Table of Contents
ToggleSEO Optimization Tag System

Page Core Optimization Tags
Title Tag: Shielded Container Installation and Commissioning Manual_Industrial Special Electromagnetic Shielding Container Construction and Acceptance Specification – Guangzhou Lain
Meta Keywords: shielded container, industrial special shielded container, electromagnetic shielding container installation and commissioning, shielded container acceptance standard, Guangzhou Lain shielded container, shielding effectiveness testing, shielded container grounding, special shielded container customization, mobile shielded container, EMC shielding room container
Meta Description: Guangzhou Lain Intelligent System Development Co., Ltd. professionally provides industrial special shielded container installation and commissioning manuals, systematically explaining the full-process specifications for electromagnetic shielding container hoisting and positioning, container body splicing, shielding door installation, filter commissioning, grounding system construction, full-band shielding effectiveness testing, and completion acceptance, accompanied by complete troubleshooting and maintenance solutions. Service hotline: +86 13538869979.
H1 Tag: Industrial Special Shielded Container Installation and Commissioning Manual
H2 Tags: Product Overview and Technical Parameters, Pre-installation Preparation Work, Container Body Hoisting and Main Installation, Shielding Door System Installation and Commissioning, Ventilation Waveguide Window and Filter System Installation, Grounding System Construction and Equipotential Bonding, Internal System Installation and Cabling, Overall System Commissioning and Performance Testing, Shielding Effectiveness Professional Testing and Acceptance, Daily Maintenance and Care Specifications, Safety Operating Procedures and Precautions, After-sales Service and Technical Support
Internal Link Optimization Tags (Natural Anchor Text Placement)
Core Anchor Text: shielded container
Long-tail Anchor Text: industrial special shielded container installation and commissioning, electromagnetic shielding container shielding effectiveness testing, mobile shielded container construction plan
Related Anchor Text: electromagnetic shielding room, shielding cabinet, shielding room construction, special container customization
Preface

This manual is compiled in accordance with GB/T 50719-2011 “Technical Code for Electromagnetic Shielding Room Engineering”, GB/T 51103-2015 “Code for Construction and Quality Acceptance of Electromagnetic Shielding Room Engineering”, GB/T 12190-2021 “Measuring Methods for Shielding Effectiveness of Electromagnetic Shielding Enclosures”, and related special container technical standards. It is applicable to the on-site installation, system commissioning, performance testing, acceptance and delivery, and daily maintenance of all series of industrial special shielded containers manufactured by Guangzhou Lain Intelligent System Development Co., Ltd.
As a modular electromagnetic protection carrier, the shielded container integrates a six-sided metal shielding shell, high-performance shielding door, honeycomb waveguide ventilation system, power and signal filtering system, grounding equipotential system, and supporting machine room infrastructure. It can be rapidly deployed in outdoor industrial sites, military command posts, emergency communication stations, classified data centers, EMC test sites, and other scenarios, achieving core functions such as broadband electromagnetic shielding, information anti-leakage, and anti-electromagnetic interference.
This manual provides a detailed breakdown of the entire installation and commissioning process, clarifying the operating specifications, technical parameters, quality control points, and safety requirements for each procedure. The construction unit must strictly follow the implementation. For customized technical support, please contact the Guangzhou Lain technical support hotline at +86 13538869979 for professional guidance.
Chapter 1 Product Overview and Technical Parameters

1.1 Shielded Container Definition and Classification
1.1.1 Product Definition
A shielded container belongs to the high-end subcategory of industrial special containers. It uses a standard shipping container or customized steel structure container body as the carrier, with a complete continuous electromagnetic shielding shell constructed inside, integrating auxiliary systems such as filtering, ventilation, grounding, and power distribution, forming a movable, rapidly deployable enclosed electromagnetic protection space. Its essence is the modular integration of all functional modules of a fixed electromagnetic shielding room into the container body, balancing transportation convenience, deployment speed, and shielding performance stability. It is an important component of the modern electromagnetic security protection system.
1.1.2 Product Classification
According to shielding effectiveness levels, shielded containers can be divided into the following four categories:
Grade A Shielded Container: Basic protection level, suitable for general industrial anti-interference scenarios. Shielding effectiveness ≥60dB in the 10kHz~18GHz frequency band, capable of withstanding conventional electromagnetic interference and protecting normal electronic equipment operation.
Grade B Shielded Container: Standard confidential level, suitable for general classified office and ordinary data protection scenarios. Shielding effectiveness ≥80dB in the 14kHz~18GHz frequency band, meeting the national confidentiality bureau Grade B shielding room standard requirements.
Grade C Shielded Container: High confidentiality level, suitable for core classified sites and military communication stations. Shielding effectiveness ≥100dB in the 14kHz~18GHz frequency band, with full-band high attenuation for magnetic field, electric field, plane wave, and microwave, meeting high-level information anti-leakage requirements.
Military Standard Grade Shielded Container: Compliant with GJB5792-2006 military standards, featuring resistance to strong electromagnetic pulses, vibration and shock resistance, and wide temperature range operation capability, suitable for field military deployment, battlefield command, and other extreme operating conditions.
According to structural form, they can be divided into:
Integrated Shielded Container: Single container body with independent shielding space. Common specifications are 10-foot, 20-foot, and 40-foot standard container sizes, offering convenient transportation and deployment.
Modular/Spliced Shielded Container: Multiple container bodies spliced horizontally or vertically to form a larger shielding space, suitable for large equipment deployment and multi-person office needs. Special electromagnetic sealing structures are used at splice points to ensure shielding continuity.
Double-Layer Shielded Container: Inner and outer independent shielding shells with an insulating isolation layer in between, providing higher shielding effectiveness, suitable for extremely high confidentiality levels or strong electromagnetic radiation environments.
According to functional use, they can be divided into shielded machine room containers, EMC testing shielded containers, classified communication shielded containers, medical equipment shielded containers, industrial control shielded containers, and other subcategories.
1.2 Working Principle and Shielding Effectiveness Mechanism
1.2.1 Basic Principles of Electromagnetic Shielding
The core principle of electromagnetic shielding is to use a closed shell constructed of conductive and magnetically permeable materials to attenuate electromagnetic wave energy penetrating the shell through three mechanisms: reflection loss, absorption loss, and multiple reflection loss, achieving isolation between the internal and external electromagnetic environments.
Reflection Loss: When electromagnetic waves are incident on the surface of a metal shielding body, due to the wave impedance difference between air and metal, most of the electromagnetic waves are reflected at the interface and cannot enter the shielding body. Reflection loss is related to electromagnetic wave frequency and shielding material conductivity. The lower the frequency, the smaller the reflection loss. Low-frequency magnetic field shielding mainly relies on the magnetic shunting effect of high-permeability materials.
Absorption Loss: Electromagnetic waves that enter the shielding body induce eddy currents in the metal material. The reverse magnetic field generated by the eddy currents cancels the original magnetic field, while the thermal effect of the eddy currents converts electromagnetic energy into heat energy for dissipation. Absorption loss is positively correlated with material thickness, conductivity, magnetic permeability, and electromagnetic wave frequency. The higher the frequency, the greater the absorption loss.
Multiple Reflection Loss: Electromagnetic waves reflect back and forth between the two surfaces of the shielding body, further attenuating energy. When the shielding body thickness is much greater than the skin depth, multiple reflection loss can be neglected; in thin shielding bodies or low-frequency scenarios, the proportion of multiple reflection loss increases significantly.
1.2.2 Shielding Mechanism Differences Across Frequency Bands
Low Frequency Band (10kHz~100kHz): Dominated by magnetic field interference, with high shielding difficulty. This primarily relies on the magnetic shielding effect of high-permeability materials (such as cold-rolled steel plates, permalloy), reducing penetrating magnetic fields through magnetic shunting. It also requires the shielding body to be continuous without breakpoints, with good conductive contact at joints.
Mid Frequency Band (100kHz~1GHz): Dominated by electric fields and plane waves, relatively easier to shield. Ordinary conductive metal plates can achieve high shielding effectiveness. The core control points are leakage suppression at openings, gaps, and cable penetration points.
High Frequency Band (1GHz~40GHz): Microwave frequency band. Electromagnetic waves have extremely short wavelengths, and even tiny gaps or openings can cause significant leakage. This places extremely high demands on shielding body machining precision and sealing structure design. Waveguide cutoff principles must be used for ventilation openings and cable interfaces.
1.3 Shielded Container Structural Composition
A complete shielded container consists of seven core systems that work together to ensure overall shielding performance and functionality:
1.3.1 Shielding Shell System
The shielding shell is the core carrier of electromagnetic protection, using a six-sided fully enclosed welded structure, and is the foundational guarantee of shielding effectiveness.
Main Material: Standard configuration uses 2.0mm thick high-quality cold-rolled steel plates; high-grade models use 3.0mm thick steel plates, integrally welded. The exterior is fitted with a shipping container corrugated steel shell, combining structural strength with transportation protection.
Welding Process: All plate joints use continuous argon arc welding, with weld height not less than the plate thickness. After welding, grinding, descaling, and conductive anti-rust treatment are performed to ensure weld seam conductive continuity of not less than 85% of the base material.
Internal Support: Light steel keel reinforcement frames are installed internally to ensure structural strength while providing a fixed foundation for interior finishing and equipment installation.
Anti-corrosion Treatment: The inner side of the shielding steel plates undergoes galvanized passivation treatment; the outer side undergoes epoxy zinc-rich primer + fluorocarbon topcoat anti-corrosion treatment, meeting outdoor weather resistance requirements of more than 15 years.
1.3.2 Shielding Door System
The shielding door is the passage for personnel and equipment and is also one of the weakest points in shielding performance. Its performance directly determines the upper limit of overall shielding effectiveness.
Structure Type: Standard configuration is a manual knife-blade type shielding door; large-size models may use electric sliding shielding doors. Knife-edge sealing structure is adopted, with continuous beryllium copper spring fingers or conductive foam around the door leaf, forming 360° continuous conductive contact with the door frame knife edge.
Locking Mechanism: Multi-point eccentric locking structure is used, with 6~12 locking points per single door leaf, ensuring uniform contact pressure of the entire ring of spring fingers, with contact resistance ≤0.01Ω.
Specifications and Dimensions: Standard pedestrian door size is 900mm×2000mm; equipment passage doors can be customized to large sizes such as 1500mm×2200mm.
Auxiliary Functions: Equipped with door closers, observation windows, emergency escape locks, interior and exterior double handles, and other accessories to meet different scenario usage requirements.
1.3.3 Ventilation Waveguide Window System
To address the ventilation and heat dissipation needs of shielded spaces while preventing electromagnetic wave leakage through ventilation openings, honeycomb waveguide window structures must be used, leveraging waveguide cutoff principles to achieve both ventilation and shielding.
Working Principle: When the electromagnetic wave frequency is lower than the waveguide cutoff frequency, the electromagnetic wave attenuates rapidly within the waveguide tube and cannot propagate. Honeycomb waveguide windows are composed of a large number of parallel cutoff waveguide tubes, ensuring ventilation area while achieving electromagnetic shielding.
Material Specifications: 0.3mm thick tin-plated copper strip stamped into honeycomb structure, with single cell side length of 3.2mm and hole depth of 100mm. The cutoff frequency exceeds 10GHz, ensuring high-frequency band shielding effectiveness.
Installation Method: 360° annular welding with the shielding shell, with continuous weld seams without breakpoints. Protective grilles and dust filter screens are installed on the exterior.
Ventilation Capacity: Standard 20-foot shielded containers are equipped with 2 sets of 600mm×400mm waveguide windows, with ventilation capacity ≥0.5m³/s, meeting conventional equipment heat dissipation requirements. High heat dissipation scenarios can add more waveguide windows or be equipped with forced ventilation systems.
1.3.4 Filtering System
All power lines, signal lines, and control lines passing through the shielding shell act as “antennas” for electromagnetic waves entering and exiting. They must be processed through dedicated filters to cut off conducted coupling paths.
Power Filters: Single-phase or three-phase power filters are configured according to power supply capacity, with insertion loss ≥60dB (10kHz~1GHz), featuring both differential mode and common mode suppression capability. The input terminal is set outside the shielding body, output terminal inside the shielding body, with the housing connected to the shielding body in 360° low impedance.
Signal Filters: Corresponding interface signal filters are configured for different types of network, telephone, video, and control signals, ensuring normal signal transmission while suppressing electromagnetic interference coupling.
Fiber Optic Waveguides: Optical signals themselves do not conduct electromagnetic interference. When fiber optics pass through the shielding body, they must pass through metal waveguides that are reliably welded to the shielding body. Both ends are sealed after the fiber optic is threaded through.
Waveguide Interface Panels: Various signal interfaces are centrally arranged with unified shielding treatment, reducing leakage risks from scattered wall penetration points.
1.3.5 Grounding and Equipotential System
The grounding system is the foundation for stable shielding effectiveness performance while also serving lightning protection, antistatic, and equipment protective grounding functions.
Equipotential Bonding Bar: An annular purple copper equipotential bar is installed inside the shielding room, specification 25mm×3mm. All metal components, equipment housings, filter housings, and shielding door frames are reliably connected to the equipotential bar.
Grounding Down Conductors: Multi-strand copper core cables ≥25mm² are used, led from multiple points on the shielding body to the outdoor grounding grid. The conductors are short and straight without bends to reduce high-frequency impedance.
Outdoor Grounding Grid: Copper-clad steel ground rods + horizontal grounding conductors form a ring-shaped grounding grid. Combined grounding resistance ≤1Ω, independent shielding grounding resistance ≤4Ω.
1.3.6 Internal Infrastructure System
The shielded container interior is equipped with complete machine room infrastructure to meet direct equipment rack-mounting and usage requirements:
Antistatic Floor: 600mm×600mm all-steel antistatic floor, 350mm height, load-bearing capacity ≥1200kg/㎡, surface resistance 10⁶~10⁹Ω, featuring antistatic, fire-resistant, and wear-resistant properties.
Power Supply and Distribution System: Configured with intelligent distribution cabinets, residual current protection, surge protection, and filtered outlets, achieving tiered power distribution and electrical safety protection.
Lighting System: LED flat panel clean room lights, illumination ≥300lux, flicker-free, with power processed through filters to avoid introducing electromagnetic interference.
Air Conditioning and Temperature Control System: Optional wall-mounted air conditioners, precision air conditioners, or heat pipe heat exchange systems maintain interior temperature and humidity within equipment operating ranges.
Fire Protection and Security System: Configured with smoke detectors, heat detectors, heptafluoropropane gas fire suppression devices, access control systems, video surveillance, etc.
1.3.7 External Protection and Auxiliary Systems
Container Shell: Standard shipping container corrugated steel structure with reinforced corners, meeting hoisting, transportation, and stacking requirements.
Rain and Sun Protection: Rain-proof slope and drainage channels are provided on the roof; sunshade canopies can be installed externally to enhance outdoor environmental adaptability.
Leveling Support Legs: 8~12 adjustable support legs are configured at the bottom, adapting to uneven terrain for rapid horizontal leveling.
Identification and Labeling: Product nameplates, safety warning signs, and operating instruction signs are affixed to the exterior of the container.
