KITOZER UPS installation and commissioning service covers input and output cabling, battery connection, startup self test, and parallel system load test for single and three phase UPS units. Our electricians verify input voltage, phase rotation, and neutral earth bond before energizing the UPS. After firmware configuration and bypass test, we perform a battery discharge test, static transfer test, and parallel load sharing test for redundant systems.
Table of Contents
ToggleCommissioning Steps
1. Verify input cable size, lug torque, and earth bonding. 2. Close input breaker and observe startup sequence. 3. Configure battery type, runtime, and alarm thresholds. 4. Run bypass transfer test on mains and battery mode. 5. For parallel systems, verify load sharing within plus or minus 5 percent. 6. Download event log and hand over operation manual.
Documentation
Commissioning report includes voltage measurement, battery string voltage, transfer time, and parallel load sharing data. Remote monitoring card is configured for SNMP or Modbus TCP if ordered.
Price
From $1,800 per UPS unit for installation and commissioning. Contact +86 13922289957 for site survey.
Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com