KITOZER Busway Trunking Installation Procedure

KITOZER busway trunking installation delivers a compact and low-loss power distribution path from main switchboard to row-level PDU. The sections are lifted by rated slings, aligned using the factory guide marks, and joint bolts are torqued in diagonal sequence. Every joint is checked with the manufacturer joint inspection tool before the next section is fitted. After full installation, insulation resistance and phase continuity are tested, and each tap-off unit is verified with its assigned feeder breaker.

Table of Contents

Installation Steps

Section lifting by rated sling, factory guide mark alignment, diagonal bolt torque sequence, joint inspection tool check, hanger spacing verification, insulation resistance test, phase continuity check, tap-off unit assignment, earthing bond, megger test report, KITOZER busway, 5 year warranty.

Price

From $350 per meter installed. Contact +86 13922289957 for busway installation quote.

Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com

Shopping Cart