Rack Installation Acceptance: Sign-Off Checklist

Don’t Accept the Rack Until You Check

The installer says it’s done. Verify before you sign. Here’s the acceptance checklist.

Physical

  • [ ] Rack is level and anchored
  • [ ] Doors open/close smoothly, locks work
  • [ ] Side panels secure
  • [ ] Mounting rails at correct depth

Power and Ground

  • [ ] PDU installed and tested
  • [ ] Ground wire connected and tested
  • [ ] UPS (if included) on battery, self-test passed

Cooling and Monitoring

  • [ ] Fan tray installed and spinning
  • [ ] Blank panels in all unused U positions
  • [ ] Temperature/humidity sensor reading correctly
  • [ ] Alerts tested (email received)

Cables and Labels

  • [ ] Cable management installed
  • [ ] All cables labeled
  • [ ] U position numbers visible