KITOZER
KITOZER

Equipment Loading Order: Put Heavy Gear at the Bottom

Bottom Heavy, Top Light

How you load the rack affects stability, cooling, and cable management. Follow the loading order.

Loading Order (Bottom to Top)

  1. Bottom (U 1-10): Heaviest equipment – UPS, battery cabinet, PDU, large servers. Low center of gravity = stable rack.
  2. Middle (U 10-25): Servers and switches (medium weight, normal heat).
  3. Upper middle (U 25-35): Patch panels, cable managers, light equipment.
  4. Top (U 35-42): Fan tray, cable entry, lightweight accessories. No heavy gear up top.

Why This Order

  • Stability: Heavy at bottom = low center of gravity = no tipping.
  • Cooling: Hot exhaust rises. Put high-heat gear low so the hot air passes through upper gear on its way out.
  • Service: Heavy gear at bottom is easier to lift. Don’t lift a 50kg server to U 40.

KITOZER / Guangzhou Laian Intelligent System Development Co., Ltd. – rack loading, best practice. Call +86 13922289957 (WeChat) or +86 18520668845. WhatsApp +86 19068534140. Web: www.gdlain.com | www.lain.com.cn. Address: Chaotian Park, Zhongrun Industrial Zone, Shilou, Panyu, Guangzhou, China.

Shopping Cart