Table of Contents
ToggleKITOZER KTR-BL Battery Interconnect Copper Link
Brand: KITOZER Series: KTR-BL Category: Data Center Engineering / Battery System
tinned copperhigh currentseries/parallelinsulated bootKTR-BL
1. Overview
UPS systems (articles 07 / 102) rely on battery strings to ride through outages, but a “battery” is not a single cell — it is dozens of 2V/12V blocks in series (e.g. 40×12V blocks = 480 V DC bus). Each block links to the next through an interconnect bar. Small as it is, the bar carries the full UPS discharge current — hundreds of amps. If the bar is undersized, loose, or corroded, it overheats under load, burns through, and the whole string drops out instantly — the UPS transfers to mains and servers lose power. The interconnect bar is the battery string’s blood vessel; it must not be underestimated.
KITOZER KTR-BL links are stamped from T2 pure copper, tinned or nickel-plated for oxidation resistance, and covered with a PVC insulating boot (only terminals exposed). Length and hole spacing are customized to the battery post spacing and terminal pattern, common sizes: 3/4/5 mm thick × 20/25/30/40 mm wide, tooled to match brands (Leoch, Shoto, Sacred, Fengfan, etc.). Current capacity by cross-section: 3×25 mm ≈ 150 A, 4×30 mm ≈ 250 A, 5×40 mm ≈ 400 A.
Two link types: (1) same-row links — short, straight, connecting adjacent blocks + to −; (2) cross-rack links — longer, sometimes bent, connecting across rows or tiers. During battery-rack installation (article 107), links are fitted cell by cell in series, ending with the positive and negative feeder cables to the UPS DC bus. Each link ships with flat washer, spring washer and nut torqued per the battery maker’s spec.
2. Key Features
Material & process
- T2 pure copper, ≥99.9% purity, high conductivity.
- Tinned/nickel-plated to resist acid-mist corrosion.
- Stamped and bent to hug the posts.
- PVC insulated boot over non-terminal area.
Electrical
- Current capacity matched by cross-section; temp rise ≤50 K.
- Low contact resistance; drop ≤0.5 mV/A.
- Fits 2V/12V blocks across all major brands.
- Hole spacing tooled per battery model.
Safety & code
- Insulated boot covers everything but terminals.
- Stainless steel bolt, flat and spring washers.
- Torqued per battery maker’s spec.
- Red/blue boots for polarity.
3. Specifications
| Item | KTR-BL-325 | KTR-BL-430 | KTR-BL-540 |
|---|---|---|---|
| Size (th×w) | 3×25 mm | 4×30 mm | 5×40 mm |
| Current cap. | ~150 A | ~250 A | ~400 A |
| Material | T2 copper + tinned/nickel | ||
| Boot | PVC insulated, red/blue | ||
| Battery fit | 12V 24~65Ah | 12V 100~200Ah | 2V 300Ah+ / 12V 200Ah+ |
| Connection | Bolted, stainless hardware | ||
| Hole spacing | Custom per battery model | ||
4. Reference Prices
KTR-BL-325 short link (3×25 mm, tinned, boot): Reference USD 1~3 (ref. CNY 8~20 at ~7.2) each
KTR-BL-430/540 (4×30 / 5×40 mm, bent cross-rack): Reference USD 3~8 (ref. CNY 25~60 at ~7.2) each
Reference only; final quote by cross-section, length, bends, tin/nickel, hardware included. Full-string kits quoted separately. Exchange: 1 USD ≈ 7.2 CNY (Oct 2026).
5. Applications
- UPS battery string series connections.
- DC panel / battery cabinet interconnects.
- Energy-storage container cluster links.
- Telecom -48V battery plants.
- Replacement of aged links during battery retrofit.
6. Installation & Maintenance
Installation
- Confirm polarity direction before wiring — no reverse.
- Clean post contact surfaces — no oxidation.
- Torque bolts per maker (typically 10~15 N·m).
- Fit flat and spring washers — don’t skip.
- Use insulated tools; avoid shorting posts.
