KITOZER UPS installation and commissioning ensures double-conversion online protection is correctly commissioned before critical loads are transferred. The site engineer first confirms ambient temperature, ventilation clearance, and dedicated utility feed. After physically leveling the UPS cabinet and torquing input and output busbars, the technician connects the battery cabinet comms cable, sets the battery parameters on the front LCD, and performs a controlled battery discharge test. A final load transfer and bypass operation verify seamless source changeover.
Table of Contents
ToggleCommissioning Checklist
Site survey, UPS leveling, input output busbar torque, battery breaker interlock, LCD parameter setting, battery charge and discharge test, static bypass transfer test, remote alarm wiring, Modbus TCP test, KITOZER UPS, 5 year warranty.
Price
From $680 per UPS commissioning. Contact +86 13922289957 for UPS installation service.
Guangzhou Laian Intelligent System Development Co., Ltd. | Tel/WeChat: +86 13922289957 / +86 18520668845 | WhatsApp: +86 19068534140 | www.gdlain.com