1.4 Main Technical Parameters
1.4.1 Standard Model Specifications and Parameters
| Model | External Dimensions (L×W×H) | Internal Shielding Dimensions (L×W×H) | Shielding Effectiveness Grade | Rated Load Capacity | Applicable Scenarios |
|---|---|---|---|---|---|
| LA-PB-10 | 3000mm×2438mm×2591mm | 2800mm×2200mm×2200mm | Grade B (≥80dB) | 5000kg | Small sites, individual soldier communication |
| LA-PB-20 | 6058mm×2438mm×2591mm | 5850mm×2200mm×2200mm | Grade B/C | 10000kg | Standard machine room, testing room |
| LA-PB-40 | 12192mm×2438mm×2896mm | 11950mm×2200mm×2500mm | Grade B/C | 20000kg | Large data node, command center |
| LA-PB-J20 | 6058mm×2438mm×2591mm | 5800mm×2150mm×2150mm | Military standard | 12000kg | Military field deployment |
1.4.2 Core Performance Parameters
Shielding Effectiveness Parameters (Grade C Standard)
| Frequency Band | Shielding Effectiveness |
|---|---|
| Magnetic field: 14kHz | ≥70dB |
| Magnetic field: 150kHz | ≥95dB |
| Electric field: 200kHz~50MHz | ≥105dB |
| Plane wave: 50MHz~1GHz | ≥105dB |
| Microwave: 1GHz~18GHz | ≥95dB |
Structural Performance Parameters
| Parameter | Value |
|---|---|
| Wind resistance rating of container body | Level 12 |
| Seismic intensity | Degree 8 |
| Container body levelness deviation | ≤3mm/m |
| Shielding door opening/closing cycles | ≥100,000 times without performance degradation |
| Operating temperature range | -40℃~+60℃ |
| Storage temperature range | -55℃~+70℃ |
Electrical Performance Parameters
| Parameter | Value |
|---|---|
| Rated power supply | AC220V/380V 50Hz |
| Grounding resistance | Combined grounding ≤1Ω; independent grounding ≤4Ω |
| Insulation resistance | ≥2MΩ (electrical circuit to ground) |
| Surge protection | Power port 20kA (8/20μs) |
Environmental Adaptation Parameters
| Parameter | Value |
|---|---|
| Protection rating | Container shell IP54, shielding room interior IP30 |
| Anti-corrosion rating | C4 grade outdoor anti-corrosion |
| Fire resistance rating | Interior finishing materials Class A non-combustible |
| Noise level | ≤55dB(A) indoors during ventilation system operation |
1.5 Application Scenarios and Scope of Application
Leveraging the advantages of modular design, mobility, and rapid deployment, shielded containers are widely applied in the following fields:
Classified and Government Affairs Fields: Temporary office locations for classified units, mobile confidential meeting rooms, government data backup sites, meeting national confidentiality bureau electromagnetic protection requirements, preventing electromagnetic leakage of classified information.
Military and National Defense Fields: Field combat command centers, mobile communication hubs, radar station supporting shielding rooms, weapons and equipment testing sites, featuring electromagnetic pulse resistance and harsh environment resistance.
Data Center and Communication Fields: Edge computing nodes, emergency communication machine rooms, base station core equipment protection enclosures, resisting external electromagnetic interference and ensuring data transmission stability.
Industrial and Manufacturing Fields: Factory EMC testing workshops, precision electronic equipment production areas, industrial control system protection enclosures, avoiding equipment malfunctions and product testing errors caused by electromagnetic interference.
Medical and Scientific Research Fields: MRI equipment supporting shielding, precision instrument laboratories, electromagnetic compatibility testing sites, ensuring testing accuracy and experimental precision.
Emergency and Security Fields: Emergency command shelter units, public security technical investigation stations, fire communication support vehicles, rapidly building electromagnetic secure spaces to ensure communication and information security during emergency response.
1.6 Executive Standards and Regulatory Basis
This product’s design, production, installation, and acceptance strictly comply with the following national standards and industry specifications:
| Standard Number | Standard Name |
|---|---|
| GB/T 50719-2011 | Technical Code for Electromagnetic Shielding Room Engineering |
| GB/T 51103-2015 | Code for Construction and Quality Acceptance of Electromagnetic Shielding Room Engineering |
| GB/T 12190-2021 | Measuring Methods for Shielding Effectiveness of Electromagnetic Shielding Enclosures |
| GB 50462-2024 | Standard for Construction and Acceptance of Data Center Infrastructure |
| GB 50057-2010 | Code for Design of Protection of Structures Against Lightning |
| GB 50169-2016 | Code for Construction and Acceptance of Grounding Device of Electric Equipment Installation Engineering |
| GJB 5792-2006 | General Specification for Military Electromagnetic Shielding Rooms |
| BMB 19-2006 | Technical Requirements for Confidentiality Protection of Computer Information Systems Involving State Secrets |
| GB/T 1413-2008 | Series 1 Freight Containers – Classification, Dimensions and Ratings |
| GB 50016-2014 (2018 Edition) | Code for Fire Protection Design of Buildings |
Chapter 2 Pre-installation Preparation Work
2.1 Site Survey and Environmental Requirements
2.1.1 Site Survey Key Points
Before shielded container installation, professional technical personnel must conduct on-site survey, form a survey report, and confirm that installation conditions meet requirements. Key verification items include:
Site Space Conditions
| Check Item | Requirements |
|---|---|
| Installation area dimensions | Must exceed the container body exterior dimensions by at least 1.5m on each side, with reserved hoisting and construction working space; spliced containers require additional reserved splicing operation space |
| Overhead obstructions | No high-voltage cables, tree branches, or other obstructions above; no obstruction within the hoisting working radius, ensuring normal crane operation |
| Access road | Road width, turning radius, height limit, and weight limit must satisfy transportation vehicle and hoisting vehicle passage requirements |
Geological and Load-bearing Conditions
| Check Item | Requirements |
|---|---|
| Site foundation bearing capacity | ≥10t/㎡; avoid selecting sites on backfill soil, silt layers, or soft foundation areas; foundation reinforcement treatment must be performed in advance for poor geological conditions |
| Underground conditions | No pipelines, caves, tombs, or other concealed structures underground, avoiding damage to underground facilities or settlement risks during construction |
| Site levelness | Site level, slope ≤3°; low-lying areas must be backfilled and compacted in advance with drainage facilities installed |
Surrounding Environment Conditions
| Check Item | Requirements |
|---|---|
| Strong electromagnetic radiation sources | Maintain distance of at least 20m or more from strong electromagnetic radiation sources (such as high-power transmitting towers, high-voltage substations), avoiding strong electromagnetic environments exceeding shielding design load |
| Flammable, explosive, corrosive environments | Avoid such locations; additional protective measures are required if installation in such locations is unavoidable |
| Utility support | Power supply, grounding, drainage, and other basic supporting conditions available for system integration |
Meteorological and Environmental Conditions
- Coastal high salt spray areas require confirmation of anti-corrosion grade matching; high-altitude areas require consideration of the impact of thin air on heat dissipation and insulation.
- Multi-thunderstorm areas require enhanced lightning protection grounding design; severe cold areas require consideration of the impact of low temperatures on sealing materials and electrical equipment.
2.1.2 Installation Environment Technical Requirements
| Parameter | Requirements |
|---|---|
| Temperature | Construction environment temperature should be 5℃~35℃; welding and sealant application operations are prohibited below 0℃; heatstroke prevention and equipment cooling measures required in high-temperature weather |
| Humidity | Relative air humidity ≤85%, no condensation; outdoor open-air welding operations prohibited in rainy weather; shielded components must be dried before installation after becoming damp |
| Cleanliness | No large amounts of dust or airborne dust at the construction site; shielded component installation surfaces must remain clean, free of oil, dust, and rust, avoiding impact on conductive contact performance |
| Safety conditions | Warning barriers set up in the construction area; unauthorized personnel prohibited from entering; fire-fighting equipment provided; hot work approval procedures completed for welding operations with fire prevention measures in place |
2.2 Foundation Construction Specifications
The shielded container foundation is the key to ensuring container body structural stability and avoiding settlement deformation, while also providing the basis for grounding system construction. Construction must strictly follow the following specifications.
2.2.1 Foundation Type Selection
Select the corresponding foundation form according to site geological conditions and container specifications:
| Foundation Type | Applicable Scenarios | Features |
|---|---|---|
| Concrete strip foundation | Long-term fixed installation, general geological conditions | Concrete strip foundations poured along the main load-bearing beam positions at the container bottom, high bearing capacity, uniform settlement |
| Concrete integral platform | Multi-container splicing, high-precision requirements | Integrally poured reinforced concrete platform, high flatness, convenient for container leveling and splicing |
| Point-type independent foundation | Temporary deployment, good geological conditions | Concrete piers poured at container support leg positions, quick construction, reusable |
| Hardened ground direct placement | Indoor or already hardened solid ground | When ground bearing capacity meets requirements, the container can be placed directly, leveled through adjustable support legs |
2.2.2 Concrete Foundation Construction Process
Site Leveling and Layout
1. Remove surface topsoil and debris; compact the base layer with rollers or compactors, compaction degree ≥95%.
2. Lay out positioning lines according to container dimensions, marking foundation outline lines and elevation control points, deviation ≤10mm.
3. Set drainage slope, foundation top slope 1.5%, with drainage channels around the perimeter to prevent water accumulation from soaking the foundation.
Cushion Layer Construction
1. Lay 100~150mm thick crushed stone cushion layer, particle size 5~10cm, compacted in layers, each layer thickness ≤10cm, compaction degree ≥95%.
2. Pour 50mm thick C15 plain concrete leveling layer on top of the cushion layer, surface finished smooth, serving as the reference plane for foundation construction.
Reinforcement Binding and Formwork Installation
1. Strip foundations use Φ12mm rebar with bound reinforcement cages, spacing 200mm, protective layer thickness 40mm.
2. Formwork uses steel or wood formwork with secure support, ensuring accurate geometric dimensions and tight joints without mortar leakage.
3. Pre-embed grounding electrode outlet terminals, fixing embedded parts, etc. in advance, position deviation ≤5mm.
Concrete Pouring and Curing
1. Use C30 ready-mixed concrete for continuous pouring, thoroughly vibrated and compacted, free of honeycomb, pitting, or voids.
2. Pre-embedded steel plates or leveling embedded parts are installed on the foundation top surface, top surface elevation deviation ≤2mm.
3. Cover and water-cure within 12 hours after pouring, curing period not less than 7 days, freeze protection measures required for winter construction.
Foundation Acceptance
| Acceptance Item | Standard |
|---|---|
| Foundation dimensional deviation | Length and width ±10mm, elevation ±5mm, flatness ≤3mm/m |
| Foundation strength | Container hoisting operations may only proceed after foundation strength reaches 100% of design strength |
2.2.3 Grounding Grid Pre-embedding Construction
The outdoor grounding grid pre-embedding is completed simultaneously during the foundation construction phase to avoid secondary excavation later:
| Step | Operation |
|---|---|
| Grounding trench excavation | Excavate grounding trench 0.5m from foundation perimeter, depth ≥0.8m, width 0.4m |
| Horizontal grounding conductor installation | Lay 40mm×4mm galvanized flat steel horizontal grounding conductors at trench bottom, with arc transitions at corners, anti-corrosion treatment at welds |
| Ground rod installation | Drive one φ14mm copper-clad steel ground rod every 2m, length 2.5m, reliably welded to horizontal grounding conductors |
| Outlet terminals | Reserve 2~4 grounding outlet terminals, led to foundation side surfaces, clearly marked for later connection to the shielded container |
| Backfill | Use fine soil, remove stones and debris, compact in layers to ensure stable grounding resistance |
2.3 Construction Tools and Testing Equipment List
2.3.1 Hoisting and Installation Tools
| Tool Name | Specification/Model | Quantity | Purpose |
|---|---|---|---|
| Truck crane | 25t/50t (selected according to container weight) | 1 unit | Container body hoisting and positioning |
| Forklift | 3t | 1 unit | Accessory and equipment handling |
| Manual chain hoist | 5t | 2 units | Container body fine adjustment, splicing tensioning |
| Hydraulic jack | 10t | 4 units | Container body lifting and leveling |
| Torque wrench | 50~300N·m | 2 units | High-strength bolt tightening |
| Electric wrench | Impact type | 2 units | Ordinary bolt tightening |
| Level | Laser high precision | 1 unit | Levelness and verticality measurement |
| Theodolite | Electronic theodolite | 1 unit | Container positioning, verticality calibration |
| Steel tape measure | 5m/50m | 2 of each | Dimensional measurement |
| Feeler gauge | 0.02~1mm | 2 units | Gap and contact clearance measurement |
2.3.2 Welding and Fabrication Tools
| Tool Name | Specification/Model | Quantity | Purpose |
|---|---|---|---|
| Argon arc welding machine | WS-315 | 2 units | Shielding body welding |
| CO₂ gas shielded welding machine | NBC-350 | 1 unit | Steel structure welding |
| Angle grinder | φ100mm | 4 units | Weld grinding, descaling |
| Electric drill | Impact drill/cordless drill | 2 of each | Drilling, fastening |
| Cutting machine | Profile cutting machine | 1 unit | Profile and plate cutting |
| Files | Flat file, half-round file | 2 of each | Burr finishing |
| Wire brush | Stainless steel | 10 units | Descaling, contact surface cleaning |
| Heat gun | 2000W | 2 units | Sealant heating, material drying |
2.3.3 Testing Instruments and Equipment
| Equipment Name | Specification/Model | Quantity | Purpose |
|---|---|---|---|
| Ground resistance tester | Clamp type/three-point method | 1 unit | Ground resistance measurement |
| Insulation resistance tester | 500V/1000V | 1 unit | Electrical insulation performance testing |
| Multimeter | High precision digital | 2 units | Voltage, resistance, continuity measurement |
| Milliohm meter | Low resistance tester | 1 unit | Conductive contact resistance measurement |
| Field strength meter | 10kHz~18GHz | 1 set | Preliminary shielding effectiveness testing |
| Anemometer | Thermal type | 1 unit | Ventilation volume testing |
| Temperature and humidity meter | High precision | 2 units | Environmental temperature and humidity monitoring |
| Illuminance meter | Digital | 1 unit | Lighting illumination testing |
| Torque calibration instrument | Matching torque wrench | 1 set | Torque wrench calibration |
2.3.4 Auxiliary Materials and Safety Protection
Conductive Materials: Conductive paste, beryllium copper spring fingers, conductive foam, purple copper strip, tin-plated copper braided strap
Sealing Materials: Electromagnetic sealing compound, waterproof sealant, anti-rust paint, epoxy zinc-rich primer
Fasteners: High-strength bolts, nuts, flat washers, spring washers, stainless steel self-tapping screws
Safety Protection: Safety helmets, safety belts, insulating gloves, protective goggles, dust masks, fire extinguishers, first aid kits
2.4 Construction Personnel Configuration and Qualification Requirements
2.4.1 Personnel Organization Structure
Shielded container installation and commissioning is a specialized engineering project requiring the formation of a professional construction team with the following positions:
| Position | Quantity | Responsibilities | Qualification Requirements |
|---|---|---|---|
| Project manager | 1 | Overall project schedule, quality, safety management; coordination of all resources | 3+ years of management experience in similar projects |
| Technical manager | 1 | Technical disclosure, construction plan implementation, quality control point management, technical issue resolution | Intermediate or above professional title in electromagnetic shielding engineering |
| Hoisting operation team | 2~3 | Container body hoisting and positioning | Including crane operator and signal rigger, holding special operation certificates |
| Shielding installation team | 4~6 | Shielding body splicing, shielding door installation, filter system installation | Including welders, sheet metal workers, and installation fitters; welders hold special equipment operation certificates |
| Electrical construction team | 2~3 | Power distribution, grounding, cabling, system commissioning | Including electricians and low-voltage engineers, holding electrician special operation certificates |
| Testing and acceptance team | 2 | Various performance tests, data recording, acceptance documentation | Familiar with shielding effectiveness testing standards |
| Safety officer | 1 | On-site safety management, safety disclosure, hazard inspection | Holding safety officer certificate |
2.4.2 Personnel Qualification and Training Requirements
1. Special operation personnel (welders, electricians, crane operators, riggers) must hold valid special operation certificates; unqualified personnel are strictly prohibited from working.
