Intrinsically Safe Explosion-Proof Temperature and Humidity Sensor System

Table of Contents

1. Cover / Document Information

– Document Title: Intrinsically Safe Explosion-Proof Temperature and Humidity Sensor System Technical Design Solution

– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Date: August 2026

– Version: V1.0

– Project Type: Technical design solution for Intrinsically Safe Explosion-Proof Temperature and Humidity Sensor System

2. Table of Contents Structure

1. Company Introduction

2. Project Overview

3. User Requirement Analysis

4. Overall Design Description

5. Detailed System Design and Product Technical Parameters

6. Project Quotation and Configuration List

7. Core Solution Advantages

8. Technical Q&A

9. Construction Schedule Plan

10. Construction Organization Plan

11. After-Sales Service System

12. Operation and Maintenance Training Plan

13. Typical Project Cases

14. SEO Optimization System and Website Backend Configuration

15. Contact Information

3. Company Introduction

3.1 Company Development Overview

Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.

After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.

3.2 Core Business System

The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:

– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;

– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;

– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;

– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.

3.3 Brand and Qualification Honors

The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.

3.4 Core Competitive Advantages

1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;

2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;

3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;

4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.

4. Project Background and Objectives

4.1 Project Background

In chemical, fireworks, pharmaceutical and warehousing industries, numerous warehouses store flammable and explosive materials. Per the classification of explosive hazardous environments, such warehouses are divided into different hazard levels: Class 1.1 process warehouses are high-hazard explosive areas, and Class 1.3 finished product warehouses are medium-hazard explosive areas. Temperature and humidity directly affect material storage safety: excessive temperature accelerates volatilization of flammable/explosive materials and increases self-ignition risk; excessive humidity causes deliquescence, corrosion and insulation degradation; overly dry conditions aggravate static accumulation, and electrostatic discharge sparks can become ignition sources.

Traditional ordinary temperature/humidity sensors lack explosion-proof performance and cannot be installed in hazardous areas; some flameproof-enclosure sensors are bulky, complex to install and costly to maintain; sensors using POE power or built-in batteries may generate sparks or high-temperature surfaces under fault conditions, becoming safety hazards. Therefore, intrinsically safe temperature/humidity monitoring systems matching the corresponding explosion-proof levels are necessary for different hazard-level warehouses.

4.2 Significance of Construction

– Compliance guarantee: strictly follows 《Code for Design of Electrical Installations in Explosive Atmospheres》and 《Explosive Atmospheres – General Requirements for Equipment》— matching monitoring equipment per Class 1.1/1.3 levels ensures the project passes explosion-proof safety acceptance;

– Intrinsic safety improvement: intrinsically safe technology limits ignition sources at the circuit energy level — even short circuits or component damage cannot produce sparks or hot surfaces capable of igniting explosive mixtures;

– Precise environment control: real-time collection, transmission, storage and display of temperature/humidity data, timely detection of anomalies to avoid material deterioration and safety incidents;

– Intelligent alarming: multi-level threshold alarms via sound/light, software pop-up and SMS, driving linked control devices for closed-loop environment management;

– Reduced O&M cost: small size, convenient installation, high reliability and remote monitoring greatly reduce inspection frequency and labor cost.

4.3 Applicable Scenarios

– Class 1.1 explosive process warehouses (initiating explosives, black powder, pyrotechnic compositions production/storage);

– Class 1.3 explosive finished product warehouses (fireworks products, flammable chemical products storage);

– Other explosive gas environments Zone 0/1/2 and combustible dust environments Zone 20/21/22 temperature/humidity monitoring;

– Explosion-proof area monitoring in chemical, pharmaceutical, military, petroleum and gas industries.

4.4 Construction Objectives

– Class 1.1 process warehouses: intrinsically safe sensors with explosion-proof rating not lower than Ex ia IIC T6 Ga / Ex ia IIIC T80℃ Da (dual gas and dust protection);

– Class 1.3 finished product warehouses: sensors not lower than Ex ib IIC T6 Gb / Ex ib IIIC T80℃ Db;

– System powered entirely by intrinsically safe DC energy limiting — POE and battery power strictly prohibited;

– 24-hour uninterrupted temperature/humidity collection with industrial-grade accuracy and stable data transmission;

– Central monitoring platform with real-time display, history query, report export, threshold alarms and permission management;

– All explosion-proof devices with explosion-proof certificates and explosion-proof 3C certification.

5. User Requirement Analysis

5.1 Explosion-Proof Level Compliance Requirements

Class 1.1 process warehouses (overall explosion hazard; gas Zone 0/1, dust Zone 20/21) require the highest protection level:

– Gas: not lower than Ex ia IIC T6 Ga — intrinsically safe ia level, IIC gas group, max surface temperature ≤85℃ (T6), protection level Ga (Zone 0 applicable);

– Dust: not lower than Ex ia IIIC T80℃ Da — intrinsically safe ia level, III conductive dust, max surface temperature ≤80℃, protection level Da (Zone 20 applicable).

Class 1.3 finished product warehouses (combustion hazard, no overall explosion; gas Zone 2, dust Zone 22) may use ib level:

– Gas: not lower than Ex ib IIC T6 Gb (Zone 1/2 applicable);

– Dust: not lower than Ex ib IIIC T80℃ Db (Zone 21/22 applicable).

5.2 Mandatory Power Supply Requirements

– POE power prohibited: POE voltage/current lack intrinsically safe energy-limiting characteristics; line faults may produce high-energy sparks; POE switches are typically in non-hazardous areas and cannot guarantee intrinsically safe performance on the hazardous side;

– Battery power prohibited: battery leakage, short circuit, overcharge/discharge may cause high temperature or sparks; battery replacement requires opening the device in the hazardous area, greatly increasing risk;

– All hazardous-area devices must be powered through intrinsically safe barriers on the safe side, with the entire supply circuit compliant with intrinsically safe circuit requirements — cables, terminals and connectors matched to intrinsically safe design.

