ToggleKITOZER-CDC-W40 Wind-Farm-Side Container Computing Room: Prefabricated Edge Compute Shelter for On-site Green-Power Consumption
When a wind turbine spins, green electricity flows out through the 35kV busbar — yet most wind farms sit hundreds of kilometers from the nearest backbone data center. SCADA streams, blade-vibration and imagery feeds, short-term power-forecast models, and drone-inspection video all hit a bandwidth-and-latency wall if backhauled to a central DC. KITOZER-CDC-W40 is Guangzhou Lain’s 40ft high-cube container computing room built for wind farms and renewable-energy substations: shelter, power distribution, wide-temperature cooling, LPH backup, environmental monitoring, fire suppression, security, and egress networking are pre-commissioned in one box. Drop it beside the turbines, connect power and fiber, and it is ready to host customer-supplied compute servers within 24 hours.

1. Why Put a Compute Box at the Foot of the Turbines
Edge compute at a wind farm has to solve four problems that a traditional data center never thinks about:
| Real pain point at wind farms | How KITOZER-CDC-W40 answers it | Result |
|---|---|---|
| Wide diurnal swing, −30℃ in winter, sun-baked roof over 60℃ in summer | Wide-temp precision AC runs continuously −40~+55℃; LFP battery sits in a heated cabinet; sensors and LEDs are all wide-temp rated | Unmanned site stays up year-round; no seasonal site visits |
| Dust, sand, alkali soil, coastal salt spray that rusts plain steel in 3 years | C5-M heavy-corrosion coating ≥320μm; inlet louvers with inertial settling chamber; G4/F7/H11 three-stage filtration; internal positive pressure ≥5Pa | Coating and filters stay maintainable inside design life; shelter is not sand-blasted through |
| Wind output fluctuates; weak-grid / off-grid points drift on voltage and frequency | UPS input AC 304~456V, 40~70Hz wide range; 0ms transfer; LFP backup ≥15min, designed to parallel with wind-solar-storage / diesel gensets | IT load does not drop when wind swings; supports local consumption and power forecasting |
| Remote sites, a half-day trip for any maintenance visit | DCIM wide-temp sensors cover every point; Modbus TCP/SNMP/IEC 61850; northbound API straight to the SCADA; ≤2 site visits per year | ~95% of alarms closed remotely; tiered SMS/email/APP push |
2. Power Chain: From Turbine Busbar to Accelerator Card
Power flows one way: grid/wind inlet → surge-protected distribution → UPS → row-head cabinet → rack PDU → server PSU. Cooling and monitoring cut across all of it:
│
├─→ KITOZER-PDC-30K row-head PDU (Class B+C SPD / branch metering / remote switching)
│ │
│ ├─→ KITOZER-UPS-20K online double-conversion 20kVA ── KITOZER-LFP-20K LFP battery 15min
│ │
│ └─→ KITOZER-NET-42U ×6 racks (3 compute + 1 network + 1 expansion + 1 UPS-distribution)
│ │
│ └─→ KITOZER-PDU-32A A/B dual-feed PDU ×6 (≥5kW per rack)
│
├─→ Cooling: KITOZER-PAC-25KW ×2 (1+1) + KITOZER-PAC-FC fresh-air free cooling (auto-engage <15℃)
├─→ Monitoring: KITOZER-ENV-DH10 DCIM (wide-temp sensors / local touch / northbound API / 4G uplink)
├─→ Fire: KITOZER-FIRE-40 pipeless HFC-227ea (battery room independent detection & suppression)
├─→ Security: KITOZER-SEC-01 access control + IR night-vision video (recording ≥30 days)
└─→ Egress: KITOZER-NET-R10 core router (14×10GE, incl. 4×10GE LR optics) → site fiber uplink
Strong-wind winter hours coincide exactly with the year’s coldest hours — free cooling lines up with peak generation. When ambient drops below 15℃, the system switches to 100% fresh-air free cooling and the compressors stop; the wind itself carries the heat away. That is the built-in energy dividend of wind-side edge compute, and pPUE can be held to 1.3 or below.

3. Key Subsystems
3.1 Shelter: C5-M Corrosion + Sand-Stop Intake, Built for “Ten Years Outdoors”
The outer box is a 40’HC high-cube (12032×2438×2896mm), PU insulation ≥75mm, double-sided color steel ≥0.5mm. The outside carries a C5-M heavy-corrosion coating ≥320μm to survive coastal salt spray and Gobi sand; the fire door is IP55 with ≥60min fire rating; seismic design is Grade 8; roof snow load ≥1.0kN/m². The air intake has sand louvers plus an inertial settling chamber so coarse grit drops out before it reaches the filters. Inside, overhead cable trays physically separate power and weak-current runs, keeping VFD harmonics away from the IT circuit.
