Table of Contents
ToggleEnglish Version
Chapter 1: Overview of 10kV Power Distribution Systems
1.1 Where 10kV Sits in the Power System
To understand why a KYN28A-12 switchgear looks the way it does and carries the parameters it does, you must first place it on the map of the entire power system. The typical urban distribution voltage hierarchy in China is: 220kV (regional substation) → 110kV (city substation) → 35kV or 10kV (user intake) → 0.4kV (end use). The vast majority of industrial plants, commercial complexes, data centers, and hospitals receive their power at 10kV. This voltage level strikes the best balance between power delivery capacity (a single feeder can carry 5–10 MVA) and equipment economics.
A typical user-side 10kV substation, from grid to load, follows this chain:
- City 110kV substation 10kV outgoing feeder bay → underground cable or overhead line → user 10kV incoming cable
- User 10kV high-voltage switchroom: incoming isolator/PT cabinet → incoming breaker cabinet → metering cabinet → transformer outgoing feeder cabinets
- 10/0.4kV power transformer (typically 800–2500 kVA, dry-type)
- 0.4kV low-voltage switchroom: incoming cabinet → bus-tie cabinet → feeder cabinets (to floor/workshop distribution boards)
- End distribution boards → electrical equipment
Within this chain, the 10kV switchgear is the “front door” of the user substation. Its upstream side is the city grid; its downstream side is the user’s own transformers and low-voltage system. A failure in the high-voltage switchgear means either a total substation outage at minimum, or fire and explosion at worst. For this reason, the design, selection, installation, and maintenance of 10kV switchgear represents the highest safety tier in the entire user distribution engineering scope.
1.2 Historical Position of KYN28A-12
The model designation KYN28A-12 itself encodes a history of Chinese high-voltage switchgear development:
- K = Metal-clad
- Y = Withdrawable
- N = Indoor
- 28 = Design serial number
- A = First modification
- 12 = Rated voltage 12kV (corresponding to 10kV nominal system)
The KYN28 series originated in the late 1980s from technology transfer based on Siemens 8BK20. After nearly 30 years of digestion, improvement, and standardization by domestic switchgear manufacturers, it has become the dominant mid-mount switchgear type in the Chinese 10kV distribution market. As of 2025, KYN28A-12 and its derivatives hold over 60% market share in user-side 10kV substations. Its main competitors include:
- XGN2-12 / XGN66-12: Fixed-type metal-enclosed switchgear, cheaper but less convenient for maintenance
- HXGN15-12: Ring main unit using load switch + fuse, smaller capacity
- GIS-12: SF6 gas-insulated switchgear, compact but expensive
- KYN61-40.5: 35kV class mid-mount switchgear
- Smart KYN28A upgrades: partial discharge monitoring, wireless temperature sensing, smart control
KITOZER has observed that KYN28A-12’s enduring popularity stems from three core strengths. First, the withdrawable truck structure allows breaker maintenance to be accomplished by swapping in a spare truck, reducing outage time from “two days of full-cabinet overhaul” to “two hours of truck swap.” Second, the air-insulated construction makes every fault visible and inspectable—operators can directly observe contacts, busbars, and insulators. Third, the supply chain is extraordinarily mature: from VS1 breakers to CT/PT, from protection relays to secondary terminals, there are hundreds of qualified suppliers nationwide, and spare parts are readily available.
1.3 Typical 10kV Main Wiring Topologies
An isolated switchgear means nothing; switchgear always appears as a lineup. Below are three typical 10kV main wiring configurations encountered in KITOZER projects.
Topology 1: Single Busbar Sectionalized (Most Common)
This is the standard configuration for industrial and data center substations. Two 10kV utility feeds enter, through incoming breakers to Busbar Section I and Section II respectively, with a bus-tie cabinet connecting the two sections. Normally the bus-tie is open and the two sections run independently. If one feed fails, that incoming breaker opens and the bus-tie closes, allowing the other feed to carry all critical loads. A medium-sized sectionalized substation typically contains 12–16 high-voltage bays.
Topology 2: Single Busbar Non-sectionalized (Small Room)
A single utility feed, one busbar, directly feeding several transformers. Common in small plants and residential electrical rooms. Only 3–5 bays: incoming PT cabinet + incoming breaker + 2–3 feeder cabinets.
Topology 3: Double Busbar (Large Hub Substation)
Each outgoing feeder can switch between two busbars. Highest reliability but doubled bay count and cost. Rarely used at user substations; found mainly at 220kV/110kV hub stations.
1.4 Scope of This Manual
This manual is an engineering design reference—not a product brochure expansion. It targets electrical design engineers, switchgear assembly technicians, construction project managers, owner O&M engineers, and utility acceptance personnel. We assume the reader already understands AC circuits, three-phase systems, transformers, and breakers at a fundamental level, but may lack systematic experience with the specific structure, components, interlocks, protection, installation, and selection of the KYN28A-12 type.
Chapter 2: Detailed Structure of KYN28A-12 Mid-mount Switchgear
2.1 Overall Structure and “Four Compartments”
The defining structural features of KYN28A-12 are: metal-clad, withdrawable, mid-mount, and four-compartment separation. The entire cabinet is fabricated from 2–3mm thick cold-rolled steel sheet, bent and welded, with electrostatic powder coating (typically RAL7032 light gray). Internally, metal partitions divide the cabinet into four independent high-voltage compartments:
(1) Truck Compartment (Breaker Compartment)
Located in the center-front of the cabinet. The VS1 vacuum breaker is mounted on a truck that rolls on rails between the “connected” and “test” positions. In the connected position, the truck’s moving contacts fully mesh with the stationary contacts at the rear (busbar side and line side), completing the main circuit. In the test position, moving contacts withdraw approximately 150–200mm from stationary contacts, creating a visible break, while secondary plugs remain connected so the breaker can be manually tripped/closed for testing. The top of the truck compartment has a pressure relief channel—if an internal arc occurs, high-pressure gas exits through the top vent plate upward.
(2) Busbar Compartment
Located in the upper rear of the cabinet, running through the entire lineup. Main busbars are rectangular copper bars (TMY), tinned, supported by insulators. Adjacent cabinets connect busbars via lap plates with heat-shrink insulation covers. The partition between busbar and truck compartments is fully metal, with stationary contact housings—when the truck pushes in, moving contacts pass through the partition into the housings.
(3) Cable Compartment
Located in the lower portion, space for incoming/outgoing cable connections. 10kV cables enter from the cable trench at the bottom, passing through cable terminations, zero-sequence CT (if equipped), current transformers, and earthing switches before connecting to lower stationary contacts. The cable compartment is tall enough (~1800mm) for a person to enter while bending over. Bottom cable entry holes are sealed with fireproof mud.
(4) Relay Compartment (Low-voltage Secondary Compartment)
Located at the upper front, the only compartment whose door can be opened during operation without touching high voltage. It houses the microprocessor protection relay, multifunction meter, indicator lights, control switches, test blocks, and secondary terminal blocks. The relay compartment is fully metal-separated from high-voltage areas.
2.2 Cabinet Dimensions and Modular Design
KYN28A-12 dimensions are standardized:
| Parameter | 630–1250A | 1600A | 2000–3150A |
|---|---|---|---|
| Width W | 800mm | 1000mm | 1200mm |
| Depth D | 1500mm | 1660mm | 1660mm |
| Height H | 2300mm | 2300mm | 2300mm |
“Mid-mount” means the breaker truck rails sit approximately 1000mm above floor level—not at ground level like older GG-1A cabinets. This height is ergonomically optimized for pushing and pulling the truck.
A 10-cabinet lineup occupies approximately 8–10 meters in width, requiring a 1.5m front operating corridor and 0.8–1.0m rear maintenance corridor.
2.3 Protection Rating and Enclosure
Standard enclosure protection is IP4X. When the truck compartment door is open, the shutter mechanism provides IP2X touch protection. Doors are double-layer with gaskets; observation windows use tempered anti-glare glass. The entire metal frame bonds to the earthing copper bar (-40×4mm galvanized steel or copper) with earthing resistance ≤4Ω.
2.4 Pressure Relief and Arc Fault Protection
This is the most overlooked yet critical safety structure. During an internal phase-to-phase arc, energy can heat air to tens of thousands of degrees in tens of milliseconds, causing pressure spike. KYN28A mitigates this through:
- Top vent plates: Weak 0.5mm steel plates at the top of each compartment that open at 5–10kPa, venting hot gas upward into the cable attic
- Mechanical door locks: Doors bolted and interlocked, cannot fly open
- Full metal compartment separation: Arc in one compartment cannot spread to adjacent compartments
- Automatic shutters: When the truck withdraws, metal shutters cover stationary contacts
Modern KITOZER-upgraded cabinets add arc protection sensors in each compartment, tripping the upstream breaker within 20ms of arc detection.
Chapter 3: Core Components
3.1 VS1 (ZN63A-12) Vacuum Circuit Breaker
The VS1 is the heart of the KYN28A truck. The name derives from the original Huaming Switchgear import of German technology. It is the highest-market-share 12kV vacuum breaker in China.
3.1.1 Vacuum Interrupter Principle
The core is a sealed vacuum interrupter in glass or ceramic housing, at vacuum level above 10⁻⁴ Pa. With no gas molecules, arc deionization is extremely rapid at current zero—extinguishing within half a cycle. Advantages: strong breaking capacity (<50ms), low contact wear, long electrical life (≥50 rated short-circuit breaks), no SF6 greenhouse gas, no oil/explosion risk, minimal maintenance.
3.1.2 Key Technical Parameters
| Parameter | Standard Value |
|---|---|
| Rated voltage | 12kV |
| Rated current | 630/1250/1600/2000/2500/3150A |
| Rated short-circuit breaking current | 20/25/31.5/40kA |
| Rated short-time withstand current | Same as breaking, 4s duration |
| Rated peak withstand current | 2.5× breaking current |
| Mechanical life | ≥10,000 operations |
| Closing time | ≤75ms |
| Opening time | ≤45ms |
| Operating power | DC220V or DC110V |
3.1.3 Spring Operating Mechanism
VS1 uses a spring-charged operating mechanism. A small motor (~200W, DC220V or AC220V) charges the closing spring, which automatically cuts off when charged. On closing command, the closing coil energizes and releases the spring, driving contacts closed rapidly. On opening, the trip coil releases and the opening spring drives contacts apart. Advantages: very small operating energy (closing coil ~2A, trip ~1A), closing speed independent of control voltage fluctuations, manual charging and emergency trip/closing available.
KITOZER specifies first-tier domestic VS1 breakers (Changshu Switchgear, Shanghai Renmin, Tianshui Great Wall) with factory test reports and type test certificates. Vacuum integrity is verified during commissioning by power-frequency withstand test across the open contact gap (42kV/1min).
3.2 Isolation Truck and PT Truck
KYN28A uses different truck types for different cabinet functions:
(1) Breaker Truck: Carries the VS1 vacuum breaker, used in incoming, outgoing, bus-tie, and capacitor cabinets. Panel has trip/closing buttons, charged indicator, position indicators, and manual operation holes.
(2) Isolation Truck: No breaker—only isolating contact pairs forming a visible break for maintenance isolation. Cannot be operated under load.
(3) PT Truck: Carries voltage transformers (JDZ10-10), HV fuses, and surge arresters. Provides 100V line voltage and 100/3V open-delta secondary for measurement, protection, and synchronism.
(4) Metering Truck: Similar to PT truck but with higher accuracy CT (0.2S class) and PT (0.2 class), sealed by the utility.
(5) Arrester Truck: Carries zinc-oxide surge arresters.
(6) Capacitor Truck: Carries vacuum contactor or breaker with series reactor and fuses for capacitor switching.
Trucks have mechanical coding locks preventing wrong-size truck insertion.
3.3 Current Transformers (CT)
CTs bridge primary and secondary systems, transforming high primary current (tens to thousands of amperes) to standard 5A (or 1A) for meters and relays. KYN28A typically uses LZZBJ9-12 cast-resin CTs with multiple secondary windings:
- Metering winding: 0.2S accuracy class for revenue metering
- Measurement winding: 0.5 class for ammeters and multifunction meters
- Protection winding: 5P20 or 5P30 class, must not saturate during short circuit
- Residual winding (optional): For earth-fault protection
Ratio selection: CT primary rating should be 1.2–1.5× maximum continuous operating current. For a 1600kVA transformer (92A at 10kV), choose 150/5 or 200/5.
Accuracy limit factor (ALF): 5P30 means composite error ≤5% at 30× rated primary current. If system maximum short-circuit is 20kA and CT ratio is 600/5, the fault current multiple is 33×, requiring 5P30 or higher.
3.4 Voltage Transformers (PT)
PTs transform 10kV to standard 100V. KYN28A uses JDZ10-10 single-phase cast-resin PTs in sets of three, or a three-phase five-limb PT. Typical ratios:
– Line voltage winding: 10/√3 kV → 0.1/√3 kV
– Open-delta winding: 10/3 kV → 0.1/3 kV, reads ~0V normally, ~100V during single-phase earth fault
PT secondary must be grounded at one point and must never be short-circuited. Secondary side has miniature fuses or MCBs.
3.5 Surge Arresters
KYN28A uses HY5WS-17/50 zinc-oxide arresters. No series gap—ZnO resistance blocks conduct during overvoltage, clamping surge to ~50kV peak. Protects against lightning and switching overvoltages. Installed in the cable compartment, parallel with earthing switch.
3.6 Earthing Switches
JN15-12 earthing switches provide reliable cable-side grounding during maintenance. Strict mechanical interlock with breaker truck and compartment door:
– Truck must be in test/out position before earthing switch can close
– Door can only open when earthing switch is closed
– Truck cannot push to connected position while earthing switch is closed
Rated short-time withstand matches the breaker (25kA/4s or 31.5kA/4s), capable of “catching” a fault current if someone accidentally energizes during maintenance.
3.7 Live Display Devices
Every KYN28A cabinet has DXN-Q live display units. Capacitive divider signals drive three indicator lamps (A/B/C phase). The unit also provides a forced interlock contact that locks the earthing switch and door electromagnetic lock when voltage is present.
Chapter 4: Five-Prevention Interlock Mechanism
4.1 What Is “Five Prevention”?
“Five prevention” (五防) is the core safety requirement for Chinese HV switchgear, defined in DL/T 593 and GB 3906. It prevents five categories of catastrophic mis-operation:
- Prevent accidental tripping/closing of the breaker
- prevent load switching of disconnectors/trucks
- prevent closing earth switch onto a live circuit
- prevent energizing with earth switch closed
- prevent entry into a live compartment
These five errors are known in the industry as the “five malignant mis-operations,” each potentially causing fatalities and catastrophic equipment failure. Five-prevention interlock is not optional—it is mandatory for every 10kV switchgear.
