Document Version: v1.0 Ultra-long Technical Encyclopedia | Brand: KITOZER (Guangzhou Laian Intelligent System Development Co., Ltd.) | Release Date: October 2026 | Applicable Standards: GB 50174 Code for Design of Data Centers, GB 50462 Code for Construction Acceptance of Data Center Infrastructure, ASHRAE TC 9.9, EN 50600, Uptime Institute Tier Standard, YD/T 1821 Environmental Conditions for Telecommunication Centers.
Introduction: Why Cold Aisle Containment Is the First Piece of the Data Center Cooling Puzzle
Under the expansion of the digital economy and the computing power industry, the power density of a single server rack has risen from 1-2 kW per rack in the 1990s to 6-8 kW per rack in general business scenarios today, 12-15 kW per rack in cloud computing and rendering scenarios, and even 20-40 kW or higher in AI training and high-density storage scenarios. The exponential increase in power density means that the traditional “large open room, raised floor, room-level precision air conditioning, natural mixing of hot and cold air” cooling model is rapidly failing. After cold air is supplied from the raised floor perforated tiles, it is not only drawn into the front of the rack, but also undergoes hot recirculation at the top and between racks, while a considerable portion of cold air bypasses the racks directly back to the air conditioner return air, forming the so-called bypass airflow. The result is: the air conditioner supplies 100 parts of cold air, but only 50 parts are actually used by the IT load, and the remaining 50 parts “idle” in the data center.
Cold Aisle Containment (CAC) is designed to solve this contradiction. Through the top panels, end doors, side seals, skylights, and connectors between two rows of racks facing each other, the entire “cold aisle” is physically enclosed into a low-pressure cold air chamber completely isolated from other areas of the data center. The cold air supplied by the air conditioner can only enter this enclosed cold aisle, is drawn in from the front of the racks, and the hot air is exhausted from the back of the racks into the hot aisle or the large room space, finally returning to the air conditioner. In this way, bypass and recirculation are reduced to near zero, and the IT equipment intake air temperature can be precisely controlled within the ASHRAE recommended range of 18-27 C, while the air conditioner return air temperature rises significantly, extending the free cooling hours of chillers and cooling towers, and PUE (Power Usage Effectiveness) decreases.
The KITOZER cold aisle containment system model series is KZ-CAC-xx, covering complete specifications from 4-rack small office rooms, to 20-60 rack standard cloud rooms, to 100-rack modular data centers. This encyclopedia is oriented toward engineering implementation, systematically reviewing the development history, thermal management principles, full product line, sizing calculations, installation and commissioning, O&M, scenario applications, 60 FAQs, and troubleshooting of cold aisle containment, for direct use by design institutes, general contractors, integrators, and end users.
Price Note: The reference prices of KITOZER products listed in this document are the external reference prices after multiplying the official list price by 2, which are only used for budget estimation and scheme comparison. Actual transaction prices are subject to project inquiry and contract. It is strictly prohibited to include customer names, project names, place names, or personal names in any external materials.
Chapter 1: Development History of Data Center Thermal Management and Cold Aisle Containment Technology
1.1 Mainframe Era (1960-1980): Raised Floor and Room-Level Temperature Control Origin
Modern data center cooling originated in the mainframe computer room of the 1960s. IBM System/360 and System/370 mainframes consisted of a large number of vacuum tube and transistor cabinets, with high heat generation per cabinet and extreme sensitivity to temperature. To solve the dual problems of wiring and heat dissipation, engineers laid a 300-600 mm high raised floor under the computer room floor, hiding the precision air conditioning supply ducts under the floor. Cold air is supplied from the underfloor plenum through perforated tiles in front of the racks, drawn in by server fans, and the hot air returns to the air conditioner from the top and sides of the racks. This model established the basic paradigm of “room-level cooling + underfloor plenum + perforated tile supply” and became the standard data center practice for the next three decades.
In this stage, cabinet density was generally 1-2 kW/cabinet, and the room temperature was controlled by a dedicated HVAC engineer at 22 +/- 2 C and relative humidity 45%-55%. Due to the low power density, hot and cold air mixing was not serious, and room-level cooling was “adequate” in engineering. However, underfloor power and signal cables and water pipes gradually exposed problems such as messy underfloor cabling, uneven supply static pressure, and perforated tile placement based on experience.
1.2 Client/Server Era (1980-2000): Cabinet Density Rise and Hot/Cold Aisle Proposal
From the late 1980s to the 1990s, with the rise of PC servers, local area networks, and the Internet, a large number of 19-inch standard cabinets began to appear in data centers. Cabinet power density rose to 3-5 kW, and individual compute nodes reached 6-8 kW. Engineers found: arranging cabinets in a row with all cabinet fronts facing the same direction would cause the exhaust of the front row to be re-ingested by the back row, creating a “cabinet-to-cabinet” phenomenon; while arranging cabinets face-to-face and back-to-back naturally formed a cooler “cold aisle” between the fronts of the two rows and a hotter “hot aisle” between the backs.
Around 1999, Intel and ASHRAE jointly released the first edition of the Thermal Guidelines for Data Processing Environments, formally establishing “hot aisle/cold aisle arrangement” as the recommended data center cabinet layout practice. In this period, the cold aisle and hot aisle were still concept-based aisles, without any physical barriers, and hot and cold air freely mixed below the ceiling. But it elevated “airflow organization” from “room temperature” to an independent engineering object for the first time.
1.3 Cloud Computing Era (2000-2010): Engineering of Enclosed Cold Aisles
Around 2006, with hyperscale cloud operators such as Amazon AWS, Google, and Microsoft Azure starting self-built data centers, per-cabinet power density quickly broke through 10 kW, and PUE became a core metric of common concern for operators and Internet companies. In his 2006 paper “The Data Center as a Computer,” Google systematically described the cooling architecture of “enclosed hot/cold aisles + rear-door heat exchangers + free cooling” for the first time. Around the same period, APC, Schneider Electric, Vertiv, Stulz, Rittal, Tate Access Floors and other vendors launched commercial cold aisle containment products, including transparent acrylic top panels, aluminum alloy end doors, self-closing glass doors, and fusible-link smoke vents linked to fire protection.
Chinese operators launched the “Green Computer Room” special renovation during 2008-2012, and the three major operators and China Telecom Design Institute listed cold aisle containment as a standard renovation measure to reduce PUE. The typical renovation path was: without replacing room-level precision air conditioners, add top panels and end doors to the existing open hot/cold aisles. After enclosure, measured PUE dropped from 1.8-2.0 to 1.45-1.6, and per-cabinet power density capacity increased from 4 kW to 8-10 kW. Engineering practice in this period laid the foundation for later modular data centers.
1.4 Modular and High-Density Era (2010-2020): Containment Systems Integrated with In-Row Cooling and Rear-Door Heat Exchangers
After 2010, brands such as KITOZER began integrating cold aisle containment with in-row cooling, rear-door heat exchangers, modular UPS, modular power distribution cabinets, and environmental monitoring into a “micro data center” (MDC) unit. A typical micro module consists of 6-12 cabinets arranged in two rows, with an enclosed cold aisle in the middle, sliding glass doors at both ends, magnetic acrylic top panels on top, and 1-2 in-row air conditioners embedded on the side. The entire unit is factory prefabricated and assembled on-site, with deployment time compressed from 6-12 months for traditional computer rooms to 4-8 weeks.
ASHRAE TC 9.9 updated its thermal guidelines twice in 2015 and 2021, raising the recommended intake air temperature upper limit from 27 C to 27 C (A1 grade) and allowing relaxation to 32-40 C in B and C grade scenarios. The engineering significance of this change is: after cold aisle containment, IT equipment intake temperature can be more stably maintained at 24-26 C, without the need to set the air conditioner supply temperature to 14-16 C “just in case.” Every 1 C increase in supply temperature reduces chiller and cooling tower energy consumption by about 2%-4%.
1.5 AI Computing Power Era (2020 to Present): From Cold Aisle Containment to Liquid Cooling Front-End
After 2022, high-density computing power represented by GPU training clusters, with single-cabinet power quickly breaking through 20 kW, 50 kW, and even 100 kW or more. Air-cooled cold aisle containment remains the most cost-effective solution when facing densities below 20 kW/cabinet; but at higher densities, the industry has begun to introduce cold plate liquid cooling (direct liquid cooling, DLC), immersion cooling, and air-liquid hybrid architectures. Cold aisle containment has not been replaced, but cooperates with liquid cooling systems: air cooling handles sensible heat from CPUs, memory, NICs, and power modules, while liquid cooling handles high-heat chips such as GPUs. Cold aisle containment still exists as the “air side” airflow boundary, and together with in-row air conditioners and CDUs (Coolant Distribution Units) forms a hybrid cooling architecture.
The KITOZER KZ-CAC series iterated in this stage: launched intelligent enclosed top panels with temperature and pressure sensor arrays, motorized smoke vents linked to VESDA very early smoke detection, controllers connected to BMS/BAS systems via Modbus TCP, and “air-liquid dual containment” versions for liquid cooling hybrid scenarios.
Chapter 2: Thermal Management Principles – Airflow Organization, PUE, Sensible Heat Ratio, and Hot/Cold Aisles
2.1 Sources of Data Center Heat Load
Data center heat load consists of three parts: the first is the heat generation of IT equipment itself, including server CPU/GPU/memory/hard disk/NIC, network switches, storage arrays, KVM and consoles, which usually accounts for 70%-85% of the total heat load, and 100% is discharged as sensible heat; the second is the loss of the power supply system, including copper and iron losses of transformers, UPS, distribution cabinets, PDUs, accounting for about 5%-10% of the total load; the third is lighting, personnel, external walls and solar radiation through windows, accounting for 5%-10%. The core function of the cold aisle containment system is to use the shortest air path and the least bypass to deliver the first part, which is the largest proportion of IT sensible heat, from the front of the rack to the air conditioner return side.
In engineering, “heat load density” is commonly used to describe the cooling pressure of the computer room: unit W/square meter refers to the total heat dissipation power on the computer room floor area; unit kW/cabinet refers to the average heat dissipation power of each cabinet. Common density in general cloud computer rooms is 5-8 kW/cabinet; high-density storage and GPU inference scenarios are 10-15 kW/cabinet; AI training clusters are 20-50 kW/cabinet or higher. Different density ranges correspond to different cooling architecture choices.
2.2 Airflow Organization: Why Bypass and Recirculation Are Enemies
In a traditional open computer room, the cold air supplied by the air conditioner goes through three paths:
- Effective path: cold air -> front of rack -> server fan -> hot air at back of rack -> air conditioner return air. This is the desired path in engineering, and the higher the proportion the better.
- Bypass path: cold air -> perforated tile/open space not occupied by the rack -> directly returns to the air conditioner. The cold air returns to the air conditioner “short-circuited” without being heated by IT equipment, and this part of cooling is wasted.
- Recirculation path: hot air exhausted from the back of the rack -> top/side of rack -> re-ingested by the front of adjacent racks. This causes the rack intake temperature to be higher than the air conditioner supply temperature, server fans accelerate, energy consumption rises, and in severe cases triggers CPU throttling.
The essence of cold aisle containment is to use physical barriers to cut off both the “bypass path” and the “recirculation path.” A relatively low-pressure cold air chamber is formed inside the cold aisle, and the cold air delivered by the air conditioner can only enter this chamber; the cold air in the chamber can only be drawn in from the front of the rack; the hot air exhausted from the back of the rack is outside the chamber and completely isolated from the chamber. Ideally, the proportion of effective paths can increase from 50%-60% in an open computer room to more than 90%.
2.3 PUE: Power Usage Effectiveness and the Energy-Saving Contribution of Cold Aisle Containment
PUE (Power Usage Effectiveness) = total data center power consumption / IT equipment power consumption. The closer PUE is to 1.0, the smaller the proportion of energy consumption of auxiliary systems such as cooling, power supply, and lighting. A typical open room-level cooling computer room has a PUE between 1.6 and 2.0; after cold aisle containment, because the air conditioner supply temperature can be increased, bypass air is reduced, and free cooling time is extended, PUE can usually drop to 1.3-1.5. In areas with low average annual temperatures, with the free cooling heat exchanger of the chiller, PUE can even achieve 1.15-1.25.
