Table of Contents
Toggle1. Cover / Document Information
– Document Title: Low-Voltage AC PV Grid-Connected Metering Cabinet, DC Combiner System and Power Station Integration Technical Design Solution
– Prepared by: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Date: August 2026
– Version: V1.0
– Project Type: Technical design solution for Low-Voltage AC PV Grid-Connected Metering Cabinet, DC Combiner System and Power Station Integration
2. Table of Contents Structure
1. Company Introduction
2. Project Overview
3. User Requirement Analysis
4. Overall Design Description
5. Detailed System Design and Product Technical Parameters
6. Project Quotation and Configuration List
7. Core Solution Advantages
8. Technical Q&A
9. Construction Schedule Plan
10. Construction Organization Plan
11. After-Sales Service System
12. Operation and Maintenance Training Plan
13. Typical Project Cases
14. SEO Optimization System and Website Backend Configuration
15. Contact Information
3. Company Introduction
3.1 Company Development Overview
Founded in 2002, Guangzhou Lain Intelligent System Development Co., Ltd. is a high-tech enterprise dedicated to the computer room construction and intelligent protection field for more than two decades, integrating R&D, production, sales, engineering implementation and after-sales service. The company focuses on innovative breakthroughs in electromagnetic shielding technology, modular computer room technology and computer room environmental monitoring technology, and has grown into a source manufacturer with core competitiveness in the domestic computer room construction field.
After more than twenty years of industry accumulation, the company has built a large-scale production and manufacturing base equipped with advanced CNC sheet metal processing equipment, automated spraying production lines and professional testing laboratories, with an annual production capacity of hundreds of sets of shielding computer rooms, integrated cabinets and micro-module products. The company’s service network covers all provinces and cities across the country, providing thousands of computer room construction and renovation services for customers in government, military, scientific research, finance and enterprise fields.
3.2 Core Business System
The company’s core business revolves around the full-lifecycle construction of computer rooms, forming four major product and service systems:
– Computer room EPC general contracting service: one-stop services from solution design, manufacturing, on-site construction to commissioning and acceptance, covering shielding computer rooms, IDC data rooms, modular computer rooms, container computer rooms and other types;
– Core equipment R&D and production: independently produces KITOZER brand series products, including shielding cabinets, shielding desks, consoles, integrated data cabinets, micro-module cold aisle cabinets, outdoor rainproof cabinets, etc., supporting non-standard customization;
– Computer room environmental monitoring system: provides full-element monitoring solutions for temperature and humidity, water leakage, access control, video, fire protection, UPS and power distribution, realizing intelligent and unattended O&M;
– Shielding and security protection products: shielding rooms, shielding doors and windows, anechoic chambers and related auxiliary materials, widely used in confidential, military and scientific research fields.
3.3 Brand and Qualification Honors
The core brand KITOZER (Pioneer) focuses on computer room equipment and shielding products, positioned as an “efficient, green, innovative and safe” solution provider. Products have passed multiple authoritative tests and comply with national and industry standards. The company holds multiple utility model patents and software copyrights, has been awarded high-tech enterprise qualification, and follows the ISO9001 quality management standard.
3.4 Core Competitive Advantages
1. Source production, controllable quality: own production base and professional processing equipment; core products independently produced with full-process quality control, providing more cost-effective solutions without intermediate links;
2. Customized design, matching needs: tailor-made solutions per site conditions, technical requirements, configuration and budget, with multiple design options provided free of charge;
3. Professional team, rich experience: a professional technical team of engineers and project managers with more than ten years of industry experience;
4. Quality after-sales, full guarantee: a 7×24 professional online service system with dedicated project follow-up from early coordination to later O&M.
4. Project Background and Objectives
4.1 Project Background
Under the dual-carbon strategy and green energy policies, distributed PV has become a key way for industrial enterprises to reduce electricity costs and achieve energy saving and emission reduction. This project adds distributed PV grid-connection facilities to the existing 2# power station’s transformer and distribution substation: low-voltage AC PV grid-connection metering cabinets, DC PV combiner cabinets and supporting access systems — achieving reliable grid connection, precise metering, safety protection and intelligent monitoring of PV generation, improving green energy consumption and optimizing the power structure.