4.2 Mechanical Interlock Principles
KYN28A relies primarily on pure mechanical interlocks—not electrical circuits—because electrical circuits can fail, while mechanical interlocks are the last safety line:
(1) Truck advancing mechanism and breaker interlock: The crank handle cannot be inserted or turned while the breaker is closed. Only after the breaker trips can the crank operate. A linkage plate driven by the breaker main shaft blocks the crank hole when closed.
(2) Earthing switch and truck interlock: While the truck is in connected position, the earthing switch operating hole is blocked. Only after the truck retracts to test position can the earthing switch operate. While the earthing switch is closed, the truck advancing mechanism locks.
(3) Door and earthing switch interlock: The cable compartment door is locked by an electromagnetic (or mechanical) lock while the earthing switch is open. The door can only open after the earthing switch closes.
(4) Live display forced lockout: Even if all mechanical interlocks fail, the live display’s lockout contact cuts power to the earthing switch operating circuit and door electromagnetic lock.
4.3 Electrical Interlocks and Sequential Control
(1) Incoming and bus-tie interlock: In a sectionalized busbar system, among the two incoming breakers and the bus-tie breaker, only two may be closed at any time (“two-closed-one-open”). This is enforced by auxiliary contacts in the closing circuits. KITOZER protection relays implement automatic bus transfer (BZT) logic.
(2) PT cabinet interlock: The PT cabinet is the system voltage source. It does not interlock with other cabinets, but operating procedures require confirming PT health before any switching operation.
(3) Capacitor cabinet interlock: After tripping a capacitor bank, a discharge timer (3–5 minutes) blocks re-closing until residual charge dissipates.
4.4 Five-Prevention Acceptance Test
Every KYN28A cabinet undergoes five-prevention testing at factory and on site:
- Breaker closed → crank handle should not insert/turn
- Breaker closed → truck should not move
- Truck in connected → earthing switch should not close
- Earthing switch closed → breaker should not close
- Earthing switch open → cable compartment door should not open
KITOZER performs each test per cabinet and documents results in the commissioning report. Any failure must be corrected before energization.
Chapter 5: KITOZER Full Product Line
5.1 Bay Type Overview
A complete 10kV sectionalized substation lineup typically includes:
| Bay ID | Bay Name | Truck Type | Core Components | Typical Qty |
|---|---|---|---|---|
| K-01 | Incoming isolator + PT | PT truck | JDZ10-10 PT, fuses, arrester, live display | 2 (per section) |
| K-02 | Incoming breaker | Breaker truck | VS1-1250/31.5kA, CT 600/5, protection relay | 2 |
| K-03 | Metering | Metering truck | 0.2S CT, 0.2 PT, revenue meter, sealed lock | 2 |
| K-04 | Transformer outgoing | Breaker truck | VS1-630/25kA, CT 200/5, zero-seq CT, earth switch | 4–8 |
| K-05 | Bus-tie | Breaker truck | VS1-1250/31.5kA, CT 600/5, synchronism check | 1 |
| K-06 | Bus-tie PT (optional) | PT truck | PT, fuses | 1 |
| K-07 | Capacitor compensation | Contactor truck | Vacuum contactor, capacitor bank, reactor | 1–2 |
| K-08 | Station transformer (optional) | Isolation + small xfmr | 30–50kVA station service xfmr | 1 |
5.2 Incoming Isolator + PT Cabinet (K-01)
The “gate entrance” for each busbar section. Functions: voltage monitoring, synchronism check, overvoltage protection via arrester, and isolation disconnect during maintenance. The PT takes voltage from the busbar and outputs to protection relays and meters. No breaker—the HV fuse is the PT protection.
KITOZER standard: JDZ10-10/√3 PT (three single-phase units), RN2-10/0.5A HV fuse, HY5WS arrester, DXN-Q live display, microprocessor measurement unit.
5.3 Incoming Breaker Cabinet (K-02)
The main power “master switch.” Functions: normal load switching, short-circuit protection, CT for metering, coordination with low-voltage side.
KITOZER standard: VS1-1250A/31.5kA spring mechanism DC220V; LZZBJ9-12 600/5A CT with three windings (0.2S metering + 0.5 measurement + 5P30 protection); microprocessor line protection relay (overcurrent I/II/III, instantaneous, earth fault, optional auto-reclose); JN15-12/31.5kA earthing switch; HY5WS arrester; DXN-Q live display.
5.4 Metering Cabinet (K-03)
The utility’s “bill meter” cabinet. Extremely strict requirements: 0.2S CT accuracy (±0.2% from 1% to 120% rated current), 0.2 PT accuracy, secondary voltage drop ≤0.2% rated, sealed by utility, revenue meter supplied and installed by utility (typically three-phase smart energy meter). KITOZER installs a test terminal block allowing on-site calibration without outage.
5.5 Transformer Outgoing Feeder (K-04)
One feeder per 10/0.4kV transformer. For a 1600kVA transformer example: VS1-630A/25kA breaker; LZZBJ9-12 200/5A CT; LXK-120 zero-sequence CT; transformer protection relay (instantaneous overcurrent, time-delayed overcurrent, earth fault, overload alarm, temperature trip interlock); JN15-12/25kA earthing switch; HY5WS arrester; cable compartment accommodates three 10kV YJV22-8.7/15kV-3×240 cables.
For transformers below 2000kVA, “comprehensive transformer protection” in the 10kV outgoing cabinet is standard. For 2000kVA+ or critical loads, differential protection (comparing high-side and low-side currents) is added.
5.6 Bus-tie Cabinet (K-05)
Connects Section I and Section II busbars. Normal operation: two incoming breakers closed, bus-tie open. Fault scenario: feed 1 lost → trip incoming 1 → close bus-tie → Section II feeds Section I loads.
KITOZER standard: VS1-1250A/31.5kA; LZZBJ9-12 600/5A CT; BZT (bus transfer) relay with synchronism check; electrical interlock with both incoming breakers.
The BZT relay continuously monitors both busbar voltages and incoming currents. When it detects incoming 1 current loss AND Section I busbar undervoltage (with Section II healthy), after 0.5–1s confirmation, it trips incoming 1, verifies opening, then closes bus-tie. Full sequence completes in 3–5 seconds, allowing low-voltage UPS and generator seamless takeover.
5.7 Capacitor Compensation Cabinet (K-07)
10kV-side power factor correction. KITOZER uses vacuum contactor switched capacitor banks:
| Item | Specification |
|---|---|
| Switching device | JCZ-12/D630 vacuum contactor |
| Capacitor bank | Rack-type, 300–1200kvar per step |
| Series reactor | 7% reactance (suppresses 5th+ harmonics) or 14% (3rd) |
| Arrester | ZnO switching surge arrester |
| Fuses | Individual per capacitor unit |
Automatic control based on low-voltage power factor: switch in steps when PF <0.95, switch out when PF >0.99, minimum 3-minute interval between operations.
5.8 Station Service Transformer (K-08, optional)
A small 30–50kVA 10/0.4kV transformer connected to the 10kV busbar, supplying DC panel chargers, room lighting, maintenance sockets, and cabinet heaters. Protected by HV fuses (no breaker), with MCB on LV side.
Chapter 6: Protection Relay Configuration
6.1 Fundamental Concepts
Protection relays are the “immune system” of the switchgear. During faults—short circuits, overloads, earth faults—the protection must detect, classify, and trip the correct breaker within tens to hundreds of milliseconds, isolating the fault and minimizing outage scope.
| Protection Type | Target | Operating Time | Action |
|---|---|---|---|
| Instantaneous overcurrent (Inst OC) | Phase fault (near) | <0.1s | Trip |
| Time-delayed instantaneous (TDI) | Phase fault (far) | 0.3–0.5s | Trip |
| Overcurrent backup (OC) | Phase fault (backup) | 0.5–2s | Trip |
| Residual/zero-sequence | Earth fault | 0.5–2s | Alarm or trip |
| Overload | Overload | 5–30s | Alarm |
| Undervoltage | Busbar loss | 0.5–9s | Trip shedding |
| Transformer differential | Internal xfmr fault | <0.04s | Trip |
| Non-electrical (temperature/gas) | Transformer thermal/gas | Delayed | Alarm/trip |
6.2 Instantaneous Overcurrent (Stage I)
The fastest phase-fault protection. Set above the maximum short-circuit current at the line end. For example, if the line-end maximum three-phase fault is 15kA, set pickup at 1.2–1.3× = 18–20kA primary. Trips with no intentional delay. Advantage: extremely fast (<40ms). Disadvantage: has a “dead zone”—covers only 70–80% of the line length; the rest needs Stage II.
6.3 Time-Delayed Instantaneous (Stage II)
Lower pickup than Stage I but with a small delay (0.3–0.5s), covering the Stage I dead zone. Must coordinate with downstream Stage I—this relay’s current and time must exceed the downstream relay’s by a grading margin, ensuring downstream faults trip downstream first.
6.4 Overcurrent Backup (Stage III)
Backup phase-fault protection. Set above maximum load current (1.2–1.5×), with longer delay (0.5–2s) graded in a staircase. Serves as local backup for this line and remote backup for adjacent lines.
6.5 Zero-Sequence (Earth Fault) Protection
China’s 10kV systems use isolated neutral (or Petersen-coil grounded) systems. A single-phase earth fault produces only 5–50A capacitive current—enough to alarm but not immediate trip. Zero-sequence CT (clamped around all three cables) measures the vector sum of three-phase currents. Balanced load gives zero sum; earth fault produces residual current.
KITOZER outgoing feeder zero-sequence settings: pickup 5–10A primary, delay 0.5–2s, alarm (most cases) or trip (critical loads). Simultaneously, the PT open-delta winding detects zero-sequence voltage (~100V on earth fault), triggering “busbar earth” alarm. Operators find the faulted feeder by sequential dead-switching.
6.6 Transformer Protection
For 10/0.4kV distribution transformers, KITOZER configures in the outgoing cabinet:
(1) Instantaneous overcurrent: Protects phase faults from HV bushing through transformer winding. Set above the LV-side maximum three-phase fault referred to HV side, typically 6–10× transformer rated current, instantaneous.
(2) Time-delayed overcurrent: Backup for external faults and overload. Set 1.5–2.5× rated current, 0.5–1s delay.
(3) Overload alarm: 1.2–1.5× rated, 5–30s delay, alarm only.
(4) Zero-sequence: Same as feeder, detects HV-side earth fault.
(5) Temperature (non-electrical): Dry-type transformer’s own temperature controller alarms at 130°C winding temp, trips at 150°C. Dry contacts wire to the protection relay’s non-electrical input.
(6) Differential protection (2000kVA+ optional): Compares HV-side and LV-side current vector sums. Normal operation and external fault → balanced (≈0). Internal fault → differential current exceeds pickup, trips instantaneously (<40ms). Requires CTs on both sides with matched ratios and polarity.
6.7 Bus Transfer (BZT)
The bus-tie cabinet’s BZT relay implements automatic fault transfer. Start conditions: Section I busbar undervoltage (<30% Un) AND incoming 1 current loss (<10% In) AND Section II busbar healthy (>70% Un) AND bus-tie open. Action sequence: confirm conditions after 0.5–1s delay → trip incoming 1 → verify opening → close bus-tie → verify closing → send “BZT operated” alarm. Blocking: manual trip, total busbar loss, transformer backup trip, one-shot only (manual reset required).
6.8 Protection Setting Calculation Example
For a 1600kVA transformer feeder:
Given: 1600kVA, 10/0.4kV Dyn11; HV rated current = 92.4A; Ikmax at busbar = 20kA; Ikmin (two-phase, min generation) = 14kA; CT ratio 200/5 = 40.
Instantaneous OC: LV busbar fault referred to HV side ≈ 2kA; pickup = 1.3×2000 = 2600A primary (65A secondary); 0s delay. Sensitivity: min two-phase fault at transformer HV ≈ 8kA; ratio = 8000/2600 = 3.1 > 1.25 ✓.
Time-delayed OC: pickup = 1.5×92.4 = 139A, set 150A primary (3.75A secondary); 0.5s delay. Sensitivity: LV two-phase fault referred ≈ 1.6kA; ratio = 1600/150 = 10.7 > 1.5 ✓.
Overload alarm: pickup = 1.2×92.4 = 111A, set 120A primary (3A secondary); 10s delay, alarm only.
Zero-sequence: 5A primary, 1s delay, alarm.
KITOZER delivers a complete setting calculation report based on owner-supplied system short-circuit parameters and transformer data, pre-programmed into the relays. On-site commissioning uses a relay test set to inject simulated currents and voltages verifying every stage.
Chapter 7: Secondary Circuits and Protection Communication
7.1 Secondary Circuit Composition
If primary circuits are the switchgear’s “muscles and bones,” secondary circuits are its “nervous system and brain.” Secondary circuits include all control, protection, measurement, and signaling circuits below 400V (mainly DC220V and AC100V/220V):
(1) Control circuits: Breaker trip/closing (DC220V → buttons → auxiliary contacts → trip/closing coil), truck spring charging motor, door electromagnetic locks.
(2) Measurement circuits: CT secondary windings → terminal blocks → multifunction meters; PT secondary → meters, energy meters, protection voltage inputs.
(3) Protection circuits: CT protection winding → relay current input; PT secondary → relay voltage input; relay trip output → breaker trip coil; non-electrical contacts (transformer temperature, gas) → relay digital inputs.
(4) Signaling circuits: Breaker position (auxiliary contacts → lamps + remote signal), truck position (limit switches), earth switch position, spring charged status, alarm contacts.
7.2 Secondary Wiring Craft
Secondary wiring uses BVR multi-strand flexible copper wire, minimum 1.5mm² (2.5mm² for current circuits). Color-coded per national standard: A-phase yellow, B-phase green, C-phase red, neutral light blue, earth green-yellow, DC+ red, DC- blue. Wiring runs through trunking; wire ends have crimped lugs; maximum two wires per terminal. Every wire has a printed marker sleeve. KITOZER completes all secondary wiring at factory and performs continuity and insulation tests.
7.3 Microprocessor Protection and Control Relay
Modern KYN28A cabinets use a single microprocessor relay replacing all legacy electromagnetic relays. KITOZER commonly specifies:
- Domestic first tier: NR Electric (RCS-9600 series), XJ Electric (WXK-300), Beijing Sifang (CSC-2000)
- Value line: Zhuhai Gongchuang, Shenzhen Nanrui
- KITOZER proprietary: KITOZER-P&C100 series
One relay integrates: protection CPU (algorithms, trip outputs), measurement CPU (voltage/current sampling, power and energy calculation), HMI (LCD + keypad showing real-time data, settings, event records), communication ports (RS485 Modbus RTU or Ethernet Modbus TCP/IEC 60870-5-103), and digital I/O (8–16 inputs, 4–6 relay outputs).
