin plating thickness ≥5μm, ensuring surface contact resistance ≤0.01Ω/cm².
  • Copper Core: Tin or nickel plating treatment to prevent copper oxidation and discoloration, improving soldering compatibility and surface conductivity.
  • Stainless Steel Core: Passivation treatment or chemical polishing to remove the surface oxide layer, ensuring electrical conductivity while enhancing corrosion resistance.

2.2 Mounting Outer Frame Flange

The outer frame flange serves as the structural support and installation connection component of the waveguide window, used to secure the honeycomb core and achieve reliable connection with the shielding wall or cabinet panel.

2.2.1 Structural Composition

The outer frame flange is generally formed by integrated bending or welding, comprising two parts: the frame body and the flange edge:

  • Frame Body: A rectangular (or custom-shaped) metal frame that internally nests and secures the honeycomb core. The frame depth matches the core thickness, providing full peripheral protection to the core.
  • Flange Edge: A flat strip extending outward along the perimeter of the frame, with evenly distributed mounting holes for bolting the waveguide window in place.

2.2.2 Materials and Process

The outer frame flange material is typically matched or compatible with the core material to ensure similar electrochemical potential and avoid galvanic corrosion:

  • Standard Aluminum Waveguide Windows: Formed by bending and welding 6061 aluminum alloy plate, with flange thickness 2~5mm and frame body thickness 1.5~3mm.
  • Steel/Stainless Steel Waveguide Windows: Formed by welding cold-rolled steel plate or stainless steel plate, with flange thickness 3~6mm, surface galvanized or copper-plated.

Flange fabrication uses CNC laser cutting for hole creation, ensuring mounting hole position accuracy within ±0.1mm. Full penetration welding is applied at all four corner welds, followed by grinding and smoothing to ensure no burrs or cold welds, guaranteeing structural strength and electrical continuity.

2.2.3 Flange Standards

Standard product flange dimensions follow common industrial standards, and non-standard flanges can also be customized per customer requirements:

  • Universal Flat Flange: The most commonly used form, with equal-width flange edges on all four sides and circular through-holes for bolt and nut fastening.
  • Pressure Strip Flange: No pre-drilled holes; secured on site with pressure strips and self-tapping screws. Suitable for retrofit projects where mounting hole positions are uncertain.
  • Duct Connection Flange: Features a duct connection spigot that allows direct connection to ventilation ducting. Suitable for shielding treatment of central air conditioning ventilation systems.

2.3 Conductive Sealing Gasket

The conductive sealing gasket is a sealing component installed between the waveguide window flange and the shielding structure, designed to fill microscopic gaps between the two surfaces, achieve electrical continuity, and prevent electromagnetic waves from leaking through mounting gaps. It is a critical auxiliary material for ensuring overall shielding effectiveness.

2.3.1 Common Types and Characteristics

The LA-BD series waveguide windows are equipped with the following three types of conductive sealing gaskets, selectable according to application scenario:

Conductive Rubber Gasket

  • Structure: Silicone rubber matrix filled with conductive particles such as silver-plated glass beads, silver-plated aluminum powder, or pure copper powder, extruded into rectangular, round, or D-shaped cross-sections.
  • Characteristics: Combines electrical conductivity with elastic sealing capability. Waterproof and dustproof. Minimum contact resistance is achieved at 20%~30% compression. Suitable for most indoor conventional scenarios.
  • Parameters: Volume resistivity ≤0.01Ω·cm, hardness 40~60 Shore A, operating temperature -40°C~120°C.

Beryllium Copper Spring Finger Gasket

  • Structure: Continuous elastic spring fingers stamped from beryllium bronze strip, secured in rubber or metal retaining channels.
  • Characteristics: Excellent electrical conductivity, good elasticity, long fatigue life, and superior high-frequency shielding performance compared to conductive rubber. Suitable for high-grade shielding and high-frequency protection scenarios.
  • Parameters: Contact resistance ≤0.005Ω, insertion/withdrawal life ≥10,000 cycles, operating temperature -55°C~200°C.

Stainless Steel Wire Mesh Gasket

  • Structure: Braided stainless steel wire mesh wrapped around a foamed silicone core, forming a rectangular cross-section gasket.
  • Characteristics: Lower cost, large compression range, suitable for mounting surfaces with less-than-ideal flatness and cost-sensitive general shielding applications.
  • Parameters: Shielding effectiveness ≥60dB, operating temperature -40°C~150°C.

2.3.2 Installation Forms

Gaskets are typically installed using adhesive backing or retaining channel fixation:

  • Adhesive Backing Type: The gasket has conductive pressure-sensitive adhesive on the back, allowing direct adhesion into the sealing groove of the waveguide window flange. Easy to install, suitable for products with sealing grooves on the flange.
  • Retaining Channel Type: A dedicated retaining channel is machined into the flange, and the gasket is embedded into the channel for fixation. Higher reliability, suitable for vibration and high-temperature environments.

2.4 Fastening Connectors

Fastening connectors are used to secure the waveguide window flange to the shielding structure while ensuring reliable electrical connection. These include bolts, nuts, flat washers, spring washers, and other hardware.

2.4.1 Material Selection

Fastener materials must be compatible with the flange material to prevent galvanic corrosion while ensuring electrical conductivity:

  • Aluminum Flange: Matched with nickel-plated stainless steel bolts or aluminum alloy bolts to avoid galvanic corrosion from dissimilar metal contact.
  • Steel/Stainless Steel Flange: Matched with 304/316 stainless steel bolts or galvanized carbon steel bolts.

2.4.2 Specifications and Spacing

Fastener specifications are selected based on waveguide window dimensions:

  • Small waveguide windows below 300mm: M5 or M6 bolts, hole spacing ≤80mm.
  • Medium waveguide windows 300~800mm: M6 or M8 bolts, hole spacing ≤100mm.
  • Large waveguide windows above 800mm: M8 or M10 bolts, hole spacing ≤120mm.

Bolt spacing strictly follows electromagnetic shielding specifications to ensure close contact between the flange and the shielding structure with no visible gap leakage. In general, the higher the frequency, the smaller the required bolt spacing. For high-frequency scenarios, spacing shall be controlled within λ/20 (where λ is the wavelength of the corresponding frequency electromagnetic wave).

2.5 Protective Mesh Cover

The protective mesh cover is installed on the outer side or both sides of the waveguide window to prevent debris, insects, and dust from entering and clogging the waveguide apertures, while also preventing accidental human contact with the waveguide core. It is a safety protection and auxiliary protective component.

2.5.1 Structure and Material

  • Mesh Body: Perforated mesh stamped from galvanized steel plate or stainless steel plate, or woven metal mesh. Aperture size is typically 3~5mm, ensuring ventilation is not affected while blocking large-particle debris.
  • Frame: Matches the waveguide window outer frame, secured to the flange via clips or screws. Removable for convenient cleaning and maintenance.

2.5.2 Configuration Principles

  • Indoor environments: Generally only the outer side is equipped with a protective mesh; the inner side may be omitted.
  • Outdoor/ceiling installation in equipment rooms: Protective mesh is installed on both sides to prevent rodents, insects, and dust ingress.
  • Clean environments: May be replaced with primary-efficiency filter media mesh, providing both protection and filtration functions.

2.6 Auxiliary Functional Modules (Optional)

2.6.1 Air Filter Module

Composed of a filter media frame and G3/G4 grade primary-efficiency filter media, installed on the air intake side of the waveguide window. It filters dust, hair, and other large-particle pollutants from the air, with filtration efficiency ≥80% (for 5μm particles). The filter media can be periodically replaced for convenient maintenance.

2.6.2 Anti-Condensation Heating Module

Composed of a PTC constant-temperature heating element, temperature sensor, and control module, installed on the inner side of the waveguide window. When the ambient temperature falls below the set value (default 5°C), heating automatically activates to raise the waveguide core temperature, preventing condensation on the inner walls of the channels that could degrade electrical conductivity and cause metal corrosion. Heating power is customized based on waveguide window dimensions, typically 50~200W, operating voltage AC220V.

2.6.3 Axial Fan Module

Integrates a low-electromagnetic-radiation brushless axial fan, installed on the inner or outer side of the waveguide window for forced ventilation and heat dissipation. The fan undergoes special EMC treatment to ensure low self-electromagnetic radiation without causing electromagnetic leakage through the waveguide window. Fan airflow rate is matched to the waveguide window dimensions, available from 100m³/h to 2000m³/h.

Chapter 3 Product List

3.1 Standard Product Configuration List

Using the LA-BD-A-C300 (aluminum, Class C, 300×300mm flange-type) electromagnetic shielding waveguide window as an example, the standard configuration list is as follows:

No. Component Name Specification/Model Qty Unit Remarks
1 Waveguide window main body LA-BD-A-C300, external dimensions 360×360×50mm, opening dimensions 300×300mm 1 Unit Includes honeycomb core and outer frame flange, aluminum with tin plating treatment
2 Conductive sealing gasket Conductive rubber, rectangular cross-section 6×4mm, perimeter 1320mm 1 Strip Adhesive backing type, pre-applied in the flange sealing groove
3 Fastening bolt kit M6×20mm nickel-plated stainless steel bolts, with flat washers, spring washers, and nuts 20 Set Standard flange hole configuration, hole spacing 90mm
4 Outer protective mesh 304 stainless steel perforated mesh, 360×360mm 1 Piece Clip-on installation
5 Product certificate / 1 Sheet Includes factory test number
6 Installation and operation manual This manual 1 Copy Paper version
7 Factory test report / 1 Copy Includes shielding effectiveness sampling data

3.2 Full Series Product Specification Configuration Notes

All LA-BD series models follow the standard configuration logic of “main body + sealing gasket + fasteners + protective mesh + documentation.” Different specifications differ only in component dimensions and quantities:

  • Dimension Specification Series: Standard sizes include 200×200mm, 300×300mm, 400×400mm, 500×500mm, 600×600mm, 800×800mm, 1000×500mm, 1200×600mm, etc. Custom rectangular, circular, and irregular shapes can also be manufactured based on customer opening dimensions.
  • Shielding Level Configuration: The higher the level, the greater the waveguide core thickness, the smaller the honeycomb aperture, the denser the fastener spacing, and the higher the grade of sealing gasket. For example, Class D products are equipped with beryllium copper spring finger gaskets as standard, with bolt spacing ≤80mm; Class B products are equipped with conductive rubber gaskets as standard, with bolt spacing ≤120mm.
  • Material Series Configuration: Stainless steel series fasteners are upgraded to 316L stainless steel, and gaskets are upgraded to corrosion-resistant conductive rubber, adapted for harsh corrosive environments.

3.3 Optional Accessories List

No. Accessory Name Applicable Scenario Available Specification Range
1 Inner protective mesh Scenarios requiring dual-side protection Matches corresponding waveguide window model
2 Primary-efficiency filter media assembly Cleanliness and dust protection scenarios G3/G4 grade, matches all sizes
3 PTC anti-condensation heating assembly Low-temperature high-humidity condensation-prone scenarios 50W/100W/150W/200W, AC220V
4 Low-radiation axial fan assembly Forced ventilation and heat dissipation scenarios Airflow 100~2000m³/h, AC220V/DC24V
5 Special conductive adhesive Installation sealing gap filling Silver-copper conductive adhesive, nickel conductive adhesive
6 Spare conductive gasket Maintenance and replacement backup Specifications corresponding to each size
7 Special installation tool kit On-site construction support Torque wrench, surface cleaning kit, feeler gauge

3.4 Special Commissioning Tool List (User-Supplied or Optional)

The following professional tools are required for product installation and commissioning and should be provided by the construction unit:

  • Electromagnetic Shielding Effectiveness Tester: For on-site shielding effectiveness testing, frequency coverage 10kHz~18GHz.
  • Spectrum Analyzer + Signal Generator + Antenna: For high-precision leakage point identification and performance testing.
  • Ground Resistance Tester: Accuracy ≤0.01Ω, for testing grounding system resistance.
  • Digital Megohmmeter: 500V range, for insulation resistance testing.
  • Anemometer/Airflow Capture Hood: For ventilation performance testing.
  • Torque Wrench: Range 5~50N·m, for bolt tightening torque control.
  • Feeler Gauge: 0.02~1mm range, for detecting installation gaps.
  • Surface Resistance Tester: For testing electrical continuity of conductive contact surfaces.
  • Laser Level / Steel Tape Measure: For installation positioning and dimension verification.
  • Cleaning Tools: Anhydrous ethanol, lint-free wipes, wire brush, compressed air gun.

Chapter 4 Product Principle

The core operating principle of the electromagnetic shielding waveguide window is based on the cutoff transmission characteristics of electromagnetic waves in metal waveguides. When the frequency of an electromagnetic wave is below the waveguide cutoff frequency, the wave cannot propagate effectively through the waveguide and rapidly attenuates along the waveguide depth direction, thereby achieving electromagnetic shielding. Meanwhile, air, as a non-electromagnetic medium, passes through the waveguide channels unhindered, achieving the ventilation function. This chapter elaborates on the waveguide cutoff principle, shielding effectiveness calculation methods, and factors affecting performance, starting from fundamental electromagnetic theory.

4.1 Basic Theory of Electromagnetic Waves and Waveguides

4.1.1 Propagation Characteristics of Electromagnetic Waves

Electromagnetic waves are oscillatory particle waves generated by mutually perpendicular electric and magnetic fields propagating and radiating through space. They propagate in wave form and have three fundamental parameters: frequency, wavelength, and propagation velocity. The relationship between the three is:

c = f × λ

Where:

  • c is the speed of light, approximately 3×10⁸ m/s;
  • f is the electromagnetic wave frequency, in Hz;
  • λ is the electromagnetic wavelength, in m.

The higher the frequency, the shorter the wavelength, and the stronger the penetration capability of the electromagnetic wave, making it easier to leak through small apertures and gaps. Conversely, low-frequency electromagnetic waves have longer wavelengths and stronger diffraction capability, but aperture leakage is relatively weaker.

4.1.2 Definition and Classification of Metal Waveguides

A metal waveguide is a wave-guiding structure composed of a hollow metal tube that guides electromagnetic waves along the tube axis. Based on cross-sectional shape, waveguides can be classified as rectangular waveguide, circular waveguide, hexagonal waveguide, etc. The propagation of electromagnetic waves within a waveguide exhibits the critical characteristic of “cutoff frequency”: only electromagnetic waves with frequencies above the cutoff frequency can propagate through the waveguide as traveling waves. Electromagnetic waves with frequencies below the cutoff frequency attenuate exponentially and cannot be effectively transmitted. This state is called the “cutoff state,” and a waveguide in the cutoff state is called a “cutoff waveguide.”

The electromagnetic shielding waveguide window precisely exploits this characteristic. By designing reasonable waveguide dimensions so that all electromagnetic wave frequencies requiring shielding fall below the waveguide cutoff frequency, the waveguide channels become “attenuation channels” for electromagnetic waves, achieving the shielding effect.

4.2 Cutoff Frequency Calculation

The cutoff frequency is the core parameter of a waveguide, determined by the cross-sectional shape and dimensions of the waveguide. Different cross-sectional shapes have different cutoff frequency calculation formulas.

4.2.1 Rectangular Waveguide Cutoff Frequency

The rectangular waveguide is the most fundamental waveguide form. The cutoff frequency formula for its dominant mode (TE₁₀ mode) is:

fc = c / (2a)

Where:

  • fc is the cutoff frequency, in Hz;
  • a is the broad-side dimension of the rectangular waveguide, in m;
  • c is the speed of light.

From the formula, it is evident that the smaller the waveguide broad-side dimension, the higher the cutoff frequency, and the wider the range of electromagnetic wave frequencies that can be shielded.

4.2.2 Circular Waveguide Cutoff Frequency

The cutoff frequency formula for the dominant mode (TE₁₁ mode) of a circular waveguide is:

fc = (1.841 × c) / (2πD) ≈ 0.293c / D

Where D is the inner diameter of the circular waveguide, in m.

Converted to common engineering units (D in inches, fc in MHz), the formula simplifies to:

fc ≈ 6900 / D

4.2.3 Regular Hexagonal Waveguide Cutoff Frequency

Individual channels of honeycomb waveguide windows are regular hexagons. Their cutoff characteristics can be equivalently treated as a circular waveguide with equal inscribed circle diameter. The equivalent diameter method is commonly used in engineering:

If the distance between opposite sides of the regular hexagon (inscribed circle diameter) is W, the equivalent cutoff frequency is approximately:

fc ≈ 0.293c / W

With units unified to the International System of Units (SI).

A commonly used simplified empirical formula in engineering (W in mm, fc in GHz):

fc ≈ 88 / W

For example, a waveguide window with a honeycomb aperture distance between opposite sides of 3.2mm has a cutoff frequency of approximately 27.5GHz, meaning all electromagnetic waves below 27.5GHz are in the cutoff state within this waveguide and will experience significant attenuation.

4.3 Shielding Effectiveness Calculation

Shielding Effectiveness (SE) is the core indicator for measuring shielding capability, expressed in decibels (dB). It is defined as the logarithmic ratio of incident wave field strength to transmitted wave field strength:

SE = 20·lg(Ei/Et) = 20·lg(Hi/Ht)

Where Ei and Hi are the incident electric and magnetic field strengths, and Et and Ht are the transmitted electric and magnetic field strengths.

For cutoff waveguides, when the operating frequency is far below the cutoff frequency (f ≪ fc), the attenuation of electromagnetic waves within the waveguide increases exponentially with waveguide length. The shielding effectiveness calculation formula is:

4.3.1 Circular Cutoff Waveguide Shielding Effectiveness

SE = 32 × (L/D) (dB)

Where:

  • L is the waveguide length (i.e., waveguide window thickness/core depth), in the same units as D;
  • D is the waveguide diameter.

This formula is an engineering empirical formula applicable to scenarios where f < fc/5. In this case, attenuation is approximately proportional to length and inversely proportional to diameter.

4.3.2 Hexagonal Honeycomb Waveguide Shielding Effectiveness

In engineering, the equivalent distance between opposite sides is used for calculation, with the simplified formula:

SE = K × (L/W)

Where:

  • W is the distance between opposite sides of the hexagon (aperture size);
  • L is the waveguide core thickness;
  • K is a coefficient, typically 27~32, varying slightly with frequency and material.

From this, the core conclusions can be drawn:

  • The smaller the waveguide aperture, the higher the shielding effectiveness;
  • The greater the waveguide thickness, the higher the shielding effectiveness;
  • In conventional design, the waveguide thickness L is generally 3~5 times the aperture size W, achieving shielding effectiveness of 60~100dB or higher.

For example, a honeycomb core with an aperture of 3.2mm and thickness of 16mm, calculated with K=30, yields a shielding effectiveness of approximately 30 × (16/3.2) = 150dB. In actual engineering, due to installation gaps, process defects, and other factors, the overall shielding effectiveness will be somewhat reduced, typically rated at approximately 100dB.

4.4 Key Factors Affecting Shielding Effectiveness

The actual shielding effectiveness of electromagnetic shielding waveguide windows is not determined solely by theoretical calculations; it is also influenced by multiple factors including materials, processes, installation, and environment.

4.4.1 Structural Parameter Factors

  • Honeycomb Aperture: The core factor determining the cutoff frequency and baseline shielding effectiveness. The smaller the aperture, the higher the cutoff frequency, and the stronger the shielding effectiveness at the same thickness. However, ventilation resistance also increases, reducing ventilation efficiency. Therefore, selection must balance shielding frequency band and ventilation requirements.
  • Core Thickness: The greater the thickness, the longer the electromagnetic wave attenuation path, and the higher the shielding effectiveness. However, product weight, cost, and airflow resistance all increase. Conventional Class C products typically have a thickness of 4~5 times the aperture size, while Class D products can reach 6~8 times.
  • Channel Arrangement Density: The thinner the honeycomb structure wall, the higher the opening ratio and the better the ventilation efficiency. However, overly thin walls reduce structural strength and welding reliability and may degrade high-frequency shielding performance.

