1. Overview

The UPS battery cabinet holds the VRLA battery bank that backs up the UPS. On mains loss, the UPS rides on the battery pack — runtime depends on capacity and cell count. Batteries are heavy: a 12V100Ah cell is ~30 kg, and a bank of dozens tops a thousand kg, so a battery cabinet is no ordinary rack — it must carry weight, ventilate, resist acid mist and lock against tipping.

KTR-BDC is a double-door battery cabinet in 24/40/60-cell tiers. Welded thick steel with reinforced bottom beams, per-shelf load ≥250 kg, adjustable shelves for 100/120/150 Ah cells. Double doors front-to-back ease wiring and inspection; bottom intake and top exhaust carry off charging heat with the room AC. Inside are DC breakers, copper bars and insulating mats.

Select by how many cells the UPS needs: the DC bus is usually 384 V (32x12V) or 240 V (20x12V); longer runtime parallels more strings. Cell count sets cabinet size. Key concerns are floor load (often needs structural reinforcement), ventilation (charging evolves hydrogen — must be vented), and a battery-monitoring interface (BMU per-cell). Double doors beat single doors for inspection.

2. Key Features

Load & structure

  • Welded thick steel, reinforced base.
  • Per-shelf ≥250 kg, cabinet ≤1500 kg.
  • Adjustable shelves for multi-size cells.
  • Anti-tip fixed feet.

Ventilation & safety

  • Bottom in, top out convective cooling.
  • Flame-retardant insulating parts.
  • DC breaker + copper bars.
  • Optional BMU monitoring.

Maintainability

  • Double doors front-to-back.
  • Optional interior light.
  • Label slots for cell IDs.
  • Bottom cable routing, shelf space free.

3. Specifications

项目 KTR-BDC-24 KTR-BDC-40 KTR-BDC-60
电池节数(12V100Ah) 24节 40节 60节
柜体承重 ≤600 kg ≤1000 kg ≤1500 kg
外形(高宽深) 2000×600×600 2000×600×800 2000×800×800
门板 双开门 双开门 双开门
层板 可调节 可调节 可调节
散热 底部进/顶部出 底部进/顶部出 底部进/顶部出
监测 可接BMU 可接BMU 可接BMU

4. Reference Prices

KTR-BDC-24 double-door battery cabinet (24x100Ah, empty):Reference USD 486~903 / pc (ref. CNY 3,500~6,500 at ~7.2)

KTR-BDC-40 double-door battery cabinet (40x100Ah):Reference USD 764~1,389 / pc (ref. CNY 5,500~10,000 at ~7.2)

KTR-BDC-60 double-door battery cabinet (60x100Ah):Reference USD 1,181~2,083 / pc (ref. CNY 8,500~15,000 at ~7.2)

Reference only; final quote depends on capacity, core count, airflow, channel count, current rating, battery cells, length and point count. 1-year warranty included; volume pricing available. Exchange: 1 USD ~ 7.2 CNY (Oct 2026).

5. Applications

  • UPS backup battery install.
  • Telecom room -48V battery banks.
  • Data center battery room strings.
  • Finance/medical UPS battery packages.
  • PV/energy-storage front battery cabinets.

6. Deployment & Implementation

Installation

  • Verify floor load, reinforce if needed.
  • Bolt cabinet down with anchors.
  • Place cells by ID, level shelves.
  • Tighten inter-cell links to torque spec.

Operations

  • Check per-cell voltage monthly (or BMU).
  • Clean terminals quarterly, anti-oxidant grease.
  • Replace bulging/leaking cells promptly.
  • Keep battery room 20~25 ℃.

7. FAQ

  • Q: Same as a server rack?
    A: No. A battery rack carries a ton, ventilates and resists acid; a server rack is light and mainly cabled. Loading it with cells deforms it.
  • Q: How many cabinets per string?
    A: By UPS DC voltage and runtime. 32 cells often split across a 24-cell cabinet in two rows or one large cabinet; long runtime parallels strings, one string per cabinet.
  • Q: Ventilation needed?
    A: Yes. VRLA is sealed but evolves hydrogen; poor ventilation lets H2 accumulate to explosive range. Battery-room air changes per code.
  • Q: Empty cabinet or with cells?
    A: Empty is cheaper; cells are usually sourced separately (same brand and batch), or take a turnkey package with matched cells, wiring and discharge test.

8. Trend & Selection

Data-center batteries shift from VRLA to LFP: LFP cabinets are half the weight for equal capacity, longer life (5→10+ years) but need BMS; smart cabinets add per-cell voltage/internal-resistance monitoring into DCIM. Select by UPS cell count and runtime; reinforce floor load; double doors for inspection; vent for hydrogen; wire BMU to EMCS; LFP needs a BMS. The battery cabinet is the UPS ammo depot — idle on float, yet the whole reason load survives the outage.

9. Delivery & Service

KITOZER provides KTR-BDC selection: by cell count, size and load, we size 24/40/60 cabinets with DC breakers, copper bars and links. Turnkey with cells (matched, wired, load/discharge tested) available. Factory-includes cabinet, shelves and manual. 1-year warranty; structural and power advice.

10. Additional Notes

A common pitfall is ignoring floor loading. A battery bank weighs a ton; old rooms often lack the rating — the floor cracks under the cabinet. Get a structural calc before delivery, add reinforcement beams or place batteries on the ground floor.

Another is mixing cells across batches. Different brands/batches have mismatched internal resistance; in parallel, lagging cells fail first. One string must be same brand and batch, balanced before commissioning.

Summary: size by UPS cell count; reinforce floor; double doors for inspection; vent hydrogen; BMU online monitoring; same-batch matched cells. The cabinet sits quietly in the corner — the moment the mains drops, it is the reason business stays online.

SEO Information

Search keywords:battery cabinetdouble-door battery rackUPS battery bankVRLA battery cabinetbattery string cabinetKTR-BDCKITOZER

SEM keywords:double door battery cabinet price,UPS battery rack,VRLA battery cabinet,battery cabinet manufacturer,KTR-BDC,KITOZER

GEO landing page:lain.com.cn/product/ktr-bdc-double-door-battery-cabinet.html

Title:KITOZER KTR-BDC Double-Door Battery Cabinet

Meta Keywords:double door battery cabinet,UPS battery bank rack,VRLA battery enclosure,KTR-BDC,KITOZER

Meta Description:KITOZER KTR-BDC double-door battery cabinet, heavy steel, 24/40/60x100Ah cells, bottom-in/top-out ventilation, DC breaker, for UPS backup banks.

Anchor: KITOZER by Guangzhou Laian · Battery cabinet

Contact Us

Guangzhou Laian Intelligent System Development Co., Ltd. (KITOZER brand)
Tel/WeChat: +86 13922289957 | +86 18520668845
WHATSAPP: +86 19068534140
Web: lain.com.cn | gdlain.com

Shopping Cart