Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 31

Warning: Undefined variable $taxonomy in /www/wwwroot/gdlain.com/public_html/wp-content/mu-plugins/gdlain-breadcrumb-jsonld.php on line 32
KITOZER
KITOZER

Explosion-Proof Weather Station Installation, Wiring and Commissioning Manual

Manufacturer: Guangdong Lain Intelligent System Development Co., Ltd.

Service Hotline: +86 13538869979 (WeChat ID same)

Technical Support: +86 13538869979

Company Address: Zhongrun Industrial Park, No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou

Official Website: https://gdlain.com

Version: V2.0

Release Date: July 2026

Table of Contents

Preface

This manual provides a comprehensive and systematic introduction to the product principles, composition, installation, wiring, commissioning, operation and maintenance, troubleshooting, and acceptance procedures of the explosion-proof weather station developed and manufactured by Guangdong Lain Intelligent System Development Co., Ltd. It is designed to provide professional, rigorous, and practical operational guidance for project construction personnel, operation and maintenance engineers, safety management personnel, and end users.

This product is a flameproof industrial meteorological monitoring device, specifically designed for explosive hazardous environments such as petrochemical plants, refinery areas, oil depots and gas stations, underground coal mines, port hazardous chemical storage yards, pharmaceutical chemical plants, and fireworks and firecracker warehouses. It strictly complies with the GB3836 series explosion-proof standards and features high reliability, high ingress protection rating, multi-parameter expandability, low power consumption, and long endurance.

All operators must carefully read this manual before construction, commissioning, and maintenance, and strictly comply with explosion-proof safety operating procedures. Improper operation may result in loss of explosion-proof integrity, equipment damage, or even safety incidents. If you encounter any technical issues during use, please call the technical support hotline at +86 13538869979 for professional guidance, or contact the service hotline at +86 13538869979 for commercial and after-sales inquiries.

The content of this manual will be continuously updated with product technology iterations. Guangdong Lain Intelligent System Development Co., Ltd. reserves the right of final interpretation. For more product information, please visit the official website at https://gdlain.com to download and view.

Chapter 1 Product Introduction

1.1 Product Overview

The explosion-proof weather station is an integrated meteorological parameter online monitoring system applied in explosive gas environments, serving as a core environmental sensing device in the industrial environmental protection and energy consumption monitoring field. The device integrates multi-element meteorological sensors, an explosion-proof data acquisition terminal, an explosion-proof power supply module, and wireless transmission units, enabling real-time monitoring of wind speed, wind direction, air temperature, air humidity, atmospheric pressure, rainfall, solar total radiation, visibility, VOC concentration, CO₂ concentration, and other environmental parameters. Data is uploaded to the environmental monitoring platform via 4G, Ethernet, LoRa, and other communication methods, enabling remote monitoring, intelligent alarm, data analysis, and report export of meteorological data in hazardous areas.

The explosion-proof weather station manufactured by Guangdong Lain Intelligent System Development Co., Ltd. adopts a flameproof enclosure design. The explosion-proof rating can reach Exd ⅡB T4 Gb, with an ingress protection rating of IP66. It can operate stably for extended periods in Zone 1 and Zone 2 explosive gas environments. It is widely used in chemical park safety management, hazardous chemical warehouse environmental monitoring, oil and gas field outdoor meteorological data collection, port and wharf environmental early warning, and coal mine surface meteorological monitoring, providing accurate meteorological data support for safe production, environmental management, and energy consumption optimization.

1.2 Application Fields

1.2.1 Petrochemical Industry

Meteorological monitoring in explosive environments of refinery plants, oil refineries, chemical parks, ethylene plants, fertilizer plants, and other production areas, providing meteorological data support for process safety, environmental emission control, and emergency response. It can be linked with sprinkler systems, ventilation systems, and emergency broadcast systems for risk warning and handling.

1.2.2 Oil and Gas Storage Industry

Meteorological monitoring at oil depots, gas stations, LNG refueling stations, LPG storage and distribution stations, and crude oil storage tank areas, with focus on wind speed, wind direction, temperature, and barometric pressure parameters to assist in assessing oil and gas dispersion trends and prevent explosion and fire risks.

1.2.3 Coal and Mining Industry

Meteorological monitoring at coal mine surface industrial squares, coal washing plants, and coal chemical plant areas, providing meteorological data for dust prevention and control, ventilation scheduling, and slope safety monitoring, compatible with mine explosion-proof area usage requirements.

1.2.4 Pharmaceutical and Fine Chemical Industry

Environmental meteorological monitoring in API production workshops, fine chemical plant areas, and flammable/explosive reagent storage areas, meeting explosion-proof area compliance monitoring requirements and assisting in production process environmental management.

1.2.5 Port and Logistics Industry

Meteorological monitoring at hazardous chemical wharves, container hazardous chemical storage yards, and port warehousing logistics areas, providing wind speed, rainfall, lightning warning, and other meteorological support for hazardous chemical loading/unloading and storage operations.

1.2.6 Other Explosion-Proof Scenarios

Meteorological monitoring in places with explosive gases or dust, such as fireworks and firecracker production and storage areas, military ammunition depots, grain fumigation storage areas, and gas pressure regulating stations.

1.3 Applicable Standards and Certifications

This product strictly complies with relevant national and industry standards for design, production, and inspection. The main applicable standards are as follows:

Standard Description
GB 3836.1-2010 Explosive atmospheres – Part 1: Equipment – General requirements
GB 3836.2-2010 Explosive atmospheres – Part 2: Equipment protected by flameproof enclosures “d”
GB/T 35221-2017 Specifications for surface meteorological observation – General
GB/T 18809-2019 General specification for air ion measuring instruments
GB/T 20524-2006 Technical requirements for agro-forestry microclimate information collection system
Q/GDLA 001-2026 Enterprise standard for explosion-proof weather stations
IP66 Ingress protection per GB 4208-2017 requirements
EMC Compliant with GB/T 17626 series standards

The product is certified with an explosion-proof certificate issued by a nationally authorized explosion-proof testing institution. Each unit undergoes rigorous testing before shipment, including high/low temperature, vibration, rain, explosion-proof pressure resistance, and accuracy calibration, ensuring product performance and safety compliance.

1.4 Explosion-Proof Rating and Applicable Areas

1.4.1 Explosion-Proof Marking

Exd ⅡB T4 Gb

Marking Meaning
Ex General explosion-proof marking
d Flameproof enclosure type of protection
ⅡB Gas group, applicable to ⅡA and ⅡB class explosive gas environments
T4 Temperature class, maximum surface temperature of equipment ≤135℃
Gb Equipment protection level, applicable to Zone 1 and Zone 2 hazardous areas

1.4.2 Applicable Hazardous Areas

  • Zone 1: Environment where explosive gas mixtures may occur during normal operation
  • Zone 2: Environment where explosive gas mixtures are unlikely to occur during normal operation, or if they do occur, exist only for a short duration

Not applicable to Zone 0 hazardous environments, and not applicable to underground mine methane environments (intrinsically safe mining-specific products can be customized for underground coal mine use).

1.4.3 Applicable Gas Types

Applicable to ⅡB class and below explosive gas environments including ethane, propane, butane, ethylene, propylene, methanol, ethanol, acetone, benzene, toluene, xylene, etc. Commonly found in most chemical, oil and gas, and pharmaceutical industry scenarios.

1.5 Product Model Naming Rules

Lain explosion-proof weather stations use a unified model naming convention for quick configuration identification:

LA - FB - QX - N  -  P  -  C
│   │    │   │     │     │
│   │    │   │     │     └─ Communication: 4G/ETH/LoRa/RS485
│   │    │   │     └─────── Power supply: S=Solar / M=Mains / D=Dual power
│   │    │   └───────────── Parameter configuration: 5-element/7-element/10-element/Custom
│   │    └───────────────── Product series: QX weather station series
│   └────────────────────── Explosion-proof type identifier
└────────────────────────── Lain brand abbreviation

Example: LA-FB-QX-7-S-4G represents a Lain explosion-proof 7-element weather station with solar power supply and 4G wireless communication.

1.6 Core Technical Parameter Summary Table

Parameter Category Item Technical Specification
Host Parameters Acquisition channels 4 analog inputs, 8 RS485 inputs, 4 digital inputs, expandable
Acquisition accuracy Analog: ±0.2%FS; Digital: error-free
Storage capacity Local storage ≥100,000 data records, retained on power loss
Acquisition cycle Configurable 1s~3600s, default 60s
Upload cycle Configurable 1min~1440min, default 5min
Operating voltage DC 12V~24V wide voltage range
Standby power consumption ≤0.5W
Operating power consumption ≤3W (excluding sensors and communication module peak)
Explosion-Proof Parameters Explosion-proof marking Exd ⅡB T4 Gb
Enclosure material 304 stainless steel / cast aluminum alloy (optional)
Ingress protection rating IP66
Operating ambient temperature -40℃~+70℃
Operating ambient humidity 0~100%RH non-condensing
Sensor Parameters Wind speed Range 0~60m/s, accuracy ±0.3m/s, three-cup type
Wind direction Range 0~360°, accuracy ±3°, wind vane type
Air temperature Range -40℃~+80℃, accuracy ±0.2℃
Air humidity Range 0~100%RH, accuracy ±2%RH
Atmospheric pressure Range 300~1100hPa, accuracy ±0.3hPa
Rainfall Range 0~4mm/min, accuracy ±4%, tipping bucket 0.2mm/bucket
Solar total radiation Range 0~2000W/㎡, accuracy ±5%
Mechanical Parameters Host dimensions 300mm × 280mm × 180mm (L × W × H)
Pole height Standard 3m, optional 2m, 4m, 6m, 10m
Total weight Approx. 35kg (excluding pole and foundation accessories)
Communication Parameters Supported protocols Modbus-RTU, Modbus-TCP, MQTT, HJ212 environmental protocol
Communication methods 4G full network, Ethernet, LoRa, RS485 wired

Chapter 2 Product Composition

The explosion-proof weather station features a modular design, comprising six core components: the explosion-proof data acquisition host, meteorological sensor unit, explosion-proof power supply system, data transmission unit, mounting bracket system, and explosion-proof supporting accessories. Each module complies with explosion-proof and industrial-grade standards and can be flexibly configured, rapidly assembled, and easily maintained.

2.1 Explosion-Proof Data Acquisition Host

The explosion-proof data acquisition host is the core control unit of the entire weather station, responsible for sensor data acquisition, computation processing, local storage, protocol conversion, data upload, and alarm logic execution. It adopts a flameproof enclosure design, with all circuit components housed within the flameproof cavity. Cables are introduced externally through explosion-proof cable glands.

2.1.1 Flameproof Enclosure Structure

  • Material Selection: Standard configuration uses 304 stainless steel enclosure with excellent corrosion resistance and high strength, suitable for coastal and chemical corrosion environments. Cast aluminum alloy enclosure is optional, offering lighter weight and better heat dissipation, suitable for general inland industrial scenarios.
  • Enclosure Structure: Flanged opening design with precision-machined mating surfaces, ensuring flameproof gap complies with GB3836.2 standard requirements. Mating surface width ≥25mm, gap ≤0.15mm, surface roughness Ra≤6.3μm, capable of withstanding internal explosion pressure without deformation or flame transmission.
  • Sealing Design: The enclosure mating surfaces are equipped with oil-resistant and temperature-resistant NBR rubber sealing rings, achieving IP66 waterproof and dustproof protection. Cable entry points use explosion-proof cable glands for clamping and sealing, providing both cable fixation and explosion-proof sealing functions.
  • Enclosure Accessories: The enclosure is equipped with grounding terminals, nameplate (including explosion-proof marking, model, factory serial number, explosion-proof certificate number), anti-theft bolts, and opening warning labels.

2.1.2 Internal Core Circuitry

  • Main Control Unit: Uses a 32-bit industrial-grade ARM processor with a main frequency ≥72MHz, featuring low power consumption and high stability. Capable of simultaneously processing multi-channel sensor data and running an embedded real-time operating system.
  • Data Acquisition Module:
  • Analog Acquisition Channels: Supports 4~20mA, 0~5V, 0~10V and other analog signal inputs with 12-bit AD resolution, equipped with overvoltage/overcurrent protection and filtering/anti-jitter processing.
  • Digital Acquisition Channels: 8 RS485 interfaces supporting Modbus-RTU protocol, allowing cascade connection of multiple digital sensors, with lightning protection, reverse-connection protection, and isolation protection.
  • Digital Input Channels: 4 digital inputs supporting dry contacts and wet contacts, connectable to tipping bucket rain gauge, alarm input, and other signals.
  • Data Storage Module: Equipped with industrial-grade Flash storage chip, capacity ≥16M, capable of circularly storing over 100,000 monitoring data records. Data is permanently retained on power loss. Supports interrupted data resumption — automatically backfills missing data upon communication recovery.
  • Power Management Module: Built-in wide voltage input circuit supporting DC12~24V input; equipped with overvoltage, undervoltage, overcurrent, short-circuit, and reverse-connection protection; supports solar + lithium battery power management with charge/discharge protection, battery level monitoring, and low-power sleep/wake functions.
  • Communication Interface Module: Built-in 4G module socket, Ethernet interface, LoRa module interface, and local debug RS485/RS232 interface. Each interface features electrical isolation and surge protection.
  • Clock Module: Built-in high-precision RTC clock chip with backup battery, maintaining accurate timekeeping for over 5 years on power loss, ensuring data timestamp accuracy.

2.1.3 Host Terminal Block Definition

The internal terminal blocks of the host are divided into four zones: power supply zone, sensor zone, communication zone, and digital input zone. Detailed terminal definitions are provided in Chapter 6 — Product Wiring.

2.2 Meteorological Sensor Unit

The sensor unit comprises the meteorological parameter sensing components. All sensors feature industrial-grade design with high protection, high stability, and wide operating temperature characteristics, and can be flexibly configured based on user requirements. The standard configuration includes five elements: wind speed, wind direction, temperature/humidity, barometric pressure, and rainfall. Expandable options include solar radiation, visibility, VOC, CO₂, dust, and lightning warning sensors.

2.2.1 Wind Speed Sensor

  • Measurement Principle: Uses a three-cup induction structure. The wind cups rotate around a vertical axis under wind force, with rotational speed proportional to wind speed. An integrated Hall magnetic-induction element converts the rotational speed into pulse frequency signal output, and the host calculates the real-time wind speed value through computation.
  • Technical Parameters:
Parameter Specification
Measurement range 0~60m/s
Measurement accuracy ±(0.3m/s + 3%FS)
Resolution 0.1m/s
Starting wind speed ≤0.5m/s
Output signal RS485 (Modbus-RTU) / pulse signal (optional)
Material ABS engineering plastic / anodized aluminum alloy housing, carbon fiber wind cups
Ingress protection IP65
Operating temperature -40℃~+85℃
  • Structural Features: Bearings use imported high-precision stainless steel ball bearings with low friction and long service life. Wind cup design is calibrated through wind tunnel testing, providing excellent linearity and wide measurement range. One-piece construction with no exposed circuitry, resistant to corrosion and aging.

2.2.2 Wind Direction Sensor

  • Measurement Principle: Uses a wind vane induction structure. The wind vane rotates with wind direction changes, driving an internal photoelectric encoder disc or potentiometer to output digital or analog signals corresponding to the wind direction angle. The host processes these signals to obtain 16-point compass or continuous 360° wind direction values.
  • Technical Parameters:
Parameter Specification
Measurement range 0~360° omnidirectional
Measurement accuracy ±3°
Resolution 1°
Starting wind speed ≤0.8m/s
Output signal RS485 (Modbus-RTU) / 0~5V analog (optional)
Direction indication 16 compass points + continuous angle
Material Anodized aluminum alloy housing, ABS wind vane
Ingress protection IP65
Operating temperature -40℃~+85℃
  • Structural Features: Equipped with damping device to reduce measurement errors caused by gust vibration. Built-in direction calibration reference allows one-key true north calibration after installation. Low-inertia design for responsive performance.

2.2.3 Temperature and Humidity Integrated Sensor

  • Measurement Principle: Uses a capacitive polymer humidity sensing element combined with an NTC thermistor. The dielectric constant of the humidity sensing element varies with ambient humidity, and the thermistor resistance varies with temperature. A dedicated ASIC chip processes and converts these signals into digital output.
  • Technical Parameters:
Parameter Specification
Temperature range -40℃~+80℃, accuracy ±0.2℃
Humidity range 0~100%RH, accuracy ±2%RH (at 25℃)
Resolution Temperature 0.1℃, humidity 0.1%RH
Output signal RS485 (Modbus-RTU)
Response time Temperature ≤10s, humidity ≤8s
Ingress protection IP65, with radiation shield
Operating temperature -40℃~+85℃
  • Structural Features: Standard configuration includes a white lightweight radiation shield that blocks direct sunlight and ground thermal radiation, ensuring measurement accuracy. The probe features a breathable waterproof membrane design, providing waterproof and dustproof protection while allowing gas permeation. Excellent long-term stability with minimal annual drift.