2. All construction personnel must undergo safety training and technical disclosure before entering the site, and be familiar with the construction plan, operating specifications, safety risk points, and emergency response procedures.
3. Shielding professional installation personnel must undergo manufacturer-specific training, be familiar with shielded container structural principles, installation process key points, and quality control standards, and may only work after passing assessment.
4. Aerial work personnel must pass physical examinations, free of contraindicated conditions such as hypertension and heart disease, wear safety belts during work, and comply with aerial work regulations.
2.5 Product Unpacking Inspection and Accessory Verification
After the shielded container arrives at the site, unpacking inspection must be conducted in the presence of manufacturer technical personnel to verify product and accessory completeness and confirm no damage during transportation.
2.5.1 Container Body Exterior Inspection
| Inspection Item | Content |
|---|---|
| Exterior condition | Check the overall appearance of the container body, confirm no collision deformation, large-area paint loss, or rust; record the position and extent of any impacts |
| Structural components | Check container corner fittings, door locks, hinges, and other structural components for integrity, normal opening/closing, and any breakage or deformation |
| Sealing elements | Check for detachment or cracking of sealing strips, cracking or rust at welds, and integrity of rain protection facilities |
| Nameplate | Verify nameplate information, confirming model, specification, and factory number match the contract |
2.5.2 Internal Component Inspection
| Inspection Item | Content |
|---|---|
| Shielding shell | Open the shielding door and check the internal shielding shell for deformation, weld detachment, or rust |
| Shielding door | Check for deformation or detachment of door spring fingers, impact damage to knife edges, and flexible door lock operation |
| Pre-installed components | Check waveguide windows, filters, grounding bars, and other pre-installed components for integrity, secure fastening, and transportation loosening |
| Interior facilities | Check antistatic floor, lighting fixtures, distribution cabinets, and other interior facilities for damage or displacement |
2.5.3 Accessories and Documentation Verification
Verify accessories, spare parts, and documentation against the packing list item by item to confirm completeness:
Accessories Category:
- Spare shielding spring fingers, conductive paste, sealing compound, special tools, fastener spares, grounding cables, filter outlets
Documentation Category:
- Product certificate of conformity, factory test report, installation manual, electrical schematic diagram, grounding system diagram, spare parts list, warranty card
Record any missing or damaged components, promptly contact the manufacturer for replenishment or replacement. Construction must not be forced to proceed when installation conditions are not satisfied.
2.5.4 Inspection Precautions
1. Unpacking inspection must be conducted on a level, dry site, avoiding unpacking in rainy or dusty conditions.
2. Document the inspection process with photo/video records and written records, signed and confirmed by all parties, serving as the basis for acceptance and claims.
3. After inspection, protect components not yet installed from moisture, dust, and theft, and store them properly.
2.6 Construction Safety Disclosure and Risk Prevention
2.6.1 General Construction Safety Requirements
1. Strictly implement the policy of “Safety First, Prevention Oriented, Comprehensive Management”, implement the work safety responsibility system, and all operations shall comply with safety operating procedures.
2. Safety helmets must be worn when entering the construction site, safety belts for aerial work, insulating shoes for electrical work, and labor protection equipment used as specified.
3. Warning signs and barriers must be set up in the construction area, non-construction personnel prohibited from entering, and warning lights installed at night.
4. Daily pre-shift safety meetings held to clarify the day’s work content and risk points, with post-shift safety review.
2.6.2 Main Risk Points and Prevention Measures
Hoisting Operation Risks
| Item | Content |
|---|---|
| Risk | Hoisting fall, container collision, personnel crushing injury |
| Prevention | Check slings and wire ropes for integrity before hoisting, rated load meets requirements; dedicated person directs hoisting with clear and uniform signals; personnel strictly prohibited within hoisting radius; stop hoisting operations when wind force ≥Level 6 |
Welding Operation Risks
| Item | Content |
|---|---|
| Risk | Fire, burns, electric shock, arc radiation injury |
| Prevention | Clear flammable and explosive materials from welding area, equip with fire extinguishers; welders wear protective face shields and gloves; welding machine reliably grounded, cables free of damage; hot work approval procedures completed with dedicated fire watch personnel |
Electrical Operation Risks
| Item | Content |
|---|---|
| Risk | Electric shock, short circuit fire |
| Prevention | Strictly implement power-off work system with lockout/tagout; energized commissioning with dedicated supervision; use qualified insulating tools; standardized wiring, prohibit unauthorized electrical connections |
Aerial Work Risks
| Item | Content |
|---|---|
| Risk | Fall from height, object impact |
| Prevention | Use qualified scaffolding or working platforms for aerial work; safety belts hooked high and anchored low; tools placed in tool bags, strictly prohibit throwing objects up or down |
Confined Space Operation Risks
| Item | Content |
|---|---|
| Risk | Oxygen deficiency, harmful gas accumulation, electric shock |
| Prevention | Confirm adequate ventilation before entering the shielding room, external personnel on watch during interior work; use safety voltage lighting inside; prohibit prolonged enclosed work inside |
2.6.3 Emergency Response Plan
1. First aid kits and first aid personnel are available on site. In case of personnel injury, immediately stop work, provide first aid, and call 120 for severe cases.
2. In case of fire, immediately cut off power, use fire extinguishers to extinguish, evacuate personnel and call 119 for major fires.
3. In case of major accidents such as hoisting failures or structural collapse, immediately evacuate from the danger zone, report to the project manager and relevant departments, and activate the emergency rescue plan.
Chapter 3 Container Body Hoisting and Main Installation
3.1 Hoisting Plan Development and Equipment Selection
3.1.1 Hoisting Plan Development Key Points
Shielded container hoisting is a heavy lift operation. A dedicated hoisting plan must be developed and approved before construction. The plan shall include the following contents:
| Item | Content |
|---|---|
| Project overview | Container parameters, weight, hoisting position, working environment |
| Hoisting equipment selection | Crane model, sling specifications, hoisting stance |
| Hoisting process | Sling point setup, lifting height, positioning path, positioning accuracy requirements |
| Personnel configuration | Operator, signalperson, rigger roles and qualifications |
| Quality control points | Container protection, positioning accuracy, anti-collision measures |
| Safety assurance measures | Risk identification, protection measures, emergency response plan |
3.1.2 Hoisting Equipment Selection
Select the appropriate crane according to container weight and hoisting radius:
| Container Type | Self-weight | Hoisting Radius | Recommended Crane |
|---|---|---|---|
| 10-foot shielded container | Approximately 3.5t | ≤8m | 8t truck crane |
| 20-foot shielded container | Approximately 6.5t | ≤10m | 25t truck crane |
| 40-foot shielded container | Approximately 12t | ≤12m | 50t truck crane |
| Multi-container splicing or confined sites | Based on actual operating conditions | Calculated per actual conditions | Double-crane lifting if necessary |
Sling Selection Standards:
| Item | Requirement |
|---|---|
| Sling type | Use dedicated container slings or high-strength nylon lifting slings; prohibit direct bundling of container corners with wire ropes to prevent damage to anti-corrosion coating and structure |
| Sling rated load | Not less than 2 times the container weight; inspect before use for damage, broken wires, or aging |
| Lifting points | Must use the standard corner fitting lifting holes on the container roof, four-point lifting to ensure uniform force distribution; single-point or two-point lifting is prohibited |
3.1.3 Pre-hoisting Inspection and Confirmation
| Check Item | Content |
|---|---|
| Crane outriggers | All outriggers fully extended, pads firmly laid, ground solid, crane levelness meets requirements |
| Slings and shackles | Intact, specifications match, securely connected |
| Container interior | No loose objects inside, doors and windows closed and locked to prevent falling during hoisting |
| Hoisting path and positioning area | Obstacles cleared, confirmed no personnel or unrelated equipment within working radius |
| Test lift | Lift the container 100~200mm, hold for 3 minutes, check crane stability, sling loading, and container balance; proceed with formal lifting only after confirming no abnormalities |
3.2 Container Body Hoisting and Positioning Operation Procedure
1. Positioning Layout Verification: Mark container installation boundary lines and center lines on the foundation, mark four corner positions, verify against design drawings, deviation ≤5mm.
2. Lifting and Transport: Slowly raise the crane hook, lift the container above the ground, maintain the container level, and traverse the container to directly above the positioning position through boom rotation and luffing.
3. Lowering and Positioning: Direct the crane to slowly lower. When the container bottom is 300mm from the foundation surface, pause, manually assist in adjusting the container orientation so that the container boundary lines align with the positioning lines.
4. Initial Positioning: Continue slowly lowering the container. Stop when the support legs contact the foundation. Check container position deviation; if deviation is significant, re-lift and adjust.
5. Temporary Fixation: After the container is in position, initially load the support legs. Only after the container is stable may the slings be removed. Temporarily install wind-resistant guy ropes to prevent container overturning.
3.3 Multi-Container Splicing Installation Process
For spliced shielded containers, horizontal or vertical splicing of multiple container bodies is required to ensure structural connection integrity and shielding performance continuity.
3.3.1 Pre-splicing Preparation
| Preparation Item | Content |
|---|---|
| Positioning verification | Confirm both container bodies are accurately positioned, splicing faces aligned, flatness and height difference meet requirements |
| Surface cleaning | Clean shielded steel plates at splicing faces, remove oil, rust, and dust, ensuring clean contact surfaces |
| Material preparation | Prepare dedicated splicing connectors, conductive gaskets, sealing materials, and welding equipment |
3.3.2 Structural Splicing and Fixation
| Step | Operation |
|---|---|
| Container alignment | Use tensioning devices to slowly bring the two container bodies together, controlling the splicing gap at 5~10mm; adjust container levelness and verticality to ensure the splicing faces align on all sides |
| Bolt installation | Install bottom connection bolts first, then top and side connection bolts, using diagonal tightening sequence, progressively and evenly tightened to design torque |
| Structural check | After frame connection is completed, check overall structural stability; no misalignment or deformation at splicing points |
3.3.3 Shielding Continuity Treatment
After structural splicing is completed, priority treatment of the electromagnetic shielding continuity at splicing seams is required. This is the core control point of spliced container performance:
| Treatment Item | Operation |
|---|---|
| Inner seam welding | Continuous argon arc welding at inner splicing seams, weld height not less than 2mm, continuous without breakpoints, porosity, or cold welding |
| Weld finishing | Grind welds after welding, remove slag and protrusions to ensure smooth surfaces |
| Conductive sealing | Apply double-layer conductive foam or beryllium copper spring fingers on the inner side of splicing seams, in tight contact with both sides of the shielding body, forming redundant shielding sealing |
| Outer waterproofing | Apply weather-resistant sealant at outer splicing seams, install rain-proof cover plates to prevent rainwater infiltration |
3.4 Container Levelness and Verticality Calibration
3.4.1 Levelness Calibration
Use a laser level to measure the elevation at the four corner points and the center point of the floor inside the container, and record the level deviation values.
Calibrate the levelness point by point by adjusting the height of the adjustable support legs at the bottom. After each leg adjustment, re-measure to avoid mutual interference between adjustments.
Calibration standard: Overall flatness of the container ≤ 3 mm, deviation per meter of length ≤ 1 mm; surface levelness of the anti-static floor ≤ 2 mm/m.
After level calibration is complete, tighten the leg locking nuts to prevent loosening; place steel shims between the leg bottoms and the foundation contact area to increase the load-bearing surface area.
3.4.2 Verticality Calibration
Use a theodolite or straightedge to measure the verticality of the four facades of the container, measuring the deviation between upper and lower points in the height direction.
Verticality deviation requirement: ≤ H/1000 (H = container height), and total deviation ≤ 10 mm.
If the verticality deviation exceeds the standard, correct it by adjusting the heights of the support legs on both sides, while also checking foundation settlement conditions.
For multi-container splicing, the verticality of adjacent containers must be consistent, and the gaps at the upper and lower sections of the splicing surfaces must be uniform.
3.5 Container Fixing and Wind/Earthquake Resistance Treatment
3.5.1 Bottom Fixing
For long-term fixed installation of shielded containers, weld and fix the bottom support legs to the foundation embedded parts, or use chemical anchor bolts for anchoring.
Each container shall have no fewer than 8 fixing points. The main load-bearing beam positions must be fixed, and the fixing components shall be treated with anti-corrosion coating.
After fixing is complete, re-verify container levelness to avoid deformation caused by the fixing process.
3.5.2 Wind Reinforcement
In strong wind areas such as coastal regions and open terrain, wind-guard cables shall be installed, using steel wire ropes with turnbuckles, pulling the four corners of the container diagonally to ground anchor points.
The angle between the cables and the ground should be 45°–60°, and the bearing capacity of the ground anchor points must meet anti-pull-out requirements.
Place rubber pads at the contact points between cables and the container to prevent abrasion of the container’s anti-corrosion coating.
3.5.3 Seismic Reinforcement
In regions with seismic fortification intensity of 8 degrees or above, internal equipment in the container requires seismic reinforcement. Equipment racks must be securely connected to the floor and walls.
Internal pipelines in the container shall use flexible connections to prevent rupture from pulling during earthquakes.
The shielding door shall be equipped with seismic limit devices to prevent door body shaking, collision, and damage during earthquakes.
3.6 Splice Seam Shielding and Sealing Treatment
All splicing gaps and installation seams of the shielding container must undergo professional electromagnetic sealing treatment to eliminate gap leakage.
3.6.1 Gap Leakage Principle
The degree of electromagnetic wave gap leakage is related to gap length, depth, shape, and electromagnetic wavelength: when the gap length approaches or exceeds 1/2 wavelength, effective radiation forms, causing severe leakage; the higher the frequency, the shorter the wavelength, and the more severe the leakage caused by the same gap. Therefore, the core of shielding seam treatment is to reduce the equivalent gap length, increase gap depth, and ensure conductive continuity.
3.6.2 Conductive Sealing Technology
Welding seal: Permanent seams shall prioritize continuous welding — this is the most reliable sealing method; after welding, clean the slag and apply conductive anti-rust paint.
Conductive gasket seal: For demountable seams, use beryllium-copper contact strips, conductive foam, conductive rubber, and other gaskets. The gasket must be continuous without breaks, and joints shall use an overlapping method with overlap length ≥ 20 mm.
Conductive adhesive seal: Fill fine gaps with conductive adhesive, ensuring full filling and forming a continuous conductive layer after curing.
