Table of Contents
Toggle1. Cover / Document Information
– Document Title: Fire Equipment Power Supply Monitoring System Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for Fire Equipment Power Supply Monitoring System
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Project Background
Fire-fighting equipment (pumps, exhaust fans, emergency lighting, fire shutters) must start reliably when a fire occurs — their power supply is the lifeline. Traditional manual inspection cannot provide 24h monitoring of fire-load circuits; voltage anomalies, phase loss, switch trips and power loss often go unnoticed until a fire reveals the failure. Per GB 50116 and GB 25506, buildings with fire-control rooms must install fire equipment power monitoring systems. This project builds such a system for the Alxa industrial park, covering the 2#/3# maintenance workshops, 1# office building and 7#-15# buildings — full-link monitoring from LV distribution to terminal fire equipment.
4.2 Project Objectives
Real-time 24h monitoring of all fire-load circuit voltages/currents with overvoltage, undervoltage, overcurrent, phase-loss, power-loss and overload alarms (alarm-only, no trip for fire loads); precise fault location; linkage with the fire alarm system; CCCF-certified compliant products; smooth fire acceptance; expandable architecture for future buildings.
4.3 Scope
1 central monitoring host in the fire control room; fire power monitoring sensors (three-phase DH-A-53M and single-phase DH-A-51M) in distribution boxes/cabinets across the park; fire two-bus network; terminal boxes, bus isolators, fire-rated breakers, cabling, software, installation and commissioning — >=105 monitored circuits total (2#/3# workshops >=24, 1# office >=36, 7#-15# >=45).
4.4 Compilation Basis
GB 28184-2011 (fire equipment power monitoring systems), GB 50116-2013 (fire alarm design), GB 25506-2010 (fire control room), GB 50166-2019 (fire alarm construction/acceptance), GB 51348-2019 (civil electrical), GB 50303 (electrical installation acceptance), GB/T 19666 (fire-resistant cables), GB 14048 series, plus project drawings and site conditions.
5. User Requirement Analysis
5.1 Functional Requirements
Continuous monitoring of voltage, current, frequency, power and switch states per fire circuit; alarms for overvoltage/undervoltage/overcurrent/phase-loss/power-loss/overload (fire loads: alarm only, no trip); precise fault location to the circuit; alarm records with history; auto self-check of host, sensors and lines; linkage with the fire alarm system; multi-terminal viewing; report generation.
5.2 Coverage Requirements
2#/3# workshops: >=12 circuits each (fire pumps, emergency lighting, smoke exhaust fans, fire shutters) with DH-A-53M on BW2-series fire circuits. 1# office: >=36 circuits — LV room incoming, per-floor fire boxes, terminal boxes (alarm host power, emergency lighting, evacuation signs, exhaust fans, fire elevator, shutters) — full-link. 7#-15#: >=45 circuits — fire garage, switching station, duty room, guard room, transformer room key circuits.
5.3 Performance Requirements
Data refresh <=1s; alarm response <=3s; single bus <=128 sensors, <=1200m (repeaters beyond); host 256 points / 4 buses; backup >=8h; history >=12 months; bus-powered sensors (no external supply); CCCF certification for all fire products.
5.4 Integration Requirements
Standard interface to the fire alarm system (bidirectional: fire alarm triggers power-status display; power faults upload to fire alarm host); graded alarm linkage with field sound/light and optional SMS; open Modbus-RTU for third-party integration.
5.5 O&M Requirements
Easy fault location (bus isolators isolate fault sections); daily/monthly/quarterly/half-year/yearly maintenance guidance; 7×24 support; training for operators, maintainers and managers.
6. Design Principles and Applicable Standards
6.1 Design Principles
Compliance first: all products CCCF-certified per GB 28184; cables fire-resistant low-smoke halogen-free; design per current fire codes. Reliability: industrial-grade components, fault isolation (bus isolators), redundant host backup power, single-sensor failure without system impact. Practical and economical: “practical, sufficient, usable” point configuration avoiding over-design; source-factory supply; low lifecycle cost. Expandable: two-bus daisy-chain — new circuits simply tap the nearest bus; modular software for future fire electrical systems integration. Safety: monitoring never interrupts fire power (alarm-only overload); live-work procedures and code-compliant installation.