2.2.4 Atmospheric Pressure Sensor

  • Measurement Principle: Uses a piezoresistive MEMS silicon pressure sensing element. Atmospheric pressure acting on the sensitive diaphragm causes deformation, resulting in resistance changes in the internal Wheatstone bridge. After signal conditioning amplification, AD conversion, and temperature compensation, an accurate pressure value is output.
  • Technical Parameters:
Parameter Specification
Measurement range 300~1100hPa
Measurement accuracy ±0.3hPa (at 25℃)
Resolution 0.1hPa
Output signal RS485 (Modbus-RTU)
Response time ≤1s
Ingress protection IP65
Operating temperature -40℃~+85℃
  • Structural Features: Built-in temperature compensation algorithm maintains high accuracy across a wide temperature range. Compact size, can be integrated within the temperature/humidity sensor or installed separately. Excellent vibration and shock resistance.

2.2.5 Tipping Bucket Rain Gauge Sensor

  • Measurement Principle: Uses a dual tipping bucket metering structure. Rainwater entering through the collection orifice flows into the upper tipping bucket. When the accumulated volume reaches the set capacity, the upper bucket tips, transferring water to the metering bucket. The metering bucket tips once for every 0.2mm of rainfall, triggering an internal reed switch to output one pulse signal. The host counts pulses to calculate cumulative rainfall and rainfall intensity.
  • Technical Parameters:
Parameter Specification
Collection orifice diameter Φ200mm (national standard)
Measurement range 0~4mm/min
Measurement accuracy ±4%
Resolution 0.2mm/bucket
Output signal Digital pulse / RS485 (optional)
Material Stainless steel collection orifice, ABS engineering plastic buckets
Ingress protection IP65
Operating temperature 0℃~+60℃ (heated version optional for cold regions)
  • Structural Features: Uses jewel bearings for sensitive tipping and minimal wear. The base is equipped with leveling bolts and a bubble level to ensure horizontal installation. Includes a filter screen to prevent debris from entering the buckets. An optional electric heating device is available for snow and ice regions, enabling equivalent snowfall monitoring.

2.2.6 Solar Total Radiation Sensor

  • Measurement Principle: Based on the thermoelectric effect principle, using a thermopile sensing element. The surface absorbs solar radiation and generates a temperature difference, outputting a millivolt-level voltage signal proportional to radiation intensity. After amplification and AD conversion, the radiation power value is obtained.
  • Technical Parameters:
Parameter Specification
Measurement range 0~2000W/㎡
Measurement accuracy ±5%
Spectral range 300~3000nm
Output signal RS485 / 4~20mA (optional)
Response time ≤10s
Ingress protection IP65
Cosine response ≤±7% (solar elevation angle 10°~90°)
  • Structural Features: Surface features a double-layer quartz glass dome, providing dustproof and waterproof protection while maintaining spectral transmittance. Built-in desiccant prevents internal condensation. Equipped with leveling adjustment base and bubble level to ensure horizontal installation.

2.2.7 Optional Expansion Sensors

Sensor Principle Measurement Range Accuracy Application
Visibility sensor Forward scattering 10m~10km ±10% Fog and haze monitoring, suitable for roads, ports, airports and surrounding explosion-proof areas
VOC gas sensor PID photoionization 0~100ppm — Volatile organic compound monitoring for chemical park explosion-proof areas
Dust sensor Laser scattering PM2.5, PM10 — Dust explosion hazardous areas
Lightning warning sensor — Within 20km radius — Lightning risk early warning for oil depots and chemical parks
CO₂ sensor Infrared 0~5000ppm — Greenhouse gas monitoring in plant areas

2.3 Explosion-Proof Power Supply System

The explosion-proof weather station power supply system is available in three configurations: solar explosion-proof power supply, mains explosion-proof power supply, and dual-power complementary supply. All power supply components comply with explosion-proof requirements and can adapt to different on-site power conditions.

2.3.1 Solar Explosion-Proof Power Supply

Applicable for remote field sites, remote plant areas, and outdoor oil and gas wells without mains power access. Consists of explosion-proof solar panels, explosion-proof lithium battery pack, and charge/discharge controller.

Explosion-Proof Solar Panel:

Parameter Specification
Power Standard 50W monocrystalline silicon, optional 80W, 100W, 150W
Conversion efficiency ≥23%
Explosion-proof design Explosion-proof junction box, cables routed through explosion-proof cable glands, overall protection IP67
Service life ≥25 years
Operating temperature -40℃~+85℃

Explosion-Proof Lithium Battery Pack:

Parameter Specification
Cell type Lithium iron phosphate (LiFePO₄), excellent safety performance, long cycle life
Capacity Standard 20Ah, optional 40Ah, 60Ah, 100Ah
Rated voltage 12.8V
Explosion-proof design Flameproof stainless steel enclosure, built-in BMS battery management system with overcharge, over-discharge, overcurrent, short-circuit, and overtemperature protection
Cycle life ≥2000 cycles
Operating temperature -20℃~+60℃ (low-temperature heated version optional for cold regions)

Charge/Discharge Controller:

  • Integrated within the host, using MPPT maximum power point tracking technology for high charging efficiency
  • Equipped with solar reverse-connection protection, battery reverse-connection protection, overcharge/over-discharge protection
  • Supports low-power sleep mode; rainy-day endurance ≥7 days (with standard configuration)

2.3.2 Mains Explosion-Proof Power Supply

Applicable for plant areas, parks, and storage areas with mains power access. Consists of an explosion-proof power adapter and surge protector.

Explosion-Proof Power Adapter:

Parameter Specification
Input AC 220V ±20%, 50Hz
Output DC 24V/2A
Explosion-proof type Flameproof, Exd ⅡB T4 Gb
Protection Overvoltage, overcurrent, short-circuit, overtemperature protection
Installation Wall-mounted or DIN-rail mounted, housed in explosion-proof distribution box

Surge Protector:

  • Power lightning protection Class C, nominal discharge current 20kA
  • Connected in series at the mains input to protect equipment from lightning surge damage

2.3.3 Dual-Power Complementary Supply

Simultaneously connects mains and solar/lithium battery power. Mains power takes priority; upon mains interruption, the system automatically switches to lithium battery power, ensuring uninterrupted equipment operation. Suitable for scenarios with unstable power supply and high requirements for monitoring continuity.

2.4 Data Transmission Unit

The data transmission unit is responsible for uploading collected meteorological data to the monitoring platform, supporting multiple communication methods selectable based on on-site network conditions.

2.4.1 4G Wireless Transmission Module

Parameter Specification
Network standard Full network compatibility, supports China Mobile, China Unicom, China Telecom 4G/3G/2G automatic switching
Protocol support MQTT, Modbus-TCP, HJ212 environmental protocol, custom TCP/UDP protocols
Antenna configuration External explosion-proof rubber stick antenna, gain 3dBi, routed through explosion-proof cable gland
Features Automatic reconnection on disconnection, data interrupted resumption; remote parameter configuration and remote firmware upgrade; built-in SIM card socket with pluggable design for easy card replacement

2.4.2 Ethernet Transmission Module

Parameter Specification
Interface standard 10/100M adaptive Ethernet, RJ45 connector
Protocol support Modbus-TCP, MQTT, HTTP, HJ212 protocol
Features Stable transmission, high speed, suitable for plant intranet/dedicated network; supports static IP and DHCP auto-acquisition; network lightning protection

2.4.3 LoRa Wireless Transmission Module

Parameter Specification
Operating frequency 433MHz/470MHz license-free bands
Transmission distance 3~5km line-of-sight, extendable via repeaters
Protocol support Modbus-RTU transparent transmission
Features Low power consumption, strong wall penetration, suitable for multi-point networking within plant areas and no-public-network scenarios; supports star networking, one gateway can connect multiple weather stations

2.4.4 RS485 Wired Transmission

Parameter Specification
Interface standard Industrial-grade RS485, bus-type wiring
Transmission distance Up to 1200m
Protocol support Modbus-RTU
Features Stable transmission, strong anti-interference, suitable for short-distance integration with plant DCS/PLC systems

2.5 Mounting Bracket System

The bracket system supports the host, sensors, solar panels, and other components. It is fabricated from hot-dip galvanized steel for corrosion resistance, rust prevention, and high strength, suitable for long-term outdoor use.

2.5.1 Mast Pole

Parameter Specification
Material Q235 carbon steel pipe, hot-dip galvanized throughout, optional powder coating
Specifications Standard diameter 76mm, wall thickness 3mm, height 3m; optional 2m, 4m, 6m, 10m
Structure Segmented flange connection for convenient transport and on-site assembly; bottom flange plate secured with foundation anchor bolts

2.5.2 Cross Arm and Clamps

  • Sensor Cross Arm: Length 1.5m, used for mounting wind speed and wind direction sensors at the top of the mast pole, ensuring unobstructed surroundings.
  • Solar Panel Bracket: Adjustable-angle clamp bracket, adaptable for optimal tilt angle adjustment at different latitudes; generally the tilt angle equals the local latitude.
  • Host Clamp: Stainless steel clamp securing the explosion-proof host to the lower-middle section of the mast pole for convenient wiring and maintenance.
  • All clamps are equipped with rubber pads to prevent coating wear on the pole and increase friction for secure fixation.

2.5.3 Foundation Accessories

Item Specification
Anchor bolts 4 × M16 × 600mm galvanized anchor bolts, embedded in concrete foundation
Flange plate Welded to the bottom of the mast pole, matching anchor bolt hole positions
Nuts and washers Matching galvanized nuts, flat washers, spring washers

2.6 Explosion-Proof Supporting Accessories

2.6.1 Explosion-Proof Cable Glands

Parameter Specification
Material 304 stainless steel
Specifications Suitable for cable outer diameter 6~12mm, PG13.5 thread
Function Clamping and sealing cables entering the host, maintaining flameproof cavity performance and ingress protection rating
Quantity Standard 6 pcs, expandable based on wiring requirements

2.6.2 Explosion-Proof Junction Box

Parameter Specification
Explosion-proof rating Exd ⅡB T4 Gb
Material Cast aluminum / 304 stainless steel
Function Intermediate connection and distribution of sensor cables, ensuring explosion-proof compliance at connection points

2.6.3 Explosion-Proof Flexible Conduit

Parameter Specification
Material 304 stainless steel braided mesh, rubber inner tube
Specifications Length 500mm/1000mm, internal threads at both ends
Function Flexible connection between host and conduit, vibration buffering, angle adjustment convenience, sealing assurance

2.6.4 Other Accessories

  • Grounding copper bar, grounding bolts, yellow-green grounding wire
  • Waterproof wiring terminals, heat-shrink tubing, cable ties
  • Product certificate, copy of explosion-proof certificate, factory calibration certificate
  • Dedicated cover-opening wrench, hex key tool set

Chapter 3 Product Principles

3.1 Meteorological Parameter Acquisition Principles

The explosion-proof weather station uses various types of sensors to independently sense different meteorological elements, converting physical quantities into recognizable electrical signals. The acquisition host then performs signal conditioning, AD conversion, digital computation, temperature compensation, and unit conversion to obtain standard meteorological parameter values.

3.1.1 Wind Speed Acquisition Principle

The three hemispherical cups of the three-cup wind speed sensor are symmetrically mounted on a vertical rotating shaft. When the concave surface of a cup faces the wind, it experiences greater wind pressure than the convex surface, generating rotational torque that drives shaft rotation. Within a certain wind speed range, the angular velocity of the shaft is approximately linearly related to wind speed.

A permanent magnet coupled to the lower end of the rotating shaft rotates synchronously, with a fixed Hall sensing element positioned below. Each complete rotation of the magnet causes the Hall element to output one pulse signal. The host counts the number of pulses per unit time via a counter, and combined with the sensor calibration coefficient, calculates the real-time wind speed using the formula:

V = k × f + b

Where: V = wind speed (m/s), f = pulse frequency (Hz), k = calibration coefficient, b = zero wind speed offset

The calibration coefficient k is determined through wind tunnel testing to ensure measurement accuracy across the full range. When wind speed falls below the starting threshold, friction torque exceeds wind dynamic torque, the cups stop rotating, and the output wind speed is 0.

3.1.2 Wind Direction Acquisition Principle

Under wind force, the wind vane points toward the direction from which the wind originates. The vane shaft drives an internal absolute photoelectric encoder disc to rotate synchronously. The encoder disc features light-transmitting and light-blocking stripes at different angles. Photoelectric tubes receive the light signals and convert them into binary Gray code, which is decoded to obtain an angle value of 0~360°.

After reading the angle value, the host applies the true north calibration offset established during installation to determine the actual geographic wind direction angle. This can be further converted into a 16-point compass direction description (such as north wind, northeast wind, east wind, etc.). To reduce data jumps caused by gust vibration, the host implements a built-in moving average filtering algorithm with configurable filter window length, outputting stable wind direction data.

3.1.3 Temperature and Humidity Acquisition Principle

Temperature measurement uses an NTC (negative temperature coefficient) thermistor whose resistance decreases as ambient temperature rises. The thermistor is connected in a precision voltage divider circuit. After AD sampling of the divider voltage, the precise temperature value is calculated using the Steinhart-Hart equation, with multi-point temperature calibration ensuring accuracy across the full temperature range.

Humidity measurement uses a capacitive polymer humidity sensing element. The dielectric constant of the polymer medium between the element’s upper and lower electrodes varies with ambient relative humidity, causing capacitance changes. A dedicated ASIC chip detects the capacitance variation and, after temperature compensation and linearity correction, outputs the relative humidity value. Sensors are calibrated using standard humidity generators before leaving the factory to ensure measurement accuracy.

3.1.4 Atmospheric Pressure Acquisition Principle

The core of the MEMS piezoresistive pressure sensor is a silicon diaphragm with four equal-value resistors formed by ion implantation, configured as a Wheatstone bridge. When atmospheric pressure acts on the diaphragm, it undergoes slight deformation, causing resistance changes that unbalance the bridge and output a millivolt-level voltage signal proportional to pressure.

After instrumentation amplifier amplification and AD conversion, the microcontroller performs temperature compensation and nonlinearity correction to obtain the accurate atmospheric pressure value. The sensor incorporates a built-in temperature sensor for real-time temperature drift compensation, maintaining stable accuracy across -40℃~+85℃.

3.1.5 Rainfall Acquisition Principle

The tipping bucket rain gauge uses the volumetric method to measure rainfall. Rainwater collected by the collection orifice flows through a guide funnel into the upper tipping bucket, which provides flow limiting and buffering to ensure even water flow into the metering bucket. The metering bucket has two symmetrical chambers. When one chamber accumulates the set volume of water (corresponding to 0.2mm of rainfall), the center of gravity shifts, causing the bucket to tip, and the other chamber begins collecting.

When the bucket tips, a magnet fixed to the bucket shaft approaches the reed switch, closing it once and outputting one digital pulse signal. The host accumulates pulse counts and multiplies by the rainfall corresponding to each tip to obtain cumulative rainfall. Rainfall intensity (mm/min) is calculated from the number of pulses per unit time.

3.2 Flameproof (Ex d) Explosion-Proof Operating Principles

Flameproof protection is one of the most widely used explosion protection types in industrial applications. Its core principle is “gap flameproofing” — using a flameproof enclosure of sufficient strength to withstand the pressure of an internal explosive mixture explosion, while cooling the explosion flame through the narrow gaps of the enclosure mating surfaces. This reduces flame temperature and energy so that the flame cannot ignite the external explosive gas environment.

3.2.1 Flameproof Enclosure Pressure Withstand Principle

The explosion-proof host enclosure is fabricated from stainless steel or cast aluminum alloy of sufficient thickness. Through finite element analysis and actual explosion testing, it can withstand the maximum explosion pressure generated by internal explosive gas explosions (typically approximately 0.8~1.0MPa for ⅡB class gases) without permanent deformation or cracking, ensuring enclosure structural integrity.

The flange mating surfaces are secured with multiple high-strength bolts, ensuring that the mating surfaces do not open and the gap does not widen during an explosion, maintaining the designed flameproof gap.

3.2.2 Gap Flame Quenching Principle

When an internal explosion occurs, high-temperature, high-pressure flames and gases diffuse toward the mating surface gaps. The gap channels are narrow and long, allowing the flame to make full contact with the metal walls. Heat is rapidly conducted away, causing the flame temperature to drop sharply. By the time the flame reaches the gap exit, its temperature is already below the ignition temperature of the external explosive gas, and the energy of the explosion products is insufficient to ignite the external gas. This achieves “internal explosion without external transmission.”

Key parameters of the flameproof mating surface include:

Parameter Specification Description
Mating surface width (L) ≥25mm Flame propagation path length; longer width provides better flame quenching. Compliant with ⅡB class explosion-proof requirements
Mating surface gap (i) ≤0.15mm Maximum gap after enclosure closure; smaller gap provides better flame quenching
Surface roughness Ra≤6.3μm Higher machining precision of mating surfaces results in more uniform gap and higher explosion-proof reliability

3.2.3 Temperature Class Control Principle

The T4 temperature class requires that the maximum surface temperature of the equipment does not exceed 135℃. This product ensures surface temperature compliance through the following measures:

  • Internal circuitry uses low-power design with minimal overall heat generation; internal temperature rise is below 20K during normal operation
  • Metal enclosure provides excellent heat dissipation, rapidly conducting internal heat outward
  • Thermal simulation verification during design confirms maximum enclosure temperature below 120℃ in extreme high-temperature environments, meeting T4 requirements
  • Power circuits are equipped with overtemperature protection, automatically reducing power output or shutting down upon abnormal overheating

3.3 Data Acquisition and Processing Principles

The explosion-proof weather station host uses a time-division polling acquisition mechanism, sequentially reading each sensor channel’s data at set intervals. After signal conditioning, filtering, calibration, and unit conversion, data is packaged, stored, and uploaded.