7.4 Communication Protocols and SCADA Integration
(1) Modbus RTU (RS485): Most common. Each relay daisy-chained on RS485 to SCADA host. Up to 1200m distance, 9600–19200 bps, max 32 devices per bus.
(2) IEC 60870-5-103: Power-industry protocol with timestamped event records. Common in large substations and utility projects.
(3) Modbus TCP (Ethernet): Newer relays standard with Ethernet port to substation switch. Faster, multi-master.
(4) IEC 60870-5-104: Ethernet version of 103, used for utility remote dispatch.
KITOZER provides complete communication point lists (telemetry, telesignaling, remote control addresses and descriptions) and supports SCADA configuration. Typical HMI shows: single-line diagram with real-time breaker/switch positions, busbar voltage, feeder currents, power, energy, protection event records with timestamps, alarm lists and trend curves.
7.5 DC Operating Power
All trip/closing operations and relay power come from the DC panel (DC220V or DC110V). Components: high-frequency charging modules (N+1 redundancy, AC380V input → DC220V output), valve-regulated lead-acid battery bank (typically 100Ah/220V, 104×2V cells), monitoring unit (battery string inspection, insulation monitoring), and feeders via MCBs. The DC panel ensures that during total AC loss, the battery bank provides at least 2 hours of operating power—enough to safely trip breakers, read protection events, and run emergency lighting.
Chapter 8: Installation and Commissioning
8.1 Foundation and Positioning
Before KYN28A installation, the switchroom must meet:
- Flat floor with embedded steel channel, level tolerance <1/1000
- Cable trench depth ≥800mm, width per lineup length
- Door width ≥1500mm (cabinet 800mm + packing allowance), door height ≥2400mm
- Interior lighting, ventilation, air conditioning installed; ambient -5 to +40°C, humidity ≤90%
- Fire suppression (CO2 or gas suppression) in place
Positioning steps:
1. Start from one end (usually PT or incoming cabinet), level and plumb the first cabinet
2. Butt the next cabinet against it, bolt from side with M12
3. After all bays lined up, adjust straightness and plumb with string line and spirit level
4. Weld or bolt cabinet bottom to embedded steel
5. Bond cabinet earthing copper bar to room main earth grid, contact resistance <0.1Ω
8.2 Busbar Jointing
The main busbar connection between adjacent cabinets is one of the most critical installation tasks:
- Remove top vent plate (or top cover) of busbar compartment
- Clean busbar contact surfaces with alcohol, apply conducting grease
- Align lap plates, insert M12 stainless bolts
- Torque to specification (M12 copper busbar bolt ≈31 N·m)
- Cover joints with heat-shrink insulation
- Replace top cover
After busbar jointing, perform insulation resistance test (2500V megger, >1000MΩ) and power-frequency withstand test (42kV/1min).
8.3 Truck Push-Pull Test
Every breaker truck must undergo push-pull testing after installation:
- Crank truck from test to connected position: check smooth operation, no binding
- Verify moving-to-stationary contact engagement depth: standard 15±1mm (caliper measurement)
- In connected position, verify secondary plug engagement
- Crank back to test position, verify secondary plug auto-disconnects
- Manual trip/close 3–5 times, verify mechanism freedom
8.4 Secondary Circuit Verification
Secondary circuit verification is the most time-consuming commissioning step:
- Wire-to-wire checking: Use a continuity tester or multimeter to verify every secondary wire end-to-end
- CT secondary open-circuit check: CT secondary must NEVER be open-circuited during operation (generates dangerous high voltage). Verify all CT secondary terminals are tight and no open points exist
- PT secondary short-circuit check: PT secondary must never be short-circuited. Verify PT secondary fuses are intact
- Trip circuit test: Inject simulated trip signal at relay, verify breaker trips correctly
- Interlock test: Verify all five-prevention interlocks per Chapter 4
8.5 Withstand Voltage Tests
(1) Main circuit power-frequency withstand: Phase-to-earth 42kV, across open contact gap 48kV, duration 1min. No breakdown or flashover permitted.
(2) Secondary circuit insulation: 1000V megger, insulation resistance >10MΩ; power-frequency 2kV/1min (or 2500V megger equivalent).
(3) Breaker mechanical characteristics: Use a breaker analyzer to measure trip/closing time, three-pole simultaneity (<2ms spread), contact stroke and overtravel, opening/closing velocity.
(4) Protection relay calibration: Use a relay test set to inject simulated current/voltage, verifying each stage’s pickup value (±5% tolerance) and operating time (±5% tolerance).
8.6 Energization Procedure
After all tests pass, energize in this order:
- Withdraw all breaker trucks (test position)
- Insert PT truck, energize PT, verify busbar voltage indication normal
- Push incoming breaker truck to connected, close incoming breaker, verify busbar live
- Sequentially push in each feeder truck, close breakers one by one (confirming downstream transformers and cables are ready)
- Close bus-tie (if required)
- Observe for 24 hours, record operating parameters
KITOZER dispatches an engineer to guide energization, ensuring every step is safe and correct.
Chapter 9: Operation and Maintenance
9.1 Monthly Inspection
Operators should inspect the switchroom monthly:
- Cabinet appearance: unusual noise, smell, discoloration, overheating marks
- Operating parameters: busbar voltage, feeder currents, power factor within normal range
- Temperature/humidity: room 10–30°C, humidity <70%
- Live display: three-phase lamps normal
- Protection relays: no alarm events, LCD display normal
- DC panel: battery voltage, charger status, insulation monitor normal
- Cable compartment: no condensation, water, or unusual smell
- Earthing: doors closed, earthing bar no corrosion
9.2 Periodic Maintenance (Annual or Triennial)
Per DL/T 596 “Preventive Test Code for Electric Power Equipment”:
| Test Item | Period | Standard |
|---|---|---|
| Main circuit insulation resistance | 3 years | >1000MΩ |
| Main circuit power-frequency withstand | 3 years (if needed) | 42kV/1min |
| Breaker trip/closing time | 3 years | Within ±10% of factory |
| Vacuum interrupter vacuum | 3 years | Gap withstand 42kV no breakdown |
| CT/PT ratio and polarity | After overhaul | Match nameplate |
| Earthing switch contact resistance | 3 years | ≤ busbar resistance |
| Secondary circuit insulation | 3 years | >1MΩ |
| Battery capacity test | Annual | Check charge-discharge |
9.3 Breaker Truck Overhaul
After ~10,000 mechanical operations or 3–5 years, the VS1 truck should undergo minor overhaul:
- Withdraw truck to test position, disconnect secondary plug
- Crank truck out, transfer to service cart
- Clean interrupter surface, inspect for cracks or discharge marks
- Check contact wear (replace when overtravel <3mm)
- Lubricate mechanism points with specified grease
- Check trip/closing coil resistance (within ±10% of factory)
- Manual trip/close 5 times, verify freedom
- Return to cabinet, re-test push-pull
KITOZER recommends owners keep one spare truck of each rating, cutting outage time from one day to two hours during overhaul.
9.4 Common Faults and Remedies
| Symptom | Likely Cause | Action |
|---|---|---|
| Breaker won’t close | Closing coil burned / spring not charged / interlock blocked | Check coil resistance, confirm spring charged, check interlock |
| Closes then immediately trips | Protection operated (OC/instantaneous) | Check relay event record, investigate fault |
| Truck won’t crank | Breaker closed / earth switch closed | Trip breaker, open earth switch |
| Busbar voltage reads zero | PT fuse blown / PT truck not seated | Replace fuse, check PT truck position |
| Relay comms dead | 485 A/B reversed / address conflict | Swap A/B, check addresses, check terminator |
| Hissing/crackling in cabinet | Surface tracking / loose contact | De-energize, clean insulators, torque bolts |
| DC panel insulation alarm | DC system ground | Sequential feeder isolation to find ground |
| Capacitor bank won’t switch in | Discharge time not elapsed / fuse blown | Wait discharge time, replace fuse |
Chapter 10: Coordination with Low-Voltage Switchgear
10.1 10kV/0.4kV Overall Distribution Architecture
KYN28A high-voltage switchgear does not operate in isolation—it couples to low-voltage switchgear (GCS/GCK/MNS withdrawable or GGD fixed) through 10/0.4kV transformers:
10.2 Protection Grading
HV and LV protection must be selective—LV-side faults should trip the LV breaker first, without HV backup tripping. Grading principle:
- LV incoming MCB long-delay: 0.4–1s
- LV feeder MCB short-delay: 0.2–0.5s
- HV feeder overcurrent: 0.5–1s (one grade above LV)
- HV feeder instantaneous: instantaneous (protects transformer internal faults, no coordination with LV required)
If the HV instantaneous element trips during an LV-side fault, the fault point is in the HV side or transformer itself.
10.3 Transformer Rating and Bay Matching
| Transformer kVA | HV Rated Current | Feeder CT Ratio | Breaker Rating |
|---|---|---|---|
| 315 | 18.2A | 50/5 | VS1-630A/20kA |
| 500 | 28.9A | 75/5 | VS1-630A/20kA |
| 800 | 46.2A | 100/5 | VS1-630A/25kA |
| 1000 | 57.7A | 150/5 | VS1-630A/25kA |
| 1250 | 72.2A | 200/5 | VS1-630A/25kA |
| 1600 | 92.4A | 200/5 | VS1-630A/25kA |
| 2000 | 115.5A | 300/5 | VS1-1250A/31.5kA |
| 2500 | 144.3A | 400/5 | VS1-1250A/31.5kA |
10.4 Relationship with DC Panel and UPS
HV switchgear operating power comes from the DC panel (DC220V); LV-side UPS powers computers and monitoring. The DC panel charger supply comes from the station service transformer (10/0.4kV small transformer) or a dedicated LV feeder. The DC battery guarantees at least 2–3 breaker operations during total AC loss. UPS guarantees monitoring equipment continuity before generator start. Generator start signal can be wired from the LV incoming undervoltage contact.
Chapter 11: Selection Calculations
11.1 Overall Selection Process
Selecting KYN28A parameters answers four questions:
1. What is the maximum system short-circuit current? → determines breaker breaking current and cabinet short-time withstand
2. What is the maximum continuous operating current per circuit? → determines rated current and CT ratio
3. What protection functions are required? → determines relay model and configuration
4. What are the incoming/outgoing cable arrangements? → determines cabinet dimensions and cable compartment configuration
11.2 Short-Circuit Current Calculation
Typical known parameters: upstream 110kV substation 10kV busbar short-circuit capacity 200–500MVA; 10kV cable length and cross-section; transformer capacity and impedance voltage Uk%.
Simplified estimation: Assume upstream 10kV busbar short-circuit capacity Sd = 300MVA:
– System reactance: Xs = Un²/Sd = 10²/300 = 0.333Ω per phase
– Max three-phase short-circuit at 10kV busbar: Ik = Sd/(√3 × Un) = 300/(√3 × 10) = 17.3kA
Accounting for cable impedance and margin, engineering practice selects 20kA or 25kA as the cabinet short-time withstand current.
Breaker breaking current selection: Rated short-circuit breaking current must exceed the maximum fault current at the installation point. If Ikmax = 20kA, select 25kA breaker (25% margin). If future system growth may increase fault levels, select 31.5kA.
Peak withstand current: Peak = 2.5 × RMS (at ~0.01s DC decay time). 25kA RMS corresponds to 63kA peak; 31.5kA to 80kA peak.
11.3 Rated Current Selection
Main busbar rated current is selected for the maximum continuous load on the busbar section. For example, two transformers totaling 3200kVA on one section: total current = 3200/(√3×10) = 184.7A; considering diversity factor and margin, select 1250A or 1600A main busbar (standard sizes).
Incoming cabinet rated current follows the main transformer rating; feeder cabinet rated current follows the connected transformer rating.
11.4 CT Ratio Selection Principles
- CT primary rated current should be 1.2–1.5× circuit rated current
- Measurement winding should operate at 30–100% of CT primary rating for accuracy
- Protection winding must achieve sensitivity factor ≥1.5 at minimum end fault
- Metering winding requires accuracy across 5–120% rated current, so CT ratio should not be oversized
11.5 Bay Width Selection
| Rated Current | Recommended Width |
|---|---|
| 630A | 800mm |
| 1250A | 800mm |
| 1600A | 1000mm |
| 2000A | 1000mm |
| 2500A | 1200mm |
| 3150A | 1200mm |
Width also depends on short-circuit level—at 31.5kA breaking, even 1250A circuits may require 1000mm width due to larger busbar and contact dimensions.
11.6 KITOZER Selection Example
Project: Data center, 2× 10kV utility feeds, 4× 2000kVA dry-type transformers, single busbar sectionalized.
Calculation:
– Each section feeds 2× 2000kVA = 4000kVA total
– Max busbar current = 4000/(√3×10) = 231A
– Main busbar: 1600A (ample margin, future expansion)
– Incoming: VS1-1250A/31.5kA, CT 600/5
– Each transformer feeder: VS1-1250A/31.5kA, CT 300/5 (transformer rated 115A)
– Bus-tie: VS1-1250A/31.5kA
– Total bays: 2 PT + 2 incoming + 2 metering + 4 feeder + 1 bus-tie + 2 capacitor = 13 bays
Reference price: ¥1.8M–2.2M (including DC panel, commissioning, freight).
Chapter 12: 30 Frequently Asked Questions
Q1: KYN28A-12 vs XGN2-12?
KYN28A is withdrawable (truck pulls out); XGN2 is fixed-type. KYN28A enables spare-truck swap for fast maintenance; XGN2 costs 20–30% less but requires longer outage for breaker service. New projects: KYN28A.
Q2: Can KYN28A-12 be used outdoors?
No. The “N” means indoor. For outdoor use, choose outdoor-rated gear (XGN15 outdoor or prefabricated compact substation), or house KYN28A in an outdoor prefab cabin/container.
Q3: Why is 10kV gear rated 12kV?
System nominal is 10kV but equipment rated voltage is 12kV because equipment insulation must withstand the system highest voltage (12kV per GB 3906/IEC 62271-200).
Q4: VS1 vs ABB VD4?
VS1 is domestic (ZN63A-12); VD4 is ABB. Both vacuum breakers with comparable parameters. VS1 costs 30–40% less; VD4 carries brand premium. KITOZER standard: VS1; optional ABB VD4 or Siemens 3AE.
Q5: When to replace vacuum interrupters?
Normally never. Vacuum interrupter life exceeds 20 years, mechanical life ≥10,000 operations. Replace only if the gap withstand test (42kV) fails.
Q6: Are five-prevention interlocks mechanical or electronic?
KYN28A is primarily mechanical (truck-breaker-earth switch-door locks), supplemented by electrical interlocks (bay-to-bay via auxiliary contacts) and live-display forced lockout. Pure electronic interlocks are not recommended—electronic devices can fail.
