Post-Installation 20-Point Checklist Quick

  1. Rack level front-to-back and side-to-side.
  2. Rack bolted to floor or wall.
  3. All cage nuts installed, no missing screws.
  4. Equipment at correct U positions, rails aligned.
  5. Screws torqued to 2.5 Nm.
  6. Power cables in PDU, labeled both ends.
  7. Network cables in correct switch ports, labeled.
  8. Ground wire connected to earth point.
  9. Ground resistance under 1 ohm.
  10. Blanks fill empty U-slots.
  11. Cable management used properly.
  12. Cable ties secure, not over-tight.
  13. Fans spinning, no unusual noise.
  14. Temperature/humidity sensor installed and reading.
  15. UPS powered on, battery charging, self-test passed.
  16. Door closes and seals; lock works.
  17. All labels applied.
  18. Monitoring sees all devices (SNMP ping OK).
  19. Alert thresholds set.
  20. Documentation updated.