KITOZER
KITOZER

KITOZER Diesel Generator: Load Bank Test Run Standard

Running a diesel generator under no load for long hours causes wet stacking and carbon build-up in the turbocharger. KITOZER recommends monthly no-load start for 15 minutes, quarterly 50 percent load bank test for 1 hour, and annual 100 percent load bank test for 2 hours. Record oil pressure, coolant temperature, exhaust temperature, frequency, voltage, and fuel rack position at 5-minute intervals. Change lube oil and fuel filters after the annual load test. Keep fuel polishers running continuously to prevent diesel bug growth.

Table of Contents

Fuel And Battery

Maintain fuel tank at least 70 percent full and treat with biocide every 6 months. Float-charge starter batteries must read 2.23V per cell. KITOZER generator sets come with automatic transfer switch integration.

Price

From $18,500 for 100kVA diesel genset. Contact +86 13922289957 for generator package.

Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com

Scroll to Top