KITOZER
KITOZER

Rack Heater Quick Installation

  1. Mount heater at bottom of rack (warm air rises).
  2. Connect to thermostat/controller.
  3. Set thermostat 5C (anti-condensation) or 10C.
  4. Ensure thermal cutout wired correctly.
  5. Test: lower temp, verify heater turns on.

KITOZER / Guangzhou Laian Intelligent System Development Co., Ltd. – heater install. Call +86 13922289957 (WeChat) or +86 18520668845. WhatsApp +86 19068534140. Web: www.gdlain.com | www.lain.com.cn. Address: Chaotian Park, Zhongrun Industrial Zone, Shilou, Panyu, Guangzhou, China.

Shopping Cart