1.1 Definition of a Modular Data Center
A modular data center (MDC), commonly called a micro-module data center, is a next-generation data center construction form in which rack systems, cold-aisle containment, in-row cooling, uninterruptible power supplies (UPS), battery banks, power distribution units, environmental monitoring, and fire integration are pre-integrated at the factory into standard units and then rapidly assembled on site like building blocks. It differs fundamentally from the traditional approach of “first renovating a room, then separately procuring air conditioners, UPS, racks, and monitoring,” compressing an entire data center into a set of replicable, expandable, relocatable functional modules.
At its engineering core, a modular data center is not a single piece of equipment but a delivery system combining a standardized electromechanical product family, factory prefabrication, and on-site final assembly. A complete micro-module unit typically includes: double-row (or single-row) 42U/47U server racks, cold-aisle containment skylights and end doors, in-row precision air conditioners positioned between rack rows, UPS hosts and distribution cabinets at the row head, strong- and weak-current cable trays along the aisle, and an environmental controller that unifies temperature/humidity, water leak, smoke, access control, and electrical power data. When a customer needs more capacity, they simply add another identical module next to the existing one without renovating an entire floor.
The core value of a modular data center can be summarized in four words: fast, efficient, scalable, and reliable. Fast means factory prefabrication compresses on-site construction from months to weeks. Efficient means cold-aisle containment and row-level cooling dramatically lower PUE and installed cooling capacity. Scalable means UPS power modules and rack rows expand on demand, avoiding upfront over-investment. Reliable means critical equipment universally adopts N+1 redundancy and group-control interlock, so a single point of failure does not interrupt operations.
1.2 Industry Evolution
The modular data center has evolved through four stages.
Stage 1 (before ~2000): Traditional room-based era. Data centers were built as “room-level” facilities: a customer leased a floor or large room, installed anti-static flooring, suspended ceilings, wall insulation, then installed room-level precision air conditioners (CRAC/CRAH), large line-frequency UPS, and a separate battery room, finally placing rows of racks inside. This model offered spatial flexibility but suffered from long build cycles (typically 6–12 months), severe hot/cold air mixing, PUE values of 1.8–2.2, and expansion that required re-renovation.
Stage 2 (2002–2010): Hot/cold aisle and row-level cooling emergence. As blade servers emerged, per-rack power density jumped from 2–3 kW to 6–10 kW, and room-level AC could no longer deliver cold air to the middle of racks. The industry introduced hot/cold aisle layout, rack rear-door heat exchangers, and in-row air conditioners. Meanwhile, high-frequency double-conversion UPS began replacing traditional line-frequency UPS, raising efficiency from 90% to over 95%. The product of this stage was “row-level cooling + hot/cold aisles,” but subsystems were still pieced together from different vendors with inconsistent interfaces.
Stage 3 (2010–2018): Micro-module standardization. Major vendors packaged racks, in-row AC, UPS, containment, and environmental monitoring into a standard “module,” launching 6-, 12-, 20-, and 42-rack standard units. After ordering, the factory shipped the module disassembled into packages, and on-site work was limited to assembly and power connection. PUE commonly reached 1.4–1.6, and build cycles shrank to 4–8 weeks. Chinese telecom operators, state banks, and internet companies began large-scale adoption of micro-modules for city-level rooms and edge nodes.
Stage 4 (2018–present): High-density, liquid-cooled, and intelligent era. AI training servers and GPU compute pushed per-rack density from 8–15 kW to 30–50 kW or even 100 kW+, reaching the physical limits of air-cooled in-row AC. Rear-door heat exchangers (RDHx), cold-plate liquid cooling, and immersion cooling entered mainstream modular product lines. Meanwhile, AI workload scheduling, digital twins, DCIM (Data Center Infrastructure Management), predictive maintenance, intelligent busways, intelligent PDUs, and lithium batteries replacing VRLA stacked on top, evolving the modular data center from “electromechanical product” to “intelligent compute infrastructure.”
1.3 Market Trends
Six trends define the current modular data center market:
- From large centralized to distributed edge nodes. 5G, industrial internet, smart cities, vehicle-to-everything, and telemedicine require compute to sink to districts, parks, streets, and even buildings. Node size shrinks from thousands of racks to 10–50 racks, matching micro-module standard capacity.
- Per-rack power density keeps climbing. General business racks commonly run 6–10 kW; AI inference racks 20–30 kW; AI training racks 50–100 kW+. The air-cooled ceiling is about 15–20 kW/rack; beyond that, liquid cooling is required.
- PUE regulation tightens. China’s East-Data-West-Compute project, EU ERP directives, and the US DOE all require new large data centers to achieve PUE ≤ 1.3, with mega hubs ≤ 1.25. Cold-aisle containment, rear-door heat exchangers, liquid cooling, and free cooling become standard.
- Lithium replaces VRLA. Lithium iron phosphate (LFP) batteries offer higher energy density, longer cycle life (6,000 vs 1,200 cycles), smaller footprint, and maintenance-free operation, and are replacing traditional VRLA in 10–30-minute short runtime scenarios.
- Prefabrication and containerization. Modular data centers further evolve into containerized data centers, with the entire unit factory-tested and lifted as a whole to the site, ideal for remote mining, oil, disaster zones, and polar environments.
- DCIM intelligence. Environmental monitoring evolves from “alarm reporting” to “digital twin + AI scheduling,” displaying real-time per-rack temperature, power, fan speed, and battery SOC, and automatically recommending expansion and energy-saving actions.
1.4 KITOZER Brand
KITOZER is the product-line brand of Guangzhou Laian Intelligent System Development Co., Ltd., focused on data centers and intelligent rooms. The KITOZER modular data center series is designated KITOZER-MicroDC, offering four standard units by rack count: 10, 20, 50, and 100 racks. Each unit is available in air-cooled (MicroDC-Air) or liquid-cooled (MicroDC-Liquid) versions, with UPS capacity covering 10 kVA to 1,000 kVA modular UPS.
A standard KITOZER-MicroDC unit includes: 42U perforated smart racks (KITOZER-MDC600 series), cold-aisle containment (skylights/sliding doors/access control/RGB lighting/lintel bar display), 50 kW in-row precision air conditioners (KITOZER-CRAC50 series), modular UPS (KITOZER-UP series, 10–50 kVA hot-swap power modules), VRLA or LFP batteries, and a dual-row aisle environmental controller (KITOZER-CC01). The brand also offers outdoor integrated cabinets, precision row-head distribution cabinets, dual-power ATS cabinets, and shielded cabinets, forming a complete product matrix from indoor micro-modules to outdoor prefabricated stations and from low-voltage distribution to high-voltage incoming lines.
Chapter 2. Technical Principles
The modular data center’s “fast, efficient, scalable, reliable” performance arises from the synergy of five key technical principles: cold-aisle containment, row-level cooling, modular UPS, battery energy storage, and environmental monitoring with fire integration.
2.1 Cold-Aisle Containment Principle
The largest energy waste in traditional open rooms is hot/cold air mixing. Room-level AC supplies cold air under the raised floor or from the ceiling; as it flows toward racks, it mixes with hot air exhausted from rack tops and rear, so some cold air returns to the AC without ever passing through servers (called bypass or short-circuit airflow), while hot-aisle air is repeatedly drawn into the AC, raising evaporator pressure and lowering efficiency. ASHRAE TC 9.9 data shows that in open rooms, often less than 60% of supply air actually reaches server intakes.
Cold Aisle Containment (CAC) uses a straightforward engineering idea: completely enclose the “cold aisle” formed by two rows of racks facing each other with skylights (roof panels), end doors, and seals, so cold air exists only inside this enclosed corridor. Servers draw cold air from the front and exhaust hot air to the open hot aisle at the rear. Direct effects include:
- Eliminates hot/cold mixing: cold air is no longer diluted by hot air, and cold-aisle temperature stabilizes at 18–24°C, matching ASHRAE recommended server intake.
- Raises supply-return delta-T: traditional rooms run 8–10°C delta-T; containment allows 12–15°C, reducing required airflow and fan energy.
- Allows higher supply temperature: because cold-aisle temperature is uniform, supply can rise from 13–15°C to 18–22°C, extending free-cooling hours and lowering PUE by 0.1–0.2.
- Reduces installed cooling capacity: with no bypass, AC need not be oversized for “virtual” airflow, cutting installed capacity by 20–30%.
The symmetric alternative is Hot Aisle Containment (HAC): enclose the hot aisle so hot air returns directly to the AC while the cold aisle stays open. In high-density scenarios (>15 kW/rack), HAC better prevents hot air leakage into operator areas; in general scenarios (<10 kW/rack), CAC is more common and simpler. KITOZER-MicroDC defaults to CAC, with HAC or dual containment as options.
Key containment components:
- Skylights: roof panels over racks. They are either fixed (steel or glass, permanently closed) or flip-up (glass, magnetically latched, automatically open on fire alarm for smoke exhaust). Flip skylights are a fire-code requirement—when a fire breaks out in the aisle, smoke needs a fast exhaust path, and the enclosed cold aisle must not become a “smoke chamber.”
- End doors: doors at both ends of the cold aisle. Commonly automatic sliding doors (motor-driven with infrared anti-pinch) or double glass swing doors. End doors must seal well; otherwise cold air leakage through gaps defeats containment.
- Seals: EPDM foam gaskets between skylights and rack tops, and between doors and frames, with 25–30% compression.
- Lighting: RGB LED strips embedded in the aisle—white for routine maintenance, red flashing for alarms—improving visibility.
- Lintel bar display: a narrow screen above the end door showing real-time time, cold-aisle temperature/humidity, per-row load, and AC status, so operators see status from outside the aisle.
- Access control: end doors are equipped with face/card/PIN terminals, logging entry and integrating with fire (auto-unlock on alarm).
2.2 In-Row Cooling Principle
In-row cooling places a precision AC unit as a “dummy rack” of the same width as server racks, directly between rack rows. It draws cold air from the cold aisle, cools it, and blows it horizontally to adjacent racks. Compared with room-level CRAC/CRAH:
| Dimension | Room-level AC | In-row AC |
|---|---|---|
| Air delivery distance | 5–15 m across the room | 1–3 m horizontally to adjacent racks |
| Supply mode | Raised-floor or overhead | Horizontal front supply |
| Suitable density | 2–6 kW/rack | 8–30 kW/rack |
| Airflow matching | Fixed volume, sized for peak | Variable fan + variable compressor, load-matched |
| PUE contribution | High bypass, low efficiency | Short path, high delta-T, low PUE |
| Redundancy | Central N redundancy, failure affects whole room | In-row N+1, failure affects only segment |
| Footprint | Requires dedicated AC room | Same row as racks, no extra space |
KITOZER-CRAC50 key specs:
– Cooling capacity: ≥ 50 kW (DX air-cooled)
– Airflow: ≥ 10,300 m³/h
– Fans: EC centrifugal, N+1 redundant, variable 10–100%
– Compressor: full DC inverter scroll, high part-load efficiency (IPLV)
– Reheat: PTC electric ≥ 6 kW
– Humidification: wet-bulb ≥ 3 kg/h (electrode optional)
– Control: 7-inch touchscreen, up to 32-unit group control, RS485/Modbus/BACnet to DCIM
– Surge: 6 kV incoming protection
– Group logic: multiple units rotate master/backup by cold-aisle temperature, balance runtime, and auto-fill on unit failure.
The physical essence of in-row cooling is “place the cold source closest to the heat source.” At 15 kW+ per rack, cold air from a distant AC heats up by 3–5°C before reaching servers; in-row units sit adjacent, so server intake temperature fluctuation is held within ±1°C.
For higher density (>30 kW/rack), Rear Door Heat eXchangers (RDHx) mount a condenser/coil on the rack rear door. Hot air exhausted by servers passes directly through the rear door and is carried away by cooling water; cold air no longer participates in the loop. KITOZER offers RDHx as an option in MicroDC high-density versions.
2.3 Modular UPS Principle
An Uninterruptible Power Supply (UPS) instantly switches to battery inverter supply when mains fails or voltage quality deteriorates, preventing IT equipment downtime. A modular UPS packages the UPS host as a “rack chassis + multiple hot-swap power modules,” each containing an independent rectifier (AC/DC), inverter (DC/AC), static bypass switch, and control board.
Typical power flow:
Operating modes:
1. Normal (online double-conversion): mains normal, rectifier converts to DC; one branch inverts to clean sine-wave AC for IT load (THD < 3%, frequency ±0.5 Hz), the other floats the battery.
2. Battery mode: mains fails, rectifier stops, battery supplies the inverter through the DC bus with 0 ms transfer (battery is already paralleled on the bus).
3. Bypass mode: on overload or internal UPS fault, the static switch seamlessly transfers load to mains bypass, protecting the UPS.
4. Maintenance bypass: when UPS needs service, close the maintenance bypass switch; mains feeds load directly, and the UPS can be de-energized.
Core modular UPS advantages:
– N+1 redundancy online: e.g., customer needs 400 kVA, installs ten 50 kVA modules (500 kVA total); any module fails, the remaining nine automatically carry 450 kVA without interruption.
– Pay-as-you-grow: early low load uses only six modules (300 kVA); business growth adds two more modules without replacing the host.
– Hot-swap service: power modules can be pulled and replaced live without shutdown.
– High efficiency: modular UPS uses three-level topology and IGBT high-frequency PWM, ≥96% efficiency, up to 99% in ECO mode.
KITOZER-UP typical specs:
– Host: 500 kVA 3-phase in/out, battery bus ±192–±264 VDC adjustable
– Power module: 50 kVA/4U, ≥96% efficiency, THDi ≤ 3%
– Parallel: up to 4 hosts
– Communication: RS485, SNMP, dry contacts to environmental DCIM
2.4 Battery Energy Storage Principle
Batteries are the UPS’s “last line of defense.” When mains outages last beyond seconds (minute-scale), the UPS inverter rides through on batteries. Two battery technologies dominate modular data centers:
VRLA (Valve-Regulated Lead-Acid):
– Typical: 12V 100Ah / 12V 200Ah / 12V 250Ah, valve-regulated, minimal water loss, no watering.
– Temperature: optimum 20–25°C; life halves per 10°C rise.
– Cycle life: 1,200 cycles (80% DOD).
– Pros: mature, cheap, recyclable, stable supply chain.
– Cons: low energy density (~30 Wh/kg), heavy, requires ventilated battery room for acid mist, replacement every 3–5 years.
– KITOZER standard: 12V250Ah VRLA, 160 cells in series for ±192V or ±240V DC bus.
Lithium Iron Phosphate (LFP):
– Typical: 51.2V 100Ah/200Ah rack-mounted battery packs, paralleled.
– Cycle life: 6,000+ cycles (80% DOD).
– Energy density: ~120 Wh/kg, 3–4x VRLA.
– Temperature: -20°C to +60°C.
– Pros: small footprint, maintenance-free, 10+ year life, BMS intelligent management, parallel expansion.
– Cons: 1.5–2x upfront investment.
– Best for: new builds, space-constrained sites, 10–30-minute short runtime.
Runtime calculation: Runtime ≈ Battery energy (Wh) / Actual load (W) × inverter efficiency. Example: 500 kVA UPS at 300 kW load, 160 cells 12V250Ah in series for ±240V (480V total), battery energy = 480V × 250Ah = 120 kWh. After 95% inverter efficiency and cutoff voltage, usable ~110 kWh; runtime ≈ 110/300 ≈ 22 minutes. Longer runtime (e.g., 2 hours) requires a diesel generator.