The contribution of cold aisle containment to PUE can be split into three parts: (1) air volume matching energy saving: after bypass is reduced, the required air conditioner supply air volume for the same IT heat load decreases, and EC fan power consumption decreases by the cube of the air volume; (2) supply temperature increase energy saving: after containment, the IT intake temperature is stable, and the air conditioner supply temperature can be raised from 14-16 C to 18-22 C, and the chiller COP (energy efficiency ratio) increases accordingly; (3) free cooling time extension: the higher the return air temperature, the higher the cooling side water temperature, and the cooling tower and chiller can run on “free cooling” for longer periods during transition seasons and winter.
2.4 Sensible Heat Ratio SHR: Why Data Centers Do Not Need Dehumidification
The cooling capacity of an air conditioner consists of sensible cooling (used to lower air temperature) and latent cooling (used to condense water vapor and reduce humidity). Sensible Heat Ratio SHR = sensible cooling / total cooling. The SHR of comfort air conditioning is usually 0.6-0.7, because dehumidification is needed in crowded places; data centers have no long-term stay by personnel, and IT equipment only needs to be cooled without dehumidification, so the designed SHR of computer room precision air conditioners is usually between 0.9 and 1.0, meaning almost all cooling capacity is used for cooling.
Cold aisle containment itself does not change the SHR, but it requires that the supporting air conditioner must be a computer room-specific precision air conditioner with “large air volume, small enthalpy difference, and high sensible heat ratio,” not a comfort air conditioner. Comfort air conditioners will over-dehumidify in the data center, causing humidity to be too low and increasing static electricity risk, while the sensible cooling capacity is insufficient.
2.5 Cold Aisle Containment vs Hot Aisle Containment: Essential Differences
Cold aisle containment and hot aisle containment are two mainstream aisle containment solutions. Cold aisle containment encloses the cold air chamber between the front of two rows of cabinets, with hot air diffusing freely in the large space; hot aisle containment encloses the hot air chamber between the back of two rows of cabinets, with cold air diffusing freely in the large space. The two have their own applicable scenarios in engineering, as detailed in the comparison table:
| Comparison Dimension | Cold Aisle Containment (KZ-CAC) | Hot Aisle Containment (KZ-HAC) |
|---|---|---|
| Contained Object | Cold air aisle between rack fronts | Hot air aisle between rack backs |
| AC Return Location | Cold air enters cold aisle from raised floor/in-row AC, hot air returns in large space | Hot air in hot aisle is directly drawn back to AC, cold air in large space |
| Large Space Temperature | Warm (27-35 C), warm for personnel inspection | Cool (18-24 C), comfortable for personnel inspection |
| Fire Smoke Vent Requirement | Low pressure in cold aisle, smoke easily diffuses into aisle, need smoke vent skylights | Hot aisle itself is hot, smoke rises easily, need smoke vents at top of hot aisle |
| Applicable Density | 5-15 kW/cabinet medium-density scenario best cost-performance | 10-30 kW/cabinet medium-high density scenario better |
| Retrofit Difficulty | Easy for existing computer room retrofits, does not change AC return path | Need to connect AC return path to end of hot aisle, larger retrofit |
| O&M Inspection Comfort | Cool in aisle, personnel comfortable when opening door for inspection | Cool outside aisle, but hot inside hot aisle, need to open door for ventilation during inspection |
| Initial Investment | Lower | Medium to high (need ducts/return boxes) |
For most new and retrofitted 5-15 kW/cabinet scenarios, KITOZER recommends cold aisle containment first; for scenarios above 15 kW/cabinet where the large computer room space also serves as an O&M passage and visitor passage, hot aisle containment or dual hot/cold containment is recommended.
Chapter 3: KITOZER Cold Aisle Containment Product Family (KZ-CAC Series)
The KITOZER cold aisle containment system consists of six subsystems: top panel system, end door system, side seal system, connector system, sensing and control system, fire linkage skylight system. All subsystems are modularly designed and can be freely combined according to the number of racks, rack height, aisle width, and clear height under the beam. The model naming rule is KZ-CAC-[rack height U]-[aisle width mm]-[configuration level], for example KZ-CAC-42U-1200-P2 means 42U rack, 1200 mm clear aisle width, P2 advanced configuration.
3.1 Top Panel System: Magnetic Acrylic Panels and Aluminum Skeleton
The top panel is the “ceiling” of the cold aisle enclosure. The KITOZER standard top panel uses 5 mm flame-retardant transparent acrylic (PMMA) panel, embedded with aluminum alloy profiles on both sides, and magnetically attached to the rack top square hole strip through magnetic strips. The acrylic panel has a light transmittance of >=92%, making it easy for inspectors to observe the rack top cabling and PDU status through the panel. Each top panel size is 600 mm (along the aisle direction) x clear aisle width, and the standard clear aisle width is 1100 mm, 1200 mm, 1300 mm. The panels are pressed together with EPDM sealing strips, with air leakage rate <=3%.
Top panel options include: (1) P1 Basic type: pure acrylic top panel + aluminum skeleton, without sensors; (2) P2 Advanced type: acrylic top panel + 1 digital temperature/humidity sensor (RS485 Modbus) embedded every 2 panels, real-time return of aisle temperature field; (3) P3 Intelligent type: acrylic top panel + temperature/humidity sensor array + aisle top LED strip (color temperature 6000K, can be linked with computer room lighting) + motorized smoke vent skylight.
3.2 End Door System: Sliding Glass Doors and Self-Closing Doors
The end doors are located at both ends of the cold aisle and are the access openings for personnel. KITOZER offers two end door forms: (1) Sliding Glass Door: 12 mm tempered transparent glass, aluminum alloy narrow frame, left-right bidirectional sliding, with door closer and self-bounce mechanism. Standard door width 900 mm, height 2000 mm. Suitable for long aisles with frequent personnel access. (2) Swing Self-Closing Door: 10 mm tempered glass, hydraulic buffer door closer, opening angle 100 degrees, automatically closes within 3-5 seconds after releasing. Suitable for short aisles with infrequent access in small micro modules.
Both end doors are equipped with mechanical emergency escape push bars (panic bar), which can be opened with one push from inside the aisle to meet fire escape requirements. The door frame is surrounded by EPDM sealing strips, and the air leakage rate after closing is <=5%.
3.3 Side Seals and Connectors: Sealing Gaps Between Racks and Top
Between racks, between the rack top and ceiling, and between the rack and end door columns, side seals and connectors need to be used to block, otherwise cold air will “escape” from these gaps. The KITOZER side seal is made of 1.5 mm cold-rolled steel sprayed plastic (RAL 7035 light gray), with dimensions customized according to on-site measurement. Connectors include: rack top connecting beam (connecting adjacent rack tops to support the top panel); rack interior blanking panel (blanking unused U positions in the rack to prevent hot air recirculation from the front panel); aisle end column (connecting the end door and rack row to form the aisle end face); cable tray opening sealing block (when the cable tray crosses above the cold aisle, use fire sealing mud + metal cover to seal the gap between the cable tray and the top panel).
3.4 Sensing and Control System: KZ-CAC-CTRL Intelligent Controller
KITOZER KZ-CAC-CTRL is the intelligent controller of the cold aisle containment system, in 2U rack form, installed in the monitoring cabinet at the end of the aisle. Controller functions include: collecting real-time data from 8-16 digital temperature/humidity sensors in the aisle, drawing temperature cloud maps; collecting door magnetic switch status at both ends of the aisle, automatically alarming and linked with air conditioners to increase air volume when the door opens; connecting to the computer room environmental monitoring platform via Modbus TCP/IP or SNMP v3, remote transmission of aisle temperature, door status, and fire linkage status; local 7-inch touch screen displays real-time aisle temperature, humidity, and air conditioner linkage status, supporting historical curve and alarm record query; optional power parameter module for real-time monitoring of PDU current, voltage, and power factor in the aisle.
3.5 Fire Linkage Skylight: Fusible and Motorized
After the cold aisle is enclosed, in case of fire, smoke will be trapped in the aisle and difficult to discharge, so fire codes require smoke exhaust skylights at the top of the aisle. KITOZER provides two types of skylights: (1) Fusible Link Vent: a flipable acrylic panel is reserved on the top panel, with a 72 C fusible alloy piece. When the temperature in the aisle reaches 72 C, the alloy piece melts, and the skylight automatically opens under gravity to discharge smoke to the large computer room space. This is the most commonly used and reliable passive solution. (2) Motorized Smoke Vent: driven by a 24VDC electric push rod, linked with VESDA very early smoke detection and fire alarm host. During a fire, the fire host outputs a dry contact signal, and the skylight fully opens within 3 seconds. It can be remotely controlled for ventilation during normal use. Skylight area is required by GB 50174 to be no less than 10%-15% of the top panel area. Each standard 12-rack channel is equipped with 2-3 skylights.
3.6 KZ-CAC Series Specification Table
| Model | Rack H | Aisle Width | Racks | Door Type | Config | Ref Price (RMB) |
|---|---|---|---|---|---|---|
| KZ-CAC-22U-1100-P1 | 22U | 1100mm | 4-8 | Swing self-close | P1 Basic | 18,000 |
| KZ-CAC-22U-1100-P2 | 22U | 1100mm | 4-8 | Swing self-close | P2 Advanced (sensor) | 26,000 |
| KZ-CAC-42U-1200-P1 | 42U | 1200mm | 8-16 | Sliding glass | P1 Basic | 32,000 |
| KZ-CAC-42U-1200-P2 | 42U | 1200mm | 8-16 | Sliding glass | P2 Advanced (sensor) | 45,000 |
| KZ-CAC-42U-1200-P3 | 42U | 1200mm | 8-20 | Sliding glass | P3 Smart (sensor array+LED+motorized vent) | 68,000 |
| KZ-CAC-47U-1300-P3 | 47U | 1300mm | 16-30 | Sliding glass | P3 Smart | 92,000 |
| KZ-CAC-MDC-12 | 42U | 1200mm | 12 (MDC) | Sliding glass | P3 Smart + in-row AC integration | 158,000 |
| KZ-CAC-MDC-24 | 42U | 1200mm | 24 (MDC) | Sliding glass | P3 Smart + in-row AC integration | 268,000 |
Note: The above reference prices are external reference prices after multiplying the official list price by 2, excluding supporting equipment such as in-row air conditioners, UPS, and power distribution cabinets; actual project quotation is subject to site survey and configuration list.
Chapter 4: Sizing Calculation for Cold Aisle Containment Systems
The cold aisle containment system itself does not produce cooling; its role is to “organize” cooling capacity. Therefore, sizing calculations need to be jointly designed with supporting precision air conditioners, in-row air conditioners, or chilled water systems. This chapter provides commonly used engineering calculation formulas and typical examples.
4.1 Step 1: Determine IT Heat Load Q_it
IT heat load equals the sum of the rated power of all rack IT equipment multiplied by the diversity factor. Commonly used formula: Q_it = sum P_rack x k_d. P_rack is the per-rack IT rated power (kW); k_d is the diversity factor, 0.7-0.85 for general cloud computer rooms, 0.9-1.0 for GPU training clusters. For example, a 20-rack computer room with 8 kW per rack and k_d=0.8 gives Q_it = 20 x 8 x 0.8 = 128 kW.
4.2 Step 2: Determine Total AC Cooling Q_ac
Total air conditioning cooling needs to superimpose power supply losses, lighting, personnel, and envelope heat transfer on the IT heat load. Engineering simplification: Q_ac = Q_it x (1.15 – 1.25). In the above example Q_ac = 128 x 1.2 = 153.6 kW, take 160 kW. If N+1 redundancy is adopted, configure two 80 kW air conditioners, one running and one standby, or two units each bearing 80 kW.
4.3 Step 3: Calculate Required Supply Air Volume L
Air volume is determined by heat load and supply/return air temperature difference: L = Q_ac / (rho x Cp x dT). rho is air density 1.2 kg/m3; Cp is air specific heat 1.005 kJ/(kg.C); dT is supply/return air temperature difference, typically 10-12 C for computer room precision air conditioning. Substituting the above example: L = 160 / (1.2 x 1.005 x 10) = 13.3 m3/s = 47,900 m3/h = 28,200 CFM.
This means the total supply air volume of the supporting air conditioner should be no less than 28,000 CFM. If using 4 in-row air conditioners, each needs 7,000 CFM; if using 2 room-level precision air conditioners, each needs 14,000 CFM.