5.3 Product Certification Requirements

– All hazardous-area explosion-proof devices must provide explosion-proof certificates from authorized national inspection bodies, with verifiable certificate numbers matching the design level;

– Devices in the mandatory product certification catalog must provide explosion-proof 3C certificates;

– Barriers and associated equipment must have corresponding explosion-proof qualifications, forming an intrinsically safe system with overall/compatibility certification.

5.4 Temperature/Humidity Monitoring Functional Requirements

– Temperature range covering year-round warehouse changes with industrial-grade accuracy and fine resolution;

– Humidity range 0-100%RH with accuracy maintained in high-humidity and low-temperature environments, condensation compensation;

– Configurable acquisition frequency (default 1/s); RS485 bus with standard Modbus-RTU protocol;

– Anti-interference capability for complex industrial electromagnetic environments, low packet loss.

5.5 Data Management and Alarm Requirements

– Real-time display via electronic map, list and curve views;

– Historical data storage ≥1 year with time/point-based report export;

– Upper/lower threshold settings with multi-level alarms (software pop-up, sound, sound/light alarm linkage);

– Alarm records stored and queryable (time, point, value, handling);

– Multi-level user permissions (administrator/operator/visitor).

5.6 System Stability and O&M Requirements

– MTBF ≥50000h for long-term continuous operation;

– Sensor enclosure IP65 for dusty, humid warehouse environments;

– Self-diagnosis with online/communication status monitoring and offline alarms;

– Convenient installation, wiring and maintenance;

– Good scalability for adding points and other environmental sensors.

6. Design Principles and Applicable Standards

6.1 Design Basis

– GB 3836.1-2010 Explosive Atmospheres Part 1: Equipment General Requirements

– GB 3836.4-2010 Explosive Atmospheres Part 4: Equipment Protected by Intrinsic Safety “i”

– GB 3836.15-2017 Explosive Atmospheres Part 15: Design, Selection and Installation of Electrical Installations

– GB 50058-2014 Code for Design of Electrical Installations in Explosive Atmospheres

– GB 12476.1-2013 Electrical Apparatus for Use in the Presence of Combustible Dust Part 1: General Requirements

– GB 12476.4-2010 Electrical Apparatus for Use in the Presence of Combustible Dust Part 4: Intrinsic Safety “iD”

– GB 50168-2018 Code for Construction and Acceptance of Cable Lines for Electrical Installation Works

– GB 50303-2015 Code for Acceptance of Building Electrical Installation Works

– GB/T 2887-2011 General Specification for Computer Field

– AQ 3009-2007 Code for Electrical Safety of Hazardous Locations

– Project site conditions and user technical requirements

6.2 Design Principles

1. Explosion-proof safety first: all equipment selection, circuit design and construction processes center on explosion safety, strictly matching site hazard levels, eliminating any design hazard that could become an ignition source;

2. Compliance: full compliance with national explosion-proof electrical standards; all devices with authoritative certifications to pass fire, safety supervision and explosion-proof acceptance;

3. Reliability: industrial-grade mature products and architectures, wide-temperature core components, anti-interference, lightning, over-current and over-voltage protection;

4. Advanced and practical: mature intrinsically safe and digital sensing technologies combined with practical needs, optimal cost performance;

5. Scalability: modular bus architecture with reserved capacity for adding points and sensors (combustible gas, differential pressure, liquid level);

6. Easy O&M: self-diagnosis, clear fault location, standardized wiring.

7. System Architecture and Working Principle

7.1 Overall System Architecture

The system uses a layered architecture from bottom to top: perception layer, isolation protection layer, transmission layer and monitoring management layer.

Perception layer (hazardous area): intrinsically safe temperature/humidity sensors — Ex ia sensors in Class 1.1 process warehouses, Ex ib sensors in Class 1.3 finished product warehouses. All are intrinsically safe: energy released under normal and fault conditions is below the minimum ignition energy of explosive mixtures. Industrial-grade enclosures adapt to harsh warehouse environments.

Isolation protection layer (safe area control cabinet): isolation-type intrinsically safe barriers, one per sensor. Core functions: energy limiting (strictly limiting voltage/current delivered to the hazardous side); signal isolation (electrical isolation between hazardous and safe sides); fault blocking (rapid disconnection on safe-side over-voltage/over-current).

Transmission layer: intrinsically safe shielded cables (copper shielded twisted pair, RS485), hot-dip galvanized steel conduits (mechanical protection and explosion-proof sealing), explosion-proof junction boxes and cable glands; intrinsically safe and non-intrinsically safe circuits strictly separated.

Monitoring management layer (safe-area control room): industrial monitoring host with monitoring software, sound/light alarm, DC stabilized power supply. The power supply provides DC24V through barriers to the hazardous area; the host collects, processes, stores and displays all point data.

7.2 Intrinsic Safety Principle

Intrinsic safety limits the energy of electrical circuits so that sparks and thermal effects under normal and specified fault conditions cannot ignite the explosive mixture. Unlike flameproof (enclosure protection) types, intrinsic safety is “active protection” from the circuit root: high safety level (ia applicable to Zone 0); fault safety (even short circuits or component damage keep energy in the safe range); small size and light weight (no heavy flameproof enclosure); low maintenance cost; dual gas/dust certification coverage.

– ia level: no ignition under normal + one fault + any combination of two faults — highest safety, for Zone 0/1/2;

– ib level: no ignition under normal + one fault — for Zone 1/2.

In this project: Class 1.1 high-hazard warehouses use ia devices; Class 1.3 medium-hazard warehouses use ib devices — precise matching of safety level and hazard level balancing safety and economy.

7.3 Power Supply System Design

The system adopts “centralized DC supply + barrier energy-limited output”: the control cabinet’s industrial DC stabilized power supply converts AC220V to DC24V; each barrier channel limits energy and delivers to the hazardous-area sensor via intrinsically safe cable; each sensor is independently powered by its own barrier channel — single-circuit faults do not affect other circuits. POE and battery power are strictly prohibited for the reasons documented in the requirement analysis (uncontrolled energy, no intrinsic isolation, regulatory prohibition, thermal runaway risk).

8. Detailed Technical Design

8.1 ia-Class Intrinsically Safe Temperature/Humidity Sensor (KTZ-TH-Ex-ia)

Designed for Zone 0/20 most dangerous environments, dual ia gas and dust certification, imported industrial sensing chips with high-precision signal processing and intrinsically safe energy-limiting design.