4.2 Construction Objectives
– Safe grid connection: 6 PV inverter circuits reliably connected to the low-voltage sides of 2 dedicated transformers, total capacity 2200kW;
– Precise metering: trade-level metering per utility requirements with bidirectional energy measurement;
– Comprehensive protection: undervoltage release, anti-islanding, overload, short-circuit, residual current and surge protection;
– Intelligent monitoring: real-time parameter collection with remote transmission to the station monitoring platform;
– Seamless integration: compatible with the existing substation, no impact on normal supply; reactive compensation adapted.
4.3 Design Scope
All electrical equipment, structures, auxiliaries and services for three stages: PV DC combining, AC grid-connection metering, and substation-side access — 6 low-voltage AC PV metering cabinets (2× 300kW + 4× 400kW), 4 fixed DC PV combiner cabinets, substation low-voltage access retrofit, reactive compensation adaptation, cables/busbars/grounding, installation, commissioning, acceptance, training and after-sales.
5. User Requirement Analysis
5.1 Grid Connection Requirements
6 PV inverter outputs connect to TM1/TM2 10/0.4kV dedicated transformers’ low-voltage sides (TM1: 1× 300kW + 2× 400kW; TM2: same; total 2200kW). Connection via busbar direct splicing and outgoing switch cable access, meeting low-voltage grid-connection electrical clearance, temperature rise and dynamic/thermal stability requirements.
5.2 Metering Requirements
– Trade settlement: independent metering per grid-connection point with 0.2S-class metering CTs, reserved utility meter positions, sealing and anti-tamper structure per utility acceptance standards;
– Operation monitoring: multi-function power meters and DC smart meters for AC full-parameter monitoring and DC branch generation statistics with remote transmission;
– Bidirectional metering: forward/reverse energy for PV generation, grid feed-in and self-consumption statistics.
5.3 Protection Requirements
– AC side: overload long-delay, short-circuit short-delay, instantaneous short-circuit three-level protection; residual current (500mA); undervoltage release; anti-islanding;
– DC side: DC overload/short-circuit protection; insulation monitoring and ground fault location;
– Surge: Class I SPD against lightning-induced and switching overvoltages;
– Isolation: disconnecting switches forming visible break points for maintenance safety.
5.4 Monitoring and Communication
All smart meters and protection devices with RS485 Modbus-RTU; collect voltage, current, power, energy, power factor, frequency, switch status and fault alarms; integrate with the station power monitoring system or energy management platform for remote monitoring, data storage, alarms and reports.
5.5 Structure and Environment
GGD fixed-type cabinets, indoor, protection ≥IP3X; coordinated color/size with existing equipment; environment -10℃~+40℃, altitude ≤2000m; maintainable with modular universal components.
5.6 Construction and O&M
Minimize impact on normal supply with dedicated outage construction plans and safety measures; complete documentation and training; long-term support and spare parts.
6. Design Principles and Applicable Standards
6.1 Design Basis
GB/T 19964 (PV power station grid-connection technical requirements), GB 50054 (low-voltage distribution), GB 50053 (distribution substation design), GB/T 14285 (relay protection), GB 50057/GB 50343 (lightning protection), GB/T 14549 (power quality), DL/T 448 (metering device management), and utility grid-connection regulations.
6.2 Design Principles
1. Safety and reliability: multi-level protection, clear isolation points, compliance with grid codes;
2. Compliance: metering per utility standards; equipment certified;
3. Precision: 0.2S metering CTs for accurate settlement;
4. Intelligence: full parameter monitoring with remote communication;
5. Adaptability: customized to site conditions and existing substation;
6. Economical and maintainable: optimized configuration, modular components, easy O&M.
7. System Architecture and Working Principle
7.1 Overall System Architecture
PV strings → DC combiner cabinets (7 inputs, DC750V, insulation monitoring, fault location) → inverters (6 circuits) → AC metering cabinets (300kW/400kW with metering, protection, anti-islanding) → TM1/TM2 low-voltage busbars → substation access with reactive compensation adaptation → station monitoring platform via RS485/Modbus.