4.4 Step 4: Check Rack Power Density and Air Duct
After cold aisle containment, the power density per rack is mainly limited by two factors: the static pressure that the server fan inside the rack can provide, and the air conditioner supply capacity. Engineering experience: 5-8 kW/rack: standard room-level air conditioner + cold aisle containment is sufficient, no in-row air conditioner needed; 8-15 kW/rack: it is recommended to embed 1 in-row air conditioner every 3-4 racks on the aisle side; 15-25 kW/rack: in-row air conditioner density increases to every 2 racks 1 unit, or use rear-door heat exchanger; above 25 kW/rack: air cooling is approaching the limit, need to introduce cold plate liquid cooling or immersion cooling.
4.5 Step 5: Calculate Enclosed Aisle Area and Skylight Area
The plane size of the cold aisle enclosure = rack row length x rack depth x aisle width. Typical aisle clear width 1200 mm, single rack depth 1200 mm, aisle between two rows of racks 1200 mm wide. A 20-rack aisle (10 racks per row) has plane dimensions: length 10×600=6000 mm, width 1200 mm, enclosed area 7.2 square meters.
Fire smoke exhaust skylight area per GB 50174 is not less than 10%-15% of the top panel area, i.e., 7.2 sqm x 12% = 0.86 sqm, configuring 2 600×800 mm skylights is sufficient.
4.6 Step 6: Chilled Water Demand Calculation
If the supporting air conditioner is chilled water type, chilled water flow: W = Q_ac / (4.187 x dT_w). W is water flow (kg/s); dT_w is supply/return water temperature difference, typically 5 C (7/12 C supply) for computer room air conditioning. Above example: W = 160 / (4.187 x 5) = 7.64 kg/s = 27.5 m3/h. Pipe diameter selected at 1.0-1.5 m/s flow rate, DN65 is sufficient.
4.7 Typical Example Summary Table
| Item | Small | Standard Cloud | High-Density Computing |
|---|---|---|---|
| Racks | 8 | 20 | 24 |
| Per-Rack Power | 4kW | 8kW | 20kW |
| Diversity Factor | 0.8 | 0.8 | 0.95 |
| IT Heat Load Q_it | 25.6kW | 128kW | 456kW |
| AC Cooling Q_ac | 32kW | 160kW | 547kW |
| Total Supply Air | ~5,700 CFM | ~28,200 CFM | ~98,000 CFM |
| Supporting AC | 2x room-level 16kW | 4x in-row 40kW | 8x in-row 80kW + rear-door |
| Recommended KZ-CAC Model | KZ-CAC-42U-1100-P1 | KZ-CAC-42U-1200-P3 | KZ-CAC-42U-1200-P3 x2 |
| Enclosed Area | ~3.6 sqm | ~7.2 sqm | ~14.4 sqm |
| Chilled Water Flow | ~5.5 m3/h | ~27.5 m3/h | ~94 m3/h |
| Design PUE Target | <=1.8 | <=1.45 | <=1.25 |
Chapter 5: Installation, Commissioning and O&M
5.1 Pre-Installation Site Survey
Before cold aisle containment installation, KITOZER engineers will go to the site to complete the following surveys: (1) measure rack row length, rack depth, rack height, clear height between rack top and beam/cable tray bottom, confirm top panel installation space; (2) measure door opening width and wall flatness at both ends of the aisle, determine end door column fixing method; (3) check raised floor perforation location and air conditioner supply direction, confirm the path of cold air entering the cold aisle; (4) check on-site cable trays, busways, and water pipes crossing above the cold aisle, determine top panel avoidance opening position; (5) check fire alarm host dry contact capacity, confirm motorized skylight linkage signal source.
5.2 Installation Steps (Standard SOP)
- Positioning and marking: Mark the top panel installation centerline on the rack top square hole strip according to the rack row position.
- Install connecting beam: Fix the aluminum alloy connecting beam with M6 screws between the rack top square hole strips of adjacent cabinets, with the beam surface flush with the rack top.
- Install end door columns: Fix the aluminum alloy columns at both ends of the aisle, fix the bottom of the columns to the floor with expansion bolts, and seal the top with the ceiling or cable tray bottom.
- Install end doors: Hang the sliding glass door or single-open door on the column rail, adjust the door closer force to ensure the door can automatically close without pinching hands.
- Lay top panels: Starting from one end of the aisle, magnetically attach the magnetic acrylic top panels one by one to the connecting beam, and stick EPDM sealing strips between panels. For cable tray crossings, use custom opening panels + fire sealing mud to seal.
- Install side seals: Fix side seals at both ends of the rack row and between the rack and the wall to block gaps.
- Install blanking panels: On the U positions in the rack where no equipment is installed, snap on metal blanking panels to prevent hot air recirculation from the front panel inside the rack.
- Install sensors and controller: Install digital temperature/humidity sensors at the designed positions, route cables along the rack top trunking to the KZ-CAC-CTRL controller, and calibrate point by point on the touch screen after power-on.
- Fire linkage commissioning: Test whether the fusible skylight can automatically open at 72 C; for motorized skylights, test whether it fully opens within 3 seconds after receiving the fire host dry contact trigger.
- Airtightness test: Close all end doors, start the air conditioner supply, use a smoke pen at the door gap, top panel seam, and side seal seam to detect air leakage points, and apply sealing strips for secondary sealing.
5.3 Commissioning and Acceptance
After installation, KITOZER performs acceptance according to GB 50462, main indicators include: aisle temperature uniformity – temperature difference at the same cross-section measuring point <= +/-1 C; rack intake temperature - stable at 22-26 C, fluctuation <= +/-1 C; air leakage rate - at 50 Pa aisle static pressure, leakage rate <=5%; door opening/closing - the closer can release the door at any 90 degree position, the door can close within 5 seconds without rebound; emergency escape - pressing the escape push bar from inside the aisle, the door can open within 1 second; sensor accuracy - compared with a standard temperature/humidity meter, temperature deviation <= +/-0.5 C, humidity deviation <= +/-3%RH; fire linkage - motorized skylight fully opens within 3 seconds after receiving the fire signal.
5.4 Daily O&M
Daily O&M of the cold aisle containment system is very lightweight, recommended to be performed according to the following cycle: Daily: Check the aisle temperature curve, door status, and alarm records on the environmental monitoring platform. Monthly: Inspect the end door door closer force, sealing strip aging, and top panel magnetic strip looseness; clean the sensor probe. Quarterly: Use a smoke pen to re-check air leakage points; check whether EPDM sealing strips are cracked and replace if necessary. Every six months: Calibrate temperature/humidity sensors once; test the fusible skylight fusible piece appearance (mandatory melting test not required); perform a full open/close test on the motorized skylight once. Annually: Conduct a fire linkage test with the fire protection maintenance unit once; check all M6 fastening screws; issue an annual O&M report.
5.5 O&M Precautions
(1) Do not stack combustibles such as cardboard boxes, foam, or plastic in the cold aisle at any time; (2) End doors must be closed after inspection, long-term door opening will cause cold air leakage and PUE rise; (3) When performing fiber splicing, cabling, and other long operations in the aisle, the motorized skylight can be temporarily opened to 50% for ventilation, but must be closed after operation; (4) Do not step on or place heavy objects on the top panel, acrylic panel load-bearing <=20 kg/sqm; (5) When cleaning the top panel, use neutral detergent + soft cloth, do not use organic solvents such as acetone or thinner, otherwise it will corrode the acrylic.
Chapter 6: Scenario Applications – High Density, Modular and Computing Centers
6.1 Scenario 1: Traditional Computer Room Energy-Saving Retrofit (PUE 1.8 to 1.45)
A traditional data center built in 2010 used open hot/cold aisles + room-level precision air conditioning, with PUE around 1.85. In 2025, energy-saving renovation was carried out without replacing the air conditioning main unit, only installing the KZ-CAC-42U-1200-P3 cold aisle containment system between two rows of racks, including top panels, sliding glass doors, side seals, temperature sensor array, and motorized smoke vent skylights. After renovation, measured: rack intake temperature stabilized from the original 24-30 C fluctuation to 24+/-1 C; air conditioner supply temperature increased from 15 C to 20 C; chiller COP increased from 4.2 to 5.8; PUE dropped from 1.85 to 1.48. The renovation investment was about 450,000 RMB, annual electricity savings about 800,000 kWh, simple payback period about 1.8 years.
6.2 Scenario 2: Enterprise Headquarters Modular Computer Room (20-Rack Micro Module)
An enterprise headquarters built a new data center computer room, requiring 20 42U racks, 2 40kW in-row air conditioners, and 1 set of modular UPS in an 80 sqm room. KITOZER delivered 2 sets of KZ-CAC-MDC-12 micro module cold aisle containment systems, each enclosing 12 racks (2 of which are in-row AC racks), with sliding glass doors at both ends and P3 intelligent top panels (with temperature/humidity sensor array and LED strip). The entire micro module was factory prefabricated and assembled on site, delivered in 7 days. Design PUE 1.4, measured operating PUE 1.38.
6.3 Scenario 3: GPU Inference Computing Center (15-20 kW/Rack)
An AI inference company deployed GPU inference servers with 15-20 kW per rack. KITOZER solution: KZ-CAC-42U-1200-P3 cold aisle containment, with 1 KZ-IRC-60 in-row air conditioner (60 kW chilled water type) embedded every 2 racks on the aisle side, and 16 temperature sensors arranged in the cold aisle. During operation, rack intake temperature stabilized at 25 C, GPU chip temperature controlled below 75 C, server fan speed dropped from 80% of full speed to 55%, and server self-energy consumption decreased by about 8%.
6.4 Scenario 4: Edge Data Center (8-Rack Small Computer Room)
An edge node computer room area of only 20 sqm, requiring 8 42U racks, 1 set of small UPS. KITOZER delivered 1 set of KZ-CAC-42U-1100-P1 basic cold aisle containment, end door as single-open self-closing door, top panel as pure acrylic, without sensors (temperature monitored by the existing environmental monitoring). The entire containment system initial investment about 32,000 RMB, construction completed in 1 day.
6.5 Scenario 5: Financial Trading Room (High Reliability Requirements)
A brokerage trading room required Tier III availability, cold aisle containment to meet N+1 redundancy, fire linkage, and 24/7 unattended operation. KITOZER solution: KZ-CAC-42U-1200-P3 intelligent type, with 2 in-row air conditioners N+1, motorized smoke vent skylight linked with VESDA very early smoke detection, KZ-CAC-CTRL controller through dual Modbus TCP access to two independent environmental monitoring platforms (primary/backup redundancy). Any single point failure does not affect aisle cooling and fire linkage.
Chapter 10: Key Materials and Construction of Cold Aisle Containment
10.1 Acrylic (PMMA) Top Panel Material Analysis
Acrylic (Polymethyl Methacrylate, PMMA) is the mainstream material for cold aisle top panels. It has high light transmittance (over 92%, exceeding ordinary glass), low density (1.18 g/cm3, about half of glass), good weather resistance, easy thermoforming, and insulating flame retardancy. The 5 mm optical grade acrylic panel selected by KITOZER has an oxygen index >=18% and passes UL 94 V-0 flame retardant certification, self-extinguishing within 30 seconds after open flame removal. The panel surface is UV-resistant treated, and the yellowing index is <=3 after 10 years under continuous lighting in the data center. In contrast, ordinary recycled acrylic will show obvious yellowing and cracking within 3-5 years, and light transmittance drops below 70%.
The edges of the acrylic top panel are 45-degree chamfered + polished to avoid cutting hands during installation. The magnetic strip uses N52 NdFeB permanent magnet, surface nickel-plated for rust prevention, single magnetic strip suction >=80N, can withstand 50 Pa aisle static pressure without falling off. The magnetic strip and acrylic panel are bonded with 3M VHB double-sided tape, temperature-resistant -40 to 150 C, life >=10 years under 24-hour continuous data center operation.
10.2 Aluminum Alloy Profiles and Surface Treatment
The cold aisle skeleton uses 6063-T5 aluminum alloy extrusion profiles, surface anodized, film thickness >=12 um, silver-white color. Aluminum alloy density 2.7 g/cm3, 2/3 lighter than steel, non-rusting, non-corrosive, high machining accuracy. The profile cross-section is optimized to ensure rigidity (mid-span deflection <=L/250) while reducing weight. The end door column uses 80x80mm square tube profile, wall thickness 2.5mm, can withstand 20,000 opening/closing cycles of sliding doors.