Parameter Value
Temperature range/accuracy -40℃~+85℃; ±0.2℃ (25℃), ±0.3℃ (-10℃~65℃); resolution 0.01℃
Humidity range/accuracy 0-100%RH; ±2%RH (25℃, 20-80%RH), ±3%RH full range; resolution 0.01%RH
Sensors Imported PT1000 platinum resistance / capacitive humidity chip; condensation tolerant with auto recovery
Electrical DC12-24V intrinsically safe input, ≤30mA, ≤0.72W; RS485 Modbus-RTU; 1200-19200bps; 32 devices/bus; 1200m distance
Explosion rating Ex ia IIC T6 Ga / Ex ia IIIC T80℃ Da; Ui=28V, Ii=93mA, Pi=0.65W
Certification GB 3836.1/3836.4, GB 12476.1/12476.4; explosion-proof certificate + 3C
Mechanical ADC12 die-cast aluminum, IP65, wall mount, M20×1.5 gland, 110×85×45mm, ~280g
Environment -40℃~+85℃ operating; vibration 10-2000Hz 10g; EMC per GB/T 17626

8.2 ib-Class Intrinsically Safe Temperature/Humidity Sensor (KTZ-TH-Ex-ib)

For Zone 1/2 gas and Zone 21/22 dust environments, ib dual certification; high accuracy, stability and cost performance.

Parameter Value
Temperature range/accuracy -40℃~+85℃; ±0.3℃ (25℃), ±0.5℃ full range; resolution 0.1℃
Humidity range/accuracy 0-100%RH; ±3%RH (25℃, 20-80%RH), ±4%RH full range
Sensors Imported NTC thermistor / industrial capacitive humidity chip
Electrical DC12-24V, ≤25mA, ≤0.6W; RS485 Modbus-RTU; 1000m distance
Explosion rating Ex ib IIC T6 Gb / Ex ib IIIC T80℃ Db; Ui=30V, Ii=100mA, Pi=0.75W
Mechanical ABS + aluminum base, IP65, 100×80×40mm, ~200g

8.3 Single-Channel Isolation Intrinsically Safe Barrier (KTZ-SG-101)

Power + signal integrated isolation barrier installed in the safe area; photoelectric isolation and energy-limiting circuits with three-terminal isolation (power, safe-side signal, intrinsically safe-side signal), isolation voltage 2500V AC 1min.

– Safe side: DC20-26V (rated 24V), ≤50mA no-load; RS485 half duplex, 300-115200bps;

– Intrinsically safe side: output rated DC24V limited ≤28V, current ≤93mA, power ≤0.65W; Co 0.08μF, Lo 2mH; cable capacitance ≤50nF/km, inductance ≤1mH/km;

– Performance: transmission error ≤0.1%, temp drift ≤50ppm/℃, response ≤10ms, cable length ≤1200m;

– Rating: [Ex ia Ga]IIC associated equipment; safe area installation only; DIN rail 35mm; 12.5×100×115mm; IP20; GB 3836.1/3836.4.

8.4 Industrial DC Stabilized Power Supply (KTZ-DY-2410)

– Input AC100-240V 50/60Hz; output DC24V ±1%, 10A, 240W; ripple ≤100mVpp; efficiency ≥88%;

– Protection: over-current (110-150%), over-voltage (110-120%), short-circuit, over-temperature (85℃), built-in surge suppression;

– DIN rail/screw mount, metal housing, 199×110×50mm, -10℃~+60℃, natural cooling, IP20, MTBF ≥100000h.

8.5 Increased-Safety Explosion-Proof Junction Box (KTZ-JXH-Exe)

– Rating: Ex e IIC T6 Gb / ExtD A21 IP65 T80℃; ADC12 die-cast aluminum, electrostatic powder coating, IP65;

– 4-position internal terminals (10A, 0.5-2.5mm²), 4× M20×1.5 entries, 100×100×80mm, wall mount, -40℃~+85℃, WF1 corrosion grade.

8.6 Explosion-Proof Cable Gland (M20×1.5)

– Brass nickel-plated, NBR seals, cable OD φ6-12mm, thread length 10mm, IP65, Ex e IIC, -40℃~+100℃, compression ≥1000N.

8.7 Hot-Dip Galvanized Explosion-Proof Conduit

– DN20, wall 1.5mm, carbon steel, internal/external hot-dip galvanizing ≥85μm, GB/T 3091-2015, threaded connection with fittings; mechanical protection and fire/explosion isolation.

8.8 Intrinsically Safe Shielded Signal Cable (RVSP 2×1.5mm²)

– Multi-strand oxygen-free copper (48 strands), PVC insulation 0.6mm, aluminum foil + copper braid shielding (density ≥85%), PVC sheath; low capacitance/inductance for intrinsically safe circuits.

8.9 Industrial Monitoring Host (KTZ-JK-610)

– Intel Celeron J4125 quad-core 2.0GHz (turbo 2.7GHz), 8GB DDR4, 256GB SSD, industrial embedded motherboard;

– 2× RS232, 4× RS485 (photoelectric isolation), 2× gigabit Ethernet, 4× USB2.0 + 2× USB3.0, VGA+HDMI;

– 1U rack-mount industrial chassis, 220V ATX power, fanless/low-noise, 0℃~50℃, MTBF ≥50000h.

8.10 Monitoring Software (KTZ-Monitor V2.0)

– Platform: Windows 7/10/Server; SQLite/MySQL; C/S architecture; C# + .NET;

– Modules: real-time monitoring (electronic map, list, curves, 1-60s refresh, abnormal highlight); alarm management (independent upper/lower thresholds, multi-level alarms, pop-up/sound/light/SMS extension, records and statistics); historical data (≥1 year storage, time/point query, curves, Excel/CSV export, daily/monthly/annual reports); system configuration (point management, parameters, 3-level users, logs, communication); expansion (other sensors, linkage control output, WEB/APP).