4.4.2 Material and Process Factors

  • Material Conductivity: The electrical conductivity of the waveguide material directly affects wall losses and reflection losses. Higher conductivity yields better shielding effectiveness. The conductivity ranking of copper > aluminum > stainless steel corresponds to the shielding effectiveness ranking, with the difference being particularly pronounced in the low-frequency band.
  • Core Weld Quality: Poor welding of the honeycomb core, including cold welds or detached welds, creates gaps between waveguide cells, resulting in additional electromagnetic leakage with particularly significant impact at high frequencies. Vacuum brazing weld quality is far superior to ordinary soldering and is a mandatory process for high-grade products.
  • Surface Treatment Quality: Surface oxidation, oil contamination, and insulating coatings increase contact resistance and reduce shielding effectiveness. Good conductive surface treatment is the foundation for ensuring performance. In high-humidity and high-salt environments, the long-term stability of anti-corrosion coatings must also be considered.

4.4.3 Installation and Sealing Factors

  • Flange Fit: Gaps between the waveguide window flange and the shielding structure mounting surface become primary electromagnetic leakage paths. The larger and longer the gap, the more severe the leakage. According to electromagnetic shielding theory, gap leakage is proportional to gap length and exponential to gap height.
  • Conductive Gasket Performance: The conductivity, compression, and continuity of the gasket directly determine the sealing effect of the mounting surface. Gasket breakage, insufficient compression, and surface contamination all lead to excessive local contact resistance and leakage.
  • Fastener Spacing and Torque: Excessive bolt spacing or insufficient tightening torque causes the flange edges to fit loosely, creating gaps. Excessive torque may cause flange deformation, paradoxically increasing gaps.

4.4.4 Environmental and Usage Factors

  • Environmental Corrosion: Humid, salt spray, acid, and alkali environments cause oxidation and corrosion of metal surfaces, forming insulating oxide layers that degrade electrical conductivity and cause year-over-year shielding effectiveness decline. Stainless steel or nickel-plated products demonstrate far superior long-term stability compared to ordinary aluminum products.
  • Channel Blockage: Dust, oil, and debris blocking waveguide channels destroy the structural integrity of the waveguide while absorbing moisture and accelerating corrosion, leading to reduced shielding effectiveness.
  • Mechanical Damage: Impact and compression causing core deformation or weld cracking directly create leakage paths, severely affecting shielding performance.

4.5 Ventilation Performance Principle

While achieving electromagnetic shielding, the electromagnetic shielding waveguide window must also ensure air circulation. Its ventilation performance is jointly determined by the opening ratio, airflow resistance coefficient, and core thickness.

4.5.1 Opening Ratio

The opening ratio, also known as the ventilation area ratio, is the ratio of effective ventilation area to the total area of the waveguide window. The opening ratio of regular hexagonal honeycomb structures can reach 85% or higher. After deducting wall thickness and outer frame occupied area, the overall ventilation efficiency is typically between 70%~80%, far higher than metal mesh or perforated plate structures at the same shielding effectiveness.

4.5.2 Airflow Resistance Characteristics

Air flowing through honeycomb channels experiences friction resistance along the path. The resistance is related to flow velocity, channel length, and aperture size. The smaller the aperture and the greater the thickness, the higher the airflow resistance, and the lower the ventilation volume at the same static pressure. The airflow resistance calculation follows the fluid mechanics friction loss formula:

ΔP = λ × (L/De) × (ρv²/2)

Where λ is the friction resistance coefficient, De is the equivalent diameter, ρ is the air density, and v is the airflow velocity.

The LA-BD series waveguide windows undergo computational fluid dynamics optimization to minimize airflow resistance while ensuring shielding effectiveness, thereby maximizing ventilation efficiency. For standard products at a face velocity of 2m/s, airflow resistance is ≤15Pa, well below the industry average.

4.6 Analysis of Honeycomb Structure Advantages

Compared to single-aperture waveguides, rectangular aperture arrays, and circular aperture arrays, the regular hexagonal honeycomb structure offers multiple advantages, making it the mainstream structure for electromagnetic shielding waveguide windows:

  • Highest Ventilation Efficiency: The hexagonal structure achieves the most compact arrangement, providing the highest opening ratio per unit area, the lowest airflow resistance, and the best ventilation effect.
  • Optimal Structural Strength: The hexagon is a naturally stable structure. Honeycomb cores possess extremely high specific strength and specific stiffness, with light weight, and excellent compression and impact resistance.
  • Uniform Shielding Performance: All channels are of identical dimensions with unified cutoff frequencies, providing uniform shielding performance across the entire frequency band with no obvious weak points.
  • Mature and Reliable Process: The honeycomb core brazing process is highly mature, enabling high-volume, high-precision production with excellent product consistency.
  • Economical Cost-Effectiveness: High material utilization and mature processing technology result in a lower comprehensive cost than other high-performance shielding ventilation structures.

Chapter 5 Product Technical Parameters

The technical parameters of the LA-BD series electromagnetic shielding waveguide windows cover five major categories: structural dimensions, shielding performance, ventilation performance, mechanical performance, and environmental adaptability. All parameters have undergone standardized laboratory testing and can serve as direct references for product selection, design, and acceptance.

5.1 Model Naming Convention

The LA-BD series product model naming follows the rules below for rapid product attribute identification:

LA - BD - □ - □ - □□□
 │    │    │    │    └── Nominal size (mm, e.g., 300 represents 300×300mm opening)
 │    │    │    └─────── Shielding level (B/C/D)
 │    │    └─────────── Material (A=Aluminum, C=Copper, S=Stainless Steel)
 │    └──────────────── Waveguide window series code
 └───────────────────── Lain brand code

Example: LA-BD-A-C500 indicates the Lain brand waveguide window series, aluminum material, Class C shielding, 500×500mm opening dimensions.

5.2 Core Performance Parameter Summary Table

5.2.1 Performance Parameter Comparison by Shielding Level

Parameter Category Parameter Item Class B Class C Class D Test Conditions
Shielding Effectiveness 14kHz~150kHz Magnetic Field ≥70dB ≥90dB ≥100dB GB/T 12190 small loop antenna method
150kHz~1GHz Plane Wave ≥80dB ≥100dB ≥105dB Dipole antenna method
1GHz~10GHz Microwave ≥80dB ≥100dB ≥105dB Horn antenna method
10GHz~18GHz Microwave ≥70dB ≥95dB ≥100dB Horn antenna method
18GHz~40GHz Microwave – ≥85dB ≥95dB Millimeter-wave antenna method
Cutoff Frequency Typical cutoff frequency ≥12GHz ≥28GHz ≥60GHz Equivalent calculated value
Honeycomb Parameters Standard opposite-side aperture 6.4mm 3.2mm 1.6mm Regular hexagon opposite-side distance
Standard core thickness 20mm 16mm 12mm Custom thickening available
Ventilation Performance Ventilation efficiency ≥78% ≥75% ≥72% Effective ventilation area / total area
Airflow resistance (2m/s face velocity) ≤10Pa ≤15Pa ≤25Pa Normal temperature and pressure
Mechanical Parameters Core compressive strength ≥2MPa ≥2.5MPa ≥3MPa Flat surface static pressure
Vibration resistance 10~2000Hz, 10g, no damage Same as left Same as left GJB 150.16
Shock resistance 15g, 11ms, half-sine wave Same as left Same as left GJB 150.18
Environmental Parameters Operating temperature -40°C~85°C -40°C~85°C -40°C~85°C Standard type
Storage temperature -55°C~120°C -55°C~120°C -55°C~120°C /
Relative humidity ≤95% (no condensation) ≤95% (no condensation) ≤95% (no condensation) At 30°C
Salt spray resistance (stainless steel) – – 1000h no rust GB/T 2423.17

5.2.2 Performance Differences by Material

Comparison Item Aluminum (A Series) Copper (C Series) Stainless Steel (S Series)
Electrical conductivity Good Excellent Fair
Low-frequency shielding effect Good Excellent Fair
High-frequency shielding effect Excellent Excellent Excellent
Weight Light Medium Heavy
Corrosion resistance Fair (requires surface treatment) Good Excellent
Cost Low Relatively high High
Welding difficulty Easy Medium Difficult
Typical application scenarios Standard computer rooms, confidential rooms Military, EMP protection, high-precision laboratories Coastal, chemical, outdoor, shipboard

5.3 Standard Dimensional Specifications

The following are the standard dimensional parameters for the LA-BD-A-C series (Aluminum, Class C), which are available for direct model selection:

Model Opening Size (mm) Flange Dimensions (mm) Flange Thickness (mm) Total Thickness (mm) Honeycomb Aperture (mm) Core Thickness (mm) Ventilation Area (m²) Reference Weight (kg) Number of Bolts
LA-BD-A-C200 200×200 260×260 3 22 3.2 16 0.03 1.2 12
LA-BD-A-C300 300×300 360×360 3 22 3.2 16 0.0675 2.5 20
LA-BD-A-C400 400×400 470×470 3 22 3.2 16 0.12 4.2 24
LA-BD-A-C500 500×500 570×570 4 24 3.2 16 0.1875 6.8 28
LA-BD-A-C600 600×600 680×680 4 24 3.2 16 0.27 9.5 32
LA-BD-A-C800 800×800 880×880 5 26 3.2 16 0.48 16.2 40
LA-BD-A-C1005 1000×500 1080×580 4 24 3.2 16 0.375 11.3 36
LA-BD-A-C1206 1200×600 1280×680 5 26 3.2 16 0.54 17.5 44

Notes:

  • All dimensions can be customized according to customer requirements. The maximum single-unit size can reach 2000×1000mm; larger dimensions can be achieved using a spliced structure.
  • Class B products feature a 6.4mm aperture and a 20mm core thickness. For the same size, they are slightly lighter and offer higher ventilation efficiency.
  • Class D products feature a 1.6mm aperture and a 12mm core thickness. For the same size, they are slightly heavier and have greater airflow resistance.
  • The weight of the stainless steel series is approximately 2.5 times that of the aluminum product of the same size; the copper series is approximately 2 times.

5.4 Electrical Performance Parameters

  • Contact Resistance: Contact resistance between the flange sealing surface and the core surface ≤ 0.01 Ω/cm², ensuring electrical continuity.
  • Grounding Resistance: Overall product grounding resistance ≤ 0.1 Ω (after reliable connection with the shielding enclosure).
  • Insulation Resistance (for models with electric auxiliary heating/fan): Insulation resistance between power input terminal and housing ≥ 100 MΩ (DC 500V).
  • Dielectric Strength (for models with electric auxiliary heating/fan): Withstands AC 1500V/1min between power input terminal and housing without breakdown or flashover.
  • Electromagnetic Radiation (for fan models): Electromagnetic radiation at 1m during fan operation ≤ 30 dBμV/m, compliant with EMC Class B standards.

5.5 Material and Surface Treatment Parameters

5.5.1 Aluminum Series (A Series)

  • Honeycomb Core: 3003 anti-corrosion aluminum foil, thickness 0.3mm, vacuum brazed.
  • Frame Flange: 6061 aluminum alloy plate, T6 condition.
  • Surface Treatment: Chemical conductive oxidation (film thickness 3~5μm) or tin plating (film thickness 5~8μm).
  • Fasteners: 304 stainless steel nickel-plated bolts.

5.5.2 Copper Series (C Series)

  • Honeycomb Core: T2 copper foil, thickness 0.25mm, vacuum brazed.
  • Frame Flange: H62 brass plate or copper-plated cold-rolled steel plate.
  • Surface Treatment: Tin plating (film thickness 5~10μm) to prevent oxidation.
  • Fasteners: Brass nickel-plated bolts.

5.5.3 Stainless Steel Series (S Series)

  • Honeycomb Core: 304/316L stainless steel foil, thickness 0.35mm, vacuum brazed.
  • Frame Flange: 304/316L stainless steel plate.
  • Surface Treatment: Pickling and passivation or electrolytic polishing.
  • Fasteners: 316L stainless steel bolts.

5.6 Installation Interface Parameters

  • Installation Method: Flange bolt fixing (standard), welded, or embedded (optional).
  • Flange Hole Specification: Standard round holes, diameter corresponding to bolt specification + 0.5mm clearance.
  • Sealing Groove Dimensions: Standard flange includes 1 sealing groove, width 6mm, depth 2mm.
  • Installation Opening Tolerance: On-site prepared opening dimension tolerance ≤ +2mm / -0mm, position deviation ≤ 1mm.
  • Mounting Surface Flatness: Required ≤ 0.5mm/m, no obvious concavity, convexity, or deformation.

5.7 Lifespan and Reliability Parameters

  • Design Service Life: ≥ 15 years in indoor dry environments, ≥ 8 years in outdoor/corrosive environments (stainless steel series ≥ 15 years).
  • Sealing Gasket Lifespan: Standard conductive rubber gasket ≥ 5 years, beryllium copper spring finger ≥ 10 years.
  • Mean Time Between Failures (MTBF): ≥ 80000 hours (passive product main body maintenance-free, including powered modules).
  • Factory Pass Rate: 100% full inspection; products failing shielding effectiveness are not shipped.

Chapter 6 Product Functions and Features

6.1 Core Functions

6.1.1 Broadband Electromagnetic Shielding Function

The core function of the LA-BD series electromagnetic shielding waveguide window is to achieve electromagnetic shielding at ventilation openings, blocking the propagation path of electromagnetic waves. The product provides protection across a wide frequency band, from low-frequency magnetic fields to high-frequency microwaves. It prevents the leakage of classified signals and sensitive electromagnetic signals from inside the shielded space, ensuring information security; it also blocks external complex electromagnetic interference and strong electromagnetic pulses from entering the internal space, protecting the stable operation of precision electronic equipment.

Depending on the shielding level, the product meets multi-level shielding requirements ranging from commercial confidentiality to national top-secret levels, and from civilian EMC to military protection. It is the standard electromagnetic protection solution for ventilation openings in shielded spaces.

6.1.2 Efficient Ventilation and Heat Dissipation Function

While ensuring shielding effectiveness, the product utilizes a high-open-area honeycomb structure, achieving excellent ventilation performance. It effectively facilitates air exchange between the inside and outside of the shielded space, removing heat generated by internal equipment, maintaining temperature stability, and preventing failures or accelerated aging caused by overheating.

With low airflow resistance and high ventilation capacity, the product is suitable for natural ventilation scenarios and forced ventilation when used with air conditioning, fresh air systems, or axial fans, fully meeting the heat dissipation needs of various shielded computer rooms and equipment compartments.

6.1.3 Structural Protection and Environmental Adaptation Function

The product features an all-metal integrated structure with high mechanical strength, offering excellent resistance to compression, vibration, and impact, suitable for vibration and shock environments of mobile platforms such as vehicles, ships, and aircraft. Through reasonable material selection and surface treatment, it adapts to various harsh environments including high temperature, low temperature, high humidity, salt spray, and dust, ensuring long-term stable operation.

Optional functional modules such as dust filtration, anti-condensation, and fan integration further expand the product’s applicable scenarios, providing an integrated solution for “shielding + ventilation + environmental control”.

6.2 Core Product Features

6.2.1 Stable and Reliable Shielding Performance with Sufficient Redundancy

  • The honeycomb core is formed using vacuum brazing technology, creating an all-metal metallurgical bond without risks of cold solder or detachment, ensuring excellent electrical continuity and long-term stable shielding performance.
  • Design specifications retain over 20% performance redundancy. Actual shielding effectiveness is generally 5~10dB higher than the nominal value, effectively offsetting performance degradation due to installation processes and environmental aging, ensuring compliance throughout the entire lifecycle.
  • Strictly adheres to a triple inspection system encompassing national, military, and confidentiality standards. Each batch undergoes outgoing shielding effectiveness sampling; critical items undergo 100% full inspection, ensuring performance consistency.

6.2.2 Industry-Leading Ventilation Efficiency, Low Airflow Resistance, and Low Energy Consumption

  • The optimized hexagonal honeycomb structure design achieves over 85% open area, with overall ventilation efficiency ≥ 75%, significantly surpassing perforated plate and metal mesh ventilation shielding devices of equivalent grade.
  • Fluid dynamically optimized channel structure with smooth inner walls minimizes path resistance. Under the same ventilation volume, airflow resistance is over 20% lower than conventional industry products, reducing fan power consumption and saving operating costs.
  • Wide range ventilation adaptability, stable operation from natural convection to high-speed forced ventilation, without resonance or abnormal noise.

6.2.3 Scientific Structural Design, Convenient Installation and Maintenance

  • Standardized flange interface design with universal installation dimensions, directly compatible with pre-cut openings in most shielding projects without secondary modification.
  • Modular structure allowing independent replacement of all components. Replacement of consumable parts such as conductive gaskets, protective mesh, and filter cotton is simple and can be completed without professional tools.
  • Lightweight yet high-strength; aluminum products weigh only 1/3 of steel products, reducing installation load-bearing requirements. Small products can be installed by a single person.

6.2.4 Comprehensive Materials and Processes, Strong Scenario Adaptability

  • Available in three material series: aluminum, copper, and stainless steel, along with B/C/D three-level shielding grades, covering all scenario needs from ordinary commercial to high-end military applications.
  • Supports full-size customization based on on-site opening dimensions and shapes, including rectangular, circular, and special-shaped waveguide windows, perfectly adapting to renovation and non-standard projects.
  • Optional filter, heating, fan modules enable one-stop procurement, preventing compatibility issues from multiple supplier coordination.

6.2.5 Long Lifespan, Low Maintenance, and Low Total Cost of Ownership

  • The passive main structure has no wearing parts, with a service life exceeding 15 years under normal environments, far exceeding ordinary shielding ventilation products.
  • Routine maintenance only requires periodic cleaning and fastener checks, minimal workload and low maintenance costs.
  • Standardized consumable parts design with low replacement costs, eliminating the need for complete product replacement, significantly reducing lifecycle costs.

6.2.6 Safe, Environmentally Compliant, and Meets All Standards

  • All-metal materials free from toxic or hazardous substances, compliant with RoHS environmental requirements.
  • Electrical safety performance conforms to the GB 7251 series standards. Powered modules feature comprehensive insulation, grounding, and overload protection.
  • High fire resistance rating; the all-metal structure is non-combustible, with fire resistance limits consistent with shielding walls, meeting building fire protection code requirements.

Chapter 7 Product Application Scenarios

The LA-BD series electromagnetic shielding waveguide window, as a versatile shielding ventilation component, finds applications across numerous fields including classified information security, national defense and military, electronic testing, healthcare, data communications, industrial control, and scientific research. Any enclosed space requiring electromagnetic shielding while accommodating ventilation and heat dissipation is a suitable scenario for the electromagnetic shielding waveguide window. The following are detailed descriptions of typical application scenarios.

7.1 Classified Information System Scenarios

7.1.1 Secure Conference Rooms / Secure Offices

Secure conference rooms and offices used by party and government agencies, the military, and classified enterprises/institutions are core locations for handling classified information. These must be constructed as electromagnetic shielded spaces according to the BMB series standards to prevent leakage of classified voice and data signals through electromagnetic radiation. Such spaces have high personnel density and require good ventilation and air exchange. Therefore, electromagnetic shielding waveguide windows must be installed at both fresh air inlets and exhaust outlets to maintain the integrity of the shielded space while ensuring ventilation.

Selection Recommendations: Class C aluminum flanged waveguide windows are standard, with size determined by fresh air volume design. Typically used with fresh air systems; optional primary efficiency filter modules available.

7.1.2 Classified Computer Rooms / Shielded Computer Rooms

Classified data centers and classified server rooms are critical to information security protection, requiring high shielding levels. Internal servers, switches, and other equipment generate significant heat, demanding excellent ventilation and heat dissipation. Electromagnetic shielding waveguide windows must be installed at air conditioning vents, exhaust pressure relief openings, and cabinet heat dissipation openings in the computer room. They are among the most used components in the shielding auxiliary materials and accessories system for complete shielded computer rooms.

Selection Recommendations: Use Class C or D large-size waveguide windows for main wall ventilation openings, small standard waveguide windows for cabinet heat dissipation openings. Anti-condensation modules are optional for high-humidity areas.

7.1.3 Cryptographic Equipment Rooms / Classified Terminal Rooms

Cryptographic equipment and classified terminals require extremely high electromagnetic leakage protection, typically housed in small shielded computer rooms or shielded cabinets. Continuous equipment operation generates heat requiring ventilation and dissipation through waveguide windows while ensuring no electromagnetic signal leakage.

Selection Recommendations: Shielded cabinets typically use 200×200mm or 300×300mm small Class C waveguide windows, which can be integrated with low-radiation fans for forced heat dissipation.