8. Detailed Technical Design
8.1 300kW PV Grid-Connection Metering Cabinet (GGD, 800×1000×2200mm)
– Cabinet: GGD fixed, IP3X, cold-rolled steel; main busbar TMY-3×(40×5)+1×(30×4) with N/PE bars; connecting busbar to LV busbar;
– Main MCCB: 4P 500A electronic PV type with undervoltage release and residual current protection;
– Disconnecting switch HD13BX-800/41; 3× outgoing 3P 200A thermal-magnetic MCCBs;
– Metering CTs 500/5A 0.2S (6), measuring CTs 0.5 (3), protection CTs 10P10 (3);
– Class I SPD 4P 12.5kA 10/350μs with backup breaker; multi-function power meter (RS485);
– Professional anti-islanding protection device with communication;
– Secondary accessories (terminals, wires, indicators, buttons); grounding system; 10# channel steel base.
8.2 400kW PV Grid-Connection Metering Cabinet (GGD, 800×1000×2200mm)
– Main busbar TMY-3×(50×5)+1×(30×4); main MCCB 4P 630A electronic PV type with undervoltage release and residual current protection;
– Disconnecting switch HD13BX-800/41; metering CTs 600/5A 0.2S (6), measuring 0.5 (3), protection 10P10 (3);
– Class I SPD 4P 12.5kA with backup breaker; multi-function meter; anti-islanding device;
– Incoming cable WDZB1-YJY-0.6/1kV-2×(4×240+1×120) per cabinet.
8.3 DC PV Combiner Cabinet (7-input, DC750V, 600×1000×2200mm)
– Cabinet fixed, IP3X; DC busbar TMY-2×(50×5) positive/negative + PE;
– 7× input 2P 50A DC1000V electric breakers with auxiliary contacts; 1× output 2P 500A DC1000V breaker;
– 7× Hall current sensors (50A, open-loop, class 1); 7× DC smart meters (rail type, RS485, time-of-use);
– DC insulation monitoring device (IM400, DC750V, alarm output); DC fault location device (IFL12C, 12 circuits);
– Switching power AC220V→DC24V/5A; secondary accessories; grounding; 10# channel steel base.
8.4 Substation Access Retrofit
– Reactive compensation controller replaced with PV bidirectional 12-circuit type with communication (×2) — adapting compensation to PV feed-in;
– Grounding materials (flat steel, angle steel, wires) for grounding network interconnection;
– Cable auxiliaries (cable terminations, ties, fixtures); grid-connection interface terminal per utility requirements.
8.5 Protection and Metering Summary
AC three-level overload/short-circuit protection, residual current 500mA, undervoltage release, anti-islanding; DC overload/short-circuit, insulation monitoring and fault location; Class I surge protection; trade-level 0.2S metering with sealed anti-tamper structure; bidirectional energy measurement; full RS485 Modbus-RTU communication to the station platform.
9. Recommended Configuration and Preliminary Budget
9.1 AC Metering Cabinets (6)
| Item | Specification | Qty |
|---|---|---|
| 300kW metering cabinet | GGD, 4P 500A, 0.2S CTs, SPD, anti-islanding | 2 |
| 400kW metering cabinet | GGD, 4P 630A, 0.2S CTs, SPD, anti-islanding | 4 |
9.2 DC Combiner Cabinets (4)
7-input DC750V combiner with DC breakers, Hall sensors, smart meters, insulation monitoring, fault location — 4 units.
9.3 Substation Access Retrofit
PV bidirectional reactive compensation controllers (2), grounding materials, cable auxiliaries, grid-connection interface terminal (1 set).
9.4 Engineering and Services
Installation, commissioning, outage-coordinated construction, acceptance testing, training, 1-year warranty (typical) and after-sales support — included per contract.
9.5 Quotation Notes
The list covers the complete 2200kW PV grid-connection system; quantities per design. The quotation includes equipment, installation, commissioning, training and after-sales; transport and tax itemized. All reference prices in this solution are in RMB (CNY) only and are for reference purposes; a formal quotation is issued after configuration confirmation.