6.2 Applicable Standards
Per section 4.4 (GB 28184, GB 50116, GB 25506, GB 50166, GB 51348, GB 50303, GB/T 19666, GB 14048, GB 31247).
7. System Architecture and Working Principle
7.1 Three-Layer Architecture
Monitoring management layer: central host (KITOZER-FPM-256) in the fire control room with monitoring software, display and UPS — data processing, storage, analysis, display, alarm output, linkage and reports; multi-terminal (office PC, mobile) remote viewing. Network transmission layer: fire two-bus communication — WDZB1N-RYS fire-resistant twisted pair for comms and WDZB1N-BYJ fire-resistant copper for power, in the same conduit (fire-rated); bus repeaters extend distance; standard Modbus-RTU for openness. Field sensing layer: sensors in distribution boxes/cabinets — DH-A-53M three-phase and DH-A-51M single-phase types selected per circuit; direct connection to fire supply circuits with wide-voltage design and electrical isolation.
7.2 Working Principle
Sensors acquire electrical parameters in real time, digitize and upload via the two-bus to the host; software analyzes against thresholds; on overvoltage/undervoltage/overcurrent/phase-loss/power-loss/trip, the host triggers sound/light alarms, pops up the fault location, records time/type/values to history. Operators use precise location to rectify immediately.
7.3 Networking
Centralized monitoring, distributed acquisition: 1 host in the fire control room; sensors daisy-chained on fire two-bus (bus topology — simple wiring, low cost, high reliability; <=128 sensors/bus, <=1200m, repeaters beyond); new circuits tap the nearest bus for easy expansion.
8. Detailed Technical Design
8.1 Monitoring Host (KITOZER-FPM-256)
Wall-mounted, 600x800x200mm, cold-rolled steel electrostatic coating, IP30; -10~+55 degC, <=95% RH, <=2000m. Max 256 points, 4 independent buses, fire two-bus, Modbus-RTU, 1200m/bus, refresh <=1s, alarm response <=3s; history >=100,000 records, alarms >=50,000, operations >=10,000, storage >=12 months. Main AC220V +-15%; built-in DC24V/7Ah backup >=8h; standby <=150W / full <=200W; bus DC24V/5A; insulation >=100M ohm; withstand AC2000V/1min. 10.1″ TFT touch 1024×600 Chinese UI; touch + physical buttons (power/reset/silence); main wiring diagram, parameter lists, alarm popups, history curves. Multi-parameter monitoring (V/I/f/P/switch); over/under voltage, overcurrent, phase loss, power loss, overload alarms; custom thresholds and delay; three-level alarm grading; three-level user permissions (admin/operator/guest); self-check; silence/reset; black-box event recording; RS232/RS485/Ethernet; linkage with fire alarm system and graphical display; optional WEB/SMS/email. Per GB 28184-2011, CCCF, GB/T 17626, ISO9001.
8.2 Sensors
DH-A-53M three-phase V/I integrated: high-precision CT + 24-bit AD; monitors three-phase V/I, frequency, P/Q/PF; 1 DI (breaker state) + 1 DO (alarm linkage); two-bus non-polar, bus-powered <=0.5W; rated 380/220V, range 0-450V +-0.5%; current options 5/10/50/100/200/400A, 0-120% +-0.5%; frequency 45-65Hz +-0.1Hz; power +-1.0%; three-way isolation 2500VAC; DIN rail 95x72x58mm; -20~+70 degC; IP20; MTBF >=50,000h; GB 28184 + CCCF. Alarms: overvoltage 115% (default), undervoltage 85%, overcurrent 120%, phase loss <30% of rated on any phase, power loss <10% on all three; delay 0.1-60s adjustable; red LED flash. DH-A-51M single-phase V/I: 220V, 0-300V +-0.5%; current 10/32/63/100A 0-120% +-0.5%; 1 DI; two-bus non-polar bus-powered <=0.3W; 76x72x58mm; -20~+70 degC; IP20; CCCF.