9. Recommended Configuration and Preliminary Budget

9.1 Configuration List

Typical scenario: 1× Class 1.1 process warehouse + 1× Class 1.3 finished product warehouse; quantities adjustable per actual warehouse/point count. All explosion-proof devices with explosion-proof certificate and 3C certification; full intrinsically safe DC power, no POE, no battery.

I. Class 1.1 Process Warehouse Acquisition Devices

No. Item Model Unit Qty Note
1 ia intrinsically safe temp/humidity sensor KTZ-TH-Ex-ia unit 2 Ex ia IIC T6 Ga / Ex ia IIIC T80℃ Da, RS485, DC12-24V

II. Class 1.3 Finished Product Warehouse Acquisition Devices

No. Item Model Unit Qty Note
2 ib intrinsically safe temp/humidity sensor KTZ-TH-Ex-ib unit 4 Ex ib IIC T6 Gb / Ex ib IIIC T80℃ Db, RS485

III. Safe-Area Control Equipment

No. Item Model Unit Qty Note
3 Single-channel isolation barrier KTZ-SG-101 unit 6 Ex ia intrinsically safe side, power+signal isolation, 1 per sensor
4 Industrial DC stabilized power KTZ-DY-2410 unit 1 AC220V in, DC24V/10A out
5 Industrial monitoring host KTZ-JK-610 unit 1 With software license
6 Monitoring software KTZ-Monitor V2.0 set 1 Real-time, alarm, history, reports
7 Indoor sound/light alarm KTZ-SG-200 unit 1 Linked alarm

IV. Explosion-Proof Installation Auxiliaries

No. Item Model Unit Qty Note
8 Increased-safety junction box KTZ-JXH-Exe pc 6 Die-cast aluminum, IP65, Ex e IIC T6 Gb
9 Explosion-proof cable gland M20×1.5 brass Ni pc 12 φ6-12mm, IP65
10 Sensor wall bracket 304 stainless set 6 With screws/anchors
11 Galvanized conduit DN20 wall 1.5mm m 50 Per actual route
12 Intrinsically safe shielded cable RVSP 2×1.5mm² m 300 RS485 shielded twisted pair
13 Control cabinet and auxiliaries 600×800×200mm wall cabinet set 1 Terminals, trays, breakers, SPD

V. Engineering and Service

No. Item Unit Qty Note
14 System installation and commissioning item 1 Conduit, installation, wiring, commissioning
15 Transport and insurance item 1 To project site
16 Training and warranty item 1 1-year warranty, on-site training, support

9.2 Quotation Notes

The list covers the typical scenario of one Class 1.1 and one Class 1.3 warehouse; quantities can be adjusted per actual warehouse count and point count. The quotation includes equipment, installation, commissioning, training and 1-year warranty; transportation and taxes itemized separately. All reference prices in this solution are in RMB (CNY) only and are for reference purposes; a formal quotation is issued after configuration confirmation.

10. Technical Specifications

10.1 System Performance Summary

Item Specification
Hazard coverage Class 1.1 (ia) and Class 1.3 (ib) warehouses; gas Zone 0/1/2, dust Zone 20/21/22
Gas explosion rating Ex ia IIC T6 Ga / Ex ib IIC T6 Gb
Dust explosion rating Ex ia IIIC T80℃ Da / Ex ib IIIC T80℃ Db
Temperature accuracy ia: ±0.2℃; ib: ±0.3℃ (25℃)
Humidity accuracy ia: ±2%RH; ib: ±3%RH (20-80%RH)
Power Intrinsically safe DC12-24V via barriers; POE/battery prohibited
Communication RS485 Modbus-RTU, up to 1200m, 32 devices/bus
Sensor IP rating IP65
MTBF ≥50000h (sensors/host)
Certification Explosion-proof certificates + explosion-proof 3C

10.2 Key Component Specifications

Component Key Parameters
ia sensor PT1000, Ui=28V/Ii=93mA/Pi=0.65W, ADC12 aluminum, 110×85×45mm
ib sensor NTC, Ui=30V/Ii=100mA/Pi=0.75W, ABS+aluminum, 100×80×40mm
Barrier 3-terminal isolation 2500VAC, output ≤28V/93mA/0.65W, Co 0.08μF/Lo 2mH
Power supply 24V/10A, protections full set, MTBF ≥100000h
Junction box Ex e IIC T6 Gb, IP65, 4 terminals
Gland M20×1.5 brass Ni, IP65, φ6-12mm
Conduit DN20 galvanized ≥85μm
Cable RVSP 2×1.5mm², foil+braid ≥85%
Host J4125, 8GB, 256GB SSD, 4×RS485 isolated

11. Key Advantages and Customer Value

11.1 Full-Chain Explosion-Proof Compliance, Zero Acceptance Risk

From sensors, junction boxes and glands to barriers, all explosion-related links strictly follow national standards; device explosion-proof levels precisely match warehouse hazard levels (ia for Class 1.1, ib for Class 1.3) eliminating downgrade compliance risk. All devices provide authoritative explosion-proof certificates and 3C certification with complete verifiable documentation, ensuring smooth passage of safety supervision, fire and explosion-proof acceptance.

11.2 Intrinsic Safety Technology Eliminates Explosion Hazards at the Root

Intrinsically safe technology is a higher safety level than flameproof: flameproof relies on enclosures to withstand internal explosions (“passive protection” — lost if the enclosure is damaged); intrinsic safety limits circuit energy so neither normal nor fault states produce ignition sources (“active protection”) — even damaged devices or exposed wires cannot cause explosion, with higher safety redundancy.

11.3 Rigorous Power Supply Design Avoids Violation Risks

Against the explicitly prohibited POE and battery power, the solution adopts the standard “centralized DC power + barrier energy limiting” intrinsically safe architecture — every supply path passes independent barrier energy limiting and isolation, keeping hazardous-side circuit energy within safe thresholds, eliminating POE high-energy supply and battery thermal runaway hazards from the design source.

11.4 Industrial-Grade Hardware for Long-Term Stable Operation

All core components are industrial-grade wide-temperature; imported sensor chips; multiple protections (anti-interference, lightning, over-current, over-voltage, reverse connection); IP65 enclosures for dusty, humid, wide-temperature-difference warehouses; MTBF over 50000h for 24-hour year-round operation with greatly reduced O&M cost.