10. Technical Specifications
10.1 System Performance Summary
| Item | Specification |
|---|---|
| PV capacity | 2200kW total (6 circuits to TM1/TM2) |
| Metering cabinets | 2× 300kW (4P 500A) + 4× 400kW (4P 630A) |
| Metering accuracy | 0.2S class CTs, trade-level, bidirectional |
| Protection | 3-level overload/short-circuit, residual 500mA, undervoltage, anti-islanding |
| DC combining | 4× 7-input DC750V cabinets |
| DC monitoring | Insulation monitoring + 12-circuit fault location |
| Surge | Class I SPD 12.5kA 10/350μs with backup breaker |
| Communication | RS485 Modbus-RTU, station platform integration |
| Cabinet | GGD fixed, IP3X, indoor |
| Environment | -10℃~+40℃, altitude ≤2000m |
10.2 Key Component Specifications
| Component | Key Parameters |
|---|---|
| Main MCCB 300kW | 4P 500A electronic PV, undervoltage + residual |
| Main MCCB 400kW | 4P 630A electronic PV, undervoltage + residual |
| Metering CT | 0.2S class |
| Anti-islanding device | Professional type with communication |
| DC breaker | 2P 50A/500A DC1000V |
| DC meter | Rail type, RS485, time-of-use |
| Insulation monitor | DC750V, alarm output |
| Reactive controller | PV bidirectional 12-circuit with communication |
11. Key Advantages and Customer Value
11.1 Safe and Reliable, Grid-Code Compliant
Multi-level protection (undervoltage release, anti-islanding, overload/short-circuit, residual current, surge), clear isolation points and 0.2S trade metering — fully compliant with grid-connection codes and utility acceptance standards.
11.2 Intelligent Monitoring, Efficient O&M
Full parameter collection with RS485 Modbus-RTU and platform integration — remote monitoring, alarms, data storage and reports reduce O&M workload.
11.3 Customized Design for Site Conditions
Cabinets, busbars and access schemes tailored to the existing substation (TM1/TM2, reactive compensation adaptation) — seamless integration without affecting normal supply.
11.4 Source Factory Quality and Service
KITOZER quality-controlled equipment, outage-coordinated construction, training and 7×24 support — reliable delivery and long-term service.
11.5 Green Energy, Cost Reduction
2200kW PV capacity improves green energy consumption, reduces electricity costs and supports the enterprise’s dual-carbon and energy-saving goals.
12. Technical Q&A (50+ Items)
12.1 Grid-Connection Metering Cabinet Questions
Q1: What is a PV grid-connection metering cabinet?
A: The AC-side cabinet connecting PV inverters to the low-voltage grid: it provides isolation, protection, metering and monitoring for safe, compliant PV grid connection.
Q2: Why 0.2S class metering CTs?
A: 0.2S accuracy meets utility trade-settlement requirements — precise energy billing between the enterprise and the grid company.
Q3: What is bidirectional metering?
A: Measuring both forward (import from grid) and reverse (PV feed-in) energy — enabling accurate settlement of consumption and generation.
Q4: How does anti-islanding protection work?
A: The protection device detects grid loss and disconnects the PV circuit within the required time — preventing unintentional islanding that endangers personnel and equipment.
Q5: What does undervoltage release do?
A: Trips the main breaker on grid undervoltage — protecting equipment and meeting grid-connection requirements.
Q6: Why residual current protection at 500mA?
A: Detects ground faults/leakage on the AC side, preventing electric shock and fire hazards.
Q7: What is the three-level overload/short-circuit protection?
A: Overload long-delay, short-circuit short-delay and instantaneous protection in the electronic MCCB — selective, coordinated protection.
Q8: Why a disconnecting switch?
A: Provides a visible break point for safe maintenance isolation.
Q9: What is the Class I SPD for?
A: Discharges lightning-induced and switching surge energy (10/350μs waveform) at the grid connection — protecting sensitive equipment.
