Adding monitoring to rack PDUs turns dumb power strips into visible branch-level intelligence. KITOZER engineers follow these five deployment steps on every monitored PDU project.
Table of Contents
ToggleDeployment Steps
Step 1: physically mount the metered or switched KITOZER PDU in the rack and label every outlet. Step 2: connect the PDU Ethernet port to the management VLAN and assign a static IP. Step 3: discover the device via Modbus TCP or SNMP v3 on the DCIM platform. Step 4: configure branch current, voltage, power factor, and outlet-level load alarms with thresholds set at 80 percent of rated. Step 5: test alarm delivery by tripping a branch breaker or pulling an outlet, and confirm the alert reaches the on-call engineer.
Best Practices
Use a dedicated management VLAN. Enable SNMP read-write only on switched PDUs. Firmware update before go-live.
Service Price
From $580 per rack for PDU monitoring deployment and integration. Contact +86 13922289957.
Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com