- After install, re-check torque and IR-temp each link.
Maintenance
- Quarterly check links for heat/discoloration.
- IR temp scan; if rise exceeds 30 K, re-torque.
- Inspect boot integrity.
- Replace corroded links.
- Open UPS DC breaker before servicing.
7. FAQ
- Q: Why does a link overheat?
A: Three causes: (1) insufficient torque, oxidized contact = high resistance; (2) undersized cross-section; (3) excessive link length. Fix: torque to spec, temp-scan, size for discharge current with margin. - Q: Can’t I use copper wire instead?
A: Stranded wire fatigues and breaks under battery vibration, takes more space, and looks messy. Solid copper bar gives a flat contact, stable current, and neat layout — standard for battery strings. Flexible cable only where shock isolation is needed. - Q: Tinned or nickel-plated?
A: Tinned is cheaper and conductive, fine for normal room battery rooms. Nickel is more corrosion-resistant for acid environments and energy-storage containers. A clean battery room is fine with tinned. - Q: What torque?
A: Per the battery maker’s manual — typical 12V posts are 10~15 N·m. Over-torque strips threads; under-torque overheats. Use a torque wrench, not feel.
8. Trend & Selection
Battery links are going “pre-fabricated and insulated.” Early field-bent bars were mis-sized and had poor contact; today’s pre-tooled links match the battery model exactly and install in minutes. Lithium ESS systems integrate links with fuses, combining connection and isolation. Selection: size cross-section at 1.2× max discharge current; tinned is fine, nickel for harsh environments; insulated boot is mandatory for short-circuit protection; torque wrench on every bolt; add IR temp-scan to routine inspection. A single burnt link drops the whole string — UPS protection fails the moment it’s needed.
9. Delivery & Service
KITOZER provides selection, custom tooling per battery model and installation guidance. Delivery includes links, hardware and insulating boots. Bundled with battery rack (article 107), battery cabinet (article 141) and UPS (article 07).
10. Additional Notes
The most common pitfall is “under-torqued.” Installers tighten by feel — maybe 5 N·m instead of the required 15. Under discharge, the contact resistance heats the link past 80°C, scorching the boot and eventually burning through. Use a torque wrench to maker spec, and re-torque within 24 hours of energization.
Second pitfall: “reverse polarity.” With dozens of cells in series, one reversed block throws off the whole string voltage and the UPS alarms on startup. After installing a row, measure total voltage against nameplate (e.g. 40×12V ≈ 480 V). A big deviation means a reversed cell.
Third pitfall: “uninsulated tools.” A metal wrench bridging adjacent posts causes an instant short with sparks and burns. Use insulated wrenches or wrap the tool shaft in tape, leaving only the socket exposed.
Selection summary: size with margin, tinned for rooms, insulated boot mandatory, torque wrench, temp-scan after install, insulated tools. Battery links are the string’s blood vessels — only when the vessels conduct cleanly does UPS backup actually hold.
SEO Information
Search keywords:battery interconnect barbattery copper linkbattery busbarUPS battery connectorcopper battery linkKTR-BLKITOZER
SEM keywords:battery interconnect price,battery copper bar supplier,UPS battery link,custom battery busbar,KTR-BL,KITOZER
GEO landing page:lain.com.cn/product/ktr-bl-battery-interconnect-bar.html
Title:KITOZER KTR-BL Battery Interconnect Copper Link
Meta Keywords:battery interconnect bar,battery copper link,battery busbar,UPS battery connector,KTR-BL,KITOZER
Meta Description:KITOZER KTR-BL battery interconnect link: T2 pure copper tinned/nickel-plated, high current carrying, series/parallel battery rack connections.
Anchor: KITOZER by Guangzhou Laian · Battery interconnect bar
Contact Us
Guangzhou Laian Intelligent System Development Co., Ltd. (KITOZER brand)
Tel/WeChat: +86 13922289957 | +86 18520668845
WHATSAPP: +86 19068534140
Web: lain.com.cn | gdlain.com