Rack Design for Data Center Cost per kW Quick Guide

  1. Build cost: $10k-$15k per kW IT load.
  2. Power cost: $50-$100 per kW/month.
  3. Cooling cost: $30-$60 per kW/month.
  4. Staff cost: $20-$40 per kW/month.
  5. Total: $100-$300 per kW/month OPEX.