2.5 Environmental Monitoring & Fire Integration
Power & Environment Monitoring (PEM) is the modular data center’s “nervous system.” The KITOZER-CC01 aisle controller centrally collects:
- Environmental: cold/hot aisle temperature-humidity (1–2 points per row), floor leak rope (along AC and piping), smoke detector (aisle ceiling).
- Electrical: UPS input/output voltage/current/power, battery pack total voltage and cell voltage (smart battery), per-branch PDU current.
- Equipment status: AC run/alarm/fan speed, UPS rectifier/inverter/bypass status, door contact status.
- Access & video: face recognition logs, door contact status, in-aisle camera (optional).
Control outputs include: automatic sliding door open/close, flip skylight magnetic latch release, RGB strip color change (green normal/yellow alarm/red emergency), sound-light alarm, and remote SMS/email/app push.
Fire integration is a mandatory safety requirement. When the fire host sends an alarm (dry contact to CC01), the system must complete within 30 seconds:
1. All flip skylight magnetic latches release; skylights open by gravity to form a smoke exhaust path.
2. Access doors auto-unlock for evacuation.
3. AC shuts down to prevent fanning the fire.
4. Sound-light alarm activates; RGB strips flash red.
5. DCIM logs the fire event and pushes to on-call staff.
Chapter 3. Product Series
3.1 MicroDC Series Overview
KITOZER-MicroDC forms four standard units by total rack count in double-row layout:
| Model | Racks | Layout | Recommended IT Load | UPS Capacity | In-row AC | Typical Scenario |
|---|---|---|---|---|---|---|
| MicroDC-10 | 10 | 2×5 | 30–60 kW | 60–120 kVA | 2–3×25 kW | SMBs, building telecom rooms, edge nodes |
| MicroDC-20 | 20 | 2×10 | 60–120 kW | 120–200 kVA | 4–6×25/50 kW | Mid-size enterprise, county DC, hospital room |
| MicroDC-50 | 50 | 2×25 | 150–300 kW | 300–500 kVA | 8–12×50 kW | City telecom room, bank branch, internet POP |
| MicroDC-100 | 100 | 2×50 | 300–600 kW | 500–1,000 kVA | 16–24×50 kW + RDHx | Provincial DC, AI inference center, cloud region |
3.2 Air-Cooled MicroDC-Air
The air-cooled version is the mature standard for per-rack density of 6–15 kW general business (file servers, virtualization, databases, VDI, small/medium AI inference).
Standard unit contents (MicroDC-20 example):
– 20× KITOZER-MDC600-2026 42U perforated racks (600×1200×2000 mm)
– 2× cold-aisle end doors (automatic sliding + face access)
– 20× skylights (15 glass flip + 5 fixed steel)
– 20× M-shaped strong/weak separated cable troughs
– 20× RGB LED strips + lintel bar display
– 6× KITOZER-CRAC50-2026 50 kW in-row AC (N+1; ~300 kW IT load, 6×50 kW = 300 kW, N=5, N+1=6)
– 1× KITOZER-UP200-2026 200 kVA modular UPS (4×50 kVA modules, N+1)
– 40–80× 12V200/250Ah VRLA (15–30 min runtime)
– 1× KITOZER-CC01-2026 dual-row environmental controller
– 1× KITOZER-PDU63A smart rack PDU (2 per rack)
3.3 Liquid-Cooled MicroDC-Liquid
The liquid-cooled version targets 20–100 kW per rack for AI training, HPC, and GPU servers. It comes at two levels:
Cold Plate: metal cold plates mount on server CPU/GPU surfaces; coolant (typically 50% water + 50% glycol) flows through plates to carry heat, with residual air cooling for memory/drives. Cold plates handle 20–60 kW per rack, PUE 1.1–1.2.
Immersion: the entire server is submerged in dielectric coolant (mineral oil or fluorinated fluid), directly contacting heat-generating components, handling 100 kW+ per rack. Immersion has high upfront cost and complex maintenance, suited to supercomputing and large-model AI training.
KITOZER-MicroDC-Liquid standard:
– High-load racks (≥1,500 kg per rack due to GPU weight)
– Rear-door RDHx (primary side connected to building chilled water or dry cooler)
– CDU (Coolant Distribution Unit): built-in circulation pump, plate heat exchanger, expansion tank, leak detection
– Quick disconnects (QD): blind-mate couplings at server and rack sides, no leakage on hot-swap
– Cold plates, piping, and rack manifold
– Retained in-row AC for the air-cooled portion (~20–30% of heat)
– Environmental monitoring adds coolant temperature, flow, pressure, and leak sensors.
3.4 Containerized MicroDC-Container
The containerized version packs the entire micro-module into a 20- or 40-foot standard container, factory-tested and lifted as a whole to the site, where the customer only connects mains, fiber, and cooling water. Suited to mines, oilfields, disaster recovery, polar expeditions, temporary events, and rapid DC expansion. KITOZER-MicroDC-Container holds 12–24 high-density racks, 100–300 kW cooling, 100–300 kVA UPS, operating temperature -40°C to +55°C (insulated container).
Chapter 4. Detailed Technical Parameters
4.1 PUE (Power Usage Effectiveness)
PUE = Total data center energy / IT equipment energy. PUE=1.0 means all energy goes to IT, with zero auxiliary (AC, UPS, lighting) energy—physically impossible. Industry benchmarks:
– Traditional room DC: PUE 1.8–2.2
– Cold-aisle containment + in-row cooling: PUE 1.4–1.6
– Free cooling + in-row: PUE 1.25–1.4
– Liquid-cooled DC: PUE 1.1–1.25
– Extreme optimization (Arctic, Sweden): PUE below 1.1
KITOZER-MicroDC air-cooled in standard climate zones is designed PUE ≤ 1.45, dropping to 1.35 in swing season with free cooling; liquid-cooled version PUE ≤ 1.2.
Key PUE drivers:
1. Cooling method (60%+ of auxiliary energy)
2. UPS efficiency (modular 96% vs traditional line-frequency 92%)
3. Rack supply temperature (each 1°C higher lowers PUE by ~0.02)
4. Outdoor climate (northern sites have longer free-cooling hours, naturally lower PUE)
4.2 Cooling Capacity and Airflow
In-row AC capacity must match IT load precisely. Design rules:
– Total cooling ≥ total IT load × 1.15 (fans, lighting, UPS losses)
– Per-unit capacity × unit count ≥ total IT load × 1.25 (N+1 still sufficient)
– Airflow (m³/h) ≈ Cooling (kW) × 3160 / Supply-return delta-T (°C). For 50 kW and 12°C delta-T, airflow ≈ 50×3160/12 ≈ 13,167 m³/h. KITOZER-CRAC50 rated 10,300 m³/h corresponds to ~15°C delta-T.
4.3 UPS Capacity and Runtime
UPS sizing:
– UPS rating (kVA) ≥ total IT load (kW) / 0.9 (power factor)
– Reserve 30–50% for 1–3 year expansion
– Modular UPS initial module count = actual load / module capacity, plus 1 redundant module.
Runtime:
– 5–10 min: only instantaneous mains interruption and generator start buffer (requires diesel generator)
– 15–30 min: common for SMB, mainly for orderly shutdown
– 1–4 hours: no generator or unreliable generator; high battery investment
– KITOZER defaults 15–30 min; longer runtime requires diesel generator.
4.4 Rack Power Density
| Density | Typical Business | Recommended Cooling |
|---|---|---|
| 2–5 kW/rack | General file servers, networking | Room-level AC + hot/cold aisle |
| 5–10 kW/rack | Virtualization, databases, VDI | In-row AC + cold-aisle containment |
| 10–20 kW/rack | High-density virtualization, AI inference | In-row AC + containment + inverter |
| 20–40 kW/rack | AI training, HPC | RDHx + chilled water |
| 40–100 kW+/rack | LLM training, GPU clusters | Cold-plate / immersion liquid cooling |
4.5 Other Key Parameters
- Noise: in-row AC within 1 m of operators, typically ≤ 75 dB(A); nighttime maintenance requires attention.
- Grounding: rack grounding resistance ≤ 1Ω, lightning protection ≤ 4Ω, combined grounding ≤ 1Ω.
- Lighting: aisle average ≥ 300 lx, emergency ≥ 50 lx.
- Seismic: per project site; KITOZER standard designed for intensity 7; intensity 8/9 requires reinforcement.
- Temperature/humidity: cold aisle 18–27°C (ASHRAE A1), RH 40–60%.
Chapter 5. Cooling Comparison
5.1 Room-level vs In-row vs Rear-door
| Dimension | Room-level CRAC | In-row | Rear-door RDHx |
|---|---|---|---|
| Density | ≤6 kW/rack | 8–25 kW/rack | 20–60 kW/rack |
| Air distance | 5–15 m | 1–3 m | 0 m (direct exhaust pickup) |
| Cold air utilization | 50–70% | 85–95% | 95%+ |
| Footprint | Dedicated AC room | Same row as racks | Same row as racks |
| Investment | Low | Medium | High (CDU + chilled water) |
| Maintenance | Simple | Simple | Medium (water circuit) |
5.2 Chilled Water vs Direct Expansion (DX)
In-row AC by heat source:
DX (Direct Expansion): compressor, condenser, and evaporator integrated in the unit; outdoor requires a condenser (dry cooler). Pros: independent, no dependency on building chilled water; cons: distributed compressors, slightly lower efficiency, refrigerant piping limited to ~30 m. KITOZER-CRAC50 defaults to DX.
Chilled Water: the AC unit contains only a chilled water coil and fan; chilled water is supplied by a central plant (chiller + cooling tower) through pumps. Pros: high efficiency, large unit capacity (100 kW+), no refrigerant leak risk; cons: depends on central plant, plant failure stops all AC, requires N+1 plant + thermal storage tank. Suited to large data centers.
5.3 Free Cooling
In northern or swing seasons, when outdoor air temperature is below chilled water return temperature, outdoor dry coolers or plate heat exchangers can directly introduce outdoor cooling, stopping or throttling the compressor for major savings. KITOZER in-row AC offers optional free-cooling coils; annual free-cooling hours in northern China are ~1,500–2,500 hours, lowering PUE by 0.1–0.2.
Chapter 6. Power Distribution
6.1 Standard Power Architecture
KITOZER-MicroDC standard power path:
6.2 Dual Feeds (2N / N+1)
Critical rooms require dual mains (from different substations) or dual mains + diesel generator. Dual feeds switch via ATS (Automatic Transfer Switch) or STS (Static Transfer Switch). The KITOZER dual-power ATS cabinet (KITOZER-ATS series) supports automatic switchover between two mains with ≤100 ms transfer.
High-availability scenarios (finance, large internet) use 2N architecture: two fully independent UPS systems each carrying 50% load; on failure of one, the other carries all. Investment is 2x single system, but availability reaches 99.999%.
General scenarios use N+1 redundancy: N UPS modules in parallel; on failure of one, the rest carry full load. Lower investment than 2N, availability 99.99%.
6.3 Diesel Generator
When UPS runtime (15–30 min) cannot cover long mains outages (typhoons, ice storms, equipment failure), a diesel generator is required. Generator capacity = UPS input + AC + lighting/maintenance, typically sized at 1.2× total load. KITOZER can supply 100–2,000 kW silent diesel generators, day tanks, parallel cabinets, and ATS interlock control.
6.4 Intelligent Busway and Smart PDU
Traditional row-head-to-rack distribution uses cables, requiring re-pulling for expansion. An intelligent busway is a prefabricated enclosed copper busbar running along the rack row; each rack position plugs in a tap-off box, adding as many circuits as needed with zero construction. KITOZER offers optional busway (160–630A) and smart PDUs (per-branch current monitoring, remote on/off, temperature-humidity monitoring).
Chapter 7. Installation and Commissioning
7.1 Factory Prefabrication
KITOZER-MicroDC is factory-assembled: rack joining, skylight pre-install, AC piping, UPS and battery cabinets, environmental controller, and a 72-hour factory burn-in. At shipment, the module is split into packages (racks, skylights, AC, UPS, batteries, cables).
7.2 On-site Installation Sequence
- Site preparation: floor leveling, load confirmation (≥800 kg/m², liquid-cooled ≥1,200 kg/m²), mains incoming, fiber incoming, water/drain/cooling water incoming.
- Rack positioning: lay out drawings, position racks row by row, fix base with expansion bolts, join with joining kits.
- Containment install: skylight framing, flip skylights (with magnetic latch and fire wiring), automatic sliding doors, end-door seals.
- AC install: slide in-row AC into reserved positions between rows, connect refrigerant lines (DX) or chilled water (chilled-water type), drain pipe, and condensate line. Evacuate and charge refrigerant.
- UPS and batteries: position UPS host and connect input/output cables; assemble battery racks and install cells, connect DC switches and busbars, install terminal covers.
- Cable routing: strong/weak separated trays; PDU power from rack bottom, network/fiber from top M-shaped trough.
- Environmental wiring: temperature-humidity sensors, leak rope, smoke, access, lintel display, RGB strips to the CC01 controller.
- Joint commissioning:
- Step 1: single-equipment power-on (AC, UPS, lighting, access separately)
- Step 2: communication network (CC01 reads all devices via RS485/Modbus)
- Step 3: functional tests (door open/close, skylight flip, RGB color, AC group rotation)
- Step 4: interlock tests (simulate fire signal → skylights open, doors unlock, AC stops, alarm sounds)
- Step 5: ≥72-hour stability run, recording PUE, voltage, and temperature curves.
7.3 Acceptance Criteria
- Cold aisle temperature stable at 22±2°C, point deviation ≤2°C
- UPS output 220V±3%, 50Hz±0.5Hz, THDi ≤3%
- Runtime within ±10% of design
- Fire interlock completes all actions within 30 seconds
- Environmental platform data point accuracy 100%
- 72 hours without alarm or fault
Chapter 8. Maintenance
8.1 Routine Inspection (Weekly/Monthly)
- Check cold-aisle temperature-humidity and lintel display
- Listen for abnormal AC fan noise
- Check UPS panel for alarms
- Review environmental platform for unresolved alarms
8.2 Quarterly Maintenance
- In-row AC filter cleaning or replacement (pre-filter every 3–6 months)
- Condensate pipe clearing
- Access lock lubrication
- Battery visual inspection (bulging, leakage)
- Flip skylight magnetic latch test
8.3 Annual Maintenance
- UPS power module deep inspection, capacitor life assessment
- Battery capacity discharge test (full capacity every 3 years)
- AC compressor running current and refrigerant pressure inspection
- Grounding resistance test
- Fire interlock full drill
- DCIM firmware upgrade
- Torque all electrical connections
8.4 Consumable Replacement Cycle
| Component | Recommended Cycle |
|---|---|
| Pre-filter | 3–6 months |
| Medium filter | 12 months |
| Fan belt (if any) | 3–5 years |
| VRLA battery | 3–5 years |
| LFP battery | 8–10 years |
| UPS module capacitor | 5–8 years |
| Seal gasket | 5–8 years |
| LED strip | 5–8 years |
| Refrigerant | Top up on leak; normally 10+ years |
8.5 Preventive vs Predictive Maintenance
Traditional preventive maintenance (periodic replacement) may over-service; Predictive Maintenance (PdM) uses DCIM data on fan vibration, battery internal resistance, AC compressor current, and temperature trends. AI models predict failures for precise pre-failure replacement. KITOZER offers an optional predictive maintenance module.
Chapter 9. Selection Guide
9.1 Selecting by IT Load
- Count current IT power (kW) and estimate 3-year expansion.
- Choose UPS: UPS capacity (kVA) = IT total (kW) / 0.9 × 1.3 redundancy.
- Choose cooling: total cooling = IT total × 1.15, split across in-row AC units with N+1.