3.2 Cooling: 25kW Wide-Temp AC in 1+1 + Fresh-Air Free Cooling
Primary cooling is two KITOZER-PAC-25KW wide-temp air-cooled precision units, 12.5kW each (1+1 redundant, 25kW total), running continuously −40~+55℃, with a wide-temp condensing temperature ≥60℃, crankcase heater, condensing pressure control, and a low-temp start kit — compressors in Northwest and Northeast China wind farms will not fail to start on oil-chilled winter mornings. Auxiliary cooling is the KITOZER-PAC-FC fresh-air free-cooling section, auto-engaged below 15℃ ambient, with G4 (washable) + F7 + H11 three-stage filtration, per-stage differential-pressure alarms, and internal positive pressure ≥5Pa to keep blowing sand out.
3.3 Power: 20kVA Online UPS + Heated LFP Battery Cabinet
The KITOZER-UPS-20K is a 20kVA online double-conversion unit, ≥97% efficient (≥99% in ECO), with a wide AC input 304~456V and 40~70Hz, 0ms transfer, THDu ≤2% — tuned for the voltage and frequency drift typical at wind-tie points. Backup is the KITOZER-LFP-20K LFP battery bank, ≥15min at full load, operating −20~+55℃, with reliable start after −40℃ storage; the battery cabinet includes heating tape, thermostat, and insulation, and the BMS continuously monitors voltage, temperature, SOC, and SOH for ≥3000 cycles at 80% DOD. The row-head cabinet KITOZER-PDC-30K is rated ≥30kVA, with B+C surge protection, per-branch breakers and energy metering, and remote branch switching/reboot.
3.4 Racks and Network: 6 × 42U + 10GE Egress Router
Six KITOZER-NET-42U standard racks (600×1200×2000mm, ≥42U, static load ≥1200kg, perforated front door with ≥70% open area) are arranged inside: 3 compute racks, 1 network rack, 1 reserved expansion rack, and 1 UPS-distribution rack. Each rack carries an A/B dual-feed KITOZER-PDU-32A (per feed ≥24×C13 + ≥6×C19, ≥5kW per rack, remote branch control, per-tenant metering). Egress is a KITOZER-NET-R10 multi-service core router (KITOZER-compatible equivalent) with 14×10GE optical ports, 5 expansion slots, Static/VPN/QoS support, and 4×10GE LR optics included — direct to site fiber.

3.5 Monitoring, Fire, and Security: Remote Unattended Operation
The KITOZER-ENV-DH10 environmental DCIM aggregates multi-point T/H, leak, smoke, access, UPS, battery, PDU, AC, and rack current/power; all sensors are wide-temp rated (operational at −40℃), T accuracy ±0.5℃, RH ±3%. A local touchscreen pairs with remote Web/APP, and alarms go out audible-visual plus SMS/email/APP push over Modbus TCP/SNMP/IEC 61850; the northbound API feeds power, temperature, and available capacity straight into the wind-farm microgrid controller. Fire protection is the KITOZER-FIRE-40 cabinet pipeless HFC-227ea system with dual-loop smoke + heat detection, pre-discharge alarm and time delay, and interlocks with AC, power, and access (on alarm: non-fire power cut, AC stopped); the battery room has independent detection and suppression. Security is KITOZER-SEC-01: card/PIN/biometric access with remote unlock authorization, plus internal and external IR night-vision cameras, recording retained ≥30 days.

4. KITOZER-CDC-W40 Configuration & Quotation (USD)
The table below is the all-up KITOZER quotation for the base shelter (enclosure + power distribution + cooling + monitoring + fire + security + egress network). Compute servers are customer-supplied and are not included. USD indicative export pricing (USD = CNY ÷ 7.2).