11.5 Precise and Stable Measurement, Trustworthy Data

High-precision sensing chips with professional calibration: temperature accuracy ±0.2℃, humidity ±2%RH, high resolution, low drift, good long-term stability; shielded cables with differential transmission resist industrial electromagnetic interference, low packet loss, long transmission distance.

11.6 Flexible Architecture for Easy Expansion

Bus-based modular architecture with reserved capacity: adding points only requires new sensors and barriers connected to the existing bus without rewiring; supports expansion with combustible gas detectors, pressure transmitters and level sensors for multi-parameter monitoring, protecting investment.

11.7 Full-Process Professional Service

One-stop service from site survey, solution design, product supply, installation and commissioning, acceptance training to after-sales O&M; professional team follow-up, 7×24 support, free on-site repair during warranty, lifetime cost-price maintenance, periodic inspection to proactively eliminate hazards.

12. Technical Q&A (50+ Items)

12.1 Basic Knowledge Questions

Q1: What is intrinsically safe explosion-proof equipment?

A: Intrinsically safe (IS) equipment limits electrical circuit energy by design so that sparks and thermal effects under normal and specified fault conditions cannot ignite the surrounding explosive mixture. IS protection achieves safety at the circuit root — active protection and one of the safest explosion-proof types.

Q2: What do Class 1.1 and Class 1.3 warehouses mean?

A: Hazard levels for civil explosives and fireworks industry warehouses: Class 1.1 process warehouses store materials with overall explosion hazard — the highest level; Class 1.3 finished product warehouses store materials with combustion hazard but generally no overall explosion. Corresponding electrical device levels differ: Class 1.1 requires ia-level devices; Class 1.3 may use ib-level.

Q3: What is the difference between gas and dust explosion protection? Why dual certification?

A: Gas protection targets explosive gases (methane, hydrogen, acetylene); dust protection targets combustible dusts (aluminum, magnesium, coal, powder). Their mechanisms and standards differ. Many chemical and fireworks warehouses have both gas volatilization and dust suspension risks, so devices need dual gas and dust certification for full-scenario safety.

Q4: What is IIC level? How does it compare to IIB and IIA?

A: Explosive gases are classified IIA, IIB, IIC by minimum ignition energy — IIA easiest to ignite, IIC hardest, requiring the highest device protection. IIC devices cover IIA/IIB environments with the strongest universality, suitable for hydrogen, acetylene and other most dangerous gases. This solution uses IIC devices for most dangerous gas scenarios.

Q5: What is the T6 temperature class?

A: The temperature class indicates the maximum surface temperature a device may reach at rated operation. T6 = max 85℃, the strictest class. Lower temperature class means lower surface temperature and less ignition likelihood. T6 covers T1-T5 with the strongest universality and highest safety.

Q6: What is an intrinsically safe barrier? Is it mandatory?

A: The barrier is the core associated device installed in the safe area: it limits voltage/current delivered to the hazardous area and electrically isolates hazardous and safe sides, preventing safe-side fault energy entering the hazardous area. Any hazardous-area IS device requires a matching barrier — otherwise no intrinsically safe system exists and no explosion-proof performance.

Q7: What is the difference between IS cable and ordinary cable?

A: IS circuits have strict requirements on cable distributed capacitance/inductance, as cable energy storage affects IS circuit safety. IS cable uses low-capacitance, low-inductance design with better shielding, and must be laid separately from non-IS cables. Ordinary cables have uncontrollable distributed parameters that may cause IS circuit energy to exceed limits.

Q8: What does IP65 mean?

A: IP ratings: first digit dust, second water. IP65: 6 = dust-tight (no dust entry); 5 = protected against low-pressure water jets. IP65 suits dusty, humid warehouse environments, preventing dust and moisture damage.

12.2 Compliance Questions

Q9: Why must Class 1.1 warehouses use ia-level devices, not ib?

A: Per GB 50058, ia applies to Zone 0/1/2; ib only to Zone 1/2. Class 1.1 process warehouse interiors are zones with continuous or long-term explosion hazard (Zone 0/20) requiring the highest ia level. Using ib is downgrading — non-compliant, fails explosion-proof acceptance, and poses major safety hazards.

Q10: Why can’t POE power be used?

A: POE voltage is typically 48V with 15W+ power, far above IS circuit energy limits — line short circuits produce high-energy sparks; ordinary POE switches lack IS isolation/energy-limiting design; national explosion-proof codes require hazardous-area powered devices to hold corresponding certification — ordinary POE equipment is not explosion-proof and is strictly prohibited in hazardous areas.

Q11: Why can’t battery-powered sensors be used?

A: Batteries may thermally run away (short circuit, over-temperature, crushing) producing fire or explosion — becoming the hazard source itself; battery replacement requires opening the device in the hazardous area (static and spark risks); battery performance drops sharply at low temperatures causing unexpected power loss and data interruption; battery devices are difficult to certify at the highest IS level.

Q12: What documents prove compliance?

A: Explosion-proof certificates from authorized national inspection bodies (verifiable numbers), explosion-proof 3C certificates for catalog devices, barrier associated-device certification, and the complete intrinsic safety system certification — all delivered with the project for acceptance.

Q13: Can non-certified similar products be substituted?

A: No — any substitution must hold equivalent certification matching the design level; unauthorized substitution voids compliance and acceptance. Any change request must be confirmed with the project team and documented.

12.3 Product Technical Questions

Q14: How is the sensor powered in the hazardous area?

A: Safe-area DC24V stabilized power → barrier energy limiting (≤28V/93mA/0.65W) → intrinsically safe cable → sensor. Each sensor has an independent barrier channel; the entire path is intrinsically safe.

Q15: How far can the sensor transmit?

A: Up to 1200m (ia, with standard shielded twisted pair) and 1000m (ib) on RS485; up to 32 devices per bus with repeaters for extension.

Q16: What is the acquisition frequency?

A: Configurable, default 1 sample/second; adjustable per needs (1-60s) via software configuration.

Q17: Can the sensor work in condensation conditions?

A: Yes — sensors support short-term condensation with automatic recovery; high-humidity warehouse environments are within design scope.