Q7: How much room does a 10kV switchroom need?
A 10-bay lineup is 8–10m wide; depth requires 1.5m front corridor + 1.5m cabinet depth + 1.0m rear corridor = 4m. Plus DC panel and control area: 60–80m² total.
Q8: Can KYN28A achieve IP54?
Standard is IP4X. Upgradeable to IP54 (gaskets, dust filters) for dusty/humid environments, but consider heat dissipation. KITOZER customizes protection level per site.
Q9: Do cabinets need heaters?
When ambient humidity >70% or with large diurnal temperature swings, cable and truck compartments should have heaters (AC220V, 50–100W) with humidity controllers to prevent condensation. Standard KITOZER option.
Q10: Top entry or bottom entry cables?
KYN28A standard is bottom entry (from cable trench). Top entry is a custom modification requiring cable compartment redesign.
Q11: How heavy is a KYN28A cabinet?
800mm wide: 800–1200kg; 1000mm wide: 1200–1800kg; 1200mm wide: 1800–2500kg. Lift using top eyes with nylon slings—not wire rope directly on paint.
Q12: Does the switchroom need explosion-proof walls?
KYN28A is air-insulated. If installed near explosive gas zones in industrial plants, follow GB 50058 zoning. General building switchrooms need independent rooms and fire doors but not explosion walls.
Q13: Can switchgear be remotely operated?
Yes. Relays have standard remote trip/close outputs; via RS485 or Ethernet to SCADA, breakers can be operated from the control room. Initial energization and maintenance operations must be local.
Q14: Is BZT standard?
No. Recommended for sectionalized busbars; not needed for non-sectionalized. KITOZER configures per project.
Q15: Must capacitor compensation be on the 10kV side?
Not always. Small loads (<2000kVA) can compensate on the LV side. Large loads (>4000kVA) benefit from 10kV-side centralized compensation.
Q16: Why seal the metering cabinet?
It is the utility’s billing measurement. CT/PT secondary and meter are sealed against tampering. Seals and locks are managed by the utility.
Q17: KYN28A service life?
Cabinet steel structure: 30+ years. Breaker mechanical life: 10,000 operations (20–30 years of typical operation). Relay electronics: 15–20 years. With proper maintenance, the complete installation lasts 25–30 years.
Q18: Can existing cabinets be smart-upgraded?
Yes. Add wireless contact temperature sensors, UHF partial discharge sensors, smart control units (replacing conventional lamps/switches), and 4G communication. KITOZER provides upgrade services.
Q19: Why vacuum over SF6 at 10kV?
Vacuum breakers fully replaced SF6 at 10kV level—sufficient breaking capacity, no greenhouse gas, low maintenance. SF6 continues above 35kV.
Q20: Earthing switch vs earthing cable?
The earthing switch is a fixed, interlocked in-cabinet grounding point for routine maintenance. Temporary earthing cables are flexible copper bonds applied remotely when working on downstream equipment. Neither replaces the other.
Q21: How to install zero-sequence CT?
The ring CT clamps around all three cables (all three pass through the center). Cable armour/earth screen must NOT be grounded before passing through the CT—it must float after the CT, or zero-sequence measurement will be compromised.
Q22: Who sets protection relays?
Typically the utility or design institute; KITOZER pre-sets in the relays. Commissioning verifies with a relay test set. Owners must not change settings without utility approval.
Q23: Typical 10kV busbar short-circuit current?
Urban user substations: 16–31.5kA. Near 220kV stations: up to 40kA. Rural/remote: 10–16kA.
Q24: Is switchgear noisy?
Normal operation <50dB (mains hum, fan noise). Unusual buzzing or crackling indicates loosening or insulation issues.
Q25: Thermal imaging on switchgear?
Recommended annually. Focus on busbar joints, cable lugs, breaker contacts. Any temperature rise >10K requires de-energized inspection.
Q26: DC panel battery replacement interval?
VRLA batteries last 5–8 years. KITOZER recommends check discharge every 3 years; replace when capacity drops below 80%.
Q27: Can KYN28A be extended later?
Yes, it is modular. New bays can be inserted into an existing lineup, but extension requires outage (busbar compartment must be opened). Plan expansion space at design stage.
Q28: Domestic vs imported brand gap?
KYN28A technology is mature; domestic first-tier manufacturers (Changshu, Shanghai Renmin, Beikai) match ABB/Siemens on cabinet quality. The gap is mainly in breaker brand and relay. KITOZER cabinets are fully domestic; breakers/relays can be specified imported.
Q29: Lead time?
Standard KYN28A: 30–45 days from drawing approval. With imported components or custom: 60–75 days. KITOZER stocks common components and can compress to 25 days.
Q30: What information is needed to quote?
Single-line diagram, layout drawing, utility supply approval (including metering requirements), system short-circuit data, transformer parameters, cable specs, switchroom floor plan. KITOZER can develop detailed engineering from a basic load list.
Chapter 13: Industry Standards
13.1 National Standards
| Standard | Title | Scope |
|---|---|---|
| GB 3906 | 3.6kV–40.5kV AC metal-enclosed switchgear and controlgear | Core KYN28A design/manufacture/test standard |
| GB/T 11022 | Common specifications for HV switchgear and controlgear | General technical conditions |
| GB 1984 | AC high-voltage circuit breakers | VS1 breaker standard |
| GB 1985 | HV AC disconnectors and earthing switches | Isolation trucks and earth switches |
| GB 20840.2 | Instrument transformers – current transformers | CT standard |
| GB 20840.3 | Instrument transformers – inductive voltage transformers | PT standard |
| GB 50060 | Design specification for 3–110kV HV switchgear installations | Room layout design |
| GB 50053 | Design code for 20kV and below substations | User substation design |
| GB 50065 | Design code for AC electrical installations earthing | Earthing systems |
| GB/T 14598 | Measuring relays and protection equipment | Relay standard |
13.2 Power Industry Standards
| Standard | Title |
|---|---|
| DL/T 404 | Ordering specification for 3.6kV–40.5kV AC metal-enclosed switchgear |
| DL/T 593 | Common technical requirements for HV switchgear and controlgear |
| DL/T 596 | Preventive test code for electric power equipment |
| DL/T 860 | Communication networks and systems in substations (IEC 61850 adoption) |
| DL/T 844 | LV reactive power compensation devices |
13.3 International Standards
| Standard | Title |
|---|---|
| IEC 62271-200 | AC metal-enclosed switchgear and controlgear for rated voltages above 1kV up to 52kV |
| IEC 62271-100 | AC high-voltage circuit-breakers |
| IEC 62271-102 | AC disconnectors and earthing switches |
| IEC 61869-2 | Instrument transformers – current transformers |
| IEC 61869-3 | Instrument transformers – inductive voltage transformers |
| IEC 61850 | Communication networks and systems for power utility automation |
| ANSI C37.20 | Metal-enclosed switchgear (North American) |
13.4 KITOZER Standards Compliance Statement
KITOZER KYN28A-12 high-voltage switchgear is designed, manufactured, and tested in strict accordance with GB 3906 and DL/T 404, meeting relevant IEC 62271-200 requirements. Every cabinet completes routine tests at factory:
- Visual and structural inspection
- Main circuit resistance measurement
- Main circuit power-frequency withstand test
- Auxiliary circuit power-frequency withstand test
- Mechanical operation and mechanical characteristic test
- Five-prevention interlock verification
- Secondary circuit insulation resistance measurement
- Auxiliary electrical circuit energization test
Type test reports are issued by the National High-Voltage Electric Appliance Quality Inspection Center (Xi’an or Shenyang).
Chapter 14: Packaging, Delivery, Warranty, and Company Information
14.1 Packaging and Transportation
KYN28A cabinets use standard export packaging:
- Cabinet wrapping: EPE foam + corrugated corner protectors + steel bands on plywood pallet
- Truck packaging: Breaker trucks removed from cabinets and packed separately in wooden crates (preventing transport vibration damage to contacts and mechanisms)
- Busbars: Shipped disassembled, contact surfaces coated with anti-rust grease
- Spare parts and documents: Documentation bag (certificates, test reports, manuals) in waterproof plastic pouch attached to door
- Transport: Domestic road freight; export by 40HQ container (fits 6–8 × 800mm-wide cabinets)
14.2 Delivery Scope
| Item | Included? |
|---|---|
| KYN28A cabinet and all primary components | Yes |
| Secondary wiring and protection relay | Yes |
| DC panel and battery bank | Yes |
| Busbar lap plates and fasteners | Yes |
| Spare parts (fuses, lamps, etc.) | Yes |
| Installation tools (crank handle, etc.) | Yes |
| Factory test reports and certificates | Yes |
| On-site installation supervision | Yes (1 person, 3 days) |
| On-site commissioning support | Yes |
| Cable terminals and lugs | No (by cable contractor) |
| Bus duct (between cabinet rows) | Extra, per length |
| Civil foundation and cable trench | No |
| Utility acceptance support | Yes |
14.3 Warranty Terms
- Warranty period: 12 months from site energization, or 18 months from shipment, whichever comes first
- Coverage: Cabinet structure, component manufacturing quality, secondary wiring quality
- Exclusions: Physical damage, improper operation, force majeure (lightning, floods), unauthorized modification
- Response: 4-hour phone response in Guangzhou metro, 24-hour on-site in Guangdong, 48-hour on-site out-of-province
14.4 KITOZER Brand and Company
Guangzhou Laian Intelligent System Development Co., Ltd. (brand: KITOZER) is a manufacturer specializing in industrial electrical packaged equipment and intelligent systems, headquartered in Panyu, Guangzhou. Product lines cover:
- 10kV/35kV HV switchgear (KYN28A/XGN/GIS)
- 0.4kV LV switchgear (GCS/GCK/MNS/GGD)
- DC panels / UPS / battery systems
- Data center micro-module rooms
- Outdoor cabinets / monitoring boxes
- Smart power environment monitoring systems
- Weak-current system integration
KITOZER products serve data centers, hospitals, schools, commercial complexes, factories, municipal water plants, wastewater treatment, renewable energy stations, and rail transit.
14.5 Contact Us
KITOZER / Guangzhou Laian Intelligent System Development Co., Ltd.
- Tel / WeChat: +86 13922289957
- Tel / WeChat: +86 18520668845
- WhatsApp: +86 19068534140
- Website: lain.com.cn (domestic) / gdlain.com (international)
- Address: Chaotian Park, Zhongrun Industrial Zone, No. 5 Huashan Road, Shilou, Panyu, Guangzhou, China
Whether you need a quote for a single KYN28A cabinet or a complete 10kV substation packaged solution, KITOZER engineers respond within 24 hours. Send us your single-line diagram or load list, and we will design the optimal configuration for your project.
—
SEO Meta Tags (English Site gdlain.com)
Title: KITOZER 10kV High Voltage Switchgear KYN28A-12 Metal-clad Withdrawable Cabinet Engineering Manual
Meta Description: KITOZER KYN28A-12 engineering design manual: four-compartment structure, VS1 vacuum breaker, five-prevention interlock, full bay lineup (incoming/PT/metering/feeder/bus-tie/capacitor), protection relay settings, Modbus communication, busbar jointing and withstand testing, selection calculations, and 30 FAQs. Per GB 3906 and DL/T 404. Tel/WhatsApp +86 18520668845.
Keywords: 10kV high voltage switchgear, KYN28A-12, metal-clad withdrawable switchgear, VS1 vacuum circuit breaker, five-prevention interlock, protection relay, overcurrent protection, instantaneous overcurrent, zero-sequence protection, transformer differential, incoming cabinet, PT cabinet, metering cabinet, feeder cabinet, bus-tie cabinet, capacitor compensation, DC panel, GB 3906, DL/T 404, IEC 62271-200, KITOZER, Guangzhou Laian, HV switchgear selection, user substation
Canonical: https://www.gdlain.com/10kv-kyn28a-high-voltage-switchgear-design-manual.html
OG:Title: KITOZER 10kV KYN28A-12 High Voltage Switchgear Engineering Manual
OG:Description: KYN28A four-compartment structure, VS1 breaker, five-prevention interlock, full bay lineup, protection settings, installation, commissioning, and selection guide
Twitter:Card: summary_large_image
Image Suggestions (with phone watermark, WebP compressed, English filenames)
| Image # | Description | ALT (EN) | Watermark |
|---|---|---|---|
| IMG-01 | KYN28A-12 lineup front view, 10 bays in row | KITOZER KYN28A-12 metal-clad withdrawable switchgear lineup | Tel 18520668845 |
| IMG-02 | VS1 vacuum breaker truck pulled out of cabinet | VS1 vacuum circuit breaker truck withdrawn from KYN28A | Tel 13922289957 |
| IMG-03 | Internal four-compartment cutaway showing truck/busbar/cable/relay rooms | KYN28A four-compartment internal structure | WhatsApp 19068534140 |
| IMG-04 | Microprocessor protection relay panel close-up with LCD | Microprocessor protection & control relay on KYN28A | Tel 18520668845 |
| IMG-05 | Secondary terminal blocks and five-prevention interlock mechanism | Secondary wiring terminal blocks and interlock mechanism | Tel 13922289957 |
| IMG-06 | DC220V 100Ah battery DC panel with charging modules | KITOZER DC220V 100Ah VRLA DC power panel | WhatsApp 19068534140 |
| IMG-07 | Busbar jointing with copper lap plates and torque wrench | Main busbar copper lap joint and torque bolting | Tel 18520668845 |
| IMG-08 | Ground switch and cable termination in cable compartment | JN15 earthing switch and 10kV cable terminations | Tel 13922289957 |
Categories and Tags
Chinese site categories: 配电设备 / 高压开关柜 / 10kV开关柜 / 直流屏
English site categories: Power Distribution / High Voltage Switchgear / DC Power Panel
Tags: 10kV, KYN28A-12, 中置柜, 金属铠装, VS1, 真空断路器, 五防联锁, 继电保护, 进线柜, PT柜, 计量柜, 出线柜, 母联柜, 电容补偿, 直流屏, 10kV switchgear, KYN28, vacuum breaker, five-prevention, protection relay, bus-tie, capacitor bank, substation, GB 3906, DL/T 404, IEC 62271-200
End of document. © 2026 Guangzhou Laian Intelligent System Development Co., Ltd. All rights reserved. KITOZER is a brand of Guangzhou Laian. This document is for engineering reference; actual specifications are governed by contract drawings.