3.3.1 Acquisition Scheduling Mechanism

The main controller runs a real-time operating system with priority-based task allocation:

Priority Tasks
High Clock operation, power monitoring, fault protection, alarm determination
Medium Sensor data acquisition, data computation processing
Low Data storage, data upload, parameter configuration response

The acquisition cycle is configurable from 1 second to 1 hour, with a default of 60 seconds per acquisition. Within each acquisition cycle, the system sequentially reads digital sensors on the RS485 bus, acquires analog sensor data, reads digital input statuses, completing one full data update cycle.

3.3.2 Signal Processing Flow

1. Signal Conditioning: Analog signals first pass through filter circuits to remove high-frequency interference, then through proportional amplification to the optimal AD sampling range, with overvoltage clamping protection.

2. AD Sampling: A 12-bit AD converter samples at a relatively high frequency multiple times, averaging to reduce random errors.

3. Digital Filtering: Uses a combination of moving average and median filtering algorithms to eliminate abnormal jumps and output stable data.

4. Calibration Computation: Applies factory calibration coefficients for zero-point calibration, gain calibration, and temperature compensation, converting AD values to actual physical quantities.

5. Unit Conversion: Converts to standard units based on configured unit system, such as m/s, ℃, %RH, hPa, etc.

6. Abnormality Detection: Checks whether data falls within the reasonable measurement range; out-of-range or abnormal values are flagged as fault status.

3.3.3 Data Storage and Interrupted Data Resumption

Processed data with timestamps is written to the local Flash storage area in a fixed format, using a circular overwrite mechanism — when full, the oldest data is automatically overwritten.

When the communication link is interrupted, data continues to be stored locally. Upon communication recovery, the host automatically backfills historical data from the interruption point. The backfill speed is significantly higher than the real-time upload speed, rapidly filling data gaps and ensuring data continuity. The backfill process does not affect real-time data collection and upload.

3.4 Wireless Data Transmission Principles

Using 4G communication as an example, the data transmission flow is as follows:

1. The host encapsulates collected data packets according to the agreed protocol (such as MQTT or HJ212), adding device ID, timestamp, data identifiers, and other information.

2. Data packets are sent to the 4G module via the UART interface.

3. The 4G module connects to the carrier cellular network and transmits data packets to the cloud platform server at the specified IP and port via TCP/IP protocol.

4. The cloud platform receives, parses, and stores the data, providing web pages, apps, mini-programs, and other terminal displays.

5. Reverse data such as configuration commands and firmware upgrades issued by the platform are transmitted back to the module via the 4G network and forwarded to the host for execution.

The 4G module features built-in PPP dial-up and TCP/IP protocol stack, supporting automatic dialing, disconnection reconnection, and heartbeat keep-alive mechanisms, maintaining a long-term online rate of over 99%. The module includes a SIM card circuit supporting hot-swappable SIM cards.

3.5 Power Supply Management Principles

The solar power supply system uses MPPT charge/discharge management to maximize solar energy utilization while protecting the lithium battery.

3.5.1 MPPT Charging Principle

MPPT (Maximum Power Point Tracking) — the controller continuously detects the solar panel’s output voltage and current, calculates the current output power, and dynamically adjusts the charging circuit duty cycle to keep the solar panel operating at the maximum power point of its I-V characteristic curve. Compared to traditional PWM charging, power generation utilization is improved by 20%~30%.

The charging process is divided into three stages:

Stage Description
Constant current charging When battery level is low, charges at higher constant current to rapidly increase capacity
Constant voltage charging When battery voltage approaches full charge voltage, converts to constant voltage charging with gradually decreasing current
Float charging After battery is fully charged, converts to low-voltage float charging to compensate self-discharge losses and prevent overcharging

3.5.2 Discharge Management and Low-Power Control

When the lithium battery supplies power externally, the controller continuously monitors battery voltage, discharge current, and temperature:

  • When battery voltage falls below the undervoltage threshold, the load output is cut off to prevent battery damage from over-discharge
  • When discharge current exceeds the rated value or a short circuit occurs, output is rapidly cut off to protect the battery and equipment
  • When temperature is too high or too low, charge/discharge current is limited to protect the cells

To extend rainy-day endurance, the host supports low-power modes:

  • Sleep Mode: Acquisition and upload cycles are extended, unnecessary peripherals are powered off, and total equipment power consumption drops below 0.5W
  • Timed Wake-Up: Wakes up at set intervals for acquisition and upload, then immediately returns to sleep
  • Configurable nighttime low-power mode further reduces nighttime energy consumption

3.6 Intelligent Alarm and Linkage Principles

The host has multi-level alarm logic built in, allowing multi-level thresholds to be set for each meteorological parameter. When conditions are met, alarm output and linkage actions are triggered.

3.6.1 Alarm Determination Logic

Multiple alarm modes are supported:

Alarm Mode Description Example
High limit alarm Triggered when parameter value exceeds set threshold Wind speed exceeds 12m/s alarm
Low limit alarm Triggered when parameter value falls below set threshold Temperature below -10℃ alarm
Rate-of-change alarm Triggered when parameter change magnitude exceeds threshold per unit time Rapid barometric pressure drop warning
Duration alarm Triggered only after parameter remains out of limits for a set duration, avoiding false alarms from transient interference —

Alarm levels are classified into three grades: general alarm, important alarm, and emergency alarm. Different grades correspond to different linkage actions and notification methods.

3.6.2 Linkage Output Principle

The host is equipped with relay output interfaces. When an alarm is triggered, relay contacts actuate to link external equipment:

Alarm Condition Linkage Action
Wind speed exceeds limit Shut down outdoor operation equipment, retract awnings, etc.
Rainfall detected Close skylights, activate drainage pumps, etc.
VOC concentration exceeds limit Activate explosion-proof fans, sprinkler systems, etc.
Lightning warning Cut off non-essential power, shut down outdoor operations

Alarm information is simultaneously pushed to management personnel through multiple channels, including platform push notifications, SMS notifications, and audible/visual alarms, achieving multi-channel early warning.

Chapter 4 Product Functions and Features

4.1 Core Meteorological Monitoring Functions

4.1.1 Multi-Element Synchronous Monitoring

Supports simultaneous acquisition of up to 16 meteorological elements including wind speed, wind direction, temperature, humidity, air pressure, rainfall, and radiation. All parameters are timestamp-aligned, enabling comprehensive understanding of on-site micro-meteorological conditions. Users can flexibly select and configure sensors based on actual requirements, with smooth future expansion capability without replacing the main unit.

4.1.2 High-Precision Data Acquisition

All sensors are factory-calibrated. The main unit incorporates built-in temperature compensation and nonlinear correction algorithms. Measurement accuracy complies with national meteorological observation specifications and meets the data precision requirements of industrial monitoring, environmental supervision, and safety early warning applications. Third-party metrological calibration certificates are available for key sensors.

4.1.3 All-Weather Continuous Monitoring

The equipment uses industrial-grade components with a wide-temperature design, capable of long-term stable operation under extreme temperatures from -40°C to +70°C and 0–100 % humidity conditions. It withstands high temperatures, extreme cold, heavy rain, and sandstorms, providing 365-day × 24-hour uninterrupted monitoring.

4.2 Explosion-Proof Safety Features

4.2.1 Compliant Flameproof Design

Designed and manufactured in strict accordance with the GB3836 standard, the product holds an authoritative explosion-proof certificate and can be legally installed in Zone 1 and Zone 2 explosive gas atmospheres, meeting the explosion-proof compliance requirements of safety supervision, fire protection, and environmental protection authorities.

4.2.2 Multiple Safety Protections

Full Circuit Isolation Design: Electrical isolation between power supply, sensors, and communication interfaces prevents fault propagation and blocks external interference from entering internal circuits.

Overvoltage and Overcurrent Protection: All interfaces feature surge, overvoltage, overcurrent, and reverse-polarity protection. Incorrect wiring will not damage the equipment.

Overtemperature Protection: When internal temperature exceeds limits, the unit automatically reduces power consumption or shuts down, ensuring surface temperature meets T4 temperature class requirements.

Open-Cover Power-Off Protection (Optional): A cover-open detection switch automatically cuts off internal power when the cover is opened, preventing sparks from live cover opening.

4.2.3 Intrinsically Safe Circuit Design

Internal sensor circuits adopt low-voltage, low-current design. Neither normal nor fault conditions can generate electrical sparks or thermal effects sufficient to ignite explosive gases, further enhancing the safety margin.

4.3 Data Transmission and Cloud Management Functions

4.3.1 Multiple Communication Options

Provides multiple communication methods including 4G, Ethernet, LoRa, and RS485, adapting to different application scenarios such as public networks, private networks, and local area networking. Supports mainstream industrial protocols and environmental protection protocols, enabling seamless integration into existing monitoring systems, DCS systems, and environmental protection platforms.

4.3.2 Rich Platform Functions

Comes with a dedicated environmental monitoring cloud platform featuring the following functions:

  • Real-Time Monitoring: Electronic map display of all stations, real-time display of all parameter values, and detailed single-station viewing.
  • Historical Data: Time-based historical data query, data curve and comparison curve generation, and Excel format export.
  • Alarm Management: Remotely configurable alarm thresholds, queryable alarm records, and multiple alarm notification methods including SMS, WeChat, email, and audible/visual alarms.
  • Statistical Reports: Automatic generation of daily, monthly, and annual reports with maximum, minimum, average, and cumulative value statistics.
  • Device Management: Remote viewing of device online status, signal strength, and battery level; remote parameter configuration and firmware upgrades.
  • Account Hierarchy: Multi-level account permission management, with different users assigned viewing and operating permissions for different stations.
  • Large-Screen Display: Supports visual large-screen display, suitable for park monitoring centers and command center large-screen deployment.

4.3.3 Data Security Assurance

Data transmission employs SSL/TLS encryption to prevent data theft and tampering.

Cloud data is multi-backup to guarantee no data loss.

Supports private deployment with data stored on the user’s local server, meeting data security and confidentiality requirements.

4.4 Low Power Consumption and Long Battery Life Features

4.4.1 Whole-Unit Low Power Consumption Design

The main unit adopts an industrial-grade low-power processor with optimized power management and multi-level sleep modes. Standby power consumption is as low as 0.5 W, significantly reducing power supply system configuration requirements and operating energy consumption.

4.4.2 Solar Long-Endurance Battery Life

Standard configuration includes a 50 W solar panel and 20 Ah lithium battery, providing 7+ days of continuous backup during cloudy/rainy weather. Enhanced configurations extend endurance to 15–30 days, suitable for regions with frequent rainy weather and short winter sunshine.

4.4.3 Intelligent Power Management

Supports automatic switching among solar, mains, and battery power sources, prioritizing clean energy with mains power as backup, enabling unattended long-duration operation. The platform allows remote viewing of battery voltage, charge level, and charging status, providing advance prediction of endurance risks.

4.5 Environmental Adaptability and Reliability Features

4.5.1 High Protection Rating

Main unit rated IP66, sensors rated IP65—fully protected against dust ingress and powerful water jets, adapting to harsh environments including heavy rain, dust, and coastal salt spray.

4.5.2 Strong Anti-Interference Capability

Power and signal interfaces feature EMC filtering and surge protection, compliant with industrial Level 4 electromagnetic compatibility standards, capable of withstanding strong electromagnetic interference environments.

Signal transmission uses differential signaling and shielded cables with strong common-mode interference rejection.

The entire unit passes vibration and shock testing, adapting to vibration environments near traffic arteries and industrial equipment.

4.5.3 Anti-Corrosion and Weather-Resistant Design

The housing is made of 304 stainless steel or anodized aluminum alloy. Brackets are hot-dip galvanized, and all exposed fasteners are stainless steel, providing corrosion resistance and aging resistance with an outdoor service life of ≥10 years. Optional 316 stainless steel material and anti-corrosion coatings are available for coastal and chemical corrosive environments.

4.6 Intelligent Alarm and Linkage Control Functions

4.6.1 Multi-Dimensional Alarm Strategies

Supports multiple alarm types including threshold alarms, sudden-change alarms, offline alarms, and fault alarms. Each parameter can be configured with multi-level alarm thresholds. Alarm delay and alarm reset thresholds are independently configurable, effectively reducing false and missed alarms.

4.6.2 Multi-Channel Alarm Notification

When an alarm occurs, multiple notification methods can be simultaneously triggered, including platform pop-ups, mobile APP push notifications, WeChat official account notifications, SMS notifications, and on-site audible/visual alarms, ensuring management personnel are informed of risks at the earliest opportunity.

4.6.3 Programmable Linkage Control

The main unit has built-in multiple relay outputs supporting custom linkage logic. It can automatically control third-party equipment based on meteorological parameter thresholds, such as explosion-proof fans, explosion-proof sprinkler systems, motorized valves, alarm lights, and public address systems—achieving closed-loop management from monitoring to response and improving emergency response speed.

4.7 Expansion and Customization Features

4.7.1 Flexible Sensor Expansion

The main unit reserves ample acquisition channels. Users can add sensors later based on business requirements, such as visibility, VOC, dust, hydrogen sulfide, and ammonia sensors, without replacing the main unit, reducing upgrade costs.

4.7.2 Custom Function Development

Custom acquisition logic, alarm rules, communication protocols, and data formats can be developed per user requirements. Supports interfacing with user-owned platforms and third-party regulatory platforms, providing customized software development services.

4.7.3 Structural Customization

Various mounting structures can be customized, including different bracket heights, wall-mount installation, pole-mount installation, clamp-mount installation, and flange installation, adapting to different on-site conditions. Special housing materials, special explosion-proof ratings, and special power supply solutions can also be customized.

Chapter 5 Product Installation

5.1 Pre-Installation Preparation

5.1.1 Personnel Qualification Requirements

Installation personnel must possess electrical installation construction qualifications and be familiar with explosion-proof electrical equipment installation specifications.

Personnel entering explosive hazardous areas must undergo explosion-proof safety training and master the safety requirements for working in explosive areas.

Personnel working at heights must hold a high-altitude work certificate and wear qualified personal protective equipment.

A designated safety supervisor must be assigned at the construction site to supervise construction safety throughout the process.

5.1.2 Construction Tool Preparation

Tool Specification Purpose
Explosion-proof adjustable wrench 8″, 12″ Bolt tightening, for use in explosive areas
Explosion-proof hex key set M3–M12 Hex bolt tightening
Torque wrench 5–50 N·m Controlling bolt tightening torque, ensuring uniform tightening of flameproof joint surfaces
Multimeter Digital, accuracy class 0.5 Voltage, continuity, and resistance measurement
Insulation resistance tester (Megger) 500 V Insulation resistance testing
Spirit level 600 mm Leveling of pole and sensors
Tape measure 5 m Dimensional measurement
Compass Professional grade True north calibration of wind direction sensor
Wire stripper 0.5–6 mm² Cable stripping
Crimping tool 0.5–6 mm² Cold-press terminal crimping
Rotary hammer Φ16 drill bit Foundation drilling (if using expansion bolts)
Concrete vibrating tools / Foundation concrete compaction
Explosion-proof flashlight Industrial grade Lighting in explosive areas
Personal protective equipment Safety helmet, anti-static workwear, insulated shoes, protective gloves Construction personnel protection
Safety warning facilities Warning cones, warning tape, hot work signage Construction area warning

Note: In Zone 1 explosive hazardous areas, the use of non-explosion-proof power tools is strictly prohibited. Hot work requires a hot work permit and implementation of safety protection measures before proceeding.

5.1.3 Unpacking Inspection

After the equipment arrives and before installation, organize an unpacking inspection to confirm the goods are intact and complete:

  • Check whether the outer packaging is intact, free of collision damage or water ingress marks, and verify that the model and quantity marked on the packaging match the contract.
  • Open the packaging, remove the packing list, and verify each item of equipment, accessories, and documentation one by one:
  • Explosion-proof weather station main unit × 1
  • Various optional sensors (quantity as configured)
  • Pole, cross arm, and bracket accessory kit × 1 set
  • Solar panel and lithium battery (for solar-powered models)
  • Accessories including explosion-proof cable glands, explosion-proof flexible conduits, and grounding components
  • Documentation including product certificate of conformity, explosion-proof certificate, factory calibration report, and instruction manual
  • Inspect the equipment appearance: check the housing for deformation, collision damage, or scratches; glass components for breakage; interfaces for looseness; and nameplate markings for clarity and completeness.
  • Inspect cable connectors and terminals for oxidation or looseness, and waterproof seals for aging or damage.
  • If missing parts, damage, model mismatch, or other issues are found, take photos immediately and contact the Guangzhou Lain Intelligent System Development Co., Ltd. service hotline at +86 13538869979.

5.1.4 On-Site Safety Briefing

Before construction, the project manager shall conduct a safety briefing for all construction personnel:

  • Clarify the on-site hazardous area classification, hazardous gas types, and work grades.
  • Specify construction time, work scope, and prohibited actions.
  • Complete approval procedures for hot work, electrical work, and high-altitude work.
  • Clarify emergency response procedures and the locations of emergency equipment.
  • Confirm ventilation and gas detection arrangements during construction.