Q18: What is the sensor’s temperature drift?

A: ia: ≤0.02℃/year temperature drift, ≤0.1℃/year long-term stability; humidity drift ≤0.5%RH/year, long-term ≤1%RH/year — requiring annual calibration in normal use.

Q19: Why does the ia sensor use PT1000 while ib uses NTC?

A: PT1000 platinum resistance offers higher precision and stability (±0.2℃) for the most demanding Zone 0/Class 1.1 environments; NTC thermistor provides good accuracy (±0.3℃) at lower cost for ib applications — balancing performance and economy per hazard level.

Q20: What are the IS parameters and why do they matter?

A: ia: Ui=28V, Ii=93mA, Pi=0.65W; ib: Ui=30V, Ii=100mA, Pi=0.75W. These define the maximum energy the device may receive from the barrier; barrier output must not exceed these values to maintain IS safety.

Q21: How is data transmission protected from interference?

A: Shielded twisted pair with aluminum foil + copper braid (≥85%), RS485 differential signaling, photoelectric isolation on host RS485 ports, and galvanized conduit shielding — multi-layer protection for stable transmission in industrial electromagnetic environments.

12.4 Installation and Construction Questions

Q22: Why must cables in hazardous areas run in steel conduits?

A: Three functions: mechanical protection (against extrusion, wear, corrosion); fire/explosion isolation (conduit blocks flame spread preventing one explosion igniting the whole line); shielding (enhanced anti-interference). Hazardous-area electrical lines must use steel or flexible explosion-proof conduits — open wiring is prohibited.

Q23: What is the difference between explosion-proof and ordinary junction boxes?

A: Explosion-proof boxes use high-strength enclosures with strict gap and width requirements on mating surfaces, and explosion-proof glands at cable entries sealing internal sparks inside. Ordinary boxes lack explosion-proof sealing — strictly prohibited in hazardous areas; all joints must be inside explosion-proof boxes with no exposed connections.

Q24: Can IS and non-IS circuits share a conduit?

A: Absolutely not — IS and non-IS circuits must be laid separately per explosion-proof codes, never in the same conduit or junction box, to prevent high-energy coupling or insulation faults transferring energy into the IS circuit. Sufficient separation or grounded metal barriers required.

Q25: What is the installation process?

A: Survey and confirm points/routes → conduit laying (leveling, threading, connecting) → junction box installation → cable pulling with labels → sensor installation with glands sealed → control room equipment installation and wiring → grounding system → insulation and short-circuit tests → staged power-on (safe side first) → communication tests → software configuration → alarm tests → 72h trial run → acceptance.

Q26: How is the sensor mounted?

A: Wall-mounted on 304 stainless brackets at representative positions (avoiding heat/cold sources, doors and vents), at appropriate height, with gland sealing at cable entry.

Q27: What grounding is required?

A: The system grounding per codes: sensor/box metal parts grounded via the conduit system and dedicated grounding; grounding resistance verified during installation per site requirements.

Q28: Can the system be installed while the warehouse is operating?

A: Construction is coordinated with the client; hazardous-area work follows site safety rules (no hot work without approval, no spark-generating tools in hazardous zones during operation); work can be scheduled in shutdown windows as needed.

12.5 O&M and Fault Questions

Q29: How often should sensors be calibrated?

A: Annual calibration recommended for general industrial warehouses; semi-annual for high-precision sites; by qualified metrology institutions or factory return; routine comparison with standard instruments during inspection.

Q30: A sensor shows offline — possible causes?

A: Sensor power fault (check barrier output and line continuity); communication line fault (broken/short circuit, loose terminals); address or baud rate changed mismatching the host; sensor hardware fault. Troubleshoot from the safe side first, then on site; energized cover opening must comply with explosion-proof safety rules.

Q31: Temperature/humidity data inaccurate — causes?

A: Sensor drift after long use (recalibrate); improper installation position (near heat/cold sources, doors, vents — not representative); condensation in high humidity causing humidity reading anomalies; line interference causing data jumps. Confirm position, compare with standard instruments, then calibrate or replace.

Q32: Can explosion-proof devices be opened for repair on site?

A: In hazardous areas, energized cover opening is strictly prohibited. Power off the circuit, confirm no explosion hazard, and comply with hot-work safety requirements before opening. For IS devices, power-off operation is also recommended with static and tool-spark precautions. Core principle: all electrical operations in hazardous areas strictly follow explosion-proof safety procedures.

Q33: What is the warranty? After warranty?

A: 1-year free warranty (non-artificial damage repaired/replaced free with technical support); after warranty, lifetime cost-price maintenance (component cost + necessary service fee only); paid annual inspection service available to proactively eliminate hazards.

Q34: How is the barrier tested?

A: Verify safe-side input voltage (20-26V), intrinsically safe-side output limits (≤28V/93mA/0.65W), signal transmission, and isolation performance; barriers are factory-tested with certificates delivered.

Q35: What spares are recommended?

A: Spare sensors, barriers, glands, terminals and fuses per point count; local warehouse stocking with emergency delivery within 48h.

12.6 System and Expansion Questions

Q36: Can other sensors be added to the system?

A: Yes — the modular bus architecture supports adding combustible gas detectors, differential pressure transmitters, level sensors and other intrinsically safe instruments for multi-parameter monitoring.

Q37: Can alarm linkage control external devices?

A: Yes — the software supports linkage control outputs driving fans, air conditioners, dehumidifiers and other devices when thresholds are exceeded.

Q38: Is remote access supported?

A: Yes — WEB access and mobile APP viewing available (custom development); data stored locally; network independence can be maintained per confidentiality requirements.

Q39: How is data secured for confidential sites?

A: Local deployment without external network connection; multi-level user permissions; operation and alarm logs; optional dual-host hot standby for critical facilities.

Q40: What if the monitoring host fails?

A: For critical sites, dual-host hot standby is available; standard sites can use the host’s high MTBF (≥50000h) and quick spare replacement; data is stored with regular backup.

Q41: How many points can one host manage?

A: The host’s 4 isolated RS485 ports support up to 32 devices per bus (128+ with repeaters), expandable via additional serial ports or converters for larger deployments.