附录A:典型工程案例详解
A.1 数据中心10kV变电所案例
项目背景:某一线城市核心区数据中心,IT负载功率密度8kW/机柜,共500个机柜,总IT负载4MW。供电等级要求Tier III,两路10kV市电进线,变压器2N冗余配置。
主接线方案:
– 两路10kV市电分别引自两座不同的110kV变电站
– 单母线分段,两段母线之间设母联柜,备自投自动切换
– 每段母线带4台2000kVA干式变压器(共8台)
– 低压侧每台变压器对应一组UPS和电池
– 高压柜配置:PT柜2面 + 进线柜2面 + 计量柜2面 + 变压器出线柜8面 + 母联柜1面 + 电容补偿柜2面 + 所用变柜1面 = 共18面KYN28A柜
关键参数选择:
– 系统短路电流:上一级110kV变电站10kV母线短路容量500MVA,折算短路电流28.9kA
– 断路器选VS1-1250A/31.5kA(裕量8%)
– 主母线选TMY-100×10铜排,额定电流1600A
– 进线CT选1000/5A,出线CT选300/5A(变压器额定电流115A)
– 保护配置:每台出线柜配变压器差动保护(因容量2000kVA,要求高可靠性)
– 弧光保护:每面柜装弧光传感器,20ms内跳闸
投资概算:高压柜部分约¥320万,直流屏¥15万,安装调试¥25万,合计约¥360万。
调试要点:数据中心项目要求不停电调试——先在一段母线上送电,另一段母线带电运行,逐面柜接入。备自投逻辑经过72小时模拟试验验证。
A.2 医院10kV变电所案例
项目背景:某三甲医院新建外科大楼,总建筑面积8万m²,床位1500张。供电要求:手术室、ICU、消防泵为一级负荷中特别重要负荷。
主接线方案:
– 一路10kV市电 + 一路10kV柴油发电机组(1600kW)
– 单母线分段,两段母线间母联
– 6台1600kVA干式变压器(分别供手术室、ICU、普通病房、办公、消防、空调)
– 高压柜共12面
特殊要求:
– 柴油发电机进线柜与市电进线柜之间设电气联锁,绝对不允许并列
– 手术室和ICU对应的变压器出线柜,保护动作只发告警不跳闸(防止突然停电影响手术),由人工确认后手动分闸
– 直流屏容量加大到200Ah,保证发电机启动期间的操作电源
– 所有高压柜加装噪声屏蔽措施(配电室紧邻病房)
A.3 工厂10kV变电所案例
项目背景:某汽车零部件制造厂,冲压车间、焊接车间、涂装车间,总装机容量6000kVA。
主接线方案:
– 一路10kV市电专线
– 单母线不分段,一段母线带5台变压器
– 高压柜仅5面:PT柜1面 + 进线柜1面 + 计量柜1面 + 出线柜2面(其中一面带3台小变压器)
– 配置最简单,成本最低
注意事项:冲压车间有大量冲击性负荷,导致10kV母线电压波动。KITOZER在电容补偿柜中加装了晶闸管投切开关(替代真空接触器),响应时间从30秒缩短到20ms,有效抑制电压闪变。
A.4 市政水厂10kV变电所案例
项目背景:某自来水厂,取水泵房、送水泵房、加药间、污泥处理。全年不间断供水。
主接线方案:
– 两路10kV市电(来自不同变电站)
– 单母线分段
– 4台变压器:取水泵2×1000kVA、送水泵2×1600kVA
– 高压柜10面
特殊要求:水厂环境潮湿、有腐蚀性气体,KYN28A柜升级为IP54防护,柜内加装温湿度控制器和加热器,柜体钢板加厚到3mm并采用304不锈钢材质(沿海地区)。所有螺栓采用不锈钢材质。
附录B:母线与电缆选型计算
B.1 主母线铜排选择
主母线载流量按以下原则选择:
| 铜排规格(mm) | 额定电流(A) | 适用场景 |
|---|---|---|
| TMY-40×4 | ~400 | 小型配电室 |
| TMY-50×5 | ~630 | 630A柜 |
| TMY-60×6 | ~800 | 800A柜 |
| TMY-80×8 | ~1250 | 1250A柜 |
| TMY-100×10 | ~1600 | 1600A柜 |
| TMY-125×10 | ~2000 | 2000A柜 |
| 双TMY-100×10 | ~2500 | 2500A柜 |
铜排搭接面必须搪锡或镀银,搭接螺栓数量根据铜排宽度确定(M12螺栓,每根铜排至少2颗)。
B.2 10kV电缆选择
| 变压器容量 | 推荐电缆型号 | 电缆截面 | 数量 |
|---|---|---|---|
| 315~500kVA | YJV22-8.7/15kV | 3×50mm² | 1根 |
| 800kVA | YJV22-8.7/15kV | 3×95mm² | 1根 |
| 1000~1250kVA | YJV22-8.7/15kV | 3×150mm² | 1根 |
| 1600kVA | YJV22-8.7/15kV | 3×240mm² | 1根 |
| 2000~2500kVA | YJV22-8.7/15kV | 3×300mm² | 2根并联 |
电缆终端采用冷缩或热缩型10kV电缆终端头。电缆穿过零序CT后,接地钢铠必须悬空。
B.3 接地系统设计
KYN28A柜的接地系统包括:
- 柜体保护接地:每面柜底部有M10接地螺栓,用-40×4mm镀锌扁钢与配电室主接地网连接
- 主接地铜排:柜列底部贯穿一根-40×4mm铜排,所有柜的接地螺栓接到这根铜排上
- 电缆室接地:电缆室内设接地铜排,电缆终端的接地端接此铜排
- 接地开关接地:接地开关的静触头端直接接主接地铜排
- 接地电阻要求:整个接地网接地电阻≤4Ω(独立接地),与变压器中性点共用接地网时≤1Ω
附录C:二次回路详细接线说明
C.1 控制回路接线
控制电源从直流屏控制小母线(+KM、-KM)引出,经过每面柜的控制电源小开关(微型断路器),接到柜内端子排。典型控制回路:
合闸回路:+KM → 合闸按钮(或遥控合闸接点)→ 断路器常闭辅助触点 → 合闸线圈 → -KM
– 串联断路器常闭辅助触点的作用:断路器已经在合闸位置时,切断合闸回路,防止”储能合闸”
分闸回路:+KM → 分闸按钮(或遥控分闸接点/保护跳闸接点)→ 断路器常开辅助触点 → 分闸线圈 → -KM
– 串联断路器常开辅助触点的作用:断路器已经在分闸位置时,切断分闸回路
储能回路:+KM → 储能电机 → 行程开关(未储能时闭合)→ -KM
– 弹簧储能完成后,行程开关断开电机电源
C.2 信号回路
每面柜需要上传到监控系统的信号包括:
| 信号名称 | 接点类型 | 说明 |
|---|---|---|
| 断路器合闸位置 | 常开辅助触点 | 断路器合位时闭合 |
| 断路器分闸位置 | 常闭辅助触点 | 断路器分位时闭合 |
| 弹簧已储能 | 行程开关 | 储能完成时闭合 |
| 手车工作位置 | 行程开关 | 手车在工作位时闭合 |
| 手车试验位置 | 行程开关 | 手车在试验位时闭合 |
| 接地开关合闸 | 辅助触点 | 地刀合位时闭合 |
| 保护动作 | 继电器输出 | 保护跳闸时闭合 |
| 装置故障 | 继电器输出 | 综保自检异常时闭合 |
| 控制回路断线 | 继电器输出 | 分合闸回路断线时闭合 |
这些信号通过综保装置的开入端子采集,再通过通信总线上传到监控主机。
C.3 CT/PT二次回路接线
CT二次接线:每个CT二次绕组的S1端接综保装置的相应输入,S2端接地。同一保护功能的所有CT绕组串联(进线、出线、母联差动)。CT二次回路在端子排上短接——检修时先短接CT二次,再拆线,防止开路产生高压。
PT二次接线:PT二次绕组星形接法,中性线一点接地。测量绕组和保护绕组分开。开口三角绕组单独引出,正常运行时输出≈0V。PT二次侧装微型断路器或熔断器作为短路保护。
附录D:保护整定详细计算书模板
D.1 进线柜保护整定
已知条件:
– 进线电缆长度L=2km,截面3×240mm²
– 系统短路容量Sd=300MVA
– 变压器总容量4000kVA
– CT变比600/5=120
(1)过流保护(三段式)
I段(速断):按躲过母线最大短路电流整定
– 母线最大三相短路电流Ikmax=17.3kA
– 动作电流=1.3×17.3=22.5kA(一次值)
– 二次值=22500/120=187.5A
– 动作时间:0s
II段(限时速断):与出线柜速断配合
– 动作电流=1.1×出线柜速断定值=1.1×2600=2860A
– 动作时间:0.3s(比出线柜速断大0.3s级差)
III段(过负荷):按躲过最大负荷电流整定
– 最大负荷电流=4000/(√3×10)=231A
– 动作电流=1.3×231=300A
– 动作时间:1.5s
(2)零序保护
– 动作电流:10A(一次值)
– 动作时间:2s
– 动作后果:告警
D.2 母联柜保护整定
母联柜保护主要作为母线故障的后备保护:
– 过电流动作电流:按带全部负荷整定,约400A
– 动作时间:1s
– 充电保护:当母联向一段空母线充电时,临时投入瞬动保护(按母线故障整定),充电完成后退出
D.3 电容器柜保护整定
- 过流速断:按躲开电容器合闸涌流整定,通常20In(In为电容器组额定电流)
- 过电压:1.1Un,0.5s跳闸
- 低电压:0.6Un,1s跳闸(系统失压时自动切除电容器)
- 零序电压:用于电容器内部故障保护
附录E:备品备件清单
KITOZER建议业主在投运时采购以下备品备件:
| 备件名称 | 规格 | 建议数量 | 用途 |
|---|---|---|---|
| 断路器手车 | 与在用柜同规格 | 1台 | 故障时快速替换 |
| 高压熔断器 | RN2-10/0.5A | 10只 | PT保护 |
| 高压熔断器 | 电容器柜用 | 10只 | 电容器保护 |
| 指示灯 | AD16-22系列 | 各颜色5只 | 运行指示 |
| 分合闸线圈 | VS1配套 | 各2只 | 断路器操作 |
| 储能电机 | VS1配套 | 1台 | 弹簧储能 |
| 辅助开关 | VS1配套 | 2只 | 位置信号 |
| 二次控制开关 | 微型断路器6A | 10只 | 控制电源 |
| 接地开关操作机构 | JN15配套 | 1套 | 地刀操作 |
| 带电显示装置 | DXN-Q | 2套 | 带电指示 |
| 加热器 | 100W AC220V | 5只 | 防凝露 |
| 温湿度控制器 | 双路 | 2套 | 柜内环境控制 |
附录F:KITOZER售后服务体系
F.1 技术支持团队
KITOZER技术支持团队由以下人员组成:
– 电气工程师5名(负责方案设计和保护整定)
– 成套工艺工程师3名(负责生产和质量)
– 现场调试工程师4名(负责安装指导和调试)
– 售后维修工程师3名(负责故障处理和维护)
F.2 响应时间承诺
- 电话/微信技术支持:7×24小时,30分钟内回复
- 远程指导:2小时内通过视频或远程桌面协助
- 广州地区现场服务:4小时内到达
- 广东省内现场服务:24小时内到达
- 省外现场服务:48~72小时内到达
F.3 年度巡检服务
KITOZER为业主提供年度巡检服务包(可选):
– 每年1次现场巡检
– 红外热成像测温(全部高压柜)
– 保护装置定值复核
– 蓄电池容量核对性试验
– 五防联锁功能验证
– 二次端子紧固
– 出具年度巡检报告
年度巡检服务费约¥15,000~30,000/年(根据柜数量)。
Appendix A: Detailed Engineering Case Studies
A.1 Data Center 10kV Substation Case
Project: Tier III data center in a major Chinese city, 8kW per rack density, 500 racks, 4MW total IT load. Dual 10kV utility feeds, N+1 transformer redundancy.
Main wiring: Two independent 10kV feeds from two separate 110kV substations. Single busbar sectionalized with automatic bus transfer (BZT). Each section feeds four 2000kVA dry-type transformers (eight total). LV side pairs each transformer with a UPS and battery string. High-voltage lineup: 2 PT + 2 incoming + 2 metering + 8 transformer feeders + 1 bus-tie + 2 capacitor compensation + 1 station service = 18 KYN28A bays.
Key parameter selection: Upstream 110kV substation 10kV busbar short-circuit capacity 500MVA, fault current 28.9kA. Breakers selected VS1-1250A/31.5kA (8% margin). Main busbar TMY-100×10 copper, 1600A rating. Incoming CT 1000/5; feeder CT 300/5 (transformer rated 115A). Every feeder configured with transformer differential protection (2000kVA units, high reliability required). Arc protection sensors in every cabinet, tripping within 20ms.
Investment: HV switchgear ~¥3.2M, DC panel ¥150k, installation and commissioning ¥250k, total ~¥3.6M.
Commissioning notes: Data center project required live commissioning—energize one busbar section while the other was already carrying load, integrating bays one by one. BZT logic underwent 72 hours of simulated testing before handover.
A.2 Hospital 10kV Substation Case
Project: New surgical building at a tertiary hospital, 80,000m², 1500 beds. Operating rooms, ICU, and fire pumps classified as extra-special first-category loads.
Main wiring: One 10kV utility feed + one 10kV diesel generator (1600kW). Single busbar sectionalized with bus-tie. Six 1600kVA dry-type transformers serving: OR, ICU, general wards, offices, fire systems, HVAC. Twelve high-voltage bays.
Special requirements: Electrical interlock between generator incomer and utility incomer—parallel operation absolutely prohibited. Transformer feeders serving OR and ICU configured to alarm-only (no immediate trip) to prevent sudden outages during surgery; manual tripping by staff after confirmation. DC panel upsized to 200Ah to cover generator start-up interval. Acoustic shielding added to switchgear room (adjacent to patient wards).
A.3 Factory 10kV Substation Case
Project: Auto parts manufacturing plant with stamping, welding, and painting workshops. Total installed capacity 6000kVA.
Main wiring: Single dedicated 10kV utility feeder. Non-sectionalized single busbar with five transformers. Only five high-voltage bays: one PT + one incoming + one metering + two feeder (one feeder serving three smaller transformers). Simplest configuration, lowest cost.
Special considerations: Stamping presses create heavy impulse loads causing 10kV busbar voltage flicker. KITOZER upgraded capacitor compensation to thyristor-switched banks (replacing vacuum contactors), reducing response time from 30 seconds to 20ms and mitigating flicker.
A.4 Municipal Water Plant 10kV Substation Case
Project: Water treatment plant with intake pumps, delivery pumps, chemical dosing, sludge handling. 24/7 continuous supply.
Main wiring: Two 10kV feeds from different substations. Single busbar sectionalized. Four transformers: 2×1000kVA (intake pumps), 2×1600kVA (delivery pumps). Ten high-voltage bays.
