Table of Contents
ToggleProduct Overview
The KITOZER 200 kW Coolant Distribution Unit is a floor-standing, mission-critical liquid cooling plant engineered for enterprise HPC halls, AI training data centers, and 20 to 40 rack high-density rows. The CDU isolates the facility primary chilled water loop from the IT secondary loop using a large-frame gasketed plate heat exchanger that allows future expansion without replacing the core. Two N+1 variable-speed pumps maintain a programmable differential pressure setpoint across the row, and an intelligent controller balances flow between multiple rack manifolds, reducing hot-spot risk during transient workloads such as batch GPU training. The cabinet integrates a 50 L expansion tank, automatic glycol make-up, conductivity monitor, and optionalUltravioletWire de-chlorination loop.
Technical Specifications
Cooling capacity 200 kW at 32 C primary inlet and 38 C secondary delta-T. Primary side: DN80 flanged, water or 30 percent glycol. Secondary side: DN65 dual supply and return, 25 to 40 percent propylene glycol. Heat exchanger: gasketed 316L stainless steel plate, 10 bar design, 96 percent effectiveness. Pumps: two N+1 3.0 kW centrifugal pumps, 25 to 55 Hz VFD, combined flow up to 18 m3 per hour. Filtration: 50 micron duplex basket filter. Expansion tank 50 L, conductivity meter, make-up solenoid. HMI 12 inch color, dual Modbus TCP ports, BACnet IP, SNMP v3, REST API, 8 dry contacts. Dimensions 2000 x 1000 x 2100 mm, weight 880 kg, IP20, CE, KITOZER, 7 year heat exchanger warranty, 3 year pump warranty.
Applications
The 200 kW CDU serves 20 to 40 GPU dense racks at 5 to 10 kW per rack, or 8 to 12 racks at 15 to 25 kW per rack with direct-to-chip cold plates. Typical installations include enterprise AI training halls, seismic exploration compute rooms, genome sequencing centers, financial risk simulation clusters, and large media render farms. The unit also supports mixed-air-and-liquid rows where some racks use rear-door heat exchangers and others use cold plate loops, thanks to the configurable secondary pressure band.
Key Advantages
Gasketed plate heat exchanger allows future capacity increase by adding plates, avoiding a full CDU replacement. N+1 pump redundancy and dual independent sensors on supply temperature, return temperature, and differential pressure eliminate single points of failure. The intelligent pump curve adapts to actual rack demand, cutting pumping energy by up to 50 percent at part load. Conductivity monitoring and automatic make-up protect secondary loop water quality and alert operators to glycol contamination. REST API and BACnet IP support direct integration with modern DCIM and building management platforms, and the HMI supports multi-language English, Chinese, and other configurations.
Installation and Maintenance
Mount on a reinforced concrete plinth with anti-vibration pads. Connect primary DN80 and secondary DN65 flanges, route a 100 A three-phase supply, and confirm pump rotation. Flush the secondary loop twice with deionized water before charging. Weekly: inspect alarm log, pump vibration, and filter differential pressure. Quarterly: test automatic make-up valve, verify conductivity reading, and exercise the pressure relief valve. Annually: open and inspect the gasketed heat exchanger plates, renew gaskets as needed, and recalibrate all sensors. Pump cartridges are front-serviceable without loop drain, reducing maintenance time to under one hour.
Price
From $34,500 per unit. Contact +86 13922289957 for 200 kW CDU factory pricing and configuration.