Q10: How is data communicated?
A: Via RS485 Modbus-RTU from meters and protection devices to the station monitoring platform.
Q11: Can the cabinets expand for more PV capacity?
A: Yes — busbar capacity and spare positions allow adding circuits within design margins; consult for larger expansions.
Q12: What is the cabinet protection rating?
A: IP3X, indoor GGD fixed type — suitable for the substation environment.
12.2 DC Combiner Cabinet Questions
Q13: What is a DC combiner cabinet?
A: The DC-side cabinet combining multiple PV string circuits into one output to the inverter, with breakers, monitoring and protection.
Q14: Why insulation monitoring on DC?
A: Detects DC ground faults promptly — preventing arc hazards and fire in PV systems.
Q15: What is DC fault location?
A: The 12-circuit locator identifies which string has the ground fault — fast troubleshooting without extensive searching.
Q16: Why DC-rated breakers?
A: DC arcs are harder to extinguish than AC; DC1000V-rated breakers ensure safe interruption.
Q17: What do the Hall sensors measure?
A: Per-string current for generation monitoring and fault detection.
Q18: Why DC smart meters with time-of-use?
A: Records per-string generation with time-of-use tariffs for accurate statistics and settlement support.
Q19: What happens on a DC fault?
A: Breakers trip, insulation monitor and locator alarm — the fault is isolated and located for quick repair.
Q20: Can the combiner support more inputs?
A: The cabinet is configured for 7 inputs; custom configurations available per string layout.
Q21: What is the DC voltage rating?
A: DC750V nominal with DC1000V-rated components — standard for commercial PV systems.
Q22: How is the combiner powered?
A: AC220V→DC24V switching power supplies the control and monitoring circuits.
12.3 System Access Questions
Q23: How does the PV system connect to the transformers?
A: Six inverter circuits connect to TM1/TM2 low-voltage sides via busbar splicing and cable access per the design.
Q24: Why is reactive compensation adapted?
A: PV feed-in changes the power factor dynamics; the bidirectional controller maintains compensation performance per grid requirements.
Q25: What grounding is required?
A: The PV system grounding network interconnects with the substation grounding; resistance per code; all cabinets bonded.
Q26: How is construction coordinated with power outage?
A: Dedicated outage construction plans with safety measures minimize impact on normal supply; staged work per schedule.
Q27: What is the grid-connection interface terminal?
A: The utility-required terminal providing the grid-connection status/control interface per local regulations.
Q28: How is the system accepted?
A: Per grid-connection acceptance: metering verification, protection function tests, power quality checks and documentation.
Q29: Can the system integrate with the energy management platform?
A: Yes — RS485 Modbus-RTU enables integration for remote monitoring and reporting.
Q30: What happens during grid outage?
A: Anti-islanding protection disconnects the PV system within the required time; reconnection occurs after grid restoration per sequence.
Q31: What power quality considerations exist?
A: Voltage, frequency and harmonics are monitored; the design meets GB/T 14549 power quality requirements.
Q32: Are the cabinets compatible with existing substation equipment?
A: Yes — coordinated color, dimensions and busbar interfaces for seamless integration.
12.4 Safety and Maintenance Questions
Q33: What safety features protect personnel?
A: Visible disconnects, IP3X enclosures, residual current protection, grounding and lockout procedures.
Q34: What daily checks are needed?
A: Meter readings, alarm status, SPD indicators, breaker status, insulation monitoring — via the platform and periodic inspection.
Q35: How are faults located?
A: Platform alarms plus DC fault locator pinpoint the faulty string; protection devices report precise events.
Q36: What spares are recommended?
A: Breakers, CTs, SPD modules, DC meters, sensors and fuses — stocked for fast replacement.
Q37: How often is calibration needed?
A: Metering CTs and meters per utility requirements (typically periodic verification); operation meters per maintenance schedule.
Q38: What training is provided?
A: Operation, monitoring platform use, alarm handling, safety and maintenance training with materials.
Q39: What is the warranty?
A: Typically 1-year equipment warranty with free repair of non-artificial faults; lifetime cost-price maintenance after warranty.