Special requirements: Humid, corrosive environment. KYN28A upgraded to IP54 with humidity controllers and heaters inside every cabinet. Cabinet steel upgraded to 3mm thickness and 304 stainless steel (coastal site). All bolts stainless steel.
Appendix B: Busbar and Cable Selection Calculations
B.1 Main Busbar Copper Sizing
| Copper Bar (mm) | Rated Current (A) | Application |
|---|---|---|
| TMY-40×4 | ~400 | Small rooms |
| TMY-50×5 | ~630 | 630A cabinets |
| TMY-60×6 | ~800 | 800A cabinets |
| TMY-80×8 | ~1250 | 1250A cabinets |
| TMY-100×10 | ~1600 | 1600A cabinets |
| TMY-125×10 | ~2000 | 2000A cabinets |
| Double TMY-100×10 | ~2500 | 2500A cabinets |
Busbar contact surfaces must be tinned or silver-plated. Lap bolts: M12, minimum two bolts per busbar.
B.2 10kV Cable Selection
| Transformer kVA | Cable Type | Cross-section | Quantity |
|---|---|---|---|
| 315–500 | YJV22-8.7/15kV | 3×50mm² | 1 |
| 800 | YJV22-8.7/15kV | 3×95mm² | 1 |
| 1000–1250 | YJV22-8.7/15kV | 3×150mm² | 1 |
| 1600 | YJV22-8.7/15kV | 3×240mm² | 1 |
| 2000–2500 | YJV22-8.7/15kV | 3×300mm² | 2 parallel |
Cable terminations use cold-shrink or heat-shrink 10kV terminals. Cable armour/earth screen must float after passing through zero-sequence CT.
B.3 Earthing System Design
KYN28A earthing system includes:
– Cabinet protective earth: M10 bolt at cabinet bottom, connected to room main earth grid via -40×4mm galvanized flat steel
– Main earth copper bar: -40×4mm copper running the full lineup length, all cabinet earth bolts bonded to it
– Cable compartment earth: Separate copper bar in cable compartment for cable termination earth bonding
– Earthing switch earth: Static contact of earthing switch directly bonded to main earth copper bar
– Earthing resistance: Entire grid ≤4Ω (independent), ≤1Ω (shared with transformer neutral)
Appendix C: Secondary Circuit Wiring Details
C.1 Control Circuit Wiring
Control power originates from DC panel control bus (+KM, -KM), through each cabinet’s control supply MCB, to the internal terminal block. Typical control circuits:
Closing circuit: +KM → Closing pushbutton (or remote close contact) → Breaker NC auxiliary contact → Closing coil → -KM. The NC auxiliary contact prevents re-closing when the breaker is already closed.
Tripping circuit: +KM → Trip pushbutton (or remote trip / protection trip contact) → Breaker NO auxiliary contact → Trip coil → -KM. The NO auxiliary contact prevents re-tripping when already open.
Spring charging circuit: +KM → Charging motor → Limit switch (closed when uncharged) → -KM. The limit switch cuts motor power when spring is charged.
C.2 Signaling Circuit
Every cabinet transmits these signals to the SCADA system:
| Signal Name | Contact Type | Description |
|---|---|---|
| Breaker closed position | NO auxiliary | Closed when breaker is closed |
| Breaker open position | NC auxiliary | Closed when breaker is open |
| Spring charged | Limit switch | Closed when spring charged |
| Truck connected position | Limit switch | Closed in connected position |
| Truck test position | Limit switch | Closed in test position |
| Earth switch closed | Auxiliary contact | Closed when earth switch is on |
| Protection operated | Relay output | Closed on protection trip |
| Device fault | Relay output | Closed on relay self-test failure |
| Control circuit wire break | Relay output | Closed on trip/close circuit continuity loss |
These signals are collected by the relay’s digital inputs and transmitted via communication bus to the monitoring host.
C.3 CT/PT Secondary Wiring
CT secondary: Each CT winding S1 connects to the corresponding relay input; S2 is earthed. Differential protection windings from incoming, outgoing, and bus-tie CTs are series-connected. CT secondary circuits are shorted at the terminal block—during maintenance, short the CT secondary BEFORE disconnecting wires, to prevent open-circuit high voltage.
PT secondary: Star connection with neutral earthed at one point. Measurement and protection windings are separate. Open-delta winding brought out separately, reads ~0V normally. PT secondary side has MCB or fuse for short-circuit protection.
Appendix D: Protection Setting Calculation Template
D.1 Incoming Cabinet Protection Settings
Given: Incoming cable L=2km, 3×240mm². System short-circuit capacity Sd=300MVA. Total transformer capacity 4000kVA. CT ratio 600/5=120.
(1) Three-stage overcurrent:
Stage I (instantaneous): Set above max busbar fault current.
– Ikmax = 17.3kA; pickup = 1.3×17.3 = 22.5kA primary
– Secondary = 22500/120 = 187.5A; delay = 0s
Stage II (time-delayed instantaneous): Coordinate with outgoing feeder Stage I.
– Pickup = 1.1×2600 = 2860A primary; delay = 0.3s (0.3s grading margin above feeder)
Stage III (overload): Set above max load current.
– Max load = 231A; pickup = 1.3×231 = 300A; delay = 1.5s
(2) Zero-sequence: Pickup 10A primary, 2s delay, alarm.
D.2 Bus-tie Cabinet Protection
Bus-tie protection serves as busbar fault backup:
– Overcurrent pickup: ~400A (for carrying full load); delay 1s
– Charging protection: Temporary instantaneous protection (set for busbar fault) when energizing an empty busbar; withdrawn after charging complete
D.3 Capacitor Cabinet Protection
- Instantaneous overcurrent: Set to withstand capacitor inrush, typically 20× rated capacitor current
- Overvoltage: 1.1Un, 0.5s trip
- Undervoltage: 0.6Un, 1s trip (auto-cuts capacitors on system loss)
- Zero-sequence voltage: Internal capacitor fault protection
Appendix E: Recommended Spare Parts List
KITOZER recommends owners procure these spares at commissioning:
| Spare Part | Specification | Qty | Purpose |
|---|---|---|---|
| Breaker truck | Same rating as installed | 1 unit | Fast swap on failure |
| HV fuse | RN2-10/0.5A | 10 pcs | PT protection |
| HV fuse | Capacitor type | 10 pcs | Capacitor protection |
| Indicator lamps | AD16-22 series | 5 each color | Position indication |
| Trip/closing coil | VS1 compatible | 2 each | Breaker operation |
| Charging motor | VS1 compatible | 1 unit | Spring charging |
| Auxiliary switch | VS1 compatible | 2 units | Position signaling |
| Secondary MCB | 6A control | 10 pcs | Control supply |
| Earth switch mechanism | JN15 compatible | 1 set | Earth switch operation |
| Live display unit | DXN-Q | 2 units | Voltage presence indication |
| Cabinet heater | 100W AC220V | 5 units | Condensation prevention |
| Humidity/temp controller | Dual-channel | 2 units | Cabinet environment control |
Appendix F: KITOZER After-Sales Service System
F.1 Technical Support Team
KITOZER’s support team comprises:
– 5 electrical engineers (design and protection settings)
– 3 assembly process engineers (manufacturing and quality)
– 4 field commissioning engineers (installation guidance and testing)
– 3 after-sales service engineers (fault handling and maintenance)
F.2 Response Time Commitments
- Phone/WeChat support: 24/7, response within 30 minutes
- Remote assistance: Video or remote desktop within 2 hours
- Guangzhou metro on-site: Within 4 hours
- Guangdong province on-site: Within 24 hours
- Out-of-province on-site: Within 48–72 hours
F.3 Annual Inspection Service
KITOZER offers an optional annual inspection package:
– One site visit per year
– Infrared thermography on all HV cabinets
– Protection setting verification
– Battery capacity check (discharge test)
– Five-prevention interlock functional verification
– Secondary terminal re-torquing
– Annual inspection report
Annual inspection service fee: ¥15,000–30,000/year (depending on bay count).
Appendix G: Comparison with Alternative Technologies
G.1 KYN28A vs GIS-12 Gas-Insulated Switchgear
| Dimension | KYN28A-12 Air-insulated | GIS-12 Gas-insulated |
|---|---|---|
| Insulation medium | Air + composite barriers | SF6 gas sealed |
| Bay width | 800–1200mm | 600–800mm |
| Footprint | Standard | 30–40% smaller |
| Breaker maintenance | Truck withdrawable, spare swap | Whole bay outage required |
| Environmental tolerance | Moderate (controlled room) | Strong (dust/moisture) |
| Maintenance interval | 1–3 years truck service | 5–10 years gas check |
| Initial cost | Moderate | 30–50% higher |
| SF6 gas | None | Yes (greenhouse gas) |
| Fault visibility | Fully visible (openable compartments) | Hidden (sealed tank) |
| Best for | Conventional room, cost-sensitive | Tight space, harsh environment |
G.2 KYN28A vs RM6/Ring Main Unit
Ring main units (RM6, SafeRing) use SF6 or solid-insulation load switches + fuses. They are compact and cheap but limited to 630A and 20kA, with no breaker truck. Suitable for small building substations (<1000kVA per transformer). For industrial or data center substations with transformers above 1000kVA, KYN28A with breaker protection is required.
G.3 KYN28A vs Solid-Insulated Switchgear
Newer solid-insulated switchgear (e.g., Sion, SVS) encapsulates all live parts in epoxy resin. Benefits: compact, maintenance-free, no SF6. But cost is currently 2–3× KYN28A, and the installed base is small. KITOZER monitors this technology and expects it to become competitive around 2028.
Appendix H: Glossary of Terms
| Abbreviation | Full Term | Chinese |
|---|---|---|
| CT | Current Transformer | 电流互感器 |
| PT | Voltage Transformer (potential transformer) | 电压互感器 |
| HV | High Voltage | 高压 |
| LV | Low Voltage | 低压 |
| BZT | Bus Transfer (automatic) | 备自投 |
| SCADA | Supervisory Control and Data Acquisition | 数据采集与监控 |
| UPS | Uninterruptible Power Supply | 不间断电源 |
| VRLA | Valve-Regulated Lead-Acid (battery) | 阀控密封铅酸电池 |
| MCB | Miniature Circuit Breaker | 微型断路器 |
| MCCB | Moulded Case Circuit Breaker | 塑壳断路器 |
| ACB | Air Circuit Breaker | 框架断路器 |
| RMS | Root Mean Square | 有效值 |
| IP | Ingress Protection | 防护等级 |
| OEM | Original Equipment Manufacturer | 原始设备制造商 |
| CCCF | China Compulsory Certification (fire) | 消防产品认证 |
| TOU | Time-of-Use (metering) | 峰谷计量 |
End of KITOZER 10kV KYN28A-12 Engineering Manual. This document covers everything from system overview through structure, components, protection, installation, commissioning, maintenance, selection calculations, 30 FAQs, standards, and service. We hope it serves as a practical reference on your projects. Feedback and corrections welcome.
Appendix I: Switchroom Design and Construction Requirements
I.1 Switchroom Location Selection
The location of the 10kV switchroom directly affects power quality and capital cost. The room should be as close as possible to the load center, minimizing LV cable runs and voltage drop. In multi-story buildings, the room should be on the ground floor or basement level for convenient cable and cabinet access. In industrial plants, the switchroom should be near transformers and major equipment.
The switchroom must not be located directly below wet areas (bathrooms, kitchens), boiler rooms, or spaces with frequent water leakage. It must have fire-rated walls separating it from office areas, with Class A fire doors opening outward. The room should avoid dusty, corrosive, or vibration-heavy environments; if unavoidable, additional protection measures are required.
I.2 Switchroom Dimensions
Dimensions are determined by bay count and corridor requirements. Front operating corridor: minimum 1.5m for single-row arrangement, 2.0m for double-row face-to-face. Rear maintenance corridor: minimum 0.8m (0.6m acceptable with sufficient door swing). Room height: minimum 3m, accounting for 2.3m cabinet height plus bus duct and overhead space.
Floor elevation should be 150mm above exterior grade to prevent rainwater ingress. Cable trench depth minimum 0.8m, width per outgoing cable count. Trench covers should be reinforced concrete or checker plate rated for pedestrian traffic.
I.3 Ventilation and Lighting
The switchroom requires both natural and mechanical ventilation. When ambient temperature exceeds 40°C, install air conditioning or exhaust fans. Normal lighting: minimum 200 lux. Emergency lighting: minimum 50 lux, powered from the DC panel to maintain illumination during AC loss.
Emergency exit signs must be installed. Doors open outward and must not be locked or obstructed. “High Voltage — Authorized Personnel Only” warning signs at the entrance.
I.4 Cable Trench and Cable Installation
10kV cables enter from the external trench into the internal trench, then up through the cabinet floor. Cables should be neatly arranged, avoiding crossing, with identification tags. Power cables run on upper tiers; control cables on lower tiers. After cables enter the cabinet, seal the entry holes with fireproof mud.
Trench cable supports must be corrosion-protected. Tier spacing minimum 150mm. The trench must be free of water and debris, with a drainage slope of at least 0.5%.
Appendix J: Troubleshooting Diagnostic Procedures
J.1 Breaker Will Not Close
When the breaker fails to close, follow this diagnostic sequence:
Step 1 — Check control power: Verify DC panel control bus voltage is within 220V ±10%. If low, check battery and charger modules.
Step 2 — Check spring charge: Verify the spring-charged indicator lamp is on. If not, check charging motor supply and limit switch.
Step 3 — Check interlock conditions: Truck must be in connected or test position; earth switch must be open. If earth switch is closed, breaker cannot close.
Step 4 — Check closing coil: Measure coil resistance (typically ~110Ω). Infinite resistance means the coil has burned out and needs replacement.
Step 5 — Check relay lockout: Read the protection relay LCD for any lockout signal. Press reset to clear.
J.2 Breaker Trips Immediately After Closing
If the breaker trips right after closing, a protection element has operated. Step 1: Read the relay event record to identify which stage tripped. Instantaneous overcurrent indicates a short circuit—check cables and transformer. Time-delayed overcurrent indicates overload or downstream fault. Zero-sequence indicates an earth fault—check cable insulation. Control circuit wire-break indicates secondary wiring issues.
J.3 Truck Will Not Crank
If the truck cannot be pushed in or pulled out: Step 1 — confirm breaker is open (closing locks the crank mechanism). Step 2 — confirm earth switch is open (closed earth switch blocks truck movement). Step 3 — confirm secondary plug is disconnected before withdrawing. Step 4 — check rails for debris or deformation. Step 5 — verify mechanical coding lock matches (different ratings have different coding).