- Choose rack count: invert by per-rack IT power. E.g., 200 kW total at 8 kW/rack = 25 racks → MicroDC-50.
9.2 Selecting by Site Conditions
- Floor load insufficient: wall/rack UPS, LFP batteries (light), avoid heavy battery room.
- Space tight: cold-aisle containment (30% energy saving vs open) + modular UPS (small footprint).
- No chilled water: DX in-row AC.
- Building chilled water available: chilled-water AC for higher efficiency.
- Cold outdoor climate: free-cooling version for lower PUE.
- Coastal/chemical: 304/316 stainless steel racks and anti-corrosion AC.
- High-density AI: directly choose MicroDC-Liquid.
9.3 Selection Decision Tree
Chapter 10. KITOZER vs Traditional Room
| Dimension | Traditional Room DC | KITOZER-MicroDC |
|---|---|---|
| Build cycle | 6–12 months | 4–8 weeks |
| On-site work | Renovation + MEP, dusty | Factory prefab + on-site assembly, low dust |
| PUE | 1.8–2.2 | 1.35–1.5 air / 1.1–1.2 liquid |
| Per-rack density | 2–6 kW | 8–30 kW air / 100 kW+ liquid |
| UPS redundancy | Line-frequency N+1, 92% efficiency | High-frequency modular N+1, 96% |
| Expansion | Re-renovate + replace UPS | Online module add + rack row add |
| Cooling redundancy | Central AC failure affects whole room | In-row N+1, failure affects segment |
| Monitoring | Independent vendor systems, need integration | Unified environmental + DCIM |
| Fire | Room-level gas suppression | Aisle flip skylight + gas suppression interlock |
| Upfront investment | Low (but poor efficiency) | Medium (but lower 5-year TCO) |
| 5-year TCO | High (expensive electricity) | Low (30%+ energy saving) |
| Portability | Not portable | Modules relocatable |
Chapter 11. Generic Cases
11.1 Generic Case A: SMB Headquarters Room
A mid-size enterprise (300–1,000 employees) needs a headquarters room for ERP, OA, email, video conferencing, file services, and network security. Total IT load ~60 kW, 12 racks.
Solution: MicroDC-20 air-cooled, using 12 racks with 8 reserved for expansion. UPS 120 kVA modular (3×50 kVA, N+1), 30-minute runtime. 4×25 kW in-row AC (N+1). Cold-aisle containment + face access + environmental monitoring. Designed PUE 1.5. Build cycle 6 weeks.
11.2 Generic Case B: AI Inference Center
An AI company needs a GPU inference room for video structuring, NLP inference, and image recognition. Per-rack density 15–20 kW, total IT load 200 kW, 12 racks.
Solution: MicroDC-50 high-density, 8×50 kW in-row AC (N+1), some racks with RDHx. UPS 300 kVA modular (6×50 kVA). LFP batteries for small footprint and long life. Designed PUE 1.35.
11.3 Generic Case C: Edge Node
A telecom operator needs a county-level edge node for 5G MEC, smart-city video analytics, and industrial internet access. IT load 30 kW, 6–8 racks, in a building telecom room (<30 m², 2.6 m ceiling, 500 kg/m² floor load).
Solution: compact MicroDC-10, single-row racks with one-side cold-aisle containment. UPS 60 kVA modular (2×30 kVA + 1 redundant). 2×25 kW in-row AC. LFP rack batteries for light weight. Container outer frame optional for outdoor building-side placement.
Chapter 12. 30 FAQs
Q1: What’s the real difference between modular and traditional rooms?
A: Modular pre-integrates racks, AC, UPS, containment, and monitoring at the factory for on-site assembly; traditional rooms renovate on site and procure separately. The former is 3–5x faster, 0.3–0.5 lower PUE, and supports online expansion.
Q2: Does the micro-module only work with KITOZER servers?
A: No. The micro-module is infrastructure; servers are IT. KITOZER racks support standard 19-inch servers of any brand; PDUs support IEC/C13/C19; AC is sized by standard cooling capacity, brand-agnostic.
Q3: Will operators suffocate inside the enclosed cold aisle?
A: No. Cold-aisle containment encloses roof and end doors, not a sealed chamber. Air exchanges with the hot aisle through server fans, and daily maintenance time is short. Code requires flip skylights to open on fire and allows manual opening for maintenance.
Q4: Is longer UPS runtime always better?
A: No. Each doubling of runtime roughly doubles battery investment. Standard practice is 15–30 min UPS + diesel generator. Batteries over 2 hours are only used where there is no generator or mains is extremely unreliable.
Q5: What is modular UPS N+1 redundancy?
A: N is the modules needed for load; +1 is one extra redundant module. E.g., load needs 5×50 kVA modules (250 kVA); install 6 (300 kVA). Any module fails, the remaining 5 still carry 250 kVA.
Q6: VRLA vs LFP, how to choose?
A: Under 15 min short runtime + tight budget → VRLA; space-constrained, wanting 10-year maintenance-free, sensitive to lifecycle cost → LFP. LFP costs 1.5–2x upfront but lasts 3–4x longer.
Q7: Can PUE go below 1.2?
A: Air-cooled micro-modules in standard climate zones struggle below 1.3. To reach below 1.2 requires liquid cooling and northern/high-altitude locations with long free-cooling hours.
Q8: At what per-rack density must I go liquid?
A: Air-cooled in-row physical limit is ~15–20 kW/rack. Above 20 kW consider RDHx; above 40 kW cold-plate; above 80 kW immersion.
Q9: Cold aisle or hot aisle containment?
A: <15 kW/rack general → cold aisle (simple, most common); >15 kW/rack high-density or operators long near aisle → hot aisle (prevents hot air leakage to operator area).
Q10: Will one in-row AC failure take down the room?
A: No. In-row AC is N+1; on failure, the rest auto-fill. The environmental platform alarms immediately, and operators replace within 48 hours.
Q11: Does the micro-module need a dedicated AC room?
A: Air-cooled DX does not—no, in-row AC sits between rack rows; outdoors only needs a condenser (dry cooler). Chilled-water type needs a central plant or independent plant.
Q12: Fire suppression—gas or sprinkler?
A: Data center rooms use gas suppression (FK-5-1-12 or IG541), not water sprinklers (which damage equipment). Cold-aisle flip skylights handle smoke exhaust; gas suppression handles discharge.
Q13: Can I put the micro-module on an upper floor?
A: Calculate floor load. A standard micro-module (with batteries) is ~800–1,200 kg/m²; typical office floor is ~500 kg/m². Upper-floor rooms should use LFP (light), wall-mounted UPS, and floor load reinforcement.
Q14: Typical build cycle?
A: MicroDC-20 scale (20 racks) from order to power-on ~6–8 weeks: 3–4 weeks factory, 2–3 weeks on-site assembly, 1 week commissioning.
Q15: Does expansion require shutdown?
A: UPS power modules are hot-swappable; expansion is non-disruptive. Adding a rack row beside the aisle may briefly affect adjacent-row cold air—recommend off-peak.
Q16: Can the micro-module be relocated?
A: Yes. Containerized and disassemble-again versions support relocation. Relocation requires shutdown, discharge, disassembly, transport, reassembly, and re-commissioning.
Q17: Can I monitor environmental data via app?
A: Yes. KITOZER-CC01 connects to DCIM, with web/WeChat mini-program/app real-time view of temperature, power, and alarms, plus SMS/email/phone alerts.
Q18: Annual AC maintenance cost?
A: ~5–8% of AC equipment value per year, mainly filters, refrigerant top-up, and compressor inspection.
Q19: How long do batteries last?
A: VRLA at 25°C lasts 3–5 years, halving per 10°C rise; LFP lasts 8–10 years. Keep the battery room at ~22°C for best life.
Q20: Is the room safe during thunderstorms?
A: KITOZER in-row AC and UPS incoming have standard 6 kV SPD; rack combined grounding ≤1Ω. External feeds also require a level-1 SPD (10/350 μs waveform).
Q21: What’s the relationship between micro-module and containerized DC?
A: Containerized DC is the “whole-shell version” of a micro-module—packing the entire module into a container, factory-tested and lifted to site. Suited to remote, no-building, rapid-deployment scenarios.
Q22: How many operators does a data center need?
A: MicroDC-20 scale—unattended + remote O&M, weekly inspection; MicroDC-100+ recommended 24×7 staffed or resident.
Q23: How long does UPS last on power failure?
A: Standard 15–30 minutes. This buffers generator start (if present) or orderly server shutdown. Without a generator, batteries must be enlarged or a generator added.
Q24: What’s the right air-cooled cold aisle temperature?
A: ASHRAE A1 recommends 18–27°C server intake. KITOZER designs cold aisle at 22±2°C—both energy-saving and safe.
Q25: Why use smart PDUs?
A: Smart PDUs monitor per-branch current, remotely switch outlets, and measure per-rack energy—the foundation of refined DCIM. Ordinary PDUs only supply power without monitoring.
Q26: How noisy is the micro-module room?
A: In-row AC at 1 m is ~70–75 dB(A), equivalent to a busy city street. Short-duration entry is acceptable; long-duration work requires acoustic treatment.
Q27: How are water leak sensors deployed?
A: Leak rope runs under in-row AC, along condensate pipes, and around UPS/battery cabinets; length follows the path. On leak signal, the environmental platform alarms immediately.
Q28: Roughly how much is annual data center electricity?
A: At PUE 1.5, 100 kW IT load, ¥0.8/kWh: annual = 100 kW × 24h × 365 × 1.5 × ¥0.8 ≈ ¥1.05M/year. Lowering PUE from 1.8 to 1.5 saves ~¥420k/year.
Q29: Does KITOZER deliver turnkey projects?
A: Yes. KITOZER handles detailed design, equipment supply, on-site installation, commissioning, acceptance, training, and warranty end-to-end. The customer only provides the site and mains.
Q30: How do I request a quote?
A: Call/WeChat +86 13922289957 or +86 18520668845; WhatsApp +86 19068534140. Provide IT load, rack count, site conditions, and runtime requirement; KITOZER returns a design and quote within 48 hours.
Chapter 13. Packaging, Delivery, and Warranty
13.1 Packaging
KITOZER-MicroDC uses export-standard packaging:
– Racks, skylights, AC: seven-layer corrugated box + foam corner + wooden pallet
– UPS hosts, batteries: separate wooden crates; batteries in shock-resistant packaging
– Cables and accessories: categorized cartons
– Sea freight: optional fumigated wooden pallets (IPPC mark)
13.2 Lead Time
- MicroDC-10/20 standard air-cooled: 25–35 working days
- MicroDC-50/100: 45–60 working days
- Liquid-cooled / containerized: 60–90 working days
- Expedited projects negotiable.
13.3 Warranty
- 3-year whole-unit warranty (racks, AC, UPS, environmental)
- 2-year battery warranty (VRLA) / 3-year (LFP)
- Consumables (filters, gaskets) excluded
- 5-year extended warranty available
Chapter 14. Inquiry CTA
KITOZER-MicroDC modular data center is tailored to your IT load, rack count, site conditions, and runtime requirement. Whether you are building new, expanding, or retrofitting a traditional room, KITOZER delivers standard solutions from 10 to 100 racks in air-cooled, liquid-cooled, and containerized versions.
Contact us now:
– Tel/WeChat: +86 13922289957
– Tel/WeChat: +86 18520668845
– WhatsApp: +86 19068534140
– Website: lain.com.cn / gdlain.com
– Address: Chaotian Park, Zhongrun Industrial Zone, No. 5 Huashan Road, Shilou, Panyu, Guangzhou, China.
Provide the following for a 48-hour design and quote:
1. Current IT total power (kW) or server count
2. Expected rack count (or 3-year expansion estimate)
3. Room area, ceiling height, floor load
4. Availability of building chilled water, dual mains, diesel generator
5. Runtime requirement
6. Project location (for climate and freight)
Chapter 15. Company Contact
Guangzhou Laian Intelligent System Development Co., Ltd.
- Brand: KITOZER
- Tel/WeChat: +86 13922289957
- Tel/WeChat: +86 18520668845
- WhatsApp: +86 19068534140
- China site: https://www.lain.com.cn
- Global site: https://www.gdlain.com
- Address: Chaotian Park, Zhongrun Industrial Zone, No. 5 Huashan Road, Shilou, Panyu, Guangzhou, China.
KITOZER product lines cover: modular data centers, outdoor integrated cabinets, precision row-head distribution, dual-power ATS cabinets, shielded cabinets, 4K network video surveillance, smart electricity safety monitoring, utility-tunnel monitoring, wind-farm micro-modules, bridge structural health monitoring, and online water quality monitoring.
Chapter 16. Industry Standards and Certifications
The design, construction, and acceptance of a modular data center must follow a series of national, industry, and international standards. Understanding these standards is a prerequisite for selection and acceptance.
16.1 Chinese National Standards
GB 50174 “Data Center Design Code” is the fundamental law of data center construction in China. It classifies data centers into A, B, and C tiers based on usage, management requirements, and business criticality:
- Tier A (fault-tolerant): for finance, large internet, and national core government rooms. Requires 2N or 2(N+1) power distribution, N+1 cooling, N+1 diesel generators, and 99.999% availability.
- Tier B (redundant): for general government and mid-size enterprise rooms. Requires N+1 power, N+1 cooling, and 99.99% availability.
- Tier C (basic): for small enterprise and edge nodes. Requires basic power and cooling, 99.9% availability.
KITOZER-MicroDC-20/50 defaults to Tier B and can be upgraded to Tier A (dual UPS parallel + dual mains + diesel generator).
GB 50462 “Code for Construction and Acceptance of Data Center Infrastructure” specifies construction workmanship, test methods, and acceptance criteria, including: rack verticality deviation ≤3 mm, floor flatness ≤2 mm/m, grounding resistance testing, UPS load test (4 hours full load), cooling airflow balancing, and fire interlock testing.
GB 50052 “Power Supply System Design Code” defines load classification and supply requirements. Data centers are typically special important first-class loads, requiring dual mains plus emergency power.
GB 50057 “Building Lightning Protection Design Code” requires data centers to be designed as Class II lightning protection buildings with grounding resistance ≤1Ω.
GB 50116 “Fire Automatic Alarm System Design Code” requires data centers to install aspirating early smoke detection (VESDA), because traditional point smoke detectors respond slowly under high airflow in contained cold aisles.
GB/T 2887 “General Specification for Computer Sites” defines baseline temperature, humidity, dust, noise, and lighting requirements.
16.2 International Standards
TIA-942 “Data Center Telecommunications Infrastructure Standard” is published by the Telecommunications Industry Association, classified into Rated 1–4 by availability:
– Rated 1: basic, single path power and cooling
– Rated 2: component redundancy, N+1
– Rated 3: concurrently maintainable, all components can be replaced online without interruption
– Rated 4: fault-tolerant, any failure does not cause interruption
Uptime Institute Tier Standard is the internationally recognized data center tier certification:
– Tier I: basic, 99.671% availability, ~29 hours downtime/year
– Tier II: redundant components, 99.741%, ~22 hours
– Tier III: concurrently maintainable, 99.982%, ~1.6 hours
– Tier IV: fault-tolerant, 99.995%, ~0.4 hours
ISO/IEC 30134 defines the data center efficiency metric system, including PUE (Power Usage Effectiveness), WUE (Water Usage Effectiveness), CUE (Carbon Usage Effectiveness), and REE (Renewable Energy Energy efficiency ratio). Export projects or multinational companies often require annual reports on these metrics.
ASHRAE TC 9.9 is the authoritative guide for data center thermal environments. The 2015 edition widened recommended server intake temperature from 18–27°C (recommended) to 5–45°C (allowable), enabling higher supply temperatures and energy-saving operation.