8.3 Distribution and Control Components
Fire-type MCCB (DM 100/JLU0): 3P, AC400V/690V, 100A frame, thermal-magnetic — overload alarm without trip (fire-load continuity), short-circuit instantaneous at 10In, Icu >=50kA, alarm dry contact, manual, electrical >=10,000 / mechanical >=20,000 cycles, -25~+40 degC, GB 14048.2 + 3C. Contactor (CJ20-63): AC380/220V, 63A, AC220V coil (380V/DC24V optional), 3P, 2NO+2NC aux, 1200 ops/h, mechanical >=10M, electrical >=1M, 10x/8x make/break, GB 14048.4 + 3C. DIN DC supply: AC185-265V in, DC24V +-1%, 2A/48W, regulation <=0.5%/1%, ripple <=50mV, efficiency >=88%, OCP/OVP/SCP/OTP, DIN, 105x75x32mm, -20~+60 degC, MTBF >=100,000h.
8.4 Enclosures
Host cabinet: 600x800x200mm, 1.2mm body / 1.5mm mounting plate, pickled/phosphated/electrostatic matte light grey, IP30, wall mount, bottom knockouts, triangle lock; internal brackets for host, battery tray, terminal rails, earth bus, cooling fan. Field terminal box: 300x400x150mm, 1.0mm, IP30, 35mm DIN rail + earth terminals + terminal blocks, wall mount — bus distribution in shaft/workshops.
8.5 Cables and Conduits
WDZB1N-RYS 2×1.5 fire-resistant twisted pair: oxygen-free copper 7/0.52mm, XLPE insulation, LSZH flame-retardant polyolefin sheath; fire-resistant per GB/T 19666 (750-800 degC flame, 90min continuous energization); B1 per GB 31247; 300/500V; 90 degC; DC resistance <=12.1 ohm/km; insulation >=1000M ohm-km. WDZB1N-BYJ 2.5 fire-resistant wire: 7/0.68mm, XLPE, LSZH, N-class fire-resistant, B1, 450/750V, 90 degC (250 degC short 5s), <=7.41 ohm/km. RC20 hot-dip galvanized conduit: DN20, outer 26.9mm, wall 2.8mm, zinc >=85um, tensile >=300MPa, threaded, GB/T 3091.
8.6 Software Platform
C/S + B/S hybrid on Windows; MySQL/SQL Server; .NET 4.5+; i3/4GB/500GB minimum. Multi-circuit display refresh <=1s; wiring diagrams, plans, bar and curve charts; popup/sound/light alarms with confirm/silence/reset; history query by time/point/type; daily/monthly/yearly reports to Excel/PDF; V/I history curves with zoom/compare; multi-level permissions with full operation logs; threshold/comm/device configuration; OPC/API third-party integration; optional WEB/mobile. Max 1024 points; storage >=3 years; response <=1s; alarm delay <=2s; MTBF >=30,000h; password-encrypted users, full audit, auto backup/restore.
8.7 Point Planning
2#/3# workshops: each >=12 circuits (fire pumps, emergency lighting, exhaust fans, fire shutters; DH-A-53M on BW2 fire circuits) = >=24. 1# office: >=36 (LV room incoming, per-floor fire boxes, terminal boxes: alarm host power, emergency lighting, evacuation signs, exhaust fans, fire elevator, shutters) — full-link from LV room to terminals. 7#-15# (fire garage, switching station, duty room, guard room, transformer room): >=45 key circuits. Total >=105 points; quantities finalized per complete drawings.
9. Recommended Configuration and Preliminary Budget
9.1 Configuration Summary
Per workshop (2#/3#): 2 terminal boxes (300x400x150), 12 DIN rails, 12 retrofit kits; 6 DH-A-53M + 6 DH-A-51M sensors; 2 DC24V/2A supplies; 2 bus isolators; 2 fire-type MCCBs 3P100A (alarm-only), 12 MCBs 16A, 2 contactors CJ20-63, 4 terminal strips, 12 fuses; 300m WDZB1N-RYS + 300m WDZB1N-BYJ + 300m RC20 with fittings; accessories; installation/commissioning/acceptance support. Project-wide: 1 central host + software; total >=105 points; 1# office and 7#-15# itemized per complete drawings following the same standard.
9.2 Budget Notes
Final quantities per complete drawings and site; all fire products CCCF-certified; cables fire-resistant LSZH; pricing tax-inclusive in RMB (CNY) only; includes 24-month warranty, half-yearly inspections, software upgrades, training and acceptance support.