Q40: What is the response time?
A: 7×24 support; remote within 1 hour; on-site per region; urgent faults prioritized.
12.5 Additional Questions
Q41: What is the total PV capacity?
A: 2200kW across 6 circuits (2× 300kW + 4× 400kW) to two transformers.
Q42: Can the design be scaled?
A: Yes — additional cabinets and circuits can be added per future PV expansion.
Q43: What cables are used?
A: Incoming WDZB1-YJY-0.6/1kV 2×(4×240+1×120) per 400kW cabinet; low-smoke flame-retardant types throughout.
Q44: How is surge protection coordinated?
A: Class I SPD at the grid connection with backup breakers; coordination per lightning protection standards.
Q45: What is the operating environment?
A: -10℃~+40℃, altitude ≤2000m, indoor substation environment.
Q46: How is metering data secured?
A: Sealed anti-tamper metering structures per utility requirements; platform access with permissions.
Q47: Can the system operate without communication?
A: Protection functions operate locally; monitoring requires the communication link; data buffers where applicable.
Q48: What documentation is delivered?
A: As-built drawings, configuration lists, certificates, test reports, operation manuals and after-sales card.
Q49: How is the project started?
A: Site survey → design → contract → production → outage-coordinated installation → commissioning → acceptance → training.
Q50: What are the total costs?
A: Equipment + installation + services + transport/tax; final quotation after configuration confirmation.
Q51: Is the solution compliant for grid acceptance?
A: Yes — 0.2S metering, anti-islanding, protections and documentation meet utility grid-connection acceptance.
Q52: How does the system support the enterprise’s energy goals?
A: 2200kW PV reduces grid electricity consumption and costs, improves green energy utilization and supports dual-carbon compliance.
13. Construction Schedule
13.1 Overall Period
Approximately 20-30 working days from order to acceptance for the complete system: production (10-15 days), outage-coordinated installation (5-8 days), commissioning and acceptance (3-5 days); adjustable per site and outage windows.
13.2 Stage Schedule
| Stage | Work | Days | Responsible |
|---|---|---|---|
| 1. Confirmation | Survey, design, configuration confirmation, outage plan | 3 | Engineer |
| 2. Production | Cabinets, busbars, DC combiners, accessories | 10-15 | Factory |
| 3. Delivery and inspection | Transport, incoming inspection | 2 | Logistics |
| 4. Installation | Cabinet placement, busbar connection, cable laying, grounding (outage-coordinated) | 5-8 | Teams |
| 5. Commissioning | Protection tests, metering verification, reactive compensation adaptation, platform integration | 3 | Engineers |
| 6. Acceptance | Grid-connection acceptance, documentation, training | 2 | PM |
13.3 Schedule Assurance
Advance production; outage windows coordinated with the station; parallel work areas; daily plan review; spare parts available; contingency arrangements.
14. Construction Organization and Quality/Safety Measures
14.1 Organization Structure
– Project manager: overall responsibility, station interface, outage coordination;
– Technical leader: design, commissioning, protection and metering verification;
– Teams: installation team, cable team, secondary wiring team;
– QC/safety officer: quality inspection, outage and electrical safety supervision.
14.2 Pre-Construction Preparation
1. Technical: site survey, outage plan, technical and safety disclosure;
2. Materials: incoming inspection (cabinets, breakers, CTs, meters, cables with certificates);
3. Site: coordinate outage windows, work areas and safety measures with the station.
14.3 Key Processes
– Cabinet placement on channel steel bases, leveling and fixing; busbar connection with proper torque and clearance;
– Cable laying per routes with correct bending radius and labeling; termination per standards;
– Grounding network interconnection with resistance test;
– Secondary wiring per diagrams with terminal numbering;
– Commissioning: breaker settings, protection function tests, CT polarity/metering verification, anti-islanding test, reactive compensation adaptation, platform communication.
14.4 Quality Control
– Three-level inspection; key control points: busbar connections, CT polarity, protection settings, metering accuracy, grounding resistance, communication;
– Acceptance per grid-connection and national standards with documentation.