5.2 Installation Site Selection Requirements

5.2.1 Explosion-Proof Area Compliance

The equipment installation location must match its explosion-proof rating. This product can be installed in Zone 1 and Zone 2 but is strictly prohibited from installation in Zone 0.

The installation location should avoid areas directly below release sources and low-lying areas where explosive gases tend to accumulate. Well-ventilated locations are preferred.

The distance between the equipment and release sources shall comply with the relevant provisions of GB50058 *Code for Design of Electrical Installations in Explosive Atmospheres*.

5.2.2 Meteorological Monitoring Site Selection Principles

Open and Unobstructed: The installation point should be in an open area. Within 10 meters of the wind speed and wind direction sensors, there should be no buildings, trees, equipment, or other obstacles higher than the sensors, ensuring unobstructed airflow.

Representativeness: The installation location should represent the overall meteorological conditions of the monitored area, avoiding local microclimate anomalies such as building corners, exhaust vent outlets, and locations adjacent to heat dissipation equipment.

Avoidance of Interference Sources:

  • Keep at least 10 meters away from strong electromagnetic radiation sources, such as high-power motors, transformers, radar, and high-voltage lines.
  • Avoid vibration sources to prevent long-term vibration from affecting sensor accuracy and lifespan.
  • The rain sensor must have no overhead obstructions, avoiding dripping water or eaves water from affecting measurement accuracy.

Safety and Maintainability:

  • The installation location should facilitate future maintenance and inspection, avoiding traffic arteries and high-altitude falling-object risk zones.
  • Avoid locations susceptible to vehicle collision or object impact; install protective barriers where necessary.
  • Solar-powered models require year-round adequate sunshine on the solar panel without shadows from buildings or trees.

5.2.3 Installation Height Requirements

General Meteorological Monitoring: The standard meteorological observation height for wind speed and wind direction sensors is 10 meters above ground. For industrial scenarios, the height can be adjusted based on actual needs, with a recommended minimum of 2 meters.

In-Plant Monitoring: Sensor height should be 0.5–1 meter higher than the tallest surrounding obstacle.

Main Unit Installation Height: The bottom of the main unit should be 1.2–1.5 meters above ground, facilitating wiring and maintenance operations.

Rain Sensor Installation Height: The rain collection orifice should be 0.7–2.0 meters above ground to avoid splash water interference and prevent debris obstruction.

5.3 Foundation and Base Construction

Pole-mount installation requires pouring a concrete foundation to ensure pole stability with wind resistance rating ≥12.

5.3.1 Foundation Dimensions

  • Standard 3 m pole foundation dimensions: 400 mm (L) × 400 mm (W) × 600 mm (D).
  • 4–6 m pole foundation dimensions: 500 mm (L) × 500 mm (W) × 800 mm (D).
  • Poles 10 meters and above require individually designed foundations; diagonal guy wires shall be added where necessary.

5.3.2 Construction Steps

Positioning and Layout: Mark the foundation excavation boundary lines according to the selected location.

Excavation: Excavate the pit to the specified dimensions, compact the bottom, and remove loose soil and debris. For soft soil conditions, enlarge the pit or implement reinforcement measures.

Anchor Bolt Placement: Position 4 M16 anchor bolts on a positioning template according to the flange hole spacing, place into the pit, and adjust the bolt protrusion above the foundation top surface to 100–120 mm, ensuring verticality.

Concrete Pouring: Use concrete of grade C20 or higher. Vibrate continuously during pouring to ensure concrete compaction. Correct the anchor bolt positions during pouring to prevent displacement.

Foundation Leveling: Level the foundation top surface using a spirit level, ensuring the surface is level with an error of ≤2 mm/m.

Curing: After pouring, cover the concrete and cure with water. The curing period shall be no less than 7 days. Anti-freezing measures are required for winter construction.

Strength Confirmation: Pole installation may proceed only after the concrete strength reaches at least 70% of the design strength (approximately 3–5 days of curing).

If the site has a hardened cement ground, the flange plate can be fixed with expansion bolts. The ground thickness must be ≥200 mm, and expansion bolt embedment depth must be ≥150 mm.

5.4 Pole and Bracket Installation Steps

5.4.1 Pole Assembly

Clean the flange mating surfaces of the segmented pole sections, removing burrs and contaminants.

Align the flange bolt holes, insert bolts, and tighten bolts uniformly in a diagonal sequence to the required torque, ensuring close contact of the flange joint surfaces.

Check the overall straightness of the pole; deviation shall not exceed 1‰ of the pole length.

5.4.2 Pole Erection

First, align the bottom flange of the pole with the foundation anchor bolts, slide bolts through, and fit nuts without tightening.

Erect the pole manually or using a crane, and adjust the pole to vertical.

Use a spirit level to check verticality in two perpendicular directions. Adjust until the pole is vertical with a deviation of ≤3 mm/m.

Tighten the anchor bolt nuts uniformly in a diagonal sequence, re-check verticality, and lock the lock nuts upon passing.

Waterproof mortar may be poured between the bottom flange and the foundation to seal gaps, preventing water accumulation and corrosion.

5.4.3 Cross Arm and Bracket Installation

Sensor Cross Arm Installation: Secure the wind speed/wind direction cross arm to the top of the pole. Adjust the cross arm direction so one end points downwind of the prevailing local wind direction, or according to on-site design requirements. Tighten the clamp bolts securely to prevent rotation.

Solar Panel Bracket Installation: Secure the solar panel clamp bracket to the sunny side of the pole (facing south in the northern hemisphere). Adjust the bracket inclination angle to equal the local latitude for optimal solar reception efficiency. Tighten temporarily first, and perform final tightening after installing the solar panel.

Main Unit Mounting Clamp: Secure the main unit mounting clamp to the middle-lower section of the pole, at a height convenient for operation. Tighten initially, then adjust the height after main unit installation and tighten finally.

5.5 Explosion-Proof Main Unit Installation

Clean the mounting surface of the main unit and the contact area on the pole to ensure a smooth fit.

Position the main unit against the pole at the installation location, slide in the stainless steel mounting clamps, and adjust the height and levelness.

Tighten the clamp bolts uniformly, ensuring the main unit is secure without wobbling. Avoid over-tightening that may cause housing deformation.

Main Unit Mounting Orientation: The wiring chamber should face downward or to the side, facilitating wiring operations and preventing rainwater from flowing along cables into the cable gland.

After installation, check the verticality of the main unit and ensure the nameplate is properly oriented for easy viewing.

Note: During main unit installation, knocking, throwing, or dropping is strictly prohibited. Damage to flameproof joint surfaces and seals is strictly prohibited.

5.6 Sensor Installation Specifications

5.6.1 Wind Speed Sensor Installation

Secure the wind speed sensor to the mounting seat at the end of the cross arm via M18 thread or flange.

Ensure the sensor is installed vertically with the shaft axis in a vertical state, using a spirit level for auxiliary calibration.

The sensor cable outlet must face downward to prevent rainwater ingress.

After installation, manually rotate the anemometer cups—they should rotate freely without jamming or abnormal noise.

When multiple wind speed sensors are installed, the spacing should be no less than 10 times the sensor diameter to avoid mutual interference.

5.6.2 Wind Direction Sensor Installation

Secure the wind direction sensor to the cross arm, maintaining a spacing of no less than 30 cm from the wind speed sensor. Typically, the wind direction sensor is positioned on the cross arm side closer to the pole, with the wind speed sensor on the outer side.

Use a compass to calibrate true north. Slowly rotate the sensor body so the north marking line (N mark) on the sensor aligns with geographic true north.

After calibration, tighten the mounting bolts to prevent sensor rotation and displacement.

Manually rotate the wind vane—it should rotate freely with uniform damping and self-return capability.

After installation, record the true north offset angle for software calibration during commissioning.

Note: When calibrating true north, avoid proximity to iron objects and electromagnetic equipment that may affect compass accuracy. Geographic true north is preferred; if magnetic north is used, the local magnetic declination must be recorded for correction.

5.6.3 Temperature and Humidity Sensor Installation

Install the temperature and humidity sensor on a dedicated cross arm or the side of the pole, with the sensor probe facing downward.

A radiation shield must be installed to prevent direct sunlight from causing high temperature measurement readings.

The installation height should be 1.2–2 m above ground, away from heat sources, cold sources, and direct exhaust outlets.

Avoid installation in building corners, dead corners, or other locations with poor air circulation.

5.6.4 Atmospheric Pressure Sensor Installation

May be integrated into the temperature/humidity sensor housing or installed separately on the pole near the main unit.

Ensure the sensor’s pressure vent is unobstructed and not blocked by dust or rainwater.

Record the installation altitude; subsequent sea-level pressure conversion can be calculated based on altitude.

5.6.5 Rain Sensor Installation

Install in an open, unobstructed location. The rain collection orifice must be level, calibrated with a bubble level, with a levelness error of ≤1°.

The rain collection orifice height should be 0.7–2 m above ground with no surrounding obstructions, avoiding dripping water from eaves and falling tree leaves.

Secure the base to a dedicated bracket or platform with bolts, ensuring firm installation without wobbling.

Remove the rain collection orifice filter screen, check whether the tipping bucket rotates freely without sticking, and reinstall after confirmation.

For heated rain sensors, verify correct heating power wiring and implement proper thermal insulation protection.

5.6.6 Total Solar Radiation Sensor Installation

Install on the sunny side of the pole top, level the base, and center the bubble level.

The sensor sensing surface must face horizontally upward without any obstruction.

Route the cable from below, creating a drip loop to prevent rainwater from flowing along the cable into the sensor.

Regularly clean the sensing surface glass dome to maintain light transmittance.

5.7 Cable Routing and Conduit Installation

5.7.1 Cable Selection

  • Power cable: RVV 2×1.5 mm² copper-core PVC insulated sheathed flexible cable
  • RS485 signal cable: RVSP 2×1.0 mm² copper-core shielded twisted pair
  • Switching/pulse signal cable: RVV 2×1.0 mm² copper-core sheathed flexible cable

All cables must have flame-retardant properties. Flame-retardant cables must be used in explosion-proof areas.

5.7.2 Conduit Requirements

Outdoor cables must be routed through galvanized steel conduit or explosion-proof flexible conduit. Bare cables are strictly prohibited.

Steel conduit connections shall use threaded joints with anti-corrosion treatment at the joints. Explosion-proof flexible conduit shall be used as transition between steel conduit and equipment.

Conduit fixing spacing: ≤1.5 m for horizontal runs, ≤2 m for vertical runs, with additional fixing points at bends.

Install cable protection bushings at conduit openings to prevent cutting of cable insulation.

For vertical conduit runs, apply waterproof sealing at the bottom to prevent water accumulation inside the conduit.

5.7.3 Wiring Specifications

Route cables along the inside of the pole, securing with cable ties at 50 cm intervals. Wiring should be neat and orderly, avoiding crossing and tangling.

Signal cables and power cables shall be routed separately with spacing ≥20 cm to avoid electromagnetic interference. If routed in the same conduit, shielded cables with single-ended grounding must be used.

Reserve 10–20 cm of cable slack for each sensor cable to facilitate sensor removal and maintenance.

Create a drip loop (waterproof bend) before cables enter equipment to prevent rainwater from flowing along cables into the device.

Label both ends of all cables with cable numbers, purposes, and connection locations at both ends for future maintenance.

5.8 Grounding System Installation

Explosion-proof electrical equipment must be reliably grounded to ensure personnel safety, lightning protection, and anti-interference performance.

5.8.1 Grounding Requirements

Functional grounding and protective grounding shall share a common grounding device with a grounding resistance of ≤4Ω.

Lightning protection grounding may share the equipment grounding, with a grounding resistance of ≤4Ω. If a separate lightning protection grounding is installed, it must be located ≥3 m from the equipment grounding with a grounding resistance of ≤10Ω.

All exposed conductive parts of the explosion-proof equipment housing, pole, metal conduits, and cable trays must be reliably grounded.

5.8.2 Grounding Construction Steps

Ground Electrode Fabrication: Use ∠50×50×5 galvanized angle steel, 2.5 m in length, driven vertically into the ground with the top 0.8 m below ground surface. Drive at least 2 ground electrodes with spacing ≥5 m, connected together by welding 40×4 galvanized flat steel.

Ground Main Conductor: Route 40×4 galvanized flat steel or 16 mm² yellow-green grounding conductor from the ground electrode to the base of the pole.

Equipment Grounding:

  • Connect the pole base with ≥10 mm² yellow-green stranded copper wire to the ground main conductor; terminals must be securely crimped with anti-corrosion treatment.
  • Connect the explosion-proof main unit housing grounding terminal with ≥6 mm² yellow-green grounding wire to the pole or ground main conductor.
  • Both ends of metal conduits must have grounding jumpers installed.

Grounding Resistance Test: After construction, measure the grounding resistance using a grounding resistance tester. The result must meet the ≤4Ω requirement. If unqualified, additional ground electrodes must be driven.

Record and Archive: Record grounding resistance test values and retain test records.

5.9 Post-Installation Visual Inspection

After all installation work is complete, conduct an overall visual inspection:

  • Pole is vertical, all bolts are properly tightened, and anti-loosening measures are complete.
  • All sensors are securely installed with correct orientation and compliant level/vertical alignment.
  • Cable routing is neat, labels are clear, conduits are properly installed, and drip loops are in place.
  • Main unit, cable glands, and flexible conduits are properly installed with complete seals.
  • Grounding connections are reliable with clear marking.
  • Equipment appearance has no damage or deformation, and nameplates are intact.
  • Clear the construction site of debris, achieving a clean and tidy work site upon completion.

Chapter 6 Product Wiring

6.1 Wiring Safety Regulations

6.1.1 Explosion-Proof Area Wiring Prohibitions

Opening the cover for wiring while energized is strictly prohibited in explosive hazardous areas. All power must be disconnected from the equipment first, and confirmation that there is no explosive gas risk at the site is required before cover opening.

Open flames, electrical sparks, and electrostatic sparks are strictly prohibited during wiring. Use explosion-proof tools and wear anti-static workwear.

Modification of the flameproof chamber structure, enlargement of bore holes, or replacement with non-conforming cable glands without authorization is strictly prohibited.

Routing multiple cables through a single cable gland is strictly prohibited. Each cable gland may only pass one cable.

Direct cable introduction into the flameproof chamber without passing through a cable gland is strictly prohibited.

After wiring is completed, the housing must be properly closed and all bolts tightened to the specified torque. Power may only be applied after confirming the flameproof joint surfaces are in proper contact.

6.1.2 General Wiring Specifications

Wiring personnel must hold valid certifications and be familiar with electrical wiring specifications and the wiring requirements of this product.

Before wiring, confirm all power sources are disconnected and verify with a multimeter that no voltage is present before proceeding.

Strictly follow the wiring diagram. Wrong connections and short circuits are strictly prohibited. Reverse connection of power supply positive and negative terminals is strictly prohibited.

Strip insulation to the appropriate length. Copper conductors must be free of oxidation and broken strands. After crimping cold-press terminals, connect to the terminal block. Direct insertion of bare copper wires into terminals is strictly prohibited.

All connections must be secure and reliable with terminal screws properly tightened, free of loose or poor connections.

After wiring, clean debris and wire clippings from the chamber and confirm no metal fragments remain.

Maintain wiring records and create an as-built wiring diagram for archiving.

6.2 Main Unit Terminal Block Definitions

The terminal blocks inside the explosion-proof main unit are divided into four zones, from left to right: Power Zone, Digital I/O Zone, RS485 Communication Zone, and Analog Input Zone. Definitions are as follows:

6.2.1 Power Zone Terminals (P1–P4)

Terminal Marking Function Description Remarks
P1 DC+ DC power positive input DC 12–24 V
P2 DC− DC power negative input / power ground Connected to system ground
P3 BAT+ Lithium battery positive input Connect to battery positive for solar-powered models
P4 BAT− Lithium battery negative input Connected to power ground

6.2.2 Digital I/O Zone Terminals (K1–K8)

Terminal Marking Function Description Remarks
K1 DI1_COM Digital input 1 common terminal Dry contact input
K2 DI1_IN Digital input 1 For rain gauge pulse, alarm input, etc.
K3 DI2_COM Digital input 2 common terminal —
K4 DI2_IN Digital input 2 —
K5 DO1_COM Relay output 1 common terminal Contact rating AC 250 V/5 A
K6 DO1_NO Relay output 1 normally open contact Alarm linkage output
K7 DO2_COM Relay output 2 common terminal —
K8 DO2_NO Relay output 2 normally open contact —

6.2.3 RS485 Communication Zone Terminals (C1–C8)

Terminal Marking Function Description Remarks
C1 485A1 Channel 1 RS485 A terminal Connect to sensor bus A
C2 485B1 Channel 1 RS485 B terminal Connect to sensor bus B
C3 GND1 Channel 1 RS485 shield ground Connect to shield layer, single-ended grounding
C4 485A2 Channel 2 RS485 A terminal Spare/expansion
C5 485B2 Channel 2 RS485 B terminal —
C6 GND2 Channel 2 RS485 shield ground —
C7 A_DEBUG Debug port RS485 A For local configuration and debugging
C8 B_DEBUG Debug port RS485 B —

6.2.4 Analog Input Zone Terminals (A1–A8)

Terminal Marking Function Description Remarks
A1 AI1+ Analog input 1 positive terminal Supports 4–20 mA/0–5 V/0–10 V
A2 AI1− Analog input 1 negative terminal —
A3 AI2+ Analog input 2 positive terminal —
A4 AI2− Analog input 2 negative terminal —
A5 AI3+ Analog input 3 positive terminal —
A6 AI3− Analog input 3 negative terminal —
A7 AI4+ Analog input 4 positive terminal —
A8 AI4− Analog input 4 negative terminal —

Note: Terminal definitions may vary slightly between models. The wiring diagram supplied with the product shall prevail. For any questions, contact the technical support hotline at +86 13538869979.

