KITOZER cabinet installation service covers receiving, positioning, leveling, floor anchoring, cabinet to cabinet bonding, and earthing for server, network, and PDU racks. Our technicians first verify floor load rating and raised floor tile integrity before moving cabinets along the hot aisle layout. Each cabinet is shimmed to a tolerance of 2 mm per meter, anchored to the subfloor with chemical anchors, and adjacent units are joined using side joining kits. The cabinet earthing terminal is bonded to the data center grounding busbar with a minimum 16 mm2 copper conductor.
Table of Contents
ToggleInstallation Steps
1. Position cabinets on the layout grid. 2. Level and plumb check with a digital inclinometer. 3. Drill and fix chemical anchors to the structural floor. 4. Join adjacent cabinets with side kits and M6 bolts. 5. Bond each cabinet earth terminal to the main grounding busbar. 6. Install cable tray brackets and blanking panels after leveling.
Service Scope
Includes layout verification, anchor fixing, cabinet joining, earthing bonding, PDU mounting, and final torque inspection. All work follows EIA 310-E and local electrical code requirements.
Price
From $880 per cabinet for installation service. Contact +86 13922289957 for on site schedule and quotation.
Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com