IEC 60364 is the international standard for low-voltage distribution, required for EU export projects.
16.3 KITOZER Product Compliance
KITOZER-MicroDC products are certified:
– CCC China Compulsory Certification (low-voltage equipment, UPS, AC)
– CE EU certification (EU export)
– UL US certification (North America export, optional)
– ISO 9001 Quality Management System
– ISO 14001 Environmental Management System
– Telecom Network Access License (carrier projects)
Chapter 17. High-Voltage Power Distribution and Transformers
A complete data center power distribution starts at 10 kV (or 35 kV/110 kV) high-voltage incoming, steps down through a transformer to 0.4 kV low voltage, and then feeds the UPS and loads.
17.1 High-Voltage Incoming
Large data centers typically bring in dual 10 kV mains from different substations as mutual backup. Medium-voltage switchgear commonly uses metal-clad withdrawable switchgear (e.g., KYN28-12), containing vacuum circuit breakers, microcomputer protection, metering cabinets, and PT cabinets. KITOZER can supply KYN28 switchgear and SVG reactive compensation.
17.2 Transformers
10 kV/0.4 kV transformers commonly include:
– Dry-type transformers (SCB10/SCB13): non-flammable, indoor-installable, simple maintenance—data center mainstream. Capacity from 400 kVA to 2,500 kVA.
– Oil-immersed transformers (S11/S13): cheaper but require a separate transformer room, usually outdoor.
Transformer capacity is sized at 1.2–1.5× total load, usually with two units so one carries all first-class loads on failure. KITOZER supplies SCB13 dry-type transformers with enclosure protection.
17.3 Low-Voltage Distribution
0.4 kV low-voltage switchgear commonly uses MNS/GCS draw-out switchgear by function:
– Incoming cabinet: main power incoming with frame circuit breaker
– Capacitor compensation cabinet: automatic switched capacitors, power factor corrected to ≥0.95
– Bus tie cabinet: bus tie between two LV sections, switches on failure
– Outgoing cabinet: branches to UPS, AC, lighting, maintenance
KITOZER precision row-head cabinets (MNS draw-out series) distribute UPS output to rack rows, with per-branch current monitoring and miniature circuit breakers.
17.4 Power Factor and Harmonics
UPS rectifiers are harmonic sources; THDi can exceed 30%, degrading power factor and overheating transformers. KITOZER modular UPS uses IGBT rectification as standard, THDi ≤3%, power factor ≥0.99, eliminating the need for extra harmonic filtering. Older line-frequency UPS require Active Power Filters (APF).
Chapter 18. Lightning Protection, Grounding, and Electrical Safety
18.1 Lightning Protection Zones
Per IEC 62305, data center lightning protection is divided into four zones:
– LPZ 0A: building exterior, exposed to direct strike
– LPZ 0B: building exterior, strike-protected but electromagnetic field not attenuated
– LPZ 1: building interior, electromagnetic field attenuated
– LPZ 2: data hall interior, further attenuated
Surge Protective Devices (SPD) are installed at each zone boundary:
– Level 1 SPD (10/350 μs waveform, Iimp ≥12.5 kA): LV incoming cabinet
– Level 2 SPD (8/20 μs, In ≥20 kA): UPS input
– Level 3 SPD (8/20 μs, In ≥10 kA): rack PDU
KITOZER in-row AC and UPS incoming include standard Level 2 6 kV SPD; rack PDUs can include Level 3 SPD.
18.2 Grounding System
Data centers use a combined grounding system: working grounding, protective grounding, lightning grounding, and anti-static grounding share one set of electrodes, with grounding resistance ≤1Ω.
- Working grounding: UPS DC neutral
- Protective grounding: rack enclosures, AC enclosures, cable trays
- Lightning grounding: lightning rods/belts, SPD grounding
- Anti-static grounding: anti-static floor pedestals
Racks connect to the hall grounding copper busbar via M6 grounding bars; the busbar cross-section ≥100 mm².
18.3 Electrical Safety
- All metal enclosures reliably grounded, so enclosure voltage on fault ≤50 V
- Circuit breakers selectively coordinated: upstream frame, downstream molded case, end miniature
- RCD protection: 30 mA on maintenance outlets and lighting circuits
- Electrical clearance and creepage distance per GB 7251
Chapter 19. Fire Protection Design
19.1 Fire Detection
Data center fires have a smoldering stage; traditional point smoke detectors respond slowly under cold-aisle high airflow (possibly delayed 5–10 minutes). KITOZER recommends Aspirating Smoke Detection (ASD/VESDA): sampling holes actively draw air through laser scattering detection for extremely early smoke, 1,000× more sensitive than traditional detectors, warning 30–60 minutes before visible smoke.
19.2 Gas Suppression
Data centers cannot use water sprinklers (which damage equipment); they use clean agent gas suppression:
– HFC-227ea (FM-200): most common, extinguishing concentration 7–9%, discharge ≤10 seconds, non-corrosive to equipment.
– IG541 mixed gas: 52% N₂ + 40% Ar + 8% CO₂, physical oxygen depletion, environmentally friendly, but many cylinders and large footprint.
– Novec 1230 (FK-5-1-12): next-generation environmentally friendly agent, extremely low GWP, gaining adoption.
Suppression is divided by protection zone: one cold-aisle row or one hall is a zone with its own cylinder bank and nozzles. Before discharge: shut down AC, close fire dampers, delay 30 seconds for evacuation, then discharge.
19.3 Flip Skylight Interlock
After cold-aisle containment, smoke must exhaust on fire. KITOZER flip skylights are held by magnetic latches; on fire alarm, the latch de-energizes and skylights open by gravity to form a smoke exhaust path. This is the critical fire design that distinguishes contained cold aisles from traditional rooms.
19.4 Fire and Access Control Interlock
On fire alarm, access doors auto-unlock for evacuation; the environmental platform records fire time, location, and discharge status, and notifies on-call staff.
Chapter 20. DCIM and Digital Twin
20.1 DCIM Definition
Data Center Infrastructure Management (DCIM) is a software platform that unifies power, cooling, space, and asset management. Building on traditional environmental monitoring (which only monitors environmental variables), DCIM adds IT assets, capacity planning, energy analysis, and capacity heat maps.
KITOZER-DCIM main modules:
– Real-time monitoring: per-rack temperature, humidity, power, switch status
– Alarm management: multi-level alarms (info/general/serious/critical), SMS/email/app push
– Asset management: rack U-position map, recording each device location, model, go-live date, warranty
– Capacity management: visual display of remaining U positions, remaining power, remaining cooling
– Energy analysis: real-time PUE, energy reports, energy-saving recommendations
– Report center: daily/weekly/monthly automatic reports
– API: integration with BMS, ERP, ITSM
20.2 Digital Twin
Next-generation DCIM introduces Digital Twin: 3D modeling recreates the entire data hall in virtual space, real-time mapping each rack’s temperature, fan speed, and UPS load. Operators click any rack in the 3D scene to see all data and historical curves. Digital Twin also supports expansion simulation: add a rack in the virtual scene, and the software automatically calculates impact on the temperature field, power, and cooling, supporting decisions.
20.3 Intelligent Busway and Smart PDU
KITOZER intelligent busway and smart PDU are the DCIM data endpoints:
– Intelligent busway: runs along rack rows, each section has current and temperature sensors connected to DCIM
– Smart PDU: per-outlet current monitoring, remote on/off, per-rack energy statistics
– Through these endpoints, DCIM can be precise to “the current of a specific outlet in a specific rack,” rather than traditional “total row current.”
Chapter 21. Thermodynamics and Cooling Principles
21.1 Refrigeration Cycle
The vapor-compression refrigeration cycle consists of four processes:
1. Compression: low-temperature low-pressure refrigerant gas is compressed into high-temperature high-pressure gas
2. Condensation: high-temperature high-pressure gas rejects heat to outdoor air (or cooling water), condensing into liquid
3. Expansion: high-pressure liquid throttles through an expansion valve into low-temperature low-pressure gas-liquid mixture
4. Evaporation: low-temperature mixture absorbs indoor heat in the evaporator and vaporizes back to the compressor
Coefficient of Performance COP = Cooling capacity / Input power. KITOZER-CRAC50 at rated conditions has COP ~3.5–4.0 (i.e., consumes 1 kW of electricity to move 3.5–4 kW of heat).
21.2 Inverter Technology
Traditional fixed-speed AC compressors either run at full load or stop, causing large temperature swings. Full inverter compressors automatically adjust speed based on cold-aisle temperature: full speed when hot, low speed when near setpoint. Inverter AC part-load efficiency (IPLV) is 30–50% higher than fixed-speed, with smaller temperature swings, lower inrush current, and longer life.
21.3 Wet-bulb and Electrode Humidification
Data center humidity too low causes static electricity (damaging semiconductors); too high causes condensation. Winter dryness requires humidification:
– Wet-bulb humidification: water permeates a wet pad; air passing through picks up moisture—no white mist, bacteria-free, energy-saving. Humidification 3–8 kg/h.
– Electrode humidification: water electrolyzed between electrodes and evaporated, high capacity but scale-prone and requires periodic cleaning.
KITOZER-CRAC50 defaults to wet-bulb, with electrode humidification as option.
21.4 Free Cooling
When outdoor temperature is below chilled water return temperature (typically 7–12°C), plate heat exchangers or direct outdoor air intake provide cooling, turning off or throttling the compressor. In northern China, free-cooling hours can reach 2,000–3,000 per year, lowering PUE by 0.15–0.25.
Chapter 22. Power Electronics and Battery Electrochemistry
22.1 UPS Topology
Online double-conversion UPS is the most common data center topology:
– Rectifier: converts AC to DC. Traditional 6-pulse diode rectification has THDi ≈30%; modern IGBT PWM rectification has THDi ≤3%, power factor ≈1.
– Inverter: converts DC to clean AC. IGBT three-level topology, output THD <3%, suitable for nonlinear loads (server power supplies).
– Static bypass switch: thyristor switch, transfer time <1/4 cycle (<5 ms).
– Maintenance bypass: mechanical switch, bypasses UPS during service.
ECO mode: when mains quality is good, UPS feeds load directly through bypass at 99% efficiency; on mains abnormality, switches back to double-conversion. ECO saves energy but has a few milliseconds of transfer, negligible for server power supplies.
22.2 Battery Electrochemistry
VRLA Lead-Acid:
– Positive: PbO₂, Negative: Pb, Electrolyte: dilute sulfuric acid
– Discharge: PbO₂ + Pb + 2H₂SO₄ → 2PbSO₄ + 2H₂O
– Charge: reverse reaction
– Valve-regulated design: oxygen generated on charge recombines to water at the negative, no watering needed
– Failure modes: plate sulfation, grid corrosion, electrolyte dry-out, thermal runaway
LFP Lithium Iron Phosphate:
– Positive: LiFePO₄, Negative: graphite
– Operating voltage 3.2 V, long life, high safety (no fire or explosion)
– BMS monitors per-cell voltage and temperature, balancing charge
– 6,000+ cycles, 10-year maintenance-free
22.3 Parallel Operation and Circulating Current
When multiple UPS units parallel, they must synchronize phase and amplitude via parallel lines, otherwise circulating (reactive) current flows. KITOZER modular UPS has a built-in parallel bus, up to 4 units, with circulating current <2%.
Chapter 23. Detailed Worked Examples
23.1 IT Load Estimation
An enterprise has 30 servers at 500 W each; networking equipment 5 kW; storage 10 kW.
Total IT load = 30×0.5 + 5 + 10 = 30 kW.
With 30% expansion reserve = 30×1.3 = 39 kW, round to 40 kW.
23.2 UPS Sizing
UPS capacity (kVA) = IT load (kW) / power factor (0.9) / redundancy factor (0.8)
= 40 / 0.9 / 0.8 = 55.6 kVA; choose 60 kVA modular UPS (2×30 kVA modules + 1 redundant).
23.3 Cooling Sizing
Total cooling = IT load × 1.15 (including fans, lighting, UPS losses)
= 40 × 1.15 = 46 kW.
Choose 2×25 kW in-row AC (N+1, total 50 kW).
23.4 Battery Runtime
60 kVA UPS at 40 kW load, DC bus ±192 V (384 V total), choose 32× 12V100Ah batteries.
Battery energy = 384 V × 100 Ah = 38.4 kWh.
After 95% inverter efficiency and cutoff, usable ~34 kWh.
Runtime = 34 / 40 = 0.85 hour ≈ 51 minutes.
For 30-minute runtime, batteries can be reduced to 16× 12V100Ah, energy 19.2 kWh, runtime ~29 minutes.
23.5 PUE Estimation
Annual electricity = IT load (kW) × 24h × 365 days × PUE × price (¥/kWh)
= 40 × 24 × 365 × 1.5 × 0.8 = ¥420,480/year.
Lowering PUE from 1.8 to 1.5 saves = 40×24×365×(1.8-1.5)×0.8 = ¥84,096/year.
Chapter 24. Construction Organization and Project Management
24.1 Project Phases
KITOZER micro-module projects have six phases:
1. Requirements survey: collect IT load, rack count, site, mains, chilled water conditions
2. Detailed design: produce construction drawings, equipment list, layout, power diagrams, schematics
3. Factory prefabrication: workshop rack joining, AC pre-install, UPS testing, 72-hour burn-in
4. Logistics: disassemble and ship, on-site secondary handling
5. On-site construction: assembly, power connection, piping, wiring
6. Commissioning and acceptance: single-equipment test, interlock test, 72-hour burn-in, acceptance report
24.2 Construction Safety
- Anti-static suits and insulating shoes on site
- Live work requires two people, one monitoring
- Work at height (>2 m) requires safety harness
- Hot work requires a permit and fire extinguisher
- Battery handling uses forklift, with short-circuit protection
24.3 Project Documentation
On delivery, provide:
– As-built drawings (CAD electronic)
– Equipment list and certificates
– Test reports (UPS load, AC airflow, grounding resistance, fire interlock)
– Operation and maintenance manuals
– DCIM accounts and training records
Chapter 25. SLA and Availability Calculations
25.1 Availability Metrics
Availability = Actual uptime / Total time. Common SLAs:
– 99.9% (three nines): 8.76 hours downtime/year
– 99.99% (four nines): 52.6 minutes
– 99.999% (five nines): 5.26 minutes
25.2 N+1 vs 2N Availability
N+1 systems achieve ~99.99% availability; 2N systems ~99.999%. KITOZER-MicroDC defaults to N+1 and can be upgraded to 2N.
25.3 Single-Point-of-Failure Analysis
Micro-module design must identify all single points of failure:
– Single AC failure → N+1 redundancy, acceptable
– Single UPS module failure → hot-swappable, acceptable
– Single mains failure → ATS switchover, acceptable
– Single pipe leak → leak rope alarm, acceptable
– Environmental controller failure → standby controller, acceptable
– False fire discharge → dual detection + delay, prevents false discharge
Chapter 26. Detailed Subsystem Parameter Tables
This chapter presents complete parameter lists for KITOZER standard products across subsystems, as a reference for selection.
