ToggleServer Rack Installation Checklist
Use this checklist before you energize any new rack. It covers floor preparation, assembly, equipment loading, cabling, and final verification.
Before Delivery
- ☐ Measure doorways and corridors — can the rack fit through?
- ☐ Verify floor load rating (≥500kg/m²)
- ☐ Mark rack positions with tape (600×1100mm footprint)
- ☐ Plan cold aisle / hot aisle layout
- ☐ Confirm power circuits are labeled and tested
Assembly
- ☐ Attach leveling feet to bottom frame
- ☐ Stand the rack upright (two people minimum)
- ☐ Level front-to-back and left-to-right with spirit level
- ☐ Torque feet to 25N·m
- ☐ Install adjustable mounting rails at correct depth
- ☐ Install side panels and lock them
- ☐ Install front and rear doors, check hinge operation
Equipment Loading
- ☐ Mount heaviest gear (UPS, storage) at bottom
- ☐ Install servers and switches from bottom up
- ☐ Use rack rails/shelves rated for equipment weight
- ☐ Install blank panels in all unused U positions
- ☐ Leave 1U gap between high-power servers
Cabling and Power
- ☐ Route power cables left, data cables right
- ☐ Install vertical cable managers on both sides
- ☐ Label both ends of every cable
- ☐ Connect PDU to correct circuit (A/B feeds)
- ☐ Ground rack frame to building earth (≤4Ω)
Final Check
- ☐ Verify all screws are tight (check after 24 hours)
- ☐ Confirm door opens 120° without obstruction
- ☐ Test door lock and keep keys in secure location
- ☐ Install temperature/humidity sensor at rack mid-height
- ☐ Document rack inventory with U positions