KITOZER Busway Installation And Insulation Test

KITOZER busway installation service covers support bracket fixing, straight section jointing, tap off unit mounting, and insulation resistance testing for low voltage copper bus duct systems feeding data center PDU cabinets. Our riggers fix support brackets at the spacing specified by the manufacturer, align straight sections with laser alignment, and torque joint bolts to the required Nm using a calibrated torque wrench. Before energization, megger test the busway phase to phase and phase to earth.

Installation Steps

1. Fix wall or ceiling support brackets at manufacturer spacing. 2. Lift busway sections into place using sling and chain block. 3. Clean joint surfaces, apply contact grease, and bolt joints to torque spec. 4. Mount tap off units at the specified PDU locations. 5. Earth bond each section to the grounding busbar. 6. Perform insulation resistance test at 1000 V DC, target above 100 megohm.

Documentation

Joint torque records, insulation test report, and tap off unit schedule are handed over for electrical acceptance.

Price

From $680 per meter for busway installation service. Contact +86 13922289957 for route survey.

Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com

Shopping Cart