7.2 Electromagnetic Compatibility Testing Scenarios

7.2.1 EMC Anechoic Chambers / Electromagnetic Shielded Rooms

EMC testing anechoic chambers and standard shielded rooms are core facilities for electronic product EMC testing, requiring extremely high shielding effectiveness. The internal electromagnetic environment must be pure and free from external interference, while internal test signals must not leak outward. High-grade electromagnetic shielding waveguide windows must be installed at ventilation and air conditioning wall penetrations to prevent air vents from becoming weak points for electromagnetic leakage.

Selection Recommendations: Use Class D copper or stainless steel waveguide windows, with cutoff frequency higher than the highest test frequency, ensuring shielding effectiveness ≥ 100dB within the test frequency band.

7.2.2 Antenna Test Ranges / Microwave Anechoic Chambers

Microwave anechoic chambers for antenna performance testing and radar cross-section testing operate at high frequency bands (up to 40GHz and above), imposing stringent high-frequency shielding requirements on ventilation openings. Ordinary waveguide windows show significant shielding effectiveness degradation at high frequencies; dedicated waveguide windows with small apertures and high cutoff frequencies must be used.

Selection Recommendations: Select Class D very small aperture honeycomb waveguide windows, with cutoff frequency more than 3 times higher than the highest test frequency, ensuring stable high-frequency shielding effectiveness.

7.3 National Defense and Military Scenarios

7.3.1 Military Command Shelters / Communication Shelter Vehicles

Field command vehicles, communication shelter vehicles, radar shelter vehicles, and other mobile military shielded platforms operate in harsh environments facing vibration, shock, temperature differentials, and sand/dust, while requiring extremely high electromagnetic shielding and communication security. High-reliability, strong environmental adaptability electromagnetic shielding waveguide windows must be used for shelter ventilation and heat dissipation openings.

Selection Recommendations: Choose stainless steel or aluminum reinforced waveguide windows with dust filtration and anti-condensation features, with anti-vibration/impact ratings meeting military standards.

7.3.2 Naval Ship Shielded Compartments

Electronic equipment compartments, command compartments, and communication compartments on naval ships face high salt spray, high humidity, and strong vibration in the marine environment, with dual stringent requirements for electromagnetic protection and corrosion resistance. Ordinary aluminum waveguide windows are susceptible to corrosion; corrosion-resistant material products must be selected.

Selection Recommendations: Use 316L stainless steel series waveguide windows with fully welded installation; sealing gaskets should be seawater corrosion-resistant fluorosilicone conductive rubber.

7.3.3 Radar Stations / Satellite Ground Stations

Radar stations and satellite ground stations have both strong transmitting electromagnetic radiation and high-sensitivity receiving systems. Shielding prevents transmitted signals from interfering with receiving systems and protects personnel from strong radiation hazards. Electromagnetic shielding waveguide windows are required at equipment room ventilation and waveguide wall penetrations.

Selection Recommendations: Select Class C or D waveguide windows with corresponding cutoff frequency based on operating frequency band; ventilation heat dissipation margin must be considered for high-power scenarios.

7.3.4 Electromagnetic Pulse (EMP) Protection Rooms

Nuclear EMP protection rooms and strong EMP laboratories require protection against intense electromagnetic pulse impacts with nanosecond-level rising edges, demanding extremely high low-frequency and transient shielding performance. Copper waveguide windows offer superior electrical conductivity and stronger attenuation of pulse signals, making them the preferred choice for such scenarios.

Selection Recommendations: Choose copper Class D waveguide windows, combined with EMP filters and waveguides to build a complete protection system.

7.4 Medical Equipment Scenarios

7.4.1 Magnetic Resonance Imaging (MRI) Rooms

MRI equipment generates strong magnetic fields and RF signals. On one hand, external electromagnetic interference must be prevented from affecting imaging quality; on the other hand, RF signal leakage must be prevented from affecting surrounding equipment and personnel safety. In MRI room shielding projects, ventilation openings are critical leakage points that must be addressed.

Selection Recommendations: Use copper Class B or C waveguide windows with excellent magnetic field shielding performance, suitable for the low-frequency strong magnetic field environment of MRI rooms.

7.4.2 Electrophysiology Laboratories / Neurophysiology Rooms

High-precision bioelectrical testing laboratories for EEG, EMG, MCG, etc., require extremely high electromagnetic environment standards. Even minor electromagnetic interference can cause distorted test data. High-grade shielding waveguide windows must be used for laboratory shielded ventilation openings.

Selection Recommendations: Select Class C or above high shielding effectiveness waveguide windows with low airflow resistance design to avoid airflow noise affecting the testing environment.

7.5 Data Center and Communication Scenarios

7.5.1 Core Data Centers

Core data centers for finance, securities, and telecommunications operators host critical business systems. Electromagnetic interference can cause data errors and business interruptions. Some high-grade data centers establish partial shielded zones or fully shielded computer rooms, with ventilation systems equipped with electromagnetic shielding waveguide windows.

Selection Recommendations: Use Class C aluminum waveguide windows; large-size designs meet high-volume ventilation needs; optional medium-efficiency filter modules ensure room cleanliness.

7.5.2 Communication Base Station Shielded Rooms

Some communication base stations and signal relay rooms in special areas undergo electromagnetic shielding treatment to prevent signal interference or leakage, with ventilation openings equipped with waveguide windows.

Selection Recommendations: Use Class B or C outdoor-type waveguide windows with rainproof, dustproof, and insect-proof designs, suitable for outdoor environments.

7.6 Industrial and Scientific Research Scenarios

7.6.1 Power Plant / Substation Control Rooms

Control rooms and relay protection rooms in high-voltage power plants and substations face strong power-frequency electric and magnetic field interference, which can affect precision control equipment and cause malfunctions. Waveguide windows with good power-frequency shielding performance must be installed at ventilation openings of shielded control rooms.

Selection Recommendations: Use copper or steel waveguide windows with excellent low-frequency magnetic field shielding, meeting power-frequency electromagnetic protection requirements.

7.6.2 Rail Transit Signal Control Rooms

Signal control rooms for subways and high-speed railways have high EMC requirements. Interference can cause signal system failures, potentially leading to train operation safety accidents. Electromagnetic shielding waveguide windows should be paired with ventilation openings in shielded rooms.

Selection Recommendations: Use Class C standard waveguide windows, compliant with rail transit EMC standards.

7.6.3 High-Energy Physics Laboratories / Particle Accelerator Laboratories

High-energy physics experimental facilities and particle accelerators impose extremely high requirements on the electromagnetic environment. These facilities have high power and strong heat dissipation needs. The ventilation system of shielded halls requires a large number of high-grade shielding waveguide windows.

Selection Recommendations: Custom large-size Class D waveguide windows with splice installation capability to meet demands for ultra-high ventilation volume and ultra-high shielding levels.

7.6.4 Semiconductor Cleanrooms

Semiconductor chip manufacturing workshops have high requirements for both electromagnetic interference protection and cleanliness. Some precision process areas require electromagnetic shielding treatment, with ventilation openings needing to meet both shielding and clean filtration requirements.

Selection Recommendations: Use stainless steel waveguide windows with integrated high-efficiency filter modules; smooth surface for easy cleaning, meeting cleanroom standards.

Chapter 8 Product Installation

Product installation is a critical step determining final shielding effectiveness; installation workmanship directly impacts shielding performance. This chapter details the installation preparation, standard installation procedures, scenario-specific installation requirements, sealing processes, and quality inspection standards for electromagnetic shielding waveguide windows. All operations must strictly follow this specification.

8.1 Pre-Installation Preparation

8.1.1 Technical Preparation

  • Drawing Review: Before installation, organize construction technical personnel to review construction drawings, product manuals, and relevant specifications/standards. Clarify installation location, elevation, dimensions, shielding level, and installation method of waveguide windows. Verify interface dimensions with ducts, walls, and cabinets.
  • Technical Disclosure: Provide detailed technical disclosure to on-site construction personnel, explaining the installation process, key operation points, quality standards, and safety precautions. Emphasize the core requirements of shielding sealing and explicitly prohibit operations that disrupt shielding continuity.
  • Plan Development: For large and special installations, develop dedicated installation construction plans clarifying construction sequence, personnel assignments, quality control points, and emergency response plans.

8.1.2 Personnel Preparation

  • The installation team must consist of professionals with electromagnetic shielding project experience, including at least 1 on-site technical lead and 2~4 skilled installation workers.
  • Welding operators must hold special operation certificates (welder’s certificate) and be familiar with metal welding techniques and shielding welding requirements.
  • Workers performing work at heights must hold height work certificates and be equipped with complete safety protective gear.
  • All personnel must undergo safety training and technical training before entering the site, with qualification assessments passed before commencing work.

8.1.3 Tool Preparation

Prepare corresponding tools based on the installation method. Standard flange bolt installation requires the following tools:

Category Tool Name Specification Purpose
Measurement/Positioning Laser Level / Positioning and leveling
Steel Tape Measure 5m/10m Dimension measurement
Feeler Gauge 0.02~1mm Gap detection
Vernier Caliper 0~150mm Aperture/thickness inspection
Surface Resistance Tester / Conductivity performance testing
Installation Tools Impact Drill / Electric Drill Matches bolt specification Drilling
Torque Wrench 5~50 N-m Bolt tightening torque control
Socket Wrench / Open-End Wrench Matches bolt specification Bolt tightening
Angle Grinder / Opening edge trimming, grinding
Wire Brush / Surface rust removal/cleaning
Utility Knife / Scissors / Gasket cutting
Welding Special Tools TIG Welding Machine / Stainless steel, carbon steel welding
Soldering Tools / Solder sealing
Welding Materials Matching wire, solder Welding filler
Cleaning Tools Anhydrous Ethanol Analytical grade Sealing surface cleaning
Lint-Free Cloth / Wiping and cleaning
Compressed Air Gun 0.3~0.5MPa Dust blowing/cleaning
Safety Protection Safety Helmet, Safety Belt, Gloves, Goggles / Personal protection

8.1.4 Material and Product Inspection

  • Product Visual Inspection: Open the box and inspect the waveguide window body for shipping damage. Check the honeycomb core for deformation, cracking, or cold solder joints. Inspect the frame flange for deformation or scratches and the surface treatment layer for peeling. If damage is found, contact the manufacturer for replacement; do not install defective products.
  • Accessories Inventory: Check all accessories including conductive gaskets, bolts, and protective mesh against the product list. Verify specifications and quantities are correct. Inspect gaskets for cracks or deformation and bolt threads for integrity.
  • Sealing Surface Inspection: Check that the flange sealing surface is flat, free from burrs, welding slag, paint, oil, or other contaminants affecting conductivity. Surface resistance testing should meet requirements.
  • Auxiliary Material Preparation: Prepare conductive adhesive, sealant, anti-rust paint, and other auxiliary materials as needed. Ensure materials are within their shelf life and meet performance requirements.

8.1.5 Site Condition Inspection

  • Opening Inspection: Verify the pre-cut opening dimensions and position on the shielding wall/cabinet panel match the drawings. Dimensional tolerances must meet requirements: opening size positive deviation ≤ 2mm, negative deviation ≤ 0; position deviation ≤ 1mm; diagonal deviation ≤ 1.5mm.
  • Base Surface Inspection: The installation base surface (shielding steel plate surface) should be flat and secure, with flatness ≤ 0.5mm/m and no obvious concavity, convexity, deformation, or rust. For welded shielded rooms, the weld around the opening should be smooth without raised slag.
  • Base Surface Cleanliness Inspection: The installation contact surface must be exposed conductive metal. No paint, plastic, rubber, or other insulating layers are allowed. If painted, the paint must be ground off in advance to reveal the metallic luster, ensuring good conductive contact.
  • Work Environment Inspection: On-site temperature should be between 5°C~40°C, relative humidity ≤ 85%, and free from rain, snow, or excessive dust. Welding operations require fire prevention measures and fire extinguishing equipment.
  • Safety Condition Inspection: For work at heights, compliant scaffolding or work platforms must be erected, and edge/open hole protections should be in place. Electrical use must comply with temporary electricity regulations. Warning signs should be posted in work areas, and unauthorized personnel prohibited from entering.

8.2 Standard Flange Bolt-Type Installation Procedure

Flange bolt-type installation is the most common method, suitable for prefabricated shielded rooms, shielded cabinets, spliced shielded wall panels, and other scenarios. It is convenient, detachable, and facilitates later maintenance and replacement.

8.2.1 Step 1: Positioning and Layout

  • Based on the construction drawings, accurately mark the centerline and outline of the waveguide window installation position on the shielding body surface. Confirm elevation and levelness meet design requirements.
  • Verify the opening position matches the marked lines. Correct the opening if deviation exists, ensuring the opening center coincides with the design center.
  • Use a laser level to calibrate the installation reference line, ensuring the waveguide window is installed horizontally and vertically level, with inclination ≤ 1‰.

8.2.2 Step 2: Opening Preparation and Base Surface Grinding

  • For on-site openings, use plasma cutting or shearing machine to cut according to the marked lines. Oxy-fuel gas cutting is strictly prohibited to avoid large-scale plate deformation and oxidation. After cutting, use an angle grinder to smooth the cut edges, removing burrs and flash. Cut surface flatness ≤ 0.5mm.
  • Centering on the opening, grind the shielding surface area covered by the flange to thoroughly remove paint, oxide layer, oil, and rust until uniform metallic luster is exposed. The grinding area must extend more than 10mm beyond the flange edge.
  • Use compressed air to blow away metal dust from grinding. Then wipe the sealing contact surface with lint-free cloth moistened with anhydrous ethanol, ensuring the surface is free from dust, oil, and impurities. After cleaning, avoid touching the sealing surface to prevent sweat contamination.
  • Use a surface resistance tester to detect the ground base surface, ensuring good conductivity with contact resistance ≤ 0.05 Ω/cm².

8.2.3 Step 3: Conductive Gasket Installation

  • Check that the conductive gasket specification matches the waveguide window flange sealing groove. Gasket length should be slightly longer than the sealing groove circumference (reserving 2~3mm compression allowance). No cracks, damage, or surface contamination.
  • Peel off the release liner from the gasket backing. Adhere the gasket evenly along the centerline of the sealing groove. Cut corners at 45° angles for butt joints, ensuring tight fit at joints without gaps or overlap.
  • After adhesion, press the gasket evenly by hand to ensure the adhesive backing is fully bonded. The gasket should be flat without twisting or lifting. A small amount of conductive adhesive can be applied at joints to enhance conductivity and sealing.

Precautions:

  • Conductive gaskets can only be adhered to clean metal sealing surfaces. Application on paint, plastic, or other insulating surfaces is prohibited.
  • Gasket compression must be controlled at 20%~30%. Over-compression causing permanent deformation and failure is prohibited.
  • Stretching the gasket arbitrarily is prohibited to avoid cross-section reduction affecting sealing performance.
  • For double-gasket designs, install each gasket in its respective sealing groove, ensuring concentric alignment.

8.2.4 Step 4: Waveguide Window Positioning and Temporary Fixing

  • With 2 or more construction personnel working together, smoothly transport the waveguide window to the installation position, align with the opening and bolt holes, and slowly fit it onto the installation base surface. Avoid impacts, scratches to the sealing surface, and gasket displacement.
  • First insert bolts at four diagonal positions (top/bottom, left/right), attach nuts without tightening, for initial positioning.
  • Adjust the waveguide window position to ensure concentricity with the opening, uniform surrounding clearance, and compliance with levelness and verticality requirements. Avoid gasket displacement or detachment during adjustment.
  • After confirming correct position, insert all remaining bolts and attach nuts to complete temporary fixing.

8.2.5 Step 5: Cross-Pattern Bolt Tightening

Bolt tightening must use the cross-pattern diagonal tightening method. Sequential tightening in order is strictly prohibited to prevent flange deformation and uneven gaps from uneven force distribution.

Tightening is completed in three steps:

  • Step 1: Initial Tightening – Use a regular wrench to evenly bring all bolts to snug tightness. Apply moderate force to ensure the flange contacts the base surface and the gasket is initially compressed.
  • Step 2: Intermediate Tightening – Use a torque wrench to tighten to 50% of the rated torque in diagonal order.
  • Step 3: Final Tightening – Use a torque wrench to tighten to the rated torque value in diagonal order. Repeat this process twice to ensure consistent torque on all bolts.

Reference Rated Torque Values for Common Bolts:

  • M6 Bolts: 4~6 N·m
  • M8 Bolts: 8~12 N·m
  • M10 Bolts: 15~20 N·m
  • M12 Bolts: 25~30 N·m

Specific torque values follow the product factory manual. Stainless steel bolt torque is slightly lower than carbon steel bolts to prevent thread stripping.

During tightening, continuously observe flange fit. Use a feeler gauge to check flange edge gaps, ensuring no localized excessive gaps. After tightening is complete, the gap between flange and base surface ≤ 0.05mm, with no continuous gaps.

8.2.6 Step 6: Sealing Gap Treatment

  • After bolt tightening, check the external gaps around the flange perimeter. If visible gaps exist, fill them with conductive adhesive.
  • First clean the gap surface, then evenly inject conductive adhesive into the gap. Fill and level it, ensuring the adhesive layer is continuous without interruptions.
  • Conductive adhesive or sealant can also be applied to bolt heads and nuts to prevent gap leakage and corrosion.
  • Wait for the conductive adhesive to fully cure (24 hours at room temperature). Do not touch or vibrate the waveguide window during this period.

8.2.7 Step 7: Protective Mesh Installation

  • Align the protective mesh with the waveguide window outer frame and snap it into place using clips, or secure it with matching screws.
  • Ensure the protective mesh is flat, undeformed, completely covering, with no exposed gaps.
  • If filter cotton is included, place the filter cotton inside the protective mesh frame first, then install as a whole.

8.2.8 Step 8: Installation Appearance and Preliminary Quality Inspection

  • Appearance Inspection: Waveguide window installed squarely, surface showing no obvious scratches or deformation, all fasteners present, protective mesh intact.
  • Gap Inspection: Use a feeler gauge to check the fit gap around the flange perimeter. Maximum value ≤ 0.05mm, with no through gaps.
  • Firmness Inspection: Shake the waveguide window by hand – should show no looseness or abnormal noise, indicating secure installation.
  • Continuity Inspection: Use a multimeter or surface resistance tester to check continuity between the waveguide window outer frame and the shielding body. Contact resistance ≤ 0.1Ω, ensuring electrical continuity.
  • Internal Inspection: From inside the shielding body, verify the opening aligns with the waveguide core, with no obstructions or excess gaps.

8.3 Welded Installation Procedure

Welded installation is suitable for welded shielded rooms, high-grade shielded compartments, and other scenarios requiring extreme shielding continuity. The waveguide window is fused with the shielding steel plate through welding, eliminating bolt gap leakage risks and achieving higher shielding effectiveness.

8.3.1 Installation Preparation

  • Welded waveguide windows have no outer flange. The outer frame thickness matches the shielding steel plate, typically 2~3mm thick steel plate with folded edges.
  • Opening dimensions and waveguide window outer frame dimensions use transition fit, with clearance ≤ 0.5mm, ensuring uniform welding gaps.
  • Welding equipment selection based on material: carbon steel/stainless steel – TIG welder; aluminum – DC TIG welder or MIG welder.
  • Welding consumables should be the same material as the parent metal to ensure weld strength and conductivity.

8.3.2 Installation Positioning

  • Embed the waveguide window into the pre-cut opening. Adjust position to achieve uniform surrounding gaps and surface flush with the shielding wall.
  • Use spot welding for positioning: weld at the midpoint of each side and at all four corners. Each spot weld length 10~15mm. After spot welding, check flatness and position deviation.

8.3.3 Continuous Welding

  • Use the back-step welding method for full welding to avoid excessive plate deformation from prolonged continuous welding. Each weld segment length 100~150mm, allowing cooling intervals between segments.
  • Weld height should be consistent with parent metal thickness. Weld beads must be uniform and full, without cold welding, missed welds, slag inclusion, porosity, cracks, or other defects.
  • Double-sided welding is required – both inner and outer sides must be fully welded to ensure complete electrical continuity.
  • During welding, protect the honeycomb core from weld spatter entering and blocking the waveguide channels. Cover the core surface with a high-temperature resistant shield plate for protection.