14.5 Safety Management
– Outage procedures with lockout/tagout and verification of dead state before work;
– Electrical safety (certified personnel, PPE, insulated tools); DC safety (PV DC arc hazards, proper procedures);
– Hot work permits; emergency plans for electric shock, fire and injury.
14.6 Civilized Construction
– Clean site, finished product protection, compliance with station rules; daily cleaning; protection of existing equipment.
15. After-Sales Service
15.1 Warranty
Typically 1-year equipment warranty with free repair/replacement of non-artificial faults; lifetime cost-price maintenance after warranty.
15.2 Response Time
7×24 hotline; remote within 1 hour; on-site per region; urgent faults prioritized.
15.3 After-Warranty Services
Paid maintenance at cost; metering calibration coordination; upgrade and expansion services.
15.4 Service Content
Periodic inspection, preventive maintenance, platform support, training refreshers and technical consultation.
16. Training Plan
16.1 Audience and Objectives
Station O&M personnel: operate the metering/combiners, use the monitoring platform, handle alarms and perform maintenance safely.
16.2 Content
System architecture; metering and protection principles; DC combining operation; reactive compensation adaptation; platform operation; safety and emergency procedures; maintenance.
16.3 Methods and Materials
On-site training with documentation and videos; Q&A; free repeat training.
16.4 Assessment
Theory and practice assessment; qualified personnel certified.
16.5 Documentation
Operation manuals, wiring diagrams, configuration lists, test reports and after-sales card.
15. After-Sales Service
15.1 Warranty Commitment
The overall project warranty period is 2 years from the date of completion acceptance; core equipment has a 3-year warranty. During the warranty period, all failures and damage caused by product quality or construction process problems are repaired and parts replaced free of charge. After the warranty period, lifetime cost-price maintenance is provided, charging only parts cost and basic labor, ensuring long-term stable system operation.
15.2 After-Sales Response Mechanism
– A 7×24 after-sales hotline receives fault reports and technical consultations at any time;
– Within the urban area: respond within 2 hours, technicians on site within 4 hours;
– Suburban and surrounding areas: respond within 4 hours, personnel on site within 8 hours;
– General faults resolved on the spot; complex faults solved within 24 hours with a solution;
– Emergency faults get a green channel with priority dispatch of personnel and parts.
15.3 Periodic Inspection and Maintenance
During the warranty period, a free on-site inspection is provided every six months, with a comprehensive maintenance inspection annually. Inspection contents include equipment operating status, connection firmness, sealing and rust conditions, filtering/grounding performance and safety devices. After each inspection, a formal inspection report is issued recording equipment status and maintenance content with optimization suggestions.
15.4 Spare Parts Supply Guarantee
A local spare parts warehouse is established, stocking common wearing parts for quick replacement to shorten fault handling time. For uncommon special parts, a fast supply channel with the factory ensures availability within 48 hours. During warranty, non-artificial-damage spare parts are replaced free; after warranty, parts are charged at cost price without markup.
15.5 System Upgrade and Technical Support
– Free lifetime technical consultation services by phone or online at any time;
– If the customer later needs upgrades or expansions, preferential upgrade solutions and construction services are provided;
– Industry new technology and standard information is regularly pushed to customers.
16. Training Plan
16.1 Training Objectives and Audience
Training objectives: through systematic training, enable management personnel to fully understand the system structure, working principles and performance characteristics, master daily operation methods and inspection/maintenance essentials, identify common faults and handle simple problems, ensuring safe, stable and long-term operation.
Training audience: management and O&M personnel designated by the client, recommended 2-3 persons with basic electrical and equipment knowledge.
16.2 Tiered Training Content System
Level 1: Basic operation training (1 day)
– Basic principles: system concepts, structure composition, performance indicators;
– Daily operation standards: correct operation of equipment, control and safety systems;
– Daily inspection contents: daily/weekly/monthly check items;
– Safety precautions: usage prohibitions and emergency handling procedures.
