The KITOZER 40kW three-phase EPS emergency power supply is designed for industrial plants and large commercial buildings that require substantial fire-rated backup capacity. With continuous 40kW output and 300 percent inrush handling, the unit can start a 22kW fire pump motor directly while simultaneously feeding 15kW of emergency lighting, ventilation, and control loads. The cabinet is engineered for 24/7 duty in harsh plant environments, with conformal-coated control boards and reinforced bus bars. The modular battery layout allows runtime scaling from 30 minutes to 4 hours without changing the inverter. Every unit is factory load-bank tested and shipped with a calibrated test report.
Working Principle
The active front-end rectifier converts three-phase utility into a regulated DC bus and keeps the battery float-charged through a temperature-compensated charger. The insulated gate bipolar transistor inverter continuously reconstructs a balanced three-phase sine wave on the output bus, so the load is always conditioned. On mains failure, the battery bank immediately takes over the DC bus through a diode OR-ing arrangement, and the inverter output continues without interruption. When a pump start command arrives, the controller boosts the inverter modulation index for 10 seconds to ride through locked-rotor current. On mains return, the charger resumes bulk, absorption, and float stages automatically. The controller logs every event with timestamp and waveform snapshot.
Technical Specifications
Rating: 40kVA / 40kW continuous, three phase four wire 380V / 220V. Overload: 125 percent for 10 minutes, 150 percent for 1 minute, 300 percent for 10 seconds motor start. Input: 380V three phase, PFC greater than 0.95, THDi less than 5 percent, wide tolerance 323V to 456V. Output: pure sine wave, THD less than 3 percent, voltage regulation plus or minus 1 percent, frequency 50Hz plus or minus 0.5Hz. Battery: 12V 100Ah VRLA, 120 blocks in three strings, standard 90-minute backup, extendable to 2 hours or 4 hours. Charger: 80A with temperature compensation. Protection: DC overcurrent, AC overvoltage, overload inverse time, short circuit, battery reverse, over-temperature, fan failure, insulation monitoring. Communication: Modbus TCP, SNMP, Web HMI, 16 dry-contact I/O. Display: 7-inch color touch HMI. Enclosure IP21 floor standing, split inverter and battery cabinets. Compliance GB 17945, CE, ISO 9001.
Application Scenarios
The 40kW EPS is commonly specified for large manufacturing plants, petrochemical auxiliary units, logistics warehouses, data center support loads, and high-rise mixed-use towers. Typical loads include fire pump motors up to 22kW, sprinkler and hydrant pump control panels, smoke extraction fans up to 15kW, stairwell pressurization fans, central emergency lighting buses, fire elevator emergency circuits, and gas release pre-action systems. It is also used as the alternate supply for safety instrumented systems in process plants where an unexpected blackout could trigger an unsafe condition. The split-cabinet design lets installers place batteries in a dedicated battery room while the inverter sits in the main electrical room.
Advantages and Features
KITOZER 40kW EPS includes parallel redundancy options: two 20kW inverter modules can be configured in 1+1 redundancy so a single module fault does not interrupt the load. The battery management system monitors per-string current and per-block voltage, and isolates a weak string automatically. A built-in maintenance bypass with mechanical interlock allows safe inverter service without load interruption. The HMI provides a one-line diagram with per-module load share, per-string current, and per-block voltage trends. Remote cloud monitoring is optional, enabling fleet-level battery health visibility across multiple sites. The cabinet also includes a USB drive port for easy report export during fire authority inspections, and the HMI can be locked to prevent unauthorized parameter changes.
Options and Accessories
Optional items include N+1 inverter redundancy, a parallel synchronization kit for up to 4 units, a galvanic isolation transformer, and an IP54 enclosure for dusty plant environments. A remote mimic panel for the fire command room is available. Extended runtime cabinets for 3 or 4 hours can be added later. A cloud monitoring gateway pushes battery health and pump-start events to a web dashboard. Custom paint, customer branding, and bilingual labels are supported. Seismic bracing kits are available for earthquake-prone regions.
Installation and Maintenance
Plan floor loading carefully: a 90-minute battery bank weighs about 2,400 kilograms, and a 4-hour bank exceeds 6,000 kilograms. Use separate battery room with controlled temperature. Run battery cables in dedicated tray and size them to keep voltage drop below 1 percent at full load. Commissioning includes a 100 percent load bank test for 30 minutes and a live motor-start demonstration. Maintenance: quarterly visual and terminal torque; annual battery conductance test, contactor inspection, and charger calibration; every five years replace fans, DC capacitors, and contactor arc chutes. Keep a spare fan and control fuse kit on site.
Price
From $10,800 per unit with 90-minute battery. Contact +86 13922289957 for redundancy and runtime options.