8.3.4 Post-Weld Treatment

  • After welding and cooling, use an angle grinder to smooth the weld beads flush with the parent metal surface. Remove slag, spatter, and protrusions.
  • Inspect welds for defects. Repair any porosity or cracks by re-welding and re-grinding.
  • Apply conductive coating or rust prevention treatment to the welded area. Stainless steel welds should undergo pickling and passivation treatment.
  • Clean welding slag and dust from waveguide channels using compressed air.

8.3.5 Quality Inspection

  • Weld Appearance Inspection: Weld beads smooth and even, defect-free, with natural transitions.
  • Continuity Inspection: Resistance across the weld ≤ 0.01Ω, with good electrical continuity.
  • Leakage Inspection: Use the kerosene penetration method to check weld density; no leakage points allowed.

8.4 Scenario-Specific Installation Requirements

8.4.1 Shielded Wall Installation

  • Waveguide window installation position should avoid wall panel seams, maintaining a distance of at least 100mm from joint welds to prevent stress concentration and multiple gap stacking.
  • Wall openings should be cut mechanically. On-site gas cutting causing wall deformation is strictly prohibited.
  • After installation, the inner side of the waveguide window should be flush with or slightly recessed from the wall surface, not protruding to affect interior decoration.
  • If the exterior wall has insulation or decorative layers, proper edge treatment around the waveguide window is required to prevent rainwater ingress.

8.4.2 Shielded Cabinet Installation

  • Cabinet openings should be designed at the top and bottom of the cabinet to create a natural convection air path, enhancing heat dissipation.
  • Openings should avoid internal cabinet columns and crossbeams, ensuring sufficient installation space.
  • Conductive gaskets MUST be installed between the waveguide window and cabinet panel. Tightening torque should be moderate to prevent cabinet panel deformation.
  • For fan-integrated waveguide windows, pay attention to airflow direction design – front inlet/rear outlet or top inlet/bottom outlet – to establish a reasonable airflow distribution.

8.4.3 Ventilation Duct Connection Installation

  • When connecting the waveguide window to ventilation ducts, a non-metallic flexible connection must be installed between the duct and waveguide window flange to prevent duct vibration from transmitting to the shielding body and to prevent the duct from becoming an electromagnetic leakage path.
  • The flexible connection length should be ≥ 200mm, using non-conductive materials such as canvas or silicone fabric. Direct metal duct connections across the shielding boundary are prohibited.
  • Install sealing strips between the duct and waveguide window connection flanges to ensure air system tightness and prevent air leakage.

8.4.4 Shielded Door Integrated Installation

  • Ventilation waveguide windows on shielded door leaves should be pre-installed during door leaf production to ensure integration with the door leaf shield.
  • Waveguide windows on door leaves must not affect door opening/closing and sealing. Weight must be within the door leaf load-bearing capacity.
  • Periodically check fasteners on door leaf waveguide windows to prevent loosening from door operation vibration.

8.4.5 Outdoor Installation

  • Outdoor-installed waveguide windows should use stainless steel or anti-corrosion treated materials to prevent rainwater corrosion.
  • Weatherproof hoods or rain louvers should be installed on the exterior side of the waveguide window to prevent rainwater from directly entering the waveguide channels. The weatherproof hood must NOT form a continuous metal body bridging the shielding boundary; insulation treatment is required.
  • Install with a slight downward tilt of 3°~5° to facilitate rainwater drainage and prevent accumulation.
  • Provide drainage holes at the bottom to prevent water accumulation from seeping into the shielding body.

8.5 Installation Quality Acceptance Standards

After installation is complete, self-inspection is conducted according to the following standards. Only after passing can the project proceed to the commissioning phase:

  • Position and Dimensions: Installation position deviation ≤ 5mm, elevation deviation ≤ 5mm, levelness deviation ≤ 1‰, verticality deviation ≤ 1‰.
  • Appearance Quality: Surface clean, no obvious scratches, deformation, or rust. Protective mesh intact, all fasteners present.
  • Sealing Performance: Flange fit gap ≤ 0.05mm, no through gaps. Conductive gasket uniformly compressed, no cracks or lifting.
  • Electrical Continuity: Contact resistance between waveguide window and shielding body ≤ 0.1Ω, reliable electrical continuity.
  • Structural Strength: Secure installation, no looseness, able to withstand normal external forces without displacement or deformation.
  • Welding Quality (welded type): Continuous full weld beads, defect-free, smooth-grinded, proper rust prevention treatment.
  • Cleanliness: Waveguide channels unobstructed, no slag, no dust, smooth ventilation.

Chapter 9 Product Wiring

The main body of the electromagnetic shielding waveguide window is a passive metal structure requiring no electrical wiring. However, functional waveguide windows with integrated anti-condensation heating modules, axial fan modules, temperature sensing modules, and the product’s associated grounding system require standardized electrical wiring operations. This chapter details the process requirements and specifications for grounding wiring and functional module wiring, ensuring electrical safety and shielding performance are not compromised.

9.1 General Wiring Principles

  • All electrical wiring must be performed by certified electricians, strictly complying with “GB 50303 Quality Acceptance Code for Building Electrical Engineering Construction” and relevant electromagnetic shielding specifications.
  • Power must be disconnected before any wiring operation. Hang “DO NOT CLOSE” warning signs. Strictly implement the power-off, voltage verification, grounding, and tagging system to ensure safe operation.
  • All power and control cables passing through the shielding body MUST pass through corresponding power filters and signal filters. Wires passing directly through waveguide windows or shielding walls are strictly prohibited, as this would create electromagnetic leakage paths leading to overall shielding failure.
  • All wiring cables, terminals, and auxiliary materials must meet flame-retardant and insulation requirements, adapted to the operating voltage and current.
  • After wiring is complete, insulation testing and grounding testing must be conducted. Power-on commissioning is only permitted after passing.

9.2 Grounding System Wiring

Grounding is an important component of an electromagnetic shielding system. Good grounding ensures both shielding effectiveness and electrical safety. Electromagnetic shielding waveguide windows must be connected to the unified grounding system together with the shielding body.

9.2.1 Grounding Requirements

  • Grounding Resistance: Shielding system grounding resistance ≤ 1Ω (high-grade shielding requires ≤ 0.5Ω). The waveguide window achieves equipotential grounding through reliable connection with the shielding body; no separate grounding electrode is required.
  • Equipotential Connection: The metal outer frame of the waveguide window MUST achieve reliable electrical connection with the shielding wall, forming an equipotential body, preventing electromagnetic leakage caused by potential differences. Flange bolt connections already provide electrical continuity; welded connections offer even better continuity.
  • Grounding Down Conductor: If the waveguide window is large or installed far from the main grounding bus, a dedicated grounding down conductor should be installed. Use multi-strand copper wire not less than 6mm², with one end connected to the waveguide window outer frame grounding terminal and the other end to the shielded room grounding busbar.

9.2.2 Grounding Terminal Installation

  • Standard waveguide window outer frames come with M6 or M8 grounding terminal holes, equipped with grounding bolts at the factory.
  • Before wiring, grind the surface around the terminal hole to remove the oxide layer, ensuring good contact.
  • Crimp the copper lug onto the grounding cable securely. Place it over the grounding bolt, add a spring washer, and tighten to ensure contact resistance ≤ 0.05Ω.
  • Connect the other end of the grounding cable to the nearest shielding grounding busbar using the same bolt-fastening method with surface grinding treatment.

9.2.3 Grounding Precautions

  • Mixing shielding grounding with lightning protection grounding or power protective grounding is prohibited. A separate grounding system must be established, with grounding electrode spacing ≥ 20m.
  • Grounding cables should be short and straight, avoiding bends and loops to minimize grounding impedance.
  • Periodically check grounding terminals for looseness or oxidation. Test grounding resistance annually to ensure compliance.

9.3 Axial Fan Module Wiring

Fan-integrated waveguide windows come with low-radiation axial fans requiring power and control wiring.

9.3.1 Pre-Wiring Inspection

  • Verify fan nameplate parameters: rated voltage, rated power, wiring method. Confirm compatibility with the power supply.
  • Inspect the fan for transportation damage. Check that the impeller rotates freely without jamming or abnormal noise.
  • Use a 500V megohmmeter to test insulation resistance between the fan winding and housing. Should be ≥ 100MΩ. Proceed with wiring only after passing.

9.3.2 Power Wiring

  • Fan power supply MUST be connected through a dedicated shielded room power filter. Direct cable penetration through walls is strictly prohibited. The power filter is installed inside the shielded wall, with the filter housing reliably connected to the shielding body.
  • Fan power cables use three-core flame-retardant copper cables. Conductor cross-section based on power:
  • Power ≤ 100W: Use RVV 3×0.75mm²
  • Power 100~300W: Use RVV 3×1.0mm²
  • Power 300~500W: Use RVV 3×1.5mm²
  • Wiring method:
  • Live wire (L) → Fan L terminal
  • Neutral wire (N) → Fan N terminal
  • Ground wire (PE) → Fan grounding terminal, connected to fan housing
  • Terminals use cold-pressed terminal lugs, inserted into the terminal block and screws tightened securely, ensuring good contact without looseness. Multi-strand copper wires must not have burrs or exposed broken strands.
  • Apply insulating sleeves or wrap with insulating tape at connection points for insulation protection.

9.3.3 Control Wiring (Optional)

  • If the fan has speed control or temperature-controlled start/stop functions, connect control signal wires. Signal lines must pass through signal filters into the shielded room interior.
  • Control cables use shielded signal cables. The shield layer should be grounded at one end only (inside the shielded room).
  • Connect temperature controllers, speed controllers, switches, and other control components according to the control schematic diagram. Ensure secure connections and clear labeling.

9.3.4 Cable Routing Requirements

  • Route cables neatly along the inner wall of the shielding body, securing with cable clips or cable trays. Keep horizontal and vertical alignment, neat and tidy.
  • Cables must not be in close contact with the waveguide core to avoid insulation damage from heat or vibration friction.
  • All cables should be labeled with loop numbers and purpose for ease of later maintenance.

9.4 Anti-Condensation Heating Module Wiring

Anti-condensation waveguide windows with PTC heating elements and temperature sensors require heating power and sensor circuit wiring.

9.4.1 Heating Power Wiring

  • PTC heating elements typically have rated voltage of AC 220V, power 50~200W. Power cable uses RVV 2×0.75mm² or 3×0.75mm² with ground protection.
  • Heating power supply must also pass through the power filter. Direct wall penetration is prohibited.
  • The heating circuit requires a series-connected temperature controller and thermal overload protector for automatic temperature control and overheat protection, preventing dry-heating damage.
  • Wiring terminals should be insulated and moisture-proofed. Heat-shrink tubing should be applied at heating element lead wire connections for insulation.

9.4.2 Temperature Sensor Wiring

  • Temperature sensors are typically NTC thermistors or PT100 platinum resistors, using two-core or three-core shielded signal cable.
  • The sensor probe is fixed on the inner surface of the waveguide core, tightly against the metal wall, ensuring accurate temperature measurement.
  • The signal cable shield layer is grounded at one end to avoid interference introduction.
  • Connect the sensor wires to the corresponding temperature controller terminals, ensuring correct polarity (if applicable).

9.4.3 Control Logic Wiring

  • Standard control logic: When temperature is below 5°C, the heating element automatically activates; when temperature is above 15°C, it automatically stops.
  • Install the temperature controller inside the shielded room at a convenient operating position, powered from the filtered indoor power supply.
  • After wiring is complete, verify the control logic to ensure correct operation.

9.5 Wiring Quality Inspection

After all wiring is complete, conduct the following inspection items. Power can only be applied after passing:

  • Visual Inspection: Neat wiring, secure fixing, clear labeling, no exposed conductors, adequate insulation protection.
  • Continuity Check: Each circuit has good continuity, no open or short circuits.
  • Insulation Resistance Test: Insulation resistance between all live circuits and housing ≥ 100MΩ (DC 500V megohmmeter).
  • Grounding Resistance Test: Equipment housing grounding resistance ≤ 4Ω; shielding grounding resistance ≤ 1Ω.
  • Polarity Check: Live, neutral, and ground wires correctly connected, no reversal or misconnection.
  • Shielding Check: All through-wall cables pass through corresponding filters; no direct through-wall cables. Shielded cable grounding method correct.

9.6 Wiring Safety Precautions

  • Strictly follow electrical safety operating procedures. Live operation requires supervision by another person.
  • For wiring in humid environments, take additional moisture-proof measures and wear insulating gloves.
  • Before power-on, re-verify the voltage rating to prevent wrong voltage connection from damaging equipment.
  • During the first power-on of heating and fan modules, observe the running status on-site for 15 minutes. Only leave after confirming no abnormalities.
  • Disassembling wiring terminals or performing equipment maintenance while power is on is strictly prohibited.

Chapter 10 Product Commissioning

After the product installation and wiring are completed, system commissioning shall be performed to verify whether the installation quality, shielding performance, ventilation performance, and electrical functions meet the design requirements. Commissioning work shall be carried out by professional technical personnel, strictly following the procedures, and commissioning data shall be truthfully recorded as the basis for acceptance.

10.1 Pre-Commissioning Preparation

10.1.1 Commissioning Tools and Instruments Preparation

Prepare all commissioning instruments and equipment, ensuring they are within the calibration validity period and that accuracy meets test requirements:

Test Item Instrument/Equipment Accuracy Requirement
Shielding Effectiveness Test Electromagnetic shielding effectiveness tester / Spectrum analyzer + signal source + test antenna ±1 dB
Ground Resistance Test Ground resistance tester ±0.01 Ω
Insulation Resistance Test Digital megohmmeter (500 V) ±0.1 MΩ
Ventilation Performance Test Hot-wire anemometer / Air volume hood ±0.1 m/s
Electrical Parameter Test Digital multimeter, Clamp meter ±0.5%
Temperature Test Infrared thermometer / Point thermometer ±0.5 ℃
Gap Inspection Feeler gauge, Vernier caliper ±0.02 mm
Auxiliary Tools Two-way radios, marker pens, test record forms /

10.1.2 Commissioning Environment Preparation

  • The shielded space shall be free of excess debris and construction waste, clean, and without large metal objects randomly stacked.
  • Test environment temperature: 10 ℃ to 35 ℃, relative humidity ≤ 80%, and no strong electromagnetic interference sources nearby during operation.
  • All doors, windows, and openings of the shielding room shall be sealed; all other through-wall pipelines shall be shielded-treated, ensuring no obvious leakage points other than the test waveguide window.
  • Warning signs shall be set up in the test area, and unauthorized personnel shall be prohibited from entering to avoid affecting test data.

10.1.3 Commissioning Personnel Preparation

  • The commissioning team shall consist of at least 2 people, one inside and one outside the room, equipped with two-way radios for communication.
  • Commissioning personnel shall be familiar with test standards and instrument operation, and proficient in shielding effectiveness test methods and data processing specifications.
  • Clarify the test plan and measurement point layout, and familiarize with the site conditions in advance.

10.2 Appearance and Structural Commissioning Inspection

10.2.1 Appearance Integrity Inspection

  • Inspect the overall appearance of the waveguide window, confirming no deformation, impact damage, or scratches caused by transportation or installation.
  • Inspect the honeycomb core for dents, deformation, unsoldering, and check the cells for blockage or foreign objects.
  • Check that fasteners are complete, without looseness or missing parts, and that spring washers are fully compressed.
  • Check that conductive gaskets have no exposure, breakage, or lifting, and that the seal is continuous.
  • Check that the protective mesh and filter cotton are properly installed, without looseness or damage.

10.2.2 Installation Accuracy Re-Verification

  • Use a steel tape measure and level to re-verify the installation position, elevation, levelness, and verticality, confirming compliance with installation quality standards.
  • Use a feeler gauge to spot-check the contact gap around the flange, record the maximum gap value, and confirm it is ≤ 0.05 mm.
  • Use a surface resistance tester to spot-check the contact resistance at multiple points between the flange and the shielding body, confirming good electrical continuity.

10.2.3 Structural Firmness Test

  • Shake the waveguide window moderately by hand to check for looseness, abnormal noise, or displacement.
  • For fan-type products, manually rotate the fan impeller to check for smooth rotation, jamming, or rubbing against the housing.
  • For welded-type products, inspect the welds for cracks or signs of unwelding.

10.3 Electrical Performance Commissioning

This section applies only to products with powered functional modules. Passive products may skip this section.

10.3.1 Grounding and Insulation Tests

  • Use a ground resistance tester to measure the ground resistance of the waveguide window housing, which shall be ≤ 0.1 Ω (the overall ground resistance after connection to the shielding body shall be ≤ 1 Ω).
  • Use a 500 V megohmmeter to measure the insulation resistance between each live circuit and the housing, which shall be ≥ 100 MΩ.
  • Test the continuity of the protective grounding to ensure the grounding circuit is continuous and reliable.

10.3.2 Power-On Functional Test

Power-on is only permitted after confirming correct wiring and acceptable insulation.

Fan Module Test:

  • Start the fan, check that the rotation direction is correct, and there are no abnormal noises or severe vibrations.
  • Use a clamp meter to test the operating current, which shall be within the rated current range, without overload.
  • Test the speed regulation function (if available), adjust the rotation speed, and observe whether the airflow change is normal.
  • Operate for 30 minutes, use an infrared thermometer to check the motor housing temperature; temperature rise ≤ 40 K, no overheating.

Heating Module Test:

  • Set the thermostat start temperature, simulate a low-temperature environment, and check whether the heating element starts normally.
  • Test the over-temperature protection function, confirming automatic power-off upon over-temperature.
  • Operate for 15 minutes, check the heating element surface temperature, which shall be within the design range, without local overheating.

Control Logic Test:

  • Test logic functions such as temperature-controlled start/stop and interlocking control, confirming accurate and reliable operation.
  • Test safety functions such as emergency stop and power-off protection, ensuring effectiveness.

10.4 Ventilation Performance Commissioning

10.4.1 Natural Ventilation Test

  • Under conditions of no fan and no external wind pressure, test the static pressure difference across both sides of the waveguide window and the natural ventilation volume.
  • Use an anemometer to measure the air velocity at multiple points across the waveguide window cross-section, take the average value, and calculate the ventilation volume:

Q = v × S × 3600

Where Q is airflow (m³/h), v is average air velocity (m/s), S is effective ventilation area (m²).

  • The test results shall meet the design ventilation requirements. If not up to standard, check for blockage, excessive airflow resistance, or other issues.

10.4.2 Forced Ventilation Test

  • Start the supporting fan or fresh air system, test the ventilation volume and airflow resistance of the waveguide window under rated operating conditions.
  • Use a micro manometer to measure the static pressure difference before and after the waveguide window, which is the airflow resistance value.
  • Test the airflow resistance curve under different airflow rates, compare with the product’s nominal parameters; deviation shall be ≤ 15%.
  • Check for airflow whistling or resonance abnormal noise during ventilation; if present, investigate the cause and rectify.

10.4.3 Ventilation Performance Failure Troubleshooting

If ventilation volume is insufficient or airflow resistance is excessive, common causes and treatments:

Cause Treatment
Waveguide cell blockage: Dust, debris, or welding slag blocking cells Use compressed air for reverse blowing to clean
Protective mesh/filter cotton too dense Replace with protective mesh or filter cotton of appropriate mesh count
Installation misalignment: Waveguide window misaligned with opening, blocking ventilation area Re-adjust the installation position
Fan selection mismatch Replace with a fan with matching airflow and pressure

10.5 Shielding Effectiveness Commissioning Test

The shielding effectiveness test is the core part of product commissioning, used to verify the actual shielding effect of the waveguide window after installation. It shall be strictly performed in accordance with the GB/T 12190 standard.

10.5.1 Test Frequency Bands and Measurement Point Layout

Test Frequency Bands: Determined by the product shielding level. Conventional Class C testing covers the full frequency band of 14 kHz to 18 GHz, divided into three bands: magnetic field, electric field, and microwave.

Measurement Point Layout:

  • Test at 9 measurement points: the center of the waveguide window, four corners, and midpoints of four edges, with emphasis on checking edge and corner leakage.
  • Test distance: 0.5 to 1 m for low-frequency band, 1 to 3 m for high-frequency band.
  • Aim the receiving antenna at the waveguide window surface and scan test point by point.