Q42: Can the system integrate with existing platforms?

A: Yes — data interfaces (Modbus, OPC, etc.) can be provided for integration with enterprise SCADA or EHS platforms; custom development available.

12.7 Project and Service Questions

Q43: What is the construction period?

A: About 15 calendar days for the typical scenario (2 days preparation, 4 days conduit/cable, 3 days equipment, 3 days commissioning, 3 days acceptance including 72h trial run); adjustable per project scale.

Q44: What documentation is delivered?

A: As-built drawings, configuration list, device certificates (explosion-proof, 3C), commissioning records, alarm test records, software manual, O&M training materials and warranty card.

Q45: What training is provided?

A: Training covers IS theory, explosion-proof compliance, software operation, hardware maintenance and practical drills; assessment with repeat training until qualified.

Q46: What is the response time for after-sales faults?

A: 7×24 hotline; remote guidance within 1 hour; on-site: city 2h response/4h arrival, provincial 4h/8h, out-of-province within 24h.

Q47: Can the system be expanded to more warehouses later?

A: Yes — adding warehouses only requires additional sensors, barriers and cable runs connected to the existing bus/control room; software point management adds the new points directly.

Q48: What is the design service life?

A: Sensors ≥5 years (with calibration), barriers ≥10 years, host ≥5 years (industrial), conduits/cables ≥15 years — long-term reliable operation with standard O&M.

Q49: How is the system protected against lightning?

A: The power supply has built-in surge suppression; control cabinet includes SPD; shielded cables and grounded conduits provide indirect lightning protection; grounding per code.

Q50: Why is the control room in the safe area?

A: All non-IS equipment (host, power supply, software) must be outside hazardous zones per code; only IS field devices and their barriers’ hazardous-side circuits enter hazardous areas.

Q51: What happens during a power failure?

A: The system resumes automatically on power restoration; sensors require no configuration after power-on; the monitoring host auto-starts the software; optional UPS provides uninterrupted monitoring for critical sites.

Q52: How are alarm thresholds set?

A: Per warehouse material requirements: temperature and humidity upper/lower limits set independently per point with multi-level thresholds; alarms trigger pop-up, sound and linked sound/light alarm; adjustable per season or material change.

13. Construction Schedule

13.1 Overall Period

The total project period is about 15 calendar days from personnel entry to commissioning, acceptance and delivery; adjustable per project scale and site conditions.

13.2 Detailed Schedule

Stage Work Content Days Responsible Acceptance Node
1. Preparation Site survey, point/route/control room confirmation; material/equipment incoming inspection (qualifications, appearance, quantity); technical disclosure and safety training; tools and consumables 2 Project manager Materials accepted, work order issued
2. Conduit and cable Layout marking; galvanized conduit laying/fixing/threading/connecting; junction box installation; IS shielded cable pulling with labels; control room cabinet and tray installation 4 Team leader Hidden works accepted, continuity tested
3. Equipment installation Hazardous-area sensor installation; gland installation and cable sealing; junction box terminal wiring with insulation; control room barrier/power/host installation and wiring; grounding with resistance test 3 Team leader + engineer Appearance and wiring checked
4. Commissioning Insulation and short-circuit tests before power-on; staged power-on (safe side first); per-sensor communication tests and configuration; software commissioning, point addition, data display; alarm tests, threshold setting, sound/light linkage; overall joint test 3 Engineer Function tests passed
5. Acceptance 72h trial run with data recording; as-built documentation and certificates; client acceptance with demonstration; operation training; acceptance signing 3 PM + engineer Acceptance passed

13.3 Schedule Assurance Measures

– Personnel: experienced project team, project manager on site throughout, fixed construction personnel;

– Materials: advance stocking, all materials/equipment at site 3 days before start; spare devices and wearing parts available;

– Plan: daily schedule with end-of-day review meeting, timely catch-up on lag;

– Coordination: early coordination with the client on entry time, power and site issues;

– Safety: strict safety compliance to avoid work stoppages.

14. Construction Organization and Quality/Safety Measures

14.1 Organization Structure

– Project manager: overall responsibility for progress, quality, safety and cost; client interface; approval of plans; acceptance organization;

– Technical leader: construction technical solution, disclosure, on-site problem solving, commissioning, training, as-built documentation;

– Construction team leader: team operation per drawings, daily plan execution, on-site safety and quality self-inspection, tool/material management;

– Safety officer/QC: safety supervision and rules enforcement; quality inspection and hidden work acceptance; hazard investigation; safety/quality ledgers.

14.2 Pre-Construction Preparation

1. Technical: review design and drawings, clarify requirements and explosion-proof codes; site survey verifying point count, positions and routes; construction solution and work instructions; technical disclosure and explosion-proof safety training with assessment;

2. Materials: incoming inspection of devices (certificates, appearance, quantity), tools, instruments and PPE; storage per requirements;

3. Site: confirm entry procedures, power and working area with the client; prepare protective measures for existing facilities.

14.3 Key Construction Processes

1. Conduit laying: layout marking; conduit cutting/threading/bending; installation with supports at specified spacing; threaded connections with fittings; grounding continuity.

2. Cable laying: verify cable type (RVSP 2×1.5mm² IS shielded); pull through conduits with protection; labeling at both ends; IS and non-IS circuits strictly separated.

3. Equipment installation: sensors at design positions on stainless brackets; glands installed and sealed at cable entries; junction box wiring with insulation and clear labeling; control room equipment installed and wired per diagrams; barrier channels matched to sensor addresses.

4. Grounding: system grounding per code; grounding resistance tested and recorded.

14.4 Quality Control Measures

– Quality targets: all acceptance items per Section 10; zero defects at handover;

– Key process control points: incoming inspection (certificates, specs, appearance); conduit hidden works; cable continuity and insulation; gland sealing; barrier channel matching; communication and alarm functions; 72h trial run;

– Inspection standards: per GB 50168, GB 50303, GB 3836.15 and design requirements; records for traceability.

