ToggleProduct Overview
The KITOZER secondary loop piping kit connects the CDU secondary outlet to each rack manifold, distributing coolant to individual cold plates or rear-door heat exchangers. The kit includes supply and return stainless steel headers, rack-mounted manifold bars, drop hoses with no-spill quick disconnects, isolation ball valves, and test points. Pre-fabricated in standard lengths and bends, the kit reduces on-site fabrication and ensures consistent pressure drop across every rack in the row.
The secondary loop kit is designed to split CDU secondary flow into individual rack manifolds. Supply and return headers run along the row ceiling or raised floor, with branch connections to each rack. Rack-mounted manifold bars distribute flow to individual server cold plates through no-spill quick disconnects. Per-rack isolation valves contain maintenance to a single rack. Test points at each manifold enable commissioning and leak testing.
Technical Specifications
Header pipe: 316L stainless, DN32 to DN50, design pressure 10 bar. Manifold: aluminum extrusion, 18 to 24 drop ports, DN12 no-spill QD. Drop hoses: EPDM braided, DN12, length 1.5 m, 10 bar. Isolation valves: 1/4 turn ball valve per rack. Test points: G1/4 pressure gauge ports. Flange connections: PN16. Insulation optional on cold secondary loops. Pressure tested at 15 bar for 30 minutes. KITOZER, CE, 5 year pipe warranty, 2 year hose warranty.
The kit includes DN32 to DN50 stainless header pipe, aluminum manifold bars with 18 to 24 drop ports, DN12 EPDM braided drop hoses, 1/4 turn isolation ball valves per rack, and G1/4 test points. Flange connections are PN16. The kit is factory pressure-tested to 15 bar for 30 minutes. Insulation is optional on cold secondary loops. Custom manifold port spacing is available.
Applications
The secondary loop kit serves every row with direct-to-chip cold plates or rear-door heat exchangers. Typical deployments include GPU training racks, CPU compute rows, storage shelves with liquid-cooled drives, and immersion tank feed lines. The kit also supports mixed rows where some racks use cold plates and others use rear-door heat exchangers, with drop ports configured per rack.
Common installations include GPU training racks, CPU compute rows, storage shelves with liquid-cooled drives, and immersion tank feed lines. The kit also supports mixed rows where some racks use cold plates and others use rear-door heat exchangers. Drop ports are configured per rack based on server count and cold plate layout.
Key Advantages
Pre-fabricated headers and manifolds reduce on-site welding by up to 80 percent. No-spill quick disconnects allow hot-swap server removal. Per-rack isolation valves contain maintenance to a single rack. Test points enable commissioning and leak testing. EPDM braided hoses tolerate repeated flexing. Factory pressure-tested to 15 bar. Custom port spacing and side orientation available.
Pre-fabricated headers and manifolds. No-spill QD for hot-swap. Per-rack isolation valves. Test points. EPDM hoses. Factory pressure-tested. Custom port spacing.
Installation and Maintenance
Mount the manifold on the rear rack rail. Run the supply and return headers along the row on pipe supports. Connect headers to the CDU secondary outlets with flanges. Pressure-test the secondary loop at 1.5 times working pressure before charging with glycol. Monthly: inspect drop hoses and quick disconnects for weepage. Quarterly: verify supply and return pressure differential. Annually: inspect hoses for cracking and replace O-rings on quick disconnects.
Commissioning includes pressure test at 1.5 times working pressure, leak check at each drop port, and verification of pressure differential. After handover, baseline supply and return pressure at nominal load. Recommended on-site spares: one hose set, one O-ring kit, one isolation ball valve, and one QD pair.
Typical Configuration
A 10-rack row uses one DN40 supply and return header, 10 manifold bars (one per rack), and 200 m of DN12 drop hoses. Each manifold has 18 to 24 drop ports matching the rack server count. The CDU secondary outlet connects to the header with flanges. Per-rack isolation valves allow single-rack service without row shutdown.
Design Notes
The secondary loop is designed to maintain a constant differential pressure of 1.0 to 1.5 bar at the farthest rack manifold, regardless of how many servers are online. The CDU variable-speed pump adjusts to this setpoint, and the test points at each manifold allow commissioning technicians to verify pressure drop along the row. Drop hoses are EPDM braided with stainless steel reinforcement, rated for 10 bar working pressure and 10,000 flex cycles. The manifold isolation valves contain any leak or maintenance to a single rack, so the rest of the row continues operating.
Price
From $3,500 per rack secondary loop kit. Contact +86 13922289957 for row-level pricing.