Multi-layer redundant sealing: High-grade shielding seams adopt a three-layer sealing structure of “welding + contact strips + conductive adhesive” to ensure no leakage across the full frequency band.
3.6.3 Quality Inspection
Visual inspection: Sealing gaskets installed flat, without twisting or detachment; weld seams continuous and smooth, without pores or cracks.
Contact resistance test: Measure conductive continuity across both sides of the seam; contact resistance ≤ 0.01 Ω qualifies as acceptable.
Post-installation performance test: Verify no obvious seam leakage through shielding effectiveness testing.
4.1 Classification and Structural Composition of Shielding Doors
4.1.1 Shielding Door Classification
The shielding door is the most critical movable shielding component of the shielded container. It can be classified into multiple types based on different dimensions:
By opening method:
| Type | Description |
|---|---|
| Manual swing shielding door | Most common type; simple structure, high reliability, suitable for routine personnel passage |
| Manual sliding shielding door | Saves opening space, good sealing performance, suitable for space-constrained scenarios |
| Electric shielding door | Motor-driven opening/closing with automatic control, suitable for large-size doors or high-frequency passage scenarios |
| Emergency escape shielding door | Single-direction opening with push-bar lock, meeting fire evacuation requirements |
By sealing structure:
| Type | Description |
|---|---|
| Knife-edge (insertion-type) shielding door | Metal knife edges are set around the door leaf, with beryllium-copper contact strips at corresponding positions on the door frame; the knife edges insert into the contact strips forming multi-line contact, providing high shielding effectiveness — mainstream structure |
| Flat-pressure shielding door | Door leaf and frame contact on a flat plane with conductive sealing gasket in between, relying on locking pressure for sealing; simple structure, suitable for medium-low grade shielding |
| Inflatable shielding door | Door frame equipped with inflatable sealing tube; after inflation, it expands and presses against the door leaf, providing uniform contact and good high-frequency shielding performance, suitable for high-frequency, high-grade shielding |
4.1.2 Structural Composition of Knife-Edge Shielding Door
A standard knife-edge shielding door consists of five parts: door frame assembly, door leaf assembly, locking mechanism, conductive sealing assembly, and auxiliary accessories.
Door frame assembly: Steel welded door frame, surface zinc-plated, with contact strip mounting grooves around the perimeter, reserved grounding terminals, welded and fixed to the shielding wall — serving as the installation datum for the door.
Door leaf assembly: Steel plate welded door leaf with internal stiffening ribs; continuous metal knife edges set around the perimeter, with the knife edge surfaces silver-plated to reduce contact resistance; the exterior of the door leaf is treated with anti-corrosion finishing, and the interior is made of the same material as the shielding enclosure.
Locking mechanism: Uses an eccentric wheel multi-point locking system. Turning the handle drives the connecting rods and eccentric locking points to press the door leaf uniformly toward the door frame, ensuring close contact between the full perimeter knife edges and contact strips; configured with multiple locking points on top, bottom, left, and right for uniform force distribution.
Conductive sealing assembly: The core is the beryllium-copper contact strip, made from high-quality beryllium bronze strip by stamping forming, followed by aging heat treatment — providing good elasticity, high conductivity, and wear resistance; the contact strips are continuously installed in the door frame grooves, forming a 360° ring seal.
Auxiliary accessories: Including door handles, door closers, observation windows, door locks, limit blocks, hinges, etc., providing opening/closing, positioning, and observation functions.
4.2 Door Frame Installation and Positioning Calibration
4.2.1 Pre-Installation Preparation
Check that the door frame, door leaf, and accessories are intact, that knife edges have no damage or deformation, and that contact strips have no detachment or breakage.
Clean the shielding wall cutout at the door opening, remove burrs and weld slag, measure the door opening dimensions, and verify against the door frame dimensions, reserving installation adjustment allowance.
Prepare installation tools: level, plumb line, jack, feeler gauge, torque wrench, welding equipment.
4.2.2 Door Frame Positioning and Temporary Fixing
Place the door frame into the door opening, place adjustable shims underneath, and perform initial height adjustment.
Use a plumb line and level to calibrate the verticality and levelness of the door frame, ensuring the frame is square, with diagonal deviation ≤ 2 mm.
Reserve a 3–5 mm adjustment gap between the door frame and the shielding wall, temporarily fix with wedges, and repeatedly measure accuracy during the adjustment process.
Calibration standards:
| Item | Standard |
|---|---|
| Door frame verticality | ≤ 1.5 mm/m, total deviation ≤ 3 mm |
| Door frame levelness | ≤ 1.5 mm/m |
| Door frame flatness | ≤ 2 mm |
| Door opening diagonal difference | ≤ 3 mm |
4.2.3 Door Frame Welding and Fixing
After accuracy calibration is qualified, first spot-weld the four corners of the door frame for temporary fixing, then re-verify accuracy to confirm no deformation.
Use segmented and symmetrical welding to fully weld the door frame to the shielding wall, avoiding continuous welding which may cause heat deformation of the door frame.
TIG welding (argon arc welding) is used, with weld height ≥ 2 mm, continuous without breaks, ensuring conductive continuity and structural strength.
After welding, allow natural cooling, then re-measure the door frame accuracy. If deformation exceeds the standard, corrective treatment is required.
Clean weld slag and apply conductive anti-rust paint at the weld areas for anti-corrosion treatment.
4.3 Door Leaf Installation and Hinge Commissioning
4.3.1 Door Leaf Hoisting and Positioning
Shielding door leaves are heavy (standard door approximately 150–300 kg); use manual hoists or special fixtures for assisted installation to avoid damage from manual handling and personnel injury.
Move the door leaf to the corresponding position of the door frame, align the hinge shaft holes, insert the hinge pins, and secure the hinge bases.
Protect the knife edges and contact strips during installation to avoid collision deformation; strictly prohibit forceful prying or hammering.
4.3.2 Hinge Gap Adjustment
After door leaf installation, adjust the hinge shims so that the gaps between the door leaf and door frame are uniform on all sides, with deviation in gaps on top, bottom, left, and right ≤ 1 mm.
Check door leaf flatness; the parallelism between the door leaf and door frame shall be ≤ 2 mm.
Open and close the door leaf repeatedly several times, checking that the hinges rotate freely without sticking or abnormal noise; apply lubricating grease if necessary.
Adjust the door closer force so that the door leaf closes smoothly and steadily at moderate speed without violent impact.
4.4 Conductive Contact Strip and Sealing Gasket Installation
4.4.1 Beryllium-Copper Contact Strip Installation Specification
Before installation, inspect the contact strip appearance — no deformation, cracks, or corrosion, with good elasticity.
Install the contact strips into the dedicated retaining grooves on the door frame, embedding segment by segment, ensuring the bottom fits tightly against the groove bottom without lifting or suspension.
Contact strip joints use 45° beveled overlapping connection, with overlap length ≥ 15 mm; joints are flat without steps, and the entire ring is continuous without breaks.
Contact strips are secured with dedicated retaining clips or countersunk screws, with fixing point spacing ≤ 100 mm, firmly fixed without loosening.
After installation, wipe the contact strip surface with a clean cotton cloth to remove oil and dust, ensuring good conductive contact.
4.4.2 Knife Edge and Contact Strip Engagement Commissioning
Slowly close the door leaf and observe the state of knife edge insertion into the contact strips, ensuring the knife edge is aligned with the center position of the contact strip — no skewing or scraping.
Knife edge insertion depth shall be controlled at 8–12 mm, with uniform insertion depth around the entire perimeter and deviation ≤ 2 mm.
After the door leaf is fully closed, use a feeler gauge to check the contact gap around the entire perimeter. Any position’s gap must be ≤ 0.05 mm to ensure effective contact.
If local contact is poor, adjust the contact strip position or add shims until reliable contact around the entire perimeter is achieved.
Apply a thin, uniform layer of conductive grease to the contact strip surface to reduce contact resistance, prevent oxidation, and improve conductive stability.
4.4.3 Auxiliary Sealing Installation
Install a waterproof sealing rubber strip on the outer side of the door leaf, fitting against the container outer shell to provide rain sealing, preventing rainwater from entering the door interior and corroding the shielding structure.
Install a floor sweep seal at the door bottom for both dust prevention and auxiliary shielding functions.
Seal around the observation window perimeter with conductive sealing adhesive to ensure shielding continuity at the observation window.
4.5 Door Lock System Installation and Locking Force Commissioning
4.5.1 Locking Mechanism Installation
Install the door lock handle, transmission connecting rods, and eccentric locking points according to the drawings. All connecting components must be securely fastened and rotate freely.
Adjust the locking point positions so that the locking points engage accurately into the lock receptacles when the door closes, with a smooth locking process and no sticking.
Install interior and exterior handles and locks, enabling opening/closing from both sides; the configured lock can be engaged to prevent unauthorized personnel from opening.
4.5.2 Locking Force Commissioning
Locking force is the key to ensuring shielding performance. Insufficient locking force results in high contact resistance and low shielding effectiveness; excessive locking force accelerates contact strip wear and makes opening/closing laborious.
Adjust the eccentric amount of the eccentric locking points to regulate locking pressure. Standard locking force shall be controlled at 80–120 N per locking point.
The contact pressure on the contact strips around the entire perimeter must be uniform. Use pressure-sensitive film to check contact impressions, which must be continuous without breaks.
After commissioning is complete, apply thread-locking adhesive to the locking nuts to prevent loosening and displacement during use.
4.5.3 Opening/Closing Performance Testing
Manually open and close the door leaf 20 times, checking for smooth operation, sticking, abnormal noise, or looseness.
Check that the door lock engages and releases smoothly with clear position sensing, without false locking.
Test the door closer function; the door leaf must close automatically, smoothly, and lock without rebound or impact.
Emergency lock test: Trigger the emergency escape lock, and the door leaf must open outward quickly, meeting fire evacuation requirements.
4.6 Shielding Door Shielding Performance Verification
After door installation is complete, use a field strength meter for preliminary leakage detection. Move the probe around the door perimeter to check for obvious leakage points.
Focus on detecting vulnerable areas such as the four corners of the door seam, locking point positions, hinge positions, and observation window perimeters.
When obvious leakage points are found, mark the positions, re-adjust the sealing structure or install additional contact strips, until leakage is eliminated.
Final shielding effectiveness must be verified through full-frequency-band professional testing; specific methods are detailed in Chapter 9.
4.7 Special Commissioning Points for Electric Shielding Doors
Electric shielding doors are additionally equipped with a drive system and control system, requiring the following additional commissioning items:
Motor and transmission commissioning: Adjust the motor speed and drive chain tension; the door body must run smoothly and at uniform speed, with no impact on start and stop.
Limit commissioning: Set open and close position limits to ensure the door body positions accurately without over-travel or under-travel.
Safety protection commissioning: Test the anti-pinch function — the door body must automatically reverse when encountering obstacles during closing; test the emergency stop function — pressing the emergency stop button must immediately halt the door body.
Control function commissioning: Test button control, remote control, access control integration, and other control methods; all functions must operate normally with correct logic.
Power failure emergency function: Cut off the power supply and test the manual opening/closing function, ensuring the door can be opened manually in the event of a power failure.
5.1 Honeycomb Waveguide Window Installation Process
5.1.1 Waveguide Window Operating Principle and Selection
The honeycomb waveguide window is the core component for ventilation and heat dissipation in shielded spaces. It operates on the cutoff waveguide principle: when the electromagnetic wave frequency is below the waveguide’s cutoff frequency, the wave attenuates exponentially within the waveguide tube and cannot penetrate; while air can pass through freely, thus achieving “ventilation without wave leakage.”
Cutoff frequency formula: fc = c / (2a), where c is the speed of light and a is the wide-side dimension of the waveguide.
The smaller the honeycomb cell side length and the greater the cell depth, the higher the cutoff frequency and the better the high-frequency shielding performance — but the greater the ventilation resistance. A balance must be struck between shielding performance and ventilation volume.
Standard configuration: Honeycomb cell side length 3.2 mm, cell depth 100 mm, cutoff frequency > 10 GHz, meeting the high-frequency shielding requirements of most scenarios; for higher frequency band requirements, the 1.6 mm aperture specification can be selected.
5.1.2 Installation Position and Opening Requirements
Intake waveguide windows are arranged at the lower part of the container, and exhaust waveguide windows at the upper part, creating a natural ventilation pressure differential to improve heat dissipation efficiency; positions may also be adjusted according to the layout of air conditioners and fans.
Opening dimensions must match the waveguide window outer frame. The opening edges must be flat and burr-free, with dimensional deviation ≤ 2 mm.
The shielding steel plate cutout at the opening must be ground smooth and treated with anti-rust coating to prevent corrosion from affecting the conductive connection.
5.1.3 Waveguide Window Installation and Fixing
Embed the waveguide window outer frame into the opening, adjust the position to ensure the outer frame fits tightly against the shielding wall, with a gap ≤ 0.5 mm.
Use 360° ring-shaped continuous welding to weld the waveguide window outer frame integrally with the shielding shell. The weld must be continuous without breaks, no cold welding, and no porosity.
Use segmented and symmetrical welding to avoid localized overheating causing waveguide window deformation and honeycomb cell blockage.
After welding, clean the slag and apply conductive anti-rust paint to the weld area; check that no weld slag is blocking the honeycomb cells and clean promptly.
5.1.4 Auxiliary Accessory Installation
Install a protective grille and dust filter screen on the outer side of the waveguide window to prevent debris and insects from entering. The filter screen can be periodically cleaned and replaced.
For forced ventilation scenarios, install an axial fan on the inner side of the waveguide window. The fan housing must be reliably grounded to the shielding enclosure, and fan power must be supplied through a filter.
For rain-resistant types, install rain-proof louvers on the outer side of the waveguide window to prevent rainwater intrusion. The louvers must be sealed-connected to the container outer shell.
5.1.5 Ventilation Performance Testing
After ventilation system installation, use an anemometer to measure the airflow velocity at the waveguide window, calculate the ventilation volume, and verify it meets the design requirements.
Check the fan operating current, noise, and vibration; these must conform to the product technical parameters.
Test the ventilation system linkage function; start/stop linkage with the temperature control system must operate normally.
5.2 Power Filter Installation and Wiring Specification
5.2.1 Power Filter Principle and Selection
The power filter is the core component for suppressing conducted electromagnetic interference on power lines. It consists of inductors, capacitors, and resistors forming a passive low-pass network that allows the power-frequency supply signal to pass while significantly attenuating high-frequency electromagnetic interference signals, blocking electromagnetic waves from entering or leaving the shielding room through power lines.
By phase count: Single-phase filters, three-phase filters — selected according to the power supply system.
By current rating: 10 A, 16 A, 32 A, 63 A, 100 A, etc. — selected according to total load current, with more than 20% margin reserved.
Performance specification: Insertion loss ≥ 60 dB (10 kHz–1 GHz), with both common-mode and differential-mode suppression capability.
5.2.2 Installation Position Requirements
The power filter must be installed on the shielding wall, with the input end on the outside of the shielding room and the output end on the inside, achieving a “through-wall” installation. It is strictly prohibited to place the filter entirely inside or outside the shielding room.
The filter installation position should be close to the grounding terminal, with the ground wire as short as possible to reduce high-frequency impedance.
Keep a distance from signal filters and low-voltage circuits to avoid mutual interference.