10.5.2 Test Method (Spectrum Analyzer Method)

Baseline Value Test: Place the transmitting antenna and receiving antenna in an open, unobstructed environment with the same spacing as the actual test distance. Test the received field strength at each frequency point and record as the baseline level.

Post-Shielding Test: Place the transmitting antenna outside the shielding room, aimed at the waveguide window under test; place the receiving antenna inside the shielding room at the corresponding position. Test the received field strength at each frequency point and record as the post-shielding level.

Shielding Effectiveness Calculation:

SE = P_baseline − P_post-shielding (dB)

That is, the difference between the baseline level and the post-shielding level is the shielding effectiveness at that frequency point.

Full Frequency Band Scan: Scan and test frequency band by band from low frequency to high frequency, recording the shielding effectiveness value at each frequency point.

Leakage Point Location: If low shielding effectiveness is found at a certain frequency point, use the receiving antenna to slowly move along the periphery of the waveguide window to precisely locate the leakage point position and mark it.

10.5.3 Test Precautions

  • During the test, all non-test equipment inside the shielding room shall be powered off to avoid self-radiation interfering with test results.
  • Test personnel shall stay away from the test antennas to avoid human body reflection affecting data.
  • Test the same measurement point 3 times and take the average value to reduce test error.
  • When ambient electromagnetic noise is too high, suspend the test or take noise reduction measures.
  • Test data shall be truthfully recorded, noting test conditions, environmental parameters, and instrument models.

10.5.4 Leakage Point Rectification

If testing reveals local leakage and shielding effectiveness does not meet requirements, rectify according to the following steps:

Flange Edge Leakage: The most common cause of leakage, usually due to loose bolts, failed gaskets, or impurities on the sealing surface.

  • Treatment: Re-tighten bolts to rated torque in diagonal sequence; if leakage persists, disassemble and check whether the gasket is damaged and whether the sealing surface has paint or impurities. Clean or replace the gasket and reinstall.

Weld Leakage (Welded Type): Porosity or defective welding in welds causing leakage.

  • Treatment: Locate the leakage position, repair-weld, grind smooth, and retest.

Core Internal Leakage: Unsoldering, cracking, or pinholes in the honeycomb core.

  • Treatment: Minor defects can be filled with conductive adhesive; severe defects require replacement of the waveguide window core.

Bolt Hole Leakage: Excessive gap between bolt and hole wall, or insulated bolts.

  • Treatment: Replace with conductive bolts and apply conductive adhesive to fill the gap.

Adjacent Shielding Body Leakage: Leakage from gaps or holes in the wall around the waveguide window itself, not a waveguide window problem.

  • Treatment: Seal and repair the surrounding wall.

After rectification is completed, re-perform the shielding effectiveness test until all measurement points and all frequency bands meet the nominal performance requirements.

10.6 System Integrated Commissioning

After individual commissioning is completed, perform overall system integrated commissioning:

  • Ventilation system operates in coordination with the air conditioning/fresh air system; test continuous operation for more than 2 hours, checking the waveguide window working status for condensation, dust accumulation, or abnormal noise.
  • Shielding system operates in fully enclosed mode; test overall shielding effectiveness, confirming no obvious performance weakness at the waveguide window location.
  • Electrical system operates under load; test voltage, current, and temperature, all within normal ranges, with no abnormalities.
  • Simulate extreme operating conditions (such as maximum wind speed, minimum temperature) to verify product adaptability.

10.7 Commissioning Records and Conclusions

After all commissioning items are completed, organize the test data and fill in the “Electromagnetic Shielding Waveguide Window Commissioning Record Form,” including installation quality inspection data, electrical test data, ventilation performance data, and shielding effectiveness test data.

All test data shall be signed and confirmed by the test personnel and the on-site person in charge.

Commissioning Acceptance Criteria:

  • Installation quality conforms to the acceptance standards in Chapter 8;
  • Electrical performance is safe and qualified, with normal functions;
  • Ventilation performance meets design requirements;
  • Shielding effectiveness meets the product’s nominal level indicators.

After commissioning is qualified, issue a commissioning qualification report as the basis for final acceptance. If commissioning is not qualified, rectify and re-commission until qualified.

Chapter 11 Product Precautions

11.1 Transportation and Storage Precautions

Transportation Requirements:

  • Products shall be transported in original packaging, with foam and pearl cotton cushioning inside to avoid collision and compression that may cause deformation of the honeycomb core.
  • Handle with care during handling;Strictly prohibited throw, roll, or step on the products, and do not use sharp objects to strike the core surface.
  • Rain and moisture protection measures shall be taken during transportation; mixing with acids, alkalis, or corrosive items is prohibited.
  • Large waveguide windows shall be transported in an upright position, firmly secured to prevent tipping; stacking shall not exceed 3 layers to avoid deformation from heavy pressure.

Storage Requirements:

  • Products shall be stored in a dry, well-ventilated indoor warehouse free of corrosive gases, avoiding open-air storage.
  • Storage environment temperature: -10 ℃ to 40 ℃, relative humidity ≤ 80%; keep away from heat sources, open flames, and strong electromagnetic radiation sources.
  • Products shall be placed on flat shelves or wooden pallets, not in direct contact with the ground, to prevent moisture and rust.
  • Regular inspection during storage; promptly handle any oxidation, rust, or deformation found.
  • Conductive gaskets, conductive adhesives, and other sealing auxiliary materials shall be stored separately and used within their shelf life, avoiding high temperature and direct sunlight which cause aging.

11.2 Installation and Construction Precautions

Shielding Continuity Prohibitions:

  • It is strictly forbidden to damage the electrical continuity of the shielding body during installation. Painting the sealing surface, applying insulating tape, or placing insulating materials such as rubber pads on the sealing surface is prohibited.
  • Openings shall be made by mechanical cutting only; gas welding or electric welding cutting is prohibited to avoid large-area oxidation and deformation.
  • After installation, arbitrarily drilling holes or welding accessories on the waveguide window is prohibited. If openings are required, shielding compensation measures must be taken.

Sealing Surface Protection:

  • Do not remove the protective film on the sealing surface before installation; it may only be removed during cleaning to avoid dust and oil contamination.
  • Do not touch the conductive sealing surface directly with bare hands; sweat can cause oxidation and affect electrical conductivity.
  • Avoid repeated disassembly after the conductive gasket is installed; multiple compressions will cause loss of elasticity and seal failure.

Bolt Tightening Specifications:

  • The diagonal cross-tightening method must be used; single-side sequential tightening is strictly prohibited to prevent flange warping and deformation.
  • Strictly control the tightening torque. Insufficient torque will cause gap leakage; excessive torque will cause flange deformation and bolt thread stripping.
  • When tightening stainless steel bolts, use moderate force to avoid thread seizing from excessive force.

Welding Construction Precautions:

  • The honeycomb core must be protected during welding to prevent welding spatter from entering the cells, causing blockage and damage.
  • Control welding current and welding time to avoid overheating, which may cause core unsoldering and deformation.
  • After welding, clean welding slag, grind smooth, and apply anti-rust and anti-corrosion treatment.

Safety Construction Precautions:

  • Safety belts must be worn when working at heights, qualified working platforms must be erected, and tools must be placed in tool bags to prevent falling and injury.
  • When welding, clear flammable materials from the surrounding area, equip fire extinguishers, and implement fire prevention measures.
  • Wear goggles and dust masks during grinding operations to prevent metal chips from injuring eyes.
  • Temporary electrical use must comply with safety regulations; distribution boxes shall have leakage protection, and cables shall have no damage or exposed conductors.

11.3 Operation Precautions

Shielding Performance Protection:

  • It is forbidden to pass metal wires, cables, water pipes, or other conductors directly through the cells of the waveguide window, as this will create an “antenna effect” and cause complete loss of electromagnetic shielding.
  • It is forbidden to hang or fix metal objects on the waveguide window to avoid affecting shielding performance.
  • Regularly inspect the shielding sealing surface to prevent foreign objects from getting stuck in gaps and causing seal failure.

Ventilation Performance Maintenance:

  • It is forbidden to block the waveguide window with plastic boards, cardboard, or other items, affecting ventilation and heat dissipation.
  • It is forbidden to pour water or dump debris into the waveguide window to prevent cell blockage and metal corrosion.
  • For fan-type products, it is strictly prohibited to place debris near the air inlet to prevent it from being sucked into the fan and causing damage.

Environmental Condition Control:

  • Conventional aluminum waveguide windows should avoid prolonged use in high-humidity, salt-spray, acid-base environments, which accelerate corrosion and reduce service life.
  • In scenarios with large temperature differences and high humidity, enable the anti-condensation heating function to prevent condensation on the inner walls of the cells.
  • In dusty environments, clean regularly and optionally install a filter module to reduce dust ingress.

Electrical Safety:

  • Products with powered modules must be reliably grounded; operation without grounding is prohibited.
  • Arbitrarily modifying electrical circuits or replacing with higher-power fans or heating elements is prohibited to prevent overload safety incidents.
  • When the fan is running, do not insert hands or tools into the air duct opening to prevent mechanical injury.
  • Before cleaning or repairing electrical parts, disconnect the power supply and apply lockout/tagout procedures.

11.4 Maintenance Precautions

  • When cleaning the waveguide window, use dry compressed air for blowing. Direct washing with high-pressure water guns is prohibited to prevent water ingress and rust.
  • It is forbidden to clean the product surface with strong acid or strong alkali cleaners to avoid corrosion of the surface conductive layer.
  • When replacing conductive gaskets, products of the same specification and model must be used; arbitrary substitution with other materials is prohibited.
  • When disassembling and reinstalling the waveguide window, check the cleanliness of the sealing surface and the condition of the gasket, and replace the gasket if necessary before installation.
  • During annual maintenance, shielding effectiveness shall be tested simultaneously; do not wait until performance has seriously degraded before addressing the issue.
  • Keep maintenance records and establish an equipment ledger to track product operating status.

11.5 Emergency Handling Precautions

  • If obvious electromagnetic leakage is found at the waveguide window, immediately investigate the cause. If it is loose sealing, tighten promptly; if it is core damage, temporarily seal with a metal plate and contact the manufacturer for repair.
  • If the fan has abnormal noise, smoke, or odor, immediately cut off power and stop the machine, investigate the fault, and prohibit continued operation with faults.
  • In case of fire, first cut off the power supply, then use dry powder fire extinguishers. It is forbidden to spray water directly on electrical equipment and energized waveguide windows.
  • During extreme weather such as strong typhoons and heavy rainstorms, outdoor waveguide windows shall be inspected and reinforced in advance, and temporary sealing measures shall be taken if necessary.

Chapter 12 Product Repair and Maintenance

Scientific and standardized repair and maintenance are key to ensuring the long-term stable operation of electromagnetic shielding waveguide windows and extending their service life. This chapter describes maintenance content, operation methods, quality standards, and replacement requirements for wearing parts in accordance with a four-level maintenance system: daily inspection, monthly maintenance, quarterly servicing, and annual overhaul.

12.1 General Maintenance Principles

  • Establish a product equipment ledger, recording product model, installation date, operating hours, maintenance records, faults, and repair situations to achieve full lifecycle management.
  • Maintenance work shall be performed by trained professionals, strictly complying with safety operating procedures; maintenance on live equipment must be performed after power-off.
  • During maintenance, protect the shielding sealing surface, do not damage shielding continuity, and verify shielding performance after maintenance.
  • Stock an appropriate quantity of wearing parts as spare parts to ensure timely replacement in case of failure.
  • High-grade shielding facilities shall establish a regular shielding effectiveness testing plan, with at least one comprehensive performance test annually.

12.2 Daily Inspection (Daily/Weekly)

Daily inspection is performed by on-site operations personnel, focusing on appearance and operating status to promptly identify obvious abnormalities.

12.2.1 Inspection Content

Appearance Inspection: Observe whether the waveguide window appearance has obvious deformation, damage, or rust; whether the protective mesh is intact; and whether there is debris blocking.

Cleanliness Inspection: Observe whether the waveguide cells have obvious dust accumulation or blockage, and whether the surface has oil stains or water marks.

Operating Status Inspection (Powered Type):

  • Whether the fan has abnormal noise or severe vibration during operation, and whether the airflow is normal.
  • Whether the heating module indicator light is normal and whether there is an overheating odor.
  • Whether the control instrument display is normal and whether there are fault alarms.

Seal Inspection: Visually inspect the gap around the flange for obvious cracking or gasket exposure, and whether bolts are loose or missing.

Surrounding Environment Inspection: Check for standing water, debris, corrosive items nearby, and whether ambient temperature and humidity are within allowable ranges.

12.2.2 Inspection Frequency

  • Important locations (classified computer rooms, laboratories): once daily
  • General locations: once weekly
  • Outdoor, harsh environments: once daily

12.2.3 Inspection Records and Handling

  • Fill in the inspection record form, recording inspection time, status, and abnormal conditions.
  • Handle minor abnormalities promptly, such as clearing blocking debris and tightening loose bolts.
  • Report severe abnormalities (such as core damage or fan failure) promptly and arrange professional repair.

12.3 Monthly Maintenance

Perform a comprehensive cleaning and basic inspection monthly to ensure product cleanliness and basic performance.

12.3.1 Cleaning Operations

External Surface Cleaning: Use a dry soft cloth to wipe the waveguide window outer frame and protective mesh to remove dust and stains. Oil stains may be wiped with a small amount of neutral cleaner, then dried with a dry cloth.

Waveguide Cell Cleaning: Use dry compressed air at 0.3–0.5 MPa pressure to blow the waveguide cells from inside to outside, removing dust inside the cells. During blowing, keep the nozzle 20–30 cm from the core, at an inclined angle, avoiding vertical high-pressure blowing that may cause core deformation.

Sealing Surface Cleaning: Use a lint-free cloth dipped in a small amount of anhydrous ethanol to wipe the flange edge sealing surface, removing dust and oil while maintaining electrical conductivity.

Filter Cotton Cleaning/Replacement: For products with filter modules, remove the filter cotton and blow dust off with compressed air in the reverse direction; if severely blocked or damaged, replace directly with new filter cotton.

12.3.2 Fastener Inspection

  • Use a wrench to inspect all mounting bolts one by one; re-tighten to the specified torque if loose.
  • Check bolts for rust or thread stripping; replace damaged ones promptly.
  • Check grounding terminals for looseness or oxidation, ensuring reliable grounding.

12.3.3 Electrical Component Inspection (Powered Type)

  • Check wiring terminals for looseness, heating, or oxidation; re-tighten terminal screws.
  • Clean dust from the fan and heating element surfaces to ensure proper heat dissipation.
  • Check cables for aging, damage, or insulation cracking; replace any found problems promptly.
  • Test ground resistance and insulation resistance, record the values, and compare with historical data to judge the trend.

12.3.4 Monthly Maintenance Quality Standards

  • Product surface is clean, without obvious dust accumulation or oil stains.
  • Waveguide cells are clear and unobstructed, without obvious blockage.
  • Fasteners are complete and secure, without looseness.
  • Electrical components operate normally, without safety hazards.
  • Sealing surface is clean, without obvious foreign objects stuck in gaps.

12.4 Quarterly Servicing

Perform deep servicing quarterly, focusing on checking sealing performance and core component status to prevent performance degradation.

12.4.1 Sealing Performance Inspection

Gasket Condition Inspection: Observe whether the conductive gasket has aging, cracking, deformation, or loss of elasticity, and whether the surface has oxidation or damage.

Gap Detection: Use a feeler gauge to spot-check the contact gap around the flange, confirming it remains within the acceptable range.

Contact Resistance Detection: Use a surface resistance tester to measure the contact resistance between the flange and the shielding body at multiple points; it shall be ≤ 0.1 Ω.

If gasket aging or a significant increase in contact resistance is found, arrange for replacement of the conductive gasket.

12.4.2 Core Condition Inspection

  • Carefully inspect the honeycomb core for deformation, unsoldering, rust, or cell blockage.
  • Check the connection between the core and the outer frame for cracking or gaps.
  • For aluminum products, check for surface oxidation; if a large area of white oxidation layer appears, conductive repair treatment is required.

12.4.3 Ventilation Performance Re-Test

  • Test the ventilation volume and airflow resistance under rated operating conditions, compare with initial data; if the deviation exceeds 20%, investigate the cause.
  • Check for increased airflow resistance or decreased airflow; clean blockages or replace filter cotton promptly.

12.4.4 Anti-Corrosion Treatment

  • Check the product surface anti-rust layer and conductive coating for peeling or rust; apply conductive anti-rust paint to local damaged areas.
  • For outdoor and coastal products, focus on corrosion inspection; add anti-corrosion coating if necessary.
  • Apply anti-rust grease to bolts and fasteners to prevent rust and seizing.

12.4.5 Comprehensive Electrical Function Inspection

  • Perform comprehensive functional tests on the fan, heating module, and control system to verify all functions are normal.
  • Calibrate temperature sensors and thermostats to ensure accurate temperature measurement.
  • Test the effectiveness of safety functions such as over-temperature protection and overload protection.

12.5 Annual Overhaul and Performance Testing

Perform a comprehensive overhaul and professional performance testing annually to fully assess product condition and restore performance indicators.

12.5.1 Overall Disassembly and Inspection

  • Remove the protective mesh and filter cotton, and clean thoroughly.
  • If necessary, disassemble the waveguide window body, inspect the inner sealing surface and gasket condition, and clean comprehensively.
  • Check the flange for deformation or warping; correct or replace if flatness exceeds limits.

12.5.2 Comprehensive Replacement of Wearing Parts

  • Replace conductive sealing gaskets: It is recommended to replace all after 3 years of use; shorten to 2 years in high-humidity, high-temperature environments.
  • Replace aged cables and terminals: Inspect electrical cables and replace all aged ones.
  • Replace filter cotton: Replace at least once per year regardless of condition.
  • Inspect fan bearings; replace the fan or bearings if severely worn.

12.5.3 Comprehensive Shielding Effectiveness Test

  • Commission a professional testing institution or use in-house equipment to perform a comprehensive shielding effectiveness test in accordance with national standards, covering the full frequency band and all measurement points.
  • Issue a formal test report to evaluate shielding performance degradation.
  • If shielding effectiveness has degraded beyond limits, investigate the cause and perform rectification and repair.

12.5.4 Anti-Corrosion and Refurbishment Treatment

  • Grind and treat oxidized or rusted surface areas, and re-apply conductive surface treatment.
  • For stainless steel products, re-passivate the welds.
  • Derust and grease all fasteners; replace all severely rusted ones.

12.5.5 Post-Overhaul Acceptance

After the overhaul is completed, re-perform comprehensive testing and acceptance of installation quality, electrical performance, ventilation performance, and shielding effectiveness. Normal operation may resume only after passing, and the equipment ledger records shall be updated.

12.6 Replacement Methods for Common Wearing Parts

12.6.1 Conductive Sealing Gasket Replacement

1. Remove the waveguide window mounting bolts and carefully remove the waveguide window body, placing it on a flat soft pad to avoid impacting the core.

2. Peel off the old conductive gasket, clean residual adhesive, dust, and oil from the sealing groove, wipe clean with anhydrous ethanol, and allow to dry.

3. Prepare a new conductive gasket of the same specification, verifying dimensions, material, and cross-section size are correct.

4. Peel off the release liner from the new gasket’s adhesive backing, and apply evenly along the centerline of the sealing groove. At corners, use 45° miter joints, with tight butt joints and no gaps.

5. Press the gasket evenly by hand to ensure firm, flat adhesion.

6. Reinstall the waveguide window according to installation specifications, tightening bolts diagonally to rated torque.

7. After replacement, perform a shielding effectiveness spot test to verify the sealing effect.

12.6.2 Protective Mesh and Filter Cotton Replacement

1. Loosen the protective mesh fixing screws or clips and remove the old protective mesh.

2. If replacing the filter cotton, remove the old filter cotton from the protective mesh frame and clean the dust inside the frame.