10. Technical Specifications
10.1 System Specification Summary
| Item | Specification |
|---|---|
| Host | KITOZER-FPM-256; wall 600x800x200mm IP30; 256 points / 4 buses; fire two-bus Modbus-RTU; 1200m/bus; refresh <=1s; alarm <=3s; history >=100,000 / alarms >=50,000 / ops >=10,000 (>=12 months); AC220V +-15% with DC24V/7Ah backup >=8h; bus DC24V/5A; 10.1″ touch; three-level users; self-check; RS232/485/Ethernet; GB 28184 + CCCF |
| Sensors | DH-A-53M three-phase: 24-bit AD, 0-450V +-0.5%, 5-400A options +-0.5%, 45-65Hz +-0.1Hz, 1DI+1DO, bus-powered <=0.5W, 2500VAC isolation, DIN, -20~+70 degC, MTBF >=50,000h; DH-A-51M single-phase: 0-300V, 10-100A; alarms 115%/85%/120%/30%/10% with 0.1-60s delay; CCCF |
| Fire MCCB | DM100/JLU0 3P 100A; overload alarm WITHOUT trip; Icu >=50kA; 10In instantaneous; alarm contact; GB 14048.2 + 3C |
| Contactor | CJ20-63 63A AC220V coil; 2NO+2NC; mechanical >=10M / electrical >=1M cycles; GB 14048.4 + 3C |
| DC supply | 24V +-1% 2A/48W; ripple <=50mV; efficiency >=88%; full protection; DIN; MTBF >=100,000h |
| Cables | WDZB1N-RYS 2×1.5 comm (fire-resistant 90min @750-800 degC, B1, 90 degC); WDZB1N-BYJ 2.5 power (N-class, B1, 450/750V); RC20 galvanized conduit wall 2.8mm zinc >=85um |
| Software | C/S+B/S; MySQL/SQL Server; 1024 points; storage >=3 years; refresh <=1s; reports Excel/PDF; curves; permissions + audit; OPC/API; optional WEB/mobile; MTBF >=30,000h |
| Coverage | >=105 points: workshops >=24, office >=36, 7#-15# >=45; bus <=128 sensors / <=1200m with repeaters |
| Schedule/service | 20 days (prep 3, cabling 7, installation 4, wiring 3, debug 2, acceptance 1); 24-month warranty; 7×24 support; 30min response, 2h/4h on-site; training >=1 day |
10.2 Standards Compliance
GB 28184-2011 (CCCF), GB 50116-2013, GB 25506-2010, GB 50166-2019, GB 51348-2019, GB 50303, GB/T 19666 (fire-resistant cables), GB 31247 (B1), GB 14048.2/.4 (3C), GB/T 17626 (EMC), ISO9001; all fire products CCCF-certified; 72h trial before acceptance.
11. Key Advantages and Customer Value
11.1 Advanced Two-Bus Technology
Power + communication on one cable pair — simpler wiring, lower cost, easier maintenance than RS485; non-polar connection prevents wiring errors; strong EMI immunity for workshops/transformer rooms; bus isolators keep faults sectionalized.
11.2 High Reliability
24-bit AD sensors with 0.5-class accuracy; industrial-grade components tested over temperature/humidity/vibration/EMC; fault-tolerant design — one sensor or a shorted section never disables the system; host backup battery >=8h; system MTBF >=50,000h.
11.3 Full Compliance
Design per GB 28184-2011, GB 50116, GB 51348; all fire products CCCF-certified; fire-rated low-smoke halogen-free cables; construction per GB 50303 — smooth fire acceptance with complete documentation.
11.4 Customized and Expandable
Source factory — cabinet sizes, point counts, modules and software interfaces customizable; three free design options; new circuits simply tap the nearest bus; software integrates future electrical fire monitoring, fire-door monitoring and smart lighting.
11.5 Easy Construction and O&M
Two-bus topology — little cable, short schedule, minimal impact on existing buildings/distribution; live-work installation options; standard modular devices for quick replacement; complete training and 7×24 support.
11.6 Cost-Effective
Manufacturer supply shortens the channel; “practical, sufficient, usable” configuration avoids waste; low energy and maintenance cost; prevents fire-power failures that cause safety incidents and losses — high safety and economic returns.
12. Technical Q&A (50+ Items)
12.1 Fundamentals
Q1: What does the system do?