5.2.3 Filter Installation and Fixing
Cut an opening in the shielding wall at the corresponding position, with dimensions matching the filter flange.
Insert the filter through the opening, with the flange surface fitting tightly against the shielding wall. The contact surface must be cleaned free of paint, rust, and oil.
Use stainless steel bolts tightened uniformly around the circumference, or use ring-shaped welding for fixing, ensuring a 360° low-impedance conductive connection between the filter housing and the shielding enclosure, with contact resistance ≤ 0.01 Ω.
Conductive grease may be applied between the filter housing and the shielding enclosure to improve contact performance and prevent oxidation.
5.2.4 Wiring Specification
Input wires: The power wires on the outside of the shielding room are unshielded wires, connected directly to the filter input terminals. Input wires should be as short as possible to avoid coupling of external interference.
Output wires: Filter output connects to the power distribution system inside the shielding room. Output wires may use shielded cables, with the shield layer grounded at one end only.
Wiring principle: Input and output wires must be strictly separated; parallel routing and bundling are prohibited to prevent input-side interference from coupling to the output side, which would reduce filtering effectiveness.
Grounding requirements: The filter grounding terminal shall be connected to the shielding enclosure grounding bus at the nearest point. The ground wire shall use stranded copper conductor with cross-sectional area ≥ 16 mm², length ≤ 0.5 m, short, straight, and without bends.
Secure wiring: Terminal crimping must be reliable, bolts tightened, without looseness or false contact; phase sequence marking shall be clear and correct.
5.2.5 Installation Precautions
Filters are precision devices; avoid dropping, bumping, or striking during installation to prevent internal component damage.
It is prohibited to connect capacitors, surge arresters, or other devices in parallel at the filter input/output terminals, as this may affect filtering performance.
After filter installation, mark the identification clearly, indicating rated current, voltage, and wiring direction. Reverse connection is prohibited.
When installing multiple filters, maintain adequate spacing between units to avoid mutual coupling.
5.3 Signal Filters and Fiber Optic Waveguide Tube Installation
5.3.1 Signal Filter Installation
For various signal lines such as network, telephone, serial port, and video, corresponding signal filters must be configured to ensure normal signal transmission while blocking electromagnetic interference.
Installation method: Centrally installed on a signal interface panel. The interface panel connects to the shielding wall via flange with 360° conductive sealing.
Wiring requirements: Input and output cables must be separated with clear marking; shield layers of shielded cables must be reliably connected to the filter housing.
Performance verification: After installation, test signal transmission quality; attenuation and bit error rate must meet specification requirements.
5.3.2 Fiber Optic Waveguide Tube Installation
Fiber optic transmission carries optical signals and does not itself conduct electromagnetic interference — it is the preferred method for signal transmission between the inside and outside of the shielding room. However, fiber optic cables must pass through a metal waveguide tube when crossing the shielding enclosure to prevent aperture leakage.
Waveguide tube selection: The inner diameter of the metal waveguide tube is determined by the number of fiber optic cables, generally φ20–φ50 mm, with length ≥ 100 mm, meeting cutoff waveguide requirements.
Installation and fixing: The waveguide tube is welded and fixed to the shielding wall, with continuous sealed welds; the inner wall of the waveguide tube must be smooth and burr-free.
Fiber threading: Thread the fiber optic cables through the waveguide tube, reserving sufficient margin at both ends; after threading, seal the gaps at both ends of the waveguide tube with fire-resistant sealing compound, serving both dust prevention and auxiliary shielding purposes.
Precautions: The fiber optic cable bending radius must meet requirements to avoid damage from sharp bends; it is strictly prohibited to ground both ends of the metal strength member simultaneously to avoid forming a ground loop.
5.4 Wall Penetration Interfaces and Shielding Treatment
All pipes, cables, and rods that pass through the shielding enclosure must undergo shielding treatment. Arbitrary penetration openings are strictly prohibited.
5.4.1 Metal Pipe Wall Penetration Treatment
For metal pipes such as air conditioning pipes and water pipes passing through the shielding enclosure:
Set up a waveguide tube or welded sleeve at the pipe penetration point, with the sleeve reliably welded to the shielding enclosure.
Fill the space between the pipe and the sleeve with conductive sealing material, or use a metal bellows connection, ensuring conductive continuity.
Ground both sides of the pipe at the nearest point, connecting to the equipotential busbar.
Non-metallic pipes are prohibited from directly penetrating the wall; a metal shielding sleeve must be added.
5.4.2 Scattered Cable Wall Penetration Treatment
When small quantities of scattered cables pass through the wall:
Use dedicated filter plates or multi-hole waveguide plates, one hole per cable. After cables pass through, apply conductive sealing.
It is prohibited for multiple cables to share one wall penetration hole, to avoid excessive aperture causing leakage.
When shielded cables pass through the wall, the shield layer must be connected to the shielding enclosure at the penetration point with 360° low-impedance connection.
5.4.3 General Principles for Shielding Treatment
All wall penetration openings must be confirmed by design; field personnel are prohibited from making arbitrary openings.
Opening dimensions shall be as small as possible while meeting usage requirements, minimizing leakage risk.
All wall penetration components must form a continuous conductive connection with the shielding enclosure, with no insulating breaks.
After installation, inspect all wall penetration points one by one, mark and number them, and include them as key points in acceptance testing.
5.5 Ventilation and Heat Dissipation System Installation and Commissioning
5.5.1 Ventilation System Composition
The shield container ventilation and heat dissipation system is divided into natural ventilation and mechanical ventilation categories:
| Type | Description |
|---|---|
| Natural ventilation system | Composed of intake and exhaust waveguide windows, relying on thermal pressure for natural ventilation; suitable for scenarios with low heat generation and moderate ambient temperatures |
| Mechanical ventilation system | Adds axial fans and temperature controllers on the basis of natural ventilation to force air convection; strong heat dissipation capability, suitable for scenarios with high equipment heat generation |
| Air conditioning temperature control system | Configured with dedicated shielded air conditioning for precise temperature and humidity control; suitable for precision equipment and constant temperature/humidity requirements |
5.5.2 Mechanical Ventilation System Installation
Fans are installed on the inner side of the exhaust waveguide windows, fixed with vibration-damping brackets to reduce vibration and noise transmission.
Fan power is supplied through indoor filtered outlets, and the fan housing must be reliably grounded.
Install a temperature controller, with the temperature sensor positioned at mid-height inside the room. Set start/stop thresholds for automatic temperature-controlled ventilation.
Duct connections must be tight with no air leakage, air flow organization must be reasonable, and short-circuit circulation must be avoided.
5.5.3 System Commissioning
Power on to test fan forward/reverse rotation; the air direction must be correct, operation smooth, with no abnormal vibration or noise.
Measure fan operating current and voltage; these must conform to rated parameters.
Test temperature control functions: raise/lower the ambient temperature and verify that the fan automatically starts and stops correctly, with the action temperature deviation from the set value ≤ 2 °C.
Measure the indoor-outdoor temperature difference to evaluate heat dissipation effectiveness, ensuring equipment operating temperature requirements are met.
Measure indoor noise levels, which must meet design requirements; install sound attenuation devices where necessary.
6.1 Grounding System Design Principles and Classification
6.1.1 Functions of the Grounding System
The grounding system of the shielded container is the core foundation for ensuring shielding effectiveness, equipment safety, personnel safety, lightning protection, and electrostatic discharge protection. Its main functions include:
| Function | Description |
|---|---|
| Shielding performance assurance | Provides a zero-potential reference for the shielding enclosure, discharges induced charges, avoids charge accumulation causing secondary radiation, improves low-frequency band shielding effectiveness, and eliminates ground potential difference interference |
| Equipment safety protection | When internal electrical equipment insulation is damaged and leaks current, the grounding system provides a fault current discharge path, triggering protective device operation to ensure equipment and personnel safety |
| Lightning and overvoltage protection | Rapidly discharges lightning current and surge overvoltages to ground, avoiding equipment damage |
| Electrostatic discharge protection | Discharges static electricity accumulated on personnel and equipment, preventing electrostatic discharge from damaging electronic components and causing safety accidents |
| System operating reference | Provides a stable working ground potential reference for electronic equipment, ensuring stable equipment operation |
6.1.2 Grounding Method Classification and Selection
Independent grounding: The shielding ground is separately configured with its own grounding grid, separated from the building lightning protection ground and equipment protection ground, with grounding resistance ≤ 4 Ω; suitable for high-precision test scenarios that are sensitive to interference and require single-point grounding.
- Advantages: Avoids interference from other grounding systems coupling into the shielding system; clean ground potential.
- Disadvantages: Requires a separately constructed grounding grid; high cost; risk of ground potential back-strike.
Combined grounding: Shielding ground, equipment protection ground, lightning protection ground, and working ground share one grounding grid, with grounding resistance ≤ 1 Ω; this is currently the mainstream recommended method.
- Advantages: Avoids ground potential differences between different grounding systems; eliminates ground potential back-strike risk; low construction cost; stable grounding resistance.
- Note: Reliable equipotential connection must be ensured; all metal components must share a common ground.
Single-point grounding vs. multi-point grounding
| Type | Description |
|---|---|
| Single-point grounding | The entire shielding system has only one grounding point; suitable for low-frequency (< 1 MHz) scenarios, avoiding ground loop interference |
| Multi-point grounding | Multiple grounding points on the shielding enclosure, shortening high-frequency return paths; suitable for high-frequency (> 1 MHz) scenarios, reducing high-frequency grounding impedance |
Shield containers typically adopt a hybrid grounding method of “single-point for low frequency, multi-point for high frequency,” balancing performance across the full frequency band.
6.1.3 Grounding System Design Principles
Low impedance principle: The overall impedance of the grounding system must be as low as possible, especially at high frequencies. Ground wires should be short, thick, and straight to reduce inductive effects.
Equipotential principle: All metal components, equipment enclosures, pipes, and racks inside the shielding room must be equipotentially connected, at the same potential, eliminating potential differences.
Single-point lead-out principle: The equipotential network inside the shielding room is lead out at a single point to the outdoor grounding grid, avoiding ground loops formed by multiple grounding points.
Redundancy and reliability principle: 2–4 ground down-conductor wires are provided in parallel for redundancy; a single point failure does not affect overall grounding performance.
Anti-corrosion and durability principle: Grounding materials shall be corrosion-resistant, with anti-corrosion treatment at weld joints to ensure stable long-term performance.
6.2 Outdoor Grounding Grid Construction Process
6.2.1 Grounding Material Selection
| Material | Specification/Model | Purpose | Remarks |
|---|---|---|---|
| Copper-clad steel ground rod | φ14.2 mm, length 2.5 m | Vertical ground electrode | Good conductivity, corrosion resistance, high strength |
| Galvanized flat steel | 40 mm × 4 mm | Horizontal ground electrode | Connects ground rods to form the grounding grid |
| Copper strip (purple copper) | 25 mm × 3 mm | Indoor equipotential busbar | Excellent conductivity |
| Ground lead-out cable | YJV-1×25 mm² copper cable | Shielding enclosure down-conductor | Stranded copper, reduces high-frequency inductance |
| Ground resistance reducing agent | Physical resistance-reducing type | For high soil resistivity areas | Environmentally friendly, non-corrosive |
6.2.2 Grounding Grid Construction Process
Layout and staking: Stake out 0.5–1 m outside the perimeter of the shielded container foundation, determine the grounding trench route in a ring configuration, with arc transitions at corners to avoid sharp right angles.
Trench excavation: Excavate the grounding trench to a depth ≥ 0.8 m, width 0.4–0.6 m. The trench bottom must be level, with rocks and debris removed; in rocky areas, the trench may be deepened or the number of ground rods increased.
Driving vertical ground rods: Drive one ground rod every 2 m along the trench. Ground rods must be driven vertically, with the top exposed 100–150 mm above the trench bottom for welding to the horizontal ground electrode.
Laying horizontal ground electrode: Lay galvanized flat steel along the trench bottom, reliably welding it to each ground rod. Use three-sided surround welding, with weld length ≥ 100 mm, full and without cold welding.
Lead-out wire installation: Reserve 2–4 ground lead-out positions, located close to the shielding container’s grounding terminals. Lead-out wires must be firmly welded to the horizontal ground electrode, with clear marking and insulation protection at the lead-out ends.
Anti-corrosion treatment at welds: Remove slag from all weld points and apply asphalt paint or epoxy zinc-rich paint for anti-corrosion treatment.
Backfilling and compaction: First backfill with fine soil, remove rocks, and compact in layers, each layer ≤ 200 mm, ensuring close contact between soil and grounding electrodes.
Initial ground resistance measurement: After backfilling, use a ground resistance tester for preliminary measurement, record the values, and take resistance-reducing measures if requirements are not met.
6.2.3 Resistance-Reducing Treatment Measures
When soil resistivity is high and the grounding resistance cannot meet requirements, the following methods may be used:
| Method | Description |
|---|---|
| Extend the grounding grid | Increase the number of ground rods and the length of horizontal ground electrodes, expanding the grounding grid area |
| Soil replacement | Replace high-resistivity sandy/rocky soil in the trench with low-resistivity soil such as clay or black soil |
| Resistance-reducing agent method | Pour resistance-reducing agent around ground rods to reduce contact resistance and increase the equivalent discharge area |
| Deep well grounding method | Use deep well ground electrodes extending into underground aquifers, suitable for areas with high surface soil resistivity |
| Ion ground electrode | Use electrolytic ion ground electrodes that continuously release electrolyte to reduce surrounding soil resistivity, providing stable ground resistance |
6.3 Indoor Equipotential Connection Network Construction
6.3.1 Equipotential Connection Structure
The shielding room adopts an equipotential structure of “ring main equipotential busbar + grid voltage equalization strip”:
Along the bottom of the interior walls around the room, install a ring-shaped main equipotential busbar, using 25 mm × 3 mm copper strip, at a height of 300 mm from the floor, fixed on insulators.
Under the anti-static floor, install grid-pattern voltage equalization strips, using 30 mm × 3 mm copper strip, with grid spacing of 2 m × 2 m, reliably connected to the ring main equipotential busbar.
All equipotential connection points shall be tinned (tin-plated) to reduce contact resistance.
6.3.2 Equipotential Connection Requirements
Shielding enclosure connection: The shielding walls, roof panels, and floor shielding layer shall have one connection point every 2 m, reliably connected to the equipotential busbar, ensuring the entire shielding enclosure is equipotential.
Shielding door connection: The door frame and door leaf shall be connected to the equipotential busbar via flexible copper braided straps, with bridging straps at hinge positions to ensure conductive continuity during movement.
Equipment rack connection: Each equipment rack shall have at least 2 connection points to the equipotential busbar, using stranded copper wire with cross-section ≥ 6 mm².
Metal pipe connection: All metal pipes, cable trays, and enclosures in the room shall be connected to the equipotential busbar at the nearest point.
Filter connection: All filter housings shall be connected to the equipotential busbar at the nearest point, with ground wires as short as possible.
6.3.3 Connection Process Standards
Copper strip connections use overlapping, with overlap length not less than 2 times the strip width, secured by bolts or welded. Contact surfaces shall be ground clean and coated with conductive grease.
Bolted connections use stainless steel bolts with flat washers and spring washers, torque per requirements, contact resistance ≤ 0.01 Ω.
All connection wires shall be neatly arranged with clear marking, avoiding parallel routing with power wires and signal wires.
