Automatic transfer switch (ATS) testing must be scheduled during a low-risk window. Start with a manual test while the generator is already warm. Drop the utility breaker and watch the ATS transfer load to generator within the programmed delay (typically 0 to 5 seconds). Restore utility, wait for the re-transfer delay, and confirm the ATS returns to utility. Log transfer time, voltage, and frequency on both sides. Test the bypass isolation position if fitted. Never operate the ATS handle live without Arc-Flash PPE.
Table of Contents
ToggleAnnual Deep Test
Once a year, simulate a utility failure while the building is under normal load for 30 minutes to prove end-to-end reliability. KITOZER ATS units are rated up to 4000A with programmable logic.
Price
From $1,850/400A ATS. Contact +86 13922289957 for transfer switch quote.
Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com