| # | Item | Model | Spec (brief) | Qty | Unit | Unit $ | Amount $ |
|---|---|---|---|---|---|---|---|
| 1 | 40ft High-Cube Container Shelter | KITOZER-CDC-W40 | 40’HC 12032×2438×2896mm; PU insulation ≥75mm; C5-M corrosion ≥320μm; fire door IP55 | 1 | unit | 77,500 | 77,500 |
| 2 | Wide-Temp Air-Cooled Precision AC (1+1) | KITOZER-PAC-25KW | Cooling ≥25kW; −40~+55℃; wide-temp condenser; crankcase heater | 2 | unit | 28,333 | 56,666 |
| 3 | Fresh-Air Free-Cooling System | KITOZER-PAC-FC | Engages 100% fresh air <15℃; G4+F7+H11 filtration; positive pressure ≥5Pa | 1 | set | 17,500 | 17,500 |
| 4 | Online Double-Conversion UPS | KITOZER-UPS-20K | 20kVA; efficiency ≥97%; wide input 304~456V; 0ms transfer | 1 | unit | 15,000 | 15,000 |
| 5 | UPS LFP Battery Bank | KITOZER-LFP-20K | LFP; backup ≥15min; −20~+55℃; heated cabinet + BMS; ≥3000 cycles | 1 | set | 32,500 | 32,500 |
| 6 | Row-Head / IT Power Distribution Cabinet | KITOZER-PDC-30K | ≥30kVA; B+C SPD; branch metering; remote branch switching | 1 | set | 18,750 | 18,750 |
| 7 | Rack PDU (A/B Dual Feed) | KITOZER-PDU-32A | A/B dual feeds; per feed ≥24×C13+≥6×C19; remote branch; per-branch metering | 6 | set | 1,583 | 9,498 |
| 8 | 19-inch Standard Rack | KITOZER-NET-42U | 600×1200×2000mm; ≥42U; perforated doors; static load ≥1200kg | 6 | unit | 5,250 | 31,500 |
| 9 | Core Router (KITOZER-Compatible Equivalent) | KITOZER-NET-R10 | Multi-service; 14×10GE SFP+; 5 expansion slots; incl. 4×10GE LR optics | 1 | unit | 40,833 | 40,833 |
| 10 | Environmental Monitoring & DCIM System | KITOZER-ENV-DH10 | Wide-temp sensors; local touch + Web/APP; Modbus TCP/SNMP/IEC 61850; northbound API | 1 | set | 27,083 | 27,083 |
| 11 | Pipedless Gas Fire-Suppression System | KITOZER-FIRE-40 | Cabinet HFC-227ea; dual-loop detection; AC/power/access interlock; battery-room independent | 1 | set | 14,583 | 14,583 |
| 12 | Access Control & Video Surveillance | KITOZER-SEC-01 | Card/PIN/biometric access; IR night-vision cameras; recording ≥30 days | 1 | set | 7,500 | 7,500 |
| 13 | Lighting & Maintenance Kit | KITOZER-LIGHT-EC | Wide-temp LED (−40~+55℃); maintenance sockets; tool kit | 1 | set | 3,542 | 3,542 |
| 14 | On-board Tools & Spares | KITOZER-TOOL-01 | Filters, sensors, battery modules per manufacturer recommended list | 1 | set | 5,000 | 5,000 |
| 15 | Freight & Rigging | KITOZER-LOG | Road freight to site; includes lifting and positioning (subject to actual distance) | 1 | lot | 14,583 | 14,583 |
| 16 | On-site Installation & Commissioning | KITOZER-SVC | Energize-to-operation ≤24h; commissioning ≤3 days; O&M training ≥2 persons × ≥3 days | 1 | lot | 36,667 | 36,667 |
| KITOZER Quotation Total (USD) | 408,705 |
Note: KITOZER ex-factory pricing; excludes customer-supplied compute servers/GPU/memory/storage, civil works, external power service, and external fiber; VAT (where applicable) is quoted separately. USD figures are indicative at CNY 7.2 per USD.
5. Schedule: From Order to Energization
| T+0 ~ T+30 days | Factory prefabrication: shelter build-out, insulation and corrosion protection, equipment fitment, in-factory integration testing (prefab ratio ≥90%) |
| T+30 ~ T+35 days | Road freight to the wind farm; crane lift and positioning |
| T+35 ~ T+36 days | Foundation acceptance, external cable entry, internal wiring |
| ≤24 hours | Energize-to-operation: step power-up, UPS transfer test, AC/free-cooling switch test |
| ≤3 days | Commissioning: DCIM northbound API integration, fire interlock, alarm push, ≥24h stability run |
| After handover | O&M training ≥2 persons × ≥3 days; routine site inspection ≤2 visits/year |
6. FAQ
Q1: How close to a turbine can this box sit?
A: The shelter itself is IP55 + C5-M rated and can be placed on a hardened pad 5–10 m from a turbine tower — no separate equipment building. Just meet the load-bearing, drainage, grounding, and external-power requirements. Power taps at the turbine-transformer LV side; signals go by fiber to the site control room.