3. Insert new filter cotton of the same dimensions, lay it flat and even, with no gaps at the edges.

4. Reinstall the protective mesh in its original position, tighten screws or fasten clips.

5. Check that the installation is secure, without looseness or gaps.

12.6.3 Fan Module Replacement

1. Disconnect the fan power supply, confirm power-off, then disconnect the fan wiring, marking the wire numbers.

2. Remove the fan mounting bolts and take out the old fan.

3. Clean dust and rust from the mounting surface, ensuring the mounting surface is flat.

4. Install the new fan, align with the mounting holes, and tighten bolts evenly.

5. Connect the power wires and control wires according to the markings, verifying correct polarity.

6. Power on for a test run, checking that rotation direction, noise, and current are all normal.

12.7 Maintenance Safety Regulations

  • All maintenance operations must be performed after power-off, with lockout/tagout applied, and work may only begin after confirming no live power.
  • For maintenance at heights, scaffolding must be erected, safety belts worn, and tools protected from falling.
  • When performing welding maintenance, implement fire prevention measures and clear flammable materials from the surrounding area.
  • When replacing gaskets or cleaning the core, wear gloves to avoid cuts from metal burrs.
  • After maintenance, check that no tools or parts are left inside the equipment to prevent them from flying out and causing injury when the fan starts.
  • After maintenance is completed and the test run is normal, personnel may leave the site.

Chapter 13 Common Product Problems and Solutions

This chapter summarizes common faults that occur during installation, use, and maintenance of electromagnetic shielding waveguide windows, detailing fault phenomena, possible causes, troubleshooting steps, solutions, and preventive measures to help operations and maintenance personnel quickly locate and resolve problems.

13.1 Shielding Effectiveness Faults

13.1.1 Overall Shielding Effectiveness Not Meeting Standards

Fault Phenomenon: Shielding effectiveness test results are generally below the nominal value across the full frequency band, not meeting the corresponding level standard.

Possible Causes:

  • Incorrect product selection; shielding level insufficient, cell size too large, or thickness insufficient.
  • Poor installation sealing; flange not fitting tightly overall, gasket failure, forming annular leakage.
  • Leakage in the shielding wall adjacent to the waveguide window itself, not a waveguide window problem.
  • Metal cables or conductors passing directly through the waveguide window cells, forming an electromagnetic coupling path.
  • Poor core welding quality, large-area defective or unsoldered joints, severe internal leakage.

Troubleshooting Steps:

1. Verify that the product model matches the design requirements, confirming cell size and thickness parameters.

2. Check for conductors passing through the waveguide window and remove them immediately.

3. Use a spectrum analyzer antenna to scan along the periphery of the waveguide window to determine whether the leakage is edge leakage or overall surface leakage.

4. Check bolt tightening and gasket condition to investigate installation sealing issues.

5. Rule out leakage from the surrounding wall; seal other openings and test the waveguide window separately.

6. Observe the core appearance and check for obvious unsoldering or cracking.

Solutions:

  • If the product was incorrectly selected, replace with a waveguide window product of the corresponding level.
  • For installation sealing issues, re-tighten bolts or replace the conductive gasket; clean the sealing surface and reinstall.
  • For surrounding wall leakage, seal gaps and openings in the wall.
  • For core welding defects, repair minor defects by re-welding; return severely defective cores to the manufacturer for replacement.

Preventive Measures:

  • Reserve performance margin during product selection, prioritizing a higher-level product.
  • Strictly follow process procedures during installation, and perform seal inspection after installation.
  • Strictly prohibit any conductor from passing through the waveguide window.
  • Procure products from reputable manufacturers to ensure core welding quality.

13.1.2 Local Point Leakage

Fault Phenomenon: Overall shielding effectiveness is acceptable, but there is an obvious leakage point at a specific local position with low effectiveness.

Possible Causes:

  • Local bolt looseness or absence, causing excessive gap at that position.
  • Local gasket breakage, missing material, or lifted by foreign objects.
  • Local flange deformation or impact protrusion, causing poor fit around the area.
  • Local weld porosity or defective welding for welded-type products.
  • Local core impact cracking or unsoldering.

Troubleshooting Steps:

1. Use a high-frequency probe to precisely locate the leakage point coordinates.

2. Check the corresponding position for bolt, gasket, flange, and weld condition.

3. Gently tap the leakage area and observe whether the leakage value changes to determine if it is a contact issue.

Solutions:

  • For loose bolts, tighten the bolts at that position and the surrounding area.
  • For gasket defects, patch the gasket locally or replace the entire gasket.
  • For flange deformation, grind the protruding area or correct the flange.
  • For weld defects, repair-weld and grind the area.
  • For local core cracking, fill with conductive adhesive or replace the core.

Preventive Measures:

  • Tighten evenly during installation to avoid local uneven stress.
  • Avoid impacting the flange edge during transportation and installation.
  • Strictly follow process specifications during welding and inspect each section after welding.

13.1.3 Poor Low-Frequency Band Shielding Effectiveness

Fault Phenomenon: High-frequency shielding is acceptable, but low-frequency magnetic field shielding effectiveness below 100 kHz is obviously insufficient.

Possible Causes:

  • Aluminum products have inherent limitations for low-frequency magnetic field shielding; insufficient for strong low-frequency magnetic field scenarios.
  • Excessive contact resistance; low-frequency magnetic fields are more sensitive to contact resistance.
  • Poor grounding; ground potential differences causing low-frequency shielding failure.
  • Strong low-frequency magnetic field sources nearby, beyond the designed protection range.

Solutions:

  • For strong low-frequency magnetic field scenarios, replace with copper or steel waveguide windows to improve low-frequency magnetic shielding performance.
  • Clean the sealing surface, reduce contact resistance, and enhance electrical continuity.
  • Improve the grounding system, reduce ground resistance, and achieve equipotential bonding.
  • Provide separate shielding for strong magnetic field sources to reduce incident field strength.

13.1.4 Significant High-Frequency Band Shielding Effectiveness Degradation

Fault Phenomenon: Low-frequency band is acceptable, but shielding effectiveness above 10 GHz has significantly decreased.

Possible Causes:

  • Honeycomb cell size too large; cutoff frequency close to the operating frequency, insufficient high-frequency attenuation.
  • Installation gaps too large; high-frequency electromagnetic waves are more sensitive to small gaps, making gap leakage significant.
  • Poor high-frequency performance of sealing gaskets; ordinary conductive rubber has reduced high-frequency shielding effect.
  • Core surface oxidation; skin effect at high frequencies causes reduced conductivity.
  • Bolt spacing too large, increasing gap leakage at high frequencies.

Solutions:

  • For high-frequency scenarios, replace with a higher-level waveguide window with smaller cell size to raise the cutoff frequency.
  • Reduce bolt spacing and increase fastening points to reduce gap leakage.
  • Replace with beryllium copper spring gaskets to improve high-frequency sealing performance.
  • Clean and grind the core surface to remove the oxidation layer and restore conductivity.

13.2 Ventilation Performance Faults

13.2.1 Insufficient Ventilation Volume

Fault Phenomenon: Actual ventilation volume is much lower than the design value; indoor heat dissipation is poor, and temperature is high.

Possible Causes:

  • Waveguide cells blocked by dust, debris, or insects, reducing effective ventilation area.
  • Protective mesh and filter cotton heavily dust-laden, increasing airflow resistance.
  • Fan selection mismatch; insufficient static pressure to overcome system resistance.
  • Installation misalignment; waveguide window not concentric with the opening, partially blocking ventilation area.
  • Unreasonable duct design; too many elbows, undersized duct diameter, high system resistance.

Troubleshooting Steps:

1. Visually inspect the waveguide cells, protective mesh, and filter cotton for blockage.

2. Test the airflow at the fan outlet and the waveguide window outlet to compare and determine the resistance location.

3. Check whether the installation position is offset, blocking the ventilation area.

4. Verify whether the fan parameters match the system resistance.

Solutions:

  • For blockage, clean thoroughly with compressed air; for severe blockage, disassemble and clean.
  • Replace dirty or blocked filter cotton and clean the protective mesh.
  • For insufficient fan static pressure, replace with a higher-pressure fan or increase the number of fans.
  • Re-adjust the waveguide window installation position to ensure alignment with the opening.
  • Optimize duct design, reduce resistance, and increase duct diameter.

13.2.2 Excessive Airflow Resistance

Fault Phenomenon: During ventilation system operation, the pressure difference before and after the waveguide window is large, and airflow cannot reach the required level.

Possible Causes:

  • Cell size too small, shielding level too high, inherently high airflow resistance.
  • Core thickness too large, high frictional resistance along the path.
  • Oil stains and dust inside the waveguide cells, rough inner walls, increased resistance.
  • Multiple layers of filtration and protective mesh stacked, adding resistance.

Solutions:

  • Under the premise of meeting shielding requirements, replace with a model with larger cell size and lower airflow resistance.
  • Clean the inner walls of the cells to reduce frictional resistance.
  • Optimize filtration configuration, selecting low-resistance, high-efficiency filter materials.
  • Increase the ventilation area of the waveguide window to reduce face velocity and resistance.

13.2.3 Airflow Whistling / Resonance Abnormal Noise

Fault Phenomenon: Sharp whistling or low-frequency resonance noise during ventilation, affecting the environment.

Possible Causes:

  • Air velocity too high; airflow passing through honeycomb cells produces aerodynamic whistling.
  • Protective mesh or grille resonates with airflow.
  • Fan speed too high; vibration transmitted through the structure.
  • Waveguide window not firmly installed; airflow causes vibration.

Solutions:

  • Reduce face velocity by increasing ventilation area or lowering fan speed.
  • Replace the protective mesh with a different cell size to avoid resonance frequency.
  • Add vibration dampers to the fan and use flexible duct connections to isolate vibration transmission.
  • Reinforce the waveguide window installation and increase fastening points to eliminate looseness gaps.

13.3 Structural and Corrosion Faults

13.3.1 Flange Deformation and Warping

Fault Phenomenon: Flange plane deformation, with the middle or edges lifting, showing obvious gaps.

Possible Causes:

  • Incorrect bolt tightening sequence during installation; excessive force on one side causing deformation.
  • Excessive tightening torque, exceeding the flange yield strength.
  • Impact or heavy pressure during transportation or installation causing deformation.
  • Severe temperature fluctuations, thermal expansion and contraction causing deformation.

Solutions:

  • For minor deformation, disassemble and correct on a flat plate, or compensate by adjusting bolt torque.
  • For severe deformation, replace the flange or replace the entire waveguide window.
  • During reinstallation, strictly follow the diagonal cross-tightening method and control torque.

13.3.2 Metal Surface Oxidation and Rust

Fault Phenomenon: White oxidation powder on aluminum product surfaces, rust spots on steel products, poor appearance, and reduced electrical conductivity.

Possible Causes:

  • Humid environment, condensation, prolonged exposure to high-humidity conditions.
  • Coastal salt-spray environment, chemical acid-base environment corrosion.
  • Surface treatment layer damaged, losing protection.
  • Improper daily cleaning with corrosive cleaners.

Solutions:

  • For minor oxidation, grind with fine sandpaper to remove the oxidation layer, then apply conductive oxidation paint or tin plating repair.
  • For severe rust, replace with stainless steel products.
  • Improve environmental ventilation and dehumidification to reduce ambient humidity.
  • For coastal corrosive environments, select 316L stainless steel series products.

13.3.3 Honeycomb Core Deformation and Unsoldering

Fault Phenomenon: Local core depression, deformed honeycomb cells, or joint unsoldering and cracking.

Possible Causes:

  • Impact or compression from external forces causing core deformation.
  • Excessive temperature during welding, solder melting and unsoldering.
  • Prolonged high-temperature environment, solder softening and failure.
  • Severe corrosion, corrosion fracture at welded joints.

Solutions:

  • For minor deformation or small-area unsoldering that does not affect shielding effectiveness, continued use with regular observation is acceptable.
  • For severe deformation or large-area unsoldering that reduces shielding effectiveness, return to the manufacturer for core replacement or overall replacement.
  • Avoid external impact and prohibit applying pressure or hanging heavy objects on the waveguide window.

13.4 Electrical Function Faults (Powered-Type Products)

13.4.1 Fan Does Not Start

Fault Phenomenon: After power-on, the fan has no response and does not rotate.

Possible Causes:

  • Power not connected, circuit breaker tripped, or circuit open.
  • Fan motor burned out, winding open circuit.
  • Start capacitor damaged (single-phase fan).
  • Impeller jammed by foreign object.
  • Thermostat or controller fault, no output signal.

Troubleshooting Steps:

1. Use a multimeter to test whether there is voltage at the fan input terminal to determine if the power supply is normal.

2. After power-off, manually rotate the impeller to check for jamming.

3. Test the motor winding resistance to determine whether it is open or short circuit.

4. Check whether the start capacitor capacitance is normal.

5. Check whether the control circuit and thermostat output normally.

Solutions:

  • For power supply faults, repair the supply circuit and restore power.
  • For impeller jamming, clear foreign objects and eliminate the jam.
  • For capacitor damage, replace with a start capacitor of the same specification.
  • For motor burnout, replace the fan motor or the entire fan.
  • For controller faults, repair or replace the controller.

13.4.2 Excessive Fan Noise and Vibration

Fault Phenomenon: Fan noise and vibration during operation are significantly higher than normal levels.

Possible Causes:

  • Fan impeller dust accumulation or deformation, dynamic balance destroyed.
  • Bearing wear or lack of lubrication, abnormal rotation noise.
  • Fan mounting bolts loose, increased vibration.
  • Rigid connection between fan and duct, vibration transmission.
  • Unstable voltage causing abnormal speed.

Solutions:

  • Clean dust from the impeller; correct or replace the impeller if deformed.
  • For bearing wear, replace bearings or add lubricating grease.
  • Tighten fan mounting bolts and add rubber vibration-damping pads.
  • Change duct connections to flexible connections to isolate vibration transmission.
  • Stabilize the power supply voltage.

13.4.3 Heating Element Does Not Heat

Fault Phenomenon: After enabling the heating function, the waveguide window has no temperature rise, and the heating element does not work.

Possible Causes:

  • Heating circuit power disconnected, fuse blown.
  • PTC heating element damaged, internal open circuit.
  • Thermostat fault, no heating signal output.
  • Temperature sensor fault, false high-temperature report.
  • Loose wiring or open circuit.

Solutions:

  • Check the power supply and fuse, restore power, and replace the fuse.
  • For loose wiring, re-tighten terminal connections.
  • For heating element damage, replace with a PTC heating element of the same specification.
  • For thermostat or sensor faults, replace the corresponding components.

13.4.4 Frequent Over-Temperature Protection Tripping for Heating Element

Fault Phenomenon: After heating operation for a period, the power automatically cuts off, requiring manual reset.

Possible Causes:

  • Over-temperature protector setpoint too low.
  • Poor ventilation, heat cannot dissipate, causing local overheating.
  • Heating element power too large.
  • Temperature sensor position shifted, inaccurate temperature measurement.

Solutions:

  • Adjust the over-temperature protection setpoint to a reasonable range.
  • Ensure good ventilation and avoid heating without airflow.
  • Replace with a heating element with matched power.
  • Re-secure the temperature sensor to ensure it fits the temperature measurement surface.

13.5 Environmental Faults

13.5.1 Condensation and Water Accumulation in Waveguide Cells

Fault Phenomenon: In low-temperature, high-humidity environments, condensation forms on the inner walls of the waveguide cells, even accumulating water.

Possible Causes:

  • Large indoor-outdoor temperature difference, high humidity, dew point temperature higher than the waveguide window surface temperature.
  • Anti-condensation heating function not enabled or heating power insufficient.
  • Excessive ventilation volume, cold air bringing in excessive moisture.

Solutions:

  • Enable the anti-condensation heating module to raise the waveguide core temperature above the dew point.
  • Appropriately reduce ventilation volume or preheat the intake air.
  • Provide drain holes at the bottom to discharge condensate promptly.
  • Reduce indoor humidity to minimize condensation conditions.

13.5.2 Insect and Rodent Entry and Blockage

Fault Phenomenon: Insects or rodents enter the waveguide window, building nests and accumulating debris, blocking the cells.

Possible Causes:

  • Protective mesh not installed, or mesh size too large or damaged.
  • No insect and rodent prevention measures for outdoor installations.
  • Poor surrounding environmental sanitation, many insects and rodents.

Solutions:

  • Clear the blocking debris and blow the cells clean.
  • Replace with a smaller mesh size protective mesh; repair or replace damaged mesh promptly.
  • Implement insect and rodent prevention measures around the area and clean sanitary dead corners.
  • An insect-prevention electric grid may be installed on the air intake side (with shielding treatment required).

Chapter 14 Product QA

14.1 Common Selection Questions

Q1: How is the size of an electromagnetic shielding waveguide window selected?

A: The waveguide window size is primarily determined by the required ventilation airflow. First, calculate the total ventilation requirement based on equipment heat dissipation or space air change rate, then calculate the required ventilation area based on a face velocity of 1.5–3 m/s, and thereby determine the waveguide window dimensions. This should be combined with the site’s reserved opening dimensions, with standard size products prioritized. Custom sizes are available for special cases. Generally, configuring waveguide windows with a ventilation area of 0.01–0.02 m² per square meter of equipment room floor area can meet basic natural ventilation requirements.

Q2: What is the relationship between honeycomb aperture size and shielding effectiveness?

A: With the same waveguide thickness, the smaller the honeycomb aperture, the higher the cutoff frequency, the stronger the shielding effectiveness, and the wider the frequency range that can be shielded. However, the smaller the aperture, the greater the airflow resistance and the lower the ventilation efficiency. Conversely, the larger the aperture, the better the ventilation, but the lower the shielded frequency range and the weaker the effectiveness. When selecting, the minimum aperture must be determined by the highest shielding frequency. The cutoff frequency should be at least 3 times the highest operating frequency to reserve sufficient margin.

Q3: How does one choose between aluminum, copper, and stainless steel waveguide windows?

A: Selection among the three is mainly based on the application environment and shielding priorities:

  • For conventional indoor classified computer rooms and ordinary shielding rooms, aluminum is preferred for its cost-effectiveness, light weight, and suitability for the vast majority of scenarios.
  • For low-frequency strong magnetic field environments, electromagnetic pulse protection, and high-grade shielding laboratories, choose copper for superior low-frequency shielding and electrical conductivity.
  • For corrosive environments such as coastal areas, outdoor locations, chemical plants, and naval vessels, choose stainless steel for its strong corrosion resistance and long service life.

Q4: How do Classes B, C, and D shielding levels correspond to selection?

A: Shielding level is determined by the protection requirements of the application scenario:

  • Class B: Ordinary commercial confidentiality, industrial EMC protection, general equipment shielding, shielding effectiveness ≥80 dB.
  • Class C: State classified venues, conventional military shielding rooms, standard EMC test chambers, shielding effectiveness ≥100 dB, meeting Class C confidentiality standards.
  • Class D: Top-secret classified venues, high-end military applications, millimeter-wave testing anechoic chambers, shielding effectiveness ≥100 dB covering higher frequency bands, representing the highest protection level.
  • For classified projects, Class C is recommended as the minimum, with important projects upgraded to Class D.

Q5: Is a thicker waveguide window always better?

A: Theoretically, greater thickness yields higher shielding effectiveness, but thicker is not always better. Increased thickness leads to greater airflow resistance, higher weight, and increased cost. In conventional design, a thickness of 3–5 times the aperture can achieve approximately 100 dB of shielding effectiveness; beyond this, the marginal benefit of additional thickness diminishes. For high-grade scenarios, thickness may be moderately increased, but ventilation, cost, and weight must all be considered comprehensively.

Q6: Can waveguide windows be customized to non-standard shapes?

A: Yes. Guangzhou Lain Intelligent System Development Co., Ltd. supports full-size customization, including rectangular, circular, trapezoidal, and arc shapes of any non-standard dimension, with 1:1 customization based on the customer’s site opening dimensions, perfectly fitting various non-standard projects. The delivery lead time for custom products is slightly longer than for standard products; please consult our sales technical staff for details.

Q7: How do I choose between an integrated fan unit and a separate waveguide window plus fan?

A: Integrated fan products undergo EMC optimization and matching commissioning before leaving the factory, featuring low electromagnetic radiation and easy installation, suitable for small shielding rooms, cabinets, and similar scenarios. Separate waveguide windows with external fans offer more flexible airflow and pressure selection, suitable for high-volume ventilation systems; however, attention must be paid to shielding treatment between the fan and waveguide window to avoid air duct conduction leakage. Generally, for low airflow scenarios, the integrated type is preferred, while the separate type is preferred for high airflow scenarios.

14.2 Common Installation Questions

Q8: Can openings for waveguide windows be cut on site, or must they be pre-reserved?