6.3 Power Circuit Wiring

6.3.1 Mains Power Supply Wiring

Connect AC 220V mains power to the explosion-proof distribution box first, then through a surge protector and air circuit breaker to the input terminals of the explosion-proof power adapter.

The power adapter outputs DC 24V, connected via flame-retardant cable to the main unit power terminals P1 (DC+) and P2 (DC−).

Pay attention to positive/negative polarity distinction. Reverse connection is strictly prohibited. Before wiring, use a multimeter to verify proper output voltage.

The power adapter housing must be reliably grounded.

6.3.2 Solar Power Supply Wiring

Connect the solar panel output cable to the input terminals of the built-in MPPT charge controller in the main unit (on some models, terminals are inside the main unit), paying attention to polarity.

Connect the explosion-proof lithium battery pack output cable to the BAT+ and BAT− terminals of the main unit, matching polarity. Reverse connection is strictly prohibited.

The lithium battery housing must be reliably grounded.

Wiring sequence: Connect battery first, then solar panel. For disconnection, the order is reversed: disconnect solar panel first, then battery.

6.3.3 Dual Power Supply Wiring

Both the mains adapter output and lithium battery output can be connected to the main unit power terminals; the main unit performs automatic switching internally.

It is recommended to connect mains power to DC+/DC− and battery to BAT+/BAT−, enabling charge management and seamless switching.

Both power supply circuits must be fitted with fuses that will open promptly in the event of a short circuit.

6.4 Sensor Loop Wiring

6.4.1 RS485 Digital Sensor Bus Wiring

Digital sensors such as wind speed, wind direction, temperature/humidity, air pressure, and radiation all use the RS485 Modbus-RTU protocol with bus-type wiring:

  • Connect all sensors’ RS485 A terminals in parallel to the main unit 485A1 terminal; connect all B terminals in parallel to the main unit 485B1 terminal.
  • Connect the shield layer at a single end to the main unit GND1 terminal. The sensor end shield layer must be left floating. Grounding both ends to form a ground loop is strictly prohibited.
  • Assign each sensor a unique Modbus address without duplication. Factory default addresses are typically 1, 2, 3, 4 in sequence.
  • A 120Ω terminating resistor may be connected in parallel at the farthest end of the bus to improve signal quality over long-distance transmission.
  • Sensor power is uniformly supplied from the main unit at DC 12V with correct polarity; a shared power bus may be used.

6.4.2 Tipping Bucket Rain Sensor Wiring

For pulse-output rain sensors:

  • Connect the two reed switch terminals to the main unit DI1_IN and DI1_COM terminals respectively; no polarity distinction.
  • For rain gauges with heating function, connect the heating power supply to a separate power circuit, controlled by the main unit or an external thermostat.

After wiring, manually flip the tipping bucket; the main unit should detect the pulse count.

6.4.3 Analog Sensor Wiring

4–20 mA output sensors:

  • Connect sensor power positive to DC+, sensor output positive to AI+, sensor negative to AI− and DC−.

0–5 V/0–10 V voltage-type sensors:

  • Connect sensor power positive and negative to the power supply, signal output to AI+, and signal ground to AI−.

Before wiring, confirm the sensor output type and set the corresponding range and coefficient in the main unit configuration software.

6.5 Communication Loop Wiring

6.5.1 4G Antenna Wiring

The 4G antenna has an SMA connector and is screwed directly into the 4G antenna socket on the main unit, tightened fully to ensure good contact.

Route the antenna to the upper section of the pole and secure it in an unobstructed position, with the antenna gain surface facing the direction of the carrier’s base station.

Avoid running the antenna cable parallel to high-voltage power cables and keep it away from metal obstructions.

Apply waterproofing at the antenna connector, such as wrapping with waterproof tape.

6.5.2 Ethernet Wiring

Use a standard RJ45 network cable, connecting one end to the main unit Ethernet interface and the other end to a switch, router, or the plant intranet.

Cable length should not exceed 100 meters. For longer distances, add switch repeaters.

Route the network cable into the main unit through an explosion-proof cable gland and ensure proper sealing.

6.5.3 LoRa Antenna Wiring

Same as the 4G antenna: connect to the main unit LoRa antenna socket. Mount the antenna in an open location to ensure communication range.

6.6 Explosion-Proof Sealing Wiring Techniques

Explosion-proof sealing is a critical process for ensuring flameproof performance and must be performed strictly in accordance with specifications.

6.6.1 Explosion-Proof Cable Gland Installation Steps

Slide the gland’s lock nut, sealing ring, and body onto the cable in sequence.

Insert the cable through the gland mounting hole in the main unit housing into the chamber, leaving appropriate length.

Screw the gland body into the housing threaded hole and tighten fully.

Adjust the cable position to ensure the sealing ring fully wraps the cable with no exposed copper conductors.

Tighten the lock nut uniformly so the sealing ring grips the cable firmly. The clamping force should be moderate—sufficient to secure the cable without crushing the insulation.

Test by pulling the cable: it is acceptable if the cable does not loosen or shift.

6.6.2 Sealing Precautions

The gland size must match the cable outer diameter. The cable diameter must be within the gland’s applicable range—too large and it cannot be installed; too small and the seal will be inadequate.

Sealing rings must be free of damage and aging. A small amount of silicone grease may be applied before installation. The use of cracked sealing rings is prohibited.

Only one cable per gland. Sharing a single gland for multiple cables is strictly prohibited.

Unused gland openings must be sealed with explosion-proof blanking plugs. Leaving openings exposed is strictly prohibited.

A small amount of anti-rust grease may be applied to the gland threads to ensure smooth disassembly.

6.6.3 Explosion-Proof Flexible Conduit Connection

Connect between the conduit and equipment using explosion-proof flexible conduit. The internal threads at both ends are tightened onto the external threads of the steel conduit and equipment, respectively.

The bending radius of the flexible conduit shall be no less than 5 times the conduit diameter, avoiding hard kinking damage.

Apply PTFE tape or sealing compound at joints to ensure sealing performance.

6.7 Post-Wiring Insulation and Continuity Testing

Before closing the cover after all wiring is complete, perform electrical tests to confirm correct wiring and absence of short circuits.

6.7.1 Continuity Testing

Using the multimeter continuity mode, measure:

  • No short circuit between power positive and negative terminals; resistance is infinite.
  • No short circuit between 485 bus A and B, and no short circuit to ground.
  • Normal open/close operation of all digital I/O terminals without sticking.
  • The shield layer is grounded at one end only, insulated from the housing at the other end.

6.7.2 Insulation Resistance Testing

Using a 500 V insulation resistance tester, measure:

  • Power circuit insulation resistance to ground ≥20 MΩ.
  • Signal circuit insulation resistance to ground ≥20 MΩ.

If insulation resistance fails, troubleshoot for cable damage, moisture ingress, or wiring errors.

6.7.3 Polarity Testing

Using the multimeter DC voltage mode, measure the power terminals to confirm the positive and negative terminals match the markings without reverse connection.

6.8 Wiring Labeling and Organization

Label both ends of all cables with labels indicating number, origin, destination, and function; labels must be clear and durable.

Organize cables neatly inside the chamber, securing with cable ties, keeping them away from heat-generating components and moving parts.

Maintain wiring records, create an as-built wiring diagram, and record the correspondence between each sensor address and terminal.

Clean wire clippings, tools, and debris from the chamber; confirm no foreign objects remain.

Tighten housing bolts uniformly in diagonal sequence with tightening torque per specifications (M6 bolts approximately 8–10 N·m, M8 approximately 15–20 N·m), ensuring uniform clearance around the flameproof joint surfaces.

Chapter 7 Product Commissioning

7.1 Pre-Commissioning Safety Inspection

Before commissioning, complete the following inspections and confirm safety conditions before applying power:

  • All housings are properly closed with all bolts tightened to specification; flameproof joint surfaces meet requirements.
  • All cable glands and blanking plugs are installed with proper sealing; no openings are exposed.
  • Power circuit wiring is correct, fuse ratings are correct, and switches are in the OFF position.
  • Grounding system is reliably connected and the grounding resistance test has passed.
  • The on-site environment is safe with no accumulation of explosive gases and adequate ventilation.
  • Commissioning tools are ready: laptop, USB-to-RS485 debug cable, configuration software, multimeter, standard calibration instruments, etc.
  • Commissioning personnel are familiar with operating procedures and safety precautions.

7.2 Power-On Startup and Self-Test

7.2.1 Power-On Steps

First, close the main power switch and measure the input voltage to confirm it is within the rated range.

Slowly close the equipment power switch and observe the main unit for abnormal noise, smoke, or odor.

Observe the main unit indicator light status:

  • Power LED: Steady ON indicates normal power supply.
  • Operation LED: Flashing indicates normal main unit operation.
  • Communication LED: Flashing indicates normal data transmission.
  • Alarm LED: Steady ON or FLASHING indicates an alarm or fault.

7.2.2 System Self-Test

After power-on, the main unit automatically runs the self-test program, sequentially checking:

  • Memory check: Read/write test to confirm storage is functional.
  • Clock check: Read the RTC time to confirm the clock is running correctly.
  • Acquisition channel check: Verify the status of all acquisition channels.
  • Communication module check: Verify whether the 4G/Ethernet module is functional.
  • Power voltage check: Verify whether input voltage and battery voltage are normal.

If the self-test fails, the alarm LED illuminates. Fault codes can be read via the configuration software to troubleshoot the cause.

7.3 Single-Unit Parameter Configuration

Connect the computer through the local RS485 debug port and run the KITOZER Explosion-Proof Weather Station Configuration Software to configure device parameters.

7.3.1 Basic Parameter Configuration

  • Device ID: Set a unique device ID for platform identification.
  • Time Calibration: Calibrate the device RTC clock to synchronize with standard time, with an error of ≤1 second.
  • Acquisition Cycle: Set the sensor acquisition interval. Default is 60 seconds, configurable from 1 s to 3600 s.
  • Upload Cycle: Set the data upload interval. Default is 5 minutes, configurable from 1 min to 1440 min.
  • Storage Policy: Set the local storage cycle and circular storage mode.

7.3.2 Sensor Parameter Configuration

Add installed sensors one by one, selecting the sensor type, communication address, and access channel.

Set the range, calibration coefficient, unit, and decimal places for each sensor.

Set filtering parameters: moving average window length, default 3 times, adjustable per site conditions.

Set abnormal thresholds: over-range and sudden-change thresholds; abnormal data is automatically rejected.

7.3.3 Alarm Parameter Configuration

Set alarm thresholds for each monitored parameter: upper limit, lower limit, and reset hysteresis value.

Set alarm delay time: how long an out-of-limit condition must persist before triggering an alarm, preventing false alarms.

Set alarm levels: General, Important, Emergency.

Configure relay linkage logic: which alarm types trigger which relay output.

Configure alarm notification methods: platform, SMS, audible/visual, etc.

7.3.4 Communication Parameter Configuration

4G Configuration: Set the platform server IP, port, protocol type, and heartbeat interval. Default APN parameters may be used; private network configurations require separate setup.

Ethernet Configuration: Set IP address, subnet mask, gateway, and DNS, or enable DHCP for automatic assignment.

Protocol Configuration: Select the communication protocol (MQTT/Modbus-TCP/HJ212, etc.) and configure protocol parameters.

After configuration, save parameters; the device will take effect after restart.

7.4 Sensor Precision Calibration

After installation, on-site calibration is required to eliminate installation errors and transportation drift, ensuring measurement accuracy.

7.4.1 Wind Direction True North Calibration

Use a high-precision compass to measure the local true north direction and record the current angle value output by the wind direction sensor.

In the configuration software, locate the wind direction calibration item, enter the current actual true north angle, and click Calibrate.

After calibration, read the wind direction value. Rotate the wind vane to point true north—the display should read 0° (or 360°); pointing due east should read 90°. An error of ≤3° is acceptable.

Verify at multiple different angles to confirm full-range calibration accuracy.

7.4.2 Wind Speed Calibration

On-site comparison calibration may be used: use a standard handheld anemometer as reference, placed at the same height and in the same airflow environment.

After the wind field stabilizes, simultaneously read values from the standard instrument and the weather station, recording multiple data sets.

Calculate the deviation and adjust the wind speed calibration coefficient in the software so the measured values are within allowable deviation from the standard values.

Verification is required across low, medium, and high wind speed bands to ensure full-range accuracy.

For high-precision calibration, wind tunnel equipment is required; this may be outsourced to a third-party metrology organization.

7.4.3 Temperature and Humidity Calibration

Use a calibrated temperature/humidity meter as the standard, placed in the same stable environment as the weather station temperature/humidity sensor.

Allow at least 30 minutes of settling time for values to stabilize, then read both data sets.

Calculate the deviation and set temperature offset and humidity offset values in the software for correction.

Post-calibration deviations: temperature ≤±0.3°C, humidity ≤±3% RH are acceptable.

7.4.4 Rain Gauge Calibration

Use the standard manual water-injection method for calibration.

Remove the rain collection orifice of the rain sensor and use a syringe or standard graduated cylinder to inject a measured quantity of clean water into the tipping bucket at a uniform rate to simulate rainfall.

Typically, inject the water volume corresponding to 10 mm of rainfall (for a 200 mm diameter rain collection orifice, 10 mm rainfall corresponds to approximately 314 ml of water).

Record the accumulated rainfall value displayed by the main unit and calculate the error.

Adjust the tipping bucket calibration screws or the software calibration coefficient so the error is ≤4%—this is acceptable.

Repeat the test 3 times to verify consistency.

7.4.5 Barometric Pressure Calibration

Query the real-time sea-level pressure value from the local weather station and convert it to the on-site atmospheric pressure value based on the installation altitude.

Read the weather station pressure measurement value and compare the deviation.

Set the pressure offset value in the software for correction. A deviation of ≤±0.5 hPa is acceptable.

7.5 Communication Link Commissioning

7.5.1 4G Communication Commissioning

Observe the host 4G indicator light: slow flashing indicates network search, fast flashing indicates network connection established, and solid on indicates platform connection established.

Read the signal strength in the configuration software. RSSI ≥ -75dBm is excellent, ≥ -95dBm is acceptable; if the signal is too weak, adjust the antenna position or install a high-gain antenna.

Check in the cloud platform backend whether the device is online and whether data is being uploaded normally.

Test disconnection and reconnection: Remove the antenna to simulate network loss. The device should automatically reconnect and upload missed data within 5 minutes after restoration.

Test remote configuration: Send a parameter modification command from the platform; the device should receive and apply it correctly.

7.5.2 Ethernet Communication Commissioning

Check the Ethernet port indicators. The LINK light solid on indicates normal physical connection; the ACT light flashing indicates data transmission.

Use the ping command to test device IP connectivity. Packet loss rate ≤ 1% is acceptable.

Verify device online status and data reception on the platform side.

Test across network segments and firewall policies to ensure the communication link is unobstructed.

7.5.3 RS485 Host Computer Communication Commissioning

Install Modbus debugging software on the host computer and set the correct baud rate, data bits, stop bits, and parity.

Send read commands; the device should return data correctly without packet loss or code errors.

Test the bit error rate on long-distance buses; continuous communication for 1 hour without errors is considered qualified.

7.6 Alarm Function Commissioning

7.6.1 Threshold Alarm Testing

Manually modify alarm thresholds to trigger an alarm with the current measurement value.

Check if the host alarm light illuminates and if the relay activates.

Check if the platform receives the alarm information and if the push notification is timely.

After restoring the threshold, the alarm should automatically clear, the relay should reset, and the platform should generate an alarm clearance record.

Test the upper and lower limit alarms for each parameter sequentially to ensure all functions correctly.

7.6.2 Fault Alarm Testing

Simulate a sensor disconnection; the host should report a sensor fault alarm.

Disconnect the power supply to simulate a mains failure; when running on battery power, the device should report a mains fault alarm.

Disconnect the antenna to simulate communication interruption; the platform should generate an offline alarm.

All fault alarms must be recorded and searchable/exportable.

7.6.3 Audible and Visual Alarm Linkage Testing

If an external audible/visual alarm is connected, it should activate with sound and light when an alarm is triggered, and stop after the alarm clears. Test whether the audible/visual patterns corresponding to different alarm levels are correct.

7.7 Linkage Function Commissioning

7.7.1 Relay Linkage Testing

Manually force the relay output in the software and verify the contact on/off operation.

Set linkage rules, e.g., trigger relay #1 when wind speed ≥ 10m/s.

Simulate wind speed exceeding the limit, verify relay activation, and check if the linked equipment starts correctly.