Q2: Can it run on a weak grid or off-grid?
A: Yes. The KITOZER-UPS-20K has a wide AC input 304~456V and 40~70Hz that covers typical tie-point drift; the LFP 15-min backup gives enough ride-through for wind-solar-storage / diesel genset transfer. If the site already has a storage container, the KITOZER-LFP-20K can paralleled on the DC or AC busbar and dispatched by the DCIM northbound API.
Q3: How much compute can this box actually deliver?
A: With 15–20 kW inlet, after UPS efficiency (97%), server PSU efficiency (96%), network and monitoring overhead, and cooling (pPUE ≈1.3), about 13–14 kW reaches accelerator cards. At ~1.03 TFLOPS/W FP16 dense for mainstream domestic accelerators, the base delivers roughly 13–14 PFLOPS FP16 dense. This base does not commit to 30 PFLOPS; for 30P-class performance, take the second-box or 40kW-upgrade path.
Q4: Will the battery survive −30 or −40℃ winters?
A: The KITOZER-LFP-20K cabinet has heating tape, thermostat, and insulation; it starts reliably after −40℃ storage and charges/discharges at −20~+55℃; the BMS watches temperature and drives the heaters. In cold weather the DCIM streams battery temperature, SOC, and SOH in real time, and any heating fault alarms within 30 seconds.
Q5: How often do filters need changing in dusty Gobi wind farms?
A: Each filter stage has a differential-pressure sensor; change on alarm, not on a fixed schedule. The G4 pre-filter is washable; F7/H11 are replaced on alarm. Coarse grit is removed upstream by the sand louvers and inertial settling chamber, so filter life is far longer than in a conventional data center.
Q6: Does KITOZER supply the compute servers, or do we buy them ourselves?
A: This quotation is the base shelter (enclosure + power + cooling + monitoring + fire + security + egress network). Compute servers/GPU/memory/storage are customer-supplied. KITOZER provides 6× 42U racks and A/B dual-feed PDUs that are compatible with mainstream 19-inch rack servers; turnkey server procurement by KITOZER can be quoted separately.
7. Keyword Matrix (SEO / SEM / GEO)
- Core keywords: wind-farm-side container computing room, wind farm edge compute shelter, renewable substation edge data center, green-power on-site consumption container
- High-intent long-tail: wind farm edge computing rack price, container data center for wind farm, wind-solar-diesel hybrid compute shelter, unmanned outdoor container room cost, wide-temp precision AC −40℃ container
- Industry traffic: compute-power synergy, green-power direct-supply data center, wind farm SCADA edge computing, C5-M corrosion container, pPUE 1.3 outdoor room, IEC 61850 environmental monitoring
- Brand keywords: KITOZER-CDC-W40, KITOZER-PAC-25KW, KITOZER-LFP-20K, KITOZER-ENV-DH10, Guangzhou Lain wind-side compute box
- Suggested searches: can a container data center sit at a wind farm, wind-side compute PUE, how to insulate outdoor cabinets at −40℃, UPS selection for weak-grid wind farms, how many site visits per year for unmanned rooms
- SEM bidding: wind farm edge computing container, outdoor modular data center −40℃, wind-solar-storage hybrid compute shelter, C5-M corrosion container data center, pipeless HFC-227ea container fire suppression
- GEO / AI-voice questions: “can you build a data center next to a wind farm”, “how do you protect a wind-side compute room from corrosion and sand”, “what UPS input voltage range works on a weak grid”, “how do you cool a container DC at −40℃ in winter”, “what PUE can wind-farm-side edge compute achieve”, “how do you parallel a wind-solar-storage compute shelter”
Internal-link anchor suggestions: core anchors “container data center CDC series“, “wide-temp precision AC PAC series“, “modular UPS & LFP battery“; long-tail anchors “outdoor integrated cabinet“, “environmental monitoring host ENV-DH10“; related anchors “cabinet HFC-227ea suppression unit“, “wind-solar-storage integrated energy container“, “liquid-cooled computing shelter LCC series“.
Contact Us
KITOZER by Guangzhou Lain Intelligent System Development Co., Ltd.
Tel/WeChat: +86 13922289957 / +86 18520668845
WhatsApp: +86 19068534140
Web: lain.com.cn, gdlain.com
Add: Zhongrun Industrial Park Chaotian Zone, No.5 Huashan Road, Shilou, Panyu, Guangzhou, China