A: Both methods are acceptable. For new construction projects, pre-reserving openings according to dimensions is recommended for higher precision and better installation results. For renovation projects, openings can be cut on site using plasma cutting or mechanical cutting; oxy-fuel gas cutting is strictly prohibited. After cutting, grind the edges smooth, apply conductive treatment, and install per the standard procedure.

Q9: Is there a mandatory requirement for bolt spacing? Why can’t it be too large?

A: Yes, there is a clear requirement. Bolt spacing directly affects flange mating tightness; excessive spacing causes poor mating in the middle sections, forming gap leaks that become more pronounced at higher frequencies. Per electromagnetic shielding specifications, bolt spacing should be less than 1/20 of the wavelength of the highest shielding frequency. For conventional Class C products, spacing is ≤100 mm; Class D, ≤80 mm; Class B, ≤120 mm. This product has mounting holes pre-drilled at standard spacing before leaving the factory; no field adjustment is required.

Q10: Can conductive gaskets be reused? Must they be replaced after disassembly and reassembly?

A: It depends on the situation. If recently installed, and the gasket shows no deformation, damage, or aging, retains good elasticity, and is clean, it may be reused once. If installed for more than six months, or if the gasket shows compression set, cracking, or surface oxidation, replacement is mandatory. To ensure shielding reliability, it is recommended to replace conductive gaskets every time the unit is disassembled and reassembled — the cost is low but shielding effectiveness is far more assured.

Q11: What if the waveguide window mounting surface has paint? Must it be ground off?

A: Yes, it must be ground off. Paint is an insulating material that interrupts electrical continuity, causing a sharp increase in contact resistance on the sealing surface and severe electromagnetic leakage. Before installation, all paint and oxide layers within the flange coverage area must be completely ground off to expose the bare metal and ensure good conductive contact. This is a critical step for ensuring shielding effectiveness and must never be skipped.

Q12: Can waveguide windows be installed on shielding doors? Will it affect the door’s shielding?

A: Yes, they can be installed on shielding door leaves, and this is the standard solution for shielding door ventilation. Waveguide windows on door leaves must be pre-installed during door body production and reliably connected to the door leaf shielding structure; this does not compromise the door’s overall shielding performance. However, the weight must not exceed the door leaf’s load capacity, and the door’s knife-edge sealing and finger-strip structures must not be affected.

Q13: Will connecting an air duct directly to the waveguide window cause shielding failure?

A: A metal air duct directly spanning between the inside and outside of a shielding room becomes a conduction path for electromagnetic waves, causing shielding failure. The correct approach is to insert a section of non-metallic flexible connection (canvas, silicone cloth, etc.) between the waveguide window and the metal air duct, with a length ≥200 mm, to interrupt the electromagnetic conduction path while providing vibration damping.

14.3 Common Performance Questions

Q14: What shielding effectiveness can electromagnetic shielding waveguide windows achieve?

A: For the LA-BD series products: Class B achieves above 80 dB from 150 kHz to 10 GHz; Class C achieves above 100 dB from 14 kHz to 18 GHz; Class D achieves above 100 dB from 10 kHz to 40 GHz. These values are typical under well-installed conditions. Actual field shielding effectiveness is also affected by installation quality, surrounding structures, and other factors; under proper installation, the rated values are achievable.

Q15: Why is shielding effectiveness lower at high frequencies than at low frequencies?

A: This is an inherent characteristic of cutoff waveguides. The closer the electromagnetic wave frequency is to the cutoff frequency, the lower the attenuation and shielding effectiveness; when the frequency is well below the cutoff frequency, attenuation is high and effectiveness is high. As frequency approaches the cutoff frequency, shielding effectiveness gradually decreases. Therefore, the cutoff frequency must be far higher than the highest operating frequency to ensure sufficient attenuation across the entire frequency band.

Q16: Does a humid environment affect shielding performance?

A: Brief, mild humidity has little impact, but long-term high-humidity environments cause metal surface oxidation and rust, forming an insulating oxide layer that increases contact resistance and gradually degrades shielding effectiveness. This is especially true for aluminum products, which oxidize quickly in long-term high-humidity, salt-spray environments. For humid environments, stainless steel or nickel-plated products are recommended, with periodic surface condition inspections.

Q17: Can waveguide windows protect against electromagnetic pulses (EMP)?

A: Copper and steel waveguide windows possess good electromagnetic pulse protection capability and can serve as the ventilation component of an EMP protection system. This is because the EMP spectrum is dominated by low-frequency components, and copper’s high electrical conductivity provides good attenuation of transient pulses. Aluminum products also provide some protection but perform slightly less effectively than copper. EMP protection requires coordination of the entire shielding system; the waveguide window alone cannot achieve it.

Q18: What does 75% ventilation efficiency mean? Does it mean only 75% of air can pass through?

A: Ventilation efficiency refers to the ratio of effective ventilation area to the total external area of the waveguide window. 75% means that for a waveguide window with 1 m² of external area, the actual area through which air can pass is 0.75 m²; the remainder is occupied by honeycomb wall thickness, outer frame, and other structures. It does not mean 75% of airflow is lost — rather, 25% of the area is occupied by structure. There is a small amount of frictional resistance loss as air passes through the channels, but overall ventilation capacity is primarily determined by the effective ventilation area.

14.4 Common Maintenance Questions

Q19: How often should waveguide windows be cleaned, and how?

A: The cleaning cycle depends on environmental dust conditions:

  • Clean indoor environments: clean every 3–6 months.
  • Ordinary equipment room environments: clean monthly.
  • Dusty or outdoor environments: clean every half month.

Cleaning method: Use dry compressed air at 0.3–0.5 MPa to blow through the channels from inside to outside to remove accumulated dust; wipe the external surface with a dry cloth. Oil stains may be wiped with neutral detergent and then dried. High-pressure water jet washing is prohibited, and poking or digging in the channels with hard objects is prohibited.

Q20: What is the service life of conductive gaskets? When must they be replaced?

A: Conventional conductive rubber gaskets have a service life of 5–8 years in indoor ambient conditions; 3–5 years in high-temperature, high-humidity environments; beryllium copper finger-strip gaskets can last over 10 years.

Replacement is mandatory under the following conditions:

  • Cracks, fractures, or missing sections.
  • Compression set, loss of elasticity, inability to spring back.
  • Severe surface oxidation or contamination with notably increased contact resistance.
  • Shielding effectiveness testing shows degradation confirmed to be caused by the gasket.

A preventive replacement cycle of 3–5 years is recommended — do not wait for complete failure before replacing.

Q21: How can I quickly troubleshoot a drop in shielding effectiveness?

A: Troubleshoot in order from easiest to most difficult:

1. First check for any conductors passing through the waveguide window, obstructions, or foreign objects caught in gaps.

2. Check for loose bolts; retighten all bolts and verify whether performance is restored.

3. Check the sealing surfaces for water ingress, oxidation, or contamination; clean and observe.

4. Check the surrounding walls and other openings for leaks to rule out peripheral factors.

5. If all above are ruled out, check the honeycomb core for solder joint failure, corrosion, or blockage.

6. Use a spectrum analyzer to locate the leakage point and address it specifically.

Q22: Can a faulty waveguide window be repaired on site, or must it be returned to the factory?

A: It depends on the fault type:

  • Sealing issues, fastener problems, cleaning issues, and electrical module faults can all be repaired and replaced on site.
  • Large-area honeycomb core solder joint failure, deformation, or severe corrosion requires factory return for core replacement or full unit replacement.
  • Minor localized core solder joint failure or small dents can be temporarily repaired on site using conductive adhesive, but long-term reliability is generally limited; factory repair is recommended when conditions permit.

Q23: What is the warranty period and warranty scope?

A: The LA-BD series electromagnetic shielding waveguide window main body carries a 2-year warranty; powered modules, 1 year; consumable parts (gaskets, filter media), 3 months. During the warranty period, quality problems not caused by human damage or force majeure are repaired or replaced free of charge by the manufacturer. Failures caused by human damage, non-compliant installation, or improper use are outside the warranty scope and are subject to paid repair services.

14.5 Common Customization & Accessory Questions

Q24: Can explosion-proof electromagnetic shielding waveguide windows be manufactured?

A: Yes, explosion-proof products can be customized, adopting explosion-proof structural design and explosion-proof electrical modules, meeting requirements such as Exd II BT4 explosion-proof ratings, suitable for shielding applications in flammable and explosive hazardous environments such as chemical, petroleum, and coal mining industries. Specific explosion-proof ratings can be customized as required.

Q25: Can waveguide windows be used in conjunction with fire dampers?

A: Yes, they can be used together, but the fire damper must be installed on the non-shielded side, and the damper body must be insulated from the shielding structure — no conductive bridging is permitted. The fire damper actuator’s signal and power cables must enter the shielding room through signal filters and power filters to prevent cable leakage.

Q26: What is the fire resistance rating of waveguide windows? Can they pass fire inspection?

A: The waveguide window main body is an all-metal non-combustible structure with a fire resistance limit consistent with steel plate of the same thickness. It qualifies as Class A non-combustible material, fully meeting building fire protection requirements and passing fire inspection. All powered modules use flame-retardant materials and comply with fire protection standards.

Chapter 15 Product Acceptance

Product acceptance is the final quality control checkpoint — the core link for verifying that product performance and installation quality match design requirements, and the formal procedure for defining quality responsibility between supplier and buyer and transferring usage rights for the delivered project. Acceptance of the LA-BD series electromagnetic shielding waveguide windows must strictly follow applicable national standards, design documents, and procurement contract requirements, adhering to the principles of objective impartiality, data-driven verification, and item-by-item inspection, covering four levels: factory acceptance, site entry acceptance, process acceptance, and completion acceptance — ensuring full-process quality control and ultimately delivering a shielding ventilation system with verified performance and reliable operation.

15.1 General Acceptance Principles

15.1.1 Acceptance Participants

Acceptance participants vary by stage:

  • Factory Acceptance: Led by the quality inspection department of Guangzhou Lain Intelligent System Development Co., Ltd.; the purchaser may send representatives for witnessed inspection, responsible for final quality verification before shipment.
  • Site Entry Acceptance: Jointly conducted by the construction unit, supervision unit, and owner unit, with supplier cooperation; includes unpacking inspection of delivered products to confirm consistency with contract requirements.
  • Process Acceptance: Conducted by the construction unit’s self-inspection with supervision unit on-site witnessing; itemized acceptance of concealed works and critical nodes in installation procedures forms the basis for completion acceptance.
  • Completion Acceptance: Organized by the owner unit with participation from the supervision unit, design unit, construction unit, and supplier; classified projects must invite the confidentiality management department or a qualified third-party testing institution for comprehensive performance acceptance of the entire project.

15.1.2 Basic Acceptance Principles

  • Standards-First Principle: All acceptance items use current national/industry standards, design drawings, and contractually agreed technical parameters as the sole basis for determination; standards must not be arbitrarily lowered.
  • Data Traceability Principle: All acceptance items must retain written inspection records and photographic documentation; test data must be truthful and verifiable, with complete signature procedures.
  • Itemized Verification Principle: Acceptance proceeds by category — appearance, structure, electrical, ventilation, and shielding effectiveness; failure of a previous item precludes progression to the next.
  • Non-Conformance Closure Principle: Non-conforming items identified during acceptance must be rectified within a specified timeframe and re-inspected after rectification, forming a closed loop; final acceptance is granted only after all non-conformances are cleared.

15.1.3 Four-Level Acceptance System

Acceptance is organized into four progressive levels; progression to the next stage requires passing the previous level:

  • Level 1 — Factory Inspection: Full inspection and batch sampling after production completion.
  • Level 2 — Site Entry Acceptance: Unpacking verification after goods arrive at the project site.
  • Level 3 — Installation Process Acceptance: Itemized concealed works acceptance for each critical construction procedure.
  • Level 4 — Overall Completion Acceptance: Final delivery acceptance after system installation and commissioning are complete.

15.2 Acceptance Basis

Acceptance of the LA-BD series electromagnetic shielding waveguide windows must strictly follow the following documents and standards. Where requirements conflict, the most stringent provision prevails:

National and Industry Standards

  • GB/T 50719-2011 “Technical Code for Electromagnetic Shielding Enclosure Engineering”
  • GB/T 12190-2006 “Measurement Method for Shielding Effectiveness of Electromagnetic Shielding Enclosures”
  • GB/T 37429-2019 “General Specification for Electromagnetic Shielding Ventilation Devices”
  • GB 50303-2015 “Code for Acceptance of Quality of Constructional Quality of Building Electrical Engineering”
  • BMB19-2006 “Technical Requirements for Hierarchical Protection of Information Systems Involving State Secrets”
  • GJB 5792-2006 “General Specification for Military Electromagnetic Shielding Enclosures”

Project Technical Documents

  • Project design and construction drawings, technical disclosure documents
  • Product procurement contract and technical agreement
  • This product installation, wiring, and commissioning manual
  • Product factory inspection reports and certificates of conformity

Other Basis

  • Design change notices, engineering consultation records
  • Specific acceptance requirements from relevant regulatory authorities

15.3 Factory Acceptance

Factory acceptance is the quality checkpoint before products leave the production facility, completed by the manufacturer’s quality inspection department. The purchaser may choose to be present for witnessed inspection.

15.3.1 Factory Acceptance Items

Appearance and Structure Inspection

  • Inspect overall product appearance; surface treatment layer uniform and intact, free from scratches, impact damage, deformation, rust, or solder joint failure.
  • Inspect the honeycomb core: channels uniform and orderly, free from deformation, blockage, or solder joint failure; wall thickness uniform; no significant burrs on edges.
  • Inspect the outer frame flange: welds smooth and even, free from cold welds, missed welds, or residual slag; mounting holes accurately positioned; burrs cleaned.
  • Inspect the sealing groove: machined regularly, depth and width within design tolerances; groove clean and free from foreign matter or surface defects.

Dimensional Accuracy Inspection

Using calipers and steel tape, verify external dimensions, flange dimensions, opening dimensions, and core thickness against the following tolerances:

  • External dimension tolerance: ≤±1 mm (dimensions ≤1000 mm); ≤±2 mm (dimensions >1000 mm)
  • Core thickness tolerance: ≤±0.5 mm
  • Mounting hole position tolerance: ≤±0.2 mm
  • Flange flatness: ≤0.3 mm/m

Material and Surface Treatment Inspection

  • Verify material certificates confirming core and flange materials match contract specifications; material spectral inspection reports may be provided.
  • Measure surface coating thickness: tin plating ≥5 μm; conductive oxidation film ≥3 μm, meeting process quality requirements.
  • Measure surface contact resistance using the four-point probe method, ≤0.01 Ω/cm², confirming electrical conductivity performance.

Shielding Effectiveness Sampling

  • Sample 3% of products from the same batch; if fewer than 10 units, sample at least 1 unit. Test shielding effectiveness in the manufacturer’s standard shielded test room per national standard methods.
  • Sampled units must achieve the rated level across the full frequency band. If a sample fails, double the sampling rate; if still failing, the entire batch is reworked.

Accessories and Documentation Inspection

  • Verify conductive gaskets, fasteners, protective screens, and other accessories against the packing list — specifications and quantities accurate, quality acceptable.
  • Verify that the certificate of conformity, factory inspection report, instruction manual, and other documentation are complete and compliant.

15.3.2 Factory Acceptance Pass Determination

Only when all inspection items pass is the “Product Certificate of Conformity” and “Factory Inspection Report” issued and the product packaged for shipment. Products failing acceptance are strictly prohibited from leaving the factory; they are returned to the production workshop for rework and must pass re-inspection before release.

15.3.3 Documentation Accompanying Shipment

The following acceptance documents accompany the shipment and serve as the basis for site acceptance:

  • Product certificate of conformity — 1 copy
  • Factory inspection report (including shielding effectiveness sampling data) — 1 copy
  • Material certificate copies — 1 set
  • Installation and operation manual — 1 copy
  • Packing list — 1 copy

15.4 Site Entry Acceptance

After products arrive at the project site, unpacking acceptance must be conducted under the witness of the supervision unit to confirm no transportation damage and conformity with procurement requirements. Only products passing acceptance may be placed into storage for use.

15.4.1 Acceptance Preparation

  • Select a flat, dry, dust-free indoor area for unpacking acceptance to avoid moisture and dust contamination during unpacking.
  • Prepare acceptance tools: 5 m steel tape measure, 0–150 mm calipers, appearance inspection record forms, and dedicated unpacking tools.
  • Gather the procurement contract, technical agreement, delivery notes, and other documents as the basis for verification.
  • Notify the owner unit and supervision unit personnel in advance to be present for joint participation and signature confirmation.

15.4.2 Unpacking Acceptance Procedure

  • Packaging Inspection: Before unpacking, inspect the outer packaging for integrity, damage, water ingress, or impact marks; photograph and record any packaging anomalies. If the outer packaging is severely damaged, focus on checking internal product damage.
  • Product Appearance Inspection: Remove the product and inspect the overall appearance for transportation impact damage, deformation, scratches, or rust; check the honeycomb core for dents or solder joint failure; check the flange for warping or deformation.
  • Model and Specification Verification: Verify the model, specification, shielding level, and material on the product nameplate against the procurement contract and design drawings for complete consistency.
  • Quantity and Accessory Count: Against the packing list, count product quantities, accessory types, and quantities; check for missing, mis-shipped, or omitted items.
  • Documentation Verification: Verify that the factory certificate of conformity, inspection report, and manual are complete and valid, and correspond to the correct product batch.
  • Acceptance Record: Complete the “Equipment Site Entry Acceptance Record Form” truthfully, with signatures from all participants; non-conforming items clearly annotated with descriptions and photos.

15.4.3 Non-Conforming Product Handling

  • If the product model is incorrect, appearance is severely damaged, or performance indicators are non-conforming, it is judged as non-conforming product: clearly labeled, segregated and stored separately, and strictly prohibited from use in construction.
  • Promptly contact the supplier with a written explanation of the non-conformance, negotiate return/exchange or repair solutions, and clarify the rectification timeframe.
  • For missing accessories, the supplier must dispatch replacements within a specified period; re-verify after replacement arrival.
  • After all non-conformances are resolved, re-conduct site entry acceptance; products may only be used in construction after passing.

15.4.4 Post-Acceptance Storage

Products passing acceptance must be stored properly in a dry, ventilated indoor warehouse, protected from impact, moisture, and dust. Retain the original protective film during storage; remove only at the time of final installation. Stacking height shall not exceed 3 layers to avoid flange deformation or core damage from excessive pressure.

15.5 Installation Process Acceptance

Installation process acceptance is a type of itemized concealed works acceptance and is critical to ensuring final installation quality. It must be conducted after each process step is completed and before the next begins; the next step may not proceed without passing acceptance.

15.5.1 Opening and Substrate Surface Treatment Acceptance

  • Acceptance Node: After opening is complete, substrate surface ground and cleaned, before gasket installation.
  • Acceptance Content:
  • Verify that the opening size, position, and shape comply with design requirements; dimensional deviations within allowable limits; cut edges vertical with no tilting.
  • Verify opening edges are smooth, free from burrs, deformation, or oxy-fuel cutting burn marks; oxy-fuel gas cutting is strictly prohibited.
  • Verify the ground area extends ≥10 mm beyond the flange edge; paint and oxide layers completely removed, exposing uniform metallic luster.
  • Use a 2 m straightedge to check substrate flatness, ≤0.5 mm/m, no significant bumps or weld protrusions.
  • Use a surface resistance tester to measure substrate contact resistance, ≤0.05 Ω/cm², confirming good electrical conductivity.
  • Acceptance Method: Supervision unit on-site witnessing; visual inspection + tool measurement; complete concealed works acceptance records and retain photographic documentation.

15.5.2 Conductive Gasket Installation Acceptance

  • Acceptance Node: After gasket adhesion is complete, before the waveguide window is positioned.
  • Acceptance Content:
  • Verify that the gasket model, specification, and material match the product and comply with the design shielding level.
  • Verify that gasket adhesion is smooth and continuous, free from twisting, tearing, or lifting; 45° miter joints at corners with tight, gapless seams.
  • Verify that gasket positioning is centered, without offset from the sealing groove, twisting, or folding.
  • Verify gasket surfaces are clean, free from dust, oil, foreign matter, and fingerprint contamination.
  • Acceptance Method: Construction unit self-inspection followed by supervision unit acceptance; visual plus tactile inspection with focus on corner and joint quality.