After the equipotential system installation is complete, test the continuity resistance between each point and the main grounding terminal; all must be ≤ 0.1 Ω to qualify.
6.4 Shielding Enclosure Grounding Connection Specification
6.4.1 Ground Down-Conductor Installation
The shielding container shall have 2–4 main grounding terminals, symmetrically arranged, each leading to the outdoor grounding grid, forming redundancy.
Ground down-conductors shall use stranded copper insulated cable with cross-section ≥ 25 mm²; for high-grade shielding, 50 mm² cable is used.
Down-conductor routes shall be short, straight, and smooth, avoiding bends and coiling to reduce high-frequency inductance; length should be as short as possible, ideally not exceeding 5 m.
Down-conductors connect to the container grounding terminals using copper lug crimping, secured with bolts. Contact surfaces shall be ground clean and coated with conductive grease.
The outdoor end shall be reliably connected to the grounding grid lead-out terminal, with anti-corrosion and insulation treatment.
6.4.2 Shielding Grounding Precautions
It is prohibited to mix the shielding ground with the power neutral wire, to avoid power-frequency current flowing through the shielding enclosure causing interference.
Ground wires are prohibited from being routed in parallel with power cables; maintain spacing ≥ 300 mm to avoid coupling interference.
The shielding enclosure must be insulated from external metal structures such as building steel and water pipes. Direct contact is prohibited to prevent ground loops from multi-point grounding.
Ground down-conductors are prohibited from forming closed loops to avoid induced circulating currents.
6.5 Ground Resistance Testing and Verification
6.5.1 Test Methods
Use the three-point method or clamp-type ground resistance tester:
| Method | Description |
|---|---|
| Three-point method (fall-of-potential) | Potential reference electrode placed 20 m from the grounding grid, current electrode 40 m away, three points in a straight line; most accurate, used as the arbitration method |
| Clamp method | Suitable for looped grounding systems; convenient for measurement, suitable for routine inspection |
6.5.2 Acceptance Criteria
| Item | Standard |
|---|---|
| Combined grounding system | Ground resistance ≤ 1 Ω |
| Independent shielding grounding system | Ground resistance ≤ 4 Ω |
| Equipotential connection continuity resistance | Between any two points ≤ 0.1 Ω |
| Shielding enclosure to grounding terminal contact resistance | ≤ 0.01 Ω |
6.5.3 Testing Precautions
Tests shall be conducted during dry soil conditions; measurements taken after rain when soil is moist will be lower than actual and cannot serve as acceptance evidence.
Before testing, disconnect all connections to other grounding systems to independently measure the shielding grounding resistance.
Take multiple measurements and average the values, with measurement deviation ≤ 10%; re-test under different seasons and different soil moisture conditions to verify resistance stability.
Maintain test records, retaining test data and test point location diagrams.
6.6 Lightning Protection and Electrostatic Discharge Grounding Integration
6.6.1 Lightning Protection Grounding Integration
The shielded container lightning protection grounding is integrated into the combined grounding system. An air termination strip or lightning rod is installed on the container roof, with down-conductors reliably connected to the grounding grid.
Install surge protective devices (SPD) at the power input end, with graded protection to discharge lightning overvoltages. SPD grounding shall connect to the equipotential busbar at the nearest point.
Install signal surge protective devices at the signal input end to protect internal low-voltage equipment.
6.6.2 Electrostatic Discharge Grounding Integration
Anti-static floor supports, metal flooring, and anti-static workstations shall all be reliably connected to the equipotential busbar, with system resistance of 10^6–10^9 Ω, meeting anti-static requirements.
Install a human body static electricity discharge device at the entrance, with reliable grounding; personnel must discharge their body static before entering.
Anti-static grounding shares the same grounding system as the shielding ground; no separate grounding is required.
7.1 Anti-Static Floor Installation
7.1.1 Floor System Composition
The all-steel anti-static floor system consists of floor panels, support beams, adjustable supports, and grounding accessories, providing load-bearing, anti-static, and cabling space functions.
| Item | Specification |
|---|---|
| Floor dimensions | 600 mm × 600 mm × 35 mm standard specification |
| Construction | All-steel base material, PVC anti-static surface layer, steel plate sealed bottom |
| Load capacity | Uniform load ≥ 1200 kg/m², concentrated load ≥ 300 kg, meeting conventional server and cabinet equipment weight requirements |
| Anti-static performance | Surface resistance 10^6–10^9 Ω, system resistance 10^6–10^9 Ω, complying with GB/T 36340 anti-static standard |
7.1.2 Installation Process
Substrate cleaning and layout marking: Clean debris and dust from the floor surface, mark the floor laying reference lines and support positioning grid lines, with deviation ≤ 1 mm.
Support installation: Arrange adjustable supports according to the grid lines, adjust support heights to ensure the top surface is level, and place vibration-damping pads under the supports.
Beam installation: Connect and fix the beams to the supports, forming a grid frame. Use a level to calibrate the top surface levelness block by block.
Grounding connection: Connect supports in series with grounding copper strips; connect to the indoor equipotential busbar every 2 m to ensure reliable grounding of the floor system.
Floor panel laying: Lay panels one by one starting from one corner, placing them gently to avoid edge damage; cut non-standard panels at edges on site, with smooth cut edges and edge banding treatment.
Edge finishing: Perform edge finishing treatment around walls and columns, with uniform gaps and sealant application.
7.1.3 Quality Acceptance Standards
| Item | Standard |
|---|---|
| Floor surface levelness | ≤ 2 mm/m, overall ≤ 3 mm |
| Gap width | ≤ 0.5 mm, gaps straight and even |
| Floor appearance | No warping, depression, or scratches; no bubbling or peeling of the surface layer |
| Walking performance | No hollow feel or abnormal noise when walked on; stable underfoot |
| Anti-static performance test | Surface resistance and system resistance meet standard requirements |
7.2 Power Supply and Distribution System Installation
7.2.1 System Composition
The shielded container power supply and distribution system consists of input filter, main distribution cabinet, branch distribution circuits, surge protection, filtered outlets, and lighting circuits, providing graded power distribution and electrical protection.
| Component | Description |
|---|---|
| Main distribution cabinet | Molded case main breaker + branch circuit breakers, configured with current/voltage display, leakage protection, and surge protection |
| Outlet circuits | Each outlet circuit has an independent breaker, configured with dedicated filtered outlets to suppress conducted interference |
| Lighting circuit | Independently switched, separated from power circuits to avoid interference |
7.2.2 Installation Specification
The distribution cabinet is installed floor-mounted or wall-mounted, firmly fixed, with verticality deviation ≤ 1.5‰.
Wiring inside the cabinet shall be neat, with correct phase sequence and clear marking; terminals securely tightened without false contact.
Color coding for phase, neutral, and ground wires: yellow/green/red for phase wires, light blue for neutral, yellow-green dual color for ground.
Outlet wiring follows the principle of “left neutral, right phase, top ground,” installed securely with accurate positioning.
All electrical equipment metal enclosures must be reliably connected to the protective ground wire.
7.2.3 Electrical Safety Requirements
Electrical circuit insulation resistance ≥ 0.5 MΩ, tested with a 500 V megger.
Leakage protection device tripping current 30 mA, tripping time ≤ 0.1 s, with reliable action verified by testing.
Surge protective device parameters must match, wiring correct, and grounding reliable.
The power distribution system shall have clear power-off markings, allowing rapid power disconnection in emergency situations.
7.3 Lighting System Installation
7.3.1 System Configuration
Use LED flat panel clean-room lights, 600 mm × 600 mm specification, recessed into the ceiling or surface-mounted, providing uniform illumination without glare.
| Area | Illuminance Standard |
|---|---|
| General office areas | ≥ 300 lux |
| Equipment operation areas | ≥ 500 lux |
| Emergency lighting | ≥ 50 lux |
Configure emergency lighting and evacuation signs; after power failure, emergency lighting duration ≥ 90 minutes.
7.3.2 Installation Requirements
Luminaires must be firmly fixed, accurately positioned, and neatly arranged.
Luminaire power must be supplied through filtered power. Direct connection of unfiltered power is prohibited to prevent electromagnetic interference introduced through the luminaire power supply.
Emergency lighting has a built-in battery, correctly wired, and automatically activated upon power failure.
Switches are installed at the door in an accessible position, at a height of 1.3 m, with clear marking.
7.4 Fire Protection and Security System Installation
7.4.1 Fire Protection System
Configure smoke detectors, heat detectors, and audible/visual alarms, connected to the fire alarm control panel.
Configure a cabinet-type heptafluoropropane (FM200) gas fire extinguishing system, pipeless (nozzle-free) design, with three start-up methods: automatic, manual, and mechanical emergency.
Install emergency start/stop buttons and discharge indicator lights at the door to guide personnel evacuation.
System installation complies with GB 50370 *Code for Design of Gas Fire Extinguishing Systems*.
Fire protection equipment power and signal lines must be filtered and must not compromise shielding integrity.
7.4.2 Security System
Access control system: The shielding door is configured with an access controller supporting card swipe, password, fingerprint, and other identification methods, recording personnel entry/exit information.
Video surveillance: Install high-definition network cameras indoors, with video signals transmitted through fiber optics or signal filters — clear images without interference.
Intrusion alarm: Configure infrared detectors; unauthorized intrusion triggers the alarm.
All security equipment metal enclosures must be reliably grounded, and signal wires must be shielded.
7.5 Air Conditioning and Temperature/Humidity Control System Installation
7.5.1 Air Conditioner Selection and Installation
Select the corresponding air conditioning system based on the internal heat load and temperature control accuracy requirements:
| Scenario | Configuration |
|---|---|
| Standard scenarios | Wall-mounted industrial air conditioner, cooling capacity matched to heat load, automatic temperature control |
| High-precision scenarios | Precision air conditioner, constant temperature and humidity control, accuracy ±1 °C / ±5% RH |
| High-reliability scenarios | Dual air conditioner redundant configuration, automatic failover |
Installation key points:
- Air conditioner indoor unit installed stably, with smooth condensate drainage.
- Copper pipes and water pipes penetrating the wall shall undergo shielding sealing treatment, with metal pipes reliably connected to the shielding enclosure.
- Outdoor unit installed on the outside of the container, firmly fixed, with good ventilation.
- Air conditioner power supplied through the filtered circuit, housing reliably grounded.
7.5.2 Temperature and Humidity Monitoring
Deploy temperature and humidity sensors inside the room for real-time environmental monitoring.
Configure an environmental monitoring host displaying temperature/humidity values, with over-limit alarm.
Linkage with air conditioning and ventilation systems for automatic indoor environment regulation.
7.6 Integrated Cabling and Cable Shielding Treatment
7.6.1 Cabling Principles
- Separation of Power and Signal Cables: Power cables and signal cables shall be laid in separate cable trays, with a spacing of ≥300mm to avoid electromagnetic coupling interference.
- Graded Filtering: All cables entering or leaving the shielding room must pass through corresponding filters. Direct penetration of cables through walls is prohibited.
- Shielding Grounding: The shield layer of shielded cables shall be grounded at a single end, connected to the equipotential busbar inside the shielding room, to avoid ground loops formed by double-ended grounding.
- Clear Identification: Both ends of all cables shall be labeled with numbers, purpose, and destination for ease of maintenance.
7.6.2 Cable Tray and Conduit Installation
- Use metal cable trays or galvanized steel conduits for cable laying. Ensure firm fixing, with neat and level installation (horizontal and vertical alignment).
- The entire length of cable trays and conduits shall be equipotentially bonded, with cross-bonding to the equipotential busbar every 5 meters.
- The bending radius at cable bends shall comply with requirements: ≥10 times the cable diameter for power cables, ≥15 times the cable diameter for data cables.
- Cable tray covers shall be complete to prevent dust and interference; conduit openings shall be fitted with protective bushings to prevent cable damage.
7.6.3 Cable Laying Requirements
- Before laying, cables shall undergo continuity and insulation tests. Laying is permitted only after passing these tests.
- Cables shall be arranged neatly, fastened securely, without twisting or compression.
- Reserve sufficient slack: 0.5 to 1 meter of spare length shall be left at equipment ends and cabinet ends.
- The shield layer of shielded cables shall be continuous without breaks; shield continuity shall be restored at joints.
- It is strictly prohibited to arbitrarily drill holes in the shielding shell for cable passage. All cables must enter/exit through dedicated filter interfaces.
7.6.4 In-Cabinet Wiring
- Within the cabinet, power and signal cables shall be routed on separate sides, organized with cable managers, following standard routing practices.
- Equipment power cables and data cables shall be bundled separately with appropriate spacing.
- The cabinet grounding terminal shall be reliably connected to the equipotential busbar. Equipment enclosures shall be grounded through the cabinet.
- Labels shall be complete, with clear port correspondence, facilitating operation and maintenance management.
Chapter 8 System Overall Commissioning and Performance Testing
8.1 Pre-Commissioning Preparation and Safety Inspection
8.1.1 Pre-Commissioning Preparation Work
- Confirm all installation procedures are complete, installation quality self-inspection has passed, with no omitted items.
- Clean the construction site, removing debris, tools, and leftover materials to keep the area tidy.
- Prepare commissioning instruments, tools, and recording forms. Instruments must be within their calibration validity period.
- Develop a commissioning plan, defining commissioning items, methods, acceptance criteria, and personnel assignments.
- Conduct technical and safety briefings for commissioning personnel, ensuring familiarity with commissioning procedures and risk points.
8.1.2 Safety Inspection Key Points
Electrical Safety Inspection
- Confirm all wiring is correct, with no wrong connections, loose connections, or short circuit hazards.
- All exposed live parts shall have insulation protection; no exposed conductors are permitted.
- The grounding system shall be reliably connected, and ground resistance tests shall pass.
- Protection switch parameters at all levels shall match, with normal operation.
Mechanical Safety Inspection
- Moving parts such as shielding doors, fans, and air conditioners shall have no jamming, with guards in place.
- All fasteners shall be tightened securely, with no looseness.
- Hoisting equipment and temporary supports shall be completely removed; the structure shall be stable.
Environmental Safety Inspection
- Indoor ventilation shall be adequate, with no harmful gases or dust.
- Firefighting equipment shall be in place, and emergency exits shall be clear.
- Warning signs shall be posted in the commissioning area; unauthorized personnel are prohibited from entering.
8.2 Electrical System Power-On Commissioning
8.2.1 Insulation Test Before Power-On
- Disconnect all loads, turn off all branch circuit breakers, and use a 500V megger to measure the insulation resistance of phase conductors and neutral conductors to ground in each circuit.
- Insulation resistance ≥0.5MΩ is considered qualified. If below standard, investigate the cause, resolve the issue, and only then proceed with power-on.
- Measure insulation resistance between phase conductors and between phase conductors and neutral conductors, also requiring ≥0.5MΩ.
8.2.2 Graded Power-On Commissioning
Power on in stages following the sequence “Main switch → Branch circuits → End equipment,” checking at each level:
- Main Power On: Close the main switch, measure the incoming voltage. Three-phase voltage shall be balanced, with voltage deviation ≤±7%.
- Distribution Circuit Power On: Close branch circuit breakers one by one, checking for short circuits or tripping, and verify normal output voltage.
- Socket Circuit Test: Test sockets individually, verifying correct wiring of phase, neutral, and ground conductors, and normal voltage.