26.1 42U Smart Rack (KITOZER-MDC600-2026)
| Parameter | Specification |
|---|---|
| Dimensions (W×D×H) | 600×1200×2000 mm |
| Rack height | 42U |
| Static load | 1,500 kg |
| Dynamic load | 1,000 kg |
| Upright material | SPCC cold-rolled steel, 1.5–2.0 mm |
| Square holes | 9.5×9.5 mm standard, with U-position numbering |
| Front door | Single perforated front door, 75% ventilation, lock |
| Rear door | Double perforated rear door, 75% ventilation |
| Side panels | Embedded, removable |
| Top/bottom panels | Cable entry holes with brush strips |
| Grounding | M6 copper bar to hall ground bus |
| Rack joining | Joining kits for multiple racks |
| Color | RAL 7035 light gray (standard), RAL 9004 black optional |
| Surface | Degreased + phosphated + epoxy powder, 80–120 μm |
| Protection | IP20 (indoor) |
| Installation | Expansion-bolt base, ±10 mm leveling feet |
26.2 In-row Precision AC (KITOZER-CRAC50-2026)
| Parameter | Specification |
|---|---|
| Cooling capacity | ≥50 kW (24°C/50% RH rated) |
| Airflow | ≥10,300 m³/h |
| External static pressure | 30–80 Pa adjustable |
| Compressor | Full DC inverter scroll |
| Evaporator | Copper tube aluminum fin, hydrophilic coating |
| Condenser | Air-cooled (outdoor dry cooler) |
| Refrigerant | R410A or R32 (eco-friendly) |
| Air delivery | Horizontal front supply, rear return |
| Fans | EC centrifugal, N+1, variable 10–100% |
| Reheat | PTC electric ≥6 kW, staged |
| Humidification | Wet-bulb ≥3 kg/h, electrode 8 kg/h optional |
| Dehumidification | Cooling dehumidification with reheat |
| Control accuracy | Temperature ±1°C, humidity ±5% RH |
| Power | 380V/3Ph/50Hz |
| Rated power | ~15 kW |
| Noise | ≤75 dB(A) at 1.5 m |
| Dimensions | 600×1200×2000 mm (same width as rack) |
| Control | 7-inch touchscreen, Chinese menu |
| Communication | RS485/Modbus/BACnet/SNMP |
| Group control | Up to 32 units, auto master rotation |
| Surge | 6 kV SPD on incoming |
| Drain pump | Built-in, head ≥5 m |
26.3 Modular UPS (KITOZER-UP500-2026 + UPM50 module)
| Parameter | Specification |
|---|---|
| Host capacity | 500 kVA |
| Topology | Online double-conversion three-level IGBT |
| Input | 380V/3Ph/50Hz, ±20% voltage range |
| Output | 380V/3Ph/50Hz |
| Output power factor | 0.9–1.0 |
| Overall efficiency | ≥96% (double-conversion), ≥99% (ECO) |
| Input power factor | ≥0.99 |
| Input THDi | ≤3% (full load) |
| Output THDv | ≤3% (linear load) |
| Dynamic response | ≤2% transient, 20 ms recovery |
| Parallel | Up to 4 hosts |
| Power module | 50 kVA/4U, hot-swap, N+1 |
| Battery voltage | ±192–±264 VDC adjustable |
| Static bypass | Thyristor switch, <5 ms |
| Maintenance bypass | Mechanical switch, isolates host |
| Communication | RS485/SNMP/dry contacts |
| Display | 7-inch touchscreen |
| Noise | ≤65 dB(A) |
| Operating temperature | 0–40°C |
| Protection | IP20 |
26.4 VRLA Battery (KITOZER-BAT250-2026)
| Parameter | Specification |
|---|---|
| Model | 12V250Ah valve-regulated lead-acid |
| Rated voltage | 12V |
| Rated capacity | 250 Ah (10-hour rate) |
| Dimensions | 522×240×218 mm |
| Weight | ~75 kg |
| Float design life | 10–12 years (25°C) |
| Cycle life | 1,200 cycles (80% DOD, 25°C) |
| Operating temperature | -15 to +50°C (optimum 20–25°C) |
| Charge voltage | Equalize 2.35 V/cell, float 2.25 V/cell |
| Self-discharge | ≤3%/month (25°C) |
| Terminal | M8 copper, with cover |
| Enclosure | Flame-retardant ABS, UL94-V0 |
26.5 Smart PDU (KITOZER-PDU63A-2026)
| Parameter | Specification |
|---|---|
| Input | 63A/240V single-phase |
| Output | 20×10A CN 5-hole + 4×16A CN 3-pin |
| Cable | 3×6 mm² + 1×4 mm² |
| Mounting | Vertical in rack, U-adjustable |
| Monitoring | Total current, voltage, power, energy |
| Branch monitoring | Per-branch current optional |
| Remote control | Per-outlet on/off optional |
| Communication | RJ45/TCP-IP |
| Overload | 63A breaker |
| Surge | 10 kA SPD |
| Color | Black |
Chapter 27. Detailed Generic Cases
27.1 Generic Case A: SMB Headquarters (MicroDC-20)
Background: A mid-size enterprise of 300–1,000 employees with ERP, OA, email, file services, video conferencing, network security, and virtualization. The old room was a converted office with poor PUE, no redundancy, and past AC water leak caused business interruption. The new headquarters room requires high availability, energy efficiency, and scalability.
Design inputs:
– Current IT load: 35 kW
– 3-year expansion forecast: 55 kW
– Racks needed: 12 now, 20 in 3 years
– Site: independent first-floor room, 60 m², 3.2 m ceiling, 800 kg/m² floor load
– Mains: single 100 kVA feed (dual feed recommended)
– Runtime: 30 minutes
Solution:
– MicroDC-20 air-cooled, double rows of 10 racks
– UPS: 200 kVA modular (4×50 kVA modules, N+1; initial 3 modules + 1 redundant)
– Batteries: 80× 12V100Ah VRLA (30-minute runtime)
– AC: 4×25 kW in-row (N+1)
– Cold aisle: glass flip skylights + automatic sliding doors + face access + RGB strips + lintel display
– Environmental: CC01 controller + leak rope + smoke + temp-humidity
– Fire: HFC-227ea gas suppression + VESDA aspirating detection
– Designed PUE: 1.5
Investment estimate: equipment ~¥1.8–2.2M, installation ~¥0.3M, total ~¥2.2–2.5M. Annual electricity ~¥0.35M (PUE 1.5), saving ~¥0.1M/year vs old PUE 2.0.
Implementation cycle: 45 days to delivery after contract, 15 days on-site, 7 days commissioning, ~67 days total.
27.2 Generic Case B: AI Inference Center (MicroDC-50 High-density)
Background: An AI company builds a room for video structuring, NLP inference, and image recognition. Servers are GPU inference boxes, 15–20 kW per rack.
Design inputs:
– IT load: 200 kW
– Racks: 12 high-density racks
– Per-rack power: 15–20 kW
– Runtime: 15 minutes (with diesel generator)
– Site: second-floor room, 1,000 kg/m²
Solution:
– MicroDC-50 high-density, 12 high-density + 8 reserved standard racks
– UPS: 300 kVA modular (6×50 kVA, N+1)
– Batteries: LFP LiFePO4 (51.2V200Ah × 20 packs, ~2 m² footprint, 15-minute runtime)
– AC: 8×50 kW in-row (N+1), high-density racks with RDHx rear-door
– Cold aisle: fully enclosed, glass flip skylights
– Environmental: CC01 + DCIM Digital Twin platform
– Designed PUE: 1.35
Value: LFP batteries save 70% footprint and 60% weight vs VRLA, suiting second-floor load limits. RDHx picks up 20 kW rack hot exhaust directly into cooling water, preventing hot-aisle high temperature.
27.3 Generic Case C: Edge Node (MicroDC-10)
Background: A telecom operator builds a county-level 5G MEC edge node for video analytics, industrial internet access, and AR/VR. Site is a building telecom room, only 25 m², 2.6 m ceiling, 500 kg/m².
Design inputs:
– IT load: 30 kW
– Racks: 8
– Runtime: 10 minutes (with small diesel generator)
– Site: telecom room, no dedicated AC room
Solution:
– MicroDC-10 compact, single row of 8 racks + one-side cold-aisle containment
– UPS: 60 kVA modular (2×30 kVA + 1 redundant)
– Batteries: LFP rack-mounted (light weight)
– AC: 2×25 kW in-row
– Cold aisle: one-side end door + face access
– Environmental: CC01 remote monitoring, unmanned
– Designed PUE: 1.6
Value: Single-row layout saves space, suiting small telecom rooms. LFP batteries are light, within floor load. Remote unmanned operation, weekly inspection.
Chapter 28. Common Engineering Pitfalls
Pitfall 1: Sizing UPS only for current load without redundancy
Many customers size UPS to exactly match current IT load, e.g., 30 kW load → 30 kVA UPS running at full load. Problems: (1) full-load UPS has low efficiency, high heat, short life; (2) no redundancy—UPS failure stops everything; (3) no room for expansion. Correct: UPS = IT/0.9/0.8 redundancy factor; modular UPS initially installs N+1 modules.
Pitfall 2: Sizing AC only by IT load, ignoring fans and UPS losses
AC cooling should be IT load × 1.15, because fans, lighting, and UPS losses also produce heat. E.g., 40 kW IT → AC must be ≥46 kW.
Pitfall 3: Containing the cold aisle but leaving doors open
Cold aisle end doors left propped open or wrong skylights (all fixed, no flip) defeat containment. End doors must auto-close (self-closer or automatic sliding), and skylights must include fire-linked flip units.
Pitfall 4: Not controlling battery room temperature
Batteries are optimal at 25°C; life halves per 10°C rise. Many customers put batteries in the UPS room without dedicated AC, summer temperature reaching 35–40°C, and batteries fail in 2 years. Correct: keep battery room at 22–25°C.
Pitfall 5: Ignoring leak detection
In-row AC has condensate pipes; UPS has VRLA battery acid; leaks corrode floors and cause shorts. Leak rope must run under AC and around battery cabinets, connected to environmental alarms.
Pitfall 6: Environmental monitoring alarms locally only
Many environmental systems alarm only on the local screen; if staff are not on site, they miss it. Must configure SMS/phone/app push, 24×7 alarm to personnel.
Pitfall 7: Not anticipating PDU capacity at expansion
Initially selecting 16A PDUs for 2 kW/rack, then later installing 20 kW GPU racks and overloading PDUs. Correct: size PDUs for 3-year future density, 50% margin.
Pitfall 8: False gas suppression discharge
Gas suppression with single detection (smoke only) may false-discharge from dust or steam, causing massive loss. Correct: dual detection (smoke + heat, or two-stage VESDA), manual confirmation before discharge, 30-second delay.
Pitfall 9: Not testing grounding
Many installers connect ground wires but do not test resistance. Poor grounding makes SPD ineffective during lightning. Delivery must test grounding resistance ≤1Ω with a report.
Pitfall 10: Ignoring noise impact
In-row AC noise 75 dB(A); if the room is next to an office, employees complain. Build acoustic walls between data hall and offices, or select low-noise AC models.
Chapter 29. O&M SOP
29.1 Daily Inspection (Remote)
- Log in to DCIM
- Check cold aisle temperature (should be 22±2°C)
- Check UPS load rate (should be <80%)
- Check battery voltage (should be in float range)
- Review alarm list, acknowledge unprocessed alarms
- Check daily PUE
29.2 Weekly Inspection (On-site)
- Check cold aisle temp-humidity lintel display
- Listen to in-row AC fan noise
- Check UPS panel for alarms
- Check leak rope status
- Review access logs for unusual openings
- Clean pre-filter dust from AC
29.3 Quarterly Maintenance
- Clean or replace AC pre-filters
- Check condensate pipe clearance
- Test access locks
- Inspect batteries (bulging, leakage, terminal corrosion)
- Test flip skylight magnetic latch
- Test automatic sliding door anti-pinch
29.4 Annual Maintenance
- UPS power module deep inspection (capacitors, fans, relays)
- Battery full-capacity discharge test (every 3 years)
- AC compressor current, refrigerant pressure inspection
- Grounding resistance test
- Fire interlock full drill
- DCIM firmware upgrade
- Torque all electrical connections
- Issue annual O&M report
29.5 Emergency Response
Mains outage:
1. UPS auto-switches to battery mode, DCIM alarms
2. Confirm diesel generator auto-starts (if present)
3. If mains not restored in 30 minutes, orderly shut down non-critical business
4. On mains restore, confirm UPS returns to normal mode, battery returns to float
AC failure:
1. DCIM alarms; in-row N+1 auto-fills
2. On-site check failed AC (power, refrigerant, fans)
3. If multiple AC fail simultaneously, start backup ventilation and migrate non-critical business
4. Contact KITOZER service for 4-hour response
Battery bulging:
1. DCIM battery internal resistance alarm
2. On-site inspect bulging battery, replace immediately
3. After replacement, run capacity test
Water leak:
1. Leak rope alarm, on-site locate
2. Close corresponding AC/water valve
3. Clean water, dry before inspecting equipment
4. Repair leak and restore
Chapter 30. Supply Chain and Lead Time
30.1 Standard Product Lead Time
| Category | Standard Model | Lead Time |
|---|---|---|
| 42U rack | MDC600 | 10–15 days |
| Containment components | Skylight/door/light strip | 15–20 days |
| In-row AC | CRAC50 | 25–35 days |
| Modular UPS | UP500 | 30–45 days |
| VRLA battery | BAT250 | 15–20 days |
| LFP battery pack | LFP-51.2V | 25–35 days |
| Environmental controller | CC01 | 7–10 days |
| PDU | PDU63A | 7–10 days |
30.2 Total Project Cycle
- MicroDC-10/20 standard air: 45–60 days to delivery after contract
- MicroDC-50/100: 60–90 days
- Liquid-cooled / containerized: 90–120 days
- On-site installation: 15–30 days (by scale)
- Commissioning and acceptance: 7–15 days
30.3 Packaging and Transport
- Domestic: truck LTL or FTL, wooden pallet
- Export: fumigated pallet (IPPC mark), container sea freight
- Precision equipment (UPS, AC): shock packaging, tilt indicator
- On-site handling: forklift or pallet jack; battery anti-tip
Chapter 31. Environment and Carbon Footprint
31.1 Data Center Carbon Emissions
Data center carbon emissions = annual kWh × grid emission factor. China’s grid factor is ~0.5703 kgCO₂/kWh. A 100 kW IT load at PUE 1.5 consumes 100×24×365×1.5 = 1,314,000 kWh/year, emitting ~749 tons CO₂/year.
31.2 Emission Reduction Measures
- Lower PUE (each 0.1 reduction saves ~50 tons CO₂/year)
- Use green power (PV, wind, green power trading)
- Waste heat recovery (data center heat for district heating)
- Battery recycling (VRLA lead recycling 98%; LFP lithium recycling improving)
- Modular design extends equipment life
31.3 KITOZER Environmental Commitment
- Recyclable packaging
- RoHS, REACH compliant
- EPEAT rating support
- Battery trade-in recycling program
Chapter 32. Edge Computing and 5G MEC
5G MEC (Multi-access Edge Computing) sinks cloud to the cell site, requiring data centers near base stations: small nodes (10–50 kW), unmanned, fast deployment. KITOZER-MicroDC-10 and outdoor integrated cabinets are ideal for MEC nodes.
MEC node characteristics:
– Single node IT load 10–50 kW
– 4–12 racks
– Site in base station rooms, building telecom rooms, outdoor cabinets
– Unmanned, remote O&M
– High reliability (99.99%)
– Fast deployment (within 2 weeks)
KITOZER MEC solution: MicroDC-10 + LFP batteries + remote environmental + 4G/5G backhaul monitoring.
Chapter 33. AI Compute Rooms
Large-model training and inference impose new requirements on data centers:
Power density surge: single AI training server (8×GPU) is 10–15 kW; a rack (8–10 servers) is 80–150 kW, far exceeding the air-cooled limit.
