KITOZER
KITOZER

Rack Installation Prep: Before You Start

Preparation Prevents Problems

Rushing into rack assembly causes mistakes. Spend 30 minutes preparing and the install goes smoothly.

Pre-Installation Checklist

  1. Unbox the rack. Check for damage during shipping. Verify all parts (rails, panels, screws, brackets).
  2. Read the assembly manual (yes, read it first).
  3. Gather tools: Phillips screwdriver, level, tape measure, drill (if wall-mount), socket set.
  4. Prepare the location: clean floor, mark position with tape, check ceiling height (rack + door swing).
  5. Verify floor can support the weight (full rack: 500-800kg).
  6. Plan cable routes: where does power enter? Where does network enter?
  7. Have two people (racks are heavy and awkward).
  8. Plan equipment placement: heaviest at bottom, lightest at top.

KITOZER / Guangzhou Laian Intelligent System Development Co., Ltd. – rack installation, prep. Call +86 13922289957 (WeChat) or +86 18520668845. WhatsApp +86 19068534140. Web: www.gdlain.com | www.lain.com.cn. Address: Chaotian Park, Zhongrun Industrial Zone, Shilou, Panyu, Guangzhou, China.

Shopping Cart