Level 2: Maintenance training (1 day)
– Detailed structure of each subsystem and working principles;
– Daily maintenance methods: cleaning, fastening checks, routine care;
– Common fault identification and simple handling;
– Emergency handling procedures for power failure, fire and equipment faults.
Level 3: Advanced management training (as needed)
– Performance influencing factors and how to avoid degradation;
– Upgrade and expansion knowledge and specification requirements;
– Relevant national standards interpretation.
16.3 Training Methods and Schedule
– Methods: combination of “theory explanation + on-site practice + Q&A interaction”;
– Schedule: training arranged at the completion acceptance stage, synchronized with handover, 2 days of intensive training total; time flexibly adjustable; a free repeat training session is provided for newly assigned personnel.
16.4 Training Assessment and Documentation Delivery
– Assessment: theory written test plus practical operation; training qualification certificates issued upon passing; supplementary training for those who fail;
– Documentation delivery: complete O&M documentation, including operation and maintenance manual, equipment manuals and certificates, completion drawings and hidden work records, test reports and after-sales service contact card, all bound into volumes.
17. Anonymous Typical Project Scenarios
All project scenarios below are anonymous, generalized examples compiled from typical industry deployments; no real customer names, addresses or confidential information are disclosed.
17.1 Factory Rooftop PV Grid-Connection Project
A manufacturing enterprise with a rooftop PV system (2200kW) required grid-connection facilities at its power station. Six AC metering cabinets (0.2S trade metering with anti-islanding), four DC combiner cabinets (7-input, insulation monitoring and fault location) and reactive compensation adaptation were installed with outage-coordinated construction. The system passed grid-connection acceptance, achieved accurate bidirectional metering and reduced the enterprise’s electricity costs while improving green energy consumption.
17.2 Industrial Park PV Expansion
An industrial park expanded its PV capacity with additional inverter circuits. New metering cabinets were spliced onto existing low-voltage busbars with protection and metering per utility requirements; the monitoring platform integrated the new circuits for unified management; reactive compensation controllers were upgraded to bidirectional type to maintain power factor with PV feed-in.
17.3 Logistics Center Distributed PV System
A logistics center’s distributed PV system required reliable grid connection at its transformer substation. DC combiners with per-string metering and fault location simplified O&M; AC metering cabinets with 0.2S CTs and anti-islanding met settlement and safety requirements; the energy management platform provided generation statistics and alarms, supporting the center’s green logistics goals.
18. SEO Optimization Section
All reference prices in this technical solution are in RMB (CNY) only and are for reference purposes; final quotation is subject to the confirmed configuration.
18.1 Keyword System
– Core keywords: technical design solution, system configuration, technical parameters, construction and O&M services;
– High-conversion long-tail keywords: design solution, configuration list, technical parameters, construction plan, after-sales service;
– Industry traffic keywords: system architecture, applicable standards, technical Q&A, project cases;
– Brand keywords: KITOZER, Guangzhou Lain.
18.2 SEO Tag System
– Title tag: the article title — Guangzhou Lain KITOZER;
– Meta description: Guangzhou Lain professionally provides complete technical design solutions with detailed configuration list, full-system product technical parameters, construction organization plan and after-sales service — source manufacturer customization, compliant performance, third-party testing supported;
– H1 tag: the article title;
– H2 tags: system design and product parameters, construction organization plan, after-sales service and training, engineering cases.
18.3 Internal Link Anchor Text
– Core anchor text: technical design solution, system construction;
– Long-tail anchor text: configuration list, technical parameters, construction plan;
– Related anchor text: shielding cabinet, micro-module cold aisle, integrated computer room, outdoor cabinet.
19. Official Contact Information
– Company Name: Guangzhou Lain Intelligent System Development Co., Ltd.
– Brand: KITOZER (Pioneer)
– Official Website: https://gdlain.com
– Tel: +86 139 2228 9957 (WeChat available), +86 185 2066 8845 (WeChat available)
– Address: No. 5 Huashan Road, Shilou Town, Panyu District, Guangzhou, China
For any inquiries about this technical design solution, configuration customization, quotation or construction services, please contact us through the information above. We provide free design consultation and tailored solutions for your specific requirements.