- Lighting Circuit Test: Turn on lights; all fixtures shall illuminate without flickering or abnormal noise, with uniform illumination.
8.2.3 Protection Function Testing
- Residual Current Device (RCD) Test: Press the test button; the RCD shall trip within 0.1 seconds.
- Overload Protection Test: Simulate overload conditions to verify the circuit breaker’s overload trip function operates correctly.
- Surge Protection Test: Check the surge protective device (SPD) status indicator is normal, without damage or failure.
8.2.4 Ground Continuity Test
- Use a milliohm meter to measure the continuity resistance between equipment enclosures, metal racks, cable trays, and the grounding terminal.
- The resistance between any point and the main grounding terminal shall be ≤0.1Ω, ensuring reliable grounding.
8.3 HVAC System Trial Operation
8.3.1 Ventilation System Commissioning
- Start the ventilation fan, check correct rotation direction, smooth operation, without abnormal vibration or noise.
- Measure the fan running current, which shall be within the rated range, with balanced three-phase current.
- Use an anemometer to measure inlet and outlet air velocities, calculate ventilation rate, ensuring compliance with design requirements.
- Test the thermostat interlock function; simulate temperature changes to verify fan start/stop operation and setpoint accuracy.
- Run continuously for 2 hours, checking fan temperature rise and bearing temperature are normal, with no faults.
8.3.2 Air Conditioning System Commissioning
- Check air conditioning piping connections are correct, refrigerant pressure is normal, with no leaks.
- Power on and test cooling, heating, dehumidification, and fan-only modes for normal operation.
- Set target temperature and humidity, run for 2 hours, verify indoor temperature and humidity stabilize within the set range, meeting control accuracy requirements.
- Check condensate drainage is smooth, with no leaks.
- Test safety protection functions including high/low pressure protection and overload protection.
8.4 Preliminary Shielding Effectiveness Testing
8.4.1 Test Purpose and Equipment
- Use a portable field strength meter for preliminary leak detection to quickly locate obvious leakage points, preparing for professional testing.
- Test Equipment: Broadband field strength meter, frequency coverage 10kHz~1GHz, with matching magnetic field and electric field antennas.
- Test Range: Around the shielding door, waveguide vents, wall penetration interfaces, panel seams, cabinet corners, and other vulnerable positions.
8.4.2 Test Method
- Set up a transmitting source outside the shielding room, emitting electromagnetic signals at a fixed frequency and power.
- Testing personnel inside the shielding room slowly move the probe along seams and around apertures, observing changes in field strength readings.
- A sudden increase in field strength readings indicates significant leakage at that location; mark the spot.
8.4.3 Common Leakage Point Inspection
Focus on inspecting the following high-risk locations:
- Shielding Door: Four corners of the door gap, lock points, hinges, and around the observation window.
- Waveguide Vent: Welded seams and four corners of the frame.
- Filters: Around the mounting flange and terminal connections.
- Panel Seams: Cabinet assembly joints, wall panel seams, and poor weld locations.
- Wall Penetrations: Poorly sealed locations where various pipes and cables pass through walls.
- Structural Components: Screw and rivet locations where shielding continuity may be compromised.
8.4.4 Leakage Point Treatment
For identified leakage points, analyze the cause and apply targeted treatment:
- Weld Leakage: Re-weld and grind smooth, apply conductive anti-corrosion treatment.
- Shielding Door Leakage: Adjust the engagement of beryllium copper finger stock and knife edge, install additional finger stock, and adjust locking force.
- Flange Leakage: Tighten bolts, clean contact surfaces, and apply conductive grease.
- Aperture Leakage: Install waveguide tubes or fill with conductive sealant.
- After treatment, re-test to confirm the leak is eliminated.
8.5 Fire Protection and Security System Interlock Commissioning
8.5.1 Fire Protection System Commissioning
- Simulate smoke signals; smoke detectors shall alarm, the main control panel shall display the alarm location, and audible/visual alarms shall activate.
- Simulate fire conditions to test the automatic activation logic of the gas extinguishing system, including delay, gas discharge warning, interlocking ventilation shutdown, and other functions.
- Test manual activation and mechanical emergency activation functions for reliable operation.
- Test fault alarm functions; the main panel shall indicate faults when detectors or wiring fail.
8.5.2 Security System Commissioning
- Access Control System: Test card swipe, PIN code, and fingerprint recognition functions are normal, door opening permissions are accurate, and records are stored completely.
- Video Surveillance: Images shall be clear, recording shall function normally, remote access shall work, with no electromagnetic interference streaks.
- Intrusion Alarm: Trigger infrared detectors; the alarm host shall alarm, interlocking audible/visual alarms and video recording.
- Test interlocking functions between systems, such as automatic door unlock during fire alarms to facilitate evacuation.
8.6 System Interlock Commissioning and Stability Testing
8.6.1 Full System Interlock Commissioning
- Power on all systems simultaneously, simulating normal operating conditions, and check the working status of each system.
- Verify compatibility between systems without mutual interference, e.g., air conditioning and fan operation shall not affect network signals or surveillance images.
- Test environmental interlocking: automatic air conditioning activation when temperature/humidity exceeds limits; automatic shutdown of non-fire-fighting power and ventilation shutdown during fire alarms.
8.6.2 Continuous Stability Testing
- Run all systems continuously for 72 hours, simulating long-term operating conditions.
- Record operating parameters every 4 hours: voltage, current, temperature, humidity, and equipment status.
- During the test period, there shall be no fault shutdowns, no performance degradation, and no abnormal alarms. All parameters shall remain stable within normal ranges.
- After the test, comprehensively inspect the status of all systems for overheating, looseness, or damage.
Chapter 9 Professional Shielding Effectiveness Testing and Acceptance
9.1 Testing Basis and Standards
Shielding effectiveness testing is a core indicator for accepting shielding container performance and must be strictly implemented in accordance with national standards, conducted by qualified third-party testing institutions or manufacturer’s professional testing personnel.
- Core Testing Standard: GB/T 12190-2021 “Measurement methods for shielding effectiveness of electromagnetic shielding enclosures”
- Acceptance Criteria Standard: GB/T 51103-2015 “Code for construction and quality acceptance of electromagnetic shielding enclosure engineering”, and technical indicators specified in the contract
- Military Standard Testing Basis: GJB 5792-2006 “General specification for military electromagnetic shielding enclosures”
9.2 Test Equipment and Environmental Requirements
9.2.1 Test Equipment Configuration
A complete shielding effectiveness testing system shall cover low-frequency magnetic field, medium/high-frequency electric field, and microwave full frequency bands. Main equipment includes:
| Equipment Name | Frequency Range | Purpose |
|---|---|---|
| Signal Generator | 9kHz~40GHz | Generate standard test signals |
| Power Amplifier | Matching frequency bands | Amplify transmitted signal power |
| Receiver/Analyzer | 9kHz~40GHz | Receive and analyze signal field strength |
| Loop Magnetic Field Antenna | 9kHz~30MHz | Low-frequency magnetic field transmission and reception |
| Biconical Antenna | 20MHz~1GHz | Medium/high-frequency electric field transmission and reception |
| Log-Periodic Antenna | 200MHz~3GHz | High-frequency plane wave testing |
| Horn Antenna | 1GHz~40GHz | Microwave frequency band far-field testing |
| Calibration Accessories | Matching | Equipment calibration, path loss calibration |
All test equipment shall be metrologically calibrated and used within the validity period. Equipment self-check and path loss calibration shall be performed before testing.
9.2.2 Test Environment Requirements
- Ambient Electromagnetic Noise: The background noise of the test environment shall be at least 10dB lower than the received level corresponding to the expected shielding effectiveness; otherwise, the test site shall be changed or transmission power increased.
- Spatial Requirements: The distance between the transmitting antenna and the exterior wall of the shielding enclosure shall be ≥3m, with no large metal reflecting objects nearby, to avoid multipath reflection affecting test results.
- Climatic Conditions: Ambient temperature 5°C~35°C, relative humidity ≤80%, no rain, snow, or strong wind. Outdoor testing shall be conducted on clear, windless days.
- Internal State: Remove all irrelevant metal objects from inside the shielding room. The shielding door shall be fully closed and locked. All filters and waveguide vents shall be installed. All wall penetration openings shall be completely treated.
9.3 Test Point Layout and Testing Procedure
9.3.1 Test Point Layout Principles
- Typical Location Placement: Place receiving test points at typical locations including the center of the shielding room, corners, near the door, beside waveguide vents, covering areas with the weakest performance.
- Height Requirement: The receiving antenna height shall be 1.2~1.5m, roughly equivalent to the transmitting antenna height.
- Quantity Requirement: No fewer than 5 test points for containers under 20 feet, and no fewer than 8 test points for 40-foot containers. Additional test points shall be added at vulnerable locations such as panel seams and doors.
- Transmission Position: The transmitting antenna shall be positioned at different sides of the shielding room to ensure all surfaces are tested.
9.3.2 Standard Testing Procedure
Baseline Field Strength Calibration
1. In free space without shielding obstruction, arrange transmitting and receiving antennas at specified distances. Set the test frequency and transmission power.
2. Measure the receiving end field strength, recorded as the baseline field strength E0, serving as the reference value before shielding.
3. Calibrate the baseline field strength for each frequency point, or calibrate in frequency band segments.
Post-Shielding Field Strength Measurement
1. Place the transmitting antenna outside the shielding room, positioned identically to the calibration setup. Place the receiving antenna at the corresponding test point inside the shielding room.
2. Close and lock the shielding door, maintaining the shielding room in normal working condition.
3. At the same frequency and same transmission power, measure the indoor received field strength value E1.
Shielding Effectiveness Calculation
- Shielding Effectiveness SE(dB) = 20lg(E0/E1), i.e., the logarithm of the ratio of baseline field strength to post-shielding field strength, multiplied by 20.
- Repeat the test 3 times at the same test point and same frequency, taking the average as the final result. Single measurement deviation shall be ≤3dB.
Point-by-Point, Frequency-by-Frequency Testing
1. Test point by point according to preset frequency points, covering the full frequency band from low to high frequencies.
2. After completing one test point, move the receiving antenna to the next test point and repeat the test.
3. After all test points are completed, change the transmitting antenna position and test the shielding effectiveness from different directions.
9.4 Shielding Effectiveness Test Methods for Different Frequency Bands
9.4.1 Low-Frequency Magnetic Field Testing (9kHz~30MHz)
- Antenna Type: Small loop antennas. The transmitting loop and receiving loop planes shall be parallel, with the normal direction aligned toward the shielding enclosure.
- Test Method: Near-field magnetic field testing. The transmitting loop is placed 1m from the exterior of the shielding enclosure; the receiving loop is positioned at the corresponding indoor location.
- Key Verification: The magnetic field shielding effectiveness at critical frequency points such as 14kHz and 150kHz, which is the most challenging frequency band for shielding.
9.4.2 Medium/High-Frequency Electric Field Testing (200kHz~1GHz)
- Antenna Type: Biconical antennas and log-periodic antennas. Antenna polarization shall be tested separately in both vertical and horizontal orientations.
- Test Method: Far-field plane wave testing, with transmission distance meeting far-field conditions.
- Key Verification: This frequency band is the primary band for common electromagnetic interference and information leakage. High shielding effectiveness shall be ensured.
9.4.3 Microwave Frequency Band Testing (1GHz~18GHz)
- Antenna Type: Standard gain horn antennas, aimed at the center of the test surface.
- Test Method: Far-field microwave testing. Adjust the antenna angle to align with the maximum reception direction.
- Key Verification: High frequencies are sensitive to gaps and apertures. Focus on detecting high-frequency leakage around doors, windows, and apertures.
9.5 Test Data Processing and Qualification Determination
9.5.1 Data Organization
- Record all test data, including frequency points, test point locations, baseline field strength, post-shielding field strength, and calculated shielding effectiveness values.
- Plot shielding effectiveness versus frequency curves to visually display full-band performance variations.
- Calculate the minimum shielding effectiveness value across all test points to identify the weakest performance location.
9.5.2 Qualification Determination Criteria
- The minimum shielding effectiveness value among all test points shall serve as the final determination basis. Meeting the contractually specified grade requirements constitutes compliance.
| Shielding Grade | 14kHz Magnetic Field | 150kHz Magnetic Field | 200kHz~50MHz Electric Field | 50MHz~1GHz Plane Wave | 1GHz~18GHz Microwave |
|---|---|---|---|---|---|
| Grade A | ≥60dB | ≥60dB | ≥65dB | ≥60dB | ≥55dB |
| Grade B | ≥70dB | ≥90dB | ≥95dB | ≥90dB | ≥85dB |
| Grade C | ≥80dB | ≥100dB | ≥105dB | ≥100dB | ≥95dB |
- If certain individual frequency points do not meet the standard, leakage points shall be investigated, rectified, and re-tested until all points comply.
9.5.3 Non-Conformance Rectification Procedure
1. Identify the non-conforming frequencies and test points, analyzing leakage causes based on structure.
2. Targeted rectification: re-welding seams, adjusting shielding door seals, replacing filters, sealing leakage apertures, etc.
3. Re-test after rectification until all indicators meet the requirements.
4. Record the rectification process and re-test results, incorporating them into the acceptance documentation.
9.6 Completion Acceptance Procedure and Documentation Delivery
9.6.1 Completion Acceptance Conditions
- All installation and commissioning work is fully completed, and the construction unit’s self-inspection has passed.
- Shielding effectiveness testing has passed, and the test report has been issued.
- All system functional commissioning is completed, with stable operation.
- Construction documentation, test documentation, and product documentation are complete.
- The site has been cleaned up and meets delivery conditions.
9.6.2 Acceptance Organization and Procedure
- Organized by the construction unit, with participation from the construction unit, supervision unit, design unit, and manufacturer.
- The construction unit reports on construction status and self-inspection results; the manufacturer reports on product performance and commissioning status.
- On-site inspection: appearance inspection, functional spot checks, documentation review, and shielding effectiveness report verification.
- Issues found during acceptance shall be rectified within a specified period, followed by re-verification.
- After all items pass, all parties shall sign the “Completion Acceptance Report,” and the product shall be formally delivered for use.