A: 24h monitoring of fire equipment power (pumps, exhaust fans, emergency lighting, shutters); alarms on overvoltage, undervoltage, overcurrent, phase loss and power loss; precise location for rapid rectification — ensuring fire equipment starts when needed.
Q2: Which buildings must install it?
A: Per GB 50116 and GB 25506, buildings with fire control rooms — malls, hotels, offices, hospitals, schools, factories, warehouses, underground garages; a mandatory fire-acceptance item.
Q3: Difference from electrical fire monitoring?
A: Power monitoring supervises fire-load circuits to guarantee supply (overload alarms WITHOUT trip); electrical fire monitoring supervises ordinary circuits for residual current/temperature to prevent fires (may trip). Complementary systems.
Q4: What happens if the main power fails?
A: The host switches to the built-in DC24V/7Ah battery seamlessly — >=8h continuous operation; sensors are bus-powered and keep reporting.
Q5: Does the system affect fire power?
A: No — sensors connect via CT/voltage taps without breaking the circuit; fire MCCBs alarm without tripping on overload — fire supply continuity preserved.
Q6: How are alarms graded?
A: Three levels with different sound/light prompts; urgent (e.g. main power loss) can drive field sound/light and optional SMS.
12.2 Selection and Parameters
Q7: How to select the current rating?
A: Slightly above the circuit’s rated current (e.g. 80A circuit -> 100A sensor; 30A -> 63A); too small reads wrong/damages; too large loses low-current accuracy.
Q8: Two-bus vs RS485?
A: Two-bus carries power + data on one pair (no external sensor supply), is non-polar (no wiring errors), has stronger EMI immunity and supports short-circuit isolation — a shorted section never kills the whole bus.
Q9: How to size the host capacity?
A: Total points + 20-30% margin (80 points -> 128-capacity; 200 -> 256); very large projects use multiple hosts networked.
Q10: What parameters does DH-A-53M measure?
A: Three-phase V/I, frequency, active/reactive power, PF, plus breaker state (DI) and alarm linkage (DO); 24-bit AD with 0.5-class accuracy.
Q11: What are the default alarm thresholds?
A: Overvoltage 115%, undervoltage 85%, overcurrent 120%, phase loss <30% on any phase, power loss <10% on all three; all configurable with 0.1-60s delay.
Q12: Do sensors need external power?
A: No — powered entirely from the two-bus (<=0.5W), simplifying installation.
Q13: What certifications do products hold?
A: CCCF (fire products per GB 28184), 3C for breakers/contactors, GB/T 17626 EMC, ISO9001.
12.3 Installation
Q14: Where are sensors installed?
A: Inside the monitored circuit’s distribution box/cabinet on 35mm DIN rail; voltage parallel to breaker terminals, current via CT in series; away from heat/moisture/strong EMI.
Q15: Cabling requirements?
A: Fire-resistant LSZH cables per codes; galvanized or flame-retardant conduit (dark-cover >=30mm, exposed fire-protected); strong/weak separated; daisy-chain bus (no star); permanent labels; reliable earthing.
Q16: Does installation require outage?
A: Live-work by certified electricians under safe procedures normally — no impact on fire equipment; special circuits coordinate brief off-peak outages.
Q17: How far can the bus run?
A: <=1200m per bus (<=128 sensors); bus repeaters extend distance for far buildings.
Q18: What are the host environmental limits?
A: -10~+55 degC, <=95% RH no condensation, altitude <=2000m; IP30 for indoor fire control room.
Q19: Are terminal boxes needed per floor?
A: Yes — 300x400x150mm boxes in shafts distribute and transition the bus with terminal blocks for tidy maintenance.
Q20: How is earthing done?
A: Host cabinet, terminal boxes and metal conduits reliably earthed; BVR-4mm2 yellow-green connections; ground resistance per code.
12.4 Commissioning and Acceptance
Q21: What does commissioning include?
A: Line continuity/insulation tests; unique sensor addressing; per-sensor acquisition/comm tests; full-bus stability (no packet loss/drop); alarm function tests (over/under voltage, overcurrent); silence/reset/query tests; linkage with the fire alarm system; software parameters, permissions and reports.
Q22: What documents are needed for fire acceptance?
A: As-built drawings and change records; equipment lists, certificates, 3C/CCCF, test reports; hidden-work and construction records; commissioning and function test records; manuals; third-party inspection report.
