KITOZER
KITOZER

Rack Grounding Bar Installation Quick Guide

  1. Mount: inside rack rear, near bottom.
  2. Material: copper bar, tin-plated.
  3. Bond: connect rack frame to bar with 16mm² wire.
  4. Devices: ground each equipment to bar.
  5. Earth: bar connects to building ground.

KITOZER / Guangzhou Laian Intelligent System Development Co., Ltd. – grounding bar installation. Call +86 13922289957 (WeChat) or +86 18520668845. WhatsApp +86 19068534140. Web: www.gdlain.com | www.lain.com.cn. Address: Chaotian Park, Zhongrun Industrial Zone, Shilou, Panyu, Guangzhou, China.

Shopping Cart