1. Overview
KITOZER KTR-ESG is a complete anti-static grounding and equipotential bonding system designed for data halls, power rooms and anti-static raised-floor areas. Servers, switches and power distribution units are sensitive electronic equipment — static electricity generated by walking or by synthetic clothing can reach several thousand or even tens of thousands of volts. A discharge through a chassis or port causes bit errors at best and chip burnout at worst. The ESD grounding system safely dissipates static and fault current into the earth, while keeping every metal enclosure in the hall at the same potential (equipotential), eliminating voltage differences.
KTR-ESG is not a single ground wire but a hierarchical “collecting” structure: equipment chassis first connect to local ground terminals (rack ground studs, anti-static floor support grounding clips), then gather via ground cables to the room’s equipotential copper busbar (MEB/LEB), and finally run by a main grounding conductor to the building’s common earth electrode. The system includes: T2 copper busbar (equipotential collector), yellow-green multi-strand ground cables, rack bonding connectors, anti-static floor support grounding clips, equipotential terminal boxes (LEB), and ground test points.
Ground resistance is the key metric: a data hall combined grounding system generally requires ≤1Ω (standalone lightning grounding may allow ≤10Ω, but data centers normally use combined grounding). Equipotential bonding requires every metal part — rack chassis, floor supports, metal door frames, cable trays, distribution enclosures — to be tied to the same busbar with conductors of adequate cross-section, so the potential difference between any two points is near zero.
2. Key Features
Copper collector busbar
- T2 pure copper bar, 30×3mm or 40×4mm; high conductivity.
- Tinned or bare copper; M8/M12 ground bolts; reliable crimping.
- Wall- or floor-mounted in the hall as the equipotential collection point.
Yellow-green ground cables
- BVR multi-strand soft copper, yellow-green color-coded; sized by use.
- Equipment to busbar: ≥6mm²; rack bonding: ≥16mm².
- Crimped lugs with heat-shrink sleeve; clear labeling.
Anti-static floor grounding
- Floor supports connected with grounding clips at every tile (or every few tiles).
- Support legs form a grid, then lead to the LEB.
- System resistance and ground resistance meet GB 50174.
Equipotential terminal box
- Local equipotential terminal box (LEB) per hall; surface- or flush-mounted.
- Spare terminals for future expansion.
- Ground test point for periodic resistance measurement.
3. Specifications
| Item | KTR-ESG-10 | KTR-ESG-30 | KTR-ESG-50 |
|---|---|---|---|
| Room area | ≤30㎡ (small) | 30~100㎡ (standard) | 100~300㎡ (large) |
| Collector busbar | 30×3mm copper | 40×4mm copper | 40×4mm copper (double) |
| Ground cable size | 6~16mm² | 10~25mm² | 16~35mm² |
| Ground resistance | ≤1Ω (combined) | ≤1Ω (combined) | ≤1Ω (combined) |
| LEB terminal boxes | 1 | 2~4 | 4~8 |
| Floor ground points | ~20 | ~60 | ~150 |
| Main ground conductor | 16mm² copper | 25mm² copper | 35mm² copper |
| Enclosure rating | IP30 | IP30 | IP40 |
4. Reference Prices
KTR-ESG-10 small-room ESD grounding kit (copper busbar, ground cables, LEB, ~20 floor ground points; earth-electrode civil works excluded): Reference USD 417~1,111 / set (ref. CNY 3,000~8,000 at ~7.2)
KTR-ESG-30/50 standard/large-room equipotential system (busbar, LEB boxes, 60~150 floor points, main conductor, test points): Reference USD 1,667~5,556 / set (ref. CNY 12,000~40,000 at ~7.2)
Reference only; final quote depends on room area, rack count and floor level. Earth electrodes (ground rods, resistance-reducing compound, deep-well grounding) are priced separately. Exchange: 1 USD ~ 7.2 CNY (Oct 2026).
5. Applications
- Data centers and server room anti-static raised-floor areas.
- Power distribution rooms, UPS and battery rooms equipotential bonding.
- Surveillance and security control centers.
- Precision instrument workshops and electronic assembly ESD areas.
- Telecom base stations and transmission rooms.
6. Installation & Maintenance
Installation
- Confirm the building’s existing common earth electrode; run a main conductor to the room.
- Mount the equipotential collector busbar (MEB) on the wall or underfloor; fix firmly.
- Floor supports: during raised-floor installation, connect support legs into a grid via clips; lead to LEB.