Q23: How long is the trial run?
A: 72h continuous fault-free trial before formal acceptance.
Q24: How is live work kept safe?
A: Two-person rule, lockout/tagout, insulated tools and gloves, supervised energization with insulation checks first.
12.5 O&M and Troubleshooting
Q25: Daily/monthly maintenance?
A: Daily host status and alarms; monthly dusting and terminal check; quarterly simulated alarm tests; half-yearly battery charge/discharge test; yearly full check with sensor calibration; regular data backup.
Q26: How to troubleshoot communication faults?
A: Check host comm settings; sensor power LED; bus wiring (loose/reversed); segment-by-segment continuity; isolate a faulty sensor; add repeaters beyond distance limits.
Q27: Causes of false alarms?
A: Thresholds too low (raise), grid fluctuation (set delay), loose wiring (tighten), EMI (separate/shield/earth), faulty sensor (replace/calibrate).
Q28: What if a bus section shorts?
A: The bus isolator automatically isolates that section — the rest of the system keeps working; locate and repair the fault without system outage.
Q29: How is the backup battery maintained?
A: Half-yearly charge/discharge test; replace when capacity drops; battery tray accessible in the host cabinet.
Q30: Can the software be upgraded?
A: Yes — free version upgrades in warranty; OTA/remote support available.
12.6 Standards and Compliance
Q31: Which national standards apply?
A: GB 28184-2011, GB 25506-2010, GB 50116-2013, GB 50166-2019, GB 51348-2019.
Q32: Can non-CCCF products be used?
A: No — fire power monitoring is a compulsory-certification product; uncertified products fail acceptance and pose safety risks. All our products are CCCF-certified.
Q33: How is the system linked to the fire alarm system?
A: Standard interface — fire alarm triggers power-status display of the zone; power faults upload to the fire alarm host for centralized management.
Q34: What about future electrical fire/fire-door systems?
A: The modular software integrates electrical fire monitoring, fire-door monitoring and smart lighting on one platform — fire electrical integrated management.
12.7 Service and Value
Q35: What is the warranty?
A: 24 months from acceptance — free repair/replacement/on-site service for quality faults; half-yearly free inspections; free software upgrades; human/force-majeure faults at material cost only.
Q36: Fault response time?
A: 7×24 hotline; 30min response with initial solution; on-site 2h urban / 4h suburban; general faults within 8h, major within 24h.
Q37: What does the half-yearly inspection cover?
A: Host status and cleaning, sensor states, terminal tightening, battery test, function/alarm tests, data backup — with report and optimization suggestions.
Q38: What training is provided?
A: >=1 day at acceptance: theory (principles, codes, architecture), operation (host, alarms, reports, permissions), maintenance (sensor wiring, fault finding, replacement, battery care), management (alarm handling flow, inspection system, data use); assessment with certificates and retraining.
Q39: What documentation is delivered?
A: Operation manual, maintenance manual, courseware, as-built drawings, test reports, certificates.
Q40: Are spare parts guaranteed?
A: Stocked host, sensors and power modules; spare-unit replacement in warranty minimizes downtime; >=5-year supply commitment after phase-out.
Q41: How is expansion handled?
A: Add a sensor on the nearest bus and configure in software — no host or trunk changes; host capacity includes 20-30% margin.
Q42: Can it serve multiple buildings?
A: Yes — one host with 4 buses covers 105+ points across the park; larger estates network multiple hosts.
Q43: What is the system accuracy?
A: Voltage/current 0.5 class; power 1.0; frequency +-0.1Hz — precise enough for reliable threshold judgments.
Q44: How does it improve fire safety value?
A: Early detection of power faults prevents fire equipment failure during fires — avoiding catastrophic losses; also supports routine electrical management.
Q45: Why choose the KITOZER/Lain solution?
A: Source factory with 20+ years; CCCF-certified products; full design/production/engineering; free 3-scheme design; 24-month warranty and proven large projects.
Q46: What about remote monitoring?
A: Optional WEB access and mobile adaptation let managers view status and alarms remotely.
Q47: How are operation records kept?
A: Black-box event recording plus software operation logs — traceable and auditable.
Q48: Is the two-bus polarity-free really?