10.3 Sealing Material: EPDM
All joints use EPDM (ethylene propylene diene monomer) sealing strips. EPDM is ozone-resistant, UV-resistant, and temperature-resistant (-40 to 150 C), with compression set <=20% (70 C x 22 hours) in the data center environment. The KITOZER selected sealing strip is a hollow D-shaped cross-section, with optimal sealing effect at 30%-40% compression. The sealing strip is adhered with 3M backing tape, do not pull hard within 24 hours after installation, allow the backing tape to fully cure.
10.4 Tempered Glass End Doors
Both sliding glass doors and single doors use 12mm tempered transparent glass, compliant with GB 15763.2 Tempered Glass for Building. Tempered glass breaks into obtuse small particles and does not hurt people. The glass surface can be pasted with anti-glare film (AG film) to reduce LED strip reflection. Door hardware is 304 stainless steel, including hangers, rails, door closers, and escape push bars. Hangers with nylon bearings, single opening/closing noise <=35 dB(A).
10.5 Digital Temperature and Humidity Sensors
The digital temperature/humidity sensors configured in KITOZER P2/P3 use Sensirion SHT45 or equivalent grade chips, temperature measurement range -40 to 125 C, accuracy +/-0.2 C (0-60 C range); humidity measurement range 0-100%RH, accuracy +/-1.8%RH. Sensors are connected to the controller via RS485 bus, single bus can hang up to 32 sensors, bus length <=1200 m. The sensor probe has a metal dust screen and can be periodically cleaned with compressed air.
10.6 Controller Hardware
The KZ-CAC-CTRL controller hardware uses ARM Cortex-A7 dual-core processor, 1GB DDR4 memory, 8GB eMMC storage, embedded Linux operating system. The front panel is a 7-inch resistive touch screen, resolution 1024×600. Rear panel interfaces include: 2 RS485, 2 Gigabit Ethernet, 4 DI, 4 DO, 2 AI, 1 USB, 1 power supply. Operating temperature 0-50 C, power consumption <=25W. The controller supports local web page access and remote firmware upgrade.
Chapter 11: Standards and Compliance
11.1 Domestic Standards
- GB 50174 Code for Design of Data Centers: Specifies basic requirements for cold aisle containment, fire smoke exhaust skylights, temperature/humidity control.
- GB 50462 Code for Construction Acceptance of Data Center Infrastructure: Specifies construction process and acceptance indicators for cold aisle containment.
- GB 50016 Code of Design on Building Fire Protection: Specifies smoke exhaust skylight area and fire sealing requirements.
- YD/T 1821 Environmental Conditions for Telecommunication Centers: Temperature/humidity grading for telecom data centers.
- GB/T 2887 General Specification for Computer Sites: Basic environmental requirements for computer room sites.
11.2 International Standards
- ASHRAE TC 9.9 Thermal Guidelines: De facto standard for global data center thermal management, 2021 edition sets A1 recommended intake 18-27 C.
- EN 50600 series: European Union data center facility standards, covering architecture, MEP, O&M.
- Uptime Institute Tier Standard: Tier I-IV grade requirements for airflow, redundancy, maintainability.
- LEED / WELL: Green building and healthy building certification, cold aisle containment is an energy-saving credit.
- ISO/IEC 30134: Data center key performance indicators (KPI), including PUE, WUE, CUE.
11.3 Fire Compliance Points
Cold aisle containment systems in fire design must meet: (1) smoke exhaust skylight area >=10% of top panel area; (2) skylight fully opens within 3 seconds during fire (motorized) or melts at 72 C (passive); (3) no combustibles stored in the aisle; (4) cable tray crossings sealed with fire sealing mud, fire resistance rating >=1 hour; (5) fire detection in the aisle with VESDA + smoke detector dual configuration; (6) gas fire suppression systems (such as IG541, heptafluoropropane) discharge concentration must still reach design concentration in the enclosed aisle, motorized skylights may need to be closed to maintain concentration.
Chapter 12: Economic Analysis – TCO and Payback Period
12.1 Initial Investment Composition
A standard 20-rack cold aisle containment project initial investment includes: top panel system (acrylic + aluminum skeleton + sealing strips) about 30%; end door system (sliding glass door + columns + closers + escape push bars) about 25%; side seals and connectors about 10%; sensing and control system (KZ-CAC-CTRL + sensor array + LED strip) about 20%; fire linkage skylight (motorized or fusible) about 10%; installation, commissioning, and transportation about 5%.
Taking KZ-CAC-42U-1200-P3 as an example, a single 20-rack aisle reference price is about 68,000 RMB, equivalent to 3,400 RMB per rack.
12.2 Annual Operating Cost Savings
Annual savings from cold aisle containment mainly come from three parts: (1) AC power consumption reduction: PUE drops from 1.8 to 1.45, assuming IT load 500 kW, annual operation 8760 hours, annual savings = 500 x (1.8-1.45) x 8760 = 1,533,000 kWh. At industrial electricity price 0.7 RMB/kWh, annual electricity savings about 1.07 million RMB. (2) Server fan energy consumption reduction: after stable rack intake temperature, server fan speed drops from 80% to 55%, fan power consumption decreases about 30%, accounting for 2%-3% of IT load. (3) Extended equipment life: after temperature fluctuation reduction, server MTBF extends about 10%-15%, indirectly saving replacement costs.
12.3 Payback Period
Taking a 500 kW IT load medium-sized computer room as an example, cold aisle containment retrofit investment about 2 million RMB, annual electricity savings about 1.07 million RMB, simple payback period about 1.9 years. If combined with UPS high-efficiency module retrofit, LED lighting retrofit, and free cooling retrofit, overall PUE can drop to 1.3, and payback period further shortens.
12.4 Intangible Benefits
Beyond direct electricity savings, cold aisle containment brings: (1) computer room can host power density improvement, same area can accommodate 30%-50% more racks; (2) temperature fluctuation reduction, server throttling events decrease, business availability improves; (3) PUE indicator improvement, meeting green data center declaration, ESG disclosure, carbon tariff compliance; (4) inspection environment improvement, operations personnel satisfaction increases.
Chapter 13: Technology Trends and Future Outlook
13.1 AI-Driven Intelligent Airflow Regulation
The next generation of cold aisle containment systems will introduce AI predictive control: through aisle temperature sensor arrays, AC operating parameters, and IT load history data, use machine learning models to predict the temperature distribution in the next 15 minutes, and proactively adjust EC fan speed and motorized skylight opening to achieve “predictive cooling.” KITOZER is developing the KZ-CAC-AI version, targeting a further 0.05-0.1 reduction on top of the traditional PUE 1.45.
13.2 Air-Liquid Hybrid Containment Architecture
Face with GPU computing power above 20 kW/rack, pure air cooling reaches its limit. KITOZER’s future containment systems will be deeply integrated with cold plate liquid cooling CDUs and rear-door heat exchangers: cold air aisle handles air side (CPU/memory/NIC), rack back handles liquid side (GPU cold plates), air and liquid two independent cycles that do not interfere. This hybrid architecture can support 40-80 kW per rack without immersion.
13.3 Digital Twin and BIM Delivery
KITOZER delivered cold aisle containment projects will come with BIM models (Revit/IFC format), combined with other MEP professional models of the computer room, can real-time map aisle temperature, door status, and AC operating status on the digital twin platform. Operations personnel click on any rack on the digital twin platform to see that rack’s intake temperature, power consumption, fan speed, and PDU current.
13.4 Low Carbon and Sustainability
With the advancement of “dual carbon” goals, data center PUE, WUE (Water Usage Effectiveness), CUE (Carbon Usage Effectiveness) will all be regulated. The cold aisle containment system itself uses recyclable aluminum alloy, acrylic, and steel; KITOZER targets 100% recyclable material proportion >=80% by 2027, and 100% degradable packaging materials.
13.5 Edge and Prefabrication
Edge data centers, 5G base station rooms, and campus small computer rooms have increasingly high requirements for “prefabrication and rapid deployment.” KITOZER will launch integrated prefabricated cold aisle containment units, factory pre-assembling racks, UPS, air conditioning, and containment systems in a 20-foot or 40-foot container, delivered to the site and running after connecting power, network, and water, with deployment time from months to days.
Chapter 14: Synergy with Other KITOZER Product Lines
14.1 Synergy with In-Row Air Conditioning (KZ-IRC)
Cold aisle containment and KZ-IRC in-row air conditioning are natural partners. The in-row air conditioner is embedded on the aisle side, with cold air horizontally delivered directly into the enclosed cold aisle. The two are linked through the same KZ-CAC-CTRL controller: for every 1 C rise in aisle temperature, AC fan speed automatically increases 5%; when the aisle door opens, AC temporarily increases air volume compensation.
14.2 Synergy with Precision Air Conditioning (KZ-PAC)
In retrofit scenarios, cold aisle containment works with existing room-level precision air conditioning: the AC still supplies air in its original position, just “encloses” the cold air into the cold aisle. The AC supply temperature can be gradually raised from 15 C to 20 C, and energy savings are immediate.
14.3 Synergy with Environmental Monitoring (KZ-EM)
KZ-CAC-CTRL uploads aisle temperature, humidity, door status, and fire linkage status to the KZ-EM environmental monitoring platform via Modbus TCP, unified on one screen with water leak detection, smoke detection, UPS status, AC status, and distribution status.
14.4 Synergy with Micro Module (KZ-MDC)
Cold aisle containment is the core component of the KZ-MDC micro data center. A complete KZ-MDC micro module = cold aisle containment + in-row AC + modular UPS + modular distribution cabinet + environmental monitoring + fire protection system, factory prefabricated and on-site assembled.
14.5 Synergy with Racks (KZ-CAB)
The KITOZER 42U/47U standard server rack square hole strip position, top dimensions, and load-bearing indicators are designed according to the KZ-CAC cold aisle containment system, and the connecting beam can be directly attached without on-site modification.
Chapter 15: CFD Airflow Simulation and Engineering Verification
15.1 Why Cold Aisle Containment Needs CFD Simulation
At the design stage of cold aisle containment, it is often difficult to discover hidden airflow problems relying solely on empirical formulas: for example, uneven underfloor static pressure distribution causing insufficient air supply at remote racks, unreasonable in-row AC positions causing near-end overcooling and far-end overheating, cable tray crossing the top panel forming an air leakage path, etc. Computational Fluid Dynamics (CFD) simulation can predict the temperature field, velocity field, and pressure field of the entire computer room before construction, discovering and correcting design flaws. KITOZER includes a standard CFD simulation report when delivering high-density projects (per-rack >=12kW or rack count >=30).
15.2 CFD Modeling Boundary Conditions
Typical CFD model includes: computer room 3D geometry (including racks, air conditioners, raised floor, ceiling, cable trays, cold aisle containment); boundary conditions include: (1) AC supply air volume and temperature (per design value); (2) rack IT load (per 90% of rack rated power); (3) external envelope heat transfer (per local summer AC outdoor calculation temperature); (4) under-floor static pressure (per AC external static pressure); (5) air leakage rate (per containment measured 3%-5%). The solver uses turbulence model k-epsilon or RNG k-epsilon, mesh count 2-5 million, solving time 4-8 hours.
15.3 CFD Output Report Content
CFD report includes: (1) computer room longitudinal section temperature cloud map; (2) cold aisle cross-section temperature cloud map; (3) rack intake temperature distribution cloud map (one point per rack); (4) rack exhaust temperature distribution; (5) under-floor static pressure distribution; (6) velocity vector map (discovering bypass and recirculation paths); (7) hot spot location and optimization recommendations. KITOZER engineers will adjust AC position, perforated tile position, and enclosed top panel air leakage based on CFD results until all rack intake temperatures fall within the 22-26 C range.
15.4 CFD Simulation Case
A project with 20 racks, 10 kW per rack, configured with 4 40kW in-row air conditioners. Initial CFD simulation found: the intake temperature at the remote 2 racks reached 31 C, exceeding the ASHRAE A1 upper limit. The reason was that the near-end in-row AC air volume was “stolen” by the near-end racks. Optimization solution: add air valves at near-end AC supply outlets, reduce near-end air volume by 15%, increase remote air volume by 20%; simultaneously add 2 perforated tiles in front of the remote racks. Secondary simulation showed remote rack intake temperature dropped to 25.5 C, and all racks were within the acceptable range. This optimization avoided post-commissioning hot spot accidents and saved post-retrofit costs of about 200,000 RMB.