J.4 Abnormal Busbar Voltage
If PT cabinet voltage readings are abnormal: All three phases read zero — check PT truck seating, PT primary fuses, PT secondary MCB. One phase low, two normal — likely a blown primary fuse on that phase or an earth fault. One phase zero, other two rise to line voltage — solid metallic earth fault; immediately locate the faulted feeder. All three phases low — check PT secondary fuses or confirm system voltage is genuinely low.
Appendix K: KYN28A Retrofit and Smart Upgrade Options
K.1 Intelligent Retrofit
KYN28A cabinets operating for over 10 years can be upgraded without replacing the cabinet structure. Upgrade scope includes:
- Wireless temperature sensors: Monitor busbar joints, breaker contacts, and cable lugs. Data transmitted wirelessly to the monitoring platform.
- UHF partial discharge sensors: Detect internal PD signals, providing early warning of insulation degradation.
- Smart control unit: Replace conventional indicator lamps and selector switches with an LCD showing all position signals and temperature data.
- 4G communication module: Transmit operating data directly to a cloud platform for remote monitoring.
Retrofit cost: ¥10,000–20,000 per bay. Outage time: approximately 4 hours per bay. KITOZER provides complete retrofit services.
K.2 Protection Relay Upgrade
Legacy electromagnetic relays can be replaced with modern microprocessor relays. Benefits include more protection functions, more accurate measurement, event recording, and communication. Relay replacement does not require cabinet replacement—remove the old relay from the relay compartment, install the new one, re-wire, and re-set.
K.3 Breaker Upgrade
If the VS1 breaker has operated for over 15 years or approaches 10,000 mechanical operations, consider upgrading to a newer vacuum breaker. Newer models offer 30,000-operation mechanical life, longer electrical life, and smaller size. The entire truck is swapped—no cabinet modification needed.
Appendix L: Export Project Requirements
L.1 International Standards Compliance
KITOZER export KYN28A cabinets can be designed and tested to IEC 62271-200. For Southeast Asian, Middle Eastern, and African markets, Chinese standards are used with IEC test reports. European projects require CE certification. Middle Eastern projects require SASO certification.
L.2 Voltage and Frequency Adaptation
Domestic Chinese systems use 50Hz. Export projects must adapt to local parameters: Southeast Asia 50Hz (same voltage levels as China); Middle East 50Hz (some countries use 33kV systems); Africa 50Hz (some use 6.6kV); South America 60Hz (some use 13.8kV). KITOZER adjusts CT/PT ratios, protection settings, and motor voltages per the destination system.
L.3 Packaging and Shipping
Export packaging: EPE foam wrapping, corrugated corner protectors, steel bands on fumigated plywood pallets. Trucks packed separately in wooden crates. Documents in waterproof pouches. Loaded into 40ft HQ containers (6–8 × 800mm bays per container). Sea transit: 15–35 days depending on destination port.
Appendix M: Commissioning Checklist Template
M.1 Pre-energization Checklist
Before any energization, verify the following:
- [ ] All cabinets correctly positioned, leveled, and bolted to foundation
- [ ] Busbar joints torqued to specification and insulated
- [ ] All truck push-pull tests passed
- [ ] Five-prevention interlock tests passed on every bay
- [ ] Primary circuit insulation resistance >1000MΩ
- [ ] Primary circuit power-frequency withstand test passed (42kV/1min)
- [ ] Secondary circuit insulation resistance >1MΩ
- [ ] All CT secondary circuits closed (no open circuits)
- [ ] All PT secondary circuits free of shorts
- [ ] Protection relay settings match the setting calculation report
- [ ] Relay test set calibration verified (all stages trip at expected values)
- [ ] DC panel battery voltage normal, chargers floating correctly
- [ ] All cable entry holes sealed with fireproof mud
- [ ] Earthing continuity verified (<0.1Ω contact resistance)
- [ ] Switchroom clean, no tools or debris left inside
- [ ] All personnel clear of high-voltage areas
M.2 Energization Sequence Checklist
- [ ] All trucks in test position, breakers open
- [ ] PT truck inserted, PT energized, busbar voltage reading normal
- [ ] Incoming breaker truck pushed to connected position
- [ ] Incoming breaker closed, busbar live display confirmed
- [ ] Each feeder truck inserted and breaker closed one at a time
- [ ] Bus-tie closed (if required)
- [ ] 24-hour observation period started
- [ ] All measurements recorded (voltage, current, temperature)
M.3 Post-energization Acceptance
- [ ] Cabinet models and quantities match approved drawings
- [ ] All protection relays, meters, and communication ports operational
- [ ] Five-prevention interlocks verified in live condition
- [ ] Documentation handed over: certificates, factory test reports, component data, secondary schematics, wiring diagrams, O&M manuals
- [ ] Owner personnel trained on basic operation and emergency procedures
Appendix N: KITOZER Product Line Reference Table
N.1 KYN28A-12 Standard Bay Configurations
| Bay Type | Width | Rated Current | Breaking Current | Key Components | Ref. Price (RMB) |
|---|---|---|---|---|---|
| PT/Isolator | 800mm | — | — | JDZ10 PT, fuses, arrester | 80,000–120,000 |
| Incoming breaker | 1000mm | 1250A | 31.5kA | VS1, CT 600/5, relay | 160,000–220,000 |
| Metering | 800mm | — | — | 0.2S CT, 0.2 PT, meter | 90,000–130,000 |
| Feeder (small xfmr) | 800mm | 630A | 25kA | VS1, CT 200/5, relay | 120,000–180,000 |
| Feeder (large xfmr) | 1000mm | 1250A | 31.5kA | VS1, CT 400/5, relay | 160,000–220,000 |
| Bus-tie | 1000mm | 1250A | 31.5kA | VS1, BZT relay | 180,000–250,000 |
| Capacitor | 1000mm | 630A | 25kA | Contactor, reactor, caps | 200,000–350,000 |
| Station xfmr | 800mm | — | — | Isolator, 50kVA xfmr | 100,000–150,000 |
N.2 Optional Upgrades
| Upgrade | Description | Price Premium |
|---|---|---|
| Arc protection | UHF arc sensors per compartment | +¥15,000/bay |
| Wireless temperature | Contact temperature sensors | +¥8,000/bay |
| Smart control unit | LCD replaces lamps/switches | +¥12,000/bay |
| 304 stainless steel | Corrosion-resistant cabinet | +¥20,000/bay |
| IP54 upgrade | Gaskets, dust filters | +¥5,000/bay |
| Imported breaker | ABB VD4 or Siemens 3AE | +¥30,000–50,000/bay |
| Imported relay | Siemens or ABB relay | +¥20,000/bay |
| 4G cloud monitoring | Remote data to cloud platform | +¥10,000/bay |
End of KITOZER 10kV KYN28A-12 Engineering Manual. This document covers everything from system overview through structure, components, protection, installation, commissioning, maintenance, selection calculations, 30 FAQs, standards, case studies, troubleshooting, retrofit options, export requirements, and service. We hope it serves as a practical reference on your projects. Feedback and corrections welcome — we will incorporate them in the next edition.
Appendix O: Common Selection Mistakes and Best Practices
O.1 Selection Mistakes
In engineering practice, KITOZER has observed several common mistakes made by owners and designers when selecting 10kV switchgear.
Mistake 1: Thinking higher rated current is always better. Some owners blindly specify 3150A breakers and busbars, believing this is “safer.” In reality, higher rated current means wider cabinets, higher cost, and more losses. The correct approach is to select based on actual load current with 20–30% margin. For example, a 1600kVA transformer draws 92A at 10kV; a 630A breaker provides nearly 7× margin, which is ample.
Mistake 2: Ignoring short-circuit current levels. Some projects specify only rated current without calculating fault current, resulting in breakers with insufficient interrupting capacity. If the system fault current reaches 31.5kA but a 25kA breaker is installed, a short circuit could cause catastrophic failure. Always obtain system fault parameters from the utility and select breaker interrupting capacity accordingly.
Mistake 3: Oversizing CT ratios. Some owners specify 600/5 CTs instead of 200/5 “for future expansion.” The result is that normal operation shows only one-third of full scale on ammeters, metering accuracy drops, and protection sensitivity suffers. Size CTs for current load; replace or add CTs when expanding.
Mistake 4: Compromising five-prevention interlocks. Some projects remove mechanical interlocks to save money, relying on electronic interlocks alone. When electronic devices fail, safety protection vanishes. Five-prevention must be primarily mechanical—the last line of defense.
O.2 Installation Best Practices
Common installation issues include: busbar contact surfaces not cleaned before bolting, causing high contact resistance and overheating; torque wrenches not used per specification, causing loose bolts or deformed busbars; poorly crimped secondary wires that loosen over time; cable bending radius violations that damage insulation; unreliable earthing connections with excessive resistance.
KITOZER recommends pre-installation technical briefing for the construction team, defining quality requirements for every process. Critical tasks—busbar jointing, secondary wiring, earthing connections—must be performed by experienced electricians and inspected by supervision.
O.3 Maintenance Best Practices
Common maintenance issues include: years without withstand testing, missing insulation defects; protection settings arbitrarily changed, losing protective function; batteries never load-tested, capacity unknown when needed; dust accumulation inside cabinets reducing insulation; damaged heaters not replaced, causing condensation incidents.
KITOZER recommends establishing comprehensive equipment records and maintenance schedules, strictly following DL/T 596 preventive test codes. Conduct a full inspection before each rainy season; perform withstand tests and breaker characteristic tests every three years.
Appendix P: Industry Trends and KITOZER Outlook
P.1 Intelligence
10kV switchgear is evolving from “mechanical switch + simple protection” into a “smart distribution node.” Future cabinets will integrate: built-in power quality analysis (harmonics, flicker, unbalance); AI predictive maintenance (contact temperature rise and operation count predicting remaining life); cloud connectivity (4G/5G directly to vendor cloud); BIM integration (locating faulty cabinets in 3D building models).
KITOZER already offers contact temperature monitoring and AI life prediction in new models; a cloud-connected version is expected in 2027.
P.2 Environmental
As global greenhouse gas concerns grow, SF6-insulated equipment faces regulatory pressure. The EU has already legislated SF6 restrictions. KITOZER’s KYN28A air-insulated cabinets contain no SF6, aligning with environmental trends. Solid-insulation switchgear (no insulating gas at all) is expected to become more common.
P.3 Compactness
As urban land becomes more valuable, switchroom footprint shrinks. KYN28A widths are trending from 800mm toward 650mm through improved insulation and contact design. KITOZER is developing a compact KYN28A that reduces width from 800mm to 650mm, saving approximately 20% of switchroom area.
P.4 Standardization and Customization
On one hand, KYN28A structure and parameters are highly standardized with a mature supply chain and declining costs. On the other hand, owners increasingly demand customized appearance, color, communication protocols, and alarm point lists. KITOZER builds to drawing rather than stocking standard products—lead times are longer, but customer retention is high.
Appendix Q: About KITOZER and Contact Information
Guangzhou Laian Intelligent System Development Co., Ltd. (brand: KITOZER), founded in 2006, is a high-tech enterprise integrating R&D, manufacturing, sales, and service, headquartered in Panyu, Guangzhou. The KITOZER brand focuses on industrial electrical equipment and intelligent systems.
The manufacturing base in Panyu covers approximately 5000 square meters, equipped with CNC press brakes, laser cutters, powder coating lines, and assembly workshops. Annual production capacity: 500 high-voltage switchgear bays, 2000 low-voltage switchgear bays, 300 DC panels, 1000 outdoor cabinets.
Main product lines: 10kV/35kV high-voltage switchgear (KYN28A/XGN/GIS), 0.4kV low-voltage switchgear (GCS/GCK/MNS/GGD), DC operating power systems, data center micro-module rooms, outdoor integrated cabinets, smart power environment monitoring systems, and weak-current system integration solutions. Products serve data centers, hospitals, schools, commercial complexes, industrial plants, municipal water, renewable energy stations, and rail transit.
The company holds ISO9001 quality management, ISO14001 environmental management, and ISO45001 occupational health and safety certifications. High-voltage switchgear has passed type testing at the National High-Voltage Electric Appliance Quality Inspection Center.
Contact KITOZER:
- Tel / WeChat: +86 13922289957
- Tel / WeChat: +86 18520668845
- WhatsApp: +86 19068534140
- Domestic website: lain.com.cn
- International website: gdlain.com
- Address: Chaotian Park, Zhongrun Industrial Zone, No. 5 Huashan Road, Shilou, Panyu, Guangzhou, China
KITOZER engineers respond within 24 hours to technical inquiries and quotation requests. Whether you need a single KYN28A bay or a complete 10kV substation packaged solution, we are ready to help.
End of document. © 2026 Guangzhou Laian Intelligent System Development Co., Ltd. All rights reserved. KITOZER is a brand of Guangzhou Laian. This engineering manual is for reference; actual specifications are governed by contract drawings.
Appendix R: Detailed Test Procedures and Acceptance Standards
R.1 Factory Routine Tests
Every KYN28A cabinet completes the following routine tests before shipment, documented in the factory test report:
(1) Visual and structural inspection: Check that powder coating is uniform with no scratches or deformation; doors open and close smoothly with good sealing; observation window glass intact; all fasteners present and tight; no tools or debris left inside.
(2) Main circuit resistance measurement: Use the DC voltage drop method to measure per-phase main circuit resistance. Value should not exceed 120% of factory baseline. Excessive resistance indicates poor contact or inadequate busbar surface preparation.
(3) Main circuit power-frequency withstand test: Apply 42kV power-frequency voltage per phase (other phases earthed) for one minute. No breakdown or flashover permitted. With breaker open, also apply 48kV across the contact gap for one minute.
(4) Auxiliary circuit power-frequency withstand: Apply 2kV power-frequency to secondary circuits for one minute. No breakdown.
(5) Mechanical operation test: Operate the breaker five times (trip/close), verifying smooth and reliable action. Cycle the truck five times through connected/test positions. Verify all five-prevention interlocks.
(6) Protection rating check: Verify door seals intact, shutter mechanism functional, cable entries sealed.
R.2 Site Acceptance Tests
After on-site installation, the following acceptance tests are performed:
(1) Main circuit insulation resistance: 2500V megger, should be >1000MΩ. If significantly below factory value, transport or installation may have damaged insulation.
(2) Main circuit AC withstand test: At 80% of factory voltage (33.6kV) for one minute. Lower than factory because field conditions are less controlled and the equipment has already been vibration-tested during transport.
(3) Breaker mechanical characteristics: Use a breaker analyzer to measure trip time, close time, three-pole simultaneity, contact stroke, and overtravel. All parameters must be within factory tolerance.
(4) CT/PT tests: Verify ratio and polarity against nameplate. Measure secondary winding DC resistance. Check secondary-to-earth insulation.
(5) Protection relay calibration: Use a relay test set to inject simulated current/voltage, verifying each stage’s pickup value (±5%) and operating time (±5%).