After wind speed returns to normal, verify the relay resets and the linked equipment stops according to the logic.

Test all linkage logic to ensure timing and logic are correct.

7.7.2 Third-Party System Linkage Testing

If integrating with third-party systems such as DCS, PLC, sprinkler systems, fan control systems, etc.:

Test data upload to the third-party system ensures values are correct and refreshed promptly.

Test alarm signal output to the third-party system ensures linkage logic is correct.

Test reverse control command issuance to ensure the actuator responds correctly.

7.8 Continuous Operation Testing

After all functional commissioning is complete, conduct a continuous 72-hour powered operation test:

Record device operating status; check for crashes, restarts, or offline occurrences.

Check data continuity; inspect for data loss or abnormal jumps.

Monitor device temperature rise; the maximum housing temperature must comply with T4 requirements.

Check power supply stability; voltage fluctuations must remain within the allowable range.

Pass criteria: No failures, complete data records, and normal functionality within 72 hours.

7.9 Commissioning Record Completion

After commissioning, truthfully fill in the “Explosion-Proof Weather Station Commissioning Record”, including:

  • Basic equipment information: model, serial number, installation location, installation date
  • Commissioning environment: temperature, humidity, weather conditions
  • Parameter configuration records: acquisition cycle, upload cycle, alarm thresholds, etc.
  • Calibration records: pre- and post-calibration data for each sensor, calibration coefficients
  • Functional test results: communication, alarm, and linkage test results
  • Continuous operation test results
  • Existing problems and rectification actions
  • Commissioning personnel signature and date
  • The commissioning record is made in duplicate, one copy for the user and one for the manufacturer, serving as the basis for acceptance and after-sales service.

Chapter 8 Product Precautions

8.1 Installation and Construction Precautions

Installation must strictly comply with GB50257 “Code for construction and acceptance of electric equipment in explosive and fire hazardous environments” and the requirements of this manual.

Construction within explosive hazardous areas must obtain a work permit, implement safety protection measures, and have designated personnel supervising.

It is strictly forbidden to perform outdoor high-altitude installation work during severe weather such as thunderstorms or strong winds.

Handle equipment with care during transportation and installation. Do not throw, strike, or collide with the equipment, especially protecting the flameproof joint surfaces from damage.

The flameproof joint surfaces must be free from scratches, corrosion, and debris. They can be wiped clean and coated with a thin layer of antitrust grease before installation; painting or applying sealant on the joint surfaces is forbidden.

Pole installation must ensure foundation strength and verticality. Wind resistance must meet local maximum wind speed requirements; in coastal and typhoon-prone areas, foundations must be reinforced, or guy wires should be installed.

Sensors must be leveled and aligned with true north as required; otherwise, measurement accuracy will be directly affected.

All fasteners must be made of stainless steel or galvanized material, tightened securely, and equipped with anti-loosening measures to prevent loosening due to long-term vibration.

Clean up the site promptly after construction to eliminate safety hazards.

8.2 Wiring Operation Precautions

Wiring must be performed with the power disconnected. Opening the cover or wiring while powered is strictly prohibited.

Strictly follow the wiring diagram. Reversing the positive and negative power terminals is strictly forbidden as it may burn out the equipment.

Appropriate wire stripping length is required; the copper core must not be exposed too long to prevent short circuits; do not damage the wire core. Stranded wires must be crimped with terminals before connection.

Explosion-proof cable glands must match the cable outer diameter to ensure a proper seal and clamping effect; running multiple cables through a single gland is strictly prohibited.

Unused cable entry holes must be sealed with explosion-proof plugs; leaving them open is strictly prohibited.

The shielding layer must be grounded at one end only. Grounding at both ends is strictly prohibited as it may form ground loops and interfere with measurement data.

After wiring, clean debris from the cavity interior and ensure no metal shavings or wire ends are left before closing the cover.

Enclosure bolts must be tightened evenly in a diagonal pattern, with torque meeting requirements, to prevent uneven joint gaps and loss of explosion-proof integrity due to over-tightening on one side.

After wiring, insulation and continuity tests must be performed. Power on only after confirming no short circuits or wiring errors.

8.3 Commissioning and Operation Precautions

A technician must be present during the first power-on. Observe the device startup status and power off immediately if any abnormality is found.

Computers and tools used for commissioning should have anti-static measures to prevent static electricity from damaging internal circuits.

Parameter configuration should be reasonable. Acquisition and upload cycles should not be excessively short to avoid increasing device power consumption and platform load.

Alarm threshold settings should consider actual site conditions to avoid frequent false alarms due to thresholds set too low, or missed alarms due to thresholds set too high.

Calibration should be performed in a stable environment, avoiding the influence of gusts, direct sunlight, or personnel movement that could affect calibration accuracy.

Keep detailed records during commissioning. All parameter modifications should be logged for future traceability.

Do not open the cover casually while the equipment is operating. If cover opening is required for maintenance, power off first and confirm the site environment is safe.

Modifying internal device programs or replacing components is strictly prohibited; doing so will void the explosion-proof performance and warranty.

8.4 Explosion-Proof Area Usage Precautions

This product is suitable for Zone 1 and Zone 2, Group IIB explosive gas atmospheres. Use beyond the specified scope is strictly prohibited.

The operating ambient temperature must not exceed -40℃ to +70℃. Exceeding this range may cause equipment failure or degradation of explosion-proof performance.

Do not stack flammable or explosive items near the equipment. Maintain good ventilation around the equipment.

It is strictly forbidden to drill, weld, or modify the equipment housing, which would compromise the flameproof structure.

If the equipment malfunctions, it should be repaired by professionals in a safe environment. Opening the cover for repair while powered in hazardous areas is strictly prohibited.

Regularly inspect the integrity of the explosion-proof structure. If housing deformation, cracks, joint surface damage, or other issues are found, stop using the equipment immediately and contact the manufacturer for handling.

After repair, all explosion-proof structures must be restored, and the seal integrity confirmed before returning the equipment to service.

Cooperate with the enterprise’s explosion-proof equipment ledger management and conduct regular explosion-proof equipment testing and verification.

8.5 Transportation and Storage Precautions

Equipment should be transported in original factory packaging with adequate cushioning and shock-proof measures, avoiding severe vibration, collision, and rain.

Keep the equipment upright during transport; do not invert or place heavy objects on top.

The storage environment should be dry, well-ventilated, free from corrosive gases, with a temperature range of -10℃ to +40℃ and relative humidity ≤ 80%.

Do not store the equipment together with acidic, alkaline, or corrosive materials.

Lithium batteries should be stored at half charge and recharged every 3 months to prevent over-discharge damage.

For long-term storage, periodically power on the equipment for inspection, generally once every 3 months, running for more than 2 hours.

During storage, protect against dust and moisture. Apply antitrust grease to flameproof joint surfaces.

When handling lithium batteries, avoid short circuits, crushing, and throwing. Keep them away from fire and heat sources.

8.6 Lightning Protection Precautions

The equipment must be reliably grounded, with grounding resistance meeting requirements, and grounding resistance should be tested periodically.

Surge protectors should be installed on power, signal, and antenna circuits for multi-level lightning protection.

If the pole is higher than surrounding structures, a lightning rod should be installed at the top of the pole, with the down-conductor grounded separately.

Before thunderstorm weather, the equipment power can be remotely disconnected and restored after lightning passes.

After a lightning strike, promptly check equipment status and replace any damaged modules.

Regularly inspect the condition of lightning protection devices and replace them promptly when degraded.

8.7 Routine Inspection Precautions

Inspection personnel should be familiar with equipment structure and safety requirements and wear personal protective equipment as required.

When entering hazardous areas for inspection, carry a gas detector to confirm environmental safety.

Prioritize visual inspection; opening the cover without authorization is strictly prohibited.

Check the equipment appearance for damage, corrosion, or loosening. Inspect cables for damage or aging.

Check indicator light status to determine if the equipment is operating normally.

Check the solar panel surface for cleanliness and obstructions.

Check the rain gauge for blockage by fallen leaves or debris.

Record and report any abnormalities found during inspection promptly. Deal with faulty equipment immediately; operation with faults is prohibited.

Chapter 9 Product Maintenance and Repair

9.1 Routine Inspection Content and Frequency

Establish an equipment inspection system, conduct regular inspections to identify hazards promptly, and ensure long-term stable equipment operation.

9.1.1 Daily Remote Inspection

Monitor remotely via the platform:

  • Check equipment online status; confirm no offline occurrences.
  • Check whether parameter values are within reasonable ranges and free from abnormal jumps.
  • Check for alarm messages and handle alarms promptly.
  • Check battery voltage and signal strength for normal status.

9.1.2 Weekly On-Site Inspection

Weekly on-site inspections include:

  • Check poles, brackets, host, and sensors for secure installation, without looseness or tilt.
  • Check equipment appearance for damage or corrosion, and glass components for cracks.
  • Check cables, conduits, and cable glands for looseness, damage, or signs of water ingress.
  • Check solar panel surfaces for dust, fallen leaves, or obstructions.
  • Check rain gauge collection opening for blockage by debris or leaves.
  • Check grounding connections for looseness or corrosion.
  • Clear weeds and debris around the equipment to maintain a clean environment.

9.1.3 Inspection Records

Fill in the “Equipment Inspection Record Form” after each inspection, recording inspection time, inspection content, issues found, handling measures, and inspector signature. Archive for future reference.

9.2 Monthly Maintenance Content

Perform comprehensive maintenance monthly:

  • Cleaning Maintenance:
  • Wipe the host and sensor housing dust and stains with a soft cloth to keep them clean.
  • Clean solar panel surfaces with clean water or neutral detergent to ensure light transmittance.
  • Clean debris from the rain gauge interior, flush the tipping bucket and filter screen to ensure smooth drainage.
  • Clean dust from the anemometer bearing area to avoid sticking.
  • Tightening Check:
  • Check all bolts and clamps for tightness; tighten any that are loose.
  • Check cable fixation and tidy any loose cables.
  • Electrical Check:
  • Measure supply voltage and battery voltage to confirm they are within normal ranges.
  • Check grounding connections and test grounding resistance.
  • Check surge protector status for any degradation indicators.
  • Functional Check:
  • Manually trigger the alarm function to test its operation.
  • Check data upload continuity for packet loss.
  • Check relay operation.
  • Anti-Corrosion Check:
  • Check brackets and bolts for protective coating peeling or rust; touch up paint on minor rust.

9.3 Quarterly Maintenance Content

Perform deep maintenance quarterly:

  • Sensor Performance Check:
  • Compare sensor data with meteorological data from the same period to determine if accuracy is normal; calibrate promptly if deviation is large.
  • Check the rotation flexibility of the anemometer cups; apply lubricating oil if sticking occurs.
  • Check whether the wind vane rotates smoothly and if damping is normal.
  • Power Supply System Check:
  • Check lithium battery charge/discharge cycles and test battery capacity.
  • Check solar charging efficiency by comparing sunlight intensity with charging current.
  • Check power adapter operating temperature and output voltage stability.
  • Communication System Check:
  • Test communication signal strength and investigate causes of signal attenuation.
  • Check antenna connectors for oxidation or water ingress.
  • Test the breakpoint resume function.
  • Explosion-Proof Performance Check:
  • Check the flameproof housing for deformation, cracks, or corrosion.
  • Check cable glands and seals for aging or failure.
  • Check joint surface bolts for looseness and re-torque to specified values.

9.4 Annual Maintenance and Calibration

Perform a comprehensive annual maintenance and metrological calibration, recommended to be outsourced to professional institutions or manufacturer after-sales:

  • Comprehensive Disassembly Cleaning:
  • Open the cover in a safe environment to clean internal dust and moisture.
  • Check internal circuit boards for oxidation, cold solder joints, or capacitor bulging.
  • Clean flameproof joint surfaces and reapply antitrust grease.
  • Replace aged seals and O-rings.
  • Full Parameter Calibration:
  • Calibrate all sensors using standard instruments and issue calibration records.
  • Wind speed/direction: calibrate via wind tunnel or comparison with standard instruments.
  • Temperature/humidity: calibrate using a standard temperature/humidity chamber.
  • Rainfall: calibrate through multiple tests using a standard measuring cup.
  • Barometric pressure: calibrate using a standard pressure source.
  • Performance Testing:
  • Test total device power consumption and power supply efficiency.
  • Test communication stability and data accuracy.
  • Test alarm and linkage functions.
  • Perform insulation resistance and voltage withstand tests.
  • Consumable Parts Replacement:
  • Replace anemometer bearings (based on wear condition).
  • Replace aged lithium batteries (when cycle life expired or capacity below 80%).
  • Replace aged cables and seals.
  • Firmware Upgrade:
  • Upgrade to the latest firmware version to optimize functionality and stability.
  • Issue an annual maintenance report providing equipment status assessment and follow-up maintenance recommendations.

9.5 Common Component Replacement Methods

9.5.1 Sensor Replacement

1. Disconnect the equipment power and open the cover after confirming safety.

2. Disconnect the corresponding sensor wiring and mark it.

3. Unscrew the sensor mounting bolts and remove the old sensor.

4. Install the new sensor, secure it firmly, and calibrate orientation/leveling.

5. Connect cables according to the marks and verify correct wiring.

6. Close and tighten the cover, power on, and configure the corresponding parameters and address in the software.

7. Perform calibration testing to confirm the new sensor operates correctly.

9.5.2 Lithium Battery Replacement

1. Disconnect the solar panel and power input, and discharge residual voltage.

2. Open the battery compartment or host cover and disconnect the old battery wiring.

3. Remove the old battery and dispose of it properly (lithium batteries are hazardous waste requiring compliant recycling).

4. Install the new battery, ensuring correct polarity and secure wiring.

5. Reconnect the solar panel and power supply, and check if charging is normal.

6. Reset the battery capacity parameters in the system.

9.5.3 Fuse Replacement

1. Disconnect all power sources and verify no power is present.

2. Open the cover, locate the fuse holder, and remove the blown fuse.

3. Replace with a fuse of the same specification. Using a fuse with current rating exceeding the rated value is strictly prohibited.

4. After confirming no short circuit in the circuit, power on for testing.

9.5.4 4G Module Replacement

1. Power off, open the cover, and disconnect the antenna and ribbon cable.

2. Remove the mounting screws and take out the old module.

3. Install the new module and connect the ribbon cable and antenna.

4. Power on, test network connectivity, and configure communication parameters.

Note: All cover-opening replacement operations must be performed in non-explosive hazard areas or after confirming no flammable gas is present and power is disconnected. After replacement, the explosion-proof structure must be restored and seal integrity guaranteed.

9.6 Fault Repair Process

1. Fault Reporting: Upon discovering equipment malfunction, record the fault phenomenon, occurrence time, and equipment serial number, then contact manufacturer technical support at +86 13538869979.

2. Remote Troubleshooting: Manufacturer technicians perform remote diagnosis via the platform or guide on-site personnel through simple troubleshooting to determine the fault cause.

3. Simple Fault Handling: Parameter issues, loose wiring, or minor faults that can be resolved remotely are handled with guidance for on-site personnel.

4. On-Site Repair: If remote resolution is not possible, arrange for after-sales engineers to visit the site.

5. Return to Factory for Repair: For major faults that cannot be repaired on-site, return the equipment or components to the factory for repair and core component replacement.

6. Repair Acceptance: After repair is completed, conduct functional testing to confirm the fault is resolved, and fill in repair records.

7. Fault Review: Analyze fault causes and formulate preventive measures to avoid recurrence of similar faults.

9.7 Return-to-Factory Repair Instructions

Before returning equipment, first communicate with technical support to confirm the fault situation and return process, and obtain the return address and contact person.

Protect the equipment with shock-proof and moisture-proof packaging. Include a note stating the fault phenomenon, contact person, and contact phone number.

Attach copies of the product certificate and explosion-proof certificate with the equipment.

Shipping Costs: Covered by the manufacturer for non-human-caused damage during the warranty period; covered by the user for out-of-warranty or human-caused damage.

Repair Cycle: 3-5 working days for general faults; 7-15 working days for complex faults.

After repair, explosion-proof performance testing is re-conducted to ensure product compliance.

Repaired parts enjoy a 3-month warranty; the full machine warranty remains as per the original contract.

9.8 Maintenance Record Ledger Management

Establish a full lifecycle O&M ledger for the equipment, including:

  • Basic equipment archive: model, serial number, manufacturing date, installation date, installation location, configuration list
  • Inspection records: daily, weekly, and monthly inspection records
  • Maintenance records: monthly, quarterly, and annual maintenance records, calibration records
  • Fault repair records: fault time, phenomenon, cause, handling measures, replaced components, repair personnel
  • Component replacement records: replacement time, part name/model, quantity, reason
  • Verification and testing records: explosion-proof testing, metrological calibration, grounding resistance tests
  • Acceptance and review records: annual equipment status review, upgrade/retrofit records
  • The ledger can be maintained in electronic or paper form, managed by designated personnel, archived regularly, providing data support for equipment O&M, life assessment, and upgrade decisions.