9.6.3 Deliverable Documentation List
Upon acceptance and delivery, complete technical documentation shall be transferred to the user, including but not limited to:
- Product certificate of conformity, factory test report
- Installation and commissioning records, concealed works records
- Third-party shielding effectiveness test report
- System as-built drawings: electrical schematic diagrams, grounding system diagrams, floor plan layouts, system diagrams
- This installation and commissioning manual, operation and maintenance manual
- Spare parts list, special tools
- Warranty card, after-sales service contact information
- Relevant equipment manuals and certificates of conformity
Chapter 10 Daily Maintenance and Care Specifications
10.1 Daily Inspection Content and Schedule
Establishing a scheduled inspection and maintenance system is key to ensuring long-term stable operation of the shielding container and extending its service life. Inspections shall be performed according to the following schedule:
| Inspection Schedule | Inspection Content | Responsible Personnel |
|---|---|---|
| Daily Inspection | 1. Whether shielding door opens/closes normally, with no abnormal noise or jamming<br>2. Whether indoor temperature and humidity are normal<br>3. Whether air conditioning and ventilation systems operate normally<br>4. Any abnormal odors or sounds | Duty personnel/User |
| Monthly Inspection | 1. Check shielding door finger stock condition, clean contact surfaces<br>2. Check waveguide vent filters, clean dust<br>3. Check power distribution cabinet wiring, tighten loose terminals<br>4. Check fire protection and security system status | Operation and maintenance personnel |
| Quarterly Inspection | 1. Measure ground resistance, verify grounding performance<br>2. Test residual current protection and surge protection functions<br>3. Check sealing strips and waterproof sealant for cracks<br>4. Check container anti-corrosion coating, touch up damaged areas | Professional maintenance personnel |
| Annual Testing | 1. Professional full-band shielding effectiveness testing<br>2. Comprehensive insulation testing of the electrical system<br>3. Deep maintenance of air conditioning system, refrigerant check<br>4. Fire suppression system cylinder pressure testing and annual inspection | Third party/Manufacturer |
10.2 Shielding Door Maintenance and Care
The shielding door is a moving part and the component most prone to shielding performance degradation, requiring priority maintenance:
- Finger Stock Cleaning: Monthly, wipe the beryllium copper finger stock and knife edge surfaces with anhydrous ethanol to remove dust and oil, maintaining good conductivity; apply a thin layer of conductive grease after wiping to prevent oxidation.
- Finger Stock Inspection: Regularly check finger stock for deformation, breakage, or loss of elasticity. Replace damaged parts promptly; store spare finger stock properly for emergency replacement.
- Lubrication Maintenance: Quarterly, apply lubricating grease to door lock transmission mechanisms and hinges to ensure smooth opening/closing and reduce wear.
- Locking Force Check: Annually check door lock locking force. Adjust promptly if loose to ensure uniform contact pressure around the entire perimeter.
- Usage Notes: Do not slam the door. Do not strike the knife edge or finger stock with hard objects. After closing the shielding door, confirm proper locking to avoid leakage from incomplete closure.
10.3 Filter System Maintenance
- Regular Inspection: Quarterly, check filter mounting bolts for looseness and terminal connections for oxidation or heating. Tighten and address issues promptly.
- Performance Testing: Annually, in conjunction with shielding effectiveness testing, verify filter performance. If insertion loss has decreased significantly, investigate the cause and replace if necessary.
- Usage Prohibitions: Do not connect other equipment in parallel before or after filters. Do not modify wiring without authorization. Do not exceed rated current, to avoid overload damage.
- Dust and Moisture Protection: Keep the filter installation environment dry and clean, avoiding insulation degradation caused by moisture and dust.
10.4 Grounding System Testing and Maintenance
- Ground Resistance Testing: Measure ground resistance quarterly. Increase testing frequency during rainy seasons or when soil moisture changes significantly. Investigate and address promptly if resistance exceeds limits.
- Connection Point Inspection: Annually, inspect all grounding connection points for corrosion or looseness. Grind, de-rust, re-tighten, and apply conductive grease.
- Down Conductor Inspection: Check grounding down conductors for damage or breakage. Repair damaged outer insulation promptly.
- Grounding Grid Maintenance: Do not excavate near the grounding grid or pour corrosive liquids. Regularly check grounding markers to prevent construction damage to grounding electrodes.
10.5 Common Fault Diagnosis and Troubleshooting Methods
| Fault Symptom | Possible Causes | Troubleshooting Methods |
|---|---|---|
| Decreased shielding effectiveness | 1. Shielding door finger stock worn, poor contact<br>2. Weld cracks, holes in shielding enclosure<br>3. Filter failure, loose wiring<br>4. Increased ground resistance<br>5. Damaged seals at cable wall penetrations | 1. Clean or replace finger stock, adjust locking force<br>2. Re-weld seams, seal holes<br>3. Tighten wiring, replace filters<br>4. Check grounding system, fix grounding points<br>5. Re-do wall penetration shielding seals |
| Shielding door jams during opening/closing | 1. Hinges lack lubrication, worn<br>2. Door lock transmission mechanism stuck<br>3. Door leaf sagging or deformed<br>4. Finger stock misaligned, rubbing | 1. Apply lubricating grease, replace worn hinges<br>2. Clean transmission mechanism, adjust linkage<br>3. Adjust hinge height, correct door leaf<br>4. Adjust finger stock position, correct knife edge |
| Indoor temperature/humidity exceeds limits | 1. Air conditioning fault, insufficient refrigerant<br>2. Ventilation fan damaged<br>3. Waveguide vent blocked, poor ventilation<br>4. Increased equipment heat generation | 1. Repair air conditioning, recharge refrigerant<br>2. Replace fan, check power supply<br>3. Clean waveguide vent filters and dust<br>4. Add heat dissipation equipment, optimize layout |
| Frequent electrical tripping | 1. Equipment overload, total current exceeds limit<br>2. Line leakage, degraded insulation<br>3. Circuit breaker aging, nuisance tripping<br>4. Surge protective device failed, short circuit | 1. Adjust load distribution, expand power distribution capacity<br>2. Locate leakage points, repair wiring<br>3. Replace circuit breaker<br>4. Replace surge protective device |
| Increased ground resistance | 1. Ground electrode corroded, poor contact<br>2. Connection points oxidized, loose<br>3. Dry soil, increased resistivity<br>4. Grounding electrode damaged | 1. Inspect ground electrode, replace corroded components<br>2. Grind connection points, re-tighten<br>3. Water around ground electrode, or add resistance-reducing agent<br>4. Repair damaged grounding electrode, install additional ground rods |
| Communication signal interference | 1. Signal filter failed<br>2. Poor grounding of cable shield layer<br>3. Lines running parallel with power cables causing coupling<br>4. Leakage points in shielding enclosure | 1. Replace signal filter<br>2. Check shield layer grounding, restore shielding<br>3. Adjust cable routing, separate power and signal cables<br>4. Locate leakage points, repair shielding |
10.6 Key Points for Long-Term Shutdown and Restart Maintenance
Pre-Shutdown Handling
1. Disconnect the main power supply, turn off all equipment.
2. Clean indoor hygiene, remove debris, keep dry.
3. Close and lock the shielding door. Apply anti-rust conductive grease to finger stock and knife edge.
4. Seal exterior openings of waveguide vents to prevent rainwater, insects, and rodents from entering.
5. Periodically (monthly) ventilate and dehumidify to prevent internal moisture and corrosion.
Pre-Restart Inspection
1. Comprehensively inspect the shielding enclosure, door, and filters for corrosion or damage.
2. Clean all conductive contact surfaces, check contact performance.
3. Measure electrical insulation resistance and ground resistance. Power on only after passing.
4. Power on and test each system individually. After confirming no faults, run the full system.
5. Conduct sampling shielding effectiveness testing. Put into use only after performance meets requirements.
Chapter 11 Safety Operation Regulations and Precautions
11.1 Construction Safety Operation Regulations
- All construction personnel must work with valid certifications and wear appropriate personal protective equipment, strictly complying with safety operation regulations.
- Conduct daily pre-shift safety briefings, clarifying the day’s work risks and protection requirements.
- Work at heights requires safety harnesses, hooked high and anchored low, with firmly erected work platforms. Throwing objects from heights is prohibited.
- Welding operations require a hot work permit, clearing of surrounding flammable materials, fire extinguishers on site, a designated fire watch, and confirmation of no residual fire after work.
- Electrical work shall implement the power-off and lockout/tagout system. The person who de-energizes shall re-energize. Scheduled power switching without coordination is prohibited.
- Hoisting operations require a designated signal person with clear, standardized signals. Personnel are prohibited within the hoisting radius. Hoisting shall stop when wind force ≥6 levels.
- Confined space operations require an external attendant, adequate ventilation, periodic rotation of personnel, and immediate evacuation if discomfort occurs.
- Smoking, working under the influence of alcohol, and horseplay are prohibited at the construction site.
11.2 Electrical Safety Regulations
- The power distribution system inside the shielding room shall be maintained by professional electricians. Unauthorized wiring and arbitrary load increases are prohibited.
- All electrical equipment metal enclosures must be reliably grounded. Equipment without ground protection is prohibited.
- Do not operate electrical switches with wet hands. Do not use electrical equipment in damp environments.
- Regularly inspect wiring, sockets, and switches. Replace promptly when damaged, overheated, or aged.
- Electrical equipment must be de-energized before cleaning. Washing live equipment with water is prohibited.
- In the event of an electrical fire, cut off the power supply first, then use dry powder or gas extinguishers. Water is prohibited.
- Turn off non-essential power when leaving for extended periods. Disconnect the main power supply during holidays.
11.3 Safety Requirements for Entering the Shielding Room
- Before entering the shielding room, confirm there are no internal hazards and ventilation is adequate.
- Strong magnetic, strong radiation, and flammable/explosive items are prohibited inside the shielding room.
- Before closing the shielding door, confirm no one remains inside to prevent personnel from being accidentally locked in.
- Long-duration enclosed operations inside the shielding room are prohibited. An attendant must remain outside, maintaining communication.
- The emergency escape door is for emergency use only and shall not be operated casually in daily use.
- Before entering high-grade shielding rooms, discharge personal static electricity to prevent static damage to equipment.
11.4 Emergency Response Plans
11.4.1 Fire Emergency Response
1. Immediately press the emergency alarm button upon discovering a fire, and call out to notify internal personnel to evacuate.
2. Cut off non-fire-fighting power, activate the gas extinguishing system, and personnel shall evacuate quickly through the shielding door.
3. Call 119, describe the situation, and guide firefighters at the entrance.
4. For small fires, use nearby fire extinguishers while calling for backup.
11.4.2 Personnel Trapped Emergency Response
1. If personnel are accidentally locked inside the shielding room, use the internal emergency door release device to open the shielding door.
2. If unable to open independently, external personnel shall open the door manually or contact technical personnel for resolution.
3. Reassure the trapped personnel, maintain communication, and confirm their condition.
4. Keep emergency exits clear at all times. Store emergency tools in accessible locations.
11.4.3 Electric Shock Emergency Response
1. Immediately cut off the power supply, or use insulating objects to separate the victim from the power source. Do not pull the victim with bare hands.
2. Move the victim to a ventilated area, loosen the collar, check breathing and pulse, and perform CPR if necessary.
3. Call 120 and transport to hospital for treatment.
4. Protect the scene, investigate the cause of the shock, and implement corrective measures.
11.5 Environmental Protection and Occupational Health Requirements
- Waste generated during construction, including used welding rods, paint buckets, and cables, shall be sorted, collected, and disposed of in compliance with regulations. Arbitrary disposal is prohibited.
- Wear dust masks and protective goggles during welding and grinding operations to reduce harm from fumes and arc light.
- Wear earplugs for high-noise operations to prevent hearing damage.
- After indoor finishing and sealant application, ensure adequate ventilation before occupancy, allowing harmful gases to dissipate.
- Regularly test indoor air quality to ensure personnel health.
Chapter 12 After-Sales Service and Technical Support
12.1 Warranty Service Commitment
Guangdong Lain Intelligent System Development Co., Ltd. provides comprehensive warranty services for its shielding containers:
- Complete Machine Warranty: 24 months of free warranty service from the date of acceptance. Product quality issues not caused by human damage during the warranty period shall be repaired free of charge, with free replacement of components.
- Core Component Warranty: 5-year warranty for the shielding enclosure structure. 12-month warranty for wearable parts such as shielding door finger stock and filters.
- Post-Warranty Service: Lifetime repair service at cost price and spare parts supply after the warranty period expires, charging only material costs and labor/travel expenses.
- Response Time: Technical solutions provided within 2 hours of receiving a fault report. For on-site service: arrival within 24 hours in the Pearl River Delta region, within 48 hours in other domestic regions.
12.2 Technical Support and Training Services
- Installation and Commissioning Support: Upon product delivery, the manufacturer shall dispatch professional technical personnel for on-site installation and commissioning guidance to ensure product performance meets standards.
- Operation Training: Free operation training for user operation and maintenance personnel, covering daily use, inspection and maintenance, and common fault handling. Personnel shall pass an assessment after training before independent operation.
- Technical Consultation: 7×24 hour technical support hotline to answer user technical questions and provide professional solutions.
- Upgrade Services: Value-added services including shielding effectiveness upgrades, functional expansion, and system modification based on user requirements.
- Regular Follow-up Visits: Quarterly telephone follow-ups during the warranty period and annual on-site inspection to proactively identify potential issues and ensure stable equipment operation.
12.3 Spare Parts Supply
- The manufacturer maintains a full range of spare parts in stock, including shielding finger stock, conductive grease, sealing sealant, filters, door lock components, electrical components, etc., ensuring rapid supply.
- Each product includes a standard spare parts kit containing common wear parts and special tools for daily maintenance and emergency replacement.
- Spare parts can be ordered via the service hotline with courier delivery. Emergency items can be arranged for expedited shipping.
12.4 Contact Information
- Manufacturer: Guangdong Lain Intelligent System Development Co., Ltd.
- Service Hotline: +86 13538869979 (also on WeChat)
- Technical Support: +86 13538869979
- Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou City, Zhongrun Industrial Park
- Official Website: https://gdlain.com
Users may contact us through the above channels at any time for any issues encountered during product use. Guangdong Lain will provide professional and efficient service to ensure long-term stable and reliable operation of the shielding container.
Appendix
Appendix A List of Relevant Standards
- GB/T 50719-2011 “Technical code for electromagnetic shielding enclosure engineering”
- GB/T 51103-2015 “Code for construction and quality acceptance of electromagnetic shielding enclosure engineering”
- GB/T 12190-2021 “Measurement methods for shielding effectiveness of electromagnetic shielding enclosures”
- GB 50057-2010 “Code for design protection of structures against lightning”
- GB 50169-2016 “Code for construction and acceptance of grounding device of electrical equipment installation engineering”
- GJB 5792-2006 “General specification for military electromagnetic shielding enclosures”
- BMB 19-2006 “Technical requirements for security protection of computer information systems involving state secrets”
- GB 50462-2024 “Standard for construction and acceptance of data center infrastructure”
- GB 50370-2005 “Code of design for gas fire extinguishing systems”
- GB/T 36340-2018 “General specification for antistatic access flooring”
Appendix B Installation and Commissioning Record Forms (Templates)
- Container hoisting and positioning record form
- Shielding door installation and commissioning record form
- Grounding system construction and testing record form
- Electrical system installation and commissioning record form
- Shielding effectiveness testing record form
- System trial operation record form
- Completion acceptance certificate
Appendix C Spare Parts List
| No. | Spare Part Name | Specification/Model | Quantity | Remarks |
|---|---|---|---|---|
| 1 | Beryllium Copper Finger Stock | For standard door | 2 meters | Spare for replacement |
| 2 | Conductive Grease | 100g container | 1 box | For maintenance |
| 3 | Electromagnetic Sealant | 310ml | 2 tubes | For leak sealing |
| 4 | Special Wrench | Shielding door specific | 1 piece | For commissioning and maintenance |
| 5 | Fuse | Matching specification | 10 pieces | Electrical spare |
| 6 | Filter Outlet | 10A, 5-hole | 2 pieces | Spare for replacement |
The final interpretation right of this manual belongs to Guangdong Lain Intelligent System Development Co., Ltd. This manual will be revised concurrently during product technology upgrades and specification updates without prior notice. For the latest version or customized technical solutions, please visit the official website https://gdlain.com or call the service hotline.