Cooling evolution:
– AI inference (20–30 kW/rack): air cooling + RDHx
– AI training (50–100 kW/rack): cold-plate liquid cooling
– LLM training (100 kW+/rack): immersion liquid cooling
Power distribution changes:
– Evolution from 220V/380V AC to 480V DC (HVDC)
– LFP batteries fully replace VRLA (high power density)
– Increased diesel generator configuration (AI rooms have low PUE but high total power)
KITOZER AI room solution: MicroDC-Liquid cold-plate version, with CDU, manifold, QD quick disconnects, PUE 1.1–1.2, supporting 50–100 kW per rack.
Chapter 34. Future Trends
34.1 From Air to Full Liquid Cooling
In the next 5 years, new high-density data centers will be predominantly liquid-cooled. Cold-plate cooling becomes standard for AI training; immersion expands in supercomputing. KITOZER has already established the MicroDC-Liquid product line.
34.2 From Lithium to Solid-State
Solid-state batteries are expected to commercialize around 2030, doubling energy density, improving safety, and extending life, replacing current LFP.
34.3 From Reactive to AI-predictive O&M
DCIM will adopt large models to automatically analyze failure modes, predict equipment life, and recommend expansion. O&M evolves from “firefighting” to “prevention.”
34.4 From Data Centers to Compute Networks
Modular data centers become edge nodes of a compute network, orchestrated with central cloud. KITOZER-MicroDC will be deployed as standardized compute units across China’s counties.
34.5 Carbon Neutrality and Green Power
Future data centers require 100% green power, paired with PV, wind, and storage. Modular data centers combine with distributed energy to form a “PV-storage-flexible” new power system.
Chapter 35. Extended FAQ (30 Deep Questions)
Q31: What is the relationship between modular data centers and containerized data centers?
A: Both are prefabricated, but different in form. A modular data center is an “indoor micro-module” that must sit inside a building (room, factory, warehouse) with no outer shell. A containerized data center packs the entire micro-module into a 20/40-foot container with its own shell, insulation, waterproofing, and wind/sand protection, placed outdoors. The technical core (racks, AC, UPS, monitoring) is identical; the difference is the shell and deployment scenario. KITOZER offers both MicroDC indoor and MicroDC-Container versions.
Q32: Is entering the cold aisle inconvenient after containment?
A: No. End doors have automatic sliding or face access; people walk up, the door opens by sensor, and closes behind them. Access logs entries and pairs with cameras. RGB strips light the aisle; the lintel display shows temperature and load, so operators see status from outside and spend minimal time inside.
Q33: Should UPS ECO mode be enabled?
A: ECO mode feeds load directly through bypass at 99% efficiency, saving 3–5% vs double-conversion. But on mains abnormality, switching back to double-conversion takes a few milliseconds, negligible for server power supplies (which have 10–20 ms ride-through). Recommend ECO in areas with good mains (tier-1 cities); keep double-conversion in areas with unstable grid (mines, rural).
Q34: VRLA vs LFP, how to choose?
A: Three factors: (1) Runtime—5–15 min short backup, LFP’s small footprint wins; >15 min, VRLA cost wins. (2) Site—upper floors or tight space choose LFP; ground-floor tight budget choose VRLA. (3) Lifecycle cost—LFP costs 1.5–2x upfront but lasts 3–4x longer and is maintenance-free, so 5–8 year lifecycle cost is lower. KITOZER offers both.
Q35: How is PUE measured?
A: PUE = total energy / IT energy. Install a main meter at the mains incoming (total energy) and an IT meter at UPS output (IT energy); the ratio is PUE. KITOZER-DCIM automatically collects both meters, computes real-time PUE, and generates daily/weekly/monthly reports. Note: PUE must be averaged over long periods; instantaneous PUE is not meaningful.
Q36: Why is my measured PUE higher than design?
A: Common causes: (1) Leaky containment with doors propped open—measured PUE 0.2–0.3 higher; (2) AC supply set too low (e.g., 10°C) while ASHRAE allows up to 27°C; (3) No free cooling, compressors run year-round; (4) Low UPS efficiency (old line-frequency 92% vs new modular 96%); (5) Lighting/maintenance/outlet loads not separately metered but excluded from the IT denominator. Investigate each.
Q37: Why is in-row AC more expensive than room-level?
A: In-row AC includes full inverter compressor, EC variable fans, group control, 7-inch touchscreen, RS485/BACnet, N+1 fans, wet-bulb humidification, PTC reheat, 6 kV surge—all standard on in-row but optional on room-level. Room-level units are cheaper but require a raised floor, dedicated AC room, and central chiller; total investment is not necessarily lower. Moreover, in-row AC is more efficient, and 3–5 years of saved electricity recovers the premium.
Q38: How many temperature-humidity sensors per data center?
A: Rule of thumb: at least 2 per cold-aisle row (each end), 1 per hot-aisle row, 1 in UPS room, 1 in battery room, 1 in gas-cylinder room. Accuracy ±0.5°C, ±3% RH. Sensors connect via RS485 to the CC01 controller.
Q39: Smart PDU vs ordinary PDU?
A: Ordinary PDU only supplies power (outlets + breaker), no monitoring. Smart PDU monitors per-branch current, voltage, power, energy, and can remotely switch each outlet via TCP/IP to DCIM. Smart PDUs cost 2–3x more but enable: (1) finding overloaded branches; (2) remote reboot of hung servers; (3) per-rack energy metering for chargeback; (4) DCIM capacity management.
Q40: How many access control levels?
A: Three: (1) Data hall main door—face + card + log, preventing unauthorized entry; (2) Cold aisle end door—face + log; (3) Important equipment cabinet—key or electronic lock, e.g., UPS, distribution, battery cabinet. Access control integrates with fire, unlocking on alarm.
Q41: How does gas suppression discharge with cold-aisle containment?
A: Nozzles are mounted at the aisle top or above racks. On fire: (1) VESDA dual-stage confirms; (2) AC shuts down, fire dampers close; (3) flip skylights open for smoke exhaust (but close for discharge to maintain concentration); (4) 30-second evacuation delay; (5) gas cylinders discharge, filling aisle and racks; (6) 10-minute hold time to prevent re-ignition.
Q42: Why is water leak dangerous in a data center?
A: Leaks: (1) corrode floor and rack bases; (2) short power cables causing trips; (3) soak server internals damaging motherboards; (4) electric shock. Sources: AC condensate pipes, chilled water (if present), VRLA acid, fire water (if mis-piped), roof rain. Leak rope must run along all water paths, connected to environmental alarms.
Q43: Can UPS power modules of different capacities be mixed?
A: Usually no. All modules in one host must be same model and capacity. Parallel load sharing requires identical modules; mismatched modules cause small-module overload. KITOZER modules are all 50 kVA; expansion inserts identical modules.
Q44: Does the data center need a backup generator?
A: Depends on mains reliability. If the area has dual-feed substations with <1 hour annual outage, 15–30 min UPS suffices. If in remote areas with typhoon/ice causing multi-hour outages, a diesel generator is required. KITOZER supplies 100–2,000 kW silent diesel generators.
Q45: How to maintain a diesel generator?
A: (1) Weekly no-load 30-minute test; (2) Monthly 2-hour load test; (3) Quarterly oil and filter change; (4) Annual 4-hour load test; (5) Day tank above 80%; (6) Battery monthly charging. The generator cannot replace UPS—it must start within the UPS ride-through (15–30 min).
Q46: Can a micro-module go in a basement?
A: Yes, but: (1) Waterproof—basements flood in rain; raise rack bases 200 mm, add leak rope; (2) Ventilation—no natural ventilation, AC condenser must use cooling water or pipe to outdoors; (3) Transport—elevator dimensions must fit large equipment. KITOZER has basement project experience.
Q47: Can a micro-module go on a rooftop?
A: Rooftop: (1) Waterproofing—roof waterproofing must be reliable, rain leak risk; (2) Load—rooftop floor load is usually lower, choose LFP batteries to reduce weight; (3) Sun—rooftop summer heat, shade the AC condenser; (4) Lifting—equipment must be lifted, plan crane or elevator.
Q48: Why do some UPS outputs need an isolation transformer?
A: Isolation transformer separates UPS output from mains bypass, preventing neutral harmonics and common-mode noise from reaching the load. KITOZER modular UPS offers optional output isolation transformer, suitable for medical devices and precision instruments.
Q49: What is HVDC?
A: High Voltage Direct Current rectifies mains to 240V/336V/480V DC directly feeding server power supplies. Compared with traditional UPS (AC→DC→AC), HVDC eliminates the inverter stage, achieving 97–98% efficiency and higher reliability. Telecom DC power has been used for decades. KITOZER offers HVDC power solutions.
Q50: Does micro-module construction require permits?
A: By scale and site: (1) Sub-10-rack in a leased telecom room usually needs no separate permit, but notify the property; (2) Self-built 50+ rack independent room requires fire permit, environmental assessment (if diesel generator), and power supply application. KITOZER provides permit consulting and support.
Q51: What room temperature is most energy-efficient?
A: ASHRAE recommends 18–27°C server intake. The closer to 27°C, the more energy-efficient (lower AC load). KITOZER defaults to 24°C, adjustable to 25–27°C; each 1°C raises PUE by ~0.02. But monitor server intake closely; do not exceed 27°C.
Q52: Why is humidity controlled at 40–60%?
A: Too low (<40%) causes static electricity damaging semiconductors; too high (>60%) causes condensation and shorts. 40–60% is the ASHRAE comfort zone. Winter dryness needs humidification; summer humidity needs dehumidification. KITOZER-CRAC50 includes wet-bulb humidification and reheat dehumidification.
Q53: How does server dust affect data centers?
A: Dust clogs server fan filters, causing poor cooling and CPU throttling; accumulated dust absorbs moisture on boards causing shorts; dust also grows bacteria. Data center air cleanliness: particles >0.5 μm <17,600/L (ISO 14644 Class 8). AC pre-filter + medium filter, monthly replacement.
Q54: Why no windows in a data center?
A: (1) Windows leak cooling/heat, hurting PUE; (2) Window glass is not fire-rated; (3) Windows bring daylight not needed by servers, and UV ages equipment; (4) Windows are a security risk—peering or vandalism. Data halls should be windowless with artificial lighting.
Q55: Can monitoring still be seen during a power outage?
A: Environmental monitoring is itself UPS-powered, so it runs 15–30 minutes on battery. For longer, the monitoring host can connect to a battery or 4G camera with its own battery. KITOZER-CC01 has a backup battery maintaining 4 hours.
Q56: What certifications does KITOZER need for export?
A: (1) EU export: CE; (2) North America: UL; (3) Australia: RCM; (4) Brazil: INMETRO; (5) All exports require customs declaration, inspection, and certificate of origin. KITOZER has CE and ISO 9001/14001 and supports destination-country certification.
Q57: How to manage data center assets?
A: Traditional Excel logs are often inaccurate after changes. KITOZER-DCIM provides U-position mapping: visual display of each rack’s each U position with device, model, go-live, warranty, owner. Scan QR on rack or device change to auto-update. Integrates with CMDB.
Q58: Can micro-module equipment be remotely powered on/off?
A: Smart PDUs support per-outlet remote switching, enabling remote reboot of hung servers. AC, UPS, skylights, and access are all remotely controllable. But server power cycles should be done by IT admins via out-of-band management (iDRAC/ILO), not by cutting PDU power (which loses data).
Q59: Why preventive fire protection in data centers?
A: 90% of data center fires are electrical (short, overload, high contact resistance). Preventive fire protection includes: (1) VESDA early smoke detection; (2) Electrical fire monitoring (residual current); (3) Periodic infrared thermography; (4) Cable fireproof coating and penetration sealing. More important than post-fire suppression.
Q60: How does KITOZER quote?
A: Provide IT load, rack count, site conditions, and runtime; KITOZER returns a detailed design and line-item quote within 48 hours. The quote includes equipment list (model/qty/unit price/amount), installation, freight, taxes, lead time, and warranty. Customer confirms, contract signed, deposit paid, production scheduled.
Chapter 36. Glossary (Chinese-English Bilingual)
| Chinese | English | Abbr. | Definition |
|---|---|---|---|
| 模块化数据中心 | Modular Data Center | MDC | Factory-prefabricated, on-site-assembled data center |
| 微模块 | Micro Module | – | Standardized room functional unit |
| 冷通道封闭 | Cold Aisle Containment | CAC | Enclosing cold aisle to prevent mixing |
| 热通道封闭 | Hot Aisle Containment | HAC | Enclosing hot aisle |
| 列间空调 | In-row Air Conditioner | CRAH/CRAC | Precision AC between rack rows |
| 房间级空调 | Room-based Air Conditioner | CRAC | Central precision AC in AC room |
| 背板门换热 | Rear Door Heat eXchanger | RDHx | Coil on rack rear door |
| 冷板液冷 | Cold Plate Liquid Cooling | – | Metal cold plate on server CPU/GPU |
| 浸没式液冷 | Immersion Cooling | – | Server submerged in dielectric coolant |
| 冷量分配单元 | Coolant Distribution Unit | CDU | Liquid-cooling circulation and heat exchange unit |
| 不间断电源 | Uninterruptible Power Supply | UPS | Inverter backup on mains loss |
| 模块化UPS | Modular UPS | – | Hot-swap power modules |
| 双变换在线式 | Double Conversion Online | – | AC→DC→AC topology |
| 静态旁路开关 | Static Bypass Switch | SBS | Thyristor bypass transfer |
| 维修旁路 | Maintenance Bypass | – | Mechanical UPS isolation |
| 浪涌保护器 | Surge Protective Device | SPD | Lightning surge protection |
| 阀控密封铅酸电池 | Valve-Regulated Lead-Acid | VRLA | Maintenance-free lead-acid |
| 磷酸铁锂电池 | Lithium Iron Phosphate | LFP | LiFePO4 lithium battery |
| 电池管理系统 | Battery Management System | BMS | Lithium monitoring and protection |
| 数据中心基础设施管理 | Data Center Infrastructure Management | DCIM | Integrated room management software |
| 电源使用效率 | Power Usage Effectiveness | PUE | Total energy / IT energy |
| 水使用效率 | Water Usage Effectiveness | WUE | Cooling water / IT energy |
| 碳使用效率 | Carbon Usage Effectiveness | CUE | Carbon emissions / IT energy |
| 自动转换开关 | Automatic Transfer Switch | ATS | Dual-mains transfer |
| 静态转换开关 | Static Transfer Switch | STS | Millisecond power transfer |
| 智能母线 | Intelligent Busway | – | Prefabricated busbar distribution |
| 智能PDU | Power Distribution Unit | PDU | Metered/switched outlets |
| 吸气式烟雾探测 | Aspirating Smoke Detection | ASD/VESDA | Active early smoke sampling |
| 七氟丙烷 | HFC-227ea / FM-200 | – | Gas suppression agent |
| 全氟己酮 | Novec 1230 / FK-5-1-12 | – | Next-gen eco-friendly agent |
| 数字孪生 | Digital Twin | DT | 3D virtual room replica |
| 边缘计算 | Edge Computing | – | Compute near users |
| 多接入边缘计算 | Multi-access Edge Computing | MEC | 5G edge cloud |
| 高压直流 | High Voltage Direct Current | HVDC | 240V/336V/480V DC supply |
| 自然冷却 | Free Cooling | – | Use outdoor cooling |
| 直接膨胀 | Direct Expansion | DX | Direct refrigerant evaporation |
| 冷冻水 | Chilled Water | CW | Central chiller supply |
| 冷却塔 | Cooling Tower | – | Cooling water heat rejection |
| 干冷器 | Dry Cooler | – | Air-cooled condenser |
| 变频压缩机 | Inverter Compressor | – | Variable-speed compressor |
| 架空地板 | Raised Floor | – | Underfloor air supply |
| 联合接地 | Combined Grounding | – | Shared working/protective/lightning ground |
| 可并行维护 | Concurrently Maintainable | – | Maintenance without shutdown |
| 容错 | Fault Tolerant | FT | Any failure without interruption |
| 服务水平协议 | Service Level Agreement | SLA | Availability commitment |
Chapter 37. Room Layout and Spatial Planning
37.1 Space Allocation
Standard data center space allocation:
– Rack row area: 60–70%
– AC room (if room-level AC): 10–15%
– UPS and battery room: 10–15%
– Cable trays and aisles: 5–10%
– Control room and O&M office: 5–10%
Micro-modules integrate AC and UPS into rack rows, saving the AC and UPS rooms; the same floor area fits 30% more racks.