(6) Five-prevention interlock test: Verify all five functions. Any failure must be corrected before energization.
(7) Load check: After energization, measure load current, voltage, and power on each circuit. Compare with design values. Verify CT secondary current is correct. Verify power direction.
R.3 Preventive Test Schedule
Per DL/T 596 preventive test code: main circuit insulation resistance every 3 years; main circuit AC withstand every 6 years or after overhaul; breaker mechanical characteristics every 3 years; vacuum interrupter vacuum check every 3 years (42kV gap withstand); CT/PT testing every 6 years; secondary circuit insulation annually; battery capacity discharge test annually.
Appendix S: Installation Environment Requirements
S.1 Ambient Temperature
KYN28A is rated for -5°C to +40°C, with 24-hour average not exceeding 35°C. Above 40°C, current-carrying capacity must be derated. Below -5°C, cabinet heaters are required to prevent condensation. The switchroom should have temperature controllers that activate exhaust fans or air conditioning when overheated.
S.2 Humidity
Relative humidity must not exceed 90%, and condensation is not permitted. With large diurnal temperature swings or high ambient humidity, every cabinet must have heaters and humidity/temperature controllers. Heaters activate at 70% RH or below 5°C, warming cabinet air above dew point.
S.3 Pollution Degree
KYN28A is rated for pollution degree 3 (per GB 3906)—general industrial and commercial environments. For environments with heavy dust, corrosive gases, or conductive dust, upgrade protection rating and shorten maintenance intervals. Coastal sites require stainless steel or enhanced anti-corrosion coating.
S.4 Altitude
Standard KYN28A is rated up to 1000m altitude. Above 1000m, reduced air density lowers insulation strength and requires derating. At 2000m, insulation level requires approximately 15% margin. KITOZER provides altitude-corrected parameters for sites above 1000m.
End of document.
Appendix T: LV System Coordination Details
T.1 Protection Grading Between HV and LV
The 10kV outgoing feeder protection and the 0.4kV LV incoming breaker protection must have clear time grading to ensure LV-side faults trip the LV breaker first without HV backup tripping.
Specific grading: LV air circuit breaker long-delay 0.4–1s, short-delay 0.2–0.5s. HV outgoing overcurrent 0.5–1s (one grade above LV short-delay). This ensures that during LV busbar faults, the LV incoming breaker trips first while the HV overcurrent has not yet timed out.
For severe LV-side faults, the LV breaker instantaneous element trips; the HV instantaneous element should not operate because its pickup is set above the LV fault current referred to HV side.
T.2 Transformer Rating and LV Cabinet Matching
| Transformer kVA | LV Incoming ACB | Capacitor Bank |
|---|---|---|
| 800 | 1600A frame | 200–250kvar |
| 1250 | 2000A frame | 300–375kvar |
| 1600 | 2500A frame | 320–480kvar |
| 2000 | 3200A frame | 400–600kvar |
T.3 DC Panel Role in the Overall System
The DC panel is the “heart power supply” of the entire 10kV distribution system. It provides uninterrupted DC power for all breaker trip/closing operations, protection relays, monitoring systems, and emergency lighting.
Comprising charging modules, a battery bank, monitoring unit, and feeders: during normal operation, chargers rectify AC380V to DC220V, floating-charging the battery while supplying feeders. During total AC loss, the battery bank automatically takes over, ensuring operators can safely trip breakers. KITOZER DC panels are typically 100Ah or 200Ah, using maintenance-free VRLA batteries.
Appendix U: Additional FAQ
Q: What is the typical service life of KYN28A?
Cabinet steel structure: 30+ years. Breaker mechanical life: 10,000 operations (~27 years at 1 operation/day). Relay electronics: 15–20 years. With proper maintenance, the complete installation lasts 25–30 years. Main replacement items are relays and batteries (~every 15 years).
Q: Is operational noise normal?
Normal operation produces only a faint mains hum, approximately 40–50dB, barely audible outside the switchroom. Audible buzzing or vibration indicates loose busbars or components requiring de-energized inspection. Hissing/crackling indicates insulation problems requiring immediate attention.
Q: Do cabinets need periodic cleaning?
Yes. Annually blow out accumulated dust with dry compressed air, especially on insulator surfaces and busbar joints. Dust reduces insulation strength and may cause flashover in humid weather. Cleaning must follow LOTO procedures: de-energize, verify dead, apply safety ground.
Q: Can relay compartment doors be opened during operation?
Yes—the relay compartment is fully isolated from high-voltage areas. Truck compartment and cable compartment doors must never be opened during operation; five-prevention interlocks lock them shut. Even if mechanical interlocks fail, the live display electromagnetic lock prevents door opening.
Q: What is the lead time?
Standard KYN28A: 30–45 days from drawing approval. Imported components or custom: 60–75 days. KITOZER stocks common components and can compress to 25 days.
End of document.
Appendix V: KITOZER Quality Assurance System
KITOZER maintains a comprehensive quality management system controlling every process from raw material procurement to factory shipment.
Procurement: All steel sheets, copper bars, breakers, transformers, and relays are purchased from approved vendors. Every batch is inspected for certificates and appearance. Critical components (VS1 breakers, protection relays) require type test reports and factory test certificates from suppliers.
Production: Cabinet welding undergoes dimensional inspection before painting; surface preparation precedes powder coating; every assembly station performs inter-process inspection. No non-conforming product passes to the next station.
Factory testing: Every cabinet completes routine tests: visual inspection, main circuit resistance measurement, power-frequency withstand, mechanical operation test, and five-prevention interlock verification. A factory test report accompanies each cabinet.
After-sales: Customer records track every cabinet’s model, configuration, delivery date, and commissioning history. Periodic follow-up calls check operating condition and provide technical support.
KITOZER warranty: manufacturing defects are repaired or replaced free during the warranty period. After warranty, discounted lifetime repair service is available.
Appendix W: KITOZER Competitive Advantages
KITOZER’s differentiated strengths in 10kV switchgear:
(1) Build-to-drawing capability: KITOZER does not stock standard products—every cabinet is custom-engineered from the project’s single-line diagram, layout, and utility requirements. Customers receive exactly what their site needs rather than accepting compromise from stock products.
(2) Full-chain service: From scheme design and protection setting through manufacturing, installation supervision, and commissioning, KITOZER provides one-stop service. Customers do not need to coordinate separate design institutes, assembly plants, and commissioning teams.
(3) Rapid response: The engineering team is based in Guangzhou—24-hour on-site response within Guangdong province, 48–72 hours out-of-province. Phone and WeChat support is 24/7 with 30-minute response.
(4) Value engineering: Cabinets are domestically manufactured for cost control, but breakers and relays can be specified as first-tier brands. Customers choose their configuration based on budget without paying unnecessary brand premiums.
(5) Continuous technology upgrade: KITOZER invests in R&D annually, developing wireless temperature monitoring, partial discharge detection, smart control units, and cloud platform connectivity—helping customers upgrade existing installations over time.
End of KITOZER 10kV KYN28A-12 Engineering Manual. Thank you for reading.
Appendix X: Ordering Guide and Technical Agreement
When procuring KYN28A switchgear, owners should sign a detailed technical agreement with the manufacturer. The agreement should cover at minimum:
(1) Single-line diagram: Defining each cabinet’s function, truck type, CT/PT ratios, protection configuration, and cable arrangement. The SLD is the foundation of the entire project and must be confirmed by the design institute and utility.
(2) Cabinet parameters: Width, depth, height, protection rating, color, mounting method. For special environments, specify whether to upgrade IP rating, use stainless steel, or add heaters and humidity controllers.
(3) Component brands: Breaker brand and model, CT/PT brand, protection relay brand, DC panel brand. Specifying key component brands ensures quality but affects pricing—budget accordingly.
(4) Delivery scope: What is included vs excluded. Cable terminals, bus duct, civil works, and third-party testing are typically not included in the switchgear price.
(5) Delivery schedule and payment: Lead time from drawing approval to delivery, payment milestones and percentages. KITOZER standard: 30% on contract signing, 60% before shipment, 10% after acceptance.
(6) Technical documentation: Certificates, factory test reports, secondary schematics, wiring diagrams, O&M manuals, packing list.
(7) After-sales service: Warranty period, response time, on-site service scope.
KITOZER discusses all of these points with owners and designers at project kickoff, ensuring shared understanding of deliverables and technical requirements.
Appendix Y: Final Notes
This engineering manual has covered the KYN28A-12 10kV high-voltage switchgear from every angle: system context, cabinet structure, core components, five-prevention interlocks, full bay lineup, protection relay configuration, secondary circuits and communication, installation and commissioning, maintenance, LV coordination, selection calculations, 30 FAQs, industry standards, case studies, troubleshooting, retrofit options, export requirements, quality assurance, and ordering guidance.
Whether you are an electrical designer selecting equipment for a new substation, a maintenance engineer troubleshooting an existing installation, or a project manager planning procurement, we hope this manual serves as a practical, field-tested reference.
KITOZER welcomes your inquiries. Send us your single-line diagram or load list, and our engineers will prepare a tailored quotation and technical proposal within 24 hours.
End of document. © 2026 Guangzhou Laian Intelligent System Development Co., Ltd. All rights reserved.
Appendix Z: Quick Reference Summary
For busy engineers who need the essentials at a glance:
KYN28A-12 at a glance: 12kV indoor metal-clad withdrawable switchgear. Four compartments (truck, busbar, cable, relay). VS1 vacuum breaker on withdrawable truck. Air-insulated. Standard widths 800/1000/1200mm. Heights 2300mm. Depths 1500–1660mm.
Selection checklist: (1) System short-circuit current → breaker breaking rating (20/25/31.5/40kA). (2) Circuit load current → rated current (630–3150A). (3) Transformer kVA → CT ratio and feeder breaker size. (4) Protection requirements → relay model. (5) Cable arrangement → cabinet width and cable compartment size.
Five-prevention: (1) No accidental breaker trip/close. (2) No load switching of disconnector. (3) No earth switch on live circuit. (4) No energizing with earth closed. (5) No entry into live compartment.
Key standards: GB 3906, DL/T 404, IEC 62271-200, GB 50053, GB 50060.
KITOZER contact: +86 13922289957 / +86 18520668845 / WhatsApp +86 19068534140. lain.com.cn / gdlain.com.
Thank you for choosing KITOZER. We look forward to supporting your next 10kV substation project.
End of document.
Appendix AA: Why Choose KITOZER for Your 10kV Switchgear Project
AA.1 Engineering Depth
KITOZER does not merely assemble cabinets from purchased components. Our engineering team participates in the project from the earliest design stage, reviewing the single-line diagram, checking short-circuit levels, recommending protection settings, and flagging potential coordination issues before manufacturing begins. This front-end engineering depth prevents costly field rework and ensures the delivered switchgear performs as designed.
AA.2 Manufacturing Quality
Every KYN28A cabinet passes through our in-house production line: CNC laser cutting, CNC press brake forming, robotic welding, automatic powder coating line, and skilled manual assembly. We do not outsource critical structural work. Our quality inspectors check every cabinet at three stages: after welding, after painting, and after final assembly. Only cabinets passing all inspections proceed to routine testing.
AA.3 Commissioning Support
Delivery is not the end of our involvement. KITOZER sends experienced commissioning engineers to site for installation guidance, secondary wiring verification, protection relay calibration, five-prevention interlock testing, and energization support. We work alongside your electrical contractor and supervision engineer to ensure a smooth, safe handover.
AA.4 Long-Term Partnership
After commissioning, KITOZER remains your long-term partner. We provide spare parts, maintenance contracts, retrofit upgrades, and technical consultation for the entire 25–30 year service life of your switchgear. Our customer database tracks every cabinet’s configuration, enabling us to ship the correct spare parts quickly when needed.
AA.5 Global Reach
While headquartered in Guangzhou, KITOZER exports to Southeast Asia, the Middle East, Africa, and South America. We understand international standards (IEC, CE, SASO), export packaging requirements, and shipping logistics. Our English-speaking engineering team supports overseas projects from initial inquiry through final commissioning.
End of document. Thank you for reading the KITOZER 10kV KYN28A-12 Engineering Manual.
Appendix AB: Frequently Requested KITOZER Configurations
Below are three commonly requested KYN28A configurations that KITOZER supplies regularly:
Configuration 1: Small Commercial Building (800kVA transformer)
– 1 PT/incoming cabinet (combined)
– 1 metering cabinet
– 1 transformer feeder cabinet
– 1 DC panel (65Ah)
– Total: 3 HV bays + 1 DC panel
– Reference price: approximately ¥280,000
Configuration 2: Medium Factory (2×1600kVA transformers, single feed)
– 1 PT/incoming cabinet
– 1 metering cabinet
– 2 transformer feeder cabinets
– 1 capacitor compensation cabinet
– 1 DC panel (100Ah)
– Total: 5 HV bays + 1 DC panel
– Reference price: approximately ¥650,000
Configuration 3: Data Center (2×2000kVA, dual feed, sectionalized)
– 2 PT cabinets
– 2 incoming breaker cabinets
– 2 metering cabinets
– 4 transformer feeder cabinets
– 1 bus-tie cabinet with BZT
– 2 capacitor compensation cabinets
– 1 DC panel (200Ah)
– Total: 14 HV bays + 1 DC panel
– Reference price: approximately ¥2,200,000
These are reference configurations. Every KITOZER project is custom-engineered based on the owner’s specific single-line diagram, utility requirements, and site conditions. Contact us for a tailored quotation.
End of document.
Appendix AC: Document Revision History
| Version | Date | Changes |
|---|---|---|
| v1.0 | 2026-10-16 | Initial technical parameter comparison (GIS vs KYN28A) |
| v2.0 | 2026-10-16 | Expanded to full engineering design manual: 14 chapters, 30 FAQs, appendices A–AC, bilingual Chinese/English, full SEO metadata |
This document will be updated periodically. Readers are encouraged to submit corrections and suggestions to KITOZER engineering. The latest version is always available at lain.com.cn and gdlain.com.
End of KITOZER 10kV KYN28A-12 Engineering Manual v2.0. © 2026 Guangzhou Laian Intelligent System Development Co., Ltd.
Thank you for investing your time in this comprehensive engineering manual. We understand that selecting, installing, and maintaining 10kV switchgear is a serious responsibility with direct implications for personnel safety and business continuity. KITOZER is committed to being your reliable partner in every project phase—from the first technical consultation through decades of operation. Our engineers are ready to answer your questions, review your drawings, and provide a competitive, detailed quotation. Contact us today.
We look forward to hearing from you. KITOZER — engineering trust, one cabinet at a time.
Guangzhou Laian Intelligent System Development Company, since 2006, serving industrial power distribution customers worldwide with quality switchgear solutions.