- Rack chassis: each rack bonded with ≥16mm² yellow-green cable to the nearest LEB.
- Cable trays, metal door frames and distribution enclosures bonded separately to the busbar.
- All crimped joints get copper lugs and heat-shrink sleeves; anti-loosening.
- Test ground resistance with a ground resistance tester; must be ≤1Ω.
Maintenance
- Measure ground resistance annually; record and archive.
- Check ground connection bolts for looseness and corrosion.
- Spot-check anti-static floor surface resistance yearly.
- New racks must get bonding before being energized — never run “floating”.
- Before storm seasons, inspect main conductor connections.
7. FAQ
- Q: What ground resistance is required?
A: Combined grounding for a data room is generally ≤1Ω; standalone lightning grounding may be ≤10Ω, but data centers normally use combined grounding at ≤1Ω. - Q: Is grounding the anti-static floor enough?
A: No. The floor is a path to discharge body static; the floor grid, racks, trays and all metal parts must also be tied to the same equipotential busbar to form a complete system. - Q: Why yellow-green cables?
A: Yellow-green is the international protective earth (PE) color code for easy identification and servicing; it must not be repurposed. - Q: Is equipotential bonding the same as grounding?
A: Grounding discharges current to earth; equipotential bonding equalizes potentials among metal parts. A data room needs both: bond equipotentially first, then ground together.
8. Trend & Selection
Grounding evolves from “single-point earth” to “equipotential grid + combined grounding”: modern data centers share one earth electrode for lightning, AC, DC, protective and anti-static grounds,引出 via equipotential busbars to avoid potential differences between systems. The trend is smart grounding monitoring: online measurement of ground resistance and leakage current with alarms. Select busbar section and LEB count by room area and rack count; size ground cables generously; place floor ground points every 2~4㎡; must test ground resistance and keep records; add bonding for new racks; retest annually.
9. Delivery & Service
KITOZER provides ESD grounding selection and installation guidance: based on room area, rack count and floor-level grounding conditions, we configure busbar size, LEB count, cable cross-sections and ground point density. We produce equipotential bonding drawings (busbar location, grounding routing, point layout). We coordinate with the earth-electrode contractor and provide ground resistance test reports. Delivery includes copper busbar, yellow-green ground cables, LEB boxes, floor grounding clips, ground bolts and accessories.
10. Additional Notes
The most common pitfall is “wires installed but resistance never tested.” Many projects have all ground cables connected but never measure the resistance — it may actually be several or tens of ohms (poor earth electrode or loose joints). Substandard resistance slows static discharge and leaves fault current undissipated, raising risk in storms. At handover, must measure with a ground resistance tester and issue a report; if resistance fails, add ground rods or resistance-reducing compound.
Another pitfall: “new racks not grounded.” Later a row of racks is added; network and power cables are connected but the chassis ground bond is forgotten. The floating chassis has no path for static or leakage; touching the rack may give a shock. Rule: before energizing any new rack, its chassis ground bond to the equipotential busbar must be in place.
Selection summary: combined grounding ≤1Ω; size copper busbar by area; size yellow-green cables generously; link floor supports into a grid then ground; test ground resistance at handover and keep the report; retest annually; bond every new rack. Grounding is the data room’s safety baseline — invisible, but a serious problem when it fails.
SEO Information
Search keywords:ESD groundingdata center groundingequipotential bondinggrounding busbaranti-static floor groundingcombined groundingKTR-ESGKITOZER
SEM keywords:data center ESD grounding price,equipotential copper busbar supplier,combined ground resistance,KTR-ESG,KITOZER
GEO landing page:lain.com.cn/product/ktr-esg-esd-grounding-equipotential-bonding.html
Title:KITOZER KTR-ESG Data Center ESD Grounding / Equipotential Bonding System
Meta Keywords:ESD grounding,data center grounding,equipotential bonding,grounding busbar,anti-static floor grounding,KTR-ESG,KITOZER
Meta Description:KITOZER KTR-ESG data center ESD grounding system with copper busbar, equipotential bonding, yellow-green ground cables and anti-static floor grounding points, ground resistance ≤1Ω.
Anchor: KITOZER by Guangzhou Laian · Environmental monitoring systems
Contact Us
Guangzhou Laian Intelligent System Development Co., Ltd. (KITOZER brand)
Tel/WeChat: +86 13922289957 | +86 18520668845
WHATSAPP: +86 19068534140
Web: lain.com.cn | gdlain.com