KITOZER
KITOZER

KITOZER ODF: 96 Port LC High Density Fiber Distribution Frame

The KITOZER 96-port LC high-density optical distribution frame delivers 192 fiber terminations in a 3U rack space, purpose-built for modern data hall aggregation layers where MTP trunk cables break out to LC patching. The front panel uses LC quad adapters, and the slide-out internal area houses four splicing trays that hold up to 96 fusion splices. A dedicated slack storage compartment protects unused fiber length, and dual rear cable gland plates separate incoming backbone trunks from outgoing horizontal distribution cables. The chassis is fabricated from 1.5 mm cold-rolled steel with a matte black powder coat and includes front and rear vertical cable management for neat patch cord dressing. The heavy-duty rails support the fully loaded sliding tray assembly, so technicians can work comfortably on splices without the tray sagging under the weight of cable bundles.

Technical Specifications

Mechanical: 3U, 19-inch rack, depth 350 mm, cold-rolled steel 1.5 mm, black powder coat, weight 10.5 kg. Optical: 96 LC quad ports (192 fibers), insertion loss less than 0.2 dB per adapter, return loss greater than 50 dB UPC and greater than 60 dB APC, compatible OS2, OM3, OM4, OM5. Splicing: 4 x 24-core sliding trays, bend radius 30 mm loaded, splice sleeve length 60 mm. Cable entry: dual rear gland plates, side entry, vertical management both sides, M5 ground, cable tie points. Environmental: operating -10 C to +60 C, humidity up to 95 percent non-condensing. Features: slide-out splicing section, removable front bezel, MTP cassette ready, label holders, lock option. Compliance: CE, RoHS, KITOZER, 5 year warranty.

Applications

This 3U ODF is deployed in hyperscale data hall middle-of-row aggregation, cloud meet-me rooms, and enterprise core distribution frames that carry 40G and 100G spine-leaf traffic. Telecom colocation cages use it as the carrier-to-customer demarcation point. Content delivery network points of presence rely on its density to consolidate multiple 12-fiber MTP trunks into manageable LC patching for router and firewall ports. Broadcast IP studios and government secure facilities also deploy this frame because it supports MPO/MTP cassette migration and keeps patching organized during frequent reconfiguration cycles. Financial trading floors, hospital enterprise networks, and university research data centers use it to aggregate building backbones and disaster recovery links into a single rack position.

Key Advantages

The slide-out splicing section allows technicians to rework splices without disturbing front patch cords, which is essential on live data hall circuits. LC quad adapters deliver four times the density of legacy SC panels, reducing rack footprint and cooling load. The chassis accepts MTP-LC cassette modules as a field upgrade path, so operators can move from field-spliced pigtails to pre-terminated cassettes when bandwidth grows. Dual rear gland plates keep backbone and horizontal cables physically separated, simplifying troubleshooting. Color-coded adapters (blue, aqua, violet, lime) prevent single-mode and multimode mismatches. The front and rear vertical management channels keep patch cords dressed and eliminate cable strain on adapter ferrules. Heavy-gauge steel rails support the loaded tray assembly safely during repeated pulls, and the lockable bezel secures patching in multi-tenant spaces.

Installation and Maintenance

Mount the 3U frame in the rack with M6 hardware, bond the ground stud, and label the U position. Route MTP trunks through the rear gland plates and support them on the cable tray with proper bend radius. Pull the slide-out section forward, lay each fiber in the tray channel, and fusion-splice to LC pigtails or insert MTP cassettes into the rear adapter slots. Dress pigtails with bends larger than 30 mm and close the tray lids. On the front, patch to active equipment using consistent-length LC jumpers and dress them in the vertical management channels. Clean every ferrule before insertion and inspect end faces with a microscope. Run an optical insertion loss test after buildout and document results per port. Quarterly, re-tie loose bundles, clean adapters, and update the label map when circuits move. Verify tray rollers slide freely and check gland torque.

Ordering Information

When placing an order, specify the model number, connector type, fiber mode, and required length or capacity. Custom lengths, special jacket colors, and OEM labeling are available on request. A detailed datasheet and drawing can be sent before purchase to confirm dimensions and port layout. Volume discounts apply for project orders, and mixed-container shipments are supported. Send your bill of materials to +86 13922289957 for a formal quotation within one business day.

Quality and Supply

Every KITOZER unit undergoes 100 percent factory testing before packing, including visual inspection, optical loss verification, and dimensional check against the approved drawing. Units are packed in foam-lined cartons with accessory bags containing mounting screws, ground washers, and installation manuals. Standard lead time is 7 to 15 working days for stock items and 20 to 30 days for custom configurations. The factory supports OEM and ODM branding, custom adapter loading, and special color finishes for large projects. Spare parts and replacement trays are available from stock to minimize downtime on site. Each shipment includes a test report and packing list for receiving. Long-term supply agreements are available for system integrators and contractors who need recurring deliveries on multi-phase builds.

Price

From $480/pc. Contact +86 13922289957 for 96 port ODF pricing.

Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com

Shopping Cart