Chapter 16: Air Leakage Measurement and Airtight Design
16.1 Sources of Air Leakage
Air leakage in the cold aisle containment system mainly comes from: (1) end door gap (30%-40% of total leakage); (2) top panel and connecting beam seam (20%-30%); (3) side seal and rack/wall seam (15%-20%); (4) cable tray, busway, water pipe crossing (10%-15%); (5) unused U positions inside the rack (10%-20%).
16.2 Air Leakage Rate Test Method
KITOZER uses the “door-to-door differential pressure method” to test leakage rate: close all end doors, use a blower to pressurize the aisle to 50 Pa, and measure the air volume Q_leak required for the blower to maintain 50 Pa. Leakage rate = Q_leak / design supply air volume x 100%. Acceptance standard: <=5%. If exceeding 5%, use a smoke pen to detect seam by seam, find the leakage point and add sealing strips or sealant.
16.3 Airtight Design Points
(1) All joints use double EPDM sealing strips, compression 30%-40%; (2) end doors adopt door leaf compression structure, the door frame presses the sealing strip when closed; (3) top panel magnetic strip suction is greater than 50 Pa aisle static pressure; (4) cable tray crossings use fire sealing mud + metal cover double sealing; (5) add sealing strips between rack top and connecting beam; (6) all unused U positions in the rack are blanked, with rubber pads between the blanking panel and the rack.
16.4 Impact of Air Leakage on PUE
Engineering data shows: for every 5% increase in leakage rate, PUE rises about 0.03-0.05. For a 500 kW IT load computer room, leakage rate from 3% to 10% means an extra 300,000 kWh per year. Therefore, airtight design is the most cost-effective investment in cold aisle containment systems.
Chapter 17: Advanced Scenarios – Liquid Cooling Hybrid and High-Density Computing
17.1 Air-Liquid Hybrid Architecture
In GPU training cluster scenarios, single-cabinet power is 20-50 kW, of which GPU chip heat generation accounts for 60%-70%, and CPU, memory, NIC, and power supply account for 30%-40%. Pure air cooling is difficult to take away GPU heat, and pure liquid cooling cannot cover air-side components. KITOZER recommends air-liquid hybrid architecture: cold aisle containment handles air side (CPU/memory/NIC), in-row air conditioners and rear-door heat exchangers handle liquid side (GPU cold plates). Cold plate coolant is 30% ethylene glycol aqueous solution, inlet temperature 35-40 C, return 45-50 C, secondary heat exchange through CDU and computer room chilled water.
17.2 Cold Plate Liquid Cooling and Cold Aisle Containment Interface
The CDU (Coolant Distribution Unit) for cold plate liquid cooling is usually placed in the computer room large space or dedicated cooling station, and connected to each rack’s quick connector through dual mains. Cold aisle containment does not affect liquid cooling piping, but needs to reserve liquid cooling pipe routing holes at the rack bottom, sealed with fire sealing mud. KITOZER can reserve standardized routing holes (diameter 50mm) on the rack side seals.
17.3 Immersion Liquid Cooling Scenarios
In immersion liquid cooling scenarios above 100 kW/rack, cold aisle containment no longer applies to that row of racks, but adjacent air-cooled racks can still use KZ-CAC containment. KITOZER provides “air-liquid zoning” design: liquid cooling cabinet area is open, air-cooled cabinet area is enclosed, and the two zones are separated by fire walls and fire doors.
17.4 Temperature Management in High-Density Scenarios
In air-liquid hybrid scenarios, cold aisle temperature can be relaxed to 27-32 C (ASHRAE W grade or higher), because GPU heat has been taken away by liquid cooling, and the air side only needs to take away CPU/memory heat, so supply air temperature can be higher. This way the chiller evaporating temperature can be increased to 15-18 C, COP further improved, and PUE can drop to 1.15-1.25.
Chapter 18: Deep Dive into Cold Aisle Containment Project Cases
18.1 Case 1: Tier-1 Operator Data Center Retrofit
Project background: A Tier-1 operator core data center built in 2012, building area 800 sqm, deployed 200 42U racks, original PUE 1.92. In 2025, required PUE below 1.5. KITOZER solution: two-phase renovation, Phase 1 retrofitted 6 cold aisles totaling 120 racks, installed 6 sets of KZ-CAC-42U-1200-P3 intelligent containment systems, equipped with motorized smoke vent skylights and temperature sensor arrays; Phase 2 retrofitted the remaining 80 racks. No business interruption during renovation, single aisle construction scheduled during off-peak hours (1-5 AM). After renovation, measured PUE 1.46, annual electricity savings about 4.2 million kWh, electricity cost savings about 2.94 million RMB. Renovation investment about 3.8 million RMB, simple payback period 1.3 years.
18.2 Case 2: Financial Cloud Room New Project
Project background: A financial cloud tenant built a new 200-rack data center, requiring Tier III, PUE <=1.4. KITOZER solution: 10 sets of KZ-CAC-42U-1200-P3 cold aisle containment, 20 racks per aisle, configured with 20 KZ-IRC-60 in-row air conditioners (N+1 redundancy), 2 sets of KZ-CAC-CTRL controllers primary/backup redundancy. Project delivery includes CAD drawings, BIM models, CFD simulation reports, factory inspection reports, and on-site acceptance reports. After commissioning, measured PUE 1.38, availability 99.982%.
18.3 Case 3: Manufacturing Edge Data Center
Project background: An automobile manufacturing park edge data center, 20 sqm room, 8 racks, requiring unattended operation. KITOZER solution: 1 set of KZ-CAC-42U-1100-P1 basic containment + 2 room-level precision air conditioners + 1 set of environmental monitoring. Construction completed in 1 day, initial investment about 80,000 RMB. Running for 1 year, PUE 1.55, no failure.
18.4 Case 4: University Computing Center
Project background: A university computing center deployed a GPU training cluster, 25 kW per rack, requiring air-liquid hybrid. KITOZER solution: 4 sets of KZ-CAC-42U-1200-P3 aisles, 12 racks per aisle, of which 4 racks are GPU liquid cooling cabinets (with cold plates), 8 racks are air-cooled CPU racks. 6 in-row air conditioners N+1, 2 CDUs 1 running 1 backup. Cold aisle temperature set to 28 C, liquid cooling water supply 35 C. After commissioning, PUE 1.22, GPU chip temperature 72 C, CPU intake 27 C.
18.5 Case 5: Medical Imaging AI Room
Project background: A tertiary hospital imaging AI inference room, 12 racks, 6 kW per rack, requiring high reliability and low noise. KITOZER solution: 1 set of KZ-CAC-42U-1200-P2 advanced containment (with sensors), configured with 2 KZ-PAC-30 room-level precision air conditioners. Considering hospital noise sensitivity, sound-absorbing louvers were added in the aisle, measured aisle noise <=58 dB(A). PUE 1.48.
Chapter 19: Common Engineering Pitfalls and Avoidance Guide
19.1 Pitfall 1: Only Install Top Panels Without End Doors
Some projects save money by only adding top panels on top of the rack, without doors at both ends, thinking “having a top panel counts as containment.” In fact, when both ends are open, cold air leaks out massively from both ends, and the containment effect is less than 30%. End doors are key to containment and cannot be omitted.
19.2 Pitfall 2: No Blanking Panels in Racks
Many operations teams think “blanking panels are a small matter” and don’t blank unused U positions in the rack. As a result, a “chimney effect” forms inside the rack, hot air recirculates from the back through the empty U positions to the front, and local intake temperature rises 5-8 C. Blanking panels are extremely cheap (20-50 RMB each), but have a huge impact on airflow organization.
19.3 Pitfall 3: AC Supply Temperature Not Adjusted
After containment, the AC supply temperature is still set to 15 C, leading to overcooling, excessive dehumidification, and PUE rising instead of falling. The correct approach is to raise the supply temperature by 1 C per week after containment, observing rack intake temperature, until intake temperature stabilizes within 26 C.
19.4 Pitfall 4: No Fire Linkage
Using pure acrylic top panels without smoke exhaust skylights, thinking “the computer room has gas fire suppression so it is enough.” In fact, it is difficult to maintain gas fire suppression concentration in an enclosed aisle, and smoke cannot be discharged during a fire, violating GB 50016. Must install smoke exhaust skylights per code.
19.5 Pitfall 5: Sensors Installed at AC Supply Outlet
Installing temperature sensors at the AC supply outlet shows 18 C, mistakenly thinking the entire aisle is 18 C. In fact, the far end of the aisle may be 30 C. Sensors should be evenly placed at the middle of the aisle, far end, and front of the rack to reflect the real temperature field.
19.6 Pitfall 6: End Door Long-Term Open for Operations
Operations personnel, for convenience, use forklifts or equipment to hold the end door open long-term. As a result, containment is as good as none. The correct approach: open the door for short operations, close it after work; for long operations, open the motorized skylight for ventilation, but the end door remains closed.
19.7 Pitfall 7: Ignoring Under-Floor Cable Organization
Raised floor under-floor power and signal cables and water pipes are messy, blocking the supply static pressure box. After containment, supply resistance increases, and remote rack air volume is insufficient. Before containment retrofit, the under-floor cables must be organized, routed in separate cable trays for power/signal/water pipes.
19.8 Pitfall 8: One-Time Containment Never Maintained
After the containment system is put into operation, sealing strips age, magnetic strips loosen, sensors drift, but no one maintains it. After 3 years, the leakage rate rises from 3% to 15%, and PUE rebounds. Must periodically inspect and maintain according to the O&M cycle in Chapter 5 of this encyclopedia.
Chapter 20: Glossary
- PUE (Power Usage Effectiveness)
- Ratio of total data center power consumption to IT equipment power consumption; closer to 1.0 is more energy efficient.
- SHR (Sensible Heat Ratio)
- Ratio of sensible cooling to total cooling. Data center SHR should be >=0.9.
- ASHRAE TC 9.9
- American Society of Heating, Refrigerating and Air-Conditioning Engineers Technical Committee 9.9, which develops data center thermal environment guidelines.
- CFD (Computational Fluid Dynamics)
- Numerical method for simulating airflow and temperature fields.
- Bypass Airflow
- Cold air supplied by AC that is not utilized by IT equipment and directly returns.
- Hot Recirculation
- Hot air exhausted from the rack is re-ingested from the front.
- Plenum
- Under-floor cavity for uniform air supply.
- Perforated Tile
- Raised floor tile with ventilation holes.
- Blanking Panel
- Metal panel to blank unused U positions in the rack.
- Fusible Link
- 72 C melting alloy piece for fire smoke exhaust skylights.
- VESDA
- Very Early Smoke Detection Apparatus, samples air through sampling tubes to alarm at the smoldering stage.
- CDU (Coolant Distribution Unit)
- Unit in liquid cooling systems that exchanges heat from primary chilled water to secondary coolant.
- Free Cooling
- Using outside cold air or cooling water to directly cool the computer room without starting the chiller.
- N+1 Redundancy
- Configuring N+1 units, any 1 unit failure does not affect operation.
- MTBF
- Mean Time Between Failures.
- WUE (Water Usage Effectiveness)
- Data center total water usage divided by IT power consumption.
- CUE (Carbon Usage Effectiveness)
- Data center carbon emissions divided by IT power consumption.
Chapter 21: KZ-CAC Product Family Deep Expansion
21.1 Sub-Series by Application Scenario
In addition to the standard KZ-CAC series, KITOZER cold aisle containment is derived into the following sub-series by application scenario:
21.1.1 KZ-CAC-EDGE Edge Computer Room Series
For 2-8 rack small edge computer rooms, 5G base station rooms, and campus small data centers. Features: small volume, rapid deployment, low initial investment. Rack height 22U/42U optional, aisle clear width 1100mm, end door is single-open self-closing door, top panel is P1 basic acrylic. The entire system weighs <=80 kg and can be installed by 2 people. Reference price 18,000-32,000 RMB.
21.1.2 KZ-CAC-MDC Micro Module Series
For 12-24 rack modular data centers, pre-assembled with in-row air conditioners, modular UPS, and distribution cabinets into a single integrated micro module. Factory prefabricated, on-site assembled, deployment cycle <=7 days. Aisle clear width 1200mm, end door is sliding glass door, top panel is P3 intelligent type (with sensor array, LED strip, motorized skylight). Reference price 158,000-268,000 RMB/set.
21.1.3 KZ-CAC-HD High-Density Computing Series
For 15-30 kW/rack GPU computing rooms. In-row air conditioners are embedded every 2 racks on the aisle side, top panel thickened (6mm acrylic), temperature sensor density increased to 1 per rack. Cooperates with cold plate liquid cooling CDU to support air-liquid hybrid architecture. Reference price 280,000-450,000 RMB/set (including in-row AC integration).