A: Yes — non-polar connection; reverse wiring simply works, eliminating a common installation error.
Q49: What are the cable fire-resistance ratings?
A: WDZB1N cables sustain 90min energization at 750-800 degC flame; B1 flame-retardant per GB 31247; LSZH low smoke.
Q50: What makes it cost-effective?
A: Two-bus saves cable and labor; project pricing; alarm-only design protects fire equipment; long MTBF and 24-month warranty minimize lifecycle cost.
13. Construction Schedule
13.1 Overall Schedule
Total ~20 calendar days in six stages (adjustable):
| No. | Stage | Main work | Days | Responsible | Acceptance node |
|---|---|---|---|---|---|
| 1 | Preparation | Drawing review/disclosure; materials/equipment/tools arrival; site survey and point recheck; scheme and safety disclosure; temporary facilities | 3 | PM, technical lead | Material arrival acceptance, disclosure sign-off |
| 2 | Cabling | Positioning, grooving; galvanized conduit laying and fixing; cable pulling and tying; continuity/insulation tests; hidden-work acceptance | 7 | Crew lead, electrician lead | Hidden-work and line test records |
| 3 | Installation | Host cabinet fixing; field terminal boxes; sensor rail mounting; distribution components; appearance/fixing check | 4 | Crew lead | Installation quality check |
| 4 | Wiring | Main power wiring; sensor V/I signal wiring; bus wiring and terminal crimping; earthing; labels and dressing | 3 | Electrician lead, debug engineer | Wiring check, insulation test |
| 5 | Commissioning | Single-unit power-on; bus comm debug; function and alarm tests; software parameters; linkage tests; trial run | 2 | Debug engineer | Debug and function test records |
| 6 | Acceptance | As-built docs; customer self-check/rectification; third-party fire inspection; formal acceptance; training and handover | 1 | PM, technical lead | Acceptance report, handover list |
13.2 Key Node Control
Material arrival: certificates, test reports and 3C/CCCF required; accepted by customer/supervision before use. Hidden work: accepted (signed, with photos) before sealing. Pre-energization check: verify wiring and insulation before staged energization. Acceptance: 72h fault-free trial before formal acceptance.
14. Construction Organization and Quality/Safety Measures
14.1 Organization
PM (1): overall management, progress, quality/safety, external coordination. Technical lead (1): scheme, drawing disclosure, commissioning guidance, problem solving. Crew leads (2): site organization, dispatch, process execution. Electricians (4): conduit/cable work, wiring, earthing. Debug engineer (1): system commissioning, software configuration, function tests. Safety officer (1): safety management, civilized construction, inspections. Documentation clerk (1): records, reporting, as-built compilation.
14.2 Preparation
Technical: drawing review and disclosure; detailed scheme, safety-specific and live-work plans approved by customer/supervision; standards and record forms ready. Materials: advance procurement with factory inspection; tools/instruments (drill, cutter, multimeter, insulation tester, line finder) calibrated; PPE complete. Site: coordinate temporary power/water and storage; recheck points, routes, reserved holes (change requests if mismatched); safety facilities and signs; entry training.
14.3 Core Processes and Standards
Conduit: accurate level runs, firm fixing; threaded joints with cross-bonding jumpers; cold-bent radius >=10x diameter without wrinkles; deburred ends with bushings; dark cover >=30mm, uniform exposed fixing. Cable pulling: spec/insulation check first; even pulling with fish tape, no damage; different circuits/voltages never share a conduit; no joints in conduit (joints at boxes); 15-20cm slack at boxes; re-test insulation before wiring. Installation: accurate firm mounting; host verticality <=3/1000 with earthing; sensor rails level with even spacing; labels readable. Wiring: verify line numbers before connecting; firm crimped/ tinned terminals; neat rows with clear labels; strong/weak separated; yellow-green earth wires, ground resistance per code. Dressing: layered binding, even spacing; power/signal separated; consistent bend radii; clear two-end labels.
14.4 Quality Assurance
Quality target: qualified with one-pass acceptance per codes; three-inspection (self/mutual/handover); all materials with certificates (CCCF for fire products); technical on-site supervision on key processes; common-defect prevention (loose wiring, unclear labels, messy dressing); finished-product protection (covers, sealed conduit ends, locked interfaces after commissioning).