15.5.3 Bolt Fastening Acceptance

  • Acceptance Node: After all bolts are tightened, before sealing caulk application.
  • Acceptance Content:
  • Verify bolt specifications and material meet requirements, complete with no missing bolts; spring washers and flat washers correctly configured.
  • Verify the tightening sequence follows the diagonal cross-tightening method; no flange warping from sequential tightening.
  • Use a torque wrench to sample-check bolt tightening torque at a rate of no less than 20%; torque values meet product requirements with deviation ≤±10%.
  • Use a feeler gauge to check flange mating gaps around the perimeter; maximum gap ≤0.05 mm, no through gaps.
  • Use a multimeter to measure the conductivity resistance between the waveguide window and shielding structure, ≤0.1 Ω, confirming electrical continuity and reliability.
  • Acceptance Method: Actual measurement; record torque values and gap measurements; supervision unit signs for confirmation.

15.5.4 Welded Installation Weld Seam Acceptance

  • Acceptance Node: After welding is complete and grinding treatment finished.
  • Acceptance Content:
  • Verify welds are continuous and full, free from cold welds, missed welds, slag inclusions, porosity, cracks, and other weld defects.
  • Verify weld height complies with design requirements; smooth transition with the base metal; no excessive reinforcement or undercut.
  • Verify weld grinding is smooth, free from protrusions, burrs, or residual slag; flush with the surrounding substrate surface.
  • Conduct a kerosene penetration test; no leakage on the opposite side of the weld, confirming sound density.
  • Measure conductivity resistance across both sides of the weld, ≤0.01 Ω, confirming electrical continuity.
  • Acceptance Method: Visual inspection + penetration test + resistance test; retain weld inspection photographic records.

15.5.5 Wiring Engineering Acceptance

  • Acceptance Node: After wiring is complete, before power-on commissioning.
  • Acceptance Content:
  • Verify cable types and specifications meet design requirements; routing is neat and standardized; cable clamps secure; no haphazard or disorderly wiring.
  • Verify terminal connections are crimped securely; wire number markings legible; insulation protection in place; no exposed copper strands.
  • Verify all through-wall cables pass through corresponding filters; no cables pass through walls directly, compromising shielding.
  • Test insulation resistance with a 500 V megohmmeter, ≥100 MΩ; test grounding resistance with a ground resistance tester, meeting design requirements.
  • Verify grounding connections are reliable; grounding terminals free from looseness and oxidation; wiring standardized.
  • Acceptance Method: Electrical engineer acceptance; insulation and grounding test records archived for reference.

15.6 Completion Acceptance

Completion acceptance is the final comprehensive acceptance after product installation and commissioning are complete — the last quality checkpoint before delivery for use. It must be conducted on the basis of successful system commissioning and 100% construction unit self-inspection.

15.6.1 Prerequisites for Completion Acceptance

  • Waveguide window installation, wiring, and commissioning are fully complete; construction unit self-inspection passed at 100%; formal self-inspection report and complete commissioning records issued.
  • All process acceptance documentation is complete with signatures and seals; concealed works records complete and traceable.
  • Site cleaned and cleared of construction debris and waste; environment suitable for acceptance testing.
  • All other parts of the shielding room construction completed; all openings, doors, and windows sealed; no other obvious leakage paths.
  • Acceptance test instruments prepared and within their calibration validity period; test personnel certified for their roles.
  • The construction unit submits the completion acceptance application and full acceptance documentation package to the owner unit at least 7 days in advance.

15.6.2 Appearance and Installation Quality Acceptance

  • Appearance: Waveguide window installed squarely, level and plumb; surfaces clean with no stains, significant scratches, deformation, or rust; protective screen flat and intact with no damage.
  • Installation Deviations:
  • Plan position deviation: ≤5 mm
  • Elevation deviation: ≤5 mm
  • Horizontal levelness deviation: ≤1‰
  • Vertical plumbness deviation: ≤1‰
  • Fastener Quality: Bolts complete and tightened properly, free from looseness and rust; exposed thread 2–3 turns, uniform and neat.
  • Sealing Quality: Flange perimeter tightly mated with no visible through gaps; sealing gasket not exposed or torn; perimeter sealant continuous and full.
  • Weld Quality (welded type): Welds smooth and neat, free from weld defects; anti-rust and anti-corrosion treatment properly applied; natural transition with surrounding walls.

15.6.3 Electrical Performance Acceptance

Only for waveguide window products with integrated fans, heating modules, or other powered functions:

  • Grounding Resistance Test: When the waveguide window housing is common-grounded with the system, grounding resistance ≤1 Ω; for independent grounding, ≤4 Ω.
  • Insulation Resistance Test: Insulation resistance between all powered circuits and the metal housing ≥100 MΩ (DC 500 V megohmmeter).
  • Withstand Voltage Test: Withstand AC 1500 V/1 min between the power input terminal and housing; no breakdown or flashover.
  • Functional Test:
  • Fan start, speed control, and stop functions normal; rotation direction correct; no abnormal noise or vibration.
  • Heating module start/stop control normal; temperature control accuracy within ±2°C; over-temperature protection actuates accurately and effectively.
  • Various control instruments and indicator lights display normally; no fault or false alarms.
  • Continuous Operation Test: Continuous loaded operation for 2 hours; equipment operating stably; motor temperature rise ≤40 K; no overheating, odor, or abnormal noise.

15.6.4 Ventilation Performance Acceptance

  • Airflow Test: Under rated conditions, measure the actual airflow through the waveguide window using a flow hood; must be ≥90% of the design airflow.
  • Pressure Drop Test: Measure the static pressure difference across the waveguide window using a micro-manometer; at rated airflow, pressure drop ≤115% of the product’s rated value.
  • Noise Test: At rated conditions, noise measured at 1 m from the waveguide window meets design requirements; no airflow whistling or structural resonance noise.
  • Airflow Uniformity: Measure air velocity at 9 evenly distributed points across the waveguide window cross-section; velocity uniformity ≥80%; no significant flow bias or dead zones.

15.6.5 Shielding Effectiveness Specialized Acceptance

Shielding effectiveness acceptance is the core mandatory indicator of completion acceptance and must be tested strictly per national standard methods. For classified projects, a formal test report must be issued by a third-party testing institution with confidentiality qualification.

Test Frequency Bands:

  • Class B: 150 kHz – 10 GHz
  • Class C: 14 kHz – 18 GHz
  • Class D: 10 kHz – 40 GHz

Measurement Point Layout:

  • Basic points: Waveguide window center, four corners, and midpoints of four sides — 9 measurement points total.
  • Enhanced points: 2 additional points at each flange edge seam, focusing on seal gap leakage detection.
  • Test distance: 1 m for low-frequency bands; 3 m for high-frequency bands.

Pass Criteria: Shielding effectiveness values at all measurement points and all test frequencies reach the corresponding rated level values — acceptance is passed.

  • Class B: Magnetic field ≥70 dB below 150 kHz; plane wave/microwave ≥80 dB from 150 kHz to 10 GHz
  • Class C: Magnetic field ≥90 dB at 14 kHz/150 kHz; plane wave/microwave ≥100 dB from 150 kHz to 18 GHz
  • Class D: Magnetic field ≥100 dB at 10 kHz/150 kHz; plane wave/microwave ≥100 dB from 150 kHz to 40 GHz

Test Method: Strictly per GB/T 12190-2006, using the transmitting antenna + receiving antenna + spectrum analyzer method. First measure the open-space reference field strength, then measure the field strength inside the shielded room; the difference represents shielding effectiveness.

Non-Conformance Handling: If any measurement point fails to meet shielding effectiveness requirements, use a near-field probe to precisely locate the leakage point, rectify within a specified period, then re-test until all points pass.

15.7 Acceptance Testing Operational Procedures

15.7.1 On-Site Shielding Effectiveness Testing Procedure

Pre-Test Preparation

  • Close all doors, windows, and openings in the shielding room; confirm no obvious leakage paths other than the waveguide window under test.
  • Power off all non-test equipment in the shielding room; test personnel withdraw to designated positions to reduce human body reflection interference.
  • Set up the test system; power on instruments and warm up for 30 minutes; calibrate instrument baseline and probes.
  • Record ambient temperature, humidity, instrument models, and calibration validity dates.

Reference Field Strength Measurement

  • In an open, unobstructed area outside the shielding room, place the transmitting and receiving antennas facing each other at the specified distance, at equal mounting heights.
  • The signal generator outputs a continuous wave signal at the set frequency and power, radiated through the transmitting antenna.
  • The receiving antenna receives the signal; the spectrum analyzer reads the stable received level, recorded as the reference level P₀.
  • Divide the preset frequency band into segments; test and record reference values at each frequency point, forming a reference level data table.

Post-Shielding Field Strength Measurement

  • Keep the transmitting antenna outside the room, aimed at the center of the waveguide window under test, maintaining the same distance and height as the reference test.
  • Move the receiving antenna to the corresponding position inside the shielding room, centered on the waveguide window plane.
  • The signal generator outputs the same power signal; the spectrum analyzer reads the indoor received level, recorded as the post-shielding level P₁.
  • Move the receiving antenna to test post-shielding levels at all measurement points, recording each.

Data Calculation and Determination

  • Single-frequency-point shielding effectiveness formula: SE = P₀ − P₁ (unit: dB)
  • Compile shielding effectiveness data for all frequency points and measurement points, forming a complete test data table and curve.
  • Compare against the standard requirements, determining pass/fail for each item.

Precise Leakage Point Location

  • For areas with low shielding effectiveness, use a near-field probe to move slowly along the waveguide window edges, observing spectrum analyzer value changes to precisely locate leak coordinates.
  • Mark the leakage location, analyze the leak cause, and formulate a targeted rectification plan.

15.7.2 Airflow Testing Procedure

  • Use the flow hood method: fully cover the waveguide window outlet with the flow hood, compacting the perimeter with sealing strips to ensure no air leakage.
  • Start the ventilation system to rated conditions; after airflow stabilizes, read the airflow value displayed on the flow hood.
  • Take 3 consecutive measurements at 1-minute intervals; use the arithmetic mean as the final airflow value.
  • Record test data, compare against the design value to calculate the deviation rate, and determine pass/fail.

15.7.3 Grounding Resistance Testing Procedure

  • Use a ground resistance tester with the three-probe method.
  • Electrode layout: current probe at ≥20 m from the test point; voltage probe at ≥12 m; the three points arranged approximately in a straight line.
  • Take 3 measurements; use the average as the final grounding resistance value.
  • Avoid underground metal pipelines and grounding grids during testing to reduce environmental measurement errors.

15.8 Acceptance Document Transfer

After successful completion acceptance, the supplier and construction unit must transfer a complete set of acceptance documents to the owner unit as part of the project archive for long-term retention. The document list is as follows:

15.8.1 Original Factory Documents

  • Product certificate of conformity
  • Factory inspection report (including shielding effectiveness sampling data)
  • Material certificates and coating inspection reports
  • Product installation, wiring, and commissioning manual (this manual)
  • Product selection manual and technical samples
  • Spare parts list and consumable specifications

15.8.2 Construction and Installation Documents

  • Construction organization design / specialized construction plan
  • Technical disclosure records
  • Equipment site entry acceptance records
  • Concealed works acceptance records (openings, substrate, gaskets, welds, wiring)
  • Installation process itemized acceptance records
  • Design change and engineering consultation records
  • Complete construction logs

15.8.3 Commissioning and Testing Documents

  • System commissioning records (installation quality, electrical, ventilation, shielding effectiveness)
  • Insulation resistance test records
  • Grounding resistance test records
  • Ventilation performance test records
  • Formal shielding effectiveness test report (issued by third-party testing institution, if required)
  • Functional test records and continuous trial operation records

15.8.4 Acceptance Documents

  • Completion acceptance application form
  • Completion acceptance record form
  • Acceptance attendance sign-in sheet
  • Acceptance meeting minutes
  • Non-conformance rectification and re-inspection records
  • Project transfer order

15.8.5 Document Requirements

  • All documents in triplicate (one set each for owner unit, supervision unit, and construction unit); for classified projects, the number of copies and storage method shall follow confidentiality requirements.
  • Documents legible, signatures and seals complete, data truthful and accurate, free from alteration or forgery.
  • Electronic and paper documents transferred simultaneously; electronic documents in non-tamperable PDF format with standardized, uniform naming.

15.9 Acceptance Determination Rules

15.9.1 Pass Determination

Acceptance items are classified as mandatory items and general items, with determination rules as follows:

  • Mandatory Items: Shielding effectiveness, grounding resistance, insulation/withstand voltage, installation sealing integrity, product material and specification. These are mandatory items requiring 100% pass; failure of any single item means overall acceptance failure.
  • General Items: Appearance, installation deviations, airflow volume, operating noise, and similar items. Acceptance passes when the pass rate reaches 90% or above and non-conforming items do not affect normal use or core performance.
  • All mandatory items passing and general item pass rate meeting the threshold constitutes a pass for completion acceptance.

15.9.2 Non-Conformance Classification

  • Minor Non-Conformance: General items slightly exceed limits; does not affect core performance or use; can be immediately rectified on site.
  • General Non-Conformance: General items severely exceed limits, or mandatory items show slight deviation; can meet the pass standard after simple rectification.
  • Severe Non-Conformance: Mandatory items severely fail to meet requirements — e.g., shielding effectiveness deficit greater than 10 dB, wrong product model shipped, or significant safety hazards — cannot be simply rectified on site.

15.9.3 Re-Inspection Rules

  • For failed acceptance, the construction unit/supplier is required to rectify within a specified period and submit a re-inspection application after rectification.
  • Minor non-conformances may be re-inspected on site after rectification; passing the review constitutes acceptance.
  • General and severe non-conformances require formal re-acceptance with full re-testing per the original standards after rectification.
  • A maximum of 2 re-inspections is permitted for the same item; if still failing after re-inspection, the product/project is judged non-conforming, and the relevant party’s responsibility is pursued per contract terms.

15.10 Acceptance Dispute Handling

  • When acceptance participants dispute the acceptance results, a written objection must be submitted specifying the disputed items, factual basis, and specific claims.
  • Upon receiving the objection, the owner unit organizes joint review by all parties, re-verifying test data, testing methods, and determination standards; if the dispute arises from test error or method issues, re-test per specification before determination.
  • If consensus cannot be reached after review, the parties may jointly commission a qualified third-party testing institution for arbitration testing; the arbitration result is the final determination basis.
  • Third-party testing costs are borne by the responsible party; if both parties bear responsibility, costs are shared proportionally.
  • Arbitration testing for classified projects must be commissioned to an institution holding the confidentiality inspection qualification issued by the State Secrets Bureau, with strict compliance with confidentiality management regulations throughout the process.

15.11 Post-Acceptance Delivery and Warranty Commencement

  • Project Delivery: After successful completion acceptance, all parties jointly sign the “Project Transfer Order,” and the product is formally handed over to the owner unit for commissioning. Daily custody, operation, and maintenance responsibilities transfer to the owner unit after handover.
  • Warranty Commencement: The product warranty period runs from the date of successful completion acceptance: main structure warranty 2 years; powered functional modules warranty 1 year; consumable parts (conductive gaskets, filter media) warranty 3 months. Other terms per the procurement contract prevail where specified.
  • Usage Training: At handover, supplier technical personnel provide on-site training to the owner unit’s operations and maintenance staff, covering product usage methods, daily maintenance essentials, and common fault emergency handling — ensuring operations staff have basic operational and maintenance capability.
  • After-Sales Contact: At handover, clarify after-sales service contact information and response procedures; issue an after-sales service card to ensure rapid contact for fault resolution.

Appendix Product Contact Information

  • Manufacturer: Guangzhou Lain Intelligent System Development Co., Ltd.
  • Service Hotline: +86 13538869979 (WeChat same number)
  • Technical Support: +86 13538869979
  • Company Address: Zhongrun Industrial Park, No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou
  • Official Website: https://gdlain.com

SEO Keywords and Optimization Tag System

I. Search Keyword Classification

1. Core Primary Keywords

Electromagnetic shielding waveguide window, shielding waveguide window, honeycomb waveguide window, cutoff waveguide ventilation window, shielding ventilation window

2. High-Conversion Long-Tail Keywords

Electromagnetic shielding waveguide window installation manual, electromagnetic shielding waveguide window commissioning guide, honeycomb electromagnetic shielding waveguide window manufacturer, Class C shielding waveguide window parameters, stainless steel electromagnetic shielding waveguide window, welded shielding waveguide window installation method, classified room shielding ventilation waveguide window, shielding computer room waveguide window acceptance standard, electromagnetic shielding waveguide window repair and maintenance, anti-condensation shielding waveguide window wiring

3. Industry Traffic Keywords

Electromagnetic shielding room ventilation window, EMC shielding room waveguide window, classified computer room shielding ventilation device, electromagnetic shielding auxiliary materials and accessories, cutoff waveguide window working principle, shielding effectiveness test method, ventilated shielding window technical parameters, military shielding cabin ventilation waveguide window, MRI room shielding ventilation window, shielding cabinet cooling waveguide window

4. Brand-Specific Keywords

Lain waveguide window, Guangzhou Lain electromagnetic shielding waveguide window, LA-BD series waveguide window, Lain shielding ventilation device, Lain smart computer room shielding accessories

5. Drop-Down / Related Search Keywords

Electromagnetic shielding waveguide window price per square meter, electromagnetic shielding waveguide window specifications and dimensions, best electromagnetic shielding waveguide window brand, electromagnetic shielding waveguide window shielding effectiveness in dB, how to install electromagnetic shielding waveguide window, electromagnetic shielding waveguide window principle, honeycomb waveguide window aperture and shielding level, difference between waveguide window and louver

II. SEO Optimization Tag System

1. Core Page Optimization Tags

  • Page Topic: Electromagnetic Shielding Waveguide Window Installation, Wiring, and Commissioning Manual — Guangzhou Lain Intelligent System Development Co., Ltd.
  • Core Optimization Direction: Cover full product lifecycle technical content, satisfy engineering personnel search needs across selection, construction, commissioning, acceptance, and maintenance scenarios, building a high-value technical landing page.

2. Title Tag

Electromagnetic Shielding Waveguide Window Installation and Wiring Commissioning Manual_Honeycomb Cutoff Waveguide Ventilation Window Parameters and Principles_Guangzhou Lain Intelligent System Development Co., Ltd.

3. Meta Keywords

Electromagnetic shielding waveguide window, shielding waveguide window, honeycomb waveguide window, cutoff waveguide ventilation window, shielding ventilation window, electromagnetic shielding waveguide window installation, waveguide window commissioning manual, shielding computer room auxiliary materials, LA-BD waveguide window, Guangzhou Lain waveguide window

4. Meta Description

Guangzhou Lain Intelligent System Development Co., Ltd. officially releases the LA-BD series electromagnetic shielding waveguide window installation, wiring, and commissioning manual, covering the full process of product introduction, composition principles, technical parameters, installation wiring, commissioning acceptance, and maintenance. Class C/D aluminum/copper/stainless steel honeycomb shielding waveguide windows available for classified rooms, shielding computer rooms, EMC anechoic chambers, and other applications. Service hotline: +86 13538869979.

5. H1 Tag

Electromagnetic Shielding Waveguide Window Installation, Wiring, and Commissioning Manual

6. H2 Tags

Product Introduction, Product Composition, Product List, Product Principles, Product Technical Parameters, Product Functions and Features, Product Application Scenarios, Product Installation, Product Wiring, Product Commissioning, Product Precautions, Product Repair and Maintenance, Product Common Problems and Solutions, Product QA, Product Acceptance

7. Internal Link Optimization Tags (Anchor Text, Natural Placement)

  • Core Anchor Text: Electromagnetic shielding waveguide window, honeycomb waveguide window, cutoff waveguide ventilation window
  • Long-Tail Anchor Text: Electromagnetic shielding waveguide window installation method, shielding waveguide window shielding effectiveness test, Class C electromagnetic shielding waveguide window parameters, stainless steel shielding waveguide window application scenarios, waveguide window installation acceptance standard
  • Related Anchor Text: Electromagnetic shielding room engineering, shielding computer room construction, electromagnetic shielding auxiliary materials and accessories, classified room shielding equipment, computer room environment monitoring system
Scroll to Top