21.1.4 KZ-CAC-RETROFIT Retrofit Series
For existing computer room energy-saving retrofit. Features: no replacement of existing racks, no change of AC position, only adding top panels, end doors, and side seals. Provides on-site survey, CFD simulation, and non-disruptive construction. Reference price per rack, about 3,000-5,000 RMB/rack.
21.1.5 KZ-CAC-GB Compliance Enhanced Series
For finance, government, military, and other scenarios with high compliance requirements. Add: dual Modbus TCP redundant communication, controller dual power, fire linkage dry contact redundancy, access control integration (swipe card to open end door), video linkage. Reference price adds 30% on P3 basis.
21.2 Bill of Materials (BOM)
| No. | Component | Spec | Unit | Ref Price (RMB) |
|---|---|---|---|---|
| 1 | Acrylic Top Panel | 5mm PMMA, 600x1200mm | pc | 380 |
| 2 | Aluminum Connecting Beam | 6063-T5, L=600mm | pc | 120 |
| 3 | Sliding Glass Door | 12mm tempered glass, 900x2000mm | door | 3,800 |
| 4 | Swing Self-Closing Door | 10mm tempered glass, 900x2000mm | door | 2,600 |
| 5 | End Door Column | 80×80 aluminum tube, H=2200mm | pc | 480 |
| 6 | Side Seal | 1.5mm steel painted, custom | sqm | 320 |
| 7 | Rack Blanking Panel | 1U/2U/4U, steel painted | pc | 35 |
| 8 | EPDM Sealing Strip | D-type hollow, 10x8mm | m | 12 |
| 9 | Magnetic Strip | N52 NdFeB, 200mm long | pc | 45 |
| 10 | Digital Temp/Humidity Sensor | RS485, +/-0.2 C | pc | 380 |
| 11 | Door Magnetic Switch | Dry contact, NO/NC | pc | 45 |
| 12 | KZ-CAC-CTRL Controller | 2U rack, 7-inch touchscreen | pc | 8,800 |
| 13 | Motorized Smoke Vent | 24VDC push rod, 600x800mm | pc | 1,800 |
| 14 | Fusible Skylight | 72 C fusible piece, 600x800mm | pc | 680 |
| 15 | LED Strip | 24VDC, 6000K, 12W/m | m | 85 |
| 16 | Fire Sealing Mud | Organic fire seal, 20kg/box | box | 480 |
| 17 | Emergency Escape Push Bar | Stainless steel, horizontal push | set | 680 |
| 18 | Door Closer | Hydraulic adjustable, 65kg door | pc | 280 |
Chapter 22: Electrical and Control Design Depth
22.1 Power Supply Design
The KZ-CAC-CTRL controller and sensor array require 220VAC single-phase power, power <=50W. The power circuit is led from the computer room UPS distribution cabinet dedicated circuit, through circuit breaker (C6A) to the controller. The motorized skylight push rod is 24VDC, powered by the internal controller power module; during a fire, the fire host directly outputs 24VDC dry contact signal to drive the push rod, not through the controller, ensuring the skylight still operates when the controller fails.
22.2 Network and Communication
The controller is equipped with 2 Gigabit Ethernet: main port connects to the computer room environmental monitoring network (VLAN 100), backup port connects to the backup monitoring network (VLAN 101). Both networks simultaneously upload data, automatically switch to the backup network when the main network is interrupted. IP addresses are uniformly allocated by the monitoring platform, using static IP to avoid DHCP lease expiry disconnects.
22.3 Sensor Wiring
Digital temperature/humidity sensors use RS485 bus daisy-chain wiring, bus length <=1200m, up to 32 sensors per bus. Cable uses shielded twisted pair RVSP 2x0.75mm2, shield single-ended grounded. Sensor installation height in the middle of the aisle (1.5m from floor), avoiding directly below AC supply outlets.
22.4 Alarm Thresholds
Controller default alarm thresholds configurable: aisle high temperature alarm: 28 C (warning) / 32 C (critical); aisle low temperature alarm: 18 C (warning) / 15 C (critical); humidity alarm: RH<30% or RH>70%; door status alarm: door open more than 5 minutes; communication fault: sensor offline more than 30 seconds; fire linkage: immediately record and fully open skylight when receiving fire dry contact signal.
22.5 BMS Integration Point List
The KZ-CAC-CTRL provides a standard Modbus register point list (Excel format), including: input registers (read-only): aisle temperature (per sensor), humidity, door status, motorized skylight position, controller operating status; holding registers (read-write): temperature alarm threshold, humidity alarm threshold, door open alarm delay, motorized skylight manual open/close, sensor calibration values; coils (read-write): motorized skylight fully open/close, LED strip on/off, alarm test. BMS integrators can configure according to the point list without developing a dedicated driver.
Chapter 23: Construction Organization and Project Management
23.1 Project Phase Division
A typical KZ-CAC cold aisle containment project is divided into 5 phases: (1) Survey and design phase (1-2 weeks): on-site survey, CAD drawings, CFD simulation, scheme review; (2) Manufacturing phase (2-3 weeks): custom top panels, end doors, side seals, sensors, controllers per drawings. Factory pre-assembly inspection before delivery; (3) Logistics phase (3-7 days): wooden box packaging, dedicated vehicle shipping, on-site unpacking inspection; (4) On-site installation phase (1-5 days): install top panels, end doors, side seals, sensors, controller per SOP, complete fire linkage commissioning; (5) Commissioning and acceptance phase (1-2 days): air tightness test, temperature uniformity test, air leakage rate test, fire linkage test, issue acceptance report.
23.2 Safety Management
On-site construction must comply with: (1) wear anti-static wrist strap and anti-static shoes before entering the computer room; (2) use insulated tools, prohibit bare metal tools from touching running equipment; (3) construction area fenced off, no unauthorized personnel; (4) hot work operations (such as steel cutting) must apply for a hot work permit, with fire extinguisher; (5) work at height (>=2m) wear safety belt; (6) construction waste cleared daily, not left in the computer room.
23.3 Quality Control Points
The project manager performs quality inspection at the end of each phase: survey phase: verify drawing dimensions vs on-site measured deviation <=+/-5mm; manufacturing phase: spot check dimensions, magnetic strip suction, acrylic light transmittance for each top panel; installation phase: after completing each aisle, perform a door gap leakage test; commissioning phase: all sensors compared one by one with standard temperature/humidity meter; acceptance phase: issue a complete acceptance report per GB 50462.
23.4 Document Delivery List
At project acceptance, KITOZER delivers the following documents: (1) as-built drawings (CAD + PDF); (2) BIM model (IFC format); (3) CFD simulation report; (4) factory inspection report; (5) on-site test report (temperature uniformity, air leakage rate, fire linkage); (6) equipment list (BOM); (7) sensor point list; (8) O&M manual; (9) warranty card.
Chapter 24: O&M SOP Detailed Version
24.1 Daily Inspection (5 minutes)
(1) Open the environmental monitoring dashboard, check whether there is a red hot spot in the aisle temperature cloud map; (2) check door magnetic status, all end doors should show closed; (3) check alarm records, no critical alarms on the day; (4) check controller CPU load and memory, should be <50%.
24.2 Monthly Inspection (30 minutes)
(1) Go on-site to inspect end door closer force one by one, open/close the door 3 times, feel whether the resistance is uniform; (2) visually inspect whether EPDM sealing strips are cracked or falling off; (3) visually inspect whether top panel magnetic strips are loose, lightly push the top panel, no obvious displacement; (4) clean the sensor probe (blow dust off with compressed air); (5) test the door magnetic switch: does the controller alarm when opening the door.
24.3 Quarterly Inspection (2 hours)
(1) Use a smoke pen to re-detect air leakage points at door gaps, top panel seams, and side seal seams, and add sealing strips for found leakage; (2) check all M6 fastening screws, re-tighten once with a screwdriver; (3) check whether the motorized skylight push rod stroke is smooth, manually fully open/close once; (4) calibrate 1-2 sensors (compare with standard temperature/humidity meter, correct in the controller if deviation >0.5 C).
24.4 Annual Inspection (1 day)
(1) Conduct a fire linkage test with the fire protection maintenance unit once: simulate the fire host dry contact signal, the motorized skylight should fully open within 3 seconds; (2) check all fusible piece appearance, immediately replace if deformed or rusted; (3) back up controller configuration parameters to a USB drive; (4) check controller firmware version, upgrade during off-peak hours if an upgrade package is available; (5) issue an annual O&M report, including temperature curves, alarm statistics, equipment status, and next year’s maintenance recommendations.
24.5 Consumable Replacement Cycle
| Consumable | Recommended Replacement Cycle | Replacement Signal |
|---|---|---|
| EPDM sealing strip | 5-8 years | Cracked, hardened, lost elasticity |
| Magnetic strip | 5 years | Suction drops, top panel loose |
| Closer hydraulic oil | 3 years | Door closing speed slows, oil leak |
| Sensor probe filter | 1 year | Dust accumulation, reading drift |
| Motorized skylight push rod carbon brush | 5 years | Thrust drops, abnormal noise |
| LED strip | 3 years | Light decay >30%, flickering |
| Acrylic panel | 10-15 years | Yellowing, cracking, transmittance drop |
Chapter 25: Sustainability and ESG
25.1 Carbon Reduction Contribution
The cold aisle containment system itself does not consume power (P1/P2) or consumes very little (P3 <=50W), but it indirectly reduces data center carbon emissions by lowering PUE. Taking a 500 kW IT load computer room as an example, PUE dropping from 1.8 to 1.45 saves 1.53 million kWh annually. At grid carbon emission factor 0.58 kg CO2/kWh, annual CO2 reduction is about 887 tons, equivalent to planting 49,000 trees.
25.2 Water Conservation
PUE reduction also means cooling tower water consumption decreases. Estimated at WUE 1.8 L/kWh, annual water saving is about 2,754 tons. In water-scarce regions (such as northern China, Singapore, the Middle East), WUE is as important as PUE.
25.3 Material Recycling
Materials used in the KITOZER cold aisle containment system: aluminum alloy (100% recyclable), steel (100% recyclable), tempered glass (100% recyclable), acrylic (recyclable into pellets), EPDM rubber (recyclable into reclaimed rubber). KITOZER targets 100% recyclable product materials by 2027 and 100% degradable packaging materials.
25.4 ESG Disclosure
For listed companies and hyperscale data center operators, PUE, WUE, and CUE have become mandatory disclosure items in ESG reports. KITOZER can provide energy-saving calculation reports for cold aisle containment projects as third-party data support for ESG disclosure.
Chapter 26: Detailed Design Calculation Book (Example)
26.1 Project Overview
An enterprise builds a new data center computer room, floor area 200 sqm, deploying 24 42U racks, per-rack power 8 kW, diversity factor 0.8. Supporting 4 40kW in-row air conditioners (3 running 1 standby), chilled water supply 7 C / return 12 C. Requires KITOZER KZ-CAC cold aisle containment system, design PUE <=1.45.
26.2 Heat Load Calculation
IT heat load Q_it = 24 x 8 x 0.8 = 153.6 kW. AC total cooling Q_ac = 153.6 x 1.2 = 184.3 kW, take 180 kW (3 60kW in-row air conditioners running). Supply air L = 180 / (1.2 x 1.005 x 10) = 14.95 m3/s = 53,820 m3/h = 31,680 CFM. Per in-row AC supply = 31,680 / 3 = 10,560 CFM, select KZ-IRC-60 (12,000 CFM).
26.3 Chilled Water Flow
W = 180 / (4.187 x 5) = 8.6 kg/s = 30.9 m3/h. Pipe diameter at 1.2 m/s flow rate: D = sqrt(4 x 0.0086 / (pi x 1.2)) = 0.095 m, select DN100.
26.4 Cold Aisle Containment Design
24 racks in 2 rows, 12 racks per row, aisle length = 12 x 0.6 = 7.2m, aisle clear width 1.2m, enclosed area = 7.2 x 1.2 = 8.64 sqm. Top panel count = 7.2 / 0.6 = 12 pieces (6 per row). End doors: 1 sliding glass door at each end, total 2. Side seals: between aisle end columns and wall, about 2 sqm. Smoke exhaust skylight: per 12% top panel area = 8.64 x 12% = 1.04 sqm, configure 2 600x800mm motorized skylights (total 0.96 sqm) + 1 600x600mm fusible skylight. Sensors: 1 every 2 racks, total 12 digital temperature/humidity sensors.
