KITOZER
KITOZER

KITOZER Battery Replacement Cycle Guide: When To Change UPS Batteries

Knowing when to replace valve-regulated lead-acid (VRLA) batteries prevents sudden UPS failure. KITOZER recommends a data-driven replacement cycle rather than a fixed calendar, because ambient temperature and duty cycle shorten battery life dramatically.

Key Indicators

Float voltage below 2.20V per cell under charge: weak cells. Internal resistance rising more than 20 percent above baseline: aging. Capacity test below 80 percent of rated Ah: replace the string. Battery case swelling, leakage, or cracked terminals: immediate replacement. Ambient temperature above 25 degrees Celsius cuts service life roughly by half for every 10 degrees rise.

Recommended Cycle

Plan full battery replacement at 3 to 5 years. Test every 6 months with a handheld impedance meter and run a full discharge capacity test once per year.

Service Price

From $350 per battery string inspection and replacement labor. Contact +86 13922289957.

Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com

Shopping Cart