14.5 Safety and Civilized Construction
Zero accidents/injuries; PM as first safety responsible person with dedicated safety officer; three-level entry education, certified special operators; three-level distribution with two-level protection, locked boxes, no random wiring; live work supervised with insulated PPE; harnesses and proper platforms for high work; fire precautions with extinguishers and hot-work permits; tidy materials, daily cleanup, uniformed staff, minimal disturbance.
14.6 Progress Assurance
Detailed daily schedule with reverse planning; parallel work streams; advance stocking; adequate crew/tools with reinforcement as needed; daily pre/post-shift meetings; coordination with customer/supervision/other contractors; contingency plans.
14.7 Finished-Product Protection
Proper storage (moisture/dust/impact); protective film on installed cabinets; sealed conduit ends; terminal covers; locked operator interfaces after commissioning; patrols against theft/damage.
15. After-Sales Service
15.1 Warranty Commitment
24-month whole-project warranty from acceptance; free repair/replacement/on-site service for quality/construction faults; half-yearly free inspection; free software upgrades; human/force-majeure faults at material cost only (no service fee).
15.2 Response and Flow
7×24 hotline; 30min response with initial solution; on-site 2h urban / 4h suburban; general faults within 8h, major within 24h. Flow: report -> register -> remote triage -> on-site repair -> confirmation -> follow-up satisfaction.
15.3 Routine O&M and Inspection
Free phone/WeChat consultation; half-yearly inspection (host status/cleaning, sensor states, terminal tightening, battery test, function/alarm tests, backup, junk cleanup) with report and optimization suggestions; annual full maintenance (deep cleaning, aging check, sensor calibration).
15.4 Upgrades and Technical Support
Free software upgrades; preferential point expansion/function additions; free technical consultation on retrofit/expansion/migration; updated documents and standards.
15.5 Spare Parts
Common spares stocked (host, sensors, power modules); spare-unit replacement in warranty minimizing downtime; preferential post-warranty parts; >=5-year supply after phase-out.
15.6 Complaint and Satisfaction
Dedicated complaint channel with 24h handling plan; satisfaction follow-up per service; regular satisfaction surveys.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples provided for reference only. No real customer names, addresses or identifiable details are disclosed.
17.1 Large Machinery Plant Fire Power Monitoring Project
Background. A 50,000 m2 machinery plant (workshops, warehouse, office, power station) had many fire devices and complex circuits; manual inspection was inefficient with late fault discovery.
Solution. 1 monitoring host with 186 points covering fire pumps, sprinkler pumps, exhaust fans, shutters and emergency lighting; two-bus network with the longest run over 800m.
Results. Stable reliable operation with real-time V/I monitoring of all fire circuits; timely accurate alarms; significantly improved fire safety management; fire acceptance passed — highly rated.
17.2 Class-A Office Building Fire Power Monitoring Project
Background. A 32-storey class-A office (120,000 m2, 3 basement levels) — high-rise public building with numerous widely distributed fire circuits.
Solution. Centralized architecture — main host in the fire control room, per-floor terminal boxes in shafts, 268 points covering the full link from LV room to terminal fire devices; integrated with the building automation and fire alarm systems.
Results. Stable operation with rapid alarm response; fire-power hazards greatly reduced; managers access status anytime — became a local fire demonstration project.
17.3 Smart Manufacturing Park Integrated Fire Electrical Project
Background. A 200,000 m2 park (12 standard workshops, 2 R&D offices, dormitory, underground garage) needed coordinated fire electrical systems.
Solution. Integrated solution: fire power monitoring (320 points) + electrical fire monitoring (450 points) + fire-door monitoring (180 points) sharing one host platform.
Results. Three systems seamlessly integrated on one platform — lower construction and O&M cost, higher management efficiency; all indicators met; fire acceptance passed.
17.4 Data Center Fire and Environment Monitoring Project
Background. A Tier III data center (8,000 m2; computer rooms, UPS rooms, generator room, cooling station) demanded extreme supply reliability.
Solution. Fire power monitoring deeply integrated with the environment monitoring system — 156 points focusing on UPS output, generators, precision distribution and fire circuits; multi-level alarms with mobile push.
Results. Integrated monitoring with precise data and rapid response; zero faults over 3 years; reliable protection for safe data center operation.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.