14.5 Safety and Civilized Construction

– Hazardous-area construction rules: strictly follow site explosion-proof management; no hot work without approval; spark-generating tools prohibited in hazardous zones during operation; energized cover opening prohibited; power isolation with lockout/tagout before work;

– General safety: three-level education; PPE (helmets, insulated shoes for electricians); safe temporary power with leakage protection; high-altitude safety for ceiling work;

– Civilized construction: materials stacked neatly, daily cleaning, work-site-clean policy, protection of existing facilities, uniform attire and badges.

14.6 Emergency Plans

– Mechanical fault: stop work, analyze, report, adjust plan with confirmation;

– Personnel injury: first aid, emergency services, report per procedure;

– Explosion-proof structure accidental damage: stop work, assess, repair per standards, verify before resuming.

15. After-Sales Service

15.1 Warranty Commitment

The overall project warranty period is 2 years from the date of completion acceptance; core equipment has a 3-year warranty. During the warranty period, all failures and damage caused by product quality or construction process problems are repaired and parts replaced free of charge. After the warranty period, lifetime cost-price maintenance is provided, charging only parts cost and basic labor, ensuring long-term stable system operation.

15.2 After-Sales Response Mechanism

– A 7×24 after-sales hotline receives fault reports and technical consultations at any time;

– Within the urban area: respond within 2 hours, technicians on site within 4 hours;

– Suburban and surrounding areas: respond within 4 hours, personnel on site within 8 hours;

– General faults resolved on the spot; complex faults solved within 24 hours with a solution;

– Emergency faults get a green channel with priority dispatch of personnel and parts.

15.3 Periodic Inspection and Maintenance

During the warranty period, a free on-site inspection is provided every six months, with a comprehensive maintenance inspection annually. Inspection contents include equipment operating status, connection firmness, sealing and rust conditions, filtering/grounding performance and safety devices. After each inspection, a formal inspection report is issued recording equipment status and maintenance content with optimization suggestions.

15.4 Spare Parts Supply Guarantee

A local spare parts warehouse is established, stocking common wearing parts for quick replacement to shorten fault handling time. For uncommon special parts, a fast supply channel with the factory ensures availability within 48 hours. During warranty, non-artificial-damage spare parts are replaced free; after warranty, parts are charged at cost price without markup.

15.5 System Upgrade and Technical Support

– Free lifetime technical consultation services by phone or online at any time;

– If the customer later needs upgrades or expansions, preferential upgrade solutions and construction services are provided;

– Industry new technology and standard information is regularly pushed to customers.

16. Training Plan

16.1 Training Objectives and Audience

Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.

Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.

16.2 Tiered Training Content System

Level 1: Basic operation training (1 day)

– Basic principles: system concepts, structure composition, performance indicators;

– Daily operation standards: correct operation of equipment, control and safety systems;

– Daily inspection contents: daily/weekly/monthly check items;

– Safety precautions: usage prohibitions and emergency handling procedures.

Level 2: Maintenance training (1 day)

– Detailed structure of each subsystem and working principles;

– Daily maintenance methods: cleaning, fastening checks, routine care;

– Common fault identification and simple handling;

– Emergency handling procedures for power failure, fire and equipment faults.

Level 3: Advanced management training (as needed)

– Performance influencing factors and how to avoid degradation;

– Upgrade and expansion knowledge and specification requirements;

– Relevant national standards interpretation.

16.3 Training Methods and Schedule

– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;

– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.

16.4 Training Assessment and Documentation Delivery

– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;

– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.

17. Anonymous Typical Project Scenarios

All project scenarios below are anonymous, generalized examples compiled from typical industry deployments; no real customer names, addresses or confidential information are disclosed.

17.1 Temperature/Humidity Monitoring for a Large Fireworks Manufacturer

A large fireworks manufacturer with multiple Class 1.1 process workshops and Class 1.3 finished product warehouses previously used ordinary (non-explosion-proof) monitoring equipment requiring manual logging. To meet safety supervision compliance and enable intelligent monitoring, an explosion-proof system was built: 12 ia-class sensors with 12 barriers in Class 1.1 workshops, 20 ib-class sensors with 20 barriers in Class 1.3 warehouses, monitoring host, software, dual power supplies, sound/light alarm and control cabinet in the safe area, plus full installation auxiliaries. The project passed explosion-proof acceptance and safety inspection; 24-hour unattended monitoring with timely alarms prevented environment-related incidents and reduced inspection costs.

17.2 Explosion-Proof Environment Monitoring for a Pharmaceutical Chemical Enterprise

A pharmaceutical chemical enterprise’s dangerous goods warehouse storing ethanol, acetone and other flammable solvents (Zone 2) had aging non-certified equipment requiring upgrade. The solution: 16 ib-class intrinsically safe sensors, 16 isolation barriers, monitoring host and software, dual power supplies (1+1), full auxiliaries. Construction was completed over a weekend without affecting production; stable operation, accurate data and strong anti-interference met the chemical workshop environment; data records and reports passed GMP audit; timely alarms protected dangerous goods storage safety.

17.3 Ammunition Warehouse Monitoring for a Military Enterprise

A military enterprise’s ammunition warehouse is a high-hazard explosion-proof site with strict temperature/humidity requirements and the highest demands on device explosion-proof level and reliability. The solution: 24 high-precision ia-class sensors, 24 high-precision isolation barriers, dual monitoring hosts (hot standby), military-grade locally deployed software, full auxiliaries, custom development, 3-year warranty and lifetime support. The project passed military acceptance; stable reliable operation, precise measurement, fully compliant explosion-proof performance, zero single-point failure with hot standby, and data security through local deployment — a benchmark military explosion-proof project.

18. SEO Optimization Section

All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.

18.1 Keyword System

– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;

– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;

– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;

– Brand keywords: KITOZER, Guangzhou Lain.

18.2 SEO Tag System

– Title tag: the article title — Guangzhou Lain KITOZER;

– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;

– H1 tag: the article title;

– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.

18.3 Internal Link Anchor Text

– Core anchor text: technical design solution, system construction;

– Long-tail anchor text: configuration list, technical parameters, construction plan;

– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.

19. Official Contact Information

– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.

– Brand: KITOZER (Pioneer)

– Official Website: https://gdlain.com

– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)

– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China

For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.