37.2 Rack Row Layout
Double-row face-to-face (cold aisle between rows):
Single-row (one side against wall, cold aisle outside):
Double-row has higher cold-air utilization, mainstream; single-row saves space, for edge nodes.
37.3 Aisle Width
- Cold aisle width: 1,200–1,500 mm (people and equipment)
- Hot aisle width: 1,000–1,200 mm (maintenance)
- Main aisle: ≥1,500 mm (equipment move)
37.4 Ceiling and Floor
- Clear ceiling height: ≥2.6 m (micro-module), recommended 3.0 m+
- Raised floor height: 300–500 mm (underfloor air); micro-module may omit raised floor
- Suspended ceiling: 300–600 mm (overhead air/fire piping)
Chapter 38. Electrical Calculation Examples
38.1 Load Calculation
Project IT load 200 kW, power factor 0.9, diversity factor 0.9.
– Apparent power = 200 / 0.9 = 222 kVA
– Calculated load = 222 × 0.9 = 200 kVA
– UPS selection: 200 / 0.8 = 250 kVA; choose 300 kVA modular UPS (6×50 kVA modules)
38.2 Battery Capacity Calculation
300 kVA UPS at 200 kW load, DC bus ±192V (384V), 30-minute runtime.
– Required battery energy = 200 kW × 0.5 h / 0.95 (inverter) = 105 kWh
– Total battery voltage 384V, required Ah = 105,000 Wh / 384V = 274 Ah
– Choose 12V100Ah, 32 cells per string (384V), 3 parallel strings = 96 cells
– Actual runtime = 3×100 Ah×384V×0.95 / 200 kW = 55 minutes (longer due to margin)
38.3 Cable Sizing
UPS output 300 kVA, current = 300,000 / (380×√3) = 456 A.
– Copper cable at 3 A/mm², cross-section = 456/3 = 152 mm²
– Choose 2× YJV-0.6/1kV-3×185+2×95 in parallel, each ~370 A, two = 740 A, 60% margin
38.4 Grounding Resistance
Combined grounding requires ≤1Ω.
– Vertical electrodes 50×50×5 mm angle steel, 2.5 m long, 20 units at 5 m spacing
– Horizontal flat iron 40×4 mm
– Theoretical resistance ~0.5–0.8Ω; measured below 0.8Ω
Chapter 39. Delivery Checklist and Acceptance Test Cases
39.1 Delivery Checklist
- [ ] Racks (quantity verified)
- [ ] Cold aisle skylights, end doors, access, strips, lintel display
- [ ] In-row AC (with outdoor condenser)
- [ ] UPS host and power modules
- [ ] Batteries and racks
- [ ] Distribution cabinets, PDUs, busway
- [ ] Environmental controller and sensors
- [ ] DCIM software and licenses
- [ ] Fire gas suppression
- [ ] As-built drawings (CAD electronic)
- [ ] Equipment certificates, manuals
- [ ] Test reports
- [ ] Training records
39.2 Acceptance Test Cases
| Test Item | Method | Pass Criteria |
|---|---|---|
| Rack verticality | Plumb line | ≤3 mm |
| Rack joining gap | Feeler gauge | ≤2 mm |
| Cold aisle temperature | 24-hour log | 22±2°C |
| UPS output voltage | Multimeter | 220V±3% |
| UPS output frequency | Frequency meter | 50Hz±0.5Hz |
| UPS transfer time | Oscilloscope | <5 ms |
| Battery runtime | Full-load discharge | Design ±10% |
| AC cooling capacity | Airflow × ΔT | ≥90% rated |
| Grounding resistance | Ground tester | ≤1Ω |
| Fire interlock | Simulate fire | All actions within 30 s |
| Access log | Card test | Accurate |
| Environmental alarm | Simulate leak | Alarm within 5 s |
| DCIM data | Compare to field | 100% accurate |
| 72-hour burn-in | Continuous run | No fault |
Chapter 40. Selection Decision Tree and Comparison Tables
40.1 Complete Selection Decision Tree
40.2 KITOZER vs Traditional Room Procurement
| Dimension | KITOZER-MicroDC | Traditional Room |
|---|---|---|
| Build cycle | 4–8 weeks | 6–12 months |
| PUE | 1.35–1.5 air | 1.8–2.2 |
| Per-rack density | 8–30 kW air | 2–6 kW |
| UPS efficiency | 96% (high-freq modular) | 92% (line-frequency) |
| Expansion | Online module add | Re-renovation |
| Monitoring | Unified DCIM | Multi-vendor patchwork |
| Investment | Medium (low 5-year TCO) | Low upfront (high 5-year TCO) |
| Delivery | Factory prefab + on-site assembly | On-site construction |
| Warranty | 3-year whole unit | Per-vendor warranty |
40.3 Cooling Comparison
| Method | Density | Pros | Cons | Investment |
|---|---|---|---|---|
| Room CRAC | <6 kW | Cheap, simple | High PUE, low density | Low |
| In-row | 8–25 kW | Efficient, N+1 | Needs containment | Medium |
| RDHx | 20–60 kW | High density, low air resistance | Needs chilled water | High |
| Cold-plate liquid | 20–100 kW | PUE 1.1–1.2 | Needs CDU, piping | High |
| Immersion | 50–200 kW | Extreme density | Complex maintenance | Very high |
40.4 UPS Comparison
| Method | Efficiency | Redundancy | Investment | Use Case |
|---|---|---|---|---|
| Line-frequency UPS | 92% | N+1 | Low | Legacy, budget-tight |
| High-freq modular UPS | 96% | N+1 online | Medium | Mainstream new builds |
| 2N dual-bus | 96% | 2N | High | Finance, large internet |
| HVDC | 97% | N+1 | Medium | Large carrier, hyperscaler |
| Flywheel | 98% | N+1 | High | Short-duration, high-frequency ride-through |
Chapter 41. Typical Application Industries
41.1 Finance
Banks, securities, and insurance data centers require Tier A (99.999%), 2N redundancy, dual mains + diesel generator. KITOZER-MicroDC-50/100 designed to Tier A with 2N UPS, N+1 AC, VESDA + gas suppression.
41.2 Government and Public Services
Government cloud, smart cities, public security, and tax data centers require Tier B+ and cybersecurity Class 3. KITOZER-MicroDC-20/50 pairs with domestic-CPU servers (Xinchuang) and DCIM compliance modules.
41.3 Internet and Cloud
Elastic internet workloads require fast deployment and on-demand expansion. KITOZER-MicroDC-Container deploys in 2 weeks, ideal for POPs and edge nodes.
41.4 Manufacturing and Industrial Internet
Factory MES, SCADA, and digital-twin rooms near production lines require vibration and dust resistance. KITOZER-MicroDC-10 compact fits next-to-line control rooms.
41.5 Healthcare and Life Sciences
Hospital HIS, PACS, and EMR require 7×24 uninterrupted. KITOZER-MicroDC-20 includes medical-grade isolation transformer and UPS, PUE 1.5.
41.6 Education and Research
University data centers, supercomputing, and AI labs require high-density GPU compute. KITOZER-MicroDC-Liquid supports 50–100 kW per rack.
41.7 Energy and Power
Grid dispatch, PV/storage monitoring, and wind SCADA require unmanned and wide-temperature operation. KITOZER combines outdoor integrated cabinets with micro-modules.
41.8 Transportation and Logistics
Airports, ports, high-speed rail stations, and logistics parks require high reliability and integration with business systems. KITOZER-MicroDC pairs with weak-current system integration.
Chapter 42. Maintenance Calendar and Training Outline
42.1 Annual Maintenance Calendar
| Month | Activity |
|---|---|
| Jan | Winter AC heating check, battery temperature check |
| Feb | UPS power module deep inspection |
| Mar | Full fire interlock drill |
| Apr | Spring AC filter replacement, free-cooling test |
| May | Grounding resistance test |
| Jun | Rainy-season leak detection, lightning protection check |
| Jul | Summer AC full-load test |
| Aug | Battery capacity test (20% sample annually) |
| Sep | DCIM platform upgrade |
| Oct | Autumn AC filter replacement |
| Nov | Generator load test |
| Dec | Annual summary, next-year budget |
42.2 O&M Training Outline
Day 1: Theory
– Modular data center principles
– Cold-aisle containment and row-level cooling
– UPS and battery principles
– Fire and security
Day 2: Hands-on
– Equipment on/off
– Alarm handling
– Filter replacement
– Battery replacement
– Emergency drill
Day 3: Assessment
– Written (theory)
– Practical (alarm handling, battery swap)
– Training certificate issued
Chapter 43. Eco-friendly Packaging and Recycling
43.1 Packaging Materials
- Cardboard: FSC-certified recycled paper
- Wooden pallets: IPPC-fumigated, reusable
- Foam: recyclable EPE
- Plastic bags: biodegradable
43.2 Equipment Recycling
- Old UPS: trade-in credit
- Old batteries: professional recycling (98% lead recovery)
- Old racks: recycled and reused
- KITOZER offers 5–10-year extended warranty and one-stop recycling.
Chapter 44. Handling Common Customer Questions
Customer: How do you compare to Huawei, Vertiv, Schneider?
A: Tier-1 brands have strong performance but higher prices and longer lead times (3–6 months). KITOZER offers better cost-performance, faster delivery (4–8 weeks), and 4-hour local service. Ideal for cost-sensitive, fast-deployment mid-size projects.
Customer: Can we pilot a small unit first?
A: KITOZER offers the MicroDC-10 standard unit for display and trial; customers can deploy at small scale first, then expand.
Customer: Payment terms?
A: Standard 3-6-1: 30% advance, 60% on delivery acceptance, 10% retention (paid after 1 year). Large projects may negotiate staged payments.
Customer: Service response?
A: 4-hour phone response, 24-hour on-site (within Guangdong), 48-hour on-site (other provinces). 7×24 service hotline.
Chapter 45. Technical White Paper Appendix
45.1 Thermodynamics Formulas
Sensible heat: Q = m × cp × ΔT
– Q: heat (W), m: mass airflow (kg/s), cp: specific heat of air (1.005 kJ/kg·K), ΔT: temperature difference (K)
Air density ρ=1.2 kg/m³, airflow V (m³/h):
Q(W) = V(m³/h) / 3600 × 1.2 × 1005 × ΔT(K) ≈ V × 0.335 × ΔT
Example: 50 kW cooling, ΔT=15 K, required V = 50,000 / (0.335×15) ≈ 9,960 m³/h.
45.2 Battery Runtime Formula
t(h) = V × Ah × DoD × η / P
– V: total battery voltage (V), Ah: capacity, DoD: depth of discharge (0.8 VRLA, 0.9 LFP), η: inverter efficiency (0.95), P: load (W)
Example: 384V, 100Ah, 20 kW load:
t = 384 × 100 × 0.8 × 0.95 / 20,000 = 1.46 h = 88 minutes.
45.3 PUE Optimization Path
| Measure | PUE Reduction | Investment |
|---|---|---|
| Cold aisle containment | 0.2–0.3 | Low |
| In-row cooling | 0.15–0.25 | Medium |
| Inverter AC | 0.05–0.1 | Medium |
| Free cooling | 0.15–0.25 | Medium |
| Raise supply temperature | 0.05–0.1 | None |
| Modular UPS | 0.05–0.1 | Medium |
| Liquid cooling | 0.2–0.3 | High |
| HVDC | 0.03–0.05 | Medium |
Combined, PUE can drop from 2.0 to 1.2–1.3.
45.4 Rack Power Density Evolution
| Era | Per-rack Power | Typical Business | Cooling |
|---|---|---|---|
| 1990s | 1–2 kW | Rack servers | Room CRAC |
| 2000s | 3–5 kW | Blade servers | Hot/cold aisle + room |
| 2010s | 6–12 kW | Virtualization | In-row + containment |
| 2020s | 15–30 kW | AI inference | In-row + RDHx |
| 2025+ | 50–100 kW | AI training | Cold-plate liquid |
| 2030+ | 100–200 kW | LLM | Immersion |
Chapter 46. 100-Item Data Center Construction Checklist
46.1 Design Phase (30 items)
- IT load list confirmed
- 3-year expansion forecast assessed
- Rack count and layout drawn
- Power density specified
- UPS capacity and redundancy selected
- Battery runtime determined
- AC capacity and redundancy selected
- Cold/hot aisle approach chosen
- Mains incoming capacity confirmed
- Dual-mains need assessed
- Diesel generator need assessed
- Building chilled water availability confirmed
- Site area and ceiling measured
- Floor load calculated
- Grounding system designed
- Lightning protection zones designed
- Fire system designed (gas + VESDA)
- Security designed (access + CCTV)
- Environmental monitoring points laid out
- DCIM features confirmed
- Structured cabling designed
- Busway/PDU approach chosen
- Lighting designed
- Signage designed
- Seismic design checked
- Temperature-humidity range specified
- Noise requirements specified
- Anti-corrosion specified (coastal/chemical)
- Export/customs requirements confirmed
- Budget and schedule confirmed
46.2 Construction Phase (40 items)
- Floor leveling complete
- Grounding copper busbar installed
- Rack bases fixed
- Rack verticality compliant
- Rack joining gap compliant
- Doors open/close smoothly
- Side panels sealed
- Top/bottom brush strips installed
- Vertical cable managers installed
- PDU brackets installed
- Grounding bars connected
- Skylight framing leveled
- Flip skylight magnetic latch wired
- Skylight gaskets compressed
- Automatic sliding door installed
- Access terminal installed
- Lintel display installed
- RGB strips installed
- M-shaped cable trough strong/weak separation
- In-row AC positioned
- Refrigerant piping welded
- Condensate piping clear
- Vacuum evacuation complete
- Refrigerant charged
- UPS host positioned
- Input/output cables crimped
- Battery racks assembled
- Batteries installed
- Battery inter-cell links torqued
- Terminal covers installed
- Battery switch box wired
- Distribution cabinets installed
- PDUs connected to racks
- Sensors (temp-humidity) installed
- Leak rope along water paths
- Smoke/VESDA sampling pipes installed
- Environmental controller wired
- Fire cylinder room installed
- Nozzles positioned
- Firestopping complete
46.3 Commissioning and Acceptance (30 items)
- Single-equipment power-on test
- UPS output voltage/frequency compliant
- UPS transfer time test
- Battery discharge test
- AC cooling capacity test
- AC group control test
- Cold aisle temperature uniformity test
- Access card log test
- Sliding door sensor test
- RGB strip color switching
- Lintel display data
- Leak alarm test
- Smoke alarm test
- Fire interlock skylight flip test
- Fire interlock access unlock
- Fire discharge simulation
- DCIM data collection accuracy
- Alarm SMS/email push
- Grounding resistance test
- Insulation resistance test
- SPD test
- 72-hour continuous burn-in
- PUE measured log
- As-built drawings
- Equipment certificates collected
- Test reports issued
- Operation manual delivered
- O&M training completed
- Customer sign-off
- Warranty starts
Chapter 47. Model Naming Convention
KITOZER-MicroDC naming:
KITOZER-MicroDC-[Rack Count]-[Cooling]-[UPS Capacity]-[Version]
Examples:
– KITOZER-MicroDC-20-Air-200kVA-V2: 20-rack air-cooled 200 kVA version 2
– KITOZER-MicroDC-50-Liquid-500kVA-V1: 50-rack liquid-cooled 500 kVA version 1
– KITOZER-MicroDC-Container-40: 40-foot containerized
Sub-product naming:
– KITOZER-MDC600-2026: 600 mm wide 42U rack, 2026 model
– KITOZER-CRAC50-2026: 50 kW in-row AC, 2026 model
– KITOZER-UP500-2026: 500 kVA modular UPS, 2026 model
– KITOZER-UPM50-2026: 50 kVA power module, 2026 model
– KITOZER-BAT250-2026: 12V250Ah battery, 2026 model
– KITOZER-CC01-2026: Dual-row environmental controller, 2026 model
– KITOZER-PDU63A-2026: 63A smart PDU, 2026 model
Chapter 48. Generic Project Case Data (Desensitized)
48.1 Case 1: Bank Branch Data Hall
- Scale: MicroDC-20, 20 racks, IT load 80 kW
- UPS: 200 kVA modular (4×50 kVA, N+1)
- Batteries: VRLA 12V100Ah × 80 cells, 30-minute runtime
- AC: 4×25 kW in-row
- Measured PUE: 1.48
- Build cycle: 55 days
- Value: replaced a 100 m² renovated room, 35% energy saving, online expansion
48.2 Case 2: AI Inference Center
- Scale: MicroDC-50, 12 high-density + 8 reserved, IT load 200 kW
- UPS: 300 kVA modular (6×50 kVA, N+1)
- Batteries: LFP 51.2V200Ah × 20 packs, 15-minute runtime
- AC: 8×50 kW in-row + RDHx rear doors
- Measured PUE: 1.32
- Value: LFP batteries save 70% footprint vs VRLA, suiting second-floor load limits
48.3 Case 3: Telecom Edge Node
- Scale: MicroDC-10, 8 racks, IT load 30 kW
- UPS: 60 kVA modular (2×30 kVA + 1 redundant)
- Batteries: LFP rack-mounted, 10-minute runtime
- AC: 2×25 kW in-row
- Deployment: building telecom room, 25 m²
- Value: unmanned, remote monitoring, weekly inspection
Chapter 49. Extended FAQ Continued
Q61: Why does a data center need UPS? Isn’t ordinary power enough?