Chapter 10 Product Common Problems and Solutions

10.1 Power Supply Faults

10.1.1 Device Completely Powered Off, Indicators Not Lit

Possible Causes:

  • External power outage or circuit breaker trip
  • Reversed power supply polarity
  • Blown fuse
  • Damaged power adapter
  • Lithium battery over-discharge protection activated
  • Loose or broken power wiring
  • Damaged host power module

Troubleshooting and Solutions:

  • Measure the voltage at the power input with a multimeter to confirm power is present and within rated range. If no power, check the upstream supply circuit.
  • Verify polarity wiring matches terminal markings; correct if reversed.
  • Check whether the fuse is blown; replace with the same specification fuse, but first investigate the short circuit cause before replacement.
  • Test the power adapter output voltage separately; replace the adapter if there is no output.
  • For battery-powered units, connect solar panels or a charger to awaken the battery protection circuit.
  • Check all wiring terminals for looseness or disconnection; re-crimp and tighten.
  • If all above are normal, the host power module is faulty; contact the manufacturer for repair or replacement.

10.1.2 Short Solar-Powered Endurance, Battery Depletes Quickly in Overcast/Rainy Weather

Possible Causes:

  • Solar panel obstructed, insufficient power generation
  • Heavy dust accumulation on solar panel surface, reducing efficiency
  • Aging lithium battery with reduced capacity
  • Excessive device power consumption, too frequent acquisition/upload intervals
  • Charging controller fault, low charging efficiency
  • Extended overcast/rainy weather exceeding designed endurance
  • Current leakage or additional load consuming power

Troubleshooting and Solutions:

  • Clear obstructions around the solar panel; adjust installation angle and orientation to ensure adequate sunlight.
  • Clean dust and stains from solar panel surfaces to improve light transmittance.
  • Test battery capacity; replace if capacity is below 80%.
  • Extend acquisition and upload intervals appropriately and enable low-power mode to reduce overall consumption.
  • Measure solar panel open-circuit voltage and charging current; repair or replace the controller if charging is abnormal.
  • Extended overcast weather is normal; consider upgrading solar panel and battery capacity configuration.
  • Measure standby current to identify leakage and additional loads; eliminate abnormal power consumption.

10.1.3 Large Power Supply Voltage Fluctuation, Frequent Device Restarts

Possible Causes:

  • Unstable input power, excessive voltage drop
  • Power cable gauge too small, high line loss
  • Poor contact, loose wiring terminals
  • Large load fluctuations, inrush current during startup
  • Insufficient power adapter capacity

Troubleshooting and Solutions:

  • Measure device-end voltage and confirm fluctuation range is within allowable limits; optimize upstream power supply if unstable.
  • Replace with thicker power cables to reduce line loss.
  • Tighten all wiring terminals and clean oxidated contact surfaces.
  • Add power filter capacitors or increase power supply margin.
  • Replace with a higher-capacity power adapter.

10.2 Host Faults

10.2.1 Host Run Indicator Not Lit, System Not Working

Possible Causes:

  • Abnormal power supply, insufficient voltage
  • Main control program crash
  • Damaged main control chip
  • Memory failure preventing startup
  • Loose internal wiring

Troubleshooting and Solutions:

  • Measure power input voltage to confirm it is normal.
  • Power off and restart the device; observe if it returns to normal.
  • If restart is ineffective, it is a motherboard hardware fault; contact the manufacturer for return-to-factory repair.
  • Open the cover and check internal ribbon cables and terminals for looseness; reseat connections.

10.2.2 Data Not Stored, Historical Data Lost

Possible Causes:

  • Damaged memory chip
  • Clock anomaly, incorrect timestamps
  • Incorrect parameter configuration, storage not enabled
  • Power failure causing loss of unwritten data
  • Circular overwrite after storage is full

Troubleshooting and Solutions:

  • Check if the device clock is correct; recalibrate time.
  • Check storage configuration to confirm the storage function is enabled.
  • Normal circular overwrite is expected behavior; expand capacity if longer storage is needed.
  • If hardware fault, replace the memory chip or motherboard.

10.2.3 Frequent Host Restarts

Possible Causes:

  • Unstable power supply voltage, below undervoltage threshold
  • Excessive power ripple causing severe interference
  • Program bug triggering watchdog reset
  • Internal short circuit or component over-temperature protection
  • Static/lightning surge impact causing reset

Troubleshooting and Solutions:

  • Stabilize input voltage; add filtering devices.
  • Upgrade to the latest firmware to optimize program stability.
  • Check for internal short circuits or abnormal heating; eliminate hardware faults.
  • Strengthen lightning and static protection; add surge protection.

10.3 Sensor Faults

10.3.1 Wind Speed Data Always Reads 0, No Data Even When Windy

Possible Causes:

  • Anemometer cups entangled with debris or spider webs, unable to rotate
  • Bearing damaged or seized
  • Sensor wiring disconnected
  • Sensor address or parameter configuration error
  • Sensor damage

Troubleshooting and Solutions:

  • Visually inspect anemometer cups; clear any entangled debris; manually spin to test rotation flexibility.
  • If bearings are stuck, apply lubricating oil or replace bearings; replace sensor if damaged.
  • Check sensor wiring and measure continuity; rewire if disconnected.
  • Check the sensor address and type configuration in the software; correct parameters.
  • Use the replacement method to test; replace the sensor if confirmed damaged.

10.3.2 Incorrect Wind Direction Data, Large Deviation

Possible Causes:

  • Inaccurate true north alignment during installation
  • Sensor rotated by external force
  • Surrounding obstructions causing airflow turbulence
  • Bearing wear causing excessive hysteresis
  • Inappropriate software filtering parameters causing data jumping

Troubleshooting and Solutions:

  • Recalibrate true north alignment using a compass for precise positioning.
  • Tighten sensor mounting bolts to prevent rotation.
  • Clear surrounding obstructions or change installation location.
  • Replace sensor if bearings are worn.
  • Adjust filtering parameters and increase averaging count for smoother data.

10.3.3 Abnormal Temperature/Humidity Data, Values Significantly Deviated

Possible Causes:

  • Missing or damaged radiation shield, direct sunlight causing elevated temperature
  • Sensor near heat/cold sources or vent outlets
  • Condensation or dust accumulation on the probe
  • Sensor calibration drift
  • Sensor damage

Troubleshooting and Solutions:

  • Install a qualified radiation shield to avoid direct sunlight.
  • Move away from heat/cold sources; select a representative location with good airflow.
  • Clean the probe, dry treatment, then test.
  • Recalibrate temperature and humidity.
  • Replace sensor if calibration is ineffective.

10.3.4 Inaccurate Rainfall Data, Too High or Too Low

Possible Causes:

  • Blocked collection opening, restricted water flow
  • Debris inside the tipping bucket causing sticking or weight imbalance
  • Improper installation level, abnormal tipping motion
  • Calibration coefficient drift
  • Splash or drip causing additional water ingress, higher readings
  • Damaged reed switch, no pulse output

Troubleshooting and Solutions:

  • Clear debris from the collection opening and filter screen to ensure smooth water flow.
  • Open the top cover and clean dust/debris from the tipping bucket; manually test tipping flexibility.
  • Adjust the base for level installation; ensure the bubble level is centered.
  • Recalibrate rainfall and adjust calibration coefficients.
  • Avoid locations prone to splash, such as under eaves or trees; raise installation height.
  • Replace the reed switch or the entire sensor.

10.4 Communication Faults

10.4.1 4G Device Offline, Not on Platform

Possible Causes:

  • SIM card arrears, deactivated, or data exhausted
  • Signal too poor to establish network connection
  • Loose or damaged antenna
  • Incorrect communication parameter configuration, wrong IP/port
  • Damaged 4G module
  • Platform server failure
  • Local carrier network fault

Troubleshooting and Solutions:

  • Check SIM card status; top up and confirm sufficient data.
  • Check signal strength; adjust antenna position or replace with high-gain antenna if the signal is weak.
  • Check antenna connector; tighten or replace the antenna.
  • Verify communication parameters; confirm IP, port, and protocol match the platform.
  • Use the replacement method to test the 4G module; replace if damaged.
  • Confirm the platform server is running normally and network firewall opens the corresponding ports.
  • Confirm the local carrier network has no faults; try a different carrier’s SIM card for testing.

10.4.2 Intermittent Data Upload, Frequent Packet Loss

Possible Causes:

  • Unstable signal with significant fluctuation
  • Network congestion, insufficient bandwidth
  • Upload cycle too short, excessive data volume
  • Insufficient server processing capability
  • Poor communication connector contact
  • Severe electromagnetic interference

Troubleshooting and Solutions:

  • Optimize antenna position to improve signal strength and stability.
  • Extend upload cycles appropriately to reduce data volume.
  • Check server performance and bandwidth; optimize platform configuration.
  • Tighten communication connectors; replace with shielded cables.
  • Move away from strong electromagnetic interference sources; add signal isolation.

10.4.3 Unstable RS485 Bus Communication

Possible Causes:

  • Wiring error, A/B reversed
  • Bus too long, exceeding transmission distance
  • Missing termination resistor, signal reflection
  • Baud rate set too high
  • Poor shielding grounding, high interference
  • Device address conflict

Troubleshooting and Solutions:

  • Verify A/B wiring sequence; correct reversed connections.
  • Shorten bus length or add repeaters.
  • Connect a 120Ω termination resistor at both ends of the bus.
  • Lower the baud rate to improve communication reliability.
  • Ensure the shield is grounded at one end to eliminate interference.
  • Modify sensor addresses to avoid conflicts.

10.5 Abnormal Data Faults

10.5.1 All Data Displayed as 0 or Maximum/Minimum Values

Possible Causes:

  • Sensor power supply abnormal, not powered
  • Communication bus disconnected, data unreadable
  • All sensor addresses misconfigured
  • Host acquisition channel fault
  • Range configuration error

Troubleshooting and Solutions:

  • Measure sensor supply voltage to confirm normal power.
  • Check bus wiring continuity; repair broken wires.
  • Verify sensor addresses match software configuration; correct addresses.
  • Test individual sensors separately to rule out host channel faults.
  • Check range configuration and set the correct measurement range.

10.5.2 Severe Data Jumping and Fluctuation

Possible Causes:

  • Naturally fluctuating environment, such as gusty winds or localized air turbulence
  • Poor sensor contact, loose wiring
  • Electromagnetic interference, unstable signal
  • Filtering parameters set too small, insufficient smoothing
  • Sensor performance degradation, poor stability

Troubleshooting and Solutions:

  • Environment-induced fluctuation is normal; increase filtering smoothing.
  • Tighten wiring terminals to ensure reliable contact.
  • Investigate interference sources; adopt shielding and grounding measures.
  • Increase the moving average window length for better data stability.
  • Replace sensors that have aged.

10.5.3 Incorrect Data Timestamps

Possible Causes:

  • RTC clock battery depleted, time reset
  • Clock chip damage
  • Time calibration not performed
  • Timezone configuration error

Troubleshooting and Solutions:

  • Recalibrate time and observe if drift reoccurs.
  • Replace the RTC backup battery if the time resets after power-off.
  • Return to factory for repair if the clock chip is damaged.
  • Check timezone configuration; set to UTC+8 Beijing time.

10.6 Abnormal Alarm Faults

10.6.1 Frequent False Alarms

Possible Causes:

  • Alarm threshold set too low
  • Significant data fluctuation frequently reaching the threshold
  • No alarm delay; instantaneous values trigger alarms
  • Sensor fault causing abnormal data
  • Clearance hysteresis too small, causing frequent repeated alarms

Troubleshooting and Solutions:

  • Set alarm thresholds reasonably based on actual site conditions.
  • Increase data filtering to reduce data fluctuation.
  • Set reasonable alarm delay time to filter instantaneous interference.
  • Repair or replace the faulty sensor.
  • Increase the alarm clearance hysteresis value to avoid frequent starts/stops.

10.6.2 Alarm Not Triggered, Missed Alarms

Possible Causes:

  • Alarm threshold set too high
  • Alarm function not enabled
  • Incorrect alarm logic configuration
  • Relay damaged, unable to output
  • Data itself did not exceed the threshold

Troubleshooting and Solutions:

  • Adjust alarm thresholds to a reasonable range.
  • Check whether the alarm switch is enabled.
  • Verify alarm logic and linkage logic configuration.
  • Test relay contacts; replace if damaged.
  • Confirm whether actual data has reached the alarm condition.

Chapter 11 Product FAQ

11.1 Basic Knowledge

Q1: What is the difference between an explosion-proof weather station and a regular weather station?

A: The core difference lies in explosion-proof performance. Explosion-proof weather stations adopt flameproof or intrinsically safe explosion-proof designs suitable for hazardous areas with explosive gases such as petroleum, chemical, and oil depot facilities. They comply with GB3836 explosion-proof standards and hold explosion-proof certificates. Regular weather stations are only suitable for ordinary civil and commercial scenarios without explosion-proof certification and cannot be used in hazardous areas due to the risk of explosion.

Q2: What is the explosion-proof rating of this weather station? What locations can it be used?

A: This product carries the explosion-proof mark Exd ⅡB T4 Gb, classified as flameproof, suitable for Zone 1 and Zone 2, Group IIB explosive gas atmospheres in industrial settings, typically used in refineries, chemical parks, oil depots, gas stations, LPG stations, and pharmaceutical chemical plants. It cannot be used in Zone 0 or in coal mine methane environments (which require specialized mining explosion-proof products).

Q3: What meteorological parameters can be monitored? Can it be customized?

A: Standard configuration includes six elements: wind speed, wind direction, temperature, humidity, atmospheric pressure, and rainfall. Optional parameters include more than ten types such as solar radiation, visibility, photosynthetically active radiation, VOC, PM2.5/PM10, CO₂, and lightning warning. Custom sensor combinations are supported based on user requirements, and additional sensors can be expanded later.

Q4: What is the protection rating of the equipment? Can it resist rain and dust?

A: The host has an IP66 protection rating, fully preventing dust ingress and withstanding powerful water jets from any direction, entirely suitable for outdoor use. Sensors have an IP65 rating, protecting against rain and dust, adapting to various harsh weather conditions.

Q5: What is the service life of the equipment?

A: Under normal use and regular maintenance conditions, the overall designed service life is ≥ 8 years, including: solar panel ≥ 25 years, steel structure bracket ≥ 10 years, lithium battery 3-5 years (consumable), sensors ≥ 5 years. Actual lifespan is related to the operating environment and maintenance conditions.

11.2 Installation and Construction

Q6: What qualifications are required for installation? Can I install it myself?

A: For ordinary areas, personnel with basic electrical knowledge can install per the manual. However, installation in explosive hazardous areas must be performed by personnel qualified for explosion-proof electrical installation, complying with local safety supervision and explosion-proof regulations. If relevant experience is lacking, it is recommended to have the manufacturer or professional installer perform the installation to ensure compliance and safety.

Q7: Is it necessary to pour concrete foundations? Can I place it directly on the ground?

A: Pole-mounted installations require concrete foundations to ensure wind resistance and prevent toppling, especially in coastal and high-wind areas. For installation on roofs, platforms, or hardened surfaces, expansion bolts can be used, provided the surface has adequate strength. Direct placement without fixing is strictly prohibited, as strong winds will topple and damage the equipment.

Q8: How do I align the wind direction sensor with true north? Can I use a phone compass?

A: A professional compass or phone compass can provide initial positioning, but phones are susceptible to interference from nearby metal objects and electromagnetic fields, limiting accuracy. Professional geological compass for calibration is recommended; where conditions permit, satellite maps can aid in determining true north, then software calibration can adjust for offsets after installation. Note the difference between magnetic north and true north; magnetic declination correction is required at high latitudes.

Q9: How do I adjust the solar panel installation angle?

A: In the Northern Hemisphere, face south with a tilt angle generally equal to local latitude for optimal year-round generation efficiency. If prioritizing winter generation, add 5-10° to latitude; for summer emphasis, subtract 5-10°. Fine-tune based on actual charging performance after installation.

Q10: What special requirements apply to explosion-proof wiring?

A: Three core requirements: First, wiring must be done after power-off and cover opening; live operation is strictly prohibited. Second, cables must enter through explosion-proof cable glands, one cable per hole, ensuring proper sealing and clamping. Third, unused holes must be sealed with explosion-proof plugs and never left open. After wiring, housing bolts must be tightened evenly to specified torque to guarantee flameproof gaps.

11.3 Wiring and Commissioning

Q11: How many RS485 sensors can be connected? What is the maximum distance?

A: No more than 16 sensors recommended per single RS485 bus, provided addresses are unique. Default maximum transmission distance is 1200 meters (at 9600 baud rate); lower baud rates allow longer distances. Repeaters can be added for longer distances.

Q12: Do I need to purchase a data SIM card for 4G communication? Is data consumption high?

A: Users can provide their own SIM card, or the manufacturer can supply an IoT card. With routine 5-minute upload intervals, monthly data consumption is approximately 30-50MB, very economical — 1GB typically lasts over a year. Higher upload frequencies and additional sensors will increase data consumption accordingly.

Q13: Can data be integrated into our own platform? What protocols are supported?

A: Integration with user-owned platforms is supported, with standard protocols including Modbus-RTU, Modbus-TCP, MQTT, HTTP, and HJ212 environmental protocol, as well as custom private protocol development. Protocol documentation is provided to facilitate third-party platform integration development.

Q14: Must calibration be performed by a metrology institute? Can I calibrate it myself?

