Post-Installation Rack Check: 20 Things to Verify Before Handover

Walk the Rack Before You Declare It Done

A fresh rack installation needs a final inspection. Run through this checklist before handing over to the customer.

Structure

  • [ ] Rack is level front-to-back and left-to-right.
  • [ ] Rack is anchored to the floor (if required).
  • [ ] Door opens, closes, locks smoothly.
  • [ ] Side panels are flush and latched.
  • [ ] All screws are tightened (no loose hardware).

Power

  • [ ] PDU input cable is rated for the load.
  • [ ] Ground wire connects rack to PE busbar.
  • [ ] No exposed copper or loose connections.
  • [ ] Breaker trips test: press test button.

Cooling

  • [ ] Fan tray runs (listen, feel airflow).
  • [ ] Blank panels fill all empty U positions.
  • [ ] Door perforation is not blocked by labels or stickers.

Cables

  • [ ] Patch cables are labeled at both ends.
  • [ ] Cables are bundled and secured (not hanging loose).
  • [ ] Data and power cables are separated.
  • [ ] No cable pinches in the door hinge.

Documentation

  • [ ] Rack drawing (layout, U positions, equipment list).
  • [ ] Cable schedule (port to port mapping).
  • [ ] IP address list for managed equipment.
  • [ ] Emergency contact sheet inside the door.