26.5 Selection Result
Select KZ-CAC-42U-1200-P3 intelligent type 1 set, including: 12 acrylic top panels, 2 sliding glass doors, 2 end door columns, custom side seals, 48 blanking panels (4 per rack), 40m EPDM sealing strip, 12 digital temperature/humidity sensors, 2 door magnetic switches, 1 KZ-CAC-CTRL controller, 2 motorized smoke vents, 1 fusible skylight, 8m LED strip, 1 box fire sealing mud. Reference price: 68,000 RMB (excluding in-row AC, UPS, distribution cabinet).
26.6 PUE Prediction
After containment, AC supply temperature can be raised from 15 C to 20 C, chiller COP increases from 4.2 to 5.5, free cooling hours from annual 1,800 hours to 3,200 hours. Predicted PUE = 1.38. Annual operating cost: IT load 153.6 kW x 8760h x (PUE-1) = 153.6 x 8760 x 0.38 = 511,000 kWh, at 0.7 RMB/kWh = 358,000 RMB/year.
Chapter 27: Comparison with Other Containment Solutions
27.1 vs Flexible Containment Curtain
The market has low-price “flexible curtain” cold aisle containment, using PVC rolling shutters instead of acrylic top panels and glass doors. Advantages: cheap (10,000-20,000 RMB per aisle); disadvantages: (1) non-flame-retardant (ordinary PVC flame rating only B2); (2) low light transmittance, inconvenient for inspection; (3) sealing strips age quickly, leak in 1-2 years; (4) cannot link with fire protection. KITOZER does not recommend for regular data centers, only suitable for temporary transition scenarios.
27.2 vs Aluminum Hard Containment
Some brands use all-aluminum top panels (non-transparent). Advantages: good rigidity, long life; disadvantages: non-transparent, need to lift the whole panel to see the rack top during inspection, inconvenient. KITOZER acrylic solution balances light transmission and rigidity.
27.3 vs Rack-Level Containment
Rack-level containment (such as single rack back door enclosure, single rack air conditioning) is suitable for ultra-high-density single racks (above 30 kW), but high cost (20,000-50,000 RMB per rack). Cold aisle containment is suitable for medium-density multi-rack scenarios with higher cost-performance. The two can be combined: high-density racks use rack-level, ordinary racks use aisle-level.
Chapter 28: Training and Technical Support
28.1 Customer Training
KITOZER provides 4 hours of on-site training for the customer O&M team at project acceptance, covering: (1) cold aisle containment system principles; (2) KZ-CAC-CTRL controller operation; (3) daily inspection SOP; (4) common fault judgment; (5) emergency handling process. A completion certificate is issued after training.
28.2 Remote Support
KITOZER provides 24/7 remote technical support: phone +86 18520668845, WeChat +86 13922289957, WhatsApp +86 19068534140. Customers can also remotely upload logs through the controller web interface, and KITOZER engineers diagnose online.
28.3 On-Site Service
Domestic projects: engineers on site within 48 hours; overseas projects per contract, usually 3-7 days. On-site service includes: troubleshooting, consumable replacement, annual maintenance, expansion retrofit.
28.4 Spare Parts Supply
KITOZER stocks commonly used spare parts in the Guangzhou warehouse: acrylic top panels, sealing strips, magnetic strips, sensors, door magnetic, closers, electric push rods. Customers can place orders via WeChat, domestic SF Express arrives next day.
Chapter 29: Company Profile and Contact
29.1 Company Introduction
Guangzhou Laian Intelligent System Development Co., Ltd. was founded in 2008, headquartered in Chaoshan Park, Zhongrun Industrial Park, No. 5 Huashan Road, Shilou, Panyu, Guangzhou. The company has long been deeply engaged in system integration and equipment manufacturing for data centers, computing centers, industrial automation, intelligent buildings, and smart parks. KITOZER is the company’s data center and intelligent equipment brand, with product lines covering: power distribution (UPS, distribution cabinets, ATS, PDU, busways), cooling (precision air conditioning, in-row air conditioning, cold/hot aisle containment, rear-door heat exchangers), cabinets (server cabinets, shielded cabinets, outdoor cabinets), monitoring (environmental monitoring, video surveillance, access control, water leak detection), and fire protection (FM200, VESDA).
29.2 Technical Capability
The company has more than 40 R&D team members, including 8 senior engineers and 20 engineers. Annual R&D investment accounts for more than 8% of revenue. It has obtained more than 60 patents and software copyrights. The company is certified ISO 9001 quality management system, ISO 14001 environmental management system, and ISO 45001 occupational health and safety management system.
29.3 Service Network
The company has offices in Guangzhou, Shenzhen, Beijing, Shanghai, Chengdu, Wuhan, and Xi’an, with a service network covering major cities nationwide. Overseas business covers Southeast Asia, the Middle East, Africa, and South America, delivered through partners.
29.4 Contact Information
- Tel/WeChat: +86 18520668845 (WeChat same number)
- WeChat: +86 13922289957
- WhatsApp: +86 19068534140
- Address: Chaoshan Park, Zhongrun Industrial Park, No. 5 Huashan Road, Shilou, Panyu, Guangzhou, China
- Chinese Site: lain.com.cn
- English Site: gdlain.com
Chapter 30: Conclusion
KITOZER cold aisle containment system (KZ-CAC series) is the foundational engineering of data center thermal management. It confines cold air within the aisle through physical barriers, eliminating bypass and recirculation, ensuring every unit of cooling is utilized by IT equipment. From open hot/cold aisles to enclosed aisles, from room-level air conditioning to in-row air conditioning, from fixed-speed fans to EC variable speed, from empirical design to CFD simulation, cold aisle containment technology continues to evolve, working with in-row air conditioners, rear-door heat exchangers, and liquid cooling CDUs to support the power density leap from 8 kW/rack to 50 kW/rack.
KITOZER, a brand of Guangzhou Laian Intelligent System Development Co., Ltd., will continue to invest in R&D for more intelligent, efficient, and low-carbon cold aisle containment products, working with customers toward a zero-carbon data center future. For inquiries: Tel/WeChat +86 18520668845, WeChat +86 13922289957, WhatsApp +86 19068534140. Chinese site lain.com.cn, English site gdlain.com.
End of KITOZER Cold Aisle Containment Technical Encyclopedia. Brand only KITOZER. Models are engineering examples. This document does not constitute final engineering design basis.
Chapter 31: Document Version
Version v1.0, released October 2026. This document covers 31 chapters of KITOZER cold aisle containment technical encyclopedia, including development history, thermal management principles, KZ-CAC full product family, sizing calculations, installation and commissioning, O&M, scenario cases, 60 FAQs, troubleshooting, materials and construction, standards compliance, economic analysis, technology trends, synergy with other product lines, CFD simulation, air leakage design, high-density liquid cooling hybrid scenarios, case studies, engineering pitfalls, glossary, product family expansion, electrical and control design, construction organization, O&M SOP, sustainability and ESG, detailed design calculation examples, comparison with other containment solutions, training and technical support, and company profile. The document will be updated based on product iteration and customer feedback. Latest version available at lain.com.cn or gdlain.com. Technical inquiries: +86 18520668845.
Chapter 7: 60 Frequently Asked Questions (FAQ)
Q1: Will cold aisle containment make the computer room too hot?
A1: No. Cold aisle containment only confines cold air to the aisle, the large computer room space temperature does rise from 22 C to 28-35 C, but personnel only need to open the end door to enter the low-temperature aisle. The rise in large space temperature instead increases the AC return air temperature and reduces refrigeration energy consumption.
Q2: Will personnel inspection be uncomfortable after cold aisle containment?
A2: The aisle temperature is 22-26 C, very comfortable; the large computer room space temperature is slightly higher, but inspectors mainly work in the aisle, and the large space is only a passage when the end door is closed, and will not stay for long.
Q3: I already have racks, can I add cold aisle containment?
A3: Yes. The KZ-CAC series is designed for retrofit scenarios, all top panels, end doors, and side seals are customized according to on-site measured dimensions, no need to replace existing racks.
Q4: Does cold aisle containment have requirements for raised floors?
A4: Raised floor height recommended >=300 mm, perforated tile rate >=30%. If the raised floor is too low or perforation insufficient, need to cooperate with in-row air conditioners or overhead supply retrofit.
Q5: Will cold aisle containment affect fire sprinklers?
A5: No. The top of the cold aisle reserves 10%-15% area of smoke exhaust skylights, which automatically open in case of fire, and fire sprinkler heads can directly spray into the aisle. Sprinkler heads are usually located on the computer room ceiling above the top panel.
Q6: How to choose between fusible and motorized skylights?
A6: Budget limited, aisle length <=12m choose fusible; budget sufficient, need VESDA linkage, need remote ventilation choose motorized. Both can be configured simultaneously as backup.
Q7: How much PUE reduction does cold aisle containment provide?
A7: Typical retrofit scenario PUE drops from 1.7-2.0 to 1.35-1.5; new computer rooms with in-row air conditioners and free cooling can achieve PUE 1.2-1.3.
Q8: Can cold aisle containment increase per-rack power density?
A8: Yes. After containment, per-rack capacity increases from 4-6 kW to 8-15 kW, with in-row air conditioners up to 20 kW.
Q9: Acrylic or tempered glass for top panels?
A9: Acrylic (PMMA) is lightweight, magnetic mounting convenient, high light transmittance (>=92%); tempered glass has high strength but is heavy and needs bolt fixing. KITOZER standard uses acrylic, glass is optional.
Q10: Why do end doors need self-closing?
A10: Because if personnel forget to close the door after entering/exiting, cold air will leak out massively from the doorway and PUE will immediately rise. Self-closing doors ensure the aisle is always in an enclosed state.
Q11: What happens if the door stays open?
A11: An open door means the aisle is not enclosed, bypass airflow surges, rack intake temperature may rise 3-5 C, server fans accelerate, and PUE returns to pre-retrofit levels.
Q12: Does the cold aisle need lighting?
A12: P3 configuration comes with LED strip; P1/P2 configuration can add LED tubes on top of the aisle, linked to computer room lighting circuit.
Q13: Can cold aisle containment and hot aisle containment be done simultaneously?
A13: Yes, called dual hot/cold containment. Suitable for high-density scenarios above 20 kW/rack, but initial investment is higher.
Q14: What protocols does KZ-CAC-CTRL support?
A14: Standard Modbus RTU (RS485) and Modbus TCP; optional SNMP v3, BACnet/IP, MQTT.
Q15: What is the sensor accuracy?
A15: Digital temperature/humidity sensor accuracy +/-0.5 C, humidity +/-3%RH, calibrated annually.
Q16: Does the cold aisle containment system need mains power?
A16: P1 does not (pure passive enclosure); P2/P3 needs 220VAC power for sensors and controller, power <=50W; motorized skylight needs 24VDC backup power, fire host directly drives it during a fire.
Q17: Where does the fire linkage signal come from?
A17: From the fire alarm host backup dry contact output, rated capacity 30VDC/1A. KITOZER engineers will interface with the fire protection contractor on site.
Q18: Can cold aisle containment be used for container data centers?
A18: Yes. The KZ-CAC-MDC series is specifically designed for container and modular data centers, factory prefabricated and transported with the container.
Q19: Does the back of the rack need to be sealed?
A19: The back of the rack faces the hot aisle or large space and does not need sealing; however, unused U positions inside the rack must be blanked to prevent hot air recirculation from the front panel.
Q20: Does cold aisle containment have requirements for floor perforation?
A20: Recommend laying 1 perforated tile (55% open area) every 2 racks directly below the cold aisle to ensure cold air is evenly supplied from the floor.
Q21: Why hasn’t PUE dropped after my cold aisle containment?
A21: Common causes: (1) end doors open long-term; (2) no blanking panels in the rack, hot air recirculates from U positions; (3) messy cables under raised floor block supply; (4) AC supply temperature not raised accordingly; (5) excessive AC air volume causes bypass.
Q22: What should the AC supply temperature be after cold aisle containment?
A22: Recommend gradually increasing from 15 C to 18-22 C, raising 1 C each week while observing rack intake temperature and server fan speed, until intake temperature stabilizes within 26 C.
Q23: Will return air temperature rise after cold aisle containment?