A: Routine calibration can be performed using comparison methods per the manual, meeting daily monitoring requirements. For compliance scenarios such as environmental acceptance or metrological certification, calibration certificates must be issued by qualified third-party metrology institutions. The manufacturer can also provide on-site calibration services.

Q15: How do I obtain the commissioning software? What systems does it support?

A: The commissioning software can be obtained free of charge by contacting technical support at +86 13538869979. It supports Windows 7/10/11 and uses a USB-to-RS485 debug cable. The software interface is user-friendly with included user instructions.

11.4 Operation and Maintenance

Q16: Does the equipment require a dedicated person for maintenance? Is the maintenance workload large?

A: The equipment is designed for unattended operation and does not require dedicated maintenance personnel. Simply check online status remotely each week and conduct a monthly on-site inspection and cleaning — the maintenance workload is very small. Yearly comprehensive calibration and maintenance should suffice.

Q17: How often do lithium batteries need replacement? Are they expensive?

A: Under normal use, lithium iron phosphate batteries have an approximate cycle life of 2000 cycles, typically replaced every 3-5 years depending on charge/discharge frequency and depth. Replacement cost is reasonable; explosion-proof lithium batteries can be purchased from the manufacturer for self-installation or manufacturer-installed replacement.

Q18: Will low winter temperatures freeze or damage the equipment? Can it be used at sub-zero temperatures?

A: The standard model operates in -40℃ to +70℃, suitable for most regions in winter. For extreme cold areas (below -40℃), customized low-temperature enhanced models are available with heating and insulation measures. Optional heated rainfall sensors prevent freezing for winter measurement.

Q19: Coastal areas have high salt mist — will the equipment rust quickly?

A: The standard model features a 304 stainless steel host housing, hot-dip galvanized brackets, and stainless steel fasteners, providing adequate corrosion resistance for general coastal environments. For high-corrosion seaside and chemical heavy-corrosion environments, optional 316 stainless steel housings with anti-corrosion coatings further enhance corrosion resistance lifespan.

Q20: Can the equipment have firmware remotely upgraded? Is there a risk of “bricking”?

A: Remote OTA firmware upgrades are supported, with breakpoint resume and verification mechanisms. Upgrade failures do not affect existing program operation and will not cause “bricking.” Upgrades are performed by manufacturer technical personnel; no user intervention is required.

11.5 Explosion-Proof Compliance

Q21: Is there an explosion-proof certificate? Can the original be provided?

A: The product holds an explosion-proof certificate issued by a state-authorized explosion-proof testing institution. A stamped copy is provided with the shipment; the original can be inspected on-site, and authenticity can be verified on the explosion-proof certification official website.

Q22: Will it pass safety supervision and fire inspection?

A: The product’s explosion-proof performance complies with national standards with complete qualifications. Normal installation and use will pass safety supervision and fire department explosion-proof inspections. It is also recommended to establish explosion-proof equipment ledgers as required and conduct regular testing.

Q23: Can it be used continuously in Zone 1?

A: Equipment with Gb protection level can be used continuously in Zone 1 and complies with standards. However, Zone 0 is not permitted — Zone 0 requires ia-level intrinsically safe equipment.

Q24: Does explosion-proof performance remain valid after self-repair with cover opening?

A: As long as operations strictly follow specifications without damaging flameproof joint surfaces, altering housing structure, or using non-original replacement parts, and bolts are retorqued to specification after closing, explosion-proof performance remains valid. Unauthorized modification, hole enlargement, or joint surface damage will void the explosion-proof performance.

Q25: How long is the explosion-proof certificate valid?

A: Current explosion-proof certificates are generally valid for 5 years. The manufacturer will re-certify before expiry to ensure continued compliance.

11.6 After-Sales and Warranty

Q26: How long is the warranty period? What is covered?

A: The complete unit is warranted for 1 year, lithium batteries for 1 year, and solar panels for 5 years. During the warranty period, product failures due to non-human causes and non-force-majeure events are repaired free of charge or with free replacement parts. Human-caused damage, unauthorized modification, natural disasters, and normal wear of consumables are not covered under warranty.

Q27: How quickly can on-site repair service arrive after a fault?

A: On-site service is available within 48 hours in most regions nationwide; remote areas require negotiated scheduling. General faults can be resolved remotely through diagnosis first; if remote resolution is not possible, engineers are dispatched to the site. The technical support hotline +86 13538869979 is available year-round with prompt responses.

Q28: Can repairs still be made after the warranty period?

A: Lifetime repair service is available. Outside the warranty period, only parts costs and labor/travel expenses are charged with transparent pricing. Extended warranty services are also available.

Q29: Is installation and commissioning service available? How is it charged?

A: On-site installation, commissioning, and training services are available nationwide. Fees are quoted based on project location and quantity; contact the service hotline +86 13538869979 for quotations.

Q30: Is training service available? Can you train our O&M personnel?

A: After installation and commissioning, on-site training will be provided for user O&M personnel, covering daily operations, inspections, simple fault troubleshooting, and other content to ensure users can operate and maintain the equipment. Centralized training and customized training services are also available.

Chapter 12 Product Acceptance

12.1 Acceptance Basis and Standards

The acceptance of the explosion-proof weather station strictly follows relevant national standards, design documents, contract requirements, and the specifications in this manual. The main basis includes:

  • GB 50257-2014 Code for Construction and Acceptance of Electrical Equipment Installation in Explosive and Fire Hazardous Environments
  • GB 3836 series standards for equipment in explosive atmospheres
  • GB/T 35221-2017 Specifications for Surface Meteorological Observation
  • Project design drawings, technical agreements, and supply contracts
  • This product manual and factory inspection standards
  • Relevant local regulations from safety supervision, environmental protection, and meteorological departments

12.2 Acceptance Organization and Personnel

  • Organizing unit: Acceptance is organized by the user unit or the project general contractor.
  • Participating units: User unit, construction unit, equipment supplier (Guangdong Lain Smart Machine Room Equipment Co., Ltd.); supervisory units and third-party testing agencies may be invited when necessary.
  • Personnel requirements: Acceptance personnel shall possess relevant professional knowledge, be familiar with the equipment and acceptance standards, and have clear acceptance responsibilities.

12.3 Arrival Acceptance

Arrival acceptance is conducted after equipment delivery and before installation to confirm that the goods are intact and complete.

12.3.1 Appearance and Packaging Acceptance

  • Packaging is intact, without damage, water immersion, or severe impact marks.
  • Packaging markings are clear; product model, quantity, and factory serial number match the contract.
  • Equipment appearance has no deformation, cracks, paint peeling, rust, or damage defects.
  • Glass components and interface fittings are intact; nameplates and markings are clear and complete.

12.3.2 Quantity and Accessories Acceptance

  • Check the host unit, sensors, brackets, and accessories one by one against the packing list, confirming model and quantity are complete and correct.
  • Verify accompanying documentation: product certificate of conformity, explosion-proof certificate, factory calibration report, manual, wiring diagrams, etc., are all complete.
  • Special tools and accessories are complete.

12.3.3 Qualification Document Acceptance

  • Product certificate of conformity is valid, and factory inspection passed.
  • Explosion-proof certificate is within its validity period, model matches the product, and can be verified online on the official website.
  • Manufacturer qualification documents are complete: business license, production qualification, test reports, etc.

12.3.4 Arrival Acceptance Conclusion

Fill in the Arrival Acceptance Form, sign for confirmation upon acceptance; list any non-conforming items, negotiate returns/exchanges or replacements, and re-accept after rectification.

12.4 Installation Construction Acceptance

Installation construction quality acceptance is conducted after installation is completed and before commissioning.

12.4.1 Foundation and Bracket Acceptance

  • Foundation dimensions and strength meet design requirements; concrete curing is complete; surface is level.
  • Pole verticality deviation ≤ 3‰; flange connections are tightened; bolts are complete; anti-loosening measures are effective.
  • Cross arm and bracket installation is firm; orientation and inclination angle meet design requirements.
  • Anti-corrosion coating is complete, without damage or rust.

12.4.2 Equipment Installation Acceptance

  • Installation position, height, and orientation of the host unit and each sensor meet design and specification requirements.
  • Equipment is firmly installed, without looseness or shaking.
  • No obstruction around wind speed and direction sensors; rain gauge leveling is qualified.
  • Solar panel orientation and inclination angle are correct, without obstruction.

12.4.3 Cabling and Wiring Acceptance

  • Cable selection is correct; conduit installation is standard; fixation is neat; markings are clear.
  • Explosion-proof cable glands and flexible conduits are installed to specification, with good sealing and no open ends.
  • Wiring is correct; terminals are tightened; no loose or incorrect connections.
  • Shield layer grounding meets requirements, with no grounding at both ends.

12.4.4 Grounding System Acceptance

  • Grounding electrode and grounding main conductor construction comply with specifications.
  • All exposed conductive parts are reliably grounded, with firm connections.
  • Grounding resistance test passes, ≤ 4Ω, with test records.

12.4.5 Explosion-Proof Compliance Acceptance

  • Equipment installation location matches the hazardous area classification, with no out-of-scope use.
  • Flameproof enclosure is intact; mating surfaces are tightened evenly; bolts are complete.
  • All cable entry devices are sealed properly, with no unauthorized openings.
  • No conditions that compromise the explosion-proof structure.

12.5 Functional and Performance Acceptance

Functional and performance acceptance is conducted after commissioning to verify that the equipment meets design and operational requirements.

12.5.1 Data Acquisition Function Acceptance

Acceptance Item Acceptance Requirement Acceptance Method
Parameter completeness All optional parameters display normally, without omission View real-time data on the platform, verify parameter count
Data update Updates normally per the set cycle, without stagnation Observe continuously for 10 minutes, data refreshes on time
Measurement accuracy Each parameter’s accuracy meets manual specifications Compare with standard instruments, deviation within allowable range
Data storage Local storage works normally, historical data queryable Query historical data, data is continuous without loss
Power-off data retention Data is not lost after power failure, clock functions normally Check historical data and time after power-off and restart

12.5.2 Data Transmission Function Acceptance

  • Communication link is stable, equipment online rate ≥ 99%.
  • Data upload is timely, delay ≤ 1 upload cycle.
  • Breakpoint resume function works normally; data is backfilled after network recovery.
  • Multi-terminal viewing is normal: web, APP, and mini-program all access properly.
  • Data export function works normally with correct format.

12.5.3 Alarm and Linkage Function Acceptance

  • Threshold alarms for each parameter trigger correctly, with accurate alarm information.
  • Alarm notification channels function properly: platform, SMS, audible/visual alarms, etc., are all received.
  • Relay linkage actions are correct and respond promptly.
  • Alarm clearing logic is normal, and alarm records are available for review.

12.5.4 Power Supply and Endurance Acceptance

  • Power supply system operates normally with stable voltage.
  • Solar charging is normal, and charging efficiency meets requirements.
  • Simulate power failure; battery power switching is normal without interruption.
  • Low-voltage protection function is normal; protection is effective when battery voltage is low.
  • Continuous rainy-day endurance meets design requirements.

12.5.5 Continuous Operation Assessment

The equipment runs continuously for 72 hours and must meet the following requirements:

  • No freezing, restarting, or offline occurrences.
  • Data integrity rate ≥ 99%, without significant data loss.
  • Maximum enclosure temperature meets T4 group requirements.
  • No abnormal noise, odor, or overheating.

12.6 Documentation Acceptance

Complete project documentation must be handed over at acceptance, including but not limited to:

  • Equipment documentation: Product manual, certificate of conformity, explosion-proof certificate, factory test report, calibration certificate.
  • Construction documentation: Installation construction records, hidden works records, grounding resistance test records.
  • Commissioning documentation: Commissioning records, parameter configuration tables, calibration records, test reports.
  • Drawing documentation: System schematic diagrams, wiring diagrams, installation layout drawings, as-built drawings.
  • Operation and maintenance documentation: O&M manual, spare parts list, training records.
  • Acceptance records: Acceptance forms and acceptance reports for each stage.

Documentation shall be complete, standardized, and validly stamped, with both paper and electronic versions handed over simultaneously.

12.7 Acceptance Conclusion and Signatures

After all acceptance items are completed, summarize the acceptance results and complete the Explosion-Proof Weather Station Completion Acceptance Report.

  • If all items pass, sign the acceptance conclusion, with representatives from all parties signing and stamping.
  • If non-conforming items exist, list a rectification checklist, specify the rectification deadline, and conduct re-inspection after rectification.
  • After acceptance, the equipment is formally handed over to the user for operation, and the warranty period begins.

12.8 Warranty Period Commencement

  • The warranty period is calculated from the date of acceptance and follows the contract terms.
  • If the equipment was trial-operated before acceptance, the warranty period does not start early.
  • Accessories replaced during the warranty period follow the main unit’s warranty period and are not separately recalculated.
  • The manufacturer provides free technical support and fault repair services during the warranty period. Contact: Technical Support +86 13538869979, Service Hotline +86 13538869979.

Chapter 13 SEO Keywords and Optimization Tag System

I. Search Keyword Layout

1. Core Primary Keywords

Explosion-proof weather station, industrial explosion-proof weather station, explosion-proof meteorological station, chemical explosion-proof weather station, flameproof weather station

2. High-Conversion Long-Tail Keywords

Explosion-proof weather station manufacturer, explosion-proof weather station price, explosion-proof weather station installation, explosion-proof weather station commissioning, explosion-proof weather station wiring, explosion-proof weather station manual, 7-element explosion-proof weather station, solar-powered explosion-proof weather station, 4G explosion-proof weather station, chemical park explosion-proof weather station, oil depot explosion-proof weather station, coal mine explosion-proof weather station, explosion-proof weather station production manufacturer, best explosion-proof weather station brand

3. Industry Traffic Keywords

Industrial weather station, plant area weather station, environmental weather station, energy consumption monitoring weather station, hazardous chemical weather station, explosion-proof environmental monitoring station, meteorological monitoring station, multi-element weather station, integrated weather station, outdoor weather station, wireless weather station, solar weather station, meteorological monitoring system, environmental meteorological monitoring equipment

4. Brand-Specific Keywords

Lain explosion-proof weather station, Guangdong Lain weather station, LA-FB explosion-proof weather station, Lain smart weather station, Guangzhou explosion-proof weather station manufacturer, Guangdong Lain Smart Machine Room Equipment Co., Ltd. weather station

5. Drop-Down/Related Search Keywords

Explosion-proof weather station explosion-proof rating, explosion-proof weather station working principle, explosion-proof weather station installation specification, explosion-proof weather station wiring diagram, explosion-proof weather station calibration method, explosion-proof weather station maintenance, explosion-proof weather station common faults, explosion-proof weather station acceptance standard, what parameters does an explosion-proof weather station have, explosion-proof weather station applicable scenarios

II. SEO Optimization Tag System

1. Core Page Optimization Tags

  • Page theme: Explosion-proof weather station installation, wiring, and commissioning manual
  • Keyword density: Core keywords evenly distributed throughout the text, density 2%–3%
  • Content length: Ultra-detailed full-process manual, meeting users’ in-depth reference needs
  • Content structure: Multi-level headings with clear logic, enabling users to quickly locate content

2. Title Tag

Explosion-Proof Weather Station Installation Wiring Commissioning Manual_Explosion-Proof Weather Station Manufacturer_Guangdong Lain Smart Machine Room Equipment Co., Ltd.

3. Meta Keywords

Explosion-proof weather station, explosion-proof weather station installation, explosion-proof weather station wiring, explosion-proof weather station commissioning, explosion-proof weather station manual, industrial explosion-proof weather station, flameproof weather station, chemical explosion-proof weather station, explosion-proof weather station manufacturer, Guangdong Lain

4. Meta Description

Guangdong Lain Smart Machine Room Equipment Co., Ltd. professionally provides explosion-proof weather station products. This manual details the full process of explosion-proof weather station product introduction, principles, composition, installation specifications, wiring methods, commissioning steps, operation and maintenance, troubleshooting, and acceptance. Explosion-proof rating ExdIIBT4, suitable for chemical, oil depot, coal mine, and other hazardous areas. Technical support: +86 13538869979.

5. H1 Tag

Explosion-Proof Weather Station Installation, Wiring, and Commissioning Manual

6. H2 Tags

Product Introduction, Product Composition, Product Principles, Product Functions and Features, Product Installation, Product Wiring, Product Commissioning, Product Precautions, Product Repair and Maintenance, Product Common Problems and Solutions, Product FAQ, Product Acceptance

7. Internal Link Optimization Tags (Anchor Text, Naturally Embedded)

  • Core anchor text: Explosion-proof weather station, industrial explosion-proof weather station, explosion-proof weather station manufacturer
  • Long-tail anchor text: Explosion-proof weather station installation and wiring, explosion-proof weather station commissioning methods, explosion-proof weather station operation and maintenance, 7-element explosion-proof weather station, solar-powered explosion-proof weather station
  • Related anchor text: Environmental monitoring equipment, industrial meteorological monitoring system, explosion-proof electrical equipment, meteorological sensors, explosion-proof data collector

Manufacturer: Guangdong Lain Smart Machine Room Equipment Co., Ltd.

Service Hotline: +86 13538869979 (WeChat same number)

Technical Support: +86 13538869979

Company Address: Zhongrun Industrial Park, No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou

Official Website: https://gdlain.com

Scroll to Top