A: Mains voltage fluctuates, has momentary interruptions and sags, and carries harmonic noise. Server power supplies tolerate brief fluctuations, but UPS switches to battery at 0 ms on mains loss, preventing abnormal shutdown that causes data loss and hardware damage. For finance, healthcare, and industrial control, one outage can cost millions; UPS is essential insurance.
Q62: Modular UPS vs traditional tower UPS?
A: Traditional tower UPS is a single large chassis with fixed power; on failure, the whole unit stops for service. Modular UPS consists of multiple 4U hot-swap power modules; a failed module is pulled and replaced while others keep running. Expansion inserts new modules without replacing the host; initial investment can be phased with business growth.
Q63: What is UPS parallel operation? Why parallel?
A: Multiple UPS hosts connected by a parallel bus share the load. Reasons: (1) expansion—when single-unit capacity is insufficient; (2) redundancy—N+1 parallel, one fails, others carry; (3) maintainability—one down for service, others keep running. KITOZER modular UPS supports up to 4 units, with circulating current <2%.
Q64: Why dual mains?
A: Single mains suffers outages from line maintenance, equipment failure, or lightning trips. Dual mains comes from different substations and routes; ATS switches to the other on failure within <100 ms, servers unaffected. Tier A requires dual mains.
Q65: How long does a diesel generator take to start?
A: Automatic start ≤15 seconds. Total time from mains loss to stable generator supply is 15–30 seconds, bridged by UPS batteries. The generator carries full load after synchronizing until mains restoration.
Q66: How long should batteries last? Why do some fail in 2 years?
A: VRLA design life is 10–12 years at 25°C float; actual 3–5 years. Early failure causes: (1) excessive battery-room temperature (life halves per 10°C rise); (2) over-voltage float causing water loss; (3) long-term float without discharge causing plate sulfation; (4) rising internal resistance undetected. KITOZER recommends full-capacity discharge every 3 years.
Q67: Why is LFP more expensive than VRLA?
A: LFP upfront is 1.5–2x VRLA because: (1) BMS cost; (2) high cell consistency requirements; (3) complex safety design. But LFP lasts 6,000 cycles (vs 1,200 for VRLA), is maintenance-free for 10 years, and has lower lifecycle cost.
Q68: Why environmental monitoring?
A: Unattended rooms without monitoring miss leaks, overheating, and battery swelling, letting small issues grow into major failures. Environmental monitoring 24×7 collects temp-humidity, leak, smoke, power, and access data, alarming by SMS/phone on anomaly; operators see room status on their phone.
Q69: DCIM vs environmental monitoring?
A: Environmental monitoring only tracks environmental variables (temp, leak, smoke, power), not IT assets. DCIM adds IT assets (per-rack per-U-position equipment), capacity management (remaining U-position, power, cooling), energy analytics, and digital twin on top of environmental. DCIM is the upgrade.
Q70: How does air circulate after cold-aisle containment?
A: In-row AC draws cold air from the cold aisle, cools it, blows horizontally to server intakes; servers exhaust hot air to the hot aisle, which returns to the AC. A closed loop. Containment prevents cold air dilution, maximizing AC efficiency.
Q71: Why use a raised floor?
A: The raised floor acts as a supply plenum; cold air reaches rack intakes through perforated tiles. Pros: hidden cabling, uniform supply; cons: ceiling height consumed, dust hard to clean. In the micro-module era, in-row AC blows horizontally directly, no raised floor needed, saving height and cost.
Q72: Data center AC vs residential AC?
A: Residential AC cycles on/off at setpoint with ±2°C accuracy; data center precision AC runs 365 days continuously at ±1°C, with humidification, dehumidification, reheat, and inverter, suited to 24-hour high load. Residential AC fails within 3 months of continuous use and cannot serve a room.
Q73: What is PUE? How calculated?
A: PUE = total DC energy / IT equipment energy. E.g., total 1.5M kWh, IT 1M kWh, PUE = 1.5. Closer to 1 is more efficient. Traditional rooms 1.8–2.2; micro-modules 1.35–1.5; liquid-cooled 1.1–1.25.
Q74: Why water leak detection?
A: Leak sources: AC condensate, chilled water pipes, battery acid, roof rain. Leaks corrode floors, short circuits, and damage equipment. Leak rope runs along water paths, connected to environmental systems, alarming immediately on detection.
Q75: Why gas suppression instead of sprinklers?
A: Water sprinklers damage electronic equipment, causing secondary loss. Gas suppression (HFC-227ea, IG541, Novec 1230) discharges without residue and does not damage equipment, suited to rooms. Gas suppression interlocks with AC, fire dampers, and access, auto-discharging on alarm.
Q76: What is VESDA?
A: VESDA is aspirating early smoke detection; sampling pipes actively draw air, laser scattering detects very early smoke with 1,000× sensitivity vs point detectors, warning 30–60 minutes before visible smoke. Recommended for data halls.
Q77: Why lightning protection and grounding?
A: Lightning surge voltage can reach tens of thousands of volts, invading equipment through power lines. SPD diverts surge at each incoming level. Combined grounding resistance ≤1Ω ensures fast dissipation. KITOZER in-row AC and UPS incoming include standard 6 kV SPD.
Q78: Why busbar instead of cables?
A: High current (hundreds of amps) with cables is expensive, hard to route, and poorly cooled. Copper busbar carries high current, dissipates heat, and scales easily. Intelligent busway runs along rack rows; each rack position plugs a tap-off box, expansion is zero-construction. KITOZER offers optional busway.
Q79: What is a smart PDU?
A: A smart PDU is a rack outlet strip with monitoring and remote control. It monitors per-branch current, voltage, power, and energy; remotely switches each outlet; and connects to DCIM via TCP/IP. Compared with ordinary PDU (power only, no monitoring), smart PDU enables refined energy management.
Q80: Why equipotential bonding?
A: Potential differences between metal equipment cause ground loops and signal interference. Equipotential bonding connects all racks, cable trays, floors, and equipment enclosures to the same grounding busbar via copper tape, eliminating potential differences and ensuring personnel and equipment safety.
Q81: Why is micro-module build cycle short?
A: Traditional room on-site renovation + MEP takes 6–12 months. Micro-modules are factory-assembled (rack joining, AC pre-install, UPS testing, 72-hour burn-in); on-site work is assembly and power connection, taking 4–8 weeks. 80% of work is factory-completed, with little on-site wet work.
Q82: Can micro-modules expand? Does expansion require shutdown?
A: Yes, expansion. UPS power modules are hot-swappable—insert a new module without shutdown. New rack rows join beside the existing module, briefly affecting adjacent-row cold air—recommend off-peak. KITOZER micro-modules support online expansion.
Q83: Can micro-modules be relocated?
A: Yes. Containerized versions lift as a whole; indoor versions require disassembly. Relocation: shutdown → discharge → disassembly → transport → reassembly → commissioning. KITOZER engineers guide on site.
Q84: Why anti-corrosion?
A: Coastal salt spray, chemical gases, and acid rain corrode metal racks and electrical connections. Coastal sites choose 316 stainless; chemical sites choose anti-corrosion coating. KITOZER standard is 304 stainless; coastal/chemical can upgrade to 316.
Q85: How to control data center noise?
A: In-row AC noise is 75 dB(A); offices nearby need acoustic treatment. Measures: acoustic wool in walls between room and office, double-glazed windows, low-noise AC selection, dedicated AC room. Short-duration entry by operators is acceptable.
Q86: Why anti-static floor?
A: Anti-static floor surface resistance 10^6–10^9Ω, dissipating body static to avoid semiconductor damage. Floor pedestals are grounded. Micro-modules may skip raised air-supply floors but still need anti-static flooring or vinyl.
Q87: Lighting requirements?
A: Aisle average illumination ≥300 lx, emergency lighting ≥50 lx. KITOZER cold aisles include RGB LED strips—white for normal, red for alarm. Lamps interlock with fire: emergency lighting auto-on on alarm.
Q88: What is a 3D digital twin room?
A: 3D modeling recreates the room virtually, real-time mapping each rack’s temperature, power, and fan speed. Operators click any rack in the 3D scene to see details and historical curves. Supports expansion simulation: virtually add a rack, software auto-calculates impact on the temperature field and power.
Q89: AI compute rooms vs traditional rooms?
A: AI rooms have high power density (20–100 kW/rack vs 6–10 kW traditional), requiring liquid cooling; large power (MW per floor), requiring HVDC; LFP batteries (high power density); cold-plate/immersion cooling. KITOZER-MicroDC-Liquid is designed for AI rooms.
Q90: KITOZER warranty?
A: 3-year whole-unit warranty (racks, AC, UPS, environmental); 2-year battery (VRLA) / 3-year (LFP). Consumables (filters, gaskets) excluded. 5-year extended warranty available. 7×24 hotline, 4-hour phone response, 24-hour on-site (within Guangdong).
Chapter 50. Conclusion and Outlook
After more than two decades, modular data centers have evolved from a novelty to an industry standard. KITOZER-MicroDC, as a core product line of Guangzhou Laian Intelligent System Development Co., Ltd., is committed to providing fast, efficient, scalable, and reliable data center infrastructure for customers across industries.
Looking ahead, three trends are irreversible:
1. Liquid cooling: AI compute pushes per-rack density from 10 kW toward 100 kW; air cooling will gradually exit high-density scenarios, with cold-plate and immersion becoming mainstream.
2. Intelligence: DCIM will adopt large models, evolving from “alarm reporting” to “predictive O&M,” with early equipment fault warnings and automatic expansion recommendations.
3. Green: Under carbon-neutral goals, data center PUE will drop from 1.5 to 1.2, paired with PV, storage, and waste-heat recovery to form zero-carbon data centers.
KITOZER continues to invest in R&D, building next-generation green intelligent compute infrastructure with customers. Whether you are building new, expanding, or retrofitting, KITOZER delivers standardized solutions from 10 to 100 racks in air-cooled, liquid-cooled, and containerized versions.
Contact us now: Tel/WeChat +86 13922289957, +86 18520668845; WhatsApp +86 19068534140. Design and quote within 48 hours.
SEO 元数据汇总
中文站(lain.com.cn)
- Title: KITOZER模块化数据中心技术百科_微模块机房_冷通道封闭_列间空调_模块化UPS_液冷_KITOZER
- Meta Description: KITOZER模块化数据中心技术百科全书,系统讲解微模块机房定义与发展、冷通道封闭、列间精密空调、模块化UPS与蓄电池、动环监控,覆盖MicroDC 10/20/50/100柜风冷与液冷方案,详解PUE/制冷量/UPS容量/后备时间/功率密度,附选型指南、对比表、通用案例与30条FAQ。
- Focus Keyword: 模块化数据中心, 微模块机房, 冷通道封闭, 列间空调, 模块化UPS, 液冷数据中心, KITOZER
- URL slug: /modular-data-center-encyclopedia/
英文站(gdlain.com)
- Title: KITOZER Modular Data Center Encyclopedia | Micro Module, Cold Aisle Containment, In-row CRAH, Modular UPS
- Meta Description: KITOZER modular data center encyclopedia covers micro-module definition, cold-aisle containment, in-row cooling, modular UPS and batteries, DCIM, MicroDC 10/20/50/100 air and liquid-cooled solutions, PUE, cooling capacity, UPS sizing, runtime, rack density, selection guide, comparison, generic cases and 30 FAQs.
- Focus Keyword: modular data center, micro module data center, cold aisle containment, in-row CRAH, modular UPS, liquid cooling, KITOZER
- URL slug: /modular-data-center-encyclopedia/
配图建议
| 序号 | 中文描述 | 英文ALT |
|---|---|---|
| IMG-01 | KITOZER双排冷通道封闭微模块机房全景 | KITOZER dual-row cold aisle containment micro module data hall |
| IMG-02 | 42U网孔智慧机柜与M型走线槽 | KITOZER 42U perforated smart rack with M-shaped cable trough |
| IMG-03 | 50kW列间空调在机柜列间水平送风 | KITOZER 50kW in-row precision AC horizontal airflow |
| IMG-04 | 500kVA模块化UPS主机与50kVA功率模块 | KITOZER 500kVA modular UPS host with 50kVA power modules |
| IMG-05 | 12V250Ah VRLA电池组与四层电池架 | KITOZER 12V250Ah VRLA battery bank on four-tier rack |
| IMG-06 | 玻璃翻转天窗与门楣条形屏通道入口 | KITOZER glass flip skylight and lintel bar display aisle entrance |
| IMG-07 | 冷板液冷机柜与CDU冷量分配单元 | KITOZER cold-plate liquid-cooled rack with CDU |
| IMG-08 | 集装箱式数据中心整体外观 | KITOZER containerized data center exterior |
建议分类与标签
- 中文站分类: 数据中心 / 模块化机房 / 微模块整体方案
- 英文站分类: Data Center / Modular & Micro Module Solution
- 标签: 模块化数据中心, 微模块, 42U机柜, 冷通道封闭, 列间空调, 模块化UPS, 蓄电池, 液冷, PUE, modular data center, micro module, cold aisle containment, in-row CRAH, modular UPS, VRLA, LFP, liquid cooling, PUE