A23: Yes. Return air temperature rises from 22-24 C to 28-35 C, which is good – the higher the return air temperature, the higher the chiller COP and the longer the free cooling time.
Q24: Will cold aisle containment create negative pressure?
A24: If AC supply exceeds return, the aisle will maintain slight positive pressure (+5-10 Pa); if supply is less than return, negative pressure. Engineering wants slight positive pressure to prevent hot air from being drawn in through door gaps.
Q25: What is the cold aisle containment air leakage rate standard?
A25: GB 50174 and ASHRAE recommend leakage rate <=5% (at 50 Pa static pressure). KITOZER factory inspection standard <=3%.
Q26: How long does the acrylic top panel last?
A26: 10+ years without yellowing or cracking under normal use; UV direct exposure accelerates aging, there is no direct UV in the aisle, so life is longer.
Q27: How often to replace sealing strips?
A27: EPDM sealing strips last 5-8 years in computer room environment, replace when found cracked, hardened, or losing elasticity.
Q28: How much does the cold aisle containment system weigh?
A28: A 12-rack aisle weighs about 150-250 kg, distributed over the rack tops, per-rack load <=15 kg, far below the rack rated load.
Q29: Can cable trays run on top of the rack?
A29: Yes, but where the cable tray crosses the cold aisle, it must be sealed with fire sealing mud + metal cover, cannot let the cable tray become an air leakage path.
Q30: Does cold aisle containment affect rack top PDU maintenance?
A30: The acrylic top panel is magnetic and can be lifted at any time to reach up from above to maintain the PDU and cable routing, then magnetically reattach after maintenance.
Q31: How to choose between KZ-CAC and KZ-HAC?
A31: 5-15 kW/rack choose KZ-CAC cold aisle containment; 15-30 kW/rack and requiring large space comfort choose KZ-HAC hot aisle containment; above 30 kW/rack choose dual hot/cold containment + in-row AC/liquid cooling.
Q32: Does the cold aisle containment system need grounding?
A32: Metal connecting beams, columns, and side seals need to be connected to the computer room equipotential grounding busbar, grounding resistance <=1 ohm. Acrylic panels are non-conductive and do not need grounding.
Q33: Can cold aisle containment work with VESDA very early smoke detection?
A33: Yes. The P3 motorized skylight links with VESDA dry contacts, and the skylight opens in advance for ventilation and smoke exhaust when VESDA alarms.
Q34: How many racks can be enclosed in one aisle at most?
A34: Single aisle recommended <=20 racks (12m length). Over 20 racks, divide into two aisles separated by end doors, for fire compartmentation and O&M convenience.
Q35: Why are there three aisle widths 1100/1200/1300mm?
A35: 1100mm for small edge rooms, narrow aisles; 1200mm is standard, personnel can pass sideways and operate; 1300mm for large computer rooms needing tool carts.
Q36: Can the cold aisle containment be disassembled and reinstalled?
A36: Yes. All top panels, end doors, and side seals are modular bolt/magnetic connections, disassembly does not damage the structure, and can be reused with the computer room relocation.
Q37: Does the cold aisle containment require computer room thermal insulation?
A37: Computer room envelope insulation per GB 50174 requirements, independent of aisle containment. Aisle containment does not replace building insulation.
Q38: Does cold aisle containment create noise?
A38: The containment system itself does not create noise. But the AC supply air is concentrated in the aisle, and aisle wind speed may be 2-3 dB(A) higher than in an open room, recommend aisle wind speed <=2.5 m/s.
Q39: Why arrange multiple temperature sensors in the aisle?
A39: A single-point temperature cannot reflect the temperature field of the entire aisle. Arranging 8-16 sensors can draw a temperature cloud map, detect local hot spots and provide early warning.
Q40: How to locate local hot spots?
A40: The KZ-CAC-CTRL touch screen has a temperature cloud map, red areas are hot spots. Common causes: (1) abnormal high power in that rack; (2) blocked perforated tile in front of that rack; (3) missing blanking panel in that rack; (4) that rack is too far from the AC.
Q41: Can cold aisle containment integrate with BMS/BAS?
A41: Yes. The controller uploads temperature, humidity, door status, fire linkage status to the BMS platform via Modbus TCP, and can remotely control skylights and read curves on BMS.
Q42: What does the KZ-CAC reference price include?
A42: P1 reference price includes top panels, end doors, side seals, connectors, blanking panels; P2 adds temperature/humidity sensor array; P3 adds LED strip, motorized skylight, KZ-CAC-CTRL controller. Excludes in-row AC, UPS, distribution cabinet.
Q43: What parameters need to be tested during cold aisle containment acceptance?
A43: Aisle temperature uniformity, rack intake temperature, air leakage rate, door opening/closing force, emergency escape push bar, sensor accuracy, fire linkage – 7 items in total, per GB 50462.
Q44: Will the cold aisle be too cold in winter after containment?
A44: No. Cold aisle containment does not control temperature, temperature is determined by the AC setting. During winter free cooling, the AC still regulates based on return air temperature, and aisle temperature is maintained by the AC.
Q45: Does cold aisle containment reduce AC N+1 redundancy requirements?
A45: No. Containment only improves airflow organization and does not change AC capacity redundancy requirements. Still configure air conditioners by N+1 or 2N.
Q46: Does the cold aisle containment system have CE/UL certification?
A46: KITOZER products designed to CE, RoHS, acrylic panel passes UL 94 V-0 flame rating.
Q47: Can cold aisle containment be used in high-vibration environments?
A47: Magnetic top panels may loosen in vibration environments. High-vibration scenarios (near railway, subway) recommend bolt-fixed top panels.
Q48: Can a raised floor be laid in the cold aisle?
A48: The cold aisle itself is above the raised floor, and cold air is supplied from the floor. No additional laying needed.
Q49: Does cold aisle containment affect rack cabling?
A49: No. Rack cabling is at the bottom and top, and aisle containment does not block. Top cabling is in the rack top cable tray, and the top panel can be partially lifted.
Q50: What happens to computer room personnel after cold aisle containment?
A50: The large space temperature is 28-35 C, short-term inspection acceptable; if long-term work in the large space is required, a separate O&M monitoring room should be set up, separated from the computer room.
Q51: How long is the cold aisle containment system life?
A51: Metal skeleton 15+ years; acrylic panels 10-15 years; sealing strips 5-8 years; sensors and controllers 5-10 years.
Q52: What is the relationship between cold aisle containment and in-row air conditioning?
A52: Cold aisle containment is the airflow organization boundary; in-row air conditioning is the cooling equipment. They are usually used together: in-row AC embedded in the aisle side, cold air directly delivered into the enclosed cold aisle.
Q53: Can cold aisle containment work with rear-door heat exchangers?
A53: Yes. Rear-door heat exchangers are mounted on the back of racks to cool hot air directly, and cold aisle containment organizes cold air into the rack. This is the standard combination for high-density scenarios above 20 kW/rack.
Q54: Can cold aisle containment work with liquid cooling CDUs?
A54: Yes. Liquid cooling CDU handles liquid cooling for high-heat chips such as GPUs, and cold aisle containment handles air cooling for CPUs, memory, and NICs, with air-liquid synergy.
Q55: Does KZ-CAC support custom colors?
A55: Standard color RAL 7035 light gray; can customize RAL 9003 white, RAL 5015 blue, etc., custom lead time +7 days.
Q56: What is the lead time for cold aisle containment system?
A56: Standard models 7-15 working days; custom dimensions 15-25 working days; micro module complete sets 30-45 working days.
Q57: Does installation require downtime?
A57: Retrofit scenarios can be installed in segments during off-peak hours without affecting other segments; new computer rooms are installed along with racks.
Q58: What is the warranty period for the cold aisle containment system?
A58: 3 years free warranty, acrylic panels and sealing strips 1 year; sensors and controllers 2 years. Lifetime paid maintenance.
Q59: Does KITOZER provide on-site installation services?
A59: Yes. Domestic projects by KITOZER’s own engineers or authorized integrators; overseas projects provide installation manual + remote video guidance, or dispatch engineers on-site (travel costs additional).
Chapter 8: Troubleshooting and Emergency Handling
| Symptom | Possible Cause | Troubleshooting Steps | Remedy |
|---|---|---|---|
| Local aisle temperature too high (hot spot) | Abnormal rack power / missing blanking / blocked tile / sensor fault | 1. View temperature cloud map to locate hot rack; 2. Check rack U-position blanking; 3. Check perforated tile under rack; 4. Compare adjacent sensor readings | Install blanking / clean tile / calibrate sensor / redistribute load |
| Rack intake temperature overall too high | End door open long-term / insufficient AC supply / AC setpoint too high | 1. Check door magnetic record; 2. Check AC operating status; 3. Compare design supply air volume | Close end door / start backup AC / lower supply temperature 1-2 C |
| PUE rises instead of falling | Bypass airflow still large / excessive AC air volume / return air short circuit | 1. Smoke pen test for leakage points; 2. Check under-floor cables; 3. Verify AC air volume match | Add sealing strips / organize under-floor cables / EC fan derating |
| End door not closing tightly | Closer force insufficient / seal strip aging / door deformation | 1. Observe door closing last 10cm action; 2. Check seal strip compression; 3. Feeler gauge door gap | Adjust closer / replace seal strip / align door body |
| Magnetic top panel falling off | Magnetic strip aging / panel overweight / vibration | 1. Check magnetic strip suction; 2. Weigh panel; 3. Check on-site vibration source | Replace magnetic strip / change to bolt fixing / vibration isolation |
| Sensor reading drift | Probe dust / end of life / calibration drift | 1. Compare with standard temperature/humidity meter; 2. Clean probe; 3. Check years of use | Clean / calibrate / replace sensor |
| Motorized skylight not operating | 24VDC power fault / push rod stuck / fire dry contact signal lost | 1. Measure voltage at push rod ends; 2. Manual push rod test; 3. Check fire host output | Repair power / replace push rod / repair linkage cable |
| Fusible skylight false operation | Fusible piece near end of life / aisle temperature chronically high | 1. Check aisle temperature history; 2. Inspect fusible piece appearance | Replace fusible piece / investigate heat source |
| Controller offline | Network cable disconnected / switch failure / IP conflict / controller crash | 1. Ping controller IP; 2. Check switch port; 3. Look at controller power light | Replace cable / restart switch / restart controller / change IP |
| Frequent false alarms | Alarm threshold too narrow / sensor drift / door magnetic jitter | 1. Check alarm log; 2. View history curve; 3. Check door magnetic installation | Widen threshold / calibrate sensor / reinforce door magnetic |
8.1 Emergency Handling
(1) All air conditioners failed: immediately open all end doors and motorized skylights, start computer room backup ventilation, derate IT load, notify HVAC engineer for emergency handling; (2) Motorized skylight jammed in closed position: manually pull the push rod emergency pull cord, the skylight can be manually opened; (3) Controller completely failed: sensor data not displayed locally, but the aisle containment structure is still effective, temperature monitored by other sensors on the AC and environmental monitoring platform; (4) Acrylic panel shattered: first apply warning tape around the shatter to prevent falling fragments, replace with a same-spec panel within 24 hours.
Chapter 9: Contact KITOZER
The KITOZER cold aisle containment system (KZ-CAC series) is independently developed, manufactured, and delivered by Guangzhou Laian Intelligent System Development Co., Ltd. We provide one-stop service from site survey, scheme design, manufacturing, installation and commissioning to long-term O&M.
- Tel/WeChat: +86 18520668845 (WeChat same number)
- WeChat: +86 13922289957
- WhatsApp: +86 19068534140
- Company: Guangzhou Laian Intelligent System Development Co., Ltd.
- Address: Chaoshan Park, Zhongrun Industrial Park, No. 5 Huashan Road, Shilou, Panyu, Guangzhou
- Chinese Site: lain.com.cn
- English Site: gdlain.com
Design institutes, general contractors, system integrators, data center operators, and computing center owners are welcome to call or write for the KZ-CAC selection manual, CAD drawings, BIM models, 3D renderings, and project case collection. Reference price is list price x2, actual quotation subject to project inquiry.
This document is a KITOZER brand technical encyclopedia covering cold aisle containment system development history, thermal management principles, KZ-CAC full product family, sizing calculations, installation and commissioning, O&M, scenario cases, 60 FAQs, and troubleshooting. Brand only KITOZER, models are engineering examples. This document does not constitute final engineering design